HomeMy WebLinkAbout0453.091October 10. 1991
THE HONORABLE CITY COUNCIL
palo ~lto! california
CUbberley Community C~_Dter Status Repon
Members of the Council:
This i~ an i_l1.formational report. and no Council action is required.
The CUbberle}" Master Plan was approved by Council on May 16. 1991.
The Use Permit for CUbberley is no. in place. and staff is prepared
to proceed further with the vae-iolls aspects of --c.he project~ This
report outlines the activities scheduled to occur during thd
current fiscal year.
BACKGROUND
Plans for the development of the site are taking place. The leasing
and rental program and the code and condition repairs previously
described to council are rEady t·, begin, and the City' 5 Training
Center has been completed and i3 being used. A community-wide
nonprofit group for promoting Cubberley funding in the private
sector is in the formative stages. and a plan for fundraising is
being developed.
)Q.STER PLAN
The Master Plan document is being revised by the consultant to
reflect the changes approved by the city council. This document
will then be available for use as ~e proceed with fundraising for
capital improvements at the site.
CODE AND COND~TZON REPAIRS
At the beginning of the 1991-92 fiscal year, $40.6,000 is available
and is designated for "code required" r€pa~rs. Staff will
recommend to Council that some needed roof replacement be included
in the first round of repairs. The roof replacement work is listed
under ~condition required~ repairs in the report prepared by the
architect, CSS Associates. Staff will return to council for
CMR:453:91
•
. .
.-, .
. .. '
Page !"do
appr~val to extend the scope
~condition required n repairs.
repairs are listed below.
of the CrF to include the necessary
Tha buildings designated for these
The designated .... ork for F'i 1991-92 is as follo;.;s. in order of
priority:
1. Upgrade restroorns in J and K vings for handicapped, and other
code required repairs in these t~o ~in9s_
2. Code required repairs, structural repairs and roof replacement
for the Pavilion.
3. code required repairs ~nd roof replaceroent for Building H~
4. Code required repairs, structural repairs and roof replacement
fer Building M.
5. Reof replacement for B'J.iloing L.
6. Structural repairs and roof replacement for Building J.
lONE CHANGE N!D CO}lDITIO~L ____ USE PERMIT
The Conditional Use Permit for the Phase 1 Implementation Plan has
been issued. On September 23, 1991. Council unanimously approved
the zone change to include the Sit~ and Design overlay district at
CUbberley. council approval included the recommendation of the
Planning Commission that all parking lot, landscaping and field
r-enovation changes should be considered major site and design
applications, even those in the Phase 1 Implementatlorl Plan.
~TE~RING COnKITTEE
Due to the complexity ~f this project, a staff Steering Committee
has been created to ccordinate the City's efforts. That committee
is composed of representatives from Planning, Public works,
Finance, community Services and the City Manager's Office. This
group will meet monthly in order to shar~ ideas and Jceep the
project moving in the proper direction.
VJSUAL ARTISTS AND DANCERS
In accordance ~ith the Master Plan vision of a community center
which reflects the needs of the publiCr space has been aesignated
at CUbberley for visual artists and dancers. This space 'Will be
CMR:45)!91
..
..
-----~
I
I
I
I
,
~--..:\ .. -.. -,--~"".-,.---,-
Page Three
available to these groups at sUbsidized rates in order to enable
them to remain in the community and to foster their grorth and
development. The details of the artists' leases ~re discussed in
CMR: 445:91, which is also in this council packet.
Three wings have been desiqnat~d as artist space. Fifteen artists
are ~lready in place and ~orking in two yings. staff will select
additional ne'" arti:sts from an existing pre-C'IIppI'oved list to fill
rooms in the remaining "'inq as the s;:.ace becomes available. The L
wing has been designated as dance space. Staff plans to lease this
space to a nonprofit cooperative dance group that will occupy room
L-3 in January 1992 and L-4 3nd L-5 as funds and demand increase.
The intention is to encourage and provide an opportunity for visual
artists, fine art dancers and choreographers t~ work in an
environmsnt conducive to their grovth as artists and to establish
a center for visual artists and dance artists to support one
anoth~r, to collaborate and to exchange ideas.
'ONDBAISING
Subsequent to the City Council's approval of the Master Plan,
representatives of various user groups who are interested in seeing
improvements at the Cubberley site have been m~eting to design a
fundraising prc.gram. At the same time, a group is pursuing the
creation of a nonprofit foundation .. hich will serve as the
fundraising arm for the CUbberley project. They hope to have that
organization in existence by this fall.
This new four.dation vould be composed of represen.tatives from the
community and the various user groups, with City staff servinq in
an advisory capacity. Their purpose would be to raise money for
the development of the Cubberley co~unity Center, in accordance
~ith the Master Plan and above end beyond the necessary code and
condition repairs. They 'Would increase the visibility of the
project ~nd keep the community informed of their proqress~
Another long-term goal for this new foundation is to eventually
take on the daily ope~ations of the Cubberley facility, but this is
a huge responsibility and should not be undertaken until the
foundation has proved its strength vith a successful capital
fundraising effort. Under this arrangement, the CUbberley
COllln'11lnity Center would be an independent cost center, organized
under the :auspices of a cOIMlI"mity nonprofit group ..... hien ..... ould
advise staff on the facility operations and policies and spearhead
the capit.al fundraising effcrts needed to modify the facility~ The
CI!R:453:9l.
•
Paqe Four
City's financial and operational responsibility for the project
would be limited, and the facility would truly belong to the
people.
RlO!spectfully subndtted.
Paul Thil tqen
DirTtor of Comm ~ty Services
Related CMR's:
ClIR: 453:91
269:9
114:0
134: 0
264:0