HomeMy WebLinkAbout0457.091l
J
1
1
1
)
October 10, 1991
THE HONOEABLE CITY COtmCIL
Palo Alto, California
underground Tank Removal Project. C!P 1900), 19101 .. _m_Arrn,,:_ndment 12
to consultant Aqreelnent No. C-59292
Members of the council:
B.ru?Q~t in Brief
This report recommends that Council authori~e the Mayor to execute
the attached Amendment No~ :2 t.o Consultant Agreement No. C-59292
'With EJ:r..con Associate.s in the amount 'Of $64.,885 fo!' a.dditional
services at the Palo Alto Airport and three underground tank sites
in city rights-of-way. Funding is available in elP 19001 (,rank
Removal Cleanup) and CIP 19101 (Tank Investigation and Removal),
The issue of cost sharing is currently under discussion with santa
Clara county.
~ck:grollnd
In 1987, Council approved eIP 87-03 as part of the City's Capital
Improvement Program~ The project scope includes removal of
underground fuel storage tanks on Ci ty prop~rty to comply 'lid th the
City's hazardous material model ordinance~ rn 1989, council
appraved Agre'£',ment No. C-S9292 with Erncon Associates to provide
technical assistance to staff on tank reIr.OVa15~ The follol<{ill9 is
a discussion of the two additional items of work addressed in the
attached amendment to that agreement.
Palo ~lto ~irport Sit$
In 1988, as part of the CIP 87-03 Tank. Rsmoval Project, three
underground tanks were removed [rom the Fd10 Alto Airport site.
During the removal process, it. was discoveL-ed that some waste oil
had leaked from the old, abandoned fuel tanks. The contaminated
soils from the site 'Were removed and treated utilizing
-1-
CKR:457:91
•
\
"
3
;
bioremedoiation techniques. As part of the original scope of ..... ork~
monitoring ""ells "W'ere installed and soil and ..... ater testing ... as
performed by Emcon Associates to identify the full extent and
concentration of contamination.
In August, staff and consultants met ~ith Santa clara Valley Water
District (SCVIllO) Water Protection. st!!!!!! to prese~t the summary and
conclusions of various technical and quarterly monitoring reports
relating to the P~lo Alto Airport tank site. The content of these
reports was di3cussed and it was agreed that the city could proceed
with ~ risk analysis to determine the potential adverse impacts of
not actively remediating the groundwater at this sit~. This
approach \lias possible because the concentrations of hydrocarbons
are relatively low' and the plume is no ... defined in area.. If the
risk analysis is found to be satisfactory, it yill become the b~gis
for possible case closure. Staff believes th~ sewD 'Will look
favorably at the results of a comprehensive and thorough risk
analysis. A description of the risk analysis to be prepared by the
consultant is included in the attached amendment.
Tank Sit •• in City Rights-of-way
Anothe.t" phase of the original scope of ..... ork under the city's
existinq agreement with Err.con Jo..ssociates was to provide technical
reports for various underground tanks on City property. The
attached amendment also address~s threa und~rground tank sites
located on city rights-of-way. The tanks are located at 841 Alma
Street (alley), )01 Alma Street (Fire station 1) and Civic center
(Forest Avenue) a These tank sites ... .ere originally p;iI,rt of the
City's tank removal project elP 84-23 'Which 'Was implemented in
19B5~ Before CIP S4-23 can be considered complete, SCVWD requires
that the City provide additional technical reports~ These reports
will describe the investigation and cleanup activities performed at
each respective site. staff anticipates that submittal of the
reports to the SCVWO _ill permit the City project file to ba
closed.
Environmental A~sessment
Adoption of Amendment No. 2 to Agreement No.
categorically exempt from the California Environmental
(CEQAJ under S~ction 15306 of the CEQ~ guidelines.
C-59292 is
Quality Act
Staff recommends that council authorize the MaYDr to execute the
attached Amendment No. 2 to Consultant ~greement No. C-59292 with
-2-
CMR:457:91
i q
~l
~con Associates in the amount of $64,885, for addition~l technical
services for the underground Tank Removal Project, elF 19001 and
19101.
Respectfully submitted,
'~8istant Di~ector of Public Works
DAVID G. ADAMS
Dir~ctor of Public Works
, " ~~~-'W.(,~
Gm;~FLEM!NG
Assistant City Manager
Attachment: Amendment 12
Related CMR~ 451:9
CMR:457:91
-3-
AXElIDJI!!:R'I' :M-O ~ 2 TO CO!I'TRACT NO. C5':2' 2
B~E. CITY OF PALO ALTO AND
EIlCOlf ASSOCIA'l'I!8 FOR P1>.OPESSIONAL CONSULTING SERVICES
THIS AMENDMEN1 to Contract No. CS9292 is ma~e and entered
into this _____ day of , 1991, by and between the CITY
OF PALO ALTO, a municipal corporation of California, hereinafter
r-eferred to as -CITY," iSnd EMCON ASSOCIATES (Taxpayer Identifica
tion Number 94-1738964), with offices at 1921 Ringwood Avenue, San
Jose, CA 95131, hereinafter I'"€ferred to as -CONSULTANT-;
, Bel TaL s:
WHEREAS, Contract No~ C59292 was previously entered into
between CITY and CONSULTANT for the provision of professional
enqineerinq and design services for CITY's airport underground tank
clean-up and ~unicipal service center fu~l tank modification; and
WHEREAS, the p~rties may agree to amend said agreement
from time to time;
NOW, THEREFORE, in consideration of their mutual
covenants, the parties hereto ag~ee as follows:
SECTION 1. The first paragraph of Section 1. ~ of
Contract NO. C59292 is hereby amended to read as follows:
-In consideration far the full performance of
the Basic Services and Reimbursable Expenses
described in Sections 4 and 7 of t~is Agree
ment, CITY aqrees to pay CONSULTANT a fee not
to excee~ Two Hundred and sev~nty 'Ivo Thou
sand, Three Hundred Seventy Nine Dollars
($272,379), an increase of Sixty Four Thou
sand, Eight Hundred Eighty Five D~llars
($64,8&5) owi~q to Amendment Number 2 to this
Agreement ••
SECTION 2. Exhibits -A· and -Bft to Contract No~ C59292
are hereby amended to includs the a.j.dendums set forth in the
follovinq exhibits attached to this Amendment and incorporated in
full by this reference:
A. Addendum to Exhibit -Aw entitled -Additional Scopes
of Projects for work Ite~s 1 and 2-.
B~ Addendum to Exhibit ~B~ entitled -Additional Project
Costs for Work Items 1 and 2 and standard Fee Schedule".
SECTION 3. Exhibit -C· to contract No. C59292 is hereby
amended to read: as set forth in Exhibit "C-attached to this
Amendment and incorporated in full by this reference~
1
'11003 D6o: 00'20lD
-_ ... =
!
I
... .:
SECTION ,. ~ Except as herei)"'. ::':'l.oditied, all ot.1"::cr
rrcvisions of ond exhibits, lnclu~lng or1\1inal Exhibits "A" and ":&"', and ant£ndmemte t,o ~a!d. a9reo.mtl'nt shall ;t'"E::lain 1n. lull force
and effect.
:IN WITNESS 'WHEREOF, the parties hereto have ~>:ecute:d this
Amendmsnt the day and year first above vritten.
ATTEST,
city Clerk
.1\PPROYEO AS 'ZO FOR'1':
Assistant City Attorney
APN~OVED'
Assistant City }!aMger
Director of Finance
Risk Xanager·
Director Of Publi0 Works
Attachments:
crT, OF PALO ALTO
Mayor
Taxparer :tdc.'i.t1fica.'t.le~. n:.~
H·l?3e9~4
EXHIBIT JIlt": 1'.,:ldenc:lu;c1. to Exhibi t. A~-Additlor.al ,scopes of
Projects for work :rtl!:f.s 1 ar:d 2
Addenclu:n to EY.hib1t S--]"ddit1onal r'rojof;ct ccsts
for W.:Jric; lten:s 1 and 2
Insurance.
Addendum 10
Exhibit A
/ • dn
ADDmONAL SCOPES OF PROJECTS
FOR WORK ITEMS 1 AND 2
.;
.. .
\ --..:..-----
o
Addendum to Exhibit A
Additional Scope of Project for Work Item 1
TANK CLOSURE REPORTS FOR
(1) 0&8 AUTOMOTIVE, 841 ALMA STREET
(2) FIRE STATION NO.1, 301 ALMA STREET
(3) CMC CENTER, 250 HAMIL TON AVENUE;
AND GROUND-WATER SAMPLING AT
250 HAMILTON AVENUE
1-"
I
I
I ,
.. ;0:;.;;':':", ___ ....... Lli oh-_ ,_. . ___ , __ .-,~ _ ,...:llp
AODENDUM TO EXHIBIT A· WORK ITEM 1
ADOmONAL SCOPE OF PROJECT
Tile adO~ional scope 01 project lor wor\< ~em 1 under thiS addendum 10
exhibit" is to proviOe closure summary repons for the fonowing three
petroleum taok removal sites in Palo Alto;
I. D&B Aulomou,e, 841 Alma Street
2. Fire Station No.1, 301 Alma Street
3. Civic c..nter near Forest Avenue and 250 Hamillon
Avenue
Also included in the scope 01 W(}~. is sampfrng and analysis of ground
water from a product werr in Ihe Civic Center srte as specified by the Santa
Clara Valley Water Dislrict (SCVWD; (attachment 3).
Tank removal acti"j~es wers performed under contract No. 4504, Crty
Improvement Project (CIP) 84-23 js,;;ued on May 13,1985. Following the
removal 01 Ihese tanks, Ihe SCYWD requestad (see SCYWD October 20,
1989, Ieller, attac:l1ment 1) lhat the Crty of Palo Alto (Crty) subm~ a techni
cal report containing a wotl<plan and proposed schedule for the next
phase 01 worl< required for Ihe above snes. The SCVWD has suggested
thai Ihe iechnical report lonow lhe SCVWD's Investigation and Remedia·
tion at Fuel Leak Sffe: GUidefines for Investigation and Technical Report
Preparation, Maron 1989.
EMCON wiii prepare a tank closure summary report for each sr.e thai ,,;11
comply with the first two steps o,,1lined in the above document, which are
1. releas6 discovery
2. immedia1e source removal
Further steps (worl<pian submittal, preliminary site assessment, etc.) are
nct expected Of included in this scope of project slnce the sites were
p;, '990803E.G()W Aev_O (Xjober~, 1991
--____ "'~ ........ r --,..-~"'."-:"'~.
o
remediated based on best available practice al Ihe lime the lan'.s wete
ramoved.
The tank closure summary raports will includ. the following, where
applicable:
brief tank sijo descrption
1ank removal closure activities and observations
sampling Iocalions and lechniques, analytical methods,
and analytical resuHs durir.g the construc'.lon period
report of construction activijias at the s~e shortly a~e r tank
removal
a drawing shcwinQ the former tani( focation, soil and
ground-water sampling poinls, and "mits of excavation
copiflS of tank removal and closura permits, field reports,
sample chain-of-rostlldy forms, cMified analytical reports,
lank cleaning certificalion, and soil and fiquid waste
manifests
A separate report will be prepared for each site. EMCON will use existing
drawings developed from the plans of Centract Speci~cation5: Hazarrious
Material Storage Proj6ct: Phase 1: UndergrolJr.d Facilities (Prebid Meet
ing, Seplember 10,1985).
The SCYWO has indk:ated that Ihere is a ground-water production well
(51ale Wen 106S3W0281 0) at the Civic Center site. In~.s July 22. 1991.
letter. the SCVWD requested that the wall should be sampled and the
ground-water samples analyzad for total petroleum hydrocarbons as
diesel. benzene, toiuene. xylenes. and ethylbenzene. The scope of work
for the Civic Cenler will therefore include the sampling and analysis (by
the methods accepled by the Departman1 of Hearth Services in the Leak
ing Undergrouna Fuel Tank Field Manua., of the specified wen.
Sampnng and analytical procedures will be described in the closure report
for the .ne. The anal,1ical results and Ihe certified analyt'cal reports
(CARs) wm also be included in the report.
T~ree draft copies of the reports will be subm1ttad for the Cify's review and
comma",s. Six copies of each final report will be forwarded to the City.
PJ\ 1990603E.GOW 2 Aev.O ~ober1. 1991
An implementation scheOOle lor the proj&C1 is she"m in fi9ure 1. EMCON
will begin the project upon receivlng the City's authorizalion to proceed.
~hmen1s: FlQure \ • Tank removal sil&S' closure woll< schedule, D&B
Automotive, Rre Slalion No. !, Civic Center
Lette rs lrom SCVWO (' ,4)
PJ1 1990803E.GOW 3 Re ..... 0 October 1, 19'31
--"-..
----~...;
'f:
oJ • .. ,. . ~ !iI .. ;!
~ .
iii
,.
• ~
ft
~
pi !
A· · :: .. ---1 ~~ ! . · • • ;; . ..
Il : r I
If
~
• • • I ~
i J 1; • .. I ! .I!
.I • ~
~ 1 ~
/
\ ------
o
, I -0-AI ~. -0_
-----I· r I
I ~ .. --II -~ r_
8
G 1~ • ...
t--I .... ;~ I I --t-III
I
I I! ,i II
'p t J 'I! I! Ii iii ,~ I, 1 !
JH ~ 11 I~ II i
I
~
i
I
i
!
!
i
I
J it
H
. -. ~
-"---~----
. -, .... ~~.j
~;..'
• A .
-.::;; ~.;~",.
Attachment 1
SCVWD
OCTOBER 20,1989, LEITER
.-
,
''''''::<;',
:-'"i:; '!"-
.~.
.'
, Odoc.: 20, 1989
Mr. Mile. Jo08er
City of P&Ic Alia
lSO H.mil,en Avenuo
Palo Alto, CA 943~
Dear Mr. J.eGer:
.... -..
'.
,.
SonI:o Cbo 'k.~ Wcier Disbid
~m -"""O£N !m~$W'1
~x:st~ml
Trc!FHON! l~oaJ 11~I;oo
C'TYCF.ALOALTO
RECEIVED
CU 2 J jSS9
PUELlC WORKS ENGINEERING
Subject' Plio Al,o C1vi: Cent.r, lSO H.,nil,oD A"eJlue, P&!o Alto, CA
The ~u:rpO$c or :hil letter Is to request a: Ee-"..r-&tILcoJ! repo.n: from you OIn~ irJor.n you of now the
Oisina: w.il1 monitor pro",w of your iJIYe.sli~tiQn ll'l.d cle.;aup of .oil and/or youndwater oz.t your
fuel leak ,i'" It!J ~ •• reby r"'l" .... ~ th., yO" prc""ed with your investiS"'ion or remedi.1tior.
wilhoutdolay:
lIy D=ber 20, 1989, YDu ,hall submit I 1e:hnjQ] roport ""nUlinins • ",orkpl.n ond propo .. d
schedule for th. next pb_ of ",,0; you pllln 10 comp!e .. a=rdins 10 th. e~Jo •• d ,umm.ry. The
teclmieal report is bcliIg reques,ed pu,,"".oIIO th. Ropon&! Boarlf, IUlhority under the C<llifcrna
Water Cede Sectl"" 13267, The encl.osed summary is excerpted from ,fi. District', &\lid,lin ..
• "ti~.d ,,!!!vestigation and Rec::ediatleo at Fuel wk S!IOI Ouid.lin .. for InvestiS",;on and
Teehni:al Report PRparatioo' doted Mueh 1989. Thes. guidelines d=i'ce the step. for
inve>tigation and nmedl:tion wbich an n......", Cor Qse closure. This dC<"\Jm."t ho. been .<nt
10 all the bOWl! consWlaDto who currently work in San", Cl.1r1 Co,nly.
Until you roe.we fUrther notice, ),our case is "" .. id,red Ie b. '.elf·directed.' Aj,housh "'e will not
be providing you dc:ta.Ded review and ~mment.s on yoU! inve.s.tigltion and remedi:t~!on. yO\! tiil.y
contact the "SeI£-Dlrcctcd Cue Advisor" (or gener.t! euidanee: I",:::: clarifl.C:llion. Be ad .. ised thiQ;t the
Dls:trict will roudncJy .elecc several "el!-dlrected" cues.in orQ:er Ul determine ... rHHher elr not L1.e
re.spons£ble parties arc pun.uin~ lnve.sL~ation or d~nup in I timely molnner. At ~: time. we m.3Y
conside, providing dir«:t DLsIMCI ove:slsh! or , .. ""rnmending that enro", .. ""O[ .e[ion b. t.1hn by
the Region&! Boord.
Please .heck with vour con,waM to doter",;n. whe,ber or M' thO)' ha,. the District pideiiocs.
If you or YDur co.m.IWlt would Ilk, 10 .ootaO! the ·SeI!·Direct.d Cas. Adviso,', pi use con Ruth
M&!oolm It (408) 26$-2600, extension 351, or wrile 10 her It the Dis!:i,,', .dd,ess.
Sincerely,
'G-y~
lleau Gol&.l -
Associ", Civil Engineer
Groundwatu Protection DM.sian
Enclosure
ce: ML D).o Wb)'te, RWQCB, 1111 Jaekson Str .... ROGm 6000, Oakland, CA 94607
Palo Alta Flr, Dept., Attn; Frank Fiala, ZSO Hamilton Ave., Palo AllO. CA 94301
-.
STEPS FOR SOILA."ID GROL'NDWAT£R L"'VESTICATION AND REMEDUTION
Oen .. ...ny. soil ODd ""lUldwater lr.ve.sli~uQn.s foUow Ih~ ".~. ou:lined ~Iow:
I. lteIuse oIlscD • ."
2-Immedlale SOW'CI romo!':!1
3. Work FbnI (S4mp" Pl.\u) SubmIU.l
4. Prc!lmllw7 SJu Ass ....... t !
5. MICl'lIfJon Control
6. Remecll:l liI.esllplloa
7. reaslbllil;y Stuq /
'.
S. P",poseil Correct.i ... Ar.tlon ,
\ P. Implcmentattcu Dr the Col'r'Cdl"c Action
10. VerUlaulo" MonIlorin, . .
I
11. Rdmed"Uon Ell'C<tl"",.n E.,I""lIo. ,
• • l.2. CaSi CloslU'O or CcrtIllclrioo or Ab.t.menl .
.I
Prlar to InI~tlnJ neld: WQrk tQl' t.:Ich ,lep except ror lmmedLale 5QUrce-remaY~r, tn.! responsible
party mwl SlIbmJlI ledmJcal report >thkh ooola"". proposal or ,.ork plan for thot p,"leu!:!r
step and I propose~ work schedille.
District or Regional !loud .:aCt may nat ~ assigned 10 provide locilnic:& review for some .ite •.
However. respon4iblc p&rda for these =igned ,;lelshaU begin end ",mplele work based 00 the
work sclIedufe in the work plan .. submitted t. the as .. cl... On the olher haod, ,esponsible
pani .. for sit .. which do recdv. lechnital ,eview !rom agency stall should nol begin field work
prior U: lechrUca.I review by ltaff. unless cm~r,en')' eondlticas exist and no adverse conditlon3 are
crealed as • rc;ul! of tho field M>rlc.
Copi .. of all !e.:hniea! r~ert.! thowd be sen! 10:
I. Santa Oar. vaUoy WaLer Dis!I;c~ Alt.ntion: Fuel wk Section or assigned "",e
boodle:
2. Regional Water Quill,), Co.lrollloard
3. Local implementir.c Igency or other age.,C)' which OVeIsee.t hautdou.s: ;;hemi=al
OlO",:e for lb •• il.
S~bsequtl'u to completion at the proposed 'W'ork. responsible parties foc all siles must submtt
anolber loohnical report whlch documcnu the , ... Its of impl,menlinll the pr~pos.J or work plan.
Th .. e te.:h.'llcaI r~1XtIi should be based on .nd contilin the appropriate technical u.formation listed
L, lbe 7echn.ica1 IDfonnatlon GuideUn .. (or Fuel uak Reports and Proposals" daled ~.nu.ry. 1989
(Append". A). and other 'PP"'I'rIa,e ReponaJ Board and St>.le Board guida,,,.
L71S7
----
..
.. "
)'''' -,-. / -~= -~~,.--.. >-''''-
Attachment 2
SCV'NO
JUNE 18,1991, LE1iER
o
~-qq'
, .',
:/
1 . ,
June 18, 1991
Mr. Bill F .1hI'.an
Office. of Real Estate Mmagement
City o!Palo Alto
P.O. Box 10250
Palo Alto, CA 94303
De3r Mr. Fe:1man:
,~
Santu Cora Vn.~~ Water Dislrict
57.50ALMADEN EXffiESS'fiAV
SNi..iOSi, CWFORMA 95118
TF..£CHONE ~4061 2B5--ZUXl
FJl.C$tMli..£ i4C8\ W;~2i'
SUbject: Fuel Leak Investigation 3.t.841 Alma Str~ot. Palo Alto, CA
~
This notifies you that Santa GaIa Valley Water District <Dtstrict) re:ords indicale that a spiIi or le..a:k of
gasoline, fuel or waste oil has contaI!lina!ed soil ana/a'r groundwater unoerlyitlg the subje.:t site. and that
you luve been k:!encfied.as a re5.vonsibJe party. Pursuant to the" California Water Code, polh.;ted soil and
groundwater must be ..:Ieancd up 1.0 me satisfaction of the Reslo~ Water Qu.aJity Control Board
(RegioJlal Board). The Regional Board is the state agency t.esponsible for enfor.:ing the C.::!ifornia Water
Code to protect beneficial uses of both surface and groundwater.
Due tJ the large. numbers of subsurface fJe! leak: cases being reponed, the Regional Board has been
unable 10 provide det.a.il.ed regulatory oversight O!l these cases. A program. bas been developed b~een
the Rqional Board and the District where the Distrkt provides c:wersight on fuel leak c.as.es .and the
Regional Board provides enforcement and case dosure. Therefore. 1tl order to protect grou..'1d \Iro'ater
quality .. we request that yo ... pr~ with invcstigatiCiD. and cteanull at. the subject s.ite without delay_
The inVestig-.a.iOD.and cleanup ofpcnuted soils and ,groundwater will generally follo ..... th~ steps listed in
the en:::losed :s.ummary which L.s excerpt!d from the District's guidelines emitled, • 'Investigation and
Remediation at FueJ Leak Sites Gllidelin~ for In-.'estigation :md TecllDlQJ Repon Preparatior., .. dated
March 1989. These guidelines de'Scribe the steps for investigation and cleanup (remediation) that are
neces.ury to resolve this matter and are a ... ailable to you by ~ling the District"s Seif-Directed CASe
Advisor. Once the ~!enminary Slt~ 2..<"s.es5ment (PSA) phast has beer. completed yO'.l may q!lalify fcr th-e
Disukt~s Conditional Case Closure Frog:-a.m; i guidan:::e dG...-umem ts enclosed for your infOIIJl4tion.
Th=ae documents have been sent to consultants known to work: in Silltil QiiliI Count)'.
Bv August .30~ 199J.te3.Se Submit. a technj.::.al~!!.._desq[bing investigation and cJ~uF acth~i[jes at :
th~e su.hject site and I roposea..s.;hedule.fQL.ID.e-»_e.;tph~;=s of work vou plan to com'p~~e..£.~ording~
. _the _enclos~._1!U~. This technkaI reE£!!. is b-eiJ1g ~~~~J:~lJ~IJall£..~i?_~.~~-=!il'i ona.! Board's 1
~U:~2E~ry_u~::~_~~mia y..'atl'.I Code, 5~ioIl13267_ ------~
Copies of ill future reports., leners. etc., shouid be submitted to the Distri~ Self-Directed Pmgrarrt.
Attention Kristin Cozza, the Regional Board. and the loc.aJ fire department or agency which bas
jurisdiction over chemical storage 00 your ~~:e. The con:..aC1S and addresses are provided below:
Ms. Penny Silzu
Regicrw. Water Qualtty Control Board
2101 Webster Street, Suite 500
Oakland, CA 94612
Mr. lim Timko
Palo AltO Fire Department
250 Hamihoc A ve::::.;c
Palo Alto. CA 94301
-.--""" > ••
o
Mr. Bill FelIl1Wl 2 June 18, 1991
Until "'\IOU receive further notice. your c;aS= is q .. msidered to be sei(-.ilrected .. lJrhol.':gb we will not be
provid,iDg you with detailed review and com.::nents O'II your inVe:!tigatiOD and clel.Il:up. you may contact
the Self-Directed Case Advisor for genera] guidance and dari5C3tlOn. Pi~ he advised that the District
will rcutinely re,,'iew selected seJ.f-dir~ cases to detemUIlC whether or Mt U:.ve.stiga!lOll or cleanup i.s
beizlg pursu~ in I timely mantle:. ..0\:: mat time, we may comider provitiing d'irea oversight or
recommending th.t enforcement action be w::en by tile RegioOlaJ &,ard if work is not being done in an
appropriate time. frame. We consider lin appropnau time fram~ to be ten weeks to do che fieJd work and
write aud submit an impJemematiotl report which eontaic.s the results oC the fleldwork.
Pl~ check with your consultants to determine whetila or oot they have the District's guideHnn. If
yO\! or your consultants have questions, please c.;ill Kr •. niI: Cozza at (408) 927~710. I:XlensioZl66t, or
write to the Self-Directed Ft.:el Leak Prcgram at the District's address.
Sin=oly,
~ DavidD~ ~ C;;,j~.n..,.
Gmtmdwater ProtectiOD Divisioo
Enclosure
ce: Ms. Peony SiIzer
R.gional Warer Quality Comrol Board
2101 Webstor Str .... Suit. 500
Oakland, CA 94612
Mr. lim Tm:ko
Palo Alto FIre Department
2SO Hmllltoo A venue
Palo Alto, CA 9430 I
, '-
-'--'~--"""-"'-.~"""""---'---, ;,
y
~.
II ;' ~ ,.
,
.. "
STEPS FOR SO!!, AND GROUNDWATER INVESTIGATIOr<l AND REMEDIATION
Geoen.lly. so:] and groundwater t.c.vestigations fonow the Steps outlined below:
1. Releas. ci1sco • ...,.
2. Immediate souree removal
3. Work Schedul< SubmiLt:l1
4. Preliminary Site Assessment
S. ~tigratiOD Control
6. Remedial In'l'estiption
7. Feasl'binl7 Siudy
8, Proposed Corredi •• Adlon
9. Imp!emtntation Df the C(}1Tect.ive Action
10. Verifa.cation Monitoring
ll. Remediation Elfed..i,eness EmuatillD
12. Case Closure or Certilic:ation o( Abatemenl
Subsequent to comp1etinz: ne!d "wk for each step, the I"'e5ponsibJe party must submit .. technical
report ctescribinz: how the work was pe:formed and' a proposed YIIo["k schedule ror the next phase
or wack 10 b. <OIIIplded.
D1strict or R~~ Board staff may Dot be wigned ttJ provide technical review for some sites.
However. responsible parties for tbe$e unassIgned sites shall begin and complete WOrl;: b.ased DC the a.'ork:
scbedU:c submitted 10 the agencies. On the other hmd. responsible parnes for sites ~ .. hi~ dQ receive
technical review from IgImCY staff should not btgiII field work prior to technIcal review by staff, unless
emer:ency conditions r.xist and no advClSe conditions are ~eated as .a result of the field work.
Copies of .all tedm.ical reports should be sent to:
1. Santa Oara Valley Water District. At:.cmion: Fuel Leak Section or-iiSsigned case handler
2. R.giocal Waler Qu.Jity Control Board
3. Local impJeme.nt:in,g a,gency or other ~[l..')' which o .... ersees b~ous chemical storage for the
site
These teclmicaJ reporu should be based OIl and cotrta1n the appropriate technical infornlatioc. fisted .in the
"Tecllnlcal 1nf0000000000D Guid~iDes {or Fuel Lt.al: R~orts and Proposals" datOO January j 989
(Appendix A). and orner appropriate Regional Baazrl and Swe Board guiduce.
L8622b
•
..
---'-"--~--I
o
Attachment 3
SCVWD
JULY22,1991, LETTER
o
,
r-.
Santa Clara Vab~ Wcler DisUid
JuJy1.2,1991
Mr. Jim Harrington
City of Palo Alto
P.O. Box 10250
Palo Alto, CA 94303
o.ar Mr. Harrington:
5750AU;:AQEN D.P.~E5SWA.Y
SAN JOSe:. CAU'F~NIA 95118
"B£l"<OOE I~ '65-2600
F,\CSlMr.L£ l408) 25ti-oZi"
I<If ~IM .rcJO,I,i EW\.OY9
em C~ f=>AtO 1.L TO
RECEiVeD
Subject: Undergrouru:! Storage Tank Leak Investigation a: Palo Alto CiviC: Center, 250 HamiltoD
Avenue, Palo Alto
As discussed in the phoa.e coDversation with Tracy HeI:nJ.1~eter on June: 24~ 199I, tie Regional Water
Quality Control &ard (RWQCB) fffi)rds indicate that I subsurface re1ea.s1! of petroteum hydrocarbons
occutted at the above she.
The Santa Clan. VaIley Watu Distric: (SCVV/D) h4s entered. into 3J] agreement with the State WilIer
Resources Board md the U. S. Environmental Protection Age%lCY (EPA) to pnwide oversight on the
mvemgatioill and remediation of all fuel leU sites in Santa Clara County.
!be SCVWD staff wm evaIldte the invcs.tiga:tioa.and cleanup a:tivitics undertaken at yOW" .site. If it can
be determined that DO further remedhticn is warranted. your case will be n:ferred to the RWQCB for
final review and closure.
In order for your .site to be corui>iered for closure.. a thorough site bisiOry must be compued_ We have
nwiewed an documents on fJ~ relilting 10 your case and in order IO initjat~ the case c!O!;un: irr;.-eo;rigatioD
for your site, we need iDformarion on the fonowing:
A description of .hJil sample ronection and preserva:ion methods
Chain of custody documematioD
The location of Sampl ~ 9
The disposal' of th~ conc:~:~ pad on which th~ tank was formerly located
Copies of the laboratory data summary report for the initial soil SAlllples
In addruon, our records indicat: that there ts il grovndwaler production weJl (Stale Well #06S3W02B10)
loc.attd at the subject site_ Groundwater samplcs for Taoof'3lOty analysis should be properly eoTIected
from this well to determine if groundwater ar the site has been impacted by petroleum hydrOQrooru._ The
gJ'OW)dWate: samples should be maly.led for Total Petroleum Hydrocarbons as diesel, beozene, toluene,
emyJbenzer,:e and xylen.es according to Table n of the "Tri-RegionaJ Re:ommc!'1dations, "which is.
Appendix B of the D.istriC1~' Guidetines_ You sholJld submit il repon describing sample collection
--------------,,.,
I
o o
Y...r. Jim HarrtJIgtoll 1 July 11, 1991
procedures. and analytical methods and copies. of the laboratory dau summary sheets amt chain of custody
documentation.
It !s reques!ed ~ you submit this infcnnation by AUgust 3ll, ! 991 in order for O'.lr staff 10 review it and
proceed Q!itb this recommenda~on.
Copie; of all repcrts sl-.ould he submitted to me SC\-"\VD (Attention: Tracy He'mmet~r), the RWQCB
{.t,.ueo.tion: Penny Silzer) and to the Palo Alto Fir~ Dl!pamtlec.t {Attemion; Jim T.iID.ko.)
If you have Uly questions. pleas: call Tracy Hemmerer at (408) 927-0110. extensiOIl 647.
c:c: Ms. l'enDy Silzer
Rqiouol Water Quality Control Boanl
2101 Webster Street, Suite sao
Oakland, CA 94612
:~',~~' , .. "
Mr. Jim runko
Palo Alto Fire Depamneru
250 Ra.'nHtcn Avenue
Palo Alto. CA 94301
.". -.,~--",-,-
Attachment 4
SCVWD
JUlY31, 1991, lETTER
."----... ~
,
•
"'. '.
o
Ju!y 3!, I~I
Sor*a Cara Var;y Wa~er DisUid
.Cc--...: ........ C{[" "..JL
:.::0 o ill. , ~!.. .... ~-:,::> :S ... ~
575QALMACEr.I EXME.SS'n'AY
SIJi JOSE. CAUFOO~IA 95:18
ffiUrtONE l~ 255-26CO
FACSrMlLE I~ ZeE-OZi'1
~~TM~N~_C"Eil
Me. Jim Hanington
City of Pale Alto
P.O. Box 10250
':::~7'f C~ ~.o\LOAL;O
i4.E'CEJVED
'~ 2 1991
?cELie "O~kS 8iGINtniiNG
Piilo Alto, CA 94303
Dear Mr. Harrington:
SUbject: Fuel Leak Inves:iga~ion at Pilla Alto Fire StatiO!l ;1,301 Alma Street.., PaIo Allo
This requests 2 Pre!aninary Site Assessmeru: (PSA) Repon and provides the basis for our request.
Ms. Tracy Hemtneter of my staff dis~od this request with you durir.g, I telephone co!lversatioc OD
Jun. 24, 1991.
BASIl, OF REQUEST
Our requtst (or a PSA Report., which wIT! provide additional informatiDu rega!'d~:'l.g the ex'enc of solI
cootamination and the threat to groundwarer at the site, is based on the feIiewing:
1. Up to 800 ppm TPH as diesel remliDS in the soil below the formec 550 ganoa diesel ta.nk.
2. The vertical and horizo.;n.aI exte..'l1 Df.s.oil contamination has DOt yet been defined to DOMcteruble
concentrations .
3. The threat (0 groundwater has DOt yet been investigated..
TEC~lCAL REPORT REQlJESI
By November I, 1991, piease submit i Preliminary Sire Assessment repon which furt.i.er d~flDes of the
extern of soil contaminatioD and the threat tc-groundwater. This repon is being requested pursuant to
the F.egionaJ Board's authority under California Wate: Code, Se...'"tiOD 13267. Copies. of this and all
reports should be SeM to the District (Attention: Tracy Hemmeter), the Regional Board (Attention:
Penny Siizer) and the Palo AltO Fire Departmeru {Attention: Jim Timko).
For this phase of work, WE propose the fon<Jwing Nic options:
Option 1.
Optio!! 2.
Pit uc:avalion and OuaZiJderi~uon: Re-txcavate the former tanl:: pit to nonoelectBbte
concmtrations. Soil samples shall be coilected from an the plt sidewalls and the pit
bottom. in a grid matrix pattern of between five and fifteen foot Lnter-vals, depending on
pit size, at relatively permeable lenses, and at the soil/groundwater imerfac:e. if
em:ountered.. Please see the enclo:sed glJidanc:e for additional information.
Son Borings: InstaIl three sci] boriogl. within 10 feet of each former ta.'ll:: area. Soil
s.ampJe:s shall be collected ~ery S feet. at significant Etholo&:ica..! changes withm the
/
Mr. Jim HarringtOn 2 July 31, 1991
unsaturated zone, and at the soillgroundwau-r Interface, if enc:oumer~. All soil sampres
sbaH be analyzeJ by I DHS certified laboratory fo[" TPH as diesel and BTEX. To define
the extent oC soil c:ootamillation, the bona m 20 (ee[ In cl 3)'S or silts and the bottom 40 fe~t
in sands or gravers mus[ ha .... e nondet:c'"..mie levels of contaminatloll in all soil samples,
b.a;ed upon analysis by I DRS cenified labora.tory. If groundwater is encoum:.red, a.
groundwater monitoring well should be instaI1ed.
The PSA. Report should descnoe how one of the above optiorcS was implemented. The report should be
based OD the District's "Gu.idelic.es far lnvestigativD and TechnicaI Report Preparation," Caober 1990
revision,. .and its Appendices, and the "Tri·RegicrW Recommetldations," August 1990 revision, which
is Appendix B of the District'S Guidelines.
AIl technical reports shall ~ signed by an officer or legally iluthorized represenutivoe of the City of Palo
Alto, as .stated in the District Guidelines (Appendix A, page 2). Also, all work and :echnkal reports
roctaining geologic or eogineering evaluatlons and/or jud.eemems must be signed and su,"l"l.pe.d by an
appropriately regi.stered professIonal (Sections 673S, 7'835, iIIXI 7835.1 of the Business a.. ... d Professions
Cede).
If you bave any questions, ploease c:aJ1 Tr.JCY Hemm~er at (408) 927...<)710, extension 641. Thank you
for your coopent..ion.
Sin=-ly, _
4g~:f£~1:{-'-_
Ee!inda A. An"", P .E.
Associate Civil Engineer
GrollDdwater Protectioo Division
Enclosur~; Pil ExC3Vari<)n Guidance
.cc: Ms. Penny Silzet
R:gioc.a.i Warer Quaiity Control Board
2101 Webster Street, Suite 500
Oakland, CA 94612
Me. Jim Timko
Palo Alto Fin: Depanment
250 Hamilton Avenue
Palo Alto, CA 9430!
•
\
SOIL AND GROUNDWAITR SAMPLING GUIDANCE
DtJRIJ'G SOIL EXCAVATION
This provides guid;m~ for (:Oil=aitm of soil and groundwater saMpr:!:S during soil exca'o'auon. More:
deuiled sampling g\1idelin=s for Soou and groundwAter C<;lt:co:iotl duri.,~ fuel fe.aJ::: .si:e ir1v~tig;HiQ11." are
proyid'ed iII the Distria "Guidelines for Pre{:larlng or Re-.'iewInJ; Sampi"ing Pl3..D.:ii for Scil anc1
Groundw.ner rnvestigation 3l Fl.ieJ ContaminatioD Sites," dat~ January 9. 1989, which is.also Appendix
C in the Dtstric:t Hlnvestigation ant! Re:m;::diatioc. at Fuel Leak Sites Guidelincs for Investigation And
Tw.nical Report Prepan.tio~·~ daud Marth 1989 a .. ,d r.evised October 1990.
After fuel tank.and piping removal, soi! samples are COfiectM from the e%C3V2.[ioD pil for (our purposes.
The fim purpose. is to confirm whether or Dot a. rele.z.se of fuel products to s.oil has (lct;Urred from tanks
or piping. The second purpose is 10 dererm.ble. how pollutant ,ccDeeotnttIons are d'i.stnouted i.., tho: soil
Mou.nd the t3rJ::: and/or piping. The third purpose is ta derme !he ener.t of soil cont.a:rni.rutioc to Lon
detea.abfe levels during.soil excavatilln. The fourth purpose is to provide;a qUiUltirative soil description.
Ground'W2ter monttoring wcJls may be tl~ based upon the Tn-Regional Recommend'iltion.s. even
t.J.iou.:b me: extent of son e.onta-niniltion ts defined.
RELEASE CONFIRMATION
The Tri-Rcgio~~ Recommendation! in the "RegiorW Board Staff Recommend'illions for Preliminary
E ... -aluation and Invcsti,gatioD ofUnduground' Tank Sires~" dated August 10. 1990. J:rovide.s this gt.:idanc::
\Jtl Pages 12~ 13. 14. Table ,fl, Table n. 2.n.1 Appendix A. The. reports generated for release
confirmation shall comain the information as diseu~ed in the following contamin~lLQn chan.C1.::-tzarion
se-'"tion.
coxr A,\IL"A TION CHARACTERIZATION'
Q;ara~erizatjon ofre.sidua! soil C(!ntantirratioll ati:~ ex;:avatiOD is appropriate i.e lieu ofsoi1 oorin: sample
conectioc as long as the following :u!"d2J'lCC is appTIed. Ch2:".acterization in tht.s ma.'l.'~ ~baI1 be used
dUrillg over--ec eavatioD of sail after i reI~ of fu.:l bas beet:! confirmtd 2.S <5 esctlbed it! :he Tri·Regional
Board Rca;nnmendations. Afi excavated soW; should be cbancterized .after removal ar.d either hauldd
a .... '3)' for disposal' at an :appropriate Jandfitl or t::reaJ:t.d and b:auled a ..... ay.
Location and Number of Soil Samples a Soil sampTes shill be conected from obviously polluted
locations which are determined either visuaIly or by fie!d screening devi~. Ie. addition, an adequare
number ohoil sa. .. np1cs sha11 be. coneaed from all th.e sidewalls and we pit bottom in a grid matrix p.artc:rc.
of bet\A.'~n fi .... e. am1 fiiiecn foot inl:rvals depending on pit sue, at relatively permeabre le:u:~, and .at the
soil/grOlmd\\';acet interface, if eneounte!'e .. ::L
S:lmple Collection a The method us~ for rele:ase confirmation, zs referenced in tJle seclion 2bove, is
.;Jrp-rc;::-:J:~.:!; tong ~ ~::: heJ.:! spac~ is pr~e~1 i'1 tile brO!s.s rube aner ~<'mpre caJleC1i(>n, !he s~mpJ~ are
KePl :r. .: do!'gre:es Ce!SiU5 • .iiil'ld the S-lmpres are ai1Jlyzed wit)lin 14 da)'S of cOITCC~i00. Groun.: ... ·.aler, if
Pi30~
\
I
/-'.
present, 1h.aJ1 be s.ampied lIo:ording 1;') t.'l(: T,i-R:gior..:j Recomme:ldalions usirlg L'l~ apprOprtale
decclllLOJminared corltajner Jist~ <In t.'1.e aru:::hed Tab!: 11. 1ne pre.!.~:1ce or abse:.c:: c-f sheen and/or
floating product .shall be noted.
L:lbor.lllO,'")' Analysis ~ The .!iDiJ :!:.a...-nples shall be a. .... aiyz-:.j for all the COl1Stlrlle:nl.S li.>t~ on Table #2 of
the Tri~Region.aI Board Re""...Dmm~!ldatjons for the ryp~ of rnat~;a1.s. StOted ~Il m: :..a...-ti:: and .assccialod
piping being remQved. The an~I'ytic.a1laboratory shaIl be St.a.:c c::erufied to pe:form amJyses Oil hazardous
ma::criaIs_
SOIL DESCRlPTlON
Soil Particle Sir..e Analysis· Soil samples shaH a!!.O be cclle...'1:.ed for particr~ size ani!.l)'sts ,ar,;cording ro
ASTM Method 0-422.. Each partk!e slz.e a.nalysis (sieve analysIs + bydr'Jr.1.e.te1" a.,.,a1ysis; requires .abOUt
200 grams of sample (two ziplocic sandwich bags full). The samples should Do! corr~ed from the most
COMS! material found io the t;des of the tar .. ~ at or be.low the W;!.U table, and from the borro-rn of me tank
excavation.. If e!e.arly cotltamin.ated soil is pI"es~r., a particle. siz.~ ar.:ilysis sample should also be eolle.c1:ed
from the szme a.-ea as the 1alJIp[~ for ch~i~ analysis. The b yo rameter te,~ mly not need to be
.,c:rformed j(the sieve analysis shows thaI less than 155'1i of t..ie solls will pass the !';o. ~OL) sieve. That
is, less than 1S~ of the tOtal .soU: is compose.:: of silt.and day combir,ed. Panicle s~e analyses are
typlea!1y performed t..y soils e!'1gineering laboratori-es.
The purpose of Lbe particle size anaLysis is to provide d.ata 10 support mil! decision pro:-e:;s ilJu5tri[oj in
Figur~ 1 of the Tri-RegionaJ Boud RecommcnJa:ions. This i.1fonnarioc. is one aspect of the
de:lcrmi.-wion whether ".no further ao:ioQ" or ~'soi1/groundwaIer iny~gatioD~' 15 reqtl::.ed.
MINIMUM REPORT COI'o-ru.'TS
The report .shall contain d~jptions. ilIllSU'2rions. Sl!mm.aries. and copies of forms ciiscussed beIow.
1. A deuiled description of the fonowing shall be. submir!ed: 1) how .s:unpl~ng equipm:m ..... a,s:
decontaminated; 2) how samples were c.cne=ted. bllldled, soore..d, and anaIjo'z.ed; ZIld 3) ~i:sposal.
Storage, or treatment cf the O-QVated soil. A repon: which only refers to the .[1Jidance dccum~"'ltS
and does not c.ont-ain a. dwiled d~c:r:ip:ioD ~ill be l.macceptable.
2. The followlng ilIustI"al:iQn.,s shall be. submitted dr .. w[: 10 scale wid. to;e compass dire::ion idemltied:
1) .. tite map illus:trating the former tank,. piping, .anel sdInple point locations; 2) a. .si:e Cl4p
iliu:alr.ating the incremental areal exteru of soil eXC4\.'atiOTl and t..'le. hIghest collcem .. ""alions found
af.:.~ each lnc:remetWiJ excavation; 6nd J) drawing! to scale of c.acil of the pit side.wGlls and boaom
with the tank and soil s.aI::lpJe Jot:a!.ioru plotted, the ch~k:aJ concentratJons tlcted, t11e locatidu
of rdatively pe.nneab!e .soil I.ayen illustrated, .and gn .• t.md ... ·are.t and free product IOc.aIiotl
ill ustrned. if found in the piL
3. A S\Jt:li1'1al}' of chemical resultS in tabular (orm.
<-. Copies of the laboratory o..-iginated dat.a summary shee:.s, chain-of-cllstody fonns. hu.ardol.!S ..... jl.:;te
manifests, and permits is~~ed by .agencies, if reqtlired, shall also be .submio-ed.
S. The .soil;particJe siz.e ar,4!ys.is graph and dala sh.e:ts.
P730~ ~
'1
'.
I
/
/'
o
C01'>TMI!NATION DEFINITION
Definition of the e:.uent of soil conwninatiC'o shall be consider!:d complete once non-<leloX'..able
concentrations U~ found. Tabie 12 of the Trl-Region;i Bc.ud Recommendations p:,ovid~ appropri;m:
der~ctioll r1miu which ""iii be considered for definition purposes.
All the in.funIuuon di.scussed.ill the co::lWninatioo c:h,arat;teri.z.ation section above shaH be provi::ftd for
ciefinition purposes. Verificatioll ~il borings to confUT!l defmitiGCI may be necessary and ",,:ilI be
det~ined on a sire speclfic basis.
P7)O<
I
I
TABLE 1
SAMPLE COI\'TAINERS. HOLDING TIMES MiD PRESERVATION
PARAMETER
Total
Fetrol CIlI11
Hydroe>rbons
(Ligbt fraetions)
(Heavy !rmions)
Beuune
Toluene
Xylen.
Ethyiben:er:e
Porgwl.
Holocaroons
PoI)'D"~Qf
Aromatic:
Hydroe>rbons
Poly~orina!ed
Biphwyu
MATRIX
Soil
Water
Water
Soil
"Vater
Soil
W.,er
Soil
Water
Soi!
Water
Snil
W",er
CONTAINER HOLDING PRESERVATION
TIME
)'"' minIes.s Sled 14 (~.aysl 4"C
f'Jt brass cyllcder 4Q day.f
40 ml gtass vial, ter1on-faced 14 daysl 4"C+HCI
:silicon septum 4() days' to pH = 2
I liter amber bottle:s tefloQ-14 days' 4"C
faeed silicon s.e rum 40 dav~
3"' scainlcss.steel 14 days' 4"C
or brass cyiiader
40 ml ~m vial, teflon-faced 1 07 days' 4"C+HCI
:11icotl seorum 14 daYf to oH = 2
3'"' staiales.s =teet
0< b ..... C)'iinde<
14 days! 4"C
SOO ml £1 ... vial. J4 daysl 4"C
t.eilOD-f.aeed siliOJc septum
3' >UinI ... s=l
or br.lS!!i cylinder
1( c!.ays.1 4"C
-40 mJ Il.as.s vial'. teflon-faced J4 dayst 4"C
silicon s rum
! oz.. wld~ mouth glas.!. with
1eflon liner
07 days' 4'C
1000 m! amber glass with
tenDo liner
40 dayi' 14 "C
I oz.. ",jde t.o)QUth glas.s with 07 days' 4"C
ldloD.linu
1 000 ml amber glass with
teflon: liner
4() days' 4"C
I Maximum 'holdin: time for .s..a.mpJe {exlnct wiLhiri LfI!S time or analyze if utnction is nOl required)
2 Maximum bO!':::1~ time for eXlr.ct (analyze \A:ilhin this time;
J )'f:u.inltJm holdj;,g lime for s.ampr~ when pH adjusted wit}. He!
•
•
------------'
'.
o
Addendum to Exhibit A
Additional Scope of Project for Work Item 2
PALO ALTO MUN!CIPAl AIRPORT SITE
. '~~,~--"--'-----'-...
•
__ : ...... ",At;
ADDENDUM TO WORK ITEM 2 •
ADDITIONAL SCOPE OF PROJECT FOR PALO ALTO
MUNICIPAL AIRPORT, PALO ALTO, CALIFORNIA
Introduction
The scope 01 project on wor!<, ijem 2 under this addendum \0 exhibit A
concerns the workplan for additional environme!1tal servfces at the Palo
Alto Municipal Airport The workplan COV&rs lhe addrtional field aeliv'rlies
agreed upon during the meeting between City staff, Consultant, and the
Santa Clara Valley Water District (SCVWO) staff, On August 21, 199t,
CIty agreed to perform a ris~ assessmert to determine the potemial impact
01 the hydrocart>ons detected in the shallow ground water at the site, and
a feasibilrty study, II the ieasibility stcody shows that ground-water cleanup
to Ilondetectable levels or drinkLng-water standards is technically and
eoonomicaJly inleasible, and the risk assessment satislactonly shows that
actille remediation of the grourtd water is not necessary. it wil~ become the
basis for possible case dosure,
Background
The Palo Alto Municipal Airport site is loca,ed at 1901 Embarcadero Road,
approximalely 1/2 mne east of the Bayshore Freeway (figure,), The
Municipal Goff Course is adjacent to the west side of the site, Marshland.
start from the east and north sides of the srte and extend approximately
t/4 m"e in each direction leading 10 San Francisco Bay, The municipal
sewage treatment plant is south and the Pato .... ~o landfill is southeast of
the srte across Embarcadero Road, 8etween the site and the Bayshore
Freeway are rig ... t commercial and industrial facilrties.
The Cijy began SO" and ground-water investigations following the removal
and ckJsure of an underground storage tank complex in August 1988, As
part of these activities. two 1 ,aOo-gaIlon underground storage tanks which
previously contained gasOline and had recentty served as waste-oil star-
PJl 199OSC3E,GOW Rev 0 September 20, 1991
-
age tanks were removed. A third tank (2,000 gallons) which conlained soil
and debris as wen as waste on, was remcved in February 1989. The 10r
mer location ollhe Ihree storage lanks is shown in ~gure 2 (,,,,mer under
ground tank complex al Ihe so:J!hwest comer of Ihe hangar building).
FIeld observations (petroleum-hydrocarbon odor, and a visible oily sheen
on so~ and ground waler) during the removal 01 the slorage lank indicaleC
tha! tho sui! and shallow groun~ waler hed been impact9d by pelroleum
hydrocarbons.
The resurts of the tank removal and closure at::tivmes conducted in August
1988 and the frrst quarter of 19B9 were presenled in rank Clos"re Sum
mary Repolt, Palo Mo Municipal Repolt, O,.,ft Report (EMCON,
November 14. 1989). Son samples 1rom the sides of Ihe excavalion, and
a ground-waler sample from the base of the lank excavation. were ana
lyzed for petroleum hydrocarbons. These analyses ;ndicaled thaI the soil
and ground water around Ihe lank complex were impacted by both gaso
lir,e and waste o~. The City retained EMCON to peilo;tn a s~e assess
n1ent, descnbed in Resuhs o( a Site Assessment, Palo Alto Municipal Air
port (EMCON. December 2B, 19BB). The site assessment included
augering of 18 shanow exploratory borings. drilling "nd installation 01 three
ground-watar mon~oring wells (MW-l, MW-2, and M"'-3), and sampnng
and analysis 01 son and ground water. localions of the three moo~oring
wens are shown in figure 2.
The EMCON site assessment report (December 2B. 1988) concluded from
the so, and ground-water anal~lical results that son adjacent to the tank
complex, and ground water as far as 150 feel from the lank complex were
impacted by petroleum hydrocarl>ons, and 'ecommended toat avanable
records be reviewed fo( :nformation on past and present practices at the
s~e, and tha! a Phase 2 site assessmenl be conduct9d to determine lroe
e.'enl of pelroleum-hydrocarl>on-impacted ground water.
EMCON's January 26, 1990, records review of former fuel slorage and
handling areas identified three polenlial fonmer fuel storage areas other
than the closed underground storage comple.. In the Phase 2 site
assessment, EMCON conlracted an undelground utilr.y localing service 10
search for metal underground storage lanks and piping in the Ihree areas.
No tanks or piping were detected. Ah~r the underground detection work
was compleled, so, samples were conected from three shallow borings
adjacent to the polential fonmer fuel slorage areas. In addition. ground
water sampfes were collected from six probe locations and analyzed in
2
---_ .. _'-
1
-
order 10 provice adcfrtionru shallow ground·watar plume definition. The
results of these ectiv~ie$ were descnbed in the Airport Soil and Ground·
Wate! Characterization Report (EMCON. June 1990). Gasoline, benzene.
xyfenes, and ethylbenzene were detected in son samples from one 01 the
suspected fermer underground storage tank areas approximately 100 feet
south·so~~hwest o! the ~angar buiiding. suggesting another possible
source of petroieum hydrocarbons near this area. The soil and 9,ound·
water characterization report (EMCON, June 1990) recommended instal·
lation of three additional ground-water monitoring wails fer defining the
hydrocarbon plume.
As part of the Phase 2 assessment, EMCON alSO measured the ground
waler elevations in weils MW·!, MW·2, and MW·3 cn three differenl dates
at different times relative to the preceding low tide. The ground·waler ele·
vations and flow directions were essentially the same e>n the Ihree dales; it
was therelor. concluded that the effect of tidal fluctuatio,," on ground
waler !!Ievations and fiow directions at Ihe site was negngibie.
Fonowing the Phase 2 assessment work EMCON conducted four quarter;
of ground-wal"r monito~ng events 'n the period August t990 10 May 1991.
The first quall.~y sampling was done afler the installation of th2 lour adcj;.
tional moniloring wens (M'N-4 through MW-7) as was recommended in the
son and ground-water characterization report (EMCON, June 1990). Mer
the evaluation of the monitoring data, EMCON installed three addil;onal
monrtoring wells (MW-8, MW-9, and MW-l0) in ordar to determine the
shanow ground·water now direction undemeath Ihe srte, and fully define
the lateral extent of Ihe hydrocarbon impact. The lhree subsequent mon
"oring events included the ten moniloring wens at the site. The resuhs of
tha monitoring evenls were presented in detail in the respective quaneMy
;round-wa:er sampling and analysis reports, and are summarized bEtlow.
Groun.cJ..water elevation data show that the ground water flows toward the
east with a slight depression around MW·7 (figure 2). The analytical data
indIcated that the hydrocarboii impac: In the ground wa1er was iimi'ted to
wens MW-l, MW-2, MW·3, and MW-7. Benzene concentrations in these
wens over the four quaner; were less than 0.5 part per blilion (ppb, non
detectable) 10 13 ppb (detected in MW·3 in the third quarter). Toluene,
xyfenes, and ethylber..zene were detected only in the wel!s MW·3 and
MW-7, and only on an occasional basis. The highesl concentralions of
these compounds detected at the site were tolcene 6 ppb, xylenes 4 ppb,
and ethylbenzene 0.6 ppb. Total petroleum hydrocarbons as gasoline
P J, 1990803E. GOw 3 ReI' 0 Septernber20.199'f
'.
,
o
(TPHG) concentrations in the impacted weils were <50 ppb
(nondetectable) to 480 ppt> Qn wef! MW-7J. Hlgh-boiling-point hydrocar
bons (HBHCs) as diesel were detected in wans MW-' and MW·2 in the
flrst sampling evant at a concentration of 50 ppt> and 70 ppb, respectively.
HBHCs were nOl detected in the subsequent sampflng events. The
ground-water concentration data are presented in appendix A-
The mon~oring ",suns ind:~e that the hydrocarbon impact at the sije is
limited. The groun~water hydrocarbon plume boundaries are defln&<! to
the north by weil MW-4, to the south by MW-S. to the east by MW-5, and
to the west Dy wens MW-8. MW-9. and MW-10, in which no impacted
ground water was detected.
Scope of Work
The adOrtionai scope of the project for wo'" item 2 under this addendum to
exhibit A includes (1) this workp/.en for additional characterization. risk
assessment. and remedial anematives evaluation. (2) installation and
sampr,ng of one shallow groun~water monitoring wen, (3) installation and
sampfing of one deeper ground-water monitoring well (both wells immedi
ately downgradient from the former tank complex source a'ea).
(4) hydnaufic testing to determine approximate values of hydraulic conduc
tivny a."fOSS the shallow aquifer. (5) nevising and updating the previous
well survey EMCON had conducted in 1989, (6) feasibihly study: evalua
tion of remediation aftematives providing cost estimates for design. con·
struction. and operation and maintenance for one year. (7) identification of
the potential recaptors of the chemicals of potential concern (CPCs) in the
impacted ground water. and a risk assessment to determine the risk. If
any. to these receptors lrom the CPCs in the ground water, and
(8) pre~aration of a report describing these actlvrtles.
Task 1. Workplan for Additionat Characterization, Risk Assessment.
and Remedial Alternatives Evaluation
Task 1 includes preparation of this workplan I<>r submittal to regulatory
agencies.
Task 2. Shallow Monitoring Weliinstattalion and Sampling
One sha.~ow monitoring well, MW·l1, will De inSlalled in the area of the
lonmer fuel tank complex excavation (ftgure 2). The purpose of this wen is
PJ1 1990803E.GOW 4 Rev. 0 September 20, , 991
•
. ,-. ~:"r< .~ .
........ __ ,c
/ '
to determine the concentra!lons of hydrocarbons closest :0 the source of
pelToleum h yd rocarbons.
EMCON will !:"ntract a drilling company to drill an exploratory boring to a
depth of approximately 15 feet wit~ 8-i"ch-<flameter, hollow-stem auger
drilling equipment
The downhole drilling equipm""t will be steam-cieanee before the wen is
drilled to mitigate possible contamination. Son samples will be collected
from the exploratory boring at 5-loot intervals. An EMCON geologist
under the supervision of a Califomia-state-reg:stered geologist will log the
sons accordi~g to the Unified Son Classification System. Two soil samples
will be collected above the wafer table for chemical analyses. These
samples will be sealed with Tefion® tape, placed in a oooler, and deliv
ered with chain-of"'Ustody forms to Columbia Analytical Services, a
CaI~omia-stat9-certified l6.boratory, lor analysis. The soil samples will be
analyzed for TPHG; benzene, toluene, xylenes, and ethylbenzene (BTXEl;
and HBHCs as dieEel by the methods accepted by the Department of
Health Serv'lceS (DHS) in the Leaking Underground Fuel Tank (LUFT)
Field Manual
The monitOring wen will be constructed of 2-ir>eh-dlameter, flush-threaded
polyvinyl chloride (PVC) casing and O.020-inch factory-slotted screen to
1 fOOl at"",e the water-bearing zone. The annulus between the casing
and the borehole wall wlll be filled wfth '2120 Monterey sand to approxi
mately 1 fOOl above the screened section. The remainder of the annulus
wm be sealed with bentontle and a cement slurry. The registered geolo
gist will also supervise the construction of the monitoring we~. The well
w11l be protected wfth a Christy box installed in conc,ete and a locking well
cap' will restriCl access to the wen.
EMCON will ~evelop the completed wen by surging, bai:ing, pumping, or a
combination of these methods. We wiil survey the location, ground eleva
tion, and top-ol-casing elevation. Following its development, well MW-l'
will be allowed to stabmze for at least 24 hours, after which the ground
water level will be measured and the wefl purged and sampled.
Ground wate, will be analyzed fO<' WHG, BTXE, and HBHCs as diesel by
the DHS LUFT methods and EPA method 8020. Ground water will also
be sampled and analyzed lor total dissolved sonds (TDS) to evaluate the
water quality in the shallow aqulfe,. A Regional Water Quality Control
Board (RWacs) policy defines an aquiter as " potential drinking-water
PJ, '990803E.GQW 5 Rev. 0 Sep1ember 20.1991
•
.•.. ',.-----...
,
1
I
~
i
i •
I
~ -,-:.,.
." ----------
o
source if ij can d',scI1arge mora thao 200 gallons per day (9.00) from a sin
gle w(;11 and has a TDS concentration b<3low 3,000 parts per million (ppm).
On the basis of field ",easurements of .'ectneal conductivity rt is eSlimated
Ihat the TDS concer-traliOn ()f !he ground water wil: be much higher than
3,000 ppm.
The so~ cuttings geneT8ted during drilling, the well development water,
and the water used in Sleam-cleaning will be stored in drums on site. The
City will be responsible for disposing of these materials,
Task 3, Deep Welt Installation and sampling
One deeper monitoring well, M';\I-12, will be installed near the proposed
shallow well described in task 2 (figure 2), The purpose of this deeper wen
is to determine whether the next deepest aquifer is impacted by hydrocar
bons and to provide additional data to conduct the ris/( assessmenl
Based on avaflable information from the nearby Palo Mo landfill, the next
aquifer is anticipated a1 a depth of about 40 fee! below grade.
EMCON will drill ae exploratory boring with B-and 12-inch-diameter,
hollow-Slem augers to mhiga!e downward migration of hydrocaribons from
the shallow aquifer to the deep aquifer. The 8-inch-<tiameter augers will
be used to drill through the s~aJlow aquifer to a depth of approximately
20 feel; Ihey are tnen removed from the borehole and steam-cleaned.
The boring is then redrilled to the same deplh, using 12-',nch-diamet9r
augers which are left in the borahoie. The clean 8-inch augers are then
used to continue lhe boring 10 the targeled daprh. In this manner, Ihe
12-inch augers are used as conductor casing through lhe shallow aquile,
10 mitigate downward migration of hydrocarbons during drilling_
EMCON will lest soil samples from the shallow aquifer. aqultard. and deep
aquifer for the following son properties: dry defls.ity. porosity, orgsnic CCi.!,"4
bon content, and son permeabilhy. These soil properties will be used in a
risk assessment ,task 7).
The monaoring weli will be constructed of 2-inch·diameter, flush-threaded
PVC casing and O.020-i~ch factory·slolled screen. The annulus belween
the casing and the borehole wall wiil be filled with 12/20 Monterey sand 10
approximately 2 feet al>ove the screened section. The remainder of the
annulus will be seaied with ben!omte and a cement slurry. The well will be
proteCled wilh a Christy box and a locl<jng well-cap as described jar
well M'vV-l1.
PJ1 1 ee0803E.GOW 6 Rev 0 September 20.1991
.. ~~;_t;:-·
, ",~ -
~·I· ~ , J
~ )
1
i
I
!
The wen will be developed, sampled, and analyzed as described in task 2.
Disposal of soIT culti n9S, well developnle n1 wate r. and wata r used in
steam-cieaning will be lhe responsibilhy of the City.
Task 4. Hy<lraullc Testing
After the shallow well (task 2) is developed and sampled. purge records of
an existir>g shallow wells will be evaluated to delenmine the most appropri
ate areas for hydraulic testing. Two slug tests will be perfonmed to estab
lish approximate values of hydraUlIC conductivity across the shallow
aquifer.
To execute a slug test. an object (usually a pipe) of known volume is low
ered into a wen. caUSing an instantaneous rise in water ravel. The drop il1
hydrostatic pressure. caused as the water-level returns to a static level
(falling-head test), is measured with a pressu~e transducer and electron i
caJ1y reco;ded on a datalogger. When the water level has stabilized, toa
slug is removed and the water level is mon~ored as ~ rises to the original
levet (riSing-head test). After the slug tests are complete, EMCON will
evaluate the data to delenmine the hydraulic conductivity and transmissiv
Ity of the shallow aquHer, for use in the risk assessment and in estimating
the aquifer yiEld_
Task 5. Wen Survey
EMCON conducted a we" survey in 1989 to identify the water producing
we~s ~hjn 1/2-m"e radius of the sne. EMCON will contact the SCVWD.
the Oepartment of Water Resources (DWR), and the RWOCB to update
the avaJlable wen infonmalion. These data will be reviewed in order to
evaluate whether nearby production wells may tend to d'aw water from the
shaJjow aquifers at the airpo~ s~e.
Task 6. Feasibllny Study
As agreed upon in the August 21. 1991. meeflng at the SCVWD, and dur
ing the subsequent conversation (September 26. 1991) with the SCVWD.
EMCON will prepare a feasibility study for the site, evalualing corrective
action options. As stated in the Seplember 27.1991. SCVWD letler 10 the
cny, the options win be based on technical and economic feasibility for
remediation to dtHerent cleanup levels and their potential impact on bene
ficial uses.
r,Jl 199G803E.GOW 7 Re .... , 0 Seplember20, 1991
Based on hydrogeoicgi<:al and chemical data obtained through previous
phases of work &.t the site, EMCON anticipates extraction and o"-s~.
tre'!lmant at ground water to be the most economical corrective action
option lor the sije comparsd wfih a~ematives soch as physical contain
ment of the plume, or in s~u bior.mediation. EMCON will evaluate the
folIo""ng three options:
extnaction of ~rour.d water 0, trenches and cleanup to
no'1detectable [ND) leve:s in the aquifer
• extraction of grOUi,d water by trenches and cleanup to
drinking-water criteria eS1abflshed by the DHS and the
recommended teste and odor thresholtls for TPH astab
~shed by the RWOCB
-no-action-aH:emative based on a risk assessment (cur
rent cortcentrations)
EMCON will evaluate these options using the evaluation criteria stated in
the SCVWD guide~nes whenever appncable. EMCON will compare these
alternatives in a CQS1-benerrt analysls, in whiGh COS1ls defined by the pre
sent worth of the construction and openating costs of the remedial action
alternative, and the benefit is defined as the success in achieving accept
able rem ediation.
Task 7_ Ground-Waler Ri sk Assessment
As discussoo above, previous SfiB investigations have revealed low levels
of HBHC3. gasonne, and associated coo,pound; (e.g., BTXE) in the shal
low aquifer at tihe site. As agreed upon by the SCVWD in the meeting on
August 2t, 1991, the object of this risk assessment will be to evaluate the
potentia! human and 91'1vironmentai nsks should the no-action remedial
ahemativa be selected for this s~e. 10 oraer 10 achieve this goal. the risk
assessment has been divided into three subtasks;
Subtask 7.1 -S~e sening andloxicity assessment
Subtask 7.2 -Exposure assessment
Su btask 7.3 -Risk cMaracte "zation
Each of these subtasks is discussed in detail bela ....
PJl 1990803E.GOW e Rev. 0 Seplember 20.1991
•
" ---...,.
SUbtask 7.1. SIte !letting and toxicity assessment
Slta Mttlng assessment A realistic evaluation of potential hea~h risks
requires an understanding of the hlstorV-..aI site use and the physical site
. setting. Knowledge as 10 w"at chemicals have been used al the s~e is
essential 10 determining how these cr,emicals may eventually contact
potenlial receptors, and tous aliows receptor risks to be evalualed.
EMCON reviewed the historical use a'ld site setting information "vanable
on the s~e as part of a records review in 1989. The results of Ihis invesU
gation were presented in Recon:Js Review. Palo Afro Municipal Airport
(EMCON. Ja"uary 1990). The historical usa inlormation will be summa·
rized In this section, concentraling on identifying the chemicals used and
stored on stle. along wtlh the tocations where chemical residuals have
been detected. I~ its review 01 Ihe site setting Information. EMCON will
locus particula,~y on thosa aspects of the physical sa!!ing which woul{j
govern ground-water transport 10 points of receptor exposure.
Toxicity assessment The basic ubjectives of the loxicily assessment
are to select chemicals of potential concem (CPCs). summarize the toxic
effects, and compne and develop toxicity indices and applicable, relevanl.
and appropriate requirements (ARMs) as standards and cnteria for eval
usting any potenhal risks associated with the CPCs.
As discu~. the focus of this risk assessment is to evaluate the potential
risks associated with the chemicals detected in the shallow aquifer at Ihe
site. Selection of CPCs in this medium will be based upon toxicity. con
centralion, mobility. and frequency of detection of lnese chemicals.
Based upon a prerrminary review of the existing stte data, CPCs will
ir.clude tlTXE. As specified in toe September 27, 1991. letter from Ihe
SCYWD. aesthelic criteria for gasoline will also be included in the evalua
tion of the polential impact to drinking water desc';bed in Iha lollowlng
subtasks.
Brief narratives will be prepared summarizing loxicological effects, larget
organs. and toxiC'.ity indices lor each of the CPCs. Both carcinogenic and
noncarcinogenic IOxicity indices will be compiled. These incfrces, In the
fonn of carct"ogenfc slope factors and noncarcinogenic appned action lel/
els (MLs) and U.S. Environmenlal Prolection Agency (EPA) re'erence
doses (RID), will be compiled from DHS so",ces, or from the EPA Heallh
PJ1 199C803E.GOW 9 Rev. 0 Seplerrober 20, 1991
•
-'-.0""------... '#1"
o
Effects Assessment Summary Tables (HEAST) and tne Integrated Risk
Information Syslem (IRIS) computerized database.
The evaluation 01 polentiai risks will bG based on a comparison 01 esti
mated c:oncentrations at the point of contact with a receptor to the ARARs
idemffied as relevant to that receptor.
~ is anticipated that the RWOCB would nO! categorize the shallow ground
water aquifer as a potential drinking-waler SOUrce on the basis of sa~
water intrusion from the bay and cons9q'Jent high salinity leyels and low
yiolds from dayey water-beanng materials. However, the deeper aquifer
is so categorized and may bG sc'bject to ground-water withdrawal within
approximately 112 mile of the site. Consequently, the RWOCS considers
drinking-water maximum contaminant levels (MCls) as ARARs for the
deeper aquifer. Therefore, MCls or, in the absence of MCls, Califomia
AALs will bG cons;jered as ARARs lor site CPCs in the deeper aquifer.
Mhough the shanow aquifer f; not considered to be a potential source of
drinking water, 1he ground wa:er from thiE aquifer flows into San Francisco
Bay iL"1 east of the site (EMCON, t 990). The EPA has deyeloped ambi
ent ... ater-quarrty protection standards to protect marine wildlife from the
in!roduction of specific chemica!s into the environment. Afthough not
legally enlorceable, these standards are generally recognized as appro
priate for the p'otection of the marine ecosystem, and thus will be consid
ered in this eval~ation as the ARARs for the shanow aquife,.
Subtask 7.2, Exposure assessment
The u"imate object of the exposure assessment is 10 estimate exposure
ooncentrations and intakes for the groups of recapters at highest risl<. In
general, an axposure assessment ranes on tNO sets of data: source
medium (e.g., ground water. etc.). and anarytical concentratfon data and
concentrations predicted from environmental transport and 1ate models.
To achieve the objective. the exposure assessment has been divided into
three subtas1<s:
exposed population anaiys'ls alid k1ent'rficatior. of
receptors
environmental transport and fate analysis
integrated exposure analysis
PJl 1990803E.GOW 10 Rev. \I Seplember20.1991
...
-... '_ .... __ .. 1--'<»C __ __
Each of \hese sutltasks is a'iscussed below,
Exposed population anaivsls and Identlflcallon of receptors. The
review of ~he site setting and prefiminary discussions with Beli:lda Allen of
the SCVWD inolcate thai t~ere is particular concern for individuals using
deep aquifers for drinking water. and human and aquatic hfe receptors
subjecllo potenfiai conlact or exposur. to CPCs in the bay, Therefore.
th&se receptors win be selected 10< evaluation of risks in this assessment
environmental !ransport and fate analysis. As discussed above, there
are two assumed points of receptor exposure: human consumption of
ground water Irom the deeper aquifer at the sits and exposure of marine
WJ1dlife fo shallow ground wafer entering the bay. Because at least one of
the site-related compounds (benzene) in the shanow ground wafer is pre
sonl at concentrations in exce;s of ilS MCL 0,e,. , microgram per liter
[,ugJI]). mathematical modeling will be used to estimate Ihe concentrations
01 it and other CPCs in excess of ARARs in the underlying aquifer. The
resulting concentrations will be compared wilh Ihe appropriate ARARs to
determine Ihe risk. ff any, to the deep aquifer posed by CPCs in lhe shal·
iow aquifer, Simita~y, concentrations of CPCs in the shanow aquifer will
be compared with ARARs te protect marine wildlife, A potential for
adverse effects will be assumed rt the appropriate ARARs are exceeded,
I! this is found to be thB case, a mathematical model will be used to esU
mate Ihe concentration of these CPCs that may be introduced into the
bay, The resulting concerdrations will be compared with t"Je appropriate
ARARs to cIelBnmine the risks, n any, 10 thB bay posecl by the CPCs in the
shanow aquifer,
The mathematical modeling referred to above will incl:Jde Ihe use of the
vertical and horizontal spread (VHS) model recommeoded by Ihe EPA
(1988) as a screening-level model for .stimaling the fate of chemicals fol
lowing a subsurface release, Tne model is considered adequate for a
screening-level evaluation because ~ considers only dispersion and
adsorption to govern the transportalion of compounds through the .nvi
ronment, and ignores potential lasses from biotogic aoo abiologlc trans·
formation as well as volatilization. Site·specific environmental parameters
such as dry denSity, porosily, son permeabilily, hydraulic conductivity. and
soil organic carbon content, will be used by the model when aYaiiable,
When site-specifIC paramelers are not available, they will be conserva
tively estimated by relying as much as possible on site information in order
to tailor these esti mates to Ihe s~e,
PJl 1990803E.GOW II Re ..... a September 20,1991
~
;;~~i}1i
-
·+
.r:"\ -
Integrated exposure analysis_ EMCON will estimate hum"n imakes
base<! on a series 0 1 upper-bound (heahh protective) human exposure
assumptions collectively called exposure scenarios. These upper-bound
exposure scenarios employ a senes of physiological and exposure
parameter values c",,11piled from DHS and EPA guidance documents.
These paramet&r values will be used 10 estimale chronic daily imakes
(COl). The following oarrative and equation illustrates the procass for
estimating CDls. The COl for an individuaJ exposed to a specific comami·
nant, via a specific exposure roUle, can be expressed using the following
~neric equation:
COl _ (Cj)(CR)(EO)(EF)(AFj)
-(BW){AT)
wnere: COl = chronic dauy intake (milligrams per kilogram per day)
j = conlarninanl indel(
C = concentratlon in enyironment (milligrams per day)
ED = exposure duration (days)
CR = contact rate (lners per day)
EF = exposure frequency (days per year)
AF = absorption tactor (unitlessl
BW = body weight
AT = averaging time (day .. per year)
The COl, expressed as a dose, will be used to determine tne amount of
CPCs a receptor comes in contact wah for each human exposure sce
nario. The CO! will in tum be compared wah the chronic reference dose or
carcinogeniC slope factor to estimate !I1e heanh risk potential to the
receptor, in accordance with EPA guidennes (EPA, 1989), as described
below.
Subtask 7.3. Risk charaete'lzallor,
There are t~ree primary objectives of risk characterization: comparison of
measured or modered concantratior"js with ARA.Rs and qua"!t:'lficatior. of
potentiaf carcinogenic and noncarcinogenic risks 10 humans aoo quantifi.
cation of risks 10 aquatic life. The first of these objectives will be achieved
by direct comparison with concentrations wah ARMs.
The second of these objectives will be achieved by the use of methodolo
gies and approaches specified in DHS (1986) and EPA (1989) guidance
documents. As specified in these guidance documents. carcinogenic risks
PJ, 'GG0903E.GCW 12 Re ... _ 0 Sep1f!mber 20, 1991
•
[,
1
~ i,
will be estimated by muHipl,ing carcinogenic slope factors by their respec
tive CD Is. CPC-specific and pathway-specific risks will be summed over
an CPCs and applicable exposure pathways to derive a total carcinogenic
risk. Noncarcinogenic risks will be derived by calculating hazard lOOices
(the ratios of DHS-derived AALs or EPA RtDs). Where avaHable. AALs, in
fieu of RIDs will be employed. These CPC-specific anci pathway-specific
hazald indices (His) will be summed up across ali applicable exposure
p8'l1ways. Following agency gUidance, ~ the sum of these His does no!
exceed the benchmark 01 unijy, ~ will be concluded that no significant site
rarated noocarcinogenic effects will occur. tf these sums exceed unity.
then, fonowing agency guidance, irldices will be disaggregated and
summed up by target organ. ~ these disaggregated sum,,-,ed rat,os still
exceed u~~·. ft ~J~ be concluded tha1 a potentially significant noncarcJ"no·
genic risk coutd occur ..
USing the exposure assessment and risk characterization procedures
descnbed in the above subtasks, potential risks to humans and the San
Francisco Bay associated with each cleanup level investigated lro the fea
sibil~ study as a separate correctio n action opti e>n will be assessed.
Following quantiflCBlion of risk. EMCON will prepare an uncertainty ana:y
sis which quarrtatively aOdresses ways in wnich risk assessment proce
dures and assumptions may resuft in uooar-or overestimation of risk..
Task 8. Report Preparation
After the completion of the first eight tasks. EMCON will prepare a report
descnbing the activ~ies aOO the r~suHs. Future activities at the site will be
recommended on Ihe basis of the risk assessment results and the reme
dial ahernatives evaluation. H rt is found throug~, the feasibility study thal ~
is technically and economically inleasible ID cleanup the ground water to
ncndetectable levels or 10 drtnking-water stancards fDr BT)(E (and taste
and odor threshold levels for TPHG), and also determined through the risk
assessment that the,e is no potential adverse impact in not actively reme
diating the ground water at the site, case closure will be requested. Three
copies of en. draft report will be submitted to the City. After the City's
review, the report will be made final and six copes wi Ii be issued to the
Crty for su bmmal to the SCVWD on or before FebrJa'Y 1 7, 199 L
PJI 199OBroE.GOW t3 Rev. 0 Seplember 20,1991
, '
"\::. ---.-~--"
()
Risk Assessment Refer.n cas
CaJ~omia Oepartment of Health Services. IS86. The California Sile Mili-
ga~on Tree Manual. Toxic Substa'JCes Control Division,
Sacramento.
EMCON Associates. 1990. Pale Alto Municipal Airport So,7 and Ground
WaterCharac!erization Report June 1900
Environmental Protection Agency. 1989a. Risk Assessment Guidance for
Superfund. Human Health Risk Assessment. USEPA Region IX
Recommendations, interim final.
Environmental Protectior, Agency. 1989b. Exposure Factors Handbook
EPA 60018-891043,
SCHEDULE
Attached is a CetBlled project schedule (figure 3) showing starting ane
completion dates of each task-EMCON will begin the project upon
receiving the City's authorization 10 proceed.
Attachments: Figure 1 -Site location
Figure 2 -Ground-water eleva'lions and hydrocarbon
concentrations
Figure 3 -Project schedule
Appendix A -Summary of quane~y ground-water analyses
PJl 1990ll03E.GOW 14 Rev. C S~e~r20.1991
-
BASE MAP. USGS 7.5' Quad. Maos
Mounlain Vie .... and Plio .... "0. ClIlii(jrrlll!i
Pholor~lI/ised 1981 and 1973.
............... ,
HlJO
-.
-I' -.. ---," -,--.:: --
-"
"r-'
;' ;-~~~;...
/J/ ,\
/(I.~
5~ALt: -0 200D FHT
~~-~
CITY OJ:" P"'lO "'LfO
P .... LO Al.TO MUNICIPAL ~IRPO;:'T
P.ALO ALTO, CAUFORN1.A
SITE LOCATION
•
-'"
-
'''.1'
\
i i --' ~ -,
\
IT_
-----'
Ii61
NO ..
NO
NO
.,
NO
NO
NO
• ..., >q"..-, ~--:-~,~
NO I :\\,'
IT___ NO' 1 ~ _ -EXP' fNATlON
"~NO (.450J X,-.. NO ",w.~ e Gtol,l!ld water tnorliiOfinQ ... 1I
_ N~ ,I me ..... red 5122/'111 ~=._ : I \J ~ Ground-wllt.r .levallon ~1Uur
........ "", ~ _3.0-(n,.lASl)d .. " ... w .... In, .......
I' :J Hydrocarbon ooncantrailOR •• ra I" i \ pAn. ptf ~1I1Of1 (pJtt) 1_ {.2;;;;'1' J, CtHlmlCaloompnund (
~.wf.
7.1;z4 --
~ ND /'1 V quo.'" who •• u""onol.
;~~ ~c.n. 231
'~ . '_\'~\I\\ ,,':' ,/ / / ~C_~.I""""."".' .... W::;" .'" IT ' \~. /.' ......... limn, ,~, ,I.. ~, . ,.,!.... 0 ~ ~ v -
" ' \ -~). .--~' ! , L .... 111-0"""',......,' ND No, d.,..,9d
\It Co OfrouND-."" 1_-"Q ' ) ':"'" I-wCmJNM ~
..... AOX' ..... ·u .. rr OF./ r-' C'J,.lFtuCo... "uw • '. I 'f'-".0 I HYDAOCARRQ!"L""YME~ -MW~3 _.-----.\-----I ToIuMI q:
EII8.AC.OAAD , \.------\ \ ,·4." I I ''''-'-.. ___.~ -.} k...... NO ,_ NO \ IIoIW-7 TP~ .'0
ffl,-u:_ NO --......... HDH(: NI
x~ NO \ ..... .. .... fZ_~2J 1'11"-,,,,,. ...... NO """ T ...... NO E .. ~_ NO --NO "I«J NO
~ NO
IT ... • NO _NO
H9UC "0 • _ NDII~ __ ~'" 1= : = :~J'02J / E.,.,.... .... He..' flilliW-g /
Sill~II.' 0 jQD 200 ,..". x,.,... NO ,.-;
'-__ ~_~L. __ ~_-' ,..... NO
HBHC ND
@ emcon
Associates
CIT't' OF PALO ALTO
PALO AltO MUNICIPAL AI,.PORT
PAW ALTO. CALIFORtljlA
o
H"He
WHO
propol8d glound· ....... ,.,
monllo"ny wlln
QltEMICAL M8AFY'AItONS
High boilIng point hydrocalboJtt.
Tula' peiroilium hydrocarbonl
u~uoli~
. ' .
1/:#'1/9'
I'"IGUR[
2
QAOUHD-WATEA UEVAT,ONS AND HYOAOCARBOH CONCEtnRATlOH8
PIlOJlrf 110,
199-011.03
!. '··-"".":.itti,~~:,,, '-;----:' ,
II' fk<·,e",T" (:t),:~" ,;',. .;
, ")"'~Ij,
,i ,,~.
I
!
!
'~ ,.;-.-'"-~, ... '"'-.-.. ~--~~-~~ \'
•
,_-I'"
j
I
I
f ,.
t
I
)
I
__________ ._ .. __ ~_. __ ~~_~ ."..,' "","<_ '~:~·l·,_
w .....
'IOU'U! 3
PROJECT 8CHEDUL~
PALO "l TO MUNICIPAL AIRPORT IITl
PALO ALTO. CAo
Oct .. 1 I NoY '" 0..1 '8' .1M 'D2 Feb re,:*-. Mar "'2_ ~m . r-'-
" .1 7 14i21121 .. 1118126 .2 g te 1'330 18113'20 ~Hr3 10 1F~4, 21" 18 23
SUOmi ",,1lopIa. to Ih. Oily ~ ~ I I
cay !.vi .. 01 tM wo~an Fzz: R~.M'~.WD~~.~"·~~~ .. -f~--~1-4--~-t-f--~+-1-4--+-f~L-t--1--I--t-f--f-t-1
10 SCVWO'-I
SOVWOrwiowond _'01~ I!Z'<IZ!I I i I---~~----++-, -f---I--f.--
Pntfield ectlll:," for Mil I t-I
~~::~"!i.... I ~-r !h--i~!--+--+--+-+--+---+--1--+-i I
Sampll"", and analy.'" I I
hydraulic 'asllng q='. I f---_
f ... lbllnYllllldy I ~+-
f~~·'~k~u~.~.~ ... ~.~n'~====Jl=t=1=J==t=t=1=:r=t=1=1c=~~~~~I-=Jt=l=1=l~t-~tl-=i==,t-=1~ Rapc;Jlt prep.ratlol'! ill I I
f---. -~C-I-f -__ 11 __ I-
Submit draft ,aport 10 Ihe '; 4. , ! I I ~c j +.!-+--+'--+--\--j
City review of the raport __ r. i rz" fm I
R"", •• nd subm. ",,,"'110 I _"-
agancl,. i I-
I I.-f--.
, ' -rL ----+--f--
-~-+"~I-+-I---+-+ f---i---
explanation I ~ EMCON wo~ Fz Ellllm8ttd regu1alo'Y (welty) ,evlaw) i!
A .. urnplloo,:
1. City and AgI$f'Kly review. do not Cfutt an,. urdorAl$en delaY'
'" ,.
.:".
September 30, 1 Y91
Project 199-08.05
u
')
, ,
I
)
[
I
\
I
{
;, ;;:,-~-.--.-..,... . ..".,.. ... ~"-
"
J
.~
•
.,.'
"'-;>
~}
,. '->-"'-~' ::-:"~~_:_--_''....:''';_''' __ '''1I_4~~-,·JF'·
o
Appendix A
SUMMARY OF QUARTERLY GROUf-ID-WATER ANAL YSES
L
" ~.
'I
I
I
..j
I
Sa/T1lII
IdemriCaiion Dale
I
tJlW~1 I 08I0~
11128190
=191 I 05123191
MW·2 08102rnl
11128190
a2I2OJ91
05123191
MW·3 08I02Mi
11127190
02120191
1l"..J23J91
MW-4 08I01J90
11128190
02120191
05123191
MW-S 08/021'90
11128J9Q
0=191
Summary of OuIl1t!r1y Grourd--Wai&[ Analyses
(ppO)'
Benzene Tolu-ene Et"ylbe"Uene Xyler.es
<0.5 <1 <1 <1
<o,S <1 <1 <1
<0.5 cC.S <0.5 <0.5
<O.S <O.S <:0.5 <0.5
1.4 <, <1 <1
1.4 <1 <1 <1
0.9 <0.5 <0.5 <:0.5
2.2 <0.5 <22" <O.S
• 6 <1 4
5.9 <1 <1 1.0
13 <0.5 cO.5 06
2.3 <OS <0.5 <':>.5
<05 <1 I <1 <1
<0.5 <1 <1 <1
<0.5 <0.5 <0.5 <0.5
<0.5 <0.5 0::0.5 <0.5
<C.S <1 <1 <1
<0.5 <1 <1 <1
<0.5 <0.5 <0.5 <0.5
05123191 , <0.5 «l.S <0.5 ..::0.5
MW-6 06I02I9O <0.5 <1 <, <1
11127190 <0.5 <1 <1 <1
02l2{)191 <0.5 <0.5 <05 <0.5
05.'23191 <0.5 <O.S <0.5 <0.5
MW-7 08101190 7 3 I <1 <1
l1f26J9() <0.5 <I <1 <1
02120191 <0.5 4.9 <0.5 0.6
05123191 <0.5 1.4 0.6 <0.5/
MW-a 11126J90 <0.5 <1 <1 <1
02J2(J191 <0.5 <0.5 <0.5 <0.5
05f23i91 <0.5 <0.5 <0.5 <0.5
MW-9 , 1(2S19O <0.5 <1 <1 <1
02120191 <0.5 <05 cO.5 <O.S
05123191 <OS <0.5 <0.5 0::0..5
PJl 1990603E.GoW A - 1
•
. ,
TPHQ2 HBHC'
120 60
59 <50
<50 <SO
100 <50
<SO 70
<50 <SO
<50 <50
S<l <50
57 <50
120 <5i)
9S <5Q
52 <50
<50 <50
<S<l <50
<50 <50
<50 <SO
<50 <50 I
<50 <50
<50 <50
<SO <50
<50 I <50
<SO <50
<50 <50
<SO <50
480 <50
<50 <50
470 <50
410 <S<l
~-~~t
,'!,
<50 <50
<S<l <50
<50 <50
<50 <50
<50 <50
<50 <50
October '. ,991
."~, ~
_.
o o
&lmmary of Ouartel1y Ground-Water Analyses
(ppb)
(Continued)
~
k!enlilcolion 001. Benzene Toluene Elhylbenzsne
MW-10 11rz8i90 <0.5
0212C191 <0.5
OS/23J91 <0.5
Regulato!}' l'
Criteria
1. ppb. pa1I pe1 bkwl
2. TPHG,. t::ot.'~ ~ OI:S flUOIirle
3 HBHC .~bcA,,, porlll'ljr.tocat>c4,'ucieMI
c. AaiMo'!I MRLIlMt ID mam .*,,""_108
<1 <I
<0.5 <O.S
<0_5 <0_5
100< 68()5
S. MI&UI1Um ~I'" b ctTIki.-.g war... (~r:A I1eUttl Sarv;ces.,
&. A.::tioro~h:Jr~d""'(~d~SerYIoetl
1. Wt.norw~
PJl 1990603E.G<JW A-2
Xylenes
<1
<O.S
<0.5
1.7SOS
TPHG HBHC
<50 <50
<50 <50
<50 <50
NA' NA
October 1, 1991
· ;.'/ , .' ," ~ ';0-"",
Addendum to Exhibit B
ADDITIONAL PROJECT COSTS FOR WORK ITEMS 1 AND 2
AND STANDARD FEE SCHEDULE
n ; . '1 I JJ'
· .. /~
o
Addendum 10 Work Hem 2 -Exhibit 81 -Palo A~o Airport
Project Budget and Schedule 0; Charges
The fees for the additional scope of pnoject uoder work ~em 2 are as
fonows.
Tesk Description
Prepare workplan for regulatory agency
submittal
stlanow well instaJ1ation, sampfing and analysis
w,,~ inSlanation
sampiing
a nalysi a (two son samples and one 9 nou ne!
water sample analyzed for TPHG, BTXE,
HBHC; grour'<J water analyzed also for TDS)
S~btotal task 2
Deep wen instailallon, sampfing, and analysis
0ncludes son testing)
installation
sampnng
analysis (ground-watar sample analyzed tor
TPHG, STXE, HBHC, TDS)
son testing (dry density, porosity, permeab,
~y, organ;.: content)
Subtotal task 3
Conduct hydraunc testing ($2,000)
Revise we n survey
Feasibility stCJdy ($4,200)
PJI 199D803E.G()W
CoSl
$ 3,800
5,100
1,500
1.000
$ 7,600
5,320
1,080
300
1.000
$ 7,700
3,400
C>rc1ober 1,1991
_.-:.,
.Il!lU . Risk !lSS9ssmen!
sije selling and IOxiCiIy assessment
• exposure assessment
risk characterization
..• :-
4,130
7,910
1,380
Subtotal task 7 $13,420
16,825
$54,745
Im!t§ . Report preparation
TOTA!.
Note: Fees for tasks 4 and 6 (total sum of $6,200) included in original
SCQpe 01 work),
PJI 1990803E,GOW October '. 199'
f
" ,
;
,..... ....... ---.~ ...... --·---... -_"'-""" .. " .. I_ ... ·~-_~-'"
o o
Addendum to Work hem 1 -Exhibit 83 -
Project Budljet and Schedule of Charges fo,
Additional Wor. Under Wor. Hem 1
Project costs 10, the tank closure summary reports are as follows:
Sampling and analysi. lor the production wen
Review files
Prepare reports
TOTAL
$ 1,715
1,625
6,800
$10,140
Since well detalls are not defined at the present time, ~ is assumed that n
is a 12-inch-diameter. 3O-foot-deep wen. and has a dedicated pump and
purging and sampling ports, n is also assumed that the wen can be sam
pled easny by routine sampr:ng techniques, All purge water will be stored
in drums on sHe, h will be the Cny's responsibilny to dispose of the stored
water.
Since the files for these tank closures have been archived and the tank
Closure information is a ponion of a project wnh numerous tasks, staff
engineering time has been allocated to review and extract relevant infer
malion from the files, Reproduction costs include three draft and six final
copies 01 each summary repor1_
EMCON will not exceed the allove costs based on the scope of project in
exhibit A If adCfrtiona! services are required, standard fees will be charged
according to the attached S<:~,edule of Charges. but only wnh Cny's prior
written consem and not to exceed the to-be·agreed-upon budget set forth
in saction 7,' of this agreement.
PJl 1990803E.GOW October I, 1991
: .~
5·:," ~'.~ .. ~' .-
,
~'-:--..
-'-, .' . ~ ; '"'-,."----... ==
ADDENDUM TO EXHIS.. B
SUMMARY OF PROJECT COSTS
Original Amendmenl 12
EXHIBIT 81: Palo Alo Airpon $191,394 $54,745
EXHIBIT~: IASC $9,950
EXHIBIT 83: Closu,. A.pons $6,1SO $'0,140
TOTAL $207,494 $64,885
Re....-Ged Total
246,139
9,950
16,290
272,379
PJ1 1990803t.GOW Rev, 0 ~pl8mber 20, 1991
Effective January I, 1991
SCHEOUL E OF CHARG ES
PERSONNEL CHARGES
Rate Per Hou!'
Protessional
Senior E~(,"iCU~\les •.•••••• ~ •••••••.•••.••••.•.•••.•.•.• $120· 140/hr
Executive Managers, ••• , , , ..... , . , ......•. , ............ $100· 12Ml1
Project Mar.agers. . • . • • . .• , • • . . .• , • . • . • • • . • . • . • . • . • . • • .$85 -1 15/ltr
SeniO<' Technica1 Staff. _. _ •.•.. _ .• _. _. _ •.. , .....•. , ..•... $85 -115h1r
Certified Industrial Hy~ienists'J' oxicologis!$ , •• _ • . • • _ . , , . • . . , . . _ . ,$65 -103thr
T ecnr. ieal Staff. . . . • . _ • . • . • _ • . . • . • . • _ . . • • . • , . . . . . , . . . . 552 • SSlhr
Technical
Samplers/Field Technicians •• , ••.•.•.•.....•..••.......••• S3:l 54<11r
OraftersICAD Ciperalors .•• _ • _ .•.. _ •... , • , _ • , .• _ .... , ..•.. SSO 85"'r
TechniCAl WrilersiEtfrtors ••.•. _ • _ .• _ •••.•.•...••••.......• $48 85lhr
Projecl As.1sta,,1s • • . • . , • _ . _ • , . . . , . . . . . . •• _ . . , .. _ • • • . . • $52 S5lt1t
Scheo'ulersiCoordiMto<s •••••• , • _ •• _ ••••• _ •.•• _ • _ • . • •• _ •• $52 65AV
Non.Tegbrtical
Word Processors One/udes equipment) .••••.••....•• , .•.• _ •..•. $40 SO/hr
SecrelariesIClerica1. . • • • . • •• , • • • . . _ . _ • _ • _ . . • . • . • . . . • • . . .530 41l1hr
Conl1 act A:lminislra\~. . • •• _ • , • . . . . _ . • . , . • _ • _ • • • • • • . • . _ . $41 54lhr
AccQunUng Clerks ••••••••••••• , • • • • • • • • • • . • • • • • • • . • . . • $33 41l1hr
ReproducUonJPrinUng •.••• , .•••..•.•...• , ••••.••..•.•... $30 4Slhr
Depositions 3ne Expert Witness TeS1im<lrly win be charged al 1 SO'" or above rale •.
Travei TIme will be charged in accordance witt. the above rates. up to a maximum of 6 hours pet
day.
DIRECT CHARGES
Xerox Reproduction, per sheel. , •••.••.•.•.• _ , •.••. _ ...•••• _ ..... SO.15
Auto or Piclwp Trucl< per mila • _ •.• , ...•• _ • _ •••.....••• _ • _ ..••.. _ $0.45
4.4 Trucks per mn ••• _ ••....•••••........• _ • _ •.......•.•.... $0.55
Blueprinls per square 1001. •••••....• _ .....•• _ ••• _ . _ •.• _ •••••.•. SO.12
Mylar per square loo! •••• _ • _ •••••.• _ ••..• _ •.•. , ...••••.. _ • _ .. .$1.45
Fax per page. _ ..•.••.••..••. , .••..•..... _ .•• , •. , .• _ . , .... $3.00
Storage of samptes per month per container" . ~ . . . .. . . . . . . . . . , . • . . • . . . . . $5.00
Disposal per container' ........... , ....... , ............... _ .. $50,00
-A container is defined as a standard core box, a capped Shelby tube, or a sealed fj..,e ga!lon _l
ADM WCPlIOOUMW 1 Of 2 Form 0-2 Rev. 1191
' ...
OUTSIO. SERVICES
CI",cpos for speciaJ oulslde services, equipment and faa1ities not II;mished directrl by EMCON
Associates wiU be bified al cost plus 15 pP.rcenl SuCh chargdS may inclUde, but shan nor be
fimitsd ro, the follOWing servia!s:
Prlnting and photographic reproduction
Flent!!d vehidas
Trans;>ortalion on pub,c carriers
Subc:onsultanrs
Spec:iaj fees, permits, insurance, etc.
Rental and operal;cn of <irilling equipment
Rented field equipment
Shipping cI1arg es
Meals and Lodging
Consumable Maferiab
SUPPLBlEm At SCH EDULES OF CHAFlG ES
• SOils laboratory • Chargeable Equipment
• Chemical Laboratory
RGutine Applications (exctuding word proceS$lng) , , , , , ••.••••.•.••• $15· 20Ihr
CADlMcdeUng , • , • • • • • • • . • • • , • • • • • • • • • • • • • • • • • . • . • .• , $3O/1"Ir
Schedule 01 charges and Standard Equipmenl Rates are subject to Change wiIflout notice.
Payment
Montllly invoices are 10 be paid within 30 days from invoice date. Interest on late payments will
be cIIa'ljed at the rate 011 8oy. per annum.
2of2 Form 0-2 Rev. 1191
\
'.~ .
/
,! ,t1~~ __ ~!IA~f£f~F iNs~~~::, <S 5S0ED ,;.:" 0' ",o,",,~:':,::';,:~;;;'~;s-
NC R 0" .... 5 U"'ON ThE CERTrFICAT'O HOt.OE~ n-rIS CE'1T:Flc","'a, DOE'S ~QT AMEND,
( llj;\~DS GF·i".JUF'. II'-1C. EXTEND CI'!:"L-;EI'l THE COVe~GE AH'ClA~EO BY r'"iE PCUC~f.s BEL" .... '
1
I
:l ,;ri'~, '3tl(JTH
~_~U'nE C10 COMPANIES AFFORDING COVERAGE
!JNSLlWi"
Erncon t"'::'!:;':JCl ".1::1':',,"
:1 9~'1 FU"9,,'nGd fl\·'tc'nuf:'
:-:;':~rl "::'!O'0C'
I COYEAA~ _. ____ _ . "--'-----" ... "---~ -~:.--~-"------.. ""-.>
THIS ~ ro CE"RT1FY rKAT Tl'fE f'O\..lCr€5 OF lNSlJFtANCE L'SlED 9!:l..OW HAVE BEE"I>< ISS:..iEO TO HIE fNSL;FlEr) N .. MED "aav:: FQA ,HE POllCV PEAlOD
IN:JIC.6.TE"D, NO'!VI.·ITHS-r ... .NDING ANY REOUIi'lfMENT, TERM 01'1 CONomm .. OF ... NY COr-lT>'.AC1 OR OTHE~ l>OCUIroiENT WITH RESFECT TO WfflCH THIS
CEFrflFlCATE ~AY.8( ISSUED ~ ..... y PERTAIN. THE INSUAAm;E M"F=OfUIEt) BY THE POt..K:IES O£SCRIBED I,Tl'!fIN IS SU9Je=CT TO .... OJ.. THE TE~MS,
EXCl.US;QNS AND CONOmolllS o,c: SVCM P::>t.tCt£;S l.II~rTS SMOWN M .... y HAvE" BEEN ReDuCED B'I' PAJO CLAIMS
----~~--~ ----~------------~---.. --... -----
COWt.oI51'IC..u.. Gn.:E~ UAalUTY . x--CLUoI' y,,*"-OCCUII
'1----
':fl'ffl,at'$, "CO!>rrI'lAr;;TOR'S~OT.
AlJ'TCMQ6ILE U~
"" ""'" .AI.L~EOAUTOS
SCXE!WLED 4UTOS
"-IRto ... ~os
rtCm-OwNEO IWTOS
GANlGE l..J.a.ilruT'l'
WOJtlC,:U·S COM~TIOIoI
."
!liI1'U)1"tJtS. ULBvn'
fOUCl' IIUIl!IlIU1 I'OUC' fFI"ECT1VJ! !>OUC"P' a"'IUT1~
:I ... T1IIoO,":rJ:>.t'!"fl O"'H 1~"'r;)a,'YYj
8/;:-:~/71
B-;'0l.I.."
il'IJUFI"
("'~o~
BOL",,,
~"IUFI"
}_~ ~~.~ll __
-------u.ri;;:-
c;Y.:C-'~FlfNCE •
;57.i.:1JTOFlY --------------------
1~~,.:TIFII:,'; .. Tt.;: j"-l\JLr-r-.r: 13 :,t;::r~CB" HN"C') ,;::;: 1-.[-I.\I!Jc:11,(.!_ n"',LW,FfI r,''; !:'---'I'r:cr~ I,:ur:"
i ''''':'.:t: >:,IF'.:."I'IED rl)' T~IE N,:o,r'IEl~ I H'J I_If.: t--(' Fe,!;' n-I[ f~ I 'r· 11 ] ClH;)1 T 1'1: ·,LII.:r.:.D.
:::ERT!F1CATE HOoLDER
i-~t~ of f·.lo ~lt0
··,t·~: Ri~~' ~1~rl~'l~'r
';0 ( 1'~ ':':'0
l' _... ':1 tr.:.,
~COAO 2S·S (1113'1\
CANCELU TK)N ."--"--~ .. ,-
S l'lOULD ~ lilY OF T~E AeO'VE Of'SCA!B ED POl-feles BE CANCELt.E D BEFORE TI'I5:
EXPIRATIDIlo CHE 'T"i-'EREOF, ~E jSSUING COMPANY WILL E~DEA\lOl=I TO
MAIL~ OA'IS w~lnE:'" NonCE TO Tr-IE' CE"'nFICAT£ ~OI.DER ""'~EO TCO TI1E
LE':-" BUT F",ILURE; TO ~ArL SUC~ ","""GE $11"Ll. rMPOSE 1110 OBLIGATION OR
LIASILITY Of ANY 1(11'00 UPON .I1E COMP,",,",\" rrs .GENTS 0" REPRESE"'T~Th'ES
'-.} ./
-r
A
lnLtt 'Il1BUTanc.. Brok.na.p
1'.0. _ '6
Cone _.n, C& '4976
eON~RS NQ RIGHTS UFON
DOES NOT ,AMENO, EXTEND
COMPANIES AFFORCING COYERAGE
------~----------~~~y B -=-------------------------------------1
~1lI~1atU
1921 iI1Da->04 .t.. .... ",..
Sa Joe., CA 95131
COMIMERCIo'.l. G.EJrfSW.. UA8ItJIY
~5 WIDE OCC\III...
OWNER'S • ~.$ P'ROT.
oV..,. .wTO
AU.. OWNf'D AU"O!
~""""
HA£D .-..nos
"""""""'" '"' '" ........ """"-"Y
V-1903U69
Cl.ry of Palo .uto
Ualt-'-"'t
7.0. Ioz 10250
Palo .uto\ CA 943Q3
POI...'CY UJ'tCTIVE ~y Ul"IIU.t1Ol!!
ran: rwWI:JDrn') D ... a ~ ..... tOO!"fV'J
9/1/91 1/1/j2
uoms
,
~o.cXJI\CC:!;lE:."'"
~sus£ __ -_~~~,, __ u.".. __ ._~~;;;;:;;:;;_
a1SE.4SC-£..lC"
SHOULD AN,' OF THE ... BOVE OESCRIIlEO POI,XI<".:S BE CANCEL..LeO BEfORE TliE
EXPIAA TIO'" DAT'E THEl'1.EOF. THE ISSUING COM pm..,. WILL ••
...... I.L ~_ C"'YS W1;!TT,,'" Nonce. 10 Tl-IE. CERTinc ... TE f-IOLOe~ N"'~EO TO THE
lEF'l,!WlPihIiI!C 1 ~'5fi!f!I8,r'B? "!!iil!" 6 dJLiUH:GIc 31
"'QJ;Gq;;cp;=; J ..... ~ t, tii BEllM ~P\ j~pllleWi'J1,,"lts
... 1tnfOf\l~~D lUP'ttSUll.,,,,,
-'.~c:!"""~'c'<;5-$':!,l;(7'OIOO~) _______ _=:::::~.:;;;;;:;:;:: .. ~ .. :.:-=~: .. :.:"""'= .. :.:'":-. ... ::~.,:.~:.=-~~ -/4::Co.-D-CD""OFii.iiON ,.;.
•
---------------
A.ORIt. CERTIFICAO OF INSURANCE '8 "M';~~;;;~'"
I"It('![!UU.1
HOBBS GRQUF' ~ IHe_
lfi:;':-, 'Sotlll{ L;F:(:H r S-l REET
<;:;UITE 810
S;'I'.j "'i~1 n~D
CJ~ OOOO?~403
I~St!flED
t:.rTicon A5-S0r:1.~ t2"i
192:1 fhncl'",!ood ~"t'.'(:;"I'lW2'
S,"n ... 'To",'?
eli 0(10(1'/'5131
COvERAGES
,"IS r::EI't"lrlCAn:: IS ISSUED AS-" ~!Mrn=_"1 '0F I~'°.'JRM""IO~' ONLY AND CO'lFEMS
NO RIGr-ITS 'JFc,N TKE Cl'1rIF:.; .... TE >-iOL.Dt:R r,,~s Ce~rlfICA.,.E OOE" NOT "d!E;;C'J,
rXi.SND C~ Al rEF, TJ-'E COI'E"IAilE MF-CFlO£O 9'1' , ... tE "oLleiES EliOL:JW
COMPANIES AFFORDING COVERAGE
1'1-1\51$ TO C£""TlF'I' TliA11"M.=. PDi..lCl"=S OF 1t-1S\J?AWCE ~IS"~ 9£lOW )-\10.1;:: '8-="-.," iSSuED TO THE INSV,,'E::D N/o,IY\EO ABOVE "OF'< THE P.OlICY PE-P"CD
I"O~TED. NOTWITMSTANCl!NG ANY REQUIREMENT, Ti:FlW OR CONDITiON 01'" A'll'!' CO',TRACT OR: QrMER O(lClIMENT WITd ROi"ECT TO W.HIC,", TroJS
CERTIflCATt ~ ... y BE ISSUED DFlIJIAY "'E~T~N. THe I"<S1.r,""'''fCE AF.oO~;uEO!3'( THE "DL~CIES JE5C~IBE;O HE,"EIl\; IS SU6JECT ,0 AU .. THE TERMS,
EXCLUSfONS AND co,,"ornolllS OF SLJOt POLICIES, L'~:TS SrlC,,",N ~A~ HAVE. ,I::::=:N "E::lUCED iff PAiO CLAIMS
'" TYPE Of ~lI""'ItCl. " COViE~"'" U"Dtl..rT'!'
CO"'r.r5ICJAL GEHEJtAJ.. ~1-'!IP~IJ'o'
Cl.""S loI,AC!E OC(;U~
OWNE~'~' ..xwm.o.cTO~·S. f"Fl:OT.
J.i,ITllIY,OIl(\..!l ~1"Il~m
... ~., "UT:)
.o,LlO'Wl"WA.\Jl'OS
SC>-4E1IUU:C "'UfOS
HiR@",,"fOE
~ .. ,O-S "~'TOS
I;:;AAAGI< 1.l.U1UT'r'
DealS UABiLm
on;~ 'tH.-'t>< U"6RELU. FO~'"
"MCfllU:"·S COMnlOlSlI,nOIi ....,
VIII"LO\'VlS· U"IIIUT(
."".
" Professional Li ab.
Incl. Consultant's
Erwironmental Uab.
PQLI,:., !!F~~'::{.(! POi.lC, :!;tP,~ .. nOH
CA.'~ ,"\"::'; ~":I 0 ... ,." :M,' :lON\'}
G~"H1"l "O"OUC,I,,[
''l:QOUCTS·CCI.IF'.'Of'S AGCi~ra.o.l1'.s
"l"fiSO~'.!. I .... "'ERrlsl~ .N,J""1 •
t..>':Jo< OC(;'O F'Rf'<CE
~IJ'I[ r, ........ O:E ( .... ....,. cr>r ~I.I
MiOICAl. E>::~NSE ,''')' 0"" ~, ... ") S
CO",E,.,"fO
S'''G~e
liM;r
S::OC'l.."t
IKJU""'"
I" .. ~r""'l
EWO'.!."
IloI,Jlm"
,PI' .o.c'~I~I'
$1 ~OO'~ .. C'OO
$1 ~ 00'). ?OO
,£.,.,: .... ACCI::lfNTJ
(l)1~~~~E-.. ffiliC" LI.lt.r1'J. ,
t!lISC.-s.e-E'-C>-4 E~I'l..O",[ej
E',CH -Ct.1' --I
AGGf.:EGATE
M$l;:Nn"!()1I OJ o.nl'lAUONSI\.OCATIO"'S,'Vt:"~ IT'UII·
CERTIFICATE PRO· ... 'IDES EI.IIDENC£ OF COVE:RAC,E.
CERTIFIC4TE HOLOER
ISSI.1E'"d to:
City .f Pal. ~lto
Departaent of Public Works
250 Hamilton Avenue
Polo Alto. CA 95301
Attn: James Harrignton
ACORD 25-$ C11Ja9)
CANCEl..L.ATlOrli
SHOULD ,!,.!'.IV cw: THE ABOV£ OE$("RIBEO F>OUCIES BE CM'rlCELLEO eEFO~E THE
EXPIFIATIOIIJ DA."'F£ T>tERE:OF-. THE IS5Uii't/(j C~F>"'~" WILL ENDEA .... OI=I TO
.... ,'\~ 0,'::;0 o,o..",s w",.:nEN NOTICE TO ;1"1£ CEFlT\.FIC"'"iE W:JI..DE;' N""MFD TO TliE
LEFT. SLFT F"'ILURE: TO MAIL $~CH NOTICE SHALL I~F>OSE N{J OBL,O"'TION ~
.y