July 23, 1992
HoNORABLE CITY COUNCIL
Palo Alto, California
14
SqpPLEKeNT)'L IlIFOR,MATION REGARDING BRYANT STREET BICYCLE BOULEVARD
EXTENSION PROJECT
Members of the Council:
REPORT IN BRIEF
This report supplements CMR:J2J:92, dated July 2, 1992, and focuses
specifically on the issue of the street closure and stop signs at
Addison and ~ingsley Avenues.
On July 6, 1992. the Council considered CKR:323:92 recommending the
award of a contract for the implementation of the Bryant street
Bicycle. .Boulevard Extension project, and approval of related.
chanqes to stop signs, parking restrictions, and bicycle routes.
The Council decided to continue further discussion and action on
these items until July 27, 1992, so that Council could furt.her
review and discuss the issue of the proposed str-e,~t closure and
stop siqn changes at Addison and Kingsley, which had been
previously approved in an earlier city Council action last
December.
staf.! supports the Approved Plan (approv~d by the City Council on
December 2, 1992) for implementing the bicycle boulevard extension~
includinq installation of a temporary street closure and removal of
stop siqns at Addison and Xingsley, for a six-month trial period;
and recommends that Council take the appropriate actions to awara
the. construction contract and approve related chanqes to stop
signs, parking restrictions, and bicycle routes, as presented in
CHR:J:23 :93.
BACKGROUND
On December 2, 1991, the City Council approved a plan for the
extension of the Bryant Street Bicycle Boulevard and directed staff
to proceed with the necessary steps for implementation. The
Approved Pla~, illustrated in Exhibit 1, includes a provision for
the installation of a temporary street closure on Bryant street, on
a six-month test basis. staff is to evaluate the effects of the
CHR:349:92
•
:
EXH18I1 1
I I' • i
I i • • I
S I
!
• j ! :
i ~ i ! i
:; •
i
!
.i • • !
;
i ,
l' I ~
! ! • ~ i
i
l
-
o
street closure and return the matter to council for further action
reqard1ng the dispo$ition (remov~l or permanent i~s~allation) of
the street closure~
The Council'. decision ~as the cul:ination of an extensive process
over an 19-month period, which included ~etailed study and
evaluation, and extensive public input and discussion. The primary
information sources for this project include: {a} th~ Bryant street
Bicycle Boulevard Extension Report, dated September 1991;
(b) CMR:42S:91~ dated September 26, 1931; and (c, CKR:49S:91, dated
November 14, 1991. The Folicy and Services committee discussed the
project on October 8, 1991, and ths full COlll'lcil c:1iscussed a.nd
approved the project on December-2, 1991. Copies ot the Study
Report, CMRs, and minutes of th~ Policy ~ Services committee and
city Council meetings are available in tbe Transportation Oivigion l
sixth floor, city Hall, 250 Hamilton Avenue.
Last De.cember, whe.n t..l1is -matter was cOl'l'sidered, Council had before
it three alternatives, identified as follows:
• Plan R = Recommended Plan (recommended by staff at that time)
• Plan S = Substitute Plan
• Plan C = Combined Plan (approved by Co~~cil in December 1991)
Plan C is the alte.rnative approved by COI.meil and, since that time,
has been referred to as the ·Approved Plan" r It includes a
t~porary street closure on Bryant street and removal o~ stop signs
on Bryant at Xinqsley ana Addison. Plan R is the same as Plan c,
except that it does not include a street closure on Bryant. Plan
S is the sue as Plan C, except that it does not include the
channelized turn restrictions at the Bryant/Embarcadero
intersection. All three plans include the removal of stop signs on
Bryant at Kingsley and Addi50n~
PURPOSE OF BICYCLE BOULEYhRQ
The-purpose of the bicycl2 boulevard is to provide: (1) a
throuqhway upon which bicycles have precedence over automobiles;
(2) a direct route that reduces travel time fot:' bicyclist.s; (3) a
safe travel route that minimizes conflicts with motor vehicle
traffic; and (4) a facility that p4omotes and facilitates the use
of bicycles as a.n alternative transportation mode, for all purposes
of travel.
TP.J..~flC DIVERSIOt{. EFFE::=t$ Q~ STREET c:LO~
Exhibits 2 and 3 illUstrate the exp~cted daily traffic vol~mes ~ith
(Plan C) and without (Plan R) a street closure at Location A.
These traffic volume numbers indicate the follo.ing~
CMR:349:92 7/23/92
Page 2
I
} ...
'1 ,.
n P' E+M 4US
mil
P ... M
E ',.R
....
OS", 1-~(8;.t. 'L'" I ~+M+R r 'l k+rl .. Mo' il ~ -~4lli tli~.;; I) mf5t~ iE ~
E~,\rd ...
E+M+R ...
E+MH:A 1090 ] F.+M 'OJ E+M lOU
E+M+R ". a:; .. ",,+M. 5),1.1
e"M+CA .. , E+~oh(:A HIkt
,~
J
J.:
L
b j~--R
r: • .., JDIJ
•• M 8ro 1i E+M+R U'l, E+M+R 1J7Q
n:~+~~ If)i\ t_ ... E+M+CA .':"!~ __
; W'V'~lET sr. it' •
'] II ~ l;j I-itl,~ u
l L:f;~%~d~ "'_ L.
r~ M 2~q'l l!+M IUO e+M I:m I, -
E+M+R m~ ~+M+R 1~!~. E+M+R mo
. ~I'\.."..... \-I'"""""'~
1
E+M+CA~ E~M+CA 18' ,,~~~~CA l~
-~ '''1 ' I I.J r I T-r-irr"
, _ titrANT Ifl I" ~IZ_ t' rw f 1 J K1! T !7 Jo'" I ~,~~~~ ".i; l-I IE] ItS 'I ~ / ,,": 1 ,-J. 11 '" I I fr~l _ ~~~'R :: : ..
E.M 1110
"'" l'_~-M+R
-_.V Il "-..', ---~ w ~ ~l U;: ct, --E+t .. hCA SN)
"" ~ ill[ .~9~-.. !' ••
E+M DRS _ f+M ~111 ir I; l:+M IDl K ~ , j5Jlllj :::.:~:; L ;:;::.;: l.;:~:; ~ D /I ,!.;?-r
I oli~ 811 1"IILllj"E ~~,J liiT-r ,~L1JIJ }~L "I I~o -LLTIT-,---,J IT I I [J OIl I Sf
ALMA
hi Numtters ftl>rueftl """'. ~". d.lly '.falr", vulumri (AOT.'), I.. . .. I'IIHllllletJ ADT J, P. .. E.rlr;linl (yellt 19911).
.. M -.~.OOO., MedlCIII F"'1I>dt!llc,,, {PAMF} £""'-"P"nll"''' rru~ct ~-tM I Ill! l...r..r R .. R"l."(Imm"'\d~ PI.'n (tam .... P, P'''(entd PIAn, III 9,.,1 Hill .. ",..,
LIIE.MtR IUD rl...l Rercn.FigO.l) .
.! IS ," Ii t II§e 3 SA. -Subll'Ulle PIli .. WI'h dOlln., In Ul('II!lnn A. (llI'rw ArJd,I(,n IIltd a..nninJ)
;). E+M+CA. IIIiO hit (qonIC .... Sln"fJlH11";.IfM:lR,,pnr1,FIIJ'(.l) .
." ~1'11"9 IIS91 1'0 CA-C..omhilwdt'llIn..-ilhrkl'lurelnlr0('8uc.nA
TJ
so -S>.alw.'"\I!e ,btl with t:kw",", In u.:..tkm D t""rw AoidIMlI1 ,"nd UftQ.l1n).
(J) • Contbined PI_n ... ilh tlDlu,,, in I~."I)I'I D.
wmpJ,<' On WIlYe,ler ~""'''n Cllannlnlllnd J\\ldl • .,n, nil"nll. ADT i. 3710.
If the rA,Mf "~nlin" ,..."" h'li!!, AOT wlluld in(fr:u .. 10 42Jfl If bol'h I~
r",MF tl<v .. nlIDr. "M! in!. bl~"k-l:tOlI1\~_"'lO tl<t .. n~ion SUu..'\1\lle rh ... wil" (I,,.,,, .. \II ,"",Alioll A WI"" hulll, iU'tT would "'ernlt I,., ~AA$.
Hi! III 1 r .' EXPECTED DAILY TRAFFIC VOLUMES
~" ...... ___ , __ .. _~ ___ , __ .. ", ...... ~~,~~. __ •. ~ .• ,"_" _ ._._ .. _.-, ____ .. m_ •. ~' _____ -..-__ ~ _. __ ~_-_.-____ ~ .~
L i;', ,:;!~i;fli"rl'~(;C ',\:,', \ " .... ~>:;\,i,;>" '. " "". '<" '"' .' ::'!~:,if'U:·~~,~·,:·-\l1¥;,;(, -·.,::';t;
--------~-------.. ----
.. \ I
I
;;;
"
~J
•
'. '" ' ,111
1
I
:,7.
~"""''-'
,~ ~.-',"" ,_,,,~~,,.-. ,'~m··'\'~"-'"
I
. ,,1----·.·,.· .. ' ~---;~I_ -. r 1 E.M '''' ~ E+M.. 194. [ji ! E+M.-R ,,60 S I, Si'l 'i!~ I i p~~-~
, E+M+CA 1S7.'1 _ I }
.At ....
1
....
'~'. FY'i 'Rl~-I Q '."'''"'' "" v~ r", lin foo _ F-+MH'A r.·. ,p
---'--'
IEb
E'" E·/I,t+R " .. ""
E+Mi'CA 200 ~R:7 ::!-
fJ 8~Y I ~
.. ---, ....... ,
F-' TT-' rTT II
CIIIlTllU".
~~
WAVERLEY
00
~
.t.r ... to .. lo .. lIrOl ---l
I n
~ ~:=~R ~~ R ~
.
r;+~.h(A )4~ I-J g .. '. ~ "'trtljBJj~~ ~ ..... LLl ul 2 '1 .. kT B,3~~ T 1
SCHOt'll
JI
-.----P----I ~~ ~trt=d jl : I > I ~~ ~L::Jl-~u
~ '"
u;=
Numbell u~pnltnl "",'Ige da,ly IIlme ,"oiu""",, (AnTI).
• • fllj'IIf1.I~d ADT
E '" E.ultln, (Jur 1990).
M • '$,000 If Medielj FOllndallon (P,4.Mf') i:.q.Il",inn Pr{lj(~L
R -R~oornml"l(/ed PI.n (SlIm .. III P, Pldll'rred Plan, in Y!91 ui.~ llt'Jd
Rftport, FIj; 9.4).
SA • SLlbt.lllut~ PI." w(,11 ci..."ure In Ltx..Illun A (bt:rrw Mdillnn lind Chlnnllll!)
(Nlm. .. S Ih 9191 Olh DI\-d Rfport, Fill 9,.).
CA .. CQlJlbined f'a.n wilh (IOIUII' In Loclliion A
SD _ SuMlllute Pilln "Vilh clo.ure ,n l,ll(IlUuo II (brrw AoJd'lllo IIr1U l.mrolroJ
CD .. CumbhlOlo Pllh will'l ,loIule in U:x:llhon D.
Wrn$: On Wllv".I"'J be""",,,n K",Uog aM Cl'IlI.ch,ll, ,.,,\in8 ADT .. 2600_ If
Ihe PAMF .~.n.iur, we." bu.ll, AOT ~uld Incn:'1e lu 172.'i. If 1)011'1 th .. ____________________________ ..... __________ 11 PAM~ clpanalon Ind lhe hl")'tle t.uul""lld UIClillofl Comhlned Pilln with
CIotUIC In III<'alion, A. ur D _u' hu'II, ADT wouk' 'nnto .. ~ 10 7:Qy~
EXHIBIT ] EXPECTED DAILY TRAFFIC v.uLUMES
o
, '8111 L"r~" " " ~d~
• • ,':.' '-., ' !.'
:'_:_~:, t:; :1-,.(
~,'. "
-
•
•
?lan R results in less trafti= diversion from Bryant to
adja~ent stre~ts than Plan C.
The primart traffic impar:ts of trdffic diver-sion froOm
Plan C are concentrated in the blocks of Channing and
Ackiison betllef.;l Waverley and Ram.ona, and the blocks of
:Ramona and Waverley between Channing and Addison. As
documented in the Environmental Assessment {90-EIA-28,
page 12; attachea to CMR:4SS:91), only in the block of
Ramona between Channing and Addison is this change in
volume expected to Dc clearly noticeable to residents4
• Both Pla.ns C and R r-ed:uce traffic volumes on Brya:""t.,
'Which is a primary objective of the bicycle boulev .:-d
extension.
EfFEct Of STOP SIGN CHANGES ON TRAFFIC VOLu~ES
The changes in daily traffic volumes On eryant and adjacent streets
under Plan C (Approved Plan) and Plan R are illustrated in
Exhibits 2 and 3. These are based on the stop sign configurations
Which result in no atop signs on Bryant between Cilanning and
~rcadQro. While the addition of one or more stop signs alonq
Bryant would ~ expected t~ result in a limited amount of
additional traffic diVersion from Bryant, de .... eloping a reasonably
sound quantitative understanding of the amount of such increMental
traffic diversion is problematic, particularly when otber
significant changes are alBo involved.
As il general indicator of the impact of step sign changes for
either pl~n, the installation of a stop sign on Bryant at Lincoln
{creating a four-way)., for example, would be expected to result in
a 2-3 percent reduction of traffic on Bryant, north of Emharcader0 4
If the diversion was all to Waverley, the increase on Wa.verley
would. amount to 1 percent co:rnpared to the nUl!1bers indicated in
Exhibits 2 and 34
EFFECT Of STOP SIGN CHbNGES ON SPEEDS
Apart from the traffic diversion erfects of changes i~ stop signs,
concern has been raised reqarding excessive vehicular travel speeds
alonq Br)~nt, ~nd possible conflicts between pedestrians crossing
Bryant (particularly school children), and bicycles and automobiles
traveling alonq Bryant. This concern i~ based upon the perception
that travel speeds will increase along Briant street, due to the
increased unimpeded travel distance created by removal of the stop
signs, thereby creating an unsafe sit~ation.
CMR:349:92
L
7/23/92
Paqe 3
f ,~ i '.>i:
LJl.~ .. :~t~~~>r· -...
:"~;~:~:~).{.--" -,
: -::_~~:-·;k<~:~~~. zi ~ .. __ .~ .... __ ,_'C .. -
-
o
The reversal of stop siqns from Btyant to Kingsley, and removal of
stop siqn& on Bryan't at Addison, 'Would result in an unimpeded
travel distance from Embarcadero to Channing ot 1700 feet.
Measurements of travel speeds O~ segments of streets with travel
related ~eatures and characteristi~6 similar to those that ~ou!d be
expected on Bryant, if one or more stop signs were re~oved, are
compared below to current speeds on Bryant Street:
Speed (mphl
Street Urimpcded Street Segment l<<mgth ~ §.llhl
Waverley Street Embarcadero to Lincoln (1,100 ftl 28 32
Cowper Street Embarcadero to Kingsley {1,000 tt) 26 32
Newell street EaWarca,dero to Channing (1.950 ftl 29 32
Bryant Street Lo-.rell to california (2.,400 ftl 26 31
Bryant Street Lincoln to Addison (850 ftl 27 32
These data, as well as other speed ~elated studies, indicate that
travel speed does not necessarily change due t.o the length of
unimpeded travel distance, but rathe~ is related to a driver's
perception of the features o~ the roadway and characteristics of
the adjacent area. The information does not support the
presumption that travel speed Yould significantly increase as a
reEult of a longer unimpeded travel distance.
Furthermore, the 8-xis.tir.q drainage. dip in the pavement across
Bryant, near the Xingsley intersect.ion, effectively reduces the
unimpeded travel distance to 1400 feet. The dip will be signed
with warninq signs; and because the ohange in qrade is substantial,
it will also serve effectively as a speed deterrent because drivers
will be forced to reduce their speed.
Since the removal of stop signs is important to help facilitate
bicycle travel alonq the bicycle boulevard, but the concerns about
their removal a~e also important, staff proposes to monitor actual
conditions (speeds, volumes, conflicts, etc.) on Bryant at the
locations where stop signs have been removed, and .,i11 specifically
report back to th~ Council following an initial six-month period,
or earlier., as conditions warrant. In that manner, problems, if
they develop, are assured of .being ~ecognii:ed, identified and
resolved.
The proposed comprehensive =onitcrinq plan includes two distinct
components: (1) an initial assessment of the immediate impacts of
the project shortly after implementation, including t.efore and
a~ter speed measurements and field observations of vehicle,
pedestrian and bicycle activity each school day, tor a week after
the street closure is installed; and (2) a comprehensive monitoring
and evaluation of the siX-month trial street Closure, ~hich will
include field observations, traffic counts, speed measurements, a
CMR,349,n 7/23/92
Page 4
review of accident and complaint records,
neighborhood survey. (Refer to Attachuent 1 for
two monitoring progra~s.)
EXISTING BICYCLE BOULEVARD -EVALUAT"1QN REPORT
and a mail-o~t
a sWIlZ'1ary of the
The existinq section of the Bryant street Bicycle Boulevard
(Churchill AVenue ~o Meadow Driv~) was first implemented in Hay
1982, as a six-month demonstration project. Attachment 2 of this
staff report is a copy of CMR:5BO:2 dated December 9, 1982, which
documents the evaluation of the bicycle boulevard, following the
demonstration period. Subsequ~ntlYI Council designated Bryant
street, between Churchill Avenue 5nd Meadow Drive, as a perman2nt
bike boulEv~rd within the framework of PalQ Alto's adopted Bikeways
Kaster Plan.
The evaluation report concluded that:
• the bicycle boulevard developed a substantial level of
bike. ridership;
• probleuts antiCipated prier to the demonstration failed to
materialize; and
• a predominately stop-free bikeway,
local residential street, can ba
effective route for ~icyclists.
CONC!.US IONS
on a less traveled
an attractiVe and
Staff supports the Approved Plan (a pproved by city Counc i 1 on
December 2, 1992) for the implementation 'of the bicycle boulevard
exte.nsion, inclusive of the installation of a temporary street
closure and removal of stop signs at Addison and Kingsley, for a
six-month trial period,.. and recomme.nds that counci.l take the
appropriate actions to award the construction contract and approve
related changes to stop e:iqns, parking restrictions and bicycle.
routes, as presented in CMR:J2J:9J, dated July 2, 1392.
CKR:349:92
L
7/23/92
Page 5
":<~*~~. ~~:~
itiM~:;
.~:;:.\..;:" ~~
-
•
I , ,
• t
j
o
Respectr~lly submitted,
MARVIN L. OVEl\WAY
Chief Transportation Official
Manaqer
KENNETH R. SCHREIBER
Director of Planning ana
community Envi~onment
Attachments: 1. outline of the street closure monitoring program
2. CMR:580:2, Evaluation of existing Bicycle
Boulevard segment
co: Palo Alto Planninq Commission
Architectural Review Board
Historical Kesources Board
Palo Alto Bicycle Advisory committee
Palo Alto Chamber of Commerce
City of Menlo Park
Stanford University
CHR: 349: 92 7/23/92
page 6
r
i.,;.;
-
L
•
•
•
IT.
•
•
•
o ATTACHMENT 1
BICYCLE BOULEVARD STREET CLOSURE MOl'-'1TORlNG PROGRAM
MONITORING AND EVALUATION OF [MMEDIATE IMPACTS
Take "before" and "immediately after" ~ measurements between 7 AM and 9 AM
on Bryant between Addison and Lincoln and betv.;eer; Lincoln and King sley_
Each school day during the flI.n week after the closure is installed, observe vehicle
a.,.'1d bicycle activity at Bryc::.n.tlAddison intersection between 7:4.5 AM and 8:30 AM:.
Conclude if there ate a..'1Y safety probiems that need immediate attention.
MONITORING AND EVALUATION OF SIX-MONTH IMPACTS
Take 2-day "before" and "after" traffic count! at 15 locations in the area bounded by
and including Channing and Kingsley and Emerson and Waverley.
Take "before" and "after" speed measurements between 7 AM and 9 AM on Bryant
between Addisoo ::.iid Lincoln and between Lincoln and Kingsley.
Compare frequency and types of bicycle, pedestrian, and motor vehicle accidents in
the area bounded by Charming and Kingsley and Emerson and Waverley before and
aft...~ installation of the st:reet closure.
• Determine impact of the street closure on governmental services, Urgent Care
Center, and Nursing Home.
• Observe and record motor vehicle and bicycle activity L."l the block of the barrier a:,d
at the Bryant! Add:'SOn intersection d1lnng one school day. lncidents to be recorded
would include vehicle U-turns, right-of-way conflicts, pedestrian activities, unsaf~
maneu.vers, and others.
• Analyze complaints registererl in the Transportation Diyjsion.
• Ask ior PABAC evaluation.
• C.ondllct mail-out neighborhood survey of residents of the Professorville area
regarding operation of t.1e street closure after ail above data has been gathered and
reported to residents.
• Conclude ifany changes sholJId be made in the street closure location or in any other
aspects of traffic control in the area affected by traffic diversion from t1"1e closme.
Note: The above data may be gathered 'before sh: month. .. , but 010 c~rlier th.a::! 411.1 months after closure
installuion. Ow will also be pthered bef'We;en 4=1.1 and sil moDI'!l:s at other toca.tioru. ouulde the
Proff:S&01"Ville area, i.e order 10 determi.ce impacts due CD the hicycle ooulev.rd eueosioa in those anws.
O'e
"
",,;-.,..;.", . ~~fEX -
£~~I\~: ! ;o~~_~ .. -~"-
-
o.cemi>er 9. 1982
KONQRABl~ CITY COUNCil
Palo Alt~t Ca'tfo~nil
t
llicy,'! BO!.J1@~.rd Demonstrilltfon Study ... E~eluatfon
_ers of th. C""ne1l:
On Oecembe~ 14, ]981, Council apprQved I dern~nstrlt1on study of the ·Bi~c7r
Bouleva~d· on Br~ant Street from cnu~ch!11 Avenue to East Mtad~w D~i¥e.
Counc.il sU'bseq~ent'y approved t:le specHic tmplementat10n plans on Marc~ 15.
1982. The demonstrltfon per10d began 1n May end tertn1nated October 31. 1982.
Thh repbM provides an .nalys1s end' eVllu!tfon of ttle demol"lstrat1on period'~
Staff rec.omme~ds that the BrYMt Street Bicycle Boulevard be made I permanent
part of the Pllo Alto BHew.y Sy.tem. b"t that no phy.ieal irnpro,."",U (i.e ••
pe~nent barriers) be ~de .10ng the route ~ntil the new State legfslation
~egard;ng barriers 1$ ~nacted.
[. RE~IEW OF THE IM.L[M~Nr~rION ~LANS
The 1mp1tmentation plan approved by Counc" establfsM!d tne b1cycle bouleward
demonstratton along Bryant Street from Churchill Ave-nue to Eut /tI\eado,,' Drive.
The' torridor. prior to Hay 1981~ contained stops alon!il Bryant at seven
fntt!rmedfary 1ntersec.tfons. tr,ree Df ~hlch were four-MlY stops.
Upon f~lementatfo" of the bike bC'1I1evard in Hay • .stop sfgns were either removed
or reversed at most of the intersectfons .long tne d~onstrltiGn r~tet lea~fn9
only fDiJ~ stops i!llong the enUre two ",,11e route. rn ad'dH fo;.. two barriers were
installed along Bryant 1" order to dissuade f ncr-eased through traffic .rd cteate
I sifer environment for bfcytTing.
T(I sllTIfililrize. the fol1o""n~ fs a list of thi! stop sfgn and barrfer fnstalTat;ons
Ilong the demonstration rQ"te (refer to Exhibit II, Citywfde stop .i90 map);
Oomonstratlon Study
Inter~eeti on Statu. Prior to Hal 1952 Implementatlon Plan
Chureh111/SrYint Stop. on Bryant on 1.1' Fou ~ -way stop
L .... ll/Bry.nt StDl" on Bryant on1y Barrier on Bryant.
stop "gns on lowi!11
Co 11 foroi alB ry. nt Stops on SrYiI nt only Four.way s.top
L~ Ve r de /Bry a nt Four-way stop fou~-~!y stop (ne
change)
£1 Verlno/Bryant Four-way stop Barrier on Briant
Stop signs on El Ver-It')o
tlst Meadow Stops on Brya nt only 4-way stop (no chan9~}
~;S80;2
L
-
.-,-:-',:
.::1~~~it
Additl"".l .leoents Of the demonstr.tion route Included dlre,tion,l lfgnlng to
BrYlnt Street 110ng Dther b1ke rCXJtes end II new fIlrked bnf rc-ute south of Eut
No.dow to Sa. ~tonlo 110ng r.sldentlal It,,otS.
ll. CATA COL'ECTION METHODOLOGY
. 1ft the December 10. 19S1 roport to Cou.dl ceo, . .,.lng the Blcycl. ~ulov .. d
·St"~y •• aluotfcn criteria (CMR:55S:11. sUff Indfcated thn evol".~lo. data
,""uld be coll.cted In two primary are .. (I) blcyclo counts on Brl',nt and (~)
fthfclJlIr counts on Bryant Ind se'!'chd para"tl and cross streets. Stiff hiS
.Tso <omplled a r.,f •• of the .ccldent history Ilo.g Bryo.t Str.ot.
CoMP6r.t~vt bfeyele cou~ts were taken It three 10cat1~s on Bryant and It t~r!'e
other location' prior to .nd during the bl,e ooul.,.rd ltudy. Count ... t. ta'.n
during. t .. l •• hour period (7:00 •••• -7:00 p.~.) an mid wee, ~.ys. Bas.
counu ... r. t,~.n 1ft May 1981 Ind Ajlrl1 1982; count. at the.e lotltlon. we,.
tl'" 19a1n In Ottober 1982.
T ... nt1-f ... r yehlc,"r tr.fflc count •... r. to'.n It .Ignt ... Tocatlons .Tong the
bUt bou1evar'd corrfdor. These counts fneluded' 10Clt1ons illong Bryant I.S well
I. -parallel and cross str"~ets where eh6ngu if! trlffic patt&rn.s were
.nHclp.t~d. Base count< ... r~ tI'en In Hat 19S1 and 19S2; counts wor. t.ten
again ;n October 1982.
The results of t"ese be:forf Ind after veMcuhr Ind bfcyr:1e t!"'.fft, counts Ire
sho"" In bhfblt 12. project locn!o .... p •• nd In ExhIbit 3, d.te collection
s ...... ..,.
II I. fiNDINGS
I. Blc cl. traffic on Br ant h •• Incr •••• d drom.tlcall d,rln the
emonstret, on ~,. o. esu ts 0 t.he e ore. ter t counts s ow that the
rate of lnc.re.se 1n b~ teo tJ"lfffc on BrYI!'It &xc.eeds t~et stlown Of! Dt~er
ltr.ets; converseT1. bike traffl. decl1n.d .Tong lIiddlefl.ld Ind ", ...
Strnts (os ..... ured .t Meadow Orl •• ). during he ..... porod.
Bryant/Churchl n
on Bryant
on Churchill
Bryant/ClTlfornl.
on 8..,lnt
an ChurchliT
~lddTefl.Td/Meldow
an iii ddl.flo1d
on No.dow
ATma/lle.dow
on AI ...
Dn. Meldow
CIIR:580:2
12 Hour Bicycle Counts
(1 ,,~ - 1 !'II
Before Aftt!:i"
240 473
460 SS9
290 536
931 1009
457 210
•• 9 362
144 94
757 856
11/24/82
-2-
-
The highest b1ke ~9untS .1ong Bryar.t were retarded at t~e Lo~~'l Street
bI~rfer (7ZS b1(es/dIY)~ The heay1rst usage of B~yant ccc~rs dur'~9 the
lIIorning cOCI'IIlWJte h~rs of 1:00 1!.lfl a .9:00 I.m. The predomfMnt flow 1,
n'rt~ound in the morning. Students c.ommuting to Palo Alto Hi gI'"l a,cou"t fo!'
• sJgnificant portIon of the total. I" the eve!'lir!9 ttle predorr.inant flc'.( is
'Southbound, .1though the count!; do 'lot exh!bH the same tommute ·paak ... s;:.ce
sthoQl and work commute ~ours 1.11 within differtnt time per'o~s.
While th11 study did ~ot !ncompass I survey of the cyc1jsts usfng the r~ute.
it appears. n~yertheiess~ that riders have grav1tated to Bryant from other
I~j~cent neighborhood ~treets including Waverley Ind Emerson. and from the
.are eor.gested Irter'ais (~iddlef1eld, Alm3)~
Although b1te r1d~rsh1p ~as th~s fncreas~d m4rledly along t~e route, some
.eaving through ne1ghborhoods and ~se of fdjacent streets st;ll occurs. The
personnel hired to conduct the Octob~r b1~e counts ~pec1fic~'ly noted that
.. ny cyclists heading toward Pilo Alto High turned off of Bryant If tor t~e
Lowell bJrrfer. and int!rsetted Churcnill at Emerson rat~er than at Brya~t.
2. The Bryant Street SHe Soule .... ard now carries 'Volumes of bicycles: com arable
ro-olner we, esta I S e 1 e r"O\.ltes ~t n a 0 to 5 ~ ... ay system.
The hst city-wfde tifcyc.le counts ~re taken: fn the Spr~ n; of 1978. At t~at
time a nl.STlber of streets car"rfed "SOO/c.yc:l1.sts a d!y. Bryent Street, Whitt'!
now carries 475-1'25 bites a day I d'jlI::H!~dip\g upon U'I! loclt 1 on, 15 cl l!'Hly ~n
I par with other majDr b1 ke routes.
Count lcclt i on l~ Hour BHe Counts
198~ Bryant Stre.t CIt 4lotit!o.s) 475-725
1978 Arastradero at CiJu10mbe SSO
~ark Boulevard It Fernl~do 587
North tal iternia It Newell 793
M;dd1ef;~ld .t Embarcadero 49;
Wil1ow/S.n Mateo Orl.o Br;dge sa)
3. Traff1~ yoiwmes w1t~in the overa11 bite boulevard corrfdor-~av! remained
fairly constant. Al I of thf streets counted !~cept Bryant (so~th ~
Oregon); Chlorldo. and Waverley carry traff1c vo1umes of cons1d~r.bly iess
thin 1,000 v;ehi~les/day. These-lilT'i1ts are we1' witntn the accephb1e range
for Tocal residenthl 5treiC!ts.
Traffic on Bryant fn thf vicinity Df each of the barr-fers has declined by
Ippr •• lrnotely fifty perc~nt (from 953 to 45) .. Mcles/dlY n." La .. 11
barriers, from 481 to 170 veh1cle5/day near the E1 Verano barrier). The
1nstallltfon of the two barriers on Bryant "itS, however. forced motor; sts
continuing to use Bryant Street to detour from Brya~t between Tlnny5~n and
Lowell and bet~en CI""ls1no and E1 Verano. At each of th.es~ t-o 'acations
Dnly one of the cross streets exhibited a Marled increase in traffiC.
CMR:saO:2
--..,.,..,"Y'c .... ·.· -._ .. ----
1I/24/~2
-3-
".--
-
4.
T~n~$on{Lowtil Diversion: Trlfffc: on Bry.nt louth of Ttnnyson declined by
5'0 nhiel.s per d.y (953/.57). R .... inlng trlffle forced to doto"r .t the
new eul-6.-<lc ha. b.on dl <ttl buted hi rly oq"lly to the two aC1j acent
blocks of T.nnylon, each o~ ~f,~ nDw Clrries .800 Y!h1"ts/~IY_ I vo1ume
sHH lltu than Br,)"f)t tarried befort the detilOr'lstration projec.t. The two
corresponding b10cks of lowell •• hlbltod only mlror fluctultion. in tr.ffic
,a11,11M!.. Trlft1 C 1101"""5 on Waverley .nd £merson 1l'1 the bloc\, par.' hl to
the BrIant clDs~re h.~t r~1ned constant. '
.rYlnt/camp.slno Di.'slon: Tr,fflc on Bryant south of lorna Verde declined
by 3O~ •• hlcl .. d.y (4711170). '"rOO$od traffic hIS be~n dht.,I>Jted to
th. tdJIC-el"lt b'o~l$ (Iof C.:npesfno end Ramon._ 'Each of ttl!'S! strtets has
borne In Incrta" of .ppro.imately 100-•• h~tlo'/day. Tr,ffic on the two
blott. Of El Vo.ano clos.,t to t~e barrl •• ~a. slgolflcantly declined.
cTe.. c.u.e. for t~ •• ",Idont., we ... ,top
at1ons. or ~runk driving.
In 19S1 tllere were throe reporto~ Icc1d.nts. Two of th ••• lnyoh,d bicycles
end aotorist •• in which the IIOtorlsts fined to yl,ld the rIght-of-way.
To dlte 1. 1981 there ha,. be.n fou. reported Iccidents. t~ree of which
otc~rrtd .rter t~t demonstrat1on ptr10d begin. T-o of these 1n~olye~ a
bIcyclist .lono. (The fIrst ,ccident octu".ed It I mldblocl lot.tion on
I.yant south of Seal.; the second octur .... It the !latadero C.eek Brldge. J
In .ath e •• , the cyclist lo.t <ont.ol of hIs blk, whe', no othe •• ,hlcl ••
wer. pre.ent. The thl.d accid,nt Involvod .... torlst aod cyclist. with the
farmer f.,llng to yl.ld the ,19ot-or ... y.
No accidents .. ro reported I. the .'cl,'ty of the t ... trlffle b •• rlers.
lV. PUlL!C RESPOKS,
At t~. begln"lng or the deoonstr.tlon study. starr .ent a lett,. to .'1
r .. ldent. within I on. ~lock .. diu. of the SIk, Boule •• , •• oot •. All were
.ncoiJraged to. rehy thefr comments to the Trans.port.tfer. Div1s1or. during the
,ourse of the study. To dett $tlff hiS reee1vld comme~ts from e!ghteen
lndl.' ..... h. A ....... rl of the c""","nt. received 1. shown on Exhibit #4.
Prlo'r to t~, ImplementatIon of tho demo .. tratlon study. stoff held. publlc
~ttfn; .rtt~ fnterested ne~9~borhDDd resfd~ntl. ~D expressed tomments in fD~r
generAl Ireas of tonc.ern:
1. Increlse~ s e.d1~ on Bryant Ind other n~1 h~or~ood stretts~ 1ne Po11ce
pl~t~nt reports t~4t severa comp I nts ~re recelved It the b!9~~nln9 ~f
the study. but 'ttry (h c.0IIP1."nt.s have come 1" dur1ng the past ftw montns~
I:MR :580:2 11/24/82
-4-
..
-
2. ~usfve be~I~1Dr b bit clfst!. motortyc'fs~s &t stop s~;~s. barriers, etc.
r ng t.e course 0 e stu 'Y. re:;: ClenU commented tFiat tFiere was an
fncrease in ~oped trlfffc along the 8ike Boulevard route. Given th1s 1~put.
t.e'~e hour counts ~re t6ke~ It Hatadero Creek Bridge end at the lowe' 1
Street blrrier. The resul,s 1nd1c~ted that .oped end motorcycle v101atfons
Irll=' IIfrdal :
21 mopeds
o motorcycles
Lo ... ll S.rrfer 58 ",opeds
4: motor:..ycle1i
The behavior of bicyc11sts at th~ californi./Bryant intersect1~n was studied
by Dawn Wijeo~, a member of the Palo Alto Bicycle Advi50r1 Committee. O~
October 19, 1982. Of the 300-400 cyclfst. obs.rved durfng e.ch of the •• m.
and p.i1I.. t~tt hOurs. most $carmed for cross traffic 15 they appro4ched
the fntersectfon (177/ •• m:-;-:fB/p.m.); some .connod a •• j slowed down, and a
fe. (~6J to"" to full stop. Or.ly •• ery few wro'9 ",y cyel ists (7) were
ObSerYEd ..
J~ Mfndered Access to residences. Staff h~s recefved o~ly one complaint of
thl$ nature from the pu611c. Th~ problem Occurred fn the closed Lowe" to
Ten"yson block of Bryant. where motorists were obser~ed tu~fng around fn
t~e c~'-de-slc at t~e lowell barrier; 10tal driver tr.fning schools were
also ~s1ng this b10ck IS I pract~ce I~ea for stude~t drivers. Stiff
subsequently contacted the local driving sthools who agreed to use other
rout... The Pol fee a,d Fir. D.p.~nts report that thefr .bflfty to
respond to emergencies kas net been seriously i~lired by the barrfers
durf ng the study perf~d.
4. Length of t~e study and 1evel of mon1torfng. Pubiic 1nput and comments to
the Transpo~tat1on b1~'$'On Ind police vepartment toave been minimal during
t~e demonstr.tion perfod; no requests for fn'rea~e~ mon1tor1ng h.ve been
fortncataing.
Y. CO~ClUS10HS
During th~ cour~e of the six month demonstration. the Bryant Stre~t Site
BouTewar-d has ~eweloped 11 substanthl level of bike ridership thl!t places it (m
I l!'¥el with other older. well estab'1s~d routes w1tt1fn Pa10 Alto's network of
bikeways. The rate 01' groliith in bike trlvel on Bryant exc.eeds the rl!te of
growth or, other bike routes where 'IJ/Jnts were tal:.i!'r ••
ConYer-sely. the prob1ems anticipated prior t~ the demonstration have actually
failed to ~terfllfle. Accidents n,.e remained It a low level; traffic hiS not
created I problem on adjacent streetsj and ne1g"~orn~o~ react10n to the fnc~n
venieRce of the barriers, I~d b1cyclist I~d motor1st behavior. has b!en It I
onnh,um.
This tnt of t~ b1cyc:Te bouTe'/ard' concept nas snowr. that a predominately
stop-fr!e b1kewIY ,orrtdor on I less traveled. local residential Itreet tan be In
CHR:58D:2 ll/ 24/82
-5-
,
•
,
i ,
t
1 • I •
,-I
~
n
Ittrlet1¥1 and effettf,e route for biCl'11sts~ ~sed on t~~ ev1dene~ collected.
the Bryant Stree:t dtfftOru,trlt1on rout, hIS proven to be I suctf'SS i Ind. therr ...
tor •• It should H Incorporated Into PIlo~lto's exIsting blk .... y system,
M Its ... tlng on OctOH' 23, the Pil. Alto Blcycl. M,horj C""",ltt .. (PABAC)
revl~d tn, demonstrltlon stuQy findings and formu'.ted tho follOWing
... C OIII1IOnd.t 10ft: ,
"In December 1981, PAB.C Identlfl.d I set ef e.,'u,tlon c,lterl. for the
bicycle boul.,.rd study. Of the crfterla wIllch ... re .t"dl.d, the c""""ltte.
fInd. III the effects of the Bry.nt Stre.t BlclCl. Boul.Vlrd f.voroblo ond
therefore recomme-nds its tOr'ltfn:.Jatton IS .. permdn!nt feature of ttlt P.10
Alto B1I: .... , Syst ... , FASAt further rec""",,,nds that the bite cres,lng ef
Kat.dere C~eek be !~ro~d.·
Should COURCn doslg •• te Bry.nt ... pe,,.,,.ent bIke bouleyard root,. stoff ""uld
propose the foll owfn9 cour .. of Ictlo.:
1. Since tilt! OIIt=_ of p.""".o.t stlte legh1otlo. r.gardl.g trofflc barrio"
Is still pendIng Ind tho statu. and dofl.ltlo" of on acceptabl. blrrler "1
net be ro.01.ed until January 1984, for thIs Interim period, tho barrlors
shou1d be N1nta1ned in 'th:eir present fann end conf1glJr'It1Dn~ SUff would
,.tyro to Council with the fl.01 de.lgn pl.no I.d cost .stl .. to for tho
porwonent barrier. It the •• rll •• t Ipproprllte tl ...
2. fol. ~,lto should .. t. IppTfcltlon to the ... t,-.polltln Trlnsportotlon COImIfs
slon 'or TDA Artlcl. 3 fund. to construct I now blcyclo bridge Itro .. MaU·
derc Cr •• t. The •• Istlng pedestrian bridge doe. net con font to state bike·
way de,lgn standards for brIdge. ,nth shared ped •• trlan/bUe u,.. The pre
H.'nary cost .,tINt. 'or a n.w ten-foot wid. brIdge Is $26,OOO-$3C,OOO.
Stiff "",uld n .. d to ~turn to Cou",ll with. specIfIc grlnt prop05l' prior
to suborlttlng In Ippl!cotlon to MTC.
VI. DEV!lD~ENT Of BICYCLE BOULEVARD METo/ORK
Program 34 of the Trlnsportatlon Element of the Co.~rehen'lye Pl •• r •• ds
-Develop Ind JI\P1ament I NetlllOrl of Throu.gh Bicycle Boulevards-.
The first test a! the concept. IS proposed 1" Program 3~. has been cond~ct~~
~t~ success on Bryant. Tnts street .. s ,elected IS the .cst suitable
demon,trltlon route .fter lengt"1 r •• lew Ind consultatIon wIth the PI'O Alto
81cyc1. AdvisOry CommItte •• A long t ..... plan for •• et .. rl: of pot.nUI bike
bou'e~lrd rautes •• S hot developed.
To d ... lop SUC" • plan, staff w111 n •• d to work .nth PAIAC to use .. the need
for oddltlon.l bike boulevlrd rout.,. te doy.lop • prIorIty lIstIng of the most
sultabl. bike 10cotlon5 and to ••• lult. the .~pr.prlat. trofflc .. nagement
~.sur~s to use .10n9 sv,h Toutes. While t~e usp of t~lfftt b4rrlers .as
I~,cessful along th~ BrYlnt Street torrfdor~ 5taff be'~e~es t~at the .pproprilte
CIIR:580:2 11124/t12
-6-
. __ ._-,-------"--"" ".---""-~'"-'''
L
-
,
L
~
i
I
j
j
I
!
o
BICYCLE BOULEV4RD bh1blt #3
DATA COLLECTION SUMMARY
I. BICYCLE COUNTS
Bfcycle counts were t~Ken at the fc'lo~ifi9 intersection. Before counts were
tlken 1n May 1981 Ind ",,-11 1982; .ft .. count, were tlken ; n October 1982. ~11
counts ~re condutted during a 12.hour per10d 7 I.m. - 7 p.m. en ~1d-w!~K days.
t.ltept IS noted' otherwise.
Location
8ry.nt/Churchlll
on Br)'lnt
on tn"reM I I
Bryant It Lowell borrl.r
Bry.nt/CalHornl.
on B"Y.nt
ctr, Cllffornh
Bryant at MaUdero Cr •• , Bridge
california Aye"ue underpass
Alma/Meadow l
on ,1,1 ...
on Meadow
Mlddl.fleld/Neldow 1
on M; ddleflel d
on Meldow
1 Comparative 8 hour cooot,
240
460
290
931
360
1274
144
751
457
449
413
589
721 (58 moped,; 4 motorcycl.,
561
978
546 (21 moped,. 0 motorcycl.s)
1517
94
856
210
362
II. TRAFFIC CQU~S SUMMARY
Totl' YD1ume tr.fflc eOLJ"Its W~ tate!"! on th~ (o"ow1n; locltJons O~ or lijjlcent
to the blcycl~ boulevlrd. All coonts .rt 24-hour tot.l volume counts_ Befor.
counts wert tlktn 10 Octo~r 1982.
Counter Laclt Ion ~ After ,
L ... ll % Bryant 446 383
L_l1 W /0 .rYlnt 242 314
Tennysor, ./0 !ry.nt 595 820
TonnY5Dn w/o Bryant 478 843
Ir11nt s/o Tennyson 953 451
We,erley ./. L ... ll 1100 1606
EJoerson 5/0 Lowell 564 473
Bryant s/o Ore~on 974 1153
Bryant sf 0 Col.r.d. «0 U2
Coloredo I/O BrYI.t 953 Ill!
Col.rldo w/o Bryant 977 1076
Bry.nt s/o Loma ~rde 481 170
Composlno t/o Bry.nt 5C 107
Campt,10D w/o Bryant 33 149
South Court s,fo Comp .. lno 307 304
Ramonl sf. Comp •• lno 438 550
El ~ran. e/o Bryant 752 574
El ~r.no w/o BrYlnt 765 572
III. COMPARISOft OF VEHICULAR/BICYCLE COU~S
12 hoo, tot.,. Mornln; POI' [Yen' noS! Pelk
(7 •• ".-7 p ••• ) {1 ..... -9 •••• } {4 p.II.-6 p.m.)
Vltlnltl on art"nt Vehicles !!m Yet'i1 (.1 es 81, •• Vohicl.s Bnt,
l.well-Sea" 390 627 52 248 82 154
Col 1 fDrnl.-Color.do 136 551 16~ 208 223 III
Colorado-Matode,. Cr •• k 349 546 47 141 80 121
L .... Vorde-El V.r.no 143 546' 2S 141 36 127
'Uslni IIIUdero Creek bit. CO'Jots sinee no b1t~ eounts toten It !1 Voran.
bar-rier •
. ~~~'1~~;;: .
" :;~:s'<, "-<. -
o . "'.
b~end of ~1kt and mQtor v~~fcle traffic on each fut~re bicycle bo~lev4rd route
must bl! evah1ated fndepefldently. The traffic. management technfqlJ2S utfllzed on
future routes (~uch IS t~~way st~ps. trafflC circles, divert~r5. or barriers,
etc., shou1d be tlilored to the 1nd1y1dual characteristics of eac~ corridor.
]f d1rected by Council to develop t~,e overall plan .. staff would pro~ose to do so
an I time permitting basis. in Ule c.ented of the currer.tTy establ1sheG
priorfties and co~1tments within the Transport4ti~~ Ser~1ces Program of the
Transport!lticn Dhfsion. Under these ccndHi:>t'ls. Itfth staff lI«lT"iing closely
with PABAC. it 15 anticip,ted that it would take at least six months to de~erop
the pl.n. If Cou:nc.11 assigns the study of Ii bicycie bouTeva,d network a higne-r
priority~ other c~rrently program~d and prioritized projects under tn~
Trens~rtatfon Services prDgram, SYch IS Project f1obl1 ity. the bH:t locke,..
insta111t1on project in business dIstricts, and the 51~ Bus Plan imp~e~ntaticn~
would have to be deferred until work on the Bicycie Boule~ard project is
comploted.
VII. ENVIRONMENTAL I~PACT
The Enviran~ntl1 Assessment of tht Bryant Street B;cyc1e Bou'e~ard which was
provided to Council in December, 1981 (CMR:S5S:1) roc""""ended a neg.tive
declaration. No furth~r environmentai assessment is req~ired.
ReCOI'IIIendat1ons
Staff recommends that Council:
1. Dts1gnate !~yant Street between Churchill Avenue ~nd Meadow Drive ~s a
penmanent bike boulevard within the framewo~k of Pa10 Alto's adopted
bU.tways master p1an.
2. Auttlor"'fze cOl"ltinu:!d u:se of the temporary barr-jers. at LOWlJ'll and' E1
Verano unt1l such time as staff 15 abie to return to Counc.il ~tl'i permanent
deSign detl11s for permanent barriers.
3. D~rect staff to WJOr"'k w1th PABAC to develop .an overall plan for a networK of
bicycle bouley!rds in PaiD Alto within the framework of current1y
estab11shed project prf~rltie:; witnin the Transportation Servic.es ?rogralTJ of
the Transportation Cfvislon~
Resp .. ctful 1y 5uilm1tted,
ft/v~
GAYLE L1XENS
S:Pl~~
J FLEM~
sfstant Cfty ~ger'"
PASAC
Residents attending March 2. 1982 meeting
CMR:530:Z
~·lJr'/~
TED T. ~DGUCHl, 1". E.
Director Df Transportation
11(24/8<
•
-... --./ ...... c-. ____ o •• _ ._---
jf~~7·' .
,
I . .
' ......
. ,.
:,·:·····;··:-········r·· . . _.. . -
.. ,--''i-#-/ --:: . ...,.' .. e 7$1$%\ Qg~~." __ ., .. ~ ___ ,_.~-., ,
.~.'~ ·,~tv}·· ,..-:~
,..: '"1 ~lJ t· " II, IJ i -
: tl. ,r
~~' I ,VI t "",! li-~ iFjF! I-
!~ L.pl \ I· ~.-
"
I ..
::::-.. j,. i f-L • . I . '1 ~. "s!
~---:-
'bl~ \ ' I -'~LJ ::-"". ... ' . I ',; := ! = d$ Ii! ~ p
IU.
,
1\
r..", --=-?::
tr'l" ---.. i . 1 I V
''\", 1'1 ; '. ~ :<~;r
i <4". '. ~~ '. ' l~,~
~' 1= , . .~ ~, ~ :,..Iid~ .,~
-W
! ~r:"i3 , ~.7.:;: . ['1
, ',I ,
I ,f-1-:!I :-,.-~ I
i ICt~
~ II i_l"'r
• I }~ :-ii ,
" l! I ~ .~ ... : .! ~.~
~ I ~ 1-::" ~ rill I , ;'ij,
~ ?_', ~ -,.-, .n,
\ -
I e
.--...
, . '
~.I
I
j
1-, .. •
I • • ...
'.
----r-.... _ ..
···.L ,-,
-
"'
-'.
o
BIKE BOULEIARD CORRESPONDENCE REECEIYED 8Y T.AN5~0'TATION DIVISION
MAY-OCTOBER 1982
.!1!!!. Add...,.. eonmont
513 300 block ~ale Up •• t with goner.l behavior of bicyclfsts'in P.lo
Alto, objtcts to lowe'l barrier
5/17 2600 Bryant Requests speed limit signs [work order issued)
5/18 1700 block Bryant Drhlns scllools using Bryant for driver tr.inlng
5/19 2800 block Bryant Students riding four abreast to school en Bryant
5/20 P,l. Alto ~precfates b1ke bouiev!rd
51Z0 3100 block Bryant Bicyclists should confirm to Vehicle Code laws. Bik.
bQule~lrd monies should have bP.en ,h!r.neled to bike
educatfon progr~~5
5/27 SUnnyv.l.
S/28 lZOO block Bryant SHe distanc. probl .... t Compesfno/Bryant. [Word
order fss.ued to correct prahl em.)
5/29 Z700 block Bry.nt Observed more ~p.dS
6/15 Unknown Hotor1st5/pedestri~ns Ire not aware of stop sign
chlnges
7/7 3200 bloclt Ra"ona Obse"ed traffic fncrea5. of sen; in block. Does not
support bike boul.vard
7/19 3~OO block
South Court
Supports b1~e boule~!rd • yses Bryant far tr1p~ to
CO'll'!1town and Stanford -feels safer
8/14 2400 bloc. Ramona Apprecl,tes bike boulevard .n~ US05 Bryant for bi'.
travel wit hi n palo Alto
8/31 Stanford
9ne 300 bl.ck
ClIurchill
lO/4 300 block
Tennyson
Co~tes on b1ke boulevard to St~nfordd
BiclCifst5 are not using bike lanes on Cnurchil1
Bike bouleyard fncDnven1ent {or area reSidents.
81 eye' hts often use other streets (Emerson &
Waverley)
10/14 2900 block Bryant Not obs.rved In,r •••• in sp •• din~. As. bicyclist rnls b1 k.e trlvel eashr. safer on Bryant
10/28 600 block San
Antoni ° Return Co 1 ot'aI do! El Dorado f nters.ect ; on t c 4 -way stop j
concerned about _oped traffiC. safety 01 pedestrian
bridge at Matadere Cre.k