Loading...
HomeMy WebLinkAbout0390.092- >'~ :. ~: ... ; .... . , . ':: -~. 2 Septemb~r ), 1992 THE HOl/ORABLE CITY COUl/eIL Palo Alto, california Pale Alto Landfill Closure, Phase !I~L -'::J..L.3...~J.PJ) -.lI.dditioD3.1 Change Order Authority Members of the Council: This report recommends that council increase the City Manager or his designee'~ authority to negotiate change orders to Contract No. C-20J0139 -:.Jith Fer::na Corporation for the Palo J>.lto Landfill Partial Closure -Phase IIA, elP Project 45100. Funds are available in CIP 45100 -Landfill Partial Closure Project and in the 1992-9) Refuse Fund Operating Budgct~ Background In May 1992, council a~arded a contract to Ferrna Corpora~ion tor the Palo Alto Landfill Partial Closure -Phase rIA, CIP Froject 45100 (CMP.:240:92). The clo~ure project involves the removal of existing: vegetation, the placem-ent of lo·..--permeable and topsoil cover layars, construction of perimeter drainagE control, insta11ation of fencing, and raj sing/securing landfill environmental control systems for landfill gas and IG3chate. As part of the !-'hase IlA Closure, lo' ... ·-permeability soil stockpiled on site is to be used as part of the final cover required for site closur~. Rec~nt changes in regulatory require:-r;ents for landfill closure have resulted in the need to screen the material to remove the 1arger aggregate in the soil to meet more rigorous testing and placement requirements. The screening operation has redv_ced the volume of low permeability soil available on site for completion of the Closure Proje~t. In order to complete the project, additional low-permeabil ity soi 1 -will need to be imported to the larldf ill. Fenna Corporation has identified material available at another of their construction sites that -will meet or exceed the regulatory reguiremer.ts. The exact amount of material needed cannot be determined at this time, as screening and cover placement operations ~re using the on­ site stockpiles. It is estimated, ho~ever, that ~p to 17 1 500 tons -1- CMR:390:92 C'" --,.:- .\' , , of additional soil will be rElq'I • .l.irer::!. Fprrna Corporation is able to furnish the needed roaterial tor $9.62 per ton, at an approximate cost ot $168,000. Ther~ 1& $80,DOQ remaining in the Phase IIA an addit,it)nal $90,000 available in the oper~ting Budget. Regommendat:on Closure elP Fund, and 1992-9] R~fuse Fund staff recom.'tll:mds th~t Counc,:'l increase the City Manager or his de.siqnee's authority to negotiate and exeC'u,te one or more additional c!)ange orders to Contract No. C-203013·9 with Fer-ma Corporation j the total value of which change orders shall not exceed $28:5,000. This represents ar. increase in staff's a'Uthority from $115,000 to $285,000 for all change order~. Respectfully submitted, ';1Ift~$£' MICHAEL H. MILLER Oeputy Director, Public Works Operations -2- CMR:)90:92