Loading...
HomeMy WebLinkAbout0129.093- January 14, 1993 HONORABLE CITY COUNCIL, Palo Alto, California 4 QUARRY/~~BORETUM/WELCH ROAD IMPROVE~ENTS AND RELATED EASEMENT AGREEMENT Members of the Council: REPORT IN BRIEF The purpose of this report .is to recommend that the Council: (1) approve the proposed Quarry Road/Welc-.h Road improvements, (2) approve the Negative Declaration prepared fo~ the project, and (3) authorize the Mayor to execute two easement agreements ..... ith Leland Stanford Junior University {Attachments 1 and 2). BACKGROUND. The construction of the new Psychiatry Building at the corner of" Quarry and ~~boretum Ro~ds has triggered a requirement that Stanford University ..... iden Quarry Road between Arboretum and Welch Roads. The concHtion was imposed by Sant'l Clara county {elt the request of the city of Pa.lo Alto). at the time th?t the county approved the Quarry Roar! Genera 1 Plan Amendment Environmental Impact Review. In addition, at its o~n discretion, Stanford has elected to include improveme~lts to two additional short roadway segments. as part of the proposed Froject. The first is to continue the ~ideni~g of Q"l:.arry past Welch, to match an existing four lane cross sectio!1 further to the "West {near the parking lot entrance that used to be Blake Wilber Drive). The second is to ~iden the Welch approach at Quarry, to add an exclusiVe left-turn lane. While the widening of the Welch Road approach to Quarry Road is a mit j gation associated with th.e approval of the Lucille Packard Children I 50 Hospital, it has not been officially "triggered". Sta.nford. tlowever I has: elect ad to constru~t it, as part of the current proposed improvements to Quarry Road. Staff supports the inclusion of these two additional imp~overnents. CMR:129;9J " , PROJECT DESCRIPTION CUrrently, Quarry Road is 4{J feet ... '~de from curb to curb, except for one area ~here it is 54 feet wide for a distance of 42G feet {plus a 9.0 fo~t taper) itt'mediately .. t":$t of Arboretum Road. The roadway 1S striped 'With two through lanes in the wE.stbound direction and one lane in the eastbc·und d.i_rection, .. rith excll.!sive right .and left-turn ldnes added on the eastbour,d Quarry Road apJ.1roach to Arboretum. No bike lanes or median currently exist on Quarr}' Road ~ Tha proposed p~oject includes the fC"".lllowing: 1 ~ irr.'idening Quarry Road to i 2 feet from cL!rb to curb, from Arboretum Road westerly to and past Welch Road, to a poir.:t where there is already an existing four lane cross section (near the parking lot entrance that used to be Blai".e Wilber Drive) ~ The ~ide-ned roadway ... ill provide for t ... o through l~nes in each direction, turn lanes, on-street bike lanes and a landscaped median. A landscaped planting strip and sidewalk outside the curb lines ~ill also be provided on Doth side~ of the roadway. 2. Widening the 'West 3ide of Welch Road by 5 feet, north of Quarry Road, for a distance of approximatel}" 240 feet (plus a 60 foot taper}. The road~ay is being widened to accommodate a second left-turn lane{ and to perBit the existing signal to be changed from a t~o-phase to a more efficient and responsive six-phase signal. 3. Widening of up to 8 feet on the ~est side of Arboretum Road, for a distance of 150 feet south of Quarry Road. This .... i 11 provide a better merging distance fc;r southbound traffic merging f~om tvo lanes into one lane. Work will also include relocating the lumina ire and associated barricade located in this area. 4. Ro:::iTluvai of left tUrns in a:ld cut of t" .. '':) of the three drive\ola)"s to the retail areas along Quarry Road, to reduce traf!:!.c­ conflicts. The proposed landscapEd median wi 11 physically eliminate the possibility of making left turns at the t .... 'o driveways~ 5. Mcdifica~ions to the existing traffic si9nals, relocation of traffic sign")] equipment, Americdns ""ith Disabilities Act ot 1990 modifications I lardscaping, 3 bus dueJ.:".-out, and other related items are inr:luded as port of the propos€'.d improvement. Exhibits 1 aDd 2 illustrate the geometric layout configuration for the proposed project. Exhibi ts ] illustrate the proposed landscaping for the prDject. CMR:129:93 and lane through 7 11 14 193 Page 2 • I I / I I I ! ~, , r, ,Ii / ,1 ( i",' "'I .... bnguftIA ...... " .. ,., ", .. i I I i ". Exhibit 2 , J i l I I I I ! 1 ! ! r r • I ! 'I I -i , It i q f , I i i • .' \ ~ '\ '. , .... ~ , • , , t t , t I • ....... -I \ ---------.--~.- : ___ , ________________ '1~------~E~X~hibit 3 • ':?1'--. ' • o • , .-."'""'! '; i." '. ~ f---. '. . ,. '"=:..--- / --- , . .... _"' .... ' ,---.--._ ..... " .. ' .. ' 1 I ~ • t J '-'-~ ... -.-.------ ---"" . ~-..=---,-=---' I "._-------- .----- -- • . ) Exhibit 4 .,--" _ .. --....... ,---..-'---, ... Ex hibit 5 ~ ______________ -,r)l __________________ ~~ ________ ~ o i = , \ \ -_ ..... , .. ....... , ..... ,..... .---_.-_." .. • ", -~---' -~-,--,,-,,"--'--"- Exhibit 6 . , .• ,'11 •• Exhibit 7 ~ ,-.... ... r-------------~~'---------------,~--------~ J '--< ." -I· {~ I \.-r7\. -', -'~j.-----"---_. -'. ) . , •• ~ ••• " •• I •• " .... The proposed project has several benefits over the existing conditions, including the f~llowing: 1. The provision of on-street ~ike lanes along Quarry Road and completion of a missing link between Welch R<:,~d and ArboretuTll Road; thereby improving bicicle safety. 2. The provision of a 16 fe·ot ..,ide landscaped pedian (narrowi~q to 5 teet next to left-turn lanes) ,,'ill physically separate traffic moving in opposite directions.. and 'Will be an aesthe.tic improvement compatible ",'ith the land.scaping that was implemented as part of the Psychiatry Building project. 3. The elimination of left turns-in and out of t .... ·o of the three dri veways along the north side cf QuarTY Road (Welch to Arboretum) 'Will reduce traffic conflicts and improve safety. 4. The additional lanes and signal modifications at the intersection of Quarry and Welch will iT!".prove the operationa.l characteristics (level of service) and reduce conge.stion. 5. The provision of a bus dUCK-out ,,,rill re-mO'le buses from the traffic flow, and provide better condi~ions for transit users. ARCHITECTURAL R.evl Eiol' BOARD The Architect~ral Review Board reviewed the ~roposed project at its meeting on October 15, 1992, and pae.sed a motion adopting the staff's recommendations, ~hic~ ~ere as follows: a. A final landscaped plan shall be submitted for review and approva: by the utilitie~ Energy services Division, the City Arborist, and Planning staff l p~ior to the issuance of a building permit. The plan shall include drought tolerant plants and trees, ~ith a coruplete plant and tree listing inclicating quant ity and size of plants, tree planting details~ and a complete irrigation plan~ b. An encroachment peril.it 'Will be required from the Public Works Department for any structures left in the pt.:blic right-ot-way. c. A permit for construction in a public street nust be obtained for any construction work in the city of Palo Alto right-of-way. Included as Attachment 1 is a proposed Road'","ay Easement Agreement, ~hereby Stanford grants and conveys to the City an easeroent, for street and roadway purposes related to the proposed project, to CMR:129~9J 1/14/9) }>ag-= 3 i~}?~~i_-i~-:; . ~~~i,2 ........ -. 4~ • I .... iden Quarry ROild and a short section of Welch Road. A portion of the easerne~t is on leased l~nd; therefore, the easem~nt agree~ent references Stanford's lea&ees. Attachment 2 is an Utiliti es Easement ~greement ~hereby Stantord conveys to the city an easement for utility equipment pads and conduits for switch gear cabinets. PROJE<;:!, COSTS The estimated cost tor the proFOsed project is approximately $).0 million, including construction and other related project development costs~ Stanford ~il1 provide the necessary easements, and pay for all costs for implementation of the ir'!proverncnts and rel.e.t~d changes. Thereafter, the City of Palo Alto "",ill assume f<.111 responsibility for maintenance, traffic control, enforcement and other ~elated functions. ANOTHER RELATED rTEM The Palo Alto Cit:t Council recently approved h,o agreements, one '-lith Santa Clara county and on.;! lIlith Stanford University (om:401:92j September 10, 1992) regarding this project. One agreement has the effect of delegating public agency responsibility for the design and con5truction of the roadway wideni ng project, as "Well as maintenance ;:and traffic enforC'.ement on the completed road'Way, from the County to the CitYi 'While the second agre.ement holds stanford responsible for pursuing the implementation of the project and paying all related costs. ENYIRO}I..'MENTAL AS S r;s SMi,;_~ An initial study recoiTl!Tlending a Negative Declaration has been complete~, and is inclUded as Attach~ent 3. RECOMMENPATION Staff recomnends that the Council: (1) approve the proposed Qual.Ty/Arboreturn/Welch Road improvel!lents, including the follo ..... ing staff/ARB com;nents: a. a final landscape pl.an shall be submitted for review' and approval by the Utilities Energy Services Division, the City Arborist, and Planning staff, prior to the issuance of a building perr!lit. The plan shall lnclude drought tolerant plants and trees, with a cOf;",plete plant and tree listing indicating quantity and size of plants, tree planting details, and a complete irrigation plan, CMR: 129; 93 1/14/$13 Page 4 • t, , D. o an e~croachment permit ~ill be required fro~ works Department for any structures left in r~ght-of-way, the Publ ic the public c. ~ permit for >::onstructioM. in a public street must be obtained for ar.y construction 'Work in the city of Palo Alto right-at-way; (2) approve the Negative Declaration prepared for t,he project; r:.nd (3) authorize the Mayor to execute two ease~ent agreements with Leland Stanford Junior University (Attachm~nts 1 and 2). Respectfully s~bmitted, MARVIN L. OVERWAY Chief Transportation Dfficial KENNETH R. SCHRElBER DireC':tor of Plannir,g and ComIl,un i ty Environment City Manager Attachments: 1. Roadway Easement Agreement for Quarry/ Arboretum/Welch Road widening project 2. Utilities Easement Agreement in Conj~nction with Quarry/Arbo~etum/Welch Road Widening project. 3. Environmental Assessnent (92-EIA-29) cc: Stanford University (Andre' ... -Doty, Michael Kuntz, Bill Phillips, CharlEs carter, Susan Herald) City of Menlo Park {Do!1ald Dey} CMR:129;93 1/14/93 Page 5 ! c Recording Requested By and When Ra,ordcd Return to: The C:'y of Palo AltO Re3.1 Estate Dill ision 250 Hamilton Avenue Palo Alto, CA 94301 Attention: Real Property Manager ." RaADWA~ EASEMEl'<' AGREEMENT (Quarryl ArtoretumlWe1ch Widening) Attachment 1 TIIIS EASEl'dENT AGREEMENf is made aJl.d entered jn~o as of 1993, by and betwccn nlE BOAlID OF TRUSTEES OF TIlE LELAND STA<'lFORD JUNIOR UNIVERSITY, a body having corporate PO""" under the laws of the State of California ("Grantor') and TIlE CITY OF PALO ALTO ("Grantee"). This Easement is consented to and joined in by SIDNEY E FOSlER AND SANDRA L FOSlER, the current lessee of the propeny descn'bed as Pan::eI Two in Exhibit A attached herelo (together with any successor or assign of the leasehold interest in said property, "l . .essee "). For valuable consideration paid by Grantee, receipt where.oJ is hereby acknowledged, Grantor does hereby grant and convey uNo Grantee, its succes..sors and assigns an euement for sl.reet al1.d roadway purposes over and acrvss the parcel or (he lands of Grantor situate in the City of Palo Alto. County (If Santa Ciara. State of California and more particularly des<:ribed in Exh,bit A attlched hereto and incorporated herein by this reference, together with a non-exclusive right to install, maintain and operate over, across and l.Jnder the aforesaid parcel of property pipes, poles, conduits., wire and appurtenant facilities ne..cessar; or useful in the transmission and furnishing of electricity, gas, water, telephone, l.eJegraph and other public utility services~ provided, however, thai any faciii'jes insta.1led by Grantee pursuant 10 this grant shall not interfere wL,h or impede' the use of any property or fac1lities of Grantor. Grantor and Lessee shall nor be responsible nor have any liability for any inspection, maintenance or repair of the easement parcel or any improvements or landscaping thereon. Upon non-use of the aforesaid easement for street and roadway purpos.es over and across the aforesaid parcel for a period of IW0 consecutive years, all right, title and interest of Grantee, its successors and assjgn~, in and undf":-this casement over and across the parcel shall revert to Grantor, its s'Uccessors and assigns; provided that Grantor shall give Granlee written notice that, due to nonuse, the easement will terminate pursuant to this Pangraph on a date not less than one hundred twenty (120) .. \] -, days after the date of the notice. Gr-4l1.tee may di5Pulc the tennination of the easement by writteD notice 10 Grantor given prior to the tenninaticln date specified in Grantor's notice. If the parties are un..tbte 10 resolve-~nd dispute, ~he is'Sup. may be r::solved by a court having jurisdiction. Grantee sball indemnify and save barmle.ss Gfllltor and Lessee, and lileir respective t:1J..st.tes, OffICers, directors.J agenu and employees. (rom and against any and all loss, damage, li..a.bi.Jjty I expense, claim or dem.and of wharsoevC'T c:haracter. direct or consequential, including, but without thereby limiting the generality of the foregoing, injtiries to persons u.d damage 10 property arising out of the e.xcrcise of Grantee or any of its agents, contractors or emptoyees of any right granted hereunder, e::.ocludlng an)' loss, damage,liability, expense, claim or demand that results from the acti\lc negUgetlce or willful miscoDduct of Grantor or Lessee or any of theU' respecti ve agt::llts oremploy=. 1 , • I . , o IN WI1NESS WHEREOF, the parties hereto have executed chis instrument by proper perwos thereunto duty authorized as of Ihe day and year first above w rinen. Approved as to ronn: GRANTOR: THE BOARD OF TRUSTEES OF THE LEIAND STANFORD JUNIOR UNIVERSITY. a body having corporate powe" under the iaw5 of the State of california By: Raymond F. Bacchetti Its: Vi"" President ror Planning."d MaI'.I3gement GRANT£E: 1HE CITY OF PALO ALTO By: ____________________ _ Type Name: _____________ __ Its: ________________ _ .. The unde"igned Sidney E. Foster and Sandra L Foster rererred to as Lessee in the above Easement: hereby consents to and joins in the grant of the F..a.sement to Grantee pursuant to the aoove Easement OD ttu~ term 5 and conditior. s contained therein. ,b-8-,~Q)-~-~~.- Dale Date (ATTACH ACKNOWLEDGMEl'rrs) J , ' Ii ~ I I I , . EXHIBIT tlAti LEGAL DESCRIPTION OF A ROAD EASEMENT WITHIN ~HE LANDS OF LELAND S~~PORD ~UN:OR UNIVERSITY QUARRY ROAD , WELCH RO~D A non-exclusive easement for street and roadway put"pcses in, under # on, and aC~OS5 all the certain real property situate within the Lands ot Leland stanford ,Junior University. County of Santa Clara, State of California, bein9 more particularly described as follows: ~ARCEL ONE BEGI~~ING at the ~ost southerly corner of Quarry Read, 60.00 teet 'Wide, as described in the Grant of Easement from The Board of TZ'"ustees of the Leland Stanfo:t"d Junior University to the city of Palo Alto, recorded February 13, 1957, in Book: 3729 of Official Records at Page 7, records of the County Recorder of said County: Thence, N 22"40'50" E 870.12 feet along the easterly line of said Quarry Road thence leaving said easterl~ line S 67'19'1~" E 14.00 feet thence N 22~40'50~ E 494.62 feet to a pcint of tangency ~ith a 40.00 foot radius curve to the right; thence northeasterl}' 62.63 feet along the arc of said curve through a central angle of 90'0'00"; thence S 67°19:'10" E 3.00 feet; thence S 2~'40'son W 11.12 feet to a point on the arc of a 30.00 foot radius curve to the left (Note: radius point bear3 S 16°10 1 23 11 W) thence southwesterly 43.72 feet along ttle arc of said curve through a central angle cf 83'"29'33"; thence S 22°40'50" W 220.35 feet: thence S 16°S8'12" W 100.50 feet; thence S 22'40'SO~ W 56.12 feet; thence S 29°48'20 W 80.62 feet: thence S 22'40'50 W 741.92 feet: thence S 24·58'16~ W 162.68 feet: thence N 74"10'08" W 24.07 feet to the POINT OF BEGINNING, Containing 36,240 square feet~ Note: the bearings used in this description are based upon the California State Plane coordlrates Zone III, North American Datum 1927. FAReEL TWO COMMENCING at the most southerly corner of Quarry Road~ 60.00 teet ""ice, as described in the Grant of Easement from The Board of T~ustees of the Leland stanford Junior University to the City of Palo Alto, recorded February 13, 1957, in Book 3729 of Official Records at Page j~ records of the county Recorder of sai~ County; Thence N 74"10'08" W 60.43 feet to the south~esterly corner of said Quarry Road; thence ~ 22~40r50~ E 344.00 feet alcng the westerly line of said Quarry Road. to the POINT OF BEGINNING: thence N 67 '19 1 10" W 5, 00 feet to a point on the arc of a 15. On f~C'-t. radius curve to the left (Note: radius point bea.r-s N 67'19 1 10" W); thence northw~sterly 23.56 feet along the arc ot said curve through a central angle of 90' oorOD~ to a point 5.00 feet perpendiculary distant sOlltherly from the 5uutherly line of Welch Road; thence parallel ..... ith the southerly line of Welch Road the following courses and distances: . ,'i, . • ;)I~ .... ,_~L ~,j.~.<:~~ ~ ..• ',., --, . ~.- ,"- point of tangency ~ith a 415.00 foot redius curve to the left; thence ~esterly 35.63 feet alo~9 the arc of said curve through a central angle of 4'55 1 11"; thence N 72°14 1 21';W 161.56 feet to a point of tangency with a 195.66 foot radius curve to the right. thence lea~in9 the line parallel with We~ ch Road vesterly 26.14 feet along the arc of said curve throuqh a central angle of 7'.39 1 16-; thence N' 64'35 r 05" W 14.62 feet to a point of tangen,-:-}' with a 146.86 foot radius curve to the left; thence westerly 19.62 feet along the arc of said curve through a ~ental angle of 7-J9'16-to the southerly line of Welch Road; thence S 72'14 1 21" E 221.67 feet along said southerly line to a point of tangency ~ith a 420.00 foot radius cu~ve to the right; thence easterly 36.06 feet along the arc of said curve through a central angle 4'55'11·; thence S 67°19110~ E 34,56 feet along said southe~ly line of Welch Road to a point of tangency with a 20.00 foot radius curve to the right; thence southeasterly JL42 feet along the arc ot said curve thro'.Jgh a central angle of 90 '00 'eo· tc the POINT OF BEGINNING. Containing 1454 square feet, more or less~ Note: The bearings used in this description a_ ' based upon the California State Plane CooI"dinates Zone III, NO:ct.l American Datum, 1927. i ! I <\ ~ I ~ OF ,- / .... , , ARBORETUM • RO. I / S 22° "O'~O" WI 'c\( UO."3:)' .. .. ' .. .. ... ~ o .. • " I ;: SI5.~a· :~"W· 100.50' S22°40'~"W ii4. t2' S 2io4S'ZC"W 60.62' S 67° ~9' to" f t .... OO· / WELC RD< -::::::-::-:-r-------.Y.\ c:i • '" ., \ \ \. PARC'Et. '- \Q:: ., I ,'" " . . -.. .... o'n r.,j ... "'­., PARCEL ONE 24.07' N71oI0'OS"W "1 i STATE OF CAllFORNlA ) "" COUNTY OF SANTA CLARA ) On ~~~/992.. boro", me, AOM Bl6I-"';~~:'" personally appeared Ltk,,~ ( -it ~ '" j ~ . .trSff.v Jli"liioell)'=lcno.wn-1O"1M: (qr proved to me on the basis of satisfactory evidence) 10 be Ihe person@ whose lWJJe(i) ;.,I,re subscribed 10 Ihe wilhin L,strument and ""knowledged to me th,t ~lhey execuled the sarne in hWher/their authorized capacity!@), and that by h_'t~eir signatur«i) on the instrument the person®, or Ihe entity upon behalf or which the perscn[s) acted, executed the instrument. _ WITNESS my hand and official seal. ~~ signature.d7~ £ A'ITENTlON NOTARY: Although the inrormation requested below ;s OPTIONAL, i( could prevent fraudulent attachment Qf lIils certificate to another document. nus CERTIFICATE MUST TiU. or Type or Document lfedJ""'1&vc....-J ~ BBATTACHED TO nm Numbu of Pages LDate o(Document ,zj .. * r. DOCUMENT DESCRIBED Signer(s) Other than Named Above ___ _ AT RIGHT: I N U , i f'j :1 I ., I , I I , I I I I I I STATE OF CAUFORNlA COUNTY OF SANTA CLARA ) 55, ) persoQally knOWD to me (or pro'/ed to me on th~ basis of satisfactory evidence) to be the person(s) whose name(s) is/are sub~ribed to the '9Io'ithin instrument and acknowledged to me that heJshelthey executed the same in hislher/their autllOri.zed capaCity(IeS), and that by hislherlmelr .ignature(s) on the instrument me penon(,), or the emil)' upon befWfof which the person(s) acled, executed the i!1strumenl. WITNESS my band and offieW seal, Signature !h-'~ ~ V ATI'ENTION NOTARY: AJthoogh the inform.tion requested below is OPTIONAL, it could prevent fl'3.udulent att.achment of this c:enificate 10 another document. • nus CERTIFlCA'IC MUST Title or Type of Document ~t R-.L" ....... ~ BE ATTACHED TO THE Number of Pages ~o.,e of Documen'-10';;~ DOCUMENT DESCRIBED Signer(') Other than Named Above AT RIGHT: ------'-,--------- ------~-.....--'. Recordlng Requested by and WIlen Recorded Return to: The City of Palo Alto Real Estate Division 250 Hamilton A \'t'mue Palo Alto, CA 94301 Attention: Real Property Manager ., Attachment lJ11llTlES EASEMENT AGREEMENT (In conjunction with Quarry! ArboretumfWekh Road widening) 1HJS EASEMENT AGREEMENT is made and enlered into as of=-o=-==,.: 1993, by and between TIlE BOARD OF TRUS1EES OF TIlE LELAND STANFORD JUNIOR UNIVERSm', a body baving corporate power.; under the laws of llJe Stile of California ("Grantor") and TIIE CI1Y OF PALO ALTO ("Grantee"). RECITAllS A. Grantor is the owner of tl".at certaln real propeny localed in the Couruy of Sanl. Clam and more particularly described in J;;WillliA attached hemo (L~. "Easement Property"). B. Granwr hzs construclod and installed certain underground conduit assembly and associated concrete pads (the "Conduit and Pads") for the instaHation of four switch gear cabinets !ogether with necessary futures and appurtenances to be installed by Gl1Ultee (coUectively .. ilh the Conduit and Pads, the "Facilities") on the Easement Property. C. Grantor has agreed to convej' the Conduit and Pads to Gr.anlee and to grant to Grantee a nonexc!usiv'e easement, on the lenns and condilions ,oncaine<! in thi.s Easement Agreement: to operate and maintain the Facilities 011 (ne Easement Propeny. AGREEMENT NOW THEREFORE, in consideration of the premises and other valuable cop.sideration, the receipt GIld adequacy of which are hereby acknowledged, the p,U'ties hereby agree as follows: 1. Grantor bereby conveys to Grantee ali of Grantor's right~ title and mlerest j n and to the Conduit and Pads . 2. Grantor hereby grants and conveys unto Grantee a nonexclusive easement (the "Easement~) to operate and maintain (lIlspect, repair, replace and II remove) the Facilities OD !.he Fasem.el1t Propeny together with a nonexclusive right of ingress and egress to the Easement Property for such Pllrposes. The Easement shall include the right to install and maintain addjtio~ underground utility (ilicilities on the E.asement PrOpelty. provided lhat any sue:h additiona.! facilities shall not interfere with or impede the U!Ie of any property or iacilitie~ of Grantor. Any :such additional facilities shall be deemed to be "facilities· for purposes (If lhis Easement Agreem~t. Gran~ shall DOl US< ~ & .. men. or the ingress and egress rights granted horein for any O!her purpose. 3. Gran.ee shaU be responsible and ,hall pay for (a) Illy inspe<:.ion, maintenance, repair, reconstructioo and removal of the Facilitie s deem ed necessary" or desirable by the City and (b) the fuU and complete repa;r, in a good and worlananlike manner, to the co~dition existing prior to :;.uc.h damage, of any c:la.maE~ caused by Grantee or any of its agents, employees or contnlclors (0 any lands or property of Grantor or any lessee of G!'3IltOf, in.eluding wirhnut Limitation, any landscaping, paving, fences. or other improvements now or herea:fter located on or across. any portion of the E.a.sem""t Property or the reimbursement to Gran.or for such repair undetUken by Grantor. NotwjtJ'Istanding the foregoL.1g, any repair, l'eC{InSlJ'uction or removal of the Facilities requited in connection with any irnprovemetits of Grantor or any lessee of Grantor, including 9o'~thout limitation, in connection with iii rurther widening of Quarry Road ""1uired by the City in connection with any such improvement., shall be the responsibility of and paid for by Gran.or. 4. Grantor reserves the right to inst.ail and maintain priva[e utility lines, conduits and other utility equipment 2.!.d facilities and landscaping, roadways, patlJwaysJ and other similar improvements (excluding t.rees and bJL1dings.) on the Easement Property, SUbject to compliance with all applicable governmental requirements, including obtaining necessary pennits and approvals, provided 1&[ Grantor shall not interfere with [he operation of (he Facilities. Except as provided in the prec.eding sentence no penn anent strucWre shall be erected 0 n the Easement Property by Grantor or anyone claiming underGranl.or during '.he time the Easemem is in effect without the cons-ent of Grantee. which C(lnscnl shall J"Iot be unreasonably withheld or delayed. 5. Grantor shall be e!1titled at all :reasonable times to go upon and tnlO the Easement Property in order [0 exercise the rights reserved under par.J.graph 4 above or for a.ny other purpose including, without limitation, to post and keep posted theroon notices of nonre~ns.ibility for any construction, inspection or maintenance thereon. 6. Grantee shall indemnify, defend and h..Jld Grantor and its trustees, officers, directors J agents J and employees harmless, from and against any and all claims, liabilities, losses J costs, damages, penalties and expenses arising out of or .resulting from or in any way connected with Grantee', u!;e of the Easement, induding wjtlJout limitation, inj uI)' or death of persons or damage to or loss of property arising out of llIe exercise by Grantee or any of its agents, contradors or employees of any of 2 the rights gfil.I:Jro herem, -excl'.lding 4.llY l<:1s5, da.'Jl3ge,llabtllty, expense, claim. Clr demand that resuhs from the active negligence or 'Ilrorillful misconduct of GrdnlOr or Gramer' 5 agents or employees. 7. TIle Easement bereby granted shall cease and terminate upon nonuse of the Easement or any portion therec;f for the purposes set fort.i herein for a periC<f of two (2) consecutive yean. Upon the happening of ""y of such event, all right, title and interest of Granfee in and to tbe Easement, or in the event of tennination of a portion of the Easement for nonuse, said portiQn~ shall tenninate and :-evert to Grantor~ provicoo that Grantor shall give Grantee written notice that, due to nonuse, the E1sement or portion thereof will termlnate pursuanllo this Paragraph 7 on a date not less than one hundred twenty (12D) day, after the da'e of the notice. Gran,ee may dispute the tennination of the Easement or portion thereof by written notice to Grantor given prior to t."1e tennination date specified in Grantor's notice. If the parties are unable to resolve such dispute, the issue may be resolved' by a ccurt haying jurisdiction. 8. Upon tennination of this Ease"'.e", or an) portion 'hereof, Grantee shall (a) if requested in writing by Gra...lJtClT, remove the Facilities (or that portion thereof as is located upon the portion of the Easement lenninated) and dili&enUy restore the land as nearly as possible to jtS condition prior ttl construction and installation thereor and (b) malee, execute, acknowledge. and deliver to Grantor a quilclaim deed conveying (0 Gimtor aU right, title and interest herein conveyed to Grantee as to Ihe EAsement or portion of the Easement so lenninated. 9. This Easemel'lt Agreement shall bind and inure to the benefit of the parties hereto and their rc.spective successors and assigns. This Easement Agreement, lO~ether with the exhibits attached hereto which are inrorpo: .... aled herein by reference, ronstitutes the entire agreement of the parties relating 10 the Easement and shall not be amended or modified except by a writing eXeC:lJted by the parties hereto. 3 c IN WITNESS WHEI<EOF, the parties hereto have executed this instrument by proper persons thereunto duly authorized os of the day and year r"" above written at Stanton!, Sanla Cia", County, California. Approved as to form: GRANTOR 1HE BOARD OF TRUSTEES OF THE LELAND STANFORD 1UNIOR UNIVERSITY, • body havlng corpoca.,e powe" under the la". of the Slate of CaJjfomia By: Raymor.d F. Ba""hetti lIS: Vice President (or Planning aml Management GRANTEE: TitECITY OF PALO ALTO By: T~~N~arn--e-:---------- [ts: ________ _ [Attach Acknowledgements] 4 o EXHIBIT "A"" ~~ DESCRIPTION OF PUBLIC UrILlry ~ASEK£~S WITHIN ~Bl! LAlIDS OF LELAND srAIIPORD JUNIOR 'IllIIVERSny QUARRY ROAD A non-exclusive easement fo~ public utility purposes in, under, on, and across all the certain real property situate vithin the Lands of Leland stanfor~ Junicr university, Ccunty of santa Clara, state of California, being ~ore particularly describ~d as follows: PAllCl:L om; COKKEWCING at the most southerly CQrner of Quarry Road_ 60.00 feet wide., as described il1 the Grant of Easement from The Board of Trustees of the Leland Stanford University to the City of Palo Alto, recorded February 13, 1957, ih Book 3729 of Official Records at page 7, records of the county Recorder of said County; ~hence, N22·40150~E 1350.12 feet along the easterly line of said Quarry Road: thence leavin9 said easterly line S67·19110~E 8.63 feet to the POnrl OP BEGl:NNING and running thence N22"40'SO"E 10.30 .feet; thence S81"16'JlhE 43.13 feet; thence RI9'10'SO"E 19.64 feet to the southerly line of .~rboretllm Road; thence 364"Z8 1 2S"E 10.06 feet along said southerly line; thence S19-10'50"W 15.79 feet; thence SG7"19'lO"E 3.19 teet; thence S22"40'SO"W 16.65 feet; thence N61"19'10 It W 1l.00 feet; thence N22·C015(JIII.E 3.00 feet; thence NB1'16'33"W 43,13 feet to the POINr OP BEGINNING. containing 809 square feet, more or less. Note; Bearings used in this description are based upon the Calitornia state Plane Coordinate system, Zone'. Ill: North American DatUlll 1927, PAJi.cmL no COKKEUCIKG at the most southerly corner of Quarry Road, ~O.OO feet Wide, as described in the Grant of Easeuent from The Board of Trustees of the Leland stanford Universit.y to the City of palo Alto, recorded February 13, 1957, in Book J729 of Official Records at Page 7, records of the County Recorder of said county; Thence, N22"40 '50"E B12.24 teet along the easterly line of said Quarry Road; thence leaving said easterly line S67 "19 'lO"E 7. JJ feet to the POINT OR' BEGINNING and runniI19 thence; N22"4C'50"E 11.26 feet; the:nce S39·55~4.l"E 57 .. 84 feet; thence S22"40'50"W 16.29 feet; thence N67·19'10 1l W 15.54 feet; thence N14-S4'24"W 27.45. feet; thence NJ9"SS'41 U W 21.49 feet to the POINT OP BEGINNING. Containing 829 sql.Jare feet, mo=e or less. Note; Bearings used in this description are based upon the California state Plane Coorcinate System, Zone III North American Datum .1927. PAltCE'L THUE COKKENcr~G at the most southe~ly corner of Quarry Road; 60.00 feet r:::7 tnr ,.,,"-''- ~:-~~}~~~:~4:· - . wide, as described in the Grant o~ Easement from The Board of Trustees of the Leland st~nford University to the city of Palo ALto, recorded February 13, 1957, in Book 37~~ of Official Records at Paqe i, records of the County RecorQer of said county; 1.'henC'.e N22'40 1 50"E ~10.18 feet along the easterly line of said Quarry Road; thence leaving: said easterly line 567'19 1 10"£ 7.28 feet to the PQ,nl'r OF BllGINNING and running thence; N22 '40 I 50 lt E 14.58 feet; thence S4S'14119 ft E 69.76 feet; thence S22'40 '50 1,W 15.73 feet; thence N67-19 1 10"W 23.49 feet; thence N2S'OB'Jl"W 25.49 feet; thence N48 '14 1.19"W 23.99 .feet to the POINT OF BEGINNING. Containing 1176 squ&re feet, more or less. Note: Bearings used in this ~~scription are based upon the Ca.lifornia StatE'> Plane Coord.inate Systen~ Zone III North American Datum 1927. END DESCRIPTION / / I ! ! / Brian bngu fauIk ~ •• l"lrl.~ ro'''I,ol ,. ! PARCEL 2 " " ) .• I'!~ t-t -.1 ... - \.... Hen g'l o·w 15.5-4' PARCEL 1 EXHIBIT "BN PlAT TO ACC~PANY LEGJ\l O(SCRIPTiON or PUl3UC UnuTY [ASEMENT WIn,IN nit: LANDS Of LElAND S.TANFOI~D .J..INfQR UNI""""TY I 1 OF' 1 '"'" " STATE OF CAllFORNIA persoDa.11y koown 10 me (or proved t(' me on the basis of satisfactory evjde.nce) to be the pe=D(S) "bore name(s) is/are sub"nbed to t~e within instrument .nd acknowledged to me that helshelthey eXOC\Jted the same in hiliherltheir au.horized capa:city{ies). aI1d that by hislher/their signature{!) on the instrument the person(s), or the entity upon behalf of which the pcrson(s) acted, executed the instrument. WInffiSS my hand and official seal. A / Signature -F--~----~=-::..::-=.-==--- A1TENTJON NOTA,t(Y; A1thaugh the information ""Iuested below is OPTIONAL, it could prevent fraudulent attachmem of Ibis certifica!e to a.lother document. • TInS CERTIFICATE MUST Ti~e or Type of Document &a4~~ ~ BE ATTACHED TO THE Number of Pa.es LDate of Document"-"il'i. / f'-- DOCUMENT DESCRIBED Signer(s) Other th,n Named Above AT RIGHT; --'---- .• ., 'fF'11 IT '. " o Attachment 3 Environmental Documents ... City of Pa10 Alto ENV IRQNM[NTAL~~" SMENT Project Oescr~pUon/Title; Qunr..:t..RQ.ad w~jerdM. S_llD'ford !Jnivers.itL_h_te~ JO ..,iden Quarry Road to fo.ur".J..!M,.S clus t~.rltJanes. between lte:l.<::b and ArborHul!1 J(oads. as an en ... ironmen.tal mitigation Jor Ule PsvchiatrLl1ullding. lh'is pr.QJhl inc' udes. continuir.g the -"iderdnu.ast Welch ROi!:~ to the parking l{lt.._~n.trance \bat used to be 81 ake Wnbur ::Jri ve i and to widen thg Weich Road approach at Quarry R.QigJo add a 1 eft turn lane. . _______ _ location/Address: Quarry Roa~._.LE.r:9.m Arboretum RoacLJo Old STake Wil.~.!JL~ Sponsoring Agency/Appl icant: Stanford Uni'(ersjty. Michael KUf!.t2'~ _____ _ Address and Telephone of ~pp1icant: 327 Bonai,.. Sidi.D~ Stanford. CA 94.3_05 __ (415) 725-3400 _____ _ Application for: AichitectM!"_al Review __ (e.g., zoning change. subdivision of property. architectural review, use permi t) Zonin9 i.t Project location: --E.L£ __ FE'2 Receipt Ne.: 92-~_l.L.. NOTICE OF DETER~INA110N Based upon review of the ~roject files, the undersigned member of the Planning Department has concluded: Ixl u NgMJive impac.t. Negative Decl3ration; The pr-oject has no significant no [n"iironmenta1 Impact Report h required. The Declaration are: envi ronmenta.l ri!aSCins. fOT 1 The project !raj tlave a significant erllt'ironmental ·;mpact. An Environmental Impact Report wi 11 be prepared'. Planning Oe?~rtment Official: ~!U~ =------ Plannin9 DiTector: fr~~ Date: 0/.)-3/-"'-2--__ _ The project has been approved. Date: The project has been denied. Date: file No.: p:\ l"'\qoarrl'. ned ENVIRONMENTAL DOCUMENTS -PALO ALTO INIlIAl STUQ.Y'* *'II r. Project Title/Address: ~ Road_ widening (from Arbcretum Road t~ Bla~e Wilbur Road) II. fr.aject Descl"'1ption: Sta.~fQrd Un.ivJ;!rslty is r~qlJt,..ed to wider. OlJa:rr't Road to four ~jnes plus turn lan~s, betwe~n Welcn .And Arbgretum Roads~ ~n envllonmenta.i mitigation for the Psychi~lrLMlding. This~~ includes continuing the widening cast nNe]en Road tomthe parking lot entra.nce tha.t u.sed t.o be. 8lake-.!llJbur Qrhej and. to widen the We1ch R9.id appro~ch at Quarry RQ_<LU_O add a 1 eft tUrn l..§.D.2...:. 1£1. (rl\dr~nmental Settir.g: Jl1_~L urban street adiac!:,nt to the Sta~fQrd Sh~ppin9 Cent€r~ l'L En'lircnmenh,1 Impact Ch~~k.iist {£x~·lanatiOt'J of ali -yes· a!)S'fIers are in Section VJ 1. E.!rth." W'!ll He pI'oponl result in: !. Unstable e~rth conditions or changes in geo1~gic substructures1 b. Oisrupt10ns~ displactments, compat· tion or overcovering of the soil c. Change in topography or 9~ound su,-face re1 i ef features? d. The destruction, covering or modi~ ficatfon of any unique geologtc or Physical features? e. Any Increase in wind or water erosion of soils, either on or off the site? f. E~posu~e of ~2ople or property to geologic hazards such as earthqu~k2s, landslides, mudslides~ ground fatlure cr similar hazards? g. Changes in siltation, deposition. or erosion which may modify the ,ha~nel of a river or the bed of a bay or inlet? • Adapted frorn Appe~dix r, California Guidelines for l~p1ementation of CEQA, December 14, 1976 . .. Updated May 1982, June 1983 P: 'Ul\QUAAII.Y. [0 -!- PAcE 1 • i i j I I 2. ",''. . Air. 'Wi 1: the proposal resuTt in: a. Substantial air emissTons or de­ terjoratio~ of ambient Jlr quality? b. The creation of c~jectionable odors? c. Alteration of air movement, mOisture temperature, cr any change in cli­ mate, eith~r locally or regional? Water. wn 1 the propo:S.al resillt in: iI:. Changes in absorption rates, drainage patterns, or the rate and amount of surface water runoff? _,x_ b. A1terations to the course or flow of flood wat!!!l"S? ~ c. Discharge into surface waters. or in any alteration of surface water qual1ty, including but not limited to temperature, diSSOlved oxy~en or turbidity? d. Alteraticn of the direction or rate of flow of ground waters? e. Exposure of people or ~roperty to water related hazard~ such as flood­ ing or tidal wa~e1 f. Change in the quantity of ground waters, either through dire-ct additions or withdrawals, or through interceptions of an aquifer by cuts or exca .... ations? 4. PJant life. Will the proposal result in: a. Change in the divel"s~iy of species, or number of &ny species of p1ants {in­ cluding trees, shrubs, grass, crops, microflc-ra and aquatic plants)? ___ ~_ b. Reduction of the numbers of any unique, rare or e-ndangered species _x_ of pl.nts? _x_ YES NO 5. c. d. '. Introduction of new species of plants into an area, cr in a barrier to the normal rep1enishment of existing species? Reduction in acreage of any agricultural crop? Animal Life. Will the proposal result in: i. (hange in the diversity of species, {lr n'Jmber tf any species of animals (birds~ land animals ,neluding repti12s, fish and shellfish, benthic organism$, insects or microfauna)? b. Reduction of the numbers of any unique, rare o~ endangered species of animals? c. Introdu<:tion of new species of animals into a~ areal or result in a barrier to th~ migration or move­ ment ~f animals? d. Deterioration;n existing fisb or .. i ldl i Fe habitat? 6. liaise. Will t~e proposal result in: iL Increases in existing noise levels? -L. b. Exposure of people to severe noise _1_ levels? _1_ 7. 8. light and Glar~. Will the proposal prod~ce ne~ ljght glare? La,.,d lis~. Will the prDposal result in a substantial alteration of the present or planned land us~ of an area? 9. Ener.ID'.L'!ll.Yral Reso'lJrcl!~. ....i 11 the proposal r~sult in: P;\l"'\Q~r.EI) a. lise of substantial amo':.Jnts of fuel or energy: till PAGE 3 --; o b. SUbstantial increase in demand upon' existing sources of energy. or require the development of new sources or pnergy? c. Increase i~ the rate of use of any natural reSQurces? d. Suhs-tint'l' deoletion of any nonre­ newable natural resource? 10. ~isk of Upset. Does the proposal involve a risk of in explosion or the release of hazardous s~bsta~ces. (in­ cluding, btJt not 1 imited to, oil, pesticides, chemicals or radio.tion) in the event of an accident or upset? 11. Popu1ation(Housing~ a. liii 1 the proposal alt2r the location, distribution, density. or growth rate of the hUman pop\Jlatiof'J. of an area? b. Will the proposal effect existing hD~sing~ or creata a demand for additional housing? 12. Transportation/Circul atioll. "'ill the pr~po~al res~lt in: a. Generati<lr'I of substantial additional vehicular movement? _x_ b. Effects on eXisting parking faCili- ties, or demand for new parking? ~ c. Alterat'ons to present patter~s of ciiculation Gr mov:?ment of people ar.d/cr goods? -X- d. fncrease i ... traffic hazJrd~ to moto,' ~ehicles, bicycli~ts or pedestrians? -A- 13~ P~b_l ic Se.rvices. Will the proposal have P:\lW'\QlU.iiJl1.fD an effect upon. or result in a need for new or altered goverrlmel'1tal ser\lic~s in ,HIY of the following areas: i. Fire protection? _x_ NO b. c. d. e. f. " Police protection? Schools? Parks or other recreational facilities? M~intenance of puhiic facilities, f~c1uding roads? Other gcvern:flental services? l~. Utilities. Win the proposal result 11"! a need for new systems. or substantiil alterat~ons to thp following utilities: a. Power or natural gas? b. (c!M1unications systt'ms? c. Water? d. S2wer or septic tank? e. Storm ~ater drainage? f. Solid waste and disposal? 15. Human Hezlth. 'Jill tht'! pr'Jp:lC'sal result in: i. Creation of any health hazard or potential health hazard (excluding menta.l healtJ-a)? b. Exposure of peop1p to potential- health hazards? - 15. llit.b~t t<:.!. l.Ii 11 the proposal res~ 1 t in t~e obstruction of any scenic vista or view open to the public:f or will tne proposal result in the creation of an aesthetically offensiYe site open to public vieill? 11. Recreation. ~jll the proposal result in an imract upon the quality or quantity of eXisting recreational opportunHies? _x_ ...L. _X_ . .L -.J_ ...L. ...L. _L _X_ ...L. -~- _x_ _1_ i, o 18. Ct41tllral Re:;ou!"'Cti. I. Will ~he proposal result in the alteraticn of/or-the destruction of a prehistoric or historic ;rcha901ogical site? b. Will the proposal result in ad­ verse physicil or aestr.etic effects to a prehistoric or historic building, structure; or object? c. Does the proposal have the potential to cause a physical change .hich would affect unique cultural values? d. Will the proposal restrict ex~sting religious or s~cred uses within the potential impact area? 19. Mandaton Findings of St~.njfi.:ance_ a. Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish {IT wildlife specie), cause a fish or wildlife population to drop below self-su:;tain'ing 1evels t threaten to eliminate a plant or animal community. reduce the number or restrict the range of i rare or endangered plant or animal or eliminate important examples of the major periods of California history or pr~history? h. Does the project have the potential to achieve short-term~ to the dis­ ad .... antage of long-term) enviror,Oilental goal s? {A short-term impact on the environment is one which occurs in a relativelJ brief. definiti .... e period of t ;me whiTe long-term impacts wi 11 endure ~eil into the future.) ill ,/-. c. Does the project ~aye impacts whicr Ire indi~idullly limited, but cumulatively conslderable? (A ~r~­ jt!ct may 1l1lpact on two or morl=C sepaTlte resources where th~ impact on each resource is rela~i~ely smal1 1 but where the ef.ect of the tatal of those impact<: on the environm&nt is 5igni.icant.) d. Does the proje~t have environmental ~ffe~ts which will caU5~ 5ubstantia1 adverse effects on human beings, either directly or indirectly? V. ExplanatiD~ of ·yes· answers in environmental checklist. See ittached. P:\l\l\Q.l.LU:RY_~O _1_ • o LiM~lliJlL.. The proposed widening of Quarry Road win ~nclt.h1e wid1:'tdn~ Quarry Road on the east side from Arboretum Road to O1d Blake WilctJr t/:o.a.d, DrQ~ide a new right turn lane on Welch Road to southbound Quarry Road traffic. This project will result i"J the adcition of la,50C square feet of paved Hea. These improvements to the existing road wil1 not ha ..... e a slg"lific:ar\t 1mpaH {In area soils. l... . .taJ.---.loJ.G.. He widF!ning of Quarry Road ..... i11 tetr.;Jorarily resuH in an increase in dust emissions over exi~ting ambient ai~ condltions. To reduce dust le\le1s during constr\.lct1on it shal1 be required that exposed till"th surfaces be watered frequently during the late morning and the end of the day, with frequency of 'wfaterlng increa<;1ng en 'lIIindy days. Reclaimed water, if'l accordance with the. Publ~<: Works D-:!partment policy, shall be used for this purpose.. All stre.ets -and haul routes shall be clewed da.ily. The app~i.car\t shali ensure that spillage resulting from hauling operations along or across. a.ny plJblic or pri~a.te property shall be removed immedia.tely and paid fOl" by the C011tractor. The applicant sMall also ensure that dust nuisances originating froll! the contractorls operations snall be controlled at the contractor's expen;t. 3 Ca) Wa.ter. The proposed project will result in a minimal incrns1! in the amount of impervious surface area (18,500 square feet) and minor alterations to existi~g drainage patterns with a slight impact on afea drain3ge. A detailed drainage plan will b~ required to be approved by the CHy Enginet!r prior to i$suance of a building permit. 4 (a) Plant life. Ine site presently has fi~e different species of snrubs and 9roundcovers in addition to native 9rasses ~nd weeds which ;nc1ude Esc~11Dn1a, Fr~ncfl lavendar. Prostrate .Rosemary. Pyrenees CotGneaster, and Sage-Teaf Rock. Rese. 1he proposed ~idenin9 ~il1 requ,re removal of four 5-fcot ~i~e Q~ercus Suber trees on Quarry Road. While the loss of these ~ree.s is not a Significant impact, an a?propriate mitigation measure would be to plant n~w trees to replace the tr-ees that will be lost. Eighty-seven new drought tolerant trees and shrubs are pr~posed to be planted i:-. the new median strips, planting strips, and sidewaJk to the new parking lots for the Psychiatry Center. ~J.!.l.~.QJ.ti..,.. ConstructiQn activities will result in a temporary increase in local ambient noise le~e1s. C~nstruction activities will be subject to t~e provisions of the Palo Alto Noise Ordinance (Chapter 9.10, PAMC) which reQui~~ construction equipm€nt to be muffled so as not tc exce~d a. noise emission of 83 dectbe1s (d8A) at i! Gistance of 25 feet, or a noise level excepding 86 dB.~ outside-t~e property, unless an excsption is granted. 12 TransportaJion/Circulation. rn accordance ""ith the terms and conditions of the agreement betwe~n th~ City and ~tanford far tk2 Psythiatry C~nter Building project, Stanford has submitted improvements plans. for the "Widening of Quarry Road. The project in(l~des the follo~~ng: 1. W~d-enin.g Quarry Road up to 72. feet from Arboretum R.aad to the par~ir1g lot entrance that used to be Blake Wilbur Drive to accommodate two through l~nes in each direction, turn la~es. on­ strpet bi~e lines and a landscaped median in ihe r~adway including p:\IOj\~rry. i~e page 1 , .... ','" ------... z. 3. 4. 5. a. planting strip and sidewal k 011 both sides as well as tree:. irl the ne' .... plantlng strip. Widening Welch Road by S feet (In the we$.t side north of Quarry ~ild for a distance of .a~prQximately 240 feet ex-eluding 60 feet of taper to aCC0lTll710d3te a second left turn lane and cnanging the existing lwc phase signal to a six phase signal. lfidenin9 Arboretum Road up to 8 fee~ on the west side south of Quarry Road for a dista!lce of 150 feel to provide a bette!"' merg~ng distance fer the sQuthboL:nd trC!ffic mergir'] from two lanes into one. Prohibiting left turns in and Qut of two of the three driveways to Stanford Shopping Center along Quarry Read to reduce traffic confl jets. Modifications tei the existing traffic signals, relocatiol" of the traffic signal eqUipment, American Disability Act prQvision~. landscaping, bu~ dUCk-out and oth~r related items are included as _p2rt of the prQPosed impro~ements. The pr()jecl described above has mar.y adva,1tages and benefits oyer the existing conditions, including: I. a provides on-street bike lanes and completes a miSSing llnk. between Welch Road cmd Quarry Road E3.st of Arboretum Road there-by Irr~roYi~g bik~ safety. 2. A 15 foot wide landscaped median (fhe foot wide next to the turn lanes) will be built as a part of this project dividing the traffic physical1y in the oppos ite di recti on and adding to the aesthetics; n the area. 3. Left turns in and out of two of the three Stanford Shopping Center driveways 'Will be prohibited reducing traffic confl jets along Quarry Road. 4. The pruposed addition of lanes at the intersection of Ouarry and welCh and traffic. signal c.hange.; 'Will modify existing ciiclJlation patterns. These changes lIIill impro .... e the level of service and relieve cong~stion. 5_ The addition of a bus duck.-out .... ill remove buses from the way of through traffic and help traffic move more smoothly. 13 eel P",hlic Ser'(icp.-:,. The City of Palo Alto 'Will aSsume responsibility for insta.llation, maintenance, traffic control and enforcement and other related function! of the proposed street improvements .. hich will increase both irr~ediate and long-term finanCial expenditures by the City. These incrEased costs will form only a minor portion of current costs of approyed Capital Improvement Programs and City maintenance responsibilities. "They will nat ,"';a',.Ie a significarrt impact on the City budget. page 1 --,-,",-,~ ....... -. .'