THE HONORABLE CITY COUNCIL
Palo Alto, California
High Pressu~ Fluid-Filled Cable System PUmping Plant
Members of the Council:
Report In Brief
5
This report recommends that the city council approv~ ~nd
authorize the Mayor to execute an aqreement with T. W. Eisenman
in the amount of $300,772.63 to design, build, test, deliver,
install, and commission a High Pressure Fluia-Filled Cable system
Pumpinq Plant. In addition, staff recommends that Council
authorize the City Manager or his designee t~ negotiate and
execute one or more change orders to the agreement to cover
additi~nal related but unforeseen work which may develop during
the course of the project. The value of th~se change orders
shall not exceed $30,000.00. The Capital Improvement Program for
FY 1591-92 includes funds for this project.
Backgrqund
In the 1990-95 Capital Improvement Program the Third 60kV
Underground Circuit project was proposed and approved by Council.
This four-year $5,300,000 project would install an additional
60,000 Volt (60kV) unde~ground cable to support the two existing
high-pressure fluid-filled (HPFF) 60kV undergound cables
installed in 1968 and 1972~ The tvo existing HPFF cables
transport over 65 percent of the electricity used in Palo Alto,
are approaching their safe loading limits ana, under emergency
conditions, are req~ired to carry more than their rated capacity.
The proposed project would have installed a third 60kV cable from
the Colorado Substation near Highway 101 to the Park Boulevard
SWitching station and continue on to the Hanovar and HanS9n Way
Substations in t.~e Stanford Industrial Park~
A study was conducted in 1990 by SA! Engineers, Santa Clara, to
evaluate the 60kV subtransmission system. The results of that
study indicated that a series of ·strengthening" actions, if
taken, could postpone the need for the $5,300,000 third 60kV
circu1t~ ~he strengthening actions ~ould allo~ us to make better
use of the existing 60kV system. The strengthening actions
CIIIU370"2 Page 1
includ.ed: replacement of some 5DkV switches, cha.nges to
protective e~~ip.ent, an in~rared survey of the 60kV lines t~
locate overloaded components, re?l~cement of overloaded and
undar.siz~ components, shifting load between substations, and
installation of a redundant oil pressurization and pumping plarlt
for the HPFF c~ble sYGtem.
Total c·ost of the strell9thening actions .... as estimated to be
$600,O~0~ Because the strengthening actions would postpone the
need for the third underqound cable, the strengthening actions
'War-a funded from the approve.d Third 60kV underground Cir-cui t
Capital Improvement Project. Unneeded funding has been r~turned
to Utility reserves. A study of the subtransmission system to be
con~ucted over the next six menths will r-eevaluate the need for
the third 60kV circuit. If the study recommends the thir~
circuit be reconsidered, a ney capital Improvement Project will
be d~veloped and proposed for the 1993-9< Capital Improvement
Program ..
Several of the recommended strengthening actions have been
implemented. On February 7, 1991, Council approved an agreement
(ref. CMR:141:91) with Po~er Technologies, Inc. for consulting
and enqineering services for the Pumping and Pressurization Plant
for the High-Pressure Fluid-Filled (HPFF) cable system. The new
pumping and pressurization plant will increase the reliability of
the 60,000 volt (60kV) sUbtrar,smission system by providing a
back-up to the 24 year old pu~ping plant installed at the Park
Boulevard switchinq Station. The new plant will also allow some
limited oil circulation, which will increase emerqency
overloading capability of the &xistinq HPFF cable system.
contractor selection Process
On June 23, 1992, bids were re~ived from tvo qualified
contractors:
c.antractor
pirelli-Jerome
T.W .. Eisenman
Dount
$300.850.57
$300,772.63
&~e to the specialized nature of this type of equipment, staff
found only tw~ contra~tcr-s (Pirelli and Mac Products) with the
expertise needed to design and construct the pumping plant~ T.W.
Eisenman's bia includes furnishing the Mac Products p1~nt.
Staff recommends awarding the contract to T.W~ Eisenman because
their p~ice was lowest, they did not take any siqnificant
exceptions to the specifications and they were given positive
references. The engineer's estimate for this pumping plant was
$300,000.
CIIR.370:92 Page 2
Funding
As discussed above, funds from the approved capital Improvement
Program Utility Project entitled -Third 6CkV Cnderqround Circuit
are beinq used for this proje~t.
Recoll!llendati~n
Staff recommend3 that the City council:
1. Approve and authorize the Kayor to execute the attaQhed
4qree.ent ~ith T.W. Eisenman i~ the a~ount of $JOO r 772.63
tor labor and materials.
2~ Authorize the City Manager or hts designee to neqotiate and
execute one or more change orders to the aqreement with the
value of such Chanqe orders not to exceed $30,000.00.
Respecttu~ly submitted,
~)'-.,J~ £ . ..,&-«,.J-<~
MICHAEL n~ S!'...IJfLAND
Electrical Engineering Manager
~-<'rr'7
~ L. YOUNG
,Ol~ecter 0 t ~ities
, I
I I
/t-£-,...4~1>-',r-t
Related Staff Reports: CMR:141:91 consulting and Engineerinq
Services for a New Pumpinq and
pressurization Plant at the
colorado Power Station4
Att4c~ents~ Agreement
Bid Sheet
CIIl1l370.92
• ,,"',C, ;':,-'C,,_"'''' "'L"'. · .... ".111 ..• nli.III .... 1OL1ll1If .. ?iII' .... "'_ ......... __ .,'
'~J11\~'
.... ">. . .
~~,~~;~,
-
I , :)
COLORADO SUB~,ATION
H!GH PRESSuR.E fLUIQ-FILlEO
PUKPiNG PLAN]
/;:>!;:l_E,-U / MAC
.=:==~;====~==========:======================:==~~~====================:;===*
: I"iEH :
~=========:==~~===============.=============~:===:---~==~=====~=====:===:---:
: 1 ~ e~se Eid 2E._l,!JOO " 245,000 i
: --"----:--------------------------------------, ---,
€,6 C f3 :
:------:----------------------------.------; -----.--------~ -----
n ."~
r------:-----------------.--------" ---------;----
~,,:,;,
: ------: ------------,,--------.------_.-. -_.--:-------------~--------------
: S : Option: Furnish K?~O~€ ?ipin~
:------:----------, ,
------:._-------------
8,22'; I, 1'),8GC :
'-----------' -------------:
---------:------.---~
,------,--------------------------------------,--------------,--------, , "
$ :10TAl (DO€:s not incl' .... j,iL~ale:s t-a~) S277,'?22.S-0: 'S:::n,'3S\:,_'JO : ------: --,---------------------------------------------.---: ----------,
? : TOTAL (1l"lcludes anticipated !:,ele-s -:2"): , ______ 1 ______ • __________________________ _
,------,----------------------------------
ConstructiCi' De:.ei:..s
Pcsltiy€ reFen.':'I"":ces called
-,--------------'---,-------------,----=: =:==:_:::; c
1
O;\':23·-~LE'':, e'I:_;',--:-r;CI.\<irJ
S.". ZUC'Cdr-,:-.
7/1~. 9]
/
I
i . r
\
l"
;~.
:, BY THIS AGREEMENT w.o£ AND ENTE'RED ,.-.n-O ~ TJ.1f;: _ 0 .. '( Of" ___ ~.
AGREEMENT No._
S'f AACBf'i'~ 11*: CtTY Of PALO ALTO (f'EP.E,N;"F':t.1" I".t:.oi::R'1l0 1'" II.S Cln' ,"N~
l"'AA'i:I("\! T.W. Eiserunan _________ .__ [2,1 ___ .____ ________________ _ ____________ _
~~Otw.ss.J .J:7~_. ____ $ylY..?_lL __ "'Ve. __ (':",1"1') ~oh.:~bU.5~J'·~2__ ',Zlr,1 4320-4 ,P .. K.lNC! §~4/2J9-::-}462'
(HE~E~ flEHR'lEO 1 0 AS CONTRACTOR) IN CONSJO(FVmlN O~ THEi~ ~UTWA.!. CO'iiON"' ..... S T~E f-',I".TI'5 \-I<::i'1fTO A(1P,Ef AS nXl.':"\o',!s
• CONTRACTO R SiW-l ~OVI~)E OR n.J RN 'SP"I HIE-fOl..l-:lI'o'!'"C:; Sf'::CWI W SER .... ICE-_S Ar.;D.-::;M ",O,TffllA.!. '5 5P~'C:I('ED 'N E X-C': e:T _~~_'-'_
"TTACHED f.lE~nO "'NO 1~~?ORAn=D HE.Rf;JN 9Y ""-I-il-'" ';'E'F~_RENCE
Design, build, test. delivery, installation, a~d start-ti? of a new high pr~S~UT!
fluid-filled pumping plant lccat('>,Q at the. Col.Qt:adc SlJ.bs.t.at_~~)n>
• EXHI BITS TKE FOL.:..OWI~ A TIAC HED E")(HIf!ITS .,.ERE B'" ,oI,R., ~Al)E. rAin Or ~I$ "'G'1 E.E:MENT
"An Notice InvitiT,g Forma:;' Bic!s (Ir.ch:ding specifications, and Tn5ur.anc~ RequiremBnts)
liB" Accepted Bidders !'rcposal {Incl1Jd:'n..-; Insurance C<":rtificate~ P.erfcrmance Bend. l&M Bond.
and AifirmaU,.-e Action Compliance)
• TERMS THE S£AVlCES IV"~ ~AT'ERIALS FL/RNISH:O UNDER TfilS ... aRE:EMENT S>iMl.-COMMENCE n.-. ..Qa te of .?-<o tJ. __ C:: __ t:! to ProS.ti..d:
~DSI4iW.UCOMf"..ETEClaH-.QfI£_~.99 calendar __ ~!;;J.Z::'2':ll. __ ~_;;]. __ i::e of N,:,tice to Proceed
• COMPENSA nON FOr;: nit: FUll PERFORMANCE or TH:S AGl'IEEMn';T $ )DG, 7 7 2. 63
:D: C[fYSHNJ.P ... y~T~. Base bid and cptions 1 and 5: $300.772.63 (Three hundred thOUSd(,d
and seven hm,rJt:ed and seventy two dollars and 63 cents)
• PAYMENl RECORD ~Di::DA~W.ENf \J$C-Rf\ll:;RS-e: srDf,1
• em ACCOUNT NUMBER:
KeY C-WE CSJECT I~~OJE'.cT -PH';SE-NO 1.~.~ __ MKlUNT
23825500 -'-322:~ __ .J::£:i~ _______ . 2.~-_ en -.---t S30G 2 7i2.63
• GENERAL TERMS AND CONDITIONS ARE INCLUDED"" BOnt SIDES OFTHI' OC>ClIMElH
TH'I$ AGREfME"T SHALL BECOME: EffECTIVE U~N ITS APPROVAL.MID €)(tCUTI'ON BY CITY. ~N WITNESS HIEAEor, THE PAP.lIF5 HA:\it EXE=C:UTEO THIS
AGREE»Hf1 M DAY. MONTh. AMiD YEAR FIRS., WRITTlili ,t..9Dvt.
HOUJ fLl.1U«.8S. COh'1ltA~TOI=I acr~ to ~nd~mllify, :lehnd a~d hOI'd Mrmless CITY, ,'!s off'~~rl, <i~nlS, ar>d e!~';JiO)'fes fram ally lfiC ail -:m .• 1M" C:.tIlTtS N 1I<1b!I:ly ol
iJT)' r\a.lIjrt, incht~~n, ~lui dutt>. cau",(} b~ ~r arisi"Q CUI ~ CO,,"TRAcrOA S. rt~ I.l:f;cers', a~er;-ts or f.m~-IG)'M'-> ne,.i:\le~t acts, err();"S, 0' omi~~ic'ns, '.ir \'J'lli e'
miscontfuC\ tlr C"(iI'l(f:Jd lor wfl:ct: the IJW ;~p-;I~ &Irn:t J;abI!:tJ <J~ f,O~T~AP"uR ir;:tt.a per1C!rTTlar.~~ D· lai;ure i:J p~"cr:-n I1ir-s "or"~ 'l1ent !;'y C:L1r.;~,l.CTQR
EJlflI'lf .lSREfIllffo"T. nus .i\l~mtm aM 1M lei m !',d '·Q.'l~~.tr,.Ii. __ CQIDtn:.r~! >"t:'p:~~~nt t!"1e 0' ,~Ir-e a';IH:ment ~n~"~~ i'!le ~I'~~S ItiIlh r~s;;ecr ~o tt,e purcroa,~
a.t'lt;i:!<lle eli the e:o.ul\imerlt m.~rnars or s:JPOr,e~ 01 ~;l'imer.' IOor ser~lc~s W~lrh n'3~ tl<! ~ S.!J':lI~c1 i)l t!1j5 ~on~ra':t Ai~ ~(]"": l\!r~scrvt'S, rl."ore5entat'or.s ~:ltur:e;]t~,
Ot'goticl.i!,lns and t.m~t'.J~ """f~r oral 01 ",r::tell all! swoe,"~ecI ~a'~t)y
• PROJECT MANAGER ~DRE!'~tsrNT ... TI\tE.~ORCI""
NtUlE _M}.9 HAE L ~. .BEM"lA.,,"P_
CONTRACTOR
Electrical Engineering MEnager
DEPl U't111tie~ngine:erit'.g Electric
P.O. BOX t 0250
PAl.O ALTO. CA ~-acJJ
TelephcrlE! ~ .. j11-::2365. __
TITL~ ____ _
50Cl.-'"L SEC:U~ITY
OR IRS NUM ... H,
.. INVOICING SENt' ,t,t.llNV':.,)IC"S T;) mE C:T!, .... Tl"N I>F\GJ-::.cr ),,0,1'111-'':'('1
• ctTY OF PALO ALTO APPROVALS: iRouT'" ~')R :':GNA~UFI.[;5 ACC-r..ri1C!NG !':J N'.'MBERS iN A"PRD"'-"L E\OXE:SBhOW:
fcmIiPAIITlolE'fr Dfll~~~~nT~iS~',.iif.~---""-IrlNA~:F-------jp,,~rnqJr,c~-;C~liI<;S-R..Io'o~1
i", [I<, '" 141 ~
< "'EO ".000 ~,WIPES 0';;' "'",GEe $S.",,"", 1 ~ ~ OVoR '" 000 "~,.,,,,, .,;c. >NO '~""N~"CM "." ---
~f\' (,IF PALOAlJO ~msr APPFl~\II1l AS m f'JAM
:! -~~.:" ;:-~~" _-' . ---,; ._.~".,~ '~"'~ ______ ":':C'""""~
Rf:; lil/,j ORF!::N t;.oPY l_ sq', T [ . S-_.",.
-