HomeMy WebLinkAbout0361.092.july 30, 1992
HONORABLE cr;r¥ COUNCIL
Palo Alto, California
calTraiDLSrort Range Transit Plan. FY 1992/93 to 2000/01
Kembers of the Council:
REpORT IN BRIEF
The purpose of this informational sta.ff report is to smr..marize the
draft Cal'I'rain Short Range Transit Plan ("Plan"). No Council
action is required. Included with this repcrt, as Attachmeut 2, is
a lettar-from the City Manager to the Peninsula corridor Joint
Powers Board ,J'PB} transmittinq the City~s cownents on the draft
Plan, as well as excerpts from the Plan.
Althouqh the JPB and the California Department of Transportation
(caltrans) havQ achieved some rema~kable improvements in CalTrain
service over the last several years, staff has identified a number
of issues of conc~rn in the Plan:
• San FrancjE-co Terminal Relocation: Last year this
project had a reasonably definitive schedule and. somewhat
hopeful pros~ects for funding, but its status is now
"uncommitted!!, with a distant prospect for
i:mple!tlent~tion.
•
•
•
CI!R:361:92
Increased Train~...Frequency:
frequency thro'Ugh 2001 is
present 60 daily trains to
nectriJication! This is
'Would. probably be needed
train frequency.
The goal for incr-eased t!'"ain
a meager increase from the
65 daily trains.
an uncommitted project that
for substantially incr-eased
SiLAde Separ2tions:
separations are not
probably be needed
frequency~
Wi th one minor' exception,
discussed in the Plan~ They
for substantially increased
grade
would
train
-~, ·,.".-L--------
t';
,i~~;t
.; -
-
,
r
-
•
o
~~~~§; The Plan calls for limited bicycle
access on trains, whereas it should advocate access for
num~rous bicycles at all hours~ Additionally, the Plan
shoula advocate enough bicycle lockers to serV2 cur~ent
and projected ~emand.
• Access for the Disabled: Improvements at the Palo) 'L to
station to acco~odate persons 'With disabilitl"es are
astimated to cost $3 mil1ion~ including retrofitting two
tunnels ",.mder the tracks, which staff supports" Staff
would also li.ke to have all remaining tunnel issues
res.,lved~
• S4n Antonio statio.n: Thj s proposeo s"tation .ill prc·,ably
become operationdl in ]993, yet is not mentioned in the
Pla.n.
• Regi~nal COQrdination: The JPB is committed to sel:
serVl.ce ticket machines, allowing improved ticketing
arrangements among CalTrain and Peninsula transit
operat.ors. staff would liKe to see a more aggressive
stance leading to one -mutual ticket for all Peninsula and
East Bay operator~~
Between 1980 and July 1, 1992, caltr~n8 administered th~ Peninsula
rail service, includi~g a contract with Southern Pacific Railroad
to operate the service. The JPB was formed in 19B7 to enable the
eventual tranDfer of responsibility for the service from the state
to the local counties (San Francisco, San Mateo, and Santa Clara).
In July 1991, the JPB designated the San Mateo county Transit
Oistrict (Samtrans) as the admini9tr~tive agency for the rail
set"vice~ In December 1991, the JPB final ized the purchase of
the right-o.f-.... ay from Southern Pacific Rajlroad~ Finally~ on
July 1, 1992, Southern Pa~ific ceased operating the service, and
~as succeeded ~y Amtrak, the new oparator hired by the JPB.
coincidental with the advent of operation by Amtrak, some of the
most extensive operational improvements in the corridor's history
were begun--an increas~ from 54 to 60 daily trains; initiation of
two weekd~y round trips to Gilroy; and extension of service for
nearly all trains to the Tamien staticn, a joint station with the
santa Clara Count.y Transit light rail system located two miles
south of downtown San Jose.
The current Shor"t Range Transit Plan is an annual document ~hich
covers Ii! nine--year planning period. It is a statement of the
achievements of the Peninsula rail service; its future plans and
programs; and the proposed budget for the next nine years.
CM:R: )61: 92 7/30/92
Page 2
•
t
L
HIGHLIGHTS OF THE' PLAN
The main elements of the Plan are as follr:lws: eV(tluation of
existing service I fut~~e ser~ice plan~ capital improvement program,
transition plan, and financial plan. ~\n introduction to the Plan
is attached (Attachment 1J. This staff report will not attempt to
summari~e the Plan.
In general, tha 1992/93 Short Range Transit Plan, compared to those
issued in recent years, contains less information, and is more
conservative and less visionary in its scope~ Lack of funding is
cited in many cases for the tentative status of f~ture improvements
that. in the past, appeared to be more likely to cccur. The
primary focus of planned service improvements to 2001 is an
increase in weekday trains from 60 to 66 in 19S4, including six
more daily round trips to Gilroy, for a total of eight round trips.
The additional trains will be used for reverse commute runs and to
fill in some gaps throughout the mid-day period. Twenty-three new
·California Cars" ~ill be purchased for integration ~nto the fleet
by 1994.
other projects to be implemented with committed funds by 2001 are!
track rehabilitation, a new maintenance facility. minor station
rehabilitation, acquisition of the Palo Alto station parking lots,
rebuilding locomotives (partially funded), accessibility for the
disabled at k~y stations, and new ticket vending machines~ Some of
the major potential projects that arE' briefly described in the
Plan, but that do not have committed funds, are: major station
improvements, passenger car rehabilitation, electrificativn, San
Francisco Airport station, San :Francisco Terminal relocation, and
right-ot-way purchases (for Dumbarton line, Vasona line, grade
separations in San Mateo County, and parking lots (includinq one at
the Palo Alto station). Tables IV-3 and IV-4 (included in
Attaclunel':!t 1) provide a listing of all these projects and the
proposed funding sche~ule, for the nine-year period ending in 2001~
ISSUES OF CONCERN TO P~_~';'_LTO
council's most recent actions s'.,lpporting CalTrain have been its
June 1992 endor~ement of the Santa Clara Coun~y Traffic Congestion
Relief and Tranc;it Improvement Plan (the follow-on to Measure "'_)
(CMR:2S4:92); and its March 1992 comments on the Santa Clara County
T201C Plan rail pr-iorities (CMR:172:92). In both cases, Council
voiced continued support for major improvements in CalTrain
service, including reloc~tion of the San Francisco Terminal, grade
separations, new rolling stock, and other improve~ents (including
electrification) leading tu transit-level train frequency. Counr.il
also initiated the City's co-sponsorship with the Santa clar-a
County Transportation Agency of the March 5, 1992 North county
elected officials workshop on CalTrain service.
CMR,361:92 7/30/92
Page 3
I
,
1 ,
i
,
---
-
,yong the improvements that the JPB and. Caltrans have achieve.d over
the last several years are: increased train trequencYI increased
ridership, station improvements, purchase ot the right-of--way,
completion of t...'le. transition to JPB administration and AmtraJe.
operation, and new service south of San Jose. Nevertheless, based
upon council's previous actions, staff has identifi,.!d several
issues of concern in the Plan4 comments on these items are being
transmitted to the JPB in a letter from the City Manager
,Attacl'.ment 2).
San Francisco Terminal Relocation
council bas strongly supported this project in the p~st. This
project is now termed "uncommittea R in the Plan, as the bulk of
funding is not committed. In recent months, cost estimate.s fo::
this project have increased ,to $847 million), and competition ~ith
the BART airport extension has emerged. Local transit officials
have stated th~t the possibility of a te~inal relocation project
seems more distant than ever. The Plan does not strongly support
this project. In its comments tc the JPB, staff has indicated
strong support or this project, provided that the project is cost
effective, in order tOo provide Peninsula residents with direct
access to downtown San Francisco and r~gional transit carriers.
Increased Train Frp~y
The proposed increase "from 60 to 66 daily trains (three round
trips) through year 2001 is a meager goal tOo car'ry forward into the
next. centu-y. Council has indicated past support for transit-level
frequency ::Jf service, which requires approximately 100 daily trains
(i.e., at least 20-minute headways in both directions between 5 k~
and midnight}. The Plan does not discuss thiS level of service.
Staff believes that, as a minimUJ:I., the 66-train goal sr.ould be
implemented rapidly, with the loo-train qoal ~eached by 2000.
Electrification
council's support of increased CalTrai:1 service itlcludes
electrification. Though not technically a prerequisite for 100-
train per day service~ it would probably be necessitated by
environmental concerns.. A study is still underway, and no funds
have been committed tor this project.
Grade Separations
Crade separations and other safety issues are not mentioned in the
Plan, except for a minor line i'cem of un-committed funds in Table.
VI-4 related to right-of-~ay options for parking lots and grade
separations. The options pertain to five proposed g~ade
separations in San Mateo County. Grade separations should be ql ven
prominent discussion in the Plan, especially in Santa Clara County,
CMR:361:92
'L
7 i3 Din
page 4
where no programs or plans fer grade separations are in p~ace.
While Council has not i~entif'l ed ~p:::e:i fic desired grace sepa.ratiens
in Palo Alto, it has ~xpressed concerns about the nSGd to study the
Datter I and to determine what. mea.sures should be talc~P:l.. Grade
eoparations will become increa5inqly important to address safety
and t.:t'atfie congestion issues that \lill arise with more frequent
tr,~in service~
Bicycle Access
Bicycles are currently not allowed: on any trains. The new
operating contract with Aatrak provides far allowing bicycles on
board o~inq orf-pea~ periods and on weekends l using the present
rolling' stock. However, this procedure has not yet beer:
implemented. T'Wenty-thr2e ne· .. "California Cars", to be plac~d into
service in 1993, will provide space for a small number of bicycles
in ea.ch train. Bicyclists l'1,ave been urging the J'PB to allow
bicycles aboaro trains as soon as possible~ The Plan appears to
support only off-peak and weekend acce:ss tor a few bicycles per
train. Bicyclists are advocating full-time access for a. much
larqer number. staff has requested that the Plan support greater
bicycle access on trains than it does now, including a demonstation
test to determine the demand for bicycle access. This could be
done by using a special car or modifying an existing one. The new
rolling stock should be designed to accommodate numerous bicycles
per train r on a full-time basis.
A supplement to bicycle access is to provide adequate numbers of
bicycle lockers at all stations. Many stations have bicycle
lockers, but in most locations there are lengthy wait,ing lists.
statf has requested that the Plan support the provision ot lockers
~t each station to serve current and projected demand.
Access for the Disabled
With the passage of the Americans with Disabili'ties Act (ADA),
commuter rail s),stetls must make key stations accessible by 1993,
with po:£:S'ible ertznsions to 2010. The JPB has completed a Key
Station Accessibility Plan~ which includes the Palo }I.lto
(University Avenue) Station as one of the key stations. The
Accessibility Plan calls for replacing or rebuilding two tunnels
under the tracks f or constructing some other means of crossing the
tracks~ Thee es.tim.ated cost is $3 million, and an e.xtensior! to 1995
is beinq requested~ staff supports this project. staff has also
requested that the project include a determination of whether or
not the five existing tunnels are need~d, and ~hich organization is
responsible for maintenance of the tunnels that remain.
CHR:361:92 7/J01n
page 5
~
'-
-
s§n Antoni? statiQD
This proposed nell! station in Mountain ~:ie:w, a replacement for the
Castro Station, h~s he en in the planning sta~e tor severa! y8ar~.
Yet~ it i$ not men'tione.d in the Plan. Thougti the JPB has not set
an official &t~rt-up date, it appeara that it could be in operation
sometime in 1993. Council has supported this station as a meanS to
serve an important activity center, and to provide an alternative
to the california .\.Yenue Station tor residents of south Palo Alto
and north Mountain View. Staff has requested that discussion of
this station he included i~ the Plan.
Regional COQrdinatioo
At preeent, there are some transfer arrangements between CalTrain
and: connecting bus o~rators. Purchasers of CalT:ain monthly
tickets can purchase i!; Peninsula pass,-Which provides unlimited
:monthly service on CalTrain, San Francisco Muni, S .... mtrans, and
santa Clara county Transit~ With the self-service fare coll~ction
system (using vending machines) plannad to be implemented ee-on,
sinqle-ride CalTrain patrons will be able to purchase one ticket
that includes tt,e necessary local bus transfere. Staff has
indicated its !>upport of this arrange)l'l,ent. staff has also
requested that the Plan include ticketing arrangements that would
permit calTrain to partic~pate in the N8ART Pl~s" regional ticket,
which is v~lid on nearly every transit syst€m in Alameda, Contra
costa, San Mateo, and S-l'nta Clara Counties. The union of the
Peninsula Pass with the BART Plus ticket would provide a near
universal transit pass for-the Bay Area.
CONCLUSION
A summary of the above concerns was transmitted to the JPB in a
letter trom the city Manaqar (attached).
Respectfully submitted,
Engineer
CMR:361: 92
fii/t;(£1'~ If' -dc.tCUi~
KENNETH R. SCHREIBER
Director of Planning and
Community Environment
7/30/92
Page 6
Attachlilents: (1) Excerpts from the CalTrain Short Bange. Transj:t
f..l.M On't.roduction, and Tables IV-3 and IV-4)
t2) Letter from City Manager to F~ninsula Corridor
Joint Powers Board
Related Staff Reports:
CMR:172:92, March 5, 1992, ~anta Clara County Transpprtation Plan
T2Q1Q PUblic Hearing
CMR:2a4~92, June 4, 1992, Resolutjon of Support fO k the Composition
of a santa Clara County Local TransportAtion Authority and the
Santa Clara County Traffic Congestion Relief and Tranill
ImprQygment Plan
cc: Peninsula Rail 2000 (Alan Hirsch)
City of Mountain View (Kevin Duggan, city Manager)
Santa Clara County congestion Manaqement Agency (Hike Evanhoe)
Joint Powers Board (Gerald T. Haugh, Executive Director)
Santa Clara county Transportation Agency (Jim Lightbody)
CMR:361:n 7/30/92
page 7
>.
DRAFT
PENINSULA COMMUTE SERVICE
SHORT RANGE TRANSIT PLA..1'IJ
JULy 1992
The preparation of this report has been financed, in part,
through a grant from the United States Cepartment of
Transportation, Federal Transit Administration under the Urpan
Mass 'l'ransportation Act of 1964 I as amended.
The contents of this report re.flect the vieys of the ?enins .... la
Corridor Joint Fowers Eoard# ~hich is responsible for the facts
an-:i the accuracy of the data presented herein. The contents do
not necessarily reflect the official views of policy of the U.S.
Department of Transportation.
•
"
-
"-'--"'''~ .. '-
CalTrain -
INTRODUCTION
The Short Range Transit Plan is an annual document which covers a
nine-year planning period. The plan is ~ statement of the
achievements of the Peninsula Commute Service, its fut.l..:re. plans
and programs and the proposed capital ano operatinq budge:s for
the next nine yeers.
This plan was writte~ during a transitional period~ The JPB has
assumed new and expanded respon5ibilities this year and Caltrans
District 4 and SamTrans personnel have been covrdinatinq the
transfer of administrative responsibilities~ A sUbstantial
amount of time was spent in finalizing the acquisition of the PCS
riqht-of-way and in recruiting a ne~ contract operator. Most
rece.J'ltly the JPB has been preparing for inal.lg'..lral ser-',rice to the
new Talllien Sta.tiOT: in San .Jose and to the ne ..... Gilroy sti!ltion.
The focus of this past year has been on short-term transition
activities. The JPB recognizes the need to develop a
comprehensive s~r8tegic plan to guide the service into the next
century and will be undertaking this effort in the near future.
In the meantime, an effort ~as made to p~ojec~ future service
needs and to identify capital and operating requirements to meet
increesea service levels and propesed service extensions.
The Plan is organized into six chapters. Follo~ing this
introductory ~hapter, five chapters follow:
Existing service -A description of the current operation as the
base upon which the balance of the plan
builds.
service -
c..pita.l Plan -
Transition Plan -
The plan fer expanding service levels and
a.ccess prograD:ls over the nine-year time
frame.
The capital improvement projects designed to
modernize the system's facilities and support
expanded service.
The transition plan to transf"er management
responsibility from the State to a local
agency and the ne~ JPB organizational
structure.
1
-.:,.
-
CalTrain -
Pin.Deisl Plan -The funding plan fot' the capital improve:a:ent
program and operating cost and revenue
p~ojection& for the nine-year time-frame.
ORGANIZAll0N A,,,n MANAGEMENT
Since 1980 the Rail Manaqement anQ Rail Operations Branches of
Cal trans administered a purchase-af-service a9r~e~ent yith
southern Pacific (SP) in 'Which SP operated the servl.ce but the
state and local government agencies subsidized and administered
it. In addition to contract administration, Caltran5'
responsibility included planni~g and marke~ing, engineering and
design, fare and schedule setting, performance monitorinq and
customer service.
In 1967, representatives of the city and County of San Francisco,
SamTrans and the SCCTD formea the Peninsula corridor study Joint
Powers Board (JPB) vith the intention of transferrinq
administrativlIi! responsibility of the Peninsula COml!l'ute Service
(pes) from the state to the local level~ In July 1991 ~~e JPB
designated SamTrans as the cve~9i9ht aqency to administer
CalTrain. The oversight fUnction contains four major components~
1. Direct oversight by the SamTrans Rail Division,
assisted by the Woodside Consultinq Group.
2. Support functions provided by the Sa:nTra!lS st"'ff.
J. Additjonal support functions by Caltrans District 4
personnel remaining in State service through FY 1994.
4. Liaison by staff ~embers cf affiliated JPB agencies
individually and through a reqularl}'-constituted
Technical Advisory Committee.
The JPB is in the process of filling posit~ons for a Citizens
Advisory COmI[',ittee. The C.A.C's principal function is to azsist
the JPB by articulating the interests and needs of transit users
and potential transit users. The 5tructure of the committee will
consist of three repres~ntativas from each of the ~B counties~
SllMMARY OF MAJOR ACCOl\flJLISHMEl\'TS -FY 1991192
During FY 1991/92, the 3PB and Caltrans continued to ~ork
together toward improving the quality and efficiency of the
2
-
CalTrain
peninsula commute
local control and
include:
JPE Agreement
Se~vlc~ {pesJ and to transfer the service to
managl;fment. Highlights of this progress
An agreement was signed on October lS# 1991 by the three member
agencies to esta~li6h 9~idelines for the planninq, oversight, end
operation of the Peninsula Co~~ute service. The agreeme~t spells
out the roles, responsibilities and the financial commitments of
the JPB aq~ncies. Each member agency has agreed to contribute
its share of the operating cost of the service and to share in
the costE of capital projects. Tne agreement names SarnTrans as
the managing agency vith the responsibility for preparing capital
~nd operating bud9ct$, developing planning and ~arketing programs
and oversight for the day-to-day service.
Righl-ilr-Way Acquisition
The JPB finalized the Sou~hern Pacific right-of-way purchase on
December 27, ~991. The JPB now o~ns 51~4 miles of right-of-way
fro~ San Francisco to San Jose and the trackage rights to another
25.4 miles to Gilroy. The right-Of-way and trackage rights cost
$219.565 million. $124 million in Proposition 116 rail bond
funds were used to~ard the purch~se with $95.565 in local funds
to make up the balance. The right of way acquisition includes
purchase options tor expanded service operation and
interconnection with BART and Santa Clara Light Rail T~ansit.
New Contract Operator
After intensive negotiations, Amtrak, the National Railroad
Passenger Corporation, was selected by the JPB to succeed
South~rn Pacific as operator of the Peninsula Commute Service.
Amtrak begins opel·at ing the ser-vice on July 1, 1992. Service
levels increaSE to a 6D-train \ro'eEkday sCbedule 'With extensions to
the Tamien Station and two weekday round trips to Gilroy.
ADA Key Station Accessibilit)'
A !(ey Station Accessibility Plan 'Was prepared to corr.ply 'With the
requirements of the Americans with Disabilities Act (ADA) to make
key stations accessible to peoples with disabilities. The plan
identifies ten stations that must be made accessible before July
3
--
CalTrain
1993~ includinq one in San Francisco, three in San Mateo county,
an~ six in Santa Cla~a County~
Catiiornia Rail Car
The 1990 voter-approved Proposition 116 required that $100
million shall be allocatad by the Califcrnia Transportation
commission tor acquisition of commuter r~il cars. O£ the first
88 st,ate-of-the-~rt passenger-rail c~rs to be manutz.ctured within
the next j--ear, the Peninsula COl'fUllute service vill be awarded the
first 23 commuter cars. These accessible cars viII be put in
service in aavan~E or the July 1995 ADA deadline.
GOALS AND OBJECTIVES
The qo~ls tor the CalTrain system are orqar.ized unde~ four
qeneral headings:
I. Service Expansion
II. Service Quality
III. Cost Effectiveness
IV. Local Management
Multiple qoals are identified uncer each category along with
supporting objectives.
I. SERVICE EXPANSION GOALS
4
GOAL 1.... EXTEND C.~LTRAIN SERVICE TO MAJOR DESTIN.~TIONS
OBJECTIVE 1
OBJECTIVE 2
OBJECTIVE 3
Recommend a course of action to the JPB
by September 1993 to complete the
planning process ~or the downtown San
Francisco Terminal project.
Develop a strategy for operating the San
Francisco Terminal over a 5 to 10 year
period until a permanent solution can be
agreed upon and financed.
complete updated Dumbarton Bridge
feasibility study by July 1, 1994~
•
CalTrain
GOAL I. B EVALUATE PARKIN~ ACCESS AND TRANSIT IMPROVEMENTS
OBJECTIVE 1
OBJECTIVE .2.
Complete a Station ~ccess Improvement
stuoy by December 1, 1993. study will
include a parking needs analysis,
options for bus feeder services and
bicycle access r~qul.rements.
Prepare preliminar}~ plans, cost
estimates and environmental assessment
for parking exp~nsion on land acquired
from 5P by July 1, 1994.
GOAL 1. C INCREASE FREQUENCY OF SERVICE
OBJECTIVE ~
OBJECTIVE .2
Develop operations plan to determine
service levels based on riQership
pr~jections and market demand.
Implement 66 ~eekday train ope~ation by
July 1, 1994.
OBJECTIVE J Implement hourly service on Saturday and
sundays by 1993.
ll. SERVICE QUALITY GOALS
GOAL II.A PROVIDE RELIABLE ~~D DEPENDABLE SERVICE
oarECTIVE 1
OBJEC~IVE 2
OBJECTIVE J
Maintain 95% availabilitr for c~rs and
85% for locomotives.
AchieVe 95\ on-time performance.
Acquire additional rolling stock to
support 66 daily train schedule by
June 30, 199-4.
5
., -'
CalTrain
GOAL lI.B PROVIDE PASSENGt~ AMENITIES AND SUPPORT FACILITIES
AT STATIONS ANC ON BOARD TRAINS
OBJECTIVE 1 Allow bicyclea or.-boa~d trains l with
arrival of new equipment, durin9 o!f
peak peri~ls and on weekends.
GOAL II.C PROVIDE ACCESSIBLE SERVICE TO.THE ELDERLY AND
DISABLED
OBJECTIVE 1
OBJECTIVE 2
Achieve accessibility at key stations in
two phases; imple~ent Phase I by July
1993, Phase II hy July 1995.
Operate service where one car pe~ train
will be accessible by July 1995.
ill. COST-EFFECTIVENESS GOALS
6
GOAL III-A OBTAl~; OPERATING COST EFFICIENCIES
OBJ'ECTIVE 1
OBJECTIVE 2
OBJECTIVE 3
OBJECTIVE 4
Install initial self-service fare
collection equipment {eleven ticket
vending machines) by December 1992.
Install ba!~nce of equipment by March
1993.
Implement self-service fare collection
system by 3anuary 1, 1994.
Begin operation of ne~ equipment
maintenance facility during FY 1994/95.
GOAL IlLB MAXIMIZE USER CONTR!BUTION TO OPERATING COSTS
OBJECTIVE 1
OBJECTIVE 2
OBJECTIVE 3
Maintain a minimum of 40% farebox ratio.
Promote Cal Train through an effective
marketing program resulting in a
ridership gain of three percent pe~
year.
Hold non-federal operating subsidy
increases to annual rate of inflation.
--... ." r TTl
CalTrain
GOAL III.C ENCOURAGE COMPATIBLE Ll\i!O CSE DEVELOPMENT
ADJACENT TO STATIONS IN SUPPORT OF SYSTEM
UTILIZATION
OBJECTIVE 1
OBJECTIVE 2
Prepare an inventory of development
experiences along similar rail systems
and provide to local communities.
ProDote compatible land uses.
Initiate a process to establish a
program for joint development along the
pes right-of-waY4
IV. LOCAL I\IANAGEMENT GOAL
GOAL IV.A TRANSFER TO LOCAL MMAGEMENT
OBJECTIVE 1
OBJECTIVE 2
Retain s~fticient staff to assume
planning and oversight responsibilities
of the JPB by J'anuarj' 1993.
Co~plete transfer of assets from the
State to the JPB by Septp.mber 1, 1992.
7
-_.----.:
't ,
'Anlll_~ 'tiliIiVi~-~ 1Irf'..iif,;..~;;,iJt'',1';( .
~ • .r-.9I , : ' : ·-1,(~:·~:1t-i;;f>&iR&:~~!,,):\q~~~~:k'-~!':,;· ',. 1""'--PENINSULA COMMU11i SEll VICE
NINI1 YBJ!R CAPFf AL lMl'ROV1lMNNT PL.4N
l'ROIHCf$ WIT/I COMMI'TTED FIINDS
REPLACHMENT 9 Y,., 'rolnl
PROJBc....,~ 1991-91 I99J~94 1994--95 1995-96 1996-97 1997-98 199B-99 1999-00 2OOrHJ1 (FY 91 -PY/I1)
T~' 3,m,'" 1'9 7,$(10,00(.1 1'9 7.JtIII.mt 1'9 1,.nJ,/W i'V ',.fOI1,OOO ,., ".5CIP,1XD ,. I,JUt,ro? ,. ~.,""'.(.07 ,. 1,.ftII'I.M.t lip c,m.#JfJ Ifl
.~MN"Iu.. I.Mt.M1lJ I¥.-' I,VJ,oro I'C l,ffl,ntJr1 I'C 1,'''J,an I'C 1,l1.f.(}(}(I F'C 1.11$,0(1() I'c U1!.«IA fC I.In,COO 1'C I.P.UlOO "" , .. WI,IQJ
".1_11,«'0 ",m,tw n,JfJ,OOf.I IU1',{J(J(J /V,J7.J,OOO $fI,J~/Jf1D f',J11,(I(r) ",:111,(11(1 ty,m,GCIO nr,~".MO
~~~~-M., __
t,JOO,1VlO "., •. m.MJ I'J 12,JOO.C01 1'.1 , , • , • , ;,:;; ;\ () I'NIII1'I(1/ 1I,lfd,® Ie }',I"',lIO!) IC
",/ro.M' 1'C ',KD.1JiJI1
I S'!I,(1/0,00I'J 1'-',.f~1UI SfL~.mJ $a " It> .. ., ., "'~,tW
\,."" .... ,tQIJ,(.07 f'C Jttl,l.«I rc .m,M1 P'(' .J(If,(J(J(J ,., .Jo:II,al'J 1'9 JW.Gm '" ,~ootI '" ... .,. " ,rao,old) ,.
lIehat.!bl.Upn ItJ,OOh K IZJ,otJD 1'C 11J,Mt I'C IUIlIXI' I'C m,lJoD I'C 1n,tJ«, IC 7..,,'"
U()!J,1tII "".= .1~.Ml ~_f.(J(JJ .ll!1.I ,(\(V ~ SUf.Q,l1 ____ u'lJ,rnn~ ___ J6ll,aoo HD,Ot1D SJ,U),fNtI
/l,4/" Nl,lI1f " • 0 0 • • « •
CMlnlwrol:.lI"" tJ4,1ItlI I'C ......
1~_"f,.WJ " '" ., " .. ., .. lfJot,.wt
------------~
,fUlMot "~iririm 2,IOO,ctm 1'0 • , • , • " , 1.fIf.V.tm ,.
~/,,""/I~J .f.t"l,1.IIl' T .'.i?OM T
JJO,cm L JJ(J,(¥MI L
lJ,Jm,tIOO SO SO SO .. '" ,. .. luro.<Iltt
L« ..... I ... • • • , • .1,.f20.tn:J 1'9 0 0 J,JlI1l11» n
~lruild' no,Dm I'(" t ..... ..j
'" '" SO .. .. Sof,"OO.t'!OO .. ., ~~"--J
K.yftWlm .... Jm.OOO ", J,1n7.tD'.I fIf' , • 0 , 0 0 'U;j Au~M;1)' 1,121,(100 1'<' I,VJ,t'OO rc r.4IlI1,b
IJ,6U,CW M,J75JIM .. . .. .. '" .. .. IIt<D',tw
i . . . ,,,,;~,
'-:-1, ,\,'
"
,,.--
t
--...-:.
I
, '.,:, ·t'··, . ' I .:,~ ... ····1"·'·· •. · . 'I,: :"-:":1:"t~id;ri\'-~','i "-~'. -~"ij,~,{i'~1t!~,~~ ,~_~-:,_,~ , ~(}.";:·~'-~(~~~'~'(,f# -, ';.:"". \ ~ll
'., .. t······' ", ,
. I
I
f
•
··-:l ""'01'2 T.,. Vl-J n-_ ---PBNINSULA COMMUTE SEltVlCE
NINE YEAR CAPlTAL lMPROVEMENT P1..AN
PROJECTs wnll COMMrrrED PUNDS
9 YurTrDJ
1991-93 1993-94 /994-9L{ /995-96 1996-91 1997-98 1998-99 1-2OOfHJ1 (FY 93 -i'YOI)
. '11\""."" , .... "' .... -~ RE~CEMENT
PROJECTS I SJJ,UtJ,tld S1f',MI,dm $tl.J1.f,tm IIO,atJ./lt\) SIjI,OIb.«Jo .r14,<1(\),@ 1IO.cw.otU 1/~cn;.1W
SUHTOTAL
ENHANCEMENT 10 Tk.t" v..t'u. J,CllIJ,17I ,.., 0 0 0 0 0 • 1,(111',1110 ,." • J,7It,ffl ",
1of~(1) "'.'~.f I'C ;JJ.UI T 1,In.U'
,...11.'11 D',IJI I. Zff,/JI ..:.
j,f,n .... 1J ., ., SO '" 10 ., I1.SSI.Jru OJ ',HI','" I
-~--~--. I !i}[!'ANSION .
&"F ... /Kd 0 0 0 • • • 1IJ,.fa'J,m;l fry "''''''''' n ", ..... """ W. ,,,,."" ~
T .... illllf /I.~ltJufma (1) • II,f1Qo,f/OO .. II.OW,()aQ
.8'.000,«12 TA JlI).tm,ot::b ~
10 10 ., '" ., .. S~.fIO,® lU~.'''.O'»_~~~~
~-----
Zl'u:tJu./W_ OIId,Ml.w:J cr:-• • • • • • • Uti.~1.JOOI
Un (41
TOT.4.L
CAPrrAL nI, 1rJf,4,d 12f,IoIa,(IOO 1ll.17S,()(V lft1.(1(\1.~ JlO:~.«l) 11-4',40),1100 S*'.'lO,(J{JO J1H, UI,1(11 .JaI',J",COO M«J,4Jj,P/'
PROGRAM
(I) A'P,.",ilrUf,1y II ..n,. fIIIJ.!,., fiIath _11161 o.M f«-............ ~_. ~i"IJf.
(7) 7TM /P' ft. • ."pw f_n.Jf/~ &.I. ...... /u6J. ...... 1&Tll,41l1<1 ;(-...:r"NIW, _I/I&' __ iflMtllf,rs..cu..' ......
OJ U""" ~""'{1JIf lAo ZJ. fill 1M pmjI>« _ ~1W) I. _1frrtI It. Ih RtfuulJ ... ptri>jM1. n.. :JItICTA .... _./IIAd' 11mA(. J1W .t,lIo. ~ II I .. 11/",-. 1Ior,. i. JilMU u. __ IIwI ......
(4) PrvptvIu.. 116 "'-" ... ~1I1f'" Iof*ldu-_" .... IWM'~ 1II< ... n ... r_ .. /~"-" JO,..,.,~ 1An., ..... ,"'.-"""" IW.~ Nn'k •.
• n..-fl"'icu ... _ "'" t-IttrI.
tl:~;;.J
,., I'TAs...In..
T T....Jr~/~,.,.",...
I'C I"C~ ...... ___ 1Mtrt hupt»~ Jl6
flpd..l!L..~.!!
IC /Mt"'iIT TC't. Prurw/tw. 10' .. ",,"!fII.
I-t-I "'.lei Il_ /I'."""
If. RAil ....... , ...... "-~k. 101
CC' 0011,.",.. Or, ...... IHdIa f'-~ 116
TA .turA.f~~ JftupiIIUtI-A~""C"'""C::::::'''''-. ______________ _ _ ____ ---l
.)
.' !J
,
\
I
!
"''!(.A 4 P 'If ..,
.---~-,.-~ ~
.<~:
':'-~;r~
•
'if':Vk .,' ,
, .
f
"-'
'f.ilil«V! ., • I
I'1WJIiCTS l1NDE1r CONS1TJ61U11ON '
I'1«lIECTs 'irITHQIJ'I' COMM177f!l) l'I1ND9
1993-9< ! 1992-9J
,~
1m-IS
~IM /thJ"fft'l'miW' J,JJiJ,W 6,J1J,(),XJ $.Av.tUJ
~mdil'll RdHiilJ .,
I ~~~= [,._;;,:;;;;;;.;:;-"'"
• • •
2M,SiXJ _!J1.~___ 141.100
J¥t..lf(l)
I~~~!~W~~~)~ ____ ~ _________ __
,_.QJl'AN~
l:tcnr""'l!i..,., \.TH~ R~(J)-t-
n.-~h>«1 {#J
C'mI<~ r.'1t/r;c(l!
C('(1('M
.J. Y~d-D--W:2L'rl.rrrt
hriJpslGrM4. MI'
:/J~
,(ad~"
i
~H.tm(5)
o o o
?.w,ooo o •
I,9JJ,()(X} !J,166,OO(1 jO,"2iJ1,m
tJ,1a(t,1')')(l
11,11tJ1,fl'kl
a o •
Im-96 19!Iti-91 1m-Ill '9'1"99
l,un.1Nl ~,<J3'liMl 5,100,tn> 1,m,@
""',(JOO J,9!P,00I1 o •
fZl,f!!O 04,M1 1,4'?P,tm tH-t@
• o 11 /4f • .I(X},tn}
• (I ~ •
a o o "
1'1'1. <kX3.1X'.O " o I.""W
9 y ... Talal
J __ ~I flY9J-FYOI)
J;miW 1.m,m;. IM/Jt'u,tm
• • 1tI,.11'1,fX»
~~~'~ __ ._.f! __ !!.~
Ul~.ft¥)f"} Ul,.(J(\a~
o •
•
a ~
.uU,w-'POO
j7.JiJIJ,(YX1
-1»;m,1W
)1 f
i i , r
I I
11
t SI2.100;~
/f/.l)XJ,11(XJ i
) , SfJ,""',.... I ~ .. J_ Mull,,,,,,,,,
~~C<f(t8:hq'\iJ 0: 6: _, b_~{X}(J ___ .gs~!!!!__ Q {J f} IJ
VJ) :rJ..~bV' mt ~.~ .IV~ t~,. &fmtf.t pn>}w!f"'. 111ft Rtf( JW ~.u"NfJ. U1<U\,?,
1
(1) ~ ~ ~rft ffJIdr~, ",Jlh ny>PI1 dne In .'!Pr1M!' 1992, ~ pNYjttd IlNt.I" Iurf Irat._ 4~M1.
O} /1(111)1 11-~ m-M.!-Dt.nmm .... ifeiONflm Pmkto't. An Mtilt/«W $114M I."""., 1'1 Inny ~ a.j'f'3~
~; T.\no,IPS N~. ~c..~ 1!IIf4'e.1I~1"". iI.wW fSTrA., FWHh M~ II{JJ/ 1Jtwo~., of/illY J,
i)h.wu,. f!iM.,.,~ ~« T ... ;" SNlttn. Jlhlif'JdJ/M f<Jr.,~ ~.I" ~ Fif~: CJ¥JJ-'N'I( ,
(51 n-JIit! F'fIt'MdMty «W ~_ aM 'JWiIJ to. ~Ild In Ff 91 ~fJdy, f
.z~~tt
,'Tm.~>M~~~ -----------------------------------___________ --1
~ Of: THE c;rr.< MAHAO[~
141<0:) .l.2'"I--J382
July 29, 1992
Mr. Gerald i. Haugh
Exacutive Director
CHp of Yalo :Rlto
r 0 BO~ H"S()
"",J ".ro. c~ S~3C'3
Penins!Jla Corddof' Joint Powers Board
P.O. So" 3005
San Carlos, CA 94070-1306
Dear Mr. Haugh:
ATTACHMEl\r 2
We appreciate this opportunity to comment on the j 992193 CalTrain ShQ.rt Range Transit
Plan. The JPB and Caltrans have achie\O'ed some remarkable improvaments that afe
evident to many of us. including right-of-way purchase, completion of the trans!tion to
JP8 administration and Amtrak operation, new service south of San Jose, increased train
frequency, increased ridership, and station fmpfovements.
In our review of the 1992/93 Plan, we have identified the foilowing i~sues, which we
would like to bring to your attention.
San Francjsco Terminal Relocation. Palo Alto has been a strong supporter ofthis project,
and we request that the Plan do likewise, provided lhat the project's cost eHectiveness
can be demonstrated in terms of increased ridership. The Plan should recognize the
present lack of a downtown San Francisco lerminal as one of the primary deficiences of
the Pensinsufa rail service. Peninsula res!dems nee-d direct access via CalTr2ir: to
downtown San Francisco and regional transit carriers.
lncreased Train Freq!.&ncy and Electrification. The proposed increase from 60 to 66 daily
trains through 2001 is, in Our opinior). a meage. goa! to carry forward into the next
century. Tri.lnsit-level frequency of service. which would seem to reqlt;re aporoximatefy
100 daily trains, is not discussed in the pjan. Palo Alto supports rapid implementation
of t.1e 66-train goar, with the 100·train goal reached at least by 2000. We arso support
electrification of the fine as a means to reach this goal. in an envIronmentally s;)und
manner.
Grade Separatjons. Grade separations should be given prominent dijscussion in the pjan,
especiafly in 5ama Clara County, where no programs or plans for grade separations are
presently in place. Whiie Palo Alto has not idtmtifjed specific desired grade separations,
we believe the malter needs to be studied in order to determine what measures s.hould
be tak.en. Grade separations will become increasingly important to address safety and
traffic congestion issues that will arise w'rth more frequent train ser ..... ice.
•
..-...........
1
1
~
i
1
I
--;
-
Mr. Gerald T. Haugh
July 29, 1992
Page 2
.~,
Bjcycle Access and Park ina. The Plan appears to support only off-peak. and weekend
access for B ~ew bicyclo$ per train. Palo Alto requests that the Plan Include a
demonstration test to determine the demand fOi bicycle acce:s.s. This cou!d be done by
using a special car, Of modifying ar"l existing one. Tne new 10Hlng stock. should be
desfgned to ac:commorlate numerous bicycles per train, on a full-time basis.
At many stations, there are lengthy wai1irig lists for bicycle lockers. Y./e reqllest that the
Ptan include the prov!sior: of ~lcefs at each station. to serve current and projected
demaoo. Allowing bicycles O'n trains and providing lockers at statK>ns are practical,
inexpensive, and environmentafly attractive alternati ..... es to providing additional
alJtomobi\e parking and ~ncreased transit service at stations.
AcC§ss for the Disabfed. Paro Alto supports this project. and, in particular, the need to
make the Paro Alto station accessible for the disabled. "Ve hope that the project will
include a determination of whether or not the five existing tunnefs at the Palo Alto
station are needed, and which organization is respon.sible for maintenance of the tunnels
that remain.
San Antonio Station. This station IS not mentioned fn the Plan, yet it has been in the
p~annlng stape for several years. We i.lnderstand that it could be in operation sometime
in 1993. Palo Alto supports this new station, and we would like to see it included in the
Plan.
Regional Coordination_ We are preased that the JPB currently seils the Peninsula Pass,
and is planning to install vending machines that will setlsingle-ride multi-operator tickets.
In adrlition. tne Pian snould include ticketing arrangements that would permit CalTrain
10 partlcipate ~n the -BART Plus" regional ticket. The union of the Peninsula Pass with
the BART Plus ticket would provide a near-universal transit pass for the Bay Area.
Thank you for this opportunity to comment on this y~ar's CalTrain ShQrt Range....Iransit
Plal'l, ~nd I look. forward to your consideration of our comments.
Very truly yours,
~~. Zaner 'L-
CITY MANAGER
cc: City Coundt
Marvin Overway, Chief Transp-ortation Official
;~1f·:
<,..:.
i>~