.E.ru2or.t in Brief
This :report des.::ribes the rece!1t mosquito problems in and around
the Pe10 Alto Baylands. No Council action is requir~d.
BacKground
Recent problems wi t!l the r,.'ater level in the Palo A1 to Flood Control
Basi" and the pres€rlse of beth fresh and salt INater in the new ITT
Marsh have contributed to a significantl}" increas-sd mosquito
popu] ati on in the Palo Alto Baylands and adj acent areas t.his
::::umrner.
The water level in the Flood Control Basin is :naintained at a
minimunl level throughout the year as a :rr,itigation :measure agreed to
by the City and the U.S. Army Corps of Engineers related to the
operation of the Pa10 Alto landfill. The minimum level maintains
relatively healthy estuarine and salt marsh habitats within parts
of the Basin.
In order to maintain the ~ater level in ~ cost effectiv~ way, an
electronic control system .... 'as installed in one of the Basin's
tidegates during the early 1970's. Whe~ operating properly, ~his
electronic control opens and closes the tidegate automatically,
maintaining th.e prC'per w.'ater level.
The electronics for the tidegate he,ve had a recent hist.ory of
systems failure~ a~d, although the system has been repaired and i~
present.ly operatin:;, properly, it fa i led sor.tetirr.€ beb,ccn June 22
and June 24, 1"992. This fail'...lre left t.he ':idegate in the Hope,,"
position, allowing tidal water to fill the Flood Control Basin to
a higher level than normally allo~ed.
This higher level essentially pushed ~ater into part5 of the Basin
;..'hich ordinarily dc-noe have 1,-,rater in then during the s~mrner
CMR:j52::92
i
I
-
_"_"' ..... A ,1 £0. L::-;.'
Page T',wo
months. M~squi-t.o eggs lying jor1':"1ant in the higher parts of the
Basin th<="n hdtchca. The larvae found a co~bin3.t.ion of ter.lper-ature,
nou~i5hme~t and ~ater in ~hich to survive, and the first hatching
of these ~osquitoes occurred as ~ major emergence during the last
,,",'eek of ,J -.!ne.
o:'\. discovering the system hcd failed, staff began operating the:
tidegate manually, w~ich is the standard fallback procedure. The
electronic repair was completed en July 6th.
santa Clara County Vector Control ~ist!ict staff increased their
monitoring of the palo Altv Baylands for ~Dsquitoes to an average
of three times a week beginning early Feb=uary 1992. They began an
intensive program of sl...::-veyir".:; and. spra'li]"~g the area's mosquito
breeding habitats with a ~acterial agent as soon as the present
prcblern became evident. Distr i ct staf f have sprayed for adult
mosquitoes ... ·ith insecticide resr.tetr.rin, or !Tscourge," at the Palo
Alto Golf course, ho""lever, they believe spraying for adults is less
effective than treating the bri'eding habitats. This is because
mosquitoes disperse rapidlY upon hatching and the sprays being used
creak dowr. rapidly in sunligh.t and have no resid'<.lal effect.
District staff met with City staff on July 2nd and again on July
17th to discuss the :rnosquit~ problem. District staff believe the
emergence of such a large population of mosquitoes this June was
the direct result of the tidegc::!te failure. A contributing factor,
both for the present and for the future, is the presence of fresh
and salt W'ater in the ne\oll}' created ITT Marsr .. Moscruito lar'v'ae were
found in the salt vater sections Df the marsh early in the
District's respons~ to the problem. prompt ~ction on the part of
District staff, in spraying the salt water areas of the ITT Marsh,
probably prevented the emergence of mosquitoes !rorr. becoming an
eVen bigger proble..., ef lc:-,ger jurdtion.
Elresent Status
City staff continue to monitor the y,,'ater-level in the Basin on at
least a daily basis. The oper-3..tion of the autol'r,ated tidegate
electronics is also being monitor-ed, and staff will begin manual
operation of the tidegate if it fails again. One long-term solution
to the problem would be the replacement of the tidegate electronics
with a ne',.; system. This '"I'ill be pll!'sued as a Capi1:i1l Improvement
PrograM.
Vector Control District staff az-e continuing to monitor the
presence of mosquitoes in the Fl~od Control Basin and the ITT
Marsh, and they are spraying or treating the ~ater when necessary.
Treatment continues to be a labor-int.ensive process~ because the
CHR: 352: 92
.'~ ..
. ~
.~.
Page Th:-ee
er.vironrn~ntally sensitive hai:'itat preclufles the use of mechanize:d
treatment mettlods. District and City staff are l!',eeting to develop
ways to minimize the e~ergence of riosquitoes in the future. A~ a
last resort response to future ernergcnces of m05quitocs~ Cistrict
staff re'[1lain available to spn.l}' (c'r adul t nosqui'toes at th,:, Gal f
Course.
Respectfully submitted,
~a~~ddAuw/
Daniel B. Wil1ia~s
Director of "RecrC3i: ion. Oper, Space & scie.,ces
/--~ I r-;
'-I-~ I ~-
Pdul Thiltgen
Dir~cto!' cf COriUl.unity Services
fu.~w\v~~~
(Jur\ Flemi ng ...
~ssistant City Manager
CMR:352:92
•
,
, ---'"-"--
.--'.