Report ill Brie.!
Thi5 report resp~nds to the Finance Committee's request of March
26, 1991 for additional information concerning the ·Palo Alto Fire
Department Fire Station Location Study~.
On further st'.ldy, staff has estimated that it will take approxi
mately five years from thG date of the first expense incurred
(1993-94) for expe.nditure savings to offset capital costs to
implement the recomm~nded proposaL After the relocations are paid
for, t~ere is an ongoing savings to the city of nine positions, or
over $60D~OCO per year. Staff recommends that Council direct staff
to develop a multi-jurisdictional Fire Station Consolidation Plan
with tbe officizls of Mour.tain Vie~, Los Altos and Los Altos Hills.
SackqrounlS
The "Palo Alto Fire Department Fire Station Location studyN (CMR
170:91, March 211 1991) found that service levels could be
maintained ~hile reducing ongoing expenditures by a combination of
relocating and consolidating fire stations with Los Altos and
Mountain view as contained i~ the Study's alternative number 4.
'r-he Finance. comr.;i ttee requested that staff investigate five areas:
L Actual potential locatioi1S for the proposed stations;
2. Improvement of response time to Greer Parki
CMR:533:91
1_ •
-.------.. ---~--.
3. Financial informativJl on cost of building new-stations;
4. Sample of elements to be cont~ined in joint po~ers authority
documents; and
5. Identify the timing and mechanist:l for implementing the
proposed relocation plan.
Staff further proposes tw'o 2dditional amend:;nepts to Alternative
Number Four. The first is to delay the relocation of the Alma
Street fir~ station to a site near the civic center because of lack
of cost savings. The second is to continue to operate the Hanover
Street fire station by reallocation of staff from eXisting
stations.
The amended alternative ~umber 4 proposes that Palo Alto build and
operate a consolidated Fire station (Number 9) with Los Altos by
moving a portion of the eXisting fire suppression resources
services from Hanover street to the proposed site on Arastradero
Road near Page Mill Road. The Hanover-Station wou.ld remain open
and serve as the Ernerger:cy Medical Services (paramedic) and
Hazardous Materials/Hesponse Center. In addition, Palo Alto's
Station Number 4 would be moved to the 800 block of Charleston Road
and consolidated W"ith Mountain VieW" 5 St'ation Number J. The
property curr.ently occupied by station Nurr.ber 4 'Wou.ld be sold.
Attachment One shows the locations of the existing and proposed
fire stations.
It.1.scussion
1. Identify potential sites for Fire Stations 4 and 9.
Staff has identified an area as a pctential site for Fire Station
Number 4 and a specific site in the 8GO blo~k of Charleston Road
has been used to calculate response tir..es. T!1e site is for sale,
but at the time this report ~as prepared, the owners ~ere negotiat
ing a possible sale.
As indicated earlier in this report~ the suppression services from
St.ation N'Wmber 2 would be relocated to staff the consolidated
Station Number 9 at a site on Arastradero Road in Palo Alto's 77-
acre parcel.
2. Improve respc1nse time from station Number 4. to Greer Park.
Response time calculat~ons from the Charleston location have been
analyzed and the service is improved for Palo Alto ~hen compared to
the studyts previous location at Middlefield and San Antonio Roads~
CMR:533:91 2
•
"
•
•
i
I
1
i
-
specifically, the area of Colorado street from Ross Road to West
Bayshore and Dry Creek sho",'s improved service time!3 from the BBO
block of Charleston Road. In adji tior., the Charleston location
provides better access to the Bayshore Fr~eway and the expanding
shoreline Industrial Park ar~a of Mountain Vie~.
3. Calculate the cost of al".d the nurr.!:ier of years it will take to
pay for relocating the fire stations.
Ii the consolidation of both fire stations with the respective
cities ~ere to take place, it would take approximately five years
tor the operational savings to pay for the investment required (see
Attachment Two). The savings would begin .,,'hen the stations are
consolidated. However, the five-year payoff period begins in 1953-
94 when the first capital expenditure is incurred. Several
assumptions and estimations were :rnac!e to arrive at this conclusion.
These are listed in Attachment Three. ~nenever there was a range
of figures available, the most ccnservative estimates were made,
i.e., the highest costs for building new stations was used and the
lowest cost tor the sale of property ~as used.
Preliminary discussions were held 'With the Fire Chiefs and city
~anagers of Mountain Vie~. Los Altos and Los Altos Hills concerning
the feasibility of consolidating fire stations. The parties
concerned are a~enable to continuing discussio~s on a more formal
basis. In addition; there is growing interest in using the
proposal contained in this report as the initial step to develop a
plan leading to full consolidation of the three fire departments
where even greater savings are possible. As per thase discussions,
the respective cities ~ould each contribute half of the calculated
building costs for the fire station tnat chey ~ould 5}-,are. Without
this contribution, the time to pay for the proposal 'Would be
extended to nine years. It is not a5SU1!led that either Los Altos or
Mountain vie ... · ... ·ould make .any contribution towards the purchase of
the property or the preparation of the property for const~uction
because both ne ...... stations would be located "'ithin Palo Alto.
Staff proposes that one engine co~pany, Engine 2 from Fire Station
2 (Hanover station), ""ould be moved to the new station on
Arastradero Road and replaced by relocating the existing Hazardous
Materials response unit, Rescue 1, currently located at Fire
station Number 1 (Al:r.1a Station). The paramedic unit would remain
at the Hanover Station. This ...... ould provide improved hazardous
materials response services to the Stanford Research Park. In
addition, there is no apparent economic benefit to closing the
Hanover Station. r/hen it 'w.'as as built, Palo .I)"lto and Stanford
UniYersity agreed tbe property ""ou Id be used by the city for
municipal purposes or it reverts to the University, and cannot
therefore be sold by the City.
CMR: 533: n 3
1 ,
i
l • I
o
4. Identify the elements that \oIculd b€ contained in a .Joint
Powers Agreement.
Implementation of Altern3.tive number 4. will require the development
of join'\:. powers agreements between Palo Alto/Los Altos and Palo
Alto/~ountain View to ~urchase. construct, staff and ope~ate two
fire stations as described iJ"'l Alternative Number 4. Staff has
researched, with the assistance of the city Attorney's Office, the
follo'ollling elements as IHcely to pe included il"". such an agreement.
Legal Elements!
o 'the agreements 1,Jould r:'.eet the guid-:.lines set forth in the
California Government Code, Section 6500 "Joint Exercise
of Powers lP •
o In addition, the agreement must fol!a ... any furtl"'~er
constraints established by local requirements for each
juriSdiction based upon local charter or genera 1 law
requirements.
Financial Elements:
C The agreement must contain a clear designation of ~hich
party ~ill handle the finances.
o An accounting and auditing process must be described in
the agreernent~
o The parties of the agreement can be reimbursed in the
ferm of goods, services, money or a combination of these
elements. Hor","eve.r, the agreement must clearly identify
the form of reimbursement intended and ~hat percentages
~ould be paid by each party.
o Tne agreement must identify ho'"" capital costs will be
shared. Alternative Number 4 may include acquisition and
any preparation of land, buildlng constructic~; permits
and any public environmental studies or revie .... require
ments. The exac"t I".ature of the agreement 'Would be
subject to negotiations between the parties.
o Operational costs of the building il1cluding all mainte
nance and insurance 'Would be included.
o Eg-uipment values, maintenance and replacement costs for
all shared equipment .... 'ould be contained in the agreement.
Personnel Elements:
o Personnel and stafflng procedures would be necessary to
clarify performance, certl.ficatiol1s, tralning, officer or
CMR:533:91 •
• t'
t 4
"
I ,
-I
I
I ,
I ,
j
' ....
;
o
position equivalents£ and recogniticn that the agreement
had not intended to equate any differences in salary,
benefits or labor contract language. It is also recog
nized that some i~sue5 may arise ...... hich could require
discussions ...... ith ~he bargaining units.
o Reporting relationships and standards for employee
conduct both fer emergency and non-emergency activities.
Liability Ele~ents:
o The agreement ""Quld inc:l'.Jde all insurance coverage which
would take into consideration the self-insurance of one
or more of the parties~
o The a.qre~!T1ent ...... ould address issues of liability in regard
to handling third party claims an~ industrial injuries4
Service Level Elements:
o Service levels and performance standards would be
identified in the agreement~
o Training criteria and c<;:rtifications, as applicable,
Would be identified.
Terms of Agreement and Disposition:
o The terms of agreement stating length, rene1tial and
termination would be clearly stated.
o Provisions for disposition of jointly held assets would
be identified in the agreement.
s. Identify the timing and mechanism for implementing the
proposed relocation plan.
The implementation of the proposed fire station relocation plan is
subject to a collaborative agreement between the participating
agencies. For the purposes of this report, staff suggests the
following four process phases: 1) Agreemerlts; 2 j Acquisi
tion/Design; 3} Construction; and 4) Consolidated Operatiof1s. The
proposed time line is attached {Attachment 7our)~
Agree!!',ent Phase:
o Establishment of a Fire station Relocation Task. Force
~ith representatives from the city of Palo Alto, Mountain
View, Los Altos/Los Altos Hills. Target date: February
15, 1992.
CMR:533:91
-----~~--,-" .... ,,;-
i
!
I
I
!
"
"
----,
Revie..., Alternative Number 4 and l''''~ke ame~d:ments as T.e:eded
9.nd prepare a consensus draft operational and implemel1ta
tion plan for presentation to the respective City and
Town Councils for conceptu~l approval and comme~tS.
Target da,t€: .July 199:2.
Pending the developm~nt of various staffing options, some
personnel issues may be subject to mei2it and confer 'With
affected employee groups. As appropriate, this procedure
l!l~y occu:r during t.his phase or at a later date prior to
cO~Ence~ent of operations.
o Receive input irort" community interest groups as needed
and maXe aDv:~naments to tt.e operational and imp1.ernentation
plan. Present final plan to the respective City and Town
Councl Is for approvaL Target date: December 1992.
Acquisition/De6ign Phase:
o Locate and negotiate the acquisition of property for
Station Number 4. funding to be included in tha 1993-94
interim budget throu~h a Sudget Amendment Ordinance.
o
Target date to begin: December 1992
Targe"t. date to complete: July 1993
Design Fire Stations Number 9 and 4.
included in 1993-94 CIP budget.
Target date to begin: July 1993
Target Date to complete: ~une 1994
Funding to be
Project Review and Construction Phase:
a Project revie ..... and Construction phase of t~e jOint tire
stations in 1 0''': er Foott.il1s an:i in South :Palo Alto.
Funding to be in~luded in the 1994-95 CIP budget.
Target date to begin process: July 1994
Target date to complete: August 1995
Consolidated Operations Phase:
"
CM1U53J:Sl
staff 'I.rill explore the possibility of joint staffing
priDr to the completion of cons"truction of tl'le new fire
stations.
•
I
1--
-
A~~itional Issues
There are two additional issues that 'Will need to be addressed
before final fire stat:'on mergers .... ith Los Altos and Mountain Vie\r'
occur.
First, the Arastradero property ~ill need to he rezoned from open
space to a use to facilitate a fire station. Secondly, the area
that has been identifi'9d as feasible for Fire Station Number 4 mal'"
have some toxic contamInation. Depending on the location, staff
may recommend that a level one hazardous materials analysis be
undert.ak.en~ No cost esti::nate fot' this cle;anup "'as added to the
break even calculation~ The current owne~ is responsible for the
contamination or ~ny future clean-up. This issue ~ould have to be
carefully assessed du.ring any discussions leading to the City's
acqui~inq prop~rty in the area.
~ommen4ation
Based on yearly cost savings of over $600,000 per year beginning in
1999-2000, staff recommends the Ccuncil direct staff to develop a
multi-jurisdictional Fire Station Consolidation Plan vith the
officials of Mountain View, Los Altos 3.nd Los Altos Hills. 'l'his
Consolidation Plan would be based on the concept outlined in
Alternative Number 4, as amended, of the Palo Alto Fire Department
Fire station Location study.
Respectfully submitted,
Ji'f.kt? f/w,", -,t/t/)'17
VIRGINIA HARRI~GTON
Senior Fina~~al Analyst
/i"/ _ ,/" _;;)!6";../~C2< '----
ROBERT WALL
Fire Chief
cc: Los Altos City Manager, Dianne Gershuny
Mountain View City Manager, Kevin Duggan
Los Altos }"ire Chief, Richard Lunc:1rum
Mountain View Fire Chief, Hugh Holden
International Association of Federated Fire Fighters Loc"!1
1319, Anthony Spitaleri, president
Palo Alto Chamber of Commerce stanfcrd Research Park Committee
Stanford public Saf.:ty Department, Chief Harvin Herrington
Related Staff Reports: CMR:17Q:91
CMR:S)): 91 ,
."-..---~
L
L
ALTERNATE, 4
Station f 2-Reloc.ate StaIf
ConsoIidolte with LAFD_
SL1.lion' l-Existing Loc..
Station' 4 -Relocate
Consolida!e with MVFD.
Station' 5--Existing Lac.
Station' 6-Existing Lac.
Station f 1-Existing Loe..
Statlon f 8-Eld .. o;fing Loc.
,
\
.' a An'ACHMEl'fTTVVO .-.,
F lRE ~T10N RELOCATiON CAlCUl).TION (! 9'92 i)~ ,5)
F~E STAnON
" ------
cosrs
.~ndcn & Pf'9P,U6 jC){ Ne.." US4
Purchase PCOI;ltmy
Prepare Propert)' lor COiISlruclion
De$i1Jl"l New Sta!iO!'1
Construct New Sta'!roo
COSTS
eENems
Sale oj ?rop&rty
CorIlributumJRert1 from Clty
Si'1arino Buiklir.g
BENEFITS
BENEFITS MINUS COSTS
YEAP,L. Y SA V!NGS TO CITY Of PALO AlTO
1993-94
'994-95
,1)95-96
1996-97
1997-9S
'\9ge-9'3
1999--00
2000-01
'995
"\.99~
10>94
,994
1995
1995
1995
1995
NUMBER OF YEARS TO MAKE UP DEFICIT FROM F~ST EXPENDITURE
OF .... ONEY (1993--94)
(1) Based on an estimate of iI cost $52.50 per SQlIare joat.
(~Based Of'Iln 8S1imated sale pric'lI til $)4,75 ~ef square leot
.;---... -................ -~-, """':--""
..
.0
$0
$0
$200,000
Il,340,00ij
$1,540,000
'0
sno,OOQ
$7TG,OOO
('!.nc,OOO)
$0
$0
$2P,'J,4Se.
$294,5213
5:'08,29,
$324,720
$340,954
$357,892
. ,
FlRE STATION .. TOTAL
560,000
$~ ,2'60.000 (l)
,
$210,000
$'.~70,OOO
$2,900,000 $4,440,000
$937.656 (2)
$790,000
$1,727,656 $2,497,656
{$'\,'112,'344) ~$.' ,9.(.2,344)
$0 .0
SO $0
$C8C,4SS $565.C~
$294,528 $S~,292
$308,291 $82',016
$324,720 $654,"0
$340,954 $686,813
5.357,892 $720,931
., 5.'
">.TTACHMENT THREE
ASSUMPTIONS
o The calculations have been adjusted for inflation using 1992
as a base year and an inflation rate of 5 percent.
o When calculating the benefits minus the co~ts for this
project. it "'<'\S ass1.1I!led that there 'Would be no eqUipment
E-avings unless bot"h part3 of th~ proposal ... ere undertaken.. If
this were the case, the City ~ould require one less engine in
future years.
o The total salary and building maintenance savings to the City
have b6en reduced by 30.3 percent to reflect the cu~rent joi~t
service reve>lue reimburse!!',ent agreement for fire ser-vices
between the city and Stanford University.
Operational savings
o Operaticnal savings will pay for the project and are realized
through retirement. This assume.s that an emplore.e ..... ill retire
upon reaching re.tirement age (55~. Retirement age vill be
i.-eached by 10 employees in 1994-95. The calculation assumes
that three Fire Fighters, three Fire Apparatus Operators and
three Fire. Captains ...... ill retire from the 'Work force. The
differences in salary between titles and what year personnel
in each title retire are not taken into account in this
calculation. Salary \~sed in calculations is the top step of
the Compensation Plan for each title. A benefit rate of 57
percent ~as used.
Real Estate and construction Costs
o It is estimated that a 24,000 ft square lot would be ~eguired
for Fire Station 4. In the area identified ~s the optimum
location for Station 4 property values ra.nge bet ... een $40 and
$50 per square foot or between $960,000 and $1,250,000 for the
lot size required. There is no factor for the cost required
to demolish any exi sting structure and prepare whataYer
property is purchased in this calculation.
o The current piece of property on -...:hich Fire Station 4 is
located "Would be sold and could be divided into th~ee single
family residential lots of 9,000 square feet that would sell
for bet~een $30 and $4D per square foot. Therefore, the city
~ould realize between $937,600 ar.d $1(190~ooa fro~ the sale af
the property that houses Station 4.
o The capital costs far Fire Station 2 and Fire Station 4 ~ere
estimated by the City's Public Works Department~ The property
O'P). which Fire station 4 is located: would have to :have prepared
a new use, "Which \r{ill cost $60~OOO for removing the existing
CMR~53J~91 1
•
. -
.i
-~
o
J
building, existing ha~dscape and underground tank. This does
not include any unknown factors. Tfie cost to design and build
a new station is approximately $115S0 j aOO.
rt would cost approximately $1,540,000 to de5iqn and construct
a new Fire St~tior, 2 on Arastradera Road. 'r'here 'Will be nCo
need for capital expenditures at the Hanov~r site of Station
Number 2.
o No costs for furnishing the new fire stations or relocation of
the new stations have been included.
CMR:53J:91 2
•
,
• An ACH EMENT FOU R
FlRE STAnm~ RElOCjl"TION STMF REPORT
TIMEUNE
Establish taslo; '()(ee wili1 MO'.Jntal~ Vie .... ,
ll)S Altosllcs AI'os rWls.
O,af! opel<uion and implemenra"oo plan
for f8Spoclive City and Town Gaur,cils.
Racefve Impt.J! from community and make
arr.BnQmenlS tr, ,o!an.. Present l'inal p~an Ie
aty and Town Councns
2. ACOOISfTJONJDESIGN
T AAG=T DATE:
BEGlN PROCESS'
COMPLETE pnoa:: S S'
Design StaHan 2 and Slal,on 4.
BEGIN PROCESS:
COMPLETE PROCESS:
3. CONSTRUCTlON PHASE
Con:.truclion.
BEGIN PROCESS:
CQMPLET:S PROCESS:
4. CCNSOUDATED OPEARATlONS P~1ASE
e~ln ioinlSlalflnQ of ne ..... Slat 10" 2 and Sta:ion 4.
STATION 2/ST,-,nON ..
F&tJru!:I1)I 15, 1992
Ju!)' 1932
Dec amb er 1992
uecember 1992
Jul)' 1993
JUly 1993
June 1994
JU I:;1994
AUQUSll995
SEPtember 1995
\,