November 21, 1991
THE HONORABLE CITY COUNCIL
Palo Alto, California
5
pglice wing Structural Moqj.ficationsr elP 18508 A .... ard_~
Construction Contract and Ameng.ment to Consultant Contract
Members of the Council:
Report in Brief
This report recommends that council approve the follo .... ing actions
for the const~~~tion of the Police wing structural Modificati~ns:
1. Award the attached Construction contract with Lee En9'ineerin.g
Enterprises in th.e amount of '$824,400, and
2. Authorize the Mayor to r~xecute the attached Amendment No.1 to
Consultant contract No. C-55986, -with Forell/ Elsesser
Engineers, Inc., in. the amount of $65,100 for construction
management eervices.
Background
An inspection of the Civic Center building, after the October 17,
1989 earthquake, revealed cracking in several areas in tha Police
Win9'~ The City retained ForelljElsesser Engineers, Inc~, an
engineering' consulting firm; ,",'hich analyzed the building's
structural adequacy and prepared plans and speci fications for
needed improvements, including the Police Wing seismic
modifications.
TWo bid openings were held previouslj' for this vroject, one en
November 6, 1990 and the other on December 12, 1990. Both bids
were rejected by Council, since they ~ere in excess of the $500,000
construction budget (CKR:570:0 and CMR: 1(5~91) ~ The low bid at the
first openlnq -,..as $1,035,659. City staff, with the help of the
consultants and a contractor, modified the plans to provide a more
cost effective design, increased the construction period, reduced
t,he scope of work, simplified construction methods and permitted
alternate methods of plaCing concrete. With these modifications,
-1-
CMR:510:91
o
bids ~ere solicited a second time. The 10 .... bid at the second
opening was $929,092. Although these bids reflected some cost
savings, they ~ere still in excess of the budget.
Due to the high construction cost r council approved an addition~l
$600,000 for this p~oject in the FY 1991-92 CTP budget, providi~g
a total budget of $l.lOO,OOO~
In preparation for the third solicitation of bids, City staff and
consultants again reworked the desigrl, considered alternate bidding
schedules, and aggressivel)· distributed plans and specifications to
interested contractors. On october 30: 1991, City staff held a
pre-bid meeting wIth pro~pective contractors to describe the
project, revie~ the site and answer questions~
Dispussion of the C __ 9JJ.§.tru.s:: __ tj,on Contract
Bids were opened on November 12. 1991. The. la ..... est responsible bid
was received from Lee Engineering E;1.terpri$es in the amount of
$824,400, 'Which is 10 percent below-the engineer's estimate of
$915,110 as shown on the attac;1ed summary. Therefore, statf
recommends that the bid of $a24,400~ submitted by Lee Engineering
Enterprises, be determined by Council to be the lo-\o\rest responsible
bid end that the contract be awarded accordingly_
construction projects involving existing buildings Experience
unforseen expenditures due to the r.1!Iture of the work and ther~fare
staff is recommending a contingency fund of 20 percent in lieu of
the standard 15 percent4 The increased contingency amount will be
used, if necessary, to compensate the contractor for any
construction taking place on weekends and after hours. City staff
:may direct this to minimize. disruption to the public and City
operations~
The project inCludes strengther:ing existing columns; and beal'!',s .and
constructing 3dditional walls and columns in the Forest AvenUE! end
of parking levels A, Band C. Also r new concrete ~alls will be
constructed on the sides of the Police Wing facing Bryant street,
Forest Avenue and Ramona Street.
Several measures have been taken to minimize disr-uption to the
public parking a:o:ea and Civic center operations. 'l'he contractor's
field office ~ill be limited to the parking stalls located along
Civic center on Bryant Street. The contractcrrs work areas will be
strictly controlled to minimize inconvenience to public and permit
parking. Hours of construction ... ·ill be between 8:00 a.la. and 5:00
p.m. to comply 'With Cit~~ noise regulations, unless circumstances
warrant extended hours. The contractor's operations 'Will not start
-2-
CMR:S10!91
•
•
.--',
until after January 6, 1992, to avoid disrupting parking during the
holidays.
Piscussion of Amendment No. ~COJ1~lJlt_~_nt ____ <::_Q_ntr3ct 1i~55986
with [grell/Elsesser Engineers, Inc,
The council appro·/ed Consultant Contr-3ct No. C-S59B6, for
structural engineering services with Forell/Elsesser Engineers,
Inc. in March 1990 (CMR:213~C).. The contract did not provide
construction ~anagement services but purposely made allowance for
tha scope and fee of construction stage services to be negotiated
after the completion of the design. In this »,ay, the extent of
consultant involvement could be more accurately defined. Staff
recommends approval of an amendmen~ to the consUltant contract in
the amount of $65,100 for construction ~anaqernent services.
Civic center RefinaricJXt9.
City staff is considering refinancing the Certificates of
PartiCipation for the Civic Center. If this does proceed# the
construction monies for the subject project will be included in the
re:fin:ancing.
Environmental Assessment
This project is categorically exempt from the California
Environmental Quality Act (CEQA).
Conflict of Interest Code Exemption
Staff, vith the concurrence of the City Attorney, has determined
thAt Forell/Elsesser Engineers is e~ernpt from the requirement to
execute Form 730 and otherwise comply ~ith the financial interest
disclosure provisions of the City's Ccr.flict of Interest Code. They
ar~ exempt because the consultant's range of duties and the
construction management services to be provided under Amendment No.
1 to Consul~ant contract No. C-559a6 for consultan~ services are
limited in scope and primarily :ministerial in nature.
Elecommendations
staff recommends that council:
1. Approve and authorize the !'I\'ayor to execute the attached
construction contract with Lee Engine~ring Enterprises in the
amount of $824 /400 to construct structural :modifications to
the Police Wing.
-)-
CMR: 51\): 91
.'
•
,-.. "
I
!
I
!
I
I
I
I
-.---1
I ,1
"
•
2. Authoriz:e the City Manag~r or his dE>:signee to negotiate and
execute one or mo~e change orders to the coptract ~ith Lee
Engineering Enterprises, the value of all of 'Which change
orders shall no~ exceed Sl~5.000.
3. Approve and authorize the Mayor to execute the attached
Amendment No.1, to Consultant Contract N~, C-55986, 'With.
Forell/Elsesser Engineers, !nc., in the amount of $65,100 far
construction management services.
Respectfully submitted,
k~
GEORGE BAGDON'
Assistant Director of public Works
(j~ ~QJj((Q~O~~
DAVID G. ADAMS
Director of ~~blic Works
! ."--~ , / '-/' ,JuNE FLOOiicl-r~N'\
:Assistant City(Manager
Attachments: ~surru,"ary
construction Contract Pages
Consultant Contract A~end~ent
Related CMFS:213:0;570:0;145:91
-4-
CMR:510:91
'. "
•
~
,I···
, I ! .' "<:"'ii:" ~i'I' j"';:. 1 ·:.:>c.~i>~1k~.\ ij(;il;1~~}. ,;.;:~ ~'(' ~'1 /';i>"';";'~~) ',:>i" "'~:\"'_. , i
···· .. ' .. i·".'\, ,'. ·.r·· .. r ")~~/-r~~~'-" ,-"'-, "_.--:
J
Qi.d Opening Date: N()'AImbo, 12. 1991.
BID SUMMARY
STRUCTURAL MODIFICATIONS, POLICE DEPARTMENT
PROJECT #18510
~!lDPoe"'i IlMF r---c&. ..... -, ~B....,bil
F.alerpri1NllJ ANOCi.... Ccnatrttctioo CoDItructiQa
[iTa. rr~M ITEM ITHIrd 1---ITSM-=-=-ITEM ! foIO, BID IT~M UNn'5 PPJCE \ JIIklC1! i PkICR PlUCE PRICE
I MobiJlurloa Lump_~m ; )41,]~.00J '~ocCOO 1--~f14~ __ !rZO,~,OO
1 ___ 1 Demolltinq Lump Sum-l ~~3,8~:"i~i , $159,000,00 ---sT61;oooliif I-~~.:..:oo-f--S20'2,j.60-:iS
3 R .. lnroroemMI lump SIl-;;;! 1-.-------J~rofi)J r-...!!.!~ ; ), ~OO ~139.000_tJJ 2-1!D,OOO.OO l--!-StructuflllCOII.('rete LumpSum; $34!1..OOI!:.'!!-~~ ii" J 1,000.00 ~1.-:oco.oo L!..._ rc';INed Co_OCtet. Lump Sll~-$10,000.00 , . St7.i5CliJ.OO ! 9,000,00 I 3',j,400,00 ~ omprulry P.rtl!ionl Lump s~;;~ S26,S50.00 Sl,OOO.OO U5,OOO:00j J2~~(ij-r-srQ,500-:ciO
At.:h1lodund FInIRite. Lump ~~ ,5 • _UI,OCXl~_ _~!cOOO,OO ----Tf,mOO'
8 t"!umhlnl! L\lrrl~~~ _~~~~_ II, . 00 18" ,I lJO,{)Xl,OO ~~,OO1.rjO
I Q M...,haal .. .t. l.ump Sum-f--~lYr;15"QOO ,000.00 _$17,000.00 \ r--flo,()(jiji>.,T t-------U:-650 I)()
__ 10 IE.lnct~ica.l l-"If~, ~9,6Jb"]Q ,400.00 ~~..:.OO ~8,lW,OO _ SI~..:OO lTiit~fll\I!JW.'erproulinJ Lump ~~~ ~-E3,~~~ 12" Sn,ooo:-~ 22 4 ,000.00 I ;hO'OOO;~~
12 ;Land~ping Lump .'ium i ~,I)) _.~'400.00 i sJ;C.iOO,OO ~,ClX1,OO i 15,600.00
" .se.;~r;!!r ServicM l:'-'n\~~ Uo,~~ 1----iin,ilOO.OO1. L.--E~'~ t:=~~ I. t20,OOO~OO,
14 ; Rut,..o". W("l~k Lump Sum 19,]60,00 '11.000.00 i I TiS,uuu,oo r $~~ I 12),~50.lX)
---, ---CONTRA,,~: $915:t'£.~ ==$a2~.4(W).'@ ~J60.000 . .'."-~-$989.5~ i _sii!".-i66.85-
ifo.-iU-i ~:R~ Fne Et:huWoet ':;~on 1 -Rusbfopfi
Engineeritl~--J 100, Ine. Cc:wWrucLion
frEM d ihM IU,..···: [fUM IlIlM
i 1'10. bin ITEM m·IITS PR.ICE PRICE PRICE r PII'ICE
1 M""i)iuno,., r."lmp s~;.. 2<. 00 ]5,000,00 IS().OOO.OO 1~f.6to2.()(f -,-r-s'O.llOO. --~ 114:.'!,.800~~ Demolltiun LumpSuitl ! 142,100.00 4,((X).OO
;\ Relnfo""o;ment LumpS;;·,:;;----1 lTItlm.OO 1~2o.~00 -mo,~~ 71,oolfoo
4 ,".;.;"", c.,,,,.. hL;;;, S'~ 635,~ r--SiD,~,oo-20,000.00 -------v,'J5:&wJ.OO
Colored COn~f"" ----i L'u", ... su.;:;--"'00 ~Cix)'~ -$!,Cl.Vl'ftji, -m,O::IG.OO
6---~~~r.'1' P.,!I.!!.~. I L UIIII' SLIm ~;ooo ~ ,000,00 flT,OOJlXIi !:J.O:\O.OO
A~"hl1..cturlll FiI1I.h~ lump Slim 29,800.00 2O,OO}'OO ----wf.OO:J.OO ---rf4iI.<iJOiiO
K Plvrn.lJlng i tump S~m Ji,41H,QO .000. 000.00 L-11,9115.("(,-
? MlIIlhankai ---r-l ump Sum r--·-ff.25'1:00 ----1i:5OO7iin --fjd,QOO.OO I 111,i09,001
10 Eloclrlcal ---L,,~p~Sum. r 1"I,2,)().OO \O',rm:~ 12,000 r----19,81'l1.oo1
,-, -Rooi".nsIWAlerpt{JfJl~g Lump SII.";-_ SII, 00 IO,(}()')J'O -~OOO·.OO -ST9,7J7.00
12 lAndauping--lump Spm i 2,500. 1. .IX' 00 -:"-00.00-
i 13 S.·;;;.:;-IiY· SenolCM L;mp Sum r-s20. .00 S20,ooo----;OO -sw:rmOO no,ooo.
14 Cwom_ork _ UI?lpSum . 00 IS • fl4,OOO.OO 1.'JOO.oo
CONTRACT SUM $1.039,19L~ $1.270.000.i!£j $1.J'-2-,-~.OO $1,375,216.00
File -Polil!fJ Floppy, A:\OIDSUM.WKI
•
u
• t
,
(J
.;..
,',"lO' ' ..
,.
•
•
'-"
CONTRACT
THIS AGREEMENT i! made and entered into, in du~ncate, thiS ______ day of __ __ ,g_. by and between the City of Palo Aito, Canfomr6, herelnafter called "CITY", and
~ngineering Enterprises , Mere!nanef caned "Contractor", whose
Taxpayer Identification Number is:
For and in consideration of their mutual covenams, the parties hereto agree as follows:
1. Contractor 'Shari do all the work and furnish all the materiafs necessary to construct
and complete in a good, workmanlike and substantial manner, and to the satisfactlon
of the City of Palo Aito. the followil"1g:
POLICE WI r-iG STRUCTURALMODI<]C""A"-T'-'I"'O'-'-N"S.....,C ... I"-P_'~8"'5"'O"'8L-______ _
2. This contract shall consist of the folio wing documents on file With the City Clerk, aH
of whfch are incorporated herein and made a part hereof by reference thereto:
a. This Contract
b. Notice Inviting Sealed Proposals
c. Accepted Proposal
d. Standard Specifications dated 1972, as amended, m as superseded by other
documents incorporaled herein.
e. General Provisions
f. Technical Specifications --Special Provisions
g. Certificate of Insurance
h. Performance Bond
i. Labor and Msteriafs Bond
j. Affirmative Act:on Guideiines and Compljance Report
k. Any ar,d all supplemental agreemeflts which amend or extend the work
contemp:ated ar:d wrlich may be required to complete the work ir1 a substantial
and acceptable manner.
3. In consideration of such work, CITY shall pay Contractor the amount spectfied in his
bid in the manner provided in said Standard Specifications dated 1972, CiS amended.
4. Concurrentfy with the execution of this contract, Cor,tractor shall provide CITY with
the Contractor's labor and Material and Faithful Performance Bonds and certificates
of insurance, including any workers' compensation insurance required by the laws of
the State of Carifornia or otherwise required in said specincations.
5. This contract shall not be assigned by Contractor.
......
•
I
I
CONTRACT (Continued) 0
s. o '1 h d' t .. All claims by Contractor regarding extra work, charyes, de ay orot er ISPU es anslng
out of the ConHact must be submitted to CITY in writing witt"1~n !er1 ('0) working d~ys
after the cl-!lim arose, describing 'n detail the naH.He and value of the d1sputed work
or c:aim.
7. Contractor hereby agrees to tndBmnify, defend and hold harmless CITY, its officers,
agents, and employees from any and all demands, claims or liability of any nature,
caused.bV CY.' arising out of Contracto;-' S, its officers'; agents'. or employees' negligent
acts, errors, oromissions, or willful misconduct, or conduct for which the law imposes
strict liability on COl1tractor tn the performance or fallure to pefform this Agreement.
s. This A.greement represents the entfre Agreement betweer, the parties with respect to
the purchase an(i sale of the equipment, materials, or suppries or paymp(1t for services
which may be the subject 01 this Contract. AJj prio~ agreements. representations,
statements, negotia-tions and undertakings ........ hether o1'al or written are su~erseded
hereby.
9. No payment, partial payment, acceptance. or partial acceptance by City shall operate
as waiver on the part of City of any of its rig~,ts under th:S contract.
10. Conuac!or agrees to permit CITY to audit. a~ any reasonable time during the term of
this Agreement and for three (3) years thereafter. Contractor's records pertaining to
matters covered by this Agreement. Contractor ~uither agrees to maintain such
records for at least three (3) years after the term of thts Agreement.
IN WITNESS WHEREOF, the Parties have set their hands an on the day and year first above
written.
ATTEST: CITY OF PALO ALTO. CALIFORNIA
8y: _________ _
City Clerk Mayor
APPROVED: CONTRACTOR
City Manage,
Public Works Department Taxpaver 1.0.# _____ _
APPROVED AS TO FORM:
Director of Finance
Risk Manager City Attorney
I
\
-,MM"JQ;IUaf 110. 1 ro OOIl'r~ JfO. C5S911
JI!i'1'1rllBli' eIn OF PALO ALTO AlIll
FOaELL/ltA18811 KBGIXBBIB, tHC.
THIS AMFNDMF.NT 'to Contract lfo. 555986 is made a.nd entered
into this 4ay ef ___ .. __ ._, 1991 .. by .and between the CI"rY
OF p~ ALTO, a municipal corporation of California, hereinaftar
reterred to as -CITY,-and FORELLIELSESSER ENGINEERS, INC.
(Taxpayer Identification Number 94-1605095), a California corpora
tion, with office. at 539 Bryant Street, San Francisco, CA 94107 1
hereinafter referred to as "CONTRACTOR~;
LI. __ C I ! A r. B~
~I Contraet No, C55986 was previously entered into
between CITY and CONTRACTOR for the provision of repair and seismic
strengthening of the Police Department Wing of the Civic center;
and
WHEREAS, the partiQ& may agre. to amend said agreement
from time to time;
NOW, THEREFORE, in consideration of their mutual
covanants t the parties hereto agree as follows:
SECTION 1. The (ollowing paraqraphs of Contract No.
C55986 are hereby amend~d to read aa follows:
9111 a ')'U OOi'OU:1
a. Paragraph 8.2.
·Specified Term. The term of this Agreement is
hereby extended to June )0, 1992, unle56 sooner t<t:::uinat
ad as provided herein,-
b. Paragraph 7.1.
"CompensAt.ion. CITY aqrees to compE!:!,\E.ate CONTRACTOR
for the full perfonnance ot its •• rvice5 under this
amended Agreement in II .UlI not to exceed One Hundred
Seventy Pour Thousand Dollars ($174,000), an increase of
$65,100 ~win9 to this Amendment.-
c. Paragraph 4.1.J{c)
-The City sha.ll provid.e for the a.dministration
of the contract 'With the qeneral contractor. The
consultant shall provide construction adMinistration
services listed in Exhibit A. The City shall provide a
re$ident inspector or the works at the sit •. w
1
d. Paraqraph 4.1.J(n)
~The contractor shall provide the Consultant with
the data necessary fOl' the c<:'Impletion of -record dr-aw
Lnqs,"
SJetIQN 1. The followin9 exhibit t~ Contract No. C559S6
are hereby amended to read as set fo~~ in the following eXhibits
attached to this Amendment and incorporated in full by this r~fer
enee.:
SECTIOH 34 Except as herein modified, all other
provisions of and exhibits and amendments to said Agreement shall
remain in full toree and .tt.ct.
IV \lITMUS WHEREOF, the parties hereto have executed this
Amendment the day and yoar first abov~ written.
ATTEST:
City Clerk
APPROVED AS TO FORK:
Assistant City Attorney
APPROVED:
Assistant City Manager
Director of Finance
Ris::k Manager
APPROVE D AS TO CONTENT,
Director of Public Works
Attaehl!\ents:
EXHIBIT RA-; SCOPE 01 WORK
~Il i 111)'11 00701Jl
CITY OF PALO ALTO
Mayor
FORELL/ELSESSER ENGINEERS. INC.
8y,llinda~
ItS:\JLc..E-P~I~ .... __ _
Ta~E;yer Identific3tlan No.
_"'{-,--~.L-: I <-OW'! a
2
•
----*' &
E.Xll:IlI!T A
PALO ALTO crvn. CENTER
POLICE WING SEISMIC S'I'RENGfHENING
Task
No.
1
2
3
4
S
6
7
8
9
Notes:
Scope of Wad:
for the
Construction Admlnisttatioo Pha.. ..
Task Description Forel1I
Elsesser
-
PYe-constructioo meeting X
Fi~' meetings and job walk-XC' through
Field visits
Review of shop dnwine X
Review of Testing and inspection X reports
Review of miscellaneous submittal, X (mi. desi&DS; mock-up)
Respond to field questions and X ronstructkm issues
Project administr.ltion X
As-built drawings X
--
1. C.A. ree, are based on • tS-monllls construction period.
WOO<!soo!
Barksdale
X
X'"
X'"
X
X
X --
X
2. Assumed one weekly progress meeting to< 6-mootl", project duration.
3. Assumed ~ maximum of 10 progress meeti"lls_
4. Assumed S field violts.
S. Assumed 6 field vis;"'.
pa-pwc:&.1tt
Encon
X
X'"
-
X'-~
X
X
--
X