Loading...
HomeMy WebLinkAbout0349.092-- .' July 23, 1992 HoNORABLE CITY COUNCIL Palo Alto, California 14 SqpPLEKeNT)'L IlIFOR,MATION REGARDING BRYANT STREET BICYCLE BOULEVARD EXTENSION PROJECT Members of the Council: REPORT IN BRIEF This report supplements CMR:J2J:92, dated July 2, 1992, and focuses specifically on the issue of the street closure and stop signs at Addison and ~ingsley Avenues. On July 6, 1992. the Council considered CKR:323:92 recommending the award of a contract for the implementation of the Bryant street Bicycle. .Boulevard Extension project, and approval of related. chanqes to stop signs, parking restrictions, and bicycle routes. The Council decided to continue further discussion and action on these items until July 27, 1992, so that Council could furt.her review and discuss the issue of the proposed str-e,~t closure and stop siqn changes at Addison and Kingsley, which had been previously approved in an earlier city Council action last December. staf.! supports the Approved Plan (approv~d by the City Council on December 2, 1992) for implementing the bicycle boulevard extension~ includinq installation of a temporary street closure and removal of stop siqns at Addison and Xingsley, for a six-month trial period; and recommends that Council take the appropriate actions to awara the. construction contract and approve related chanqes to stop signs, parking restrictions, and bicycle routes, as presented in CHR:J:23 :93. BACKGROUND On December 2, 1991, the City Council approved a plan for the extension of the Bryant Street Bicycle Boulevard and directed staff to proceed with the necessary steps for implementation. The Approved Pla~, illustrated in Exhibit 1, includes a provision for the installation of a temporary street closure on Bryant street, on a six-month test basis. staff is to evaluate the effects of the CHR:349:92 • : EXH18I1 1 I I' • i I i • • I S I ! • j ! : i ~ i ! i :; • i ! .i • • ! ; i , l' I ~ ! ! • ~ i i l - o street closure and return the matter to council for further action reqard1ng the dispo$ition (remov~l or permanent i~s~allation) of the street closure~ The Council'. decision ~as the cul:ination of an extensive process over an 19-month period, which included ~etailed study and evaluation, and extensive public input and discussion. The primary information sources for this project include: {a} th~ Bryant street Bicycle Boulevard Extension Report, dated September 1991; (b) CMR:42S:91~ dated September 26, 1931; and (c, CKR:49S:91, dated November 14, 1991. The Folicy and Services committee discussed the project on October 8, 1991, and ths full COlll'lcil c:1iscussed a.nd approved the project on December-2, 1991. Copies ot the Study Report, CMRs, and minutes of th~ Policy ~ Services committee and city Council meetings are available in tbe Transportation Oivigion l sixth floor, city Hall, 250 Hamilton Avenue. Last De.cember, whe.n t..l1is -matter was cOl'l'sidered, Council had before it three alternatives, identified as follows: • Plan R = Recommended Plan (recommended by staff at that time) • Plan S = Substitute Plan • Plan C = Combined Plan (approved by Co~~cil in December 1991) Plan C is the alte.rnative approved by COI.meil and, since that time, has been referred to as the ·Approved Plan" r It includes a t~porary street closure on Bryant street and removal o~ stop signs on Bryant at Xinqsley ana Addison. Plan R is the same as Plan c, except that it does not include a street closure on Bryant. Plan S is the sue as Plan C, except that it does not include the channelized turn restrictions at the Bryant/Embarcadero intersection. All three plans include the removal of stop signs on Bryant at Kingsley and Addi50n~ PURPOSE OF BICYCLE BOULEYhRQ The-purpose of the bicycl2 boulevard is to provide: (1) a throuqhway upon which bicycles have precedence over automobiles; (2) a direct route that reduces travel time fot:' bicyclist.s; (3) a safe travel route that minimizes conflicts with motor vehicle traffic; and (4) a facility that p4omotes and facilitates the use of bicycles as a.n alternative transportation mode, for all purposes of travel. TP.J..~flC DIVERSIOt{. EFFE::=t$ Q~ STREET c:LO~ Exhibits 2 and 3 illUstrate the exp~cted daily traffic vol~mes ~ith (Plan C) and without (Plan R) a street closure at Location A. These traffic volume numbers indicate the follo.ing~ CMR:349:92 7/23/92 Page 2 I } ... '1 ,. n P' E+M 4US mil P ... M E ',.R .... OS", 1-~(8;.t. 'L'" I ~+M+R r 'l k+rl .. Mo' il ~ -~4lli tli~.;; I) mf5t~ iE ~ E~,\rd ... E+M+R ... E+MH:A 1090 ] F.+M 'OJ E+M lOU E+M+R ". a:; .. ",,+M. 5),1.1 e"M+CA .. , E+~oh(:A HIkt ,~ J J.: L b j~--R r: • .., JDIJ •• M 8ro 1i E+M+R U'l, E+M+R 1J7Q n:~+~~ If)i\ t_ ... E+M+CA .':"!~ __ ; W'V'~lET sr. it' • '] II ~ l;j I-itl,~ u l L:f;~%~d~ "'_ L. r~ M 2~q'l l!+M IUO e+M I:m I, - E+M+R m~ ~+M+R 1~!~. E+M+R mo . ~I'\.."..... \-I'"""""'~ 1 E+M+CA~ E~M+CA 18' ,,~~~~CA l~ -~ '''1 ' I I.J r I T-r-irr" , _ titrANT Ifl I" ~IZ_ t' rw f 1 J K1! T !7 Jo'" I ~,~~~~ ".i; l-I IE] ItS 'I ~ / ,,": 1 ,-J. 11 '" I I fr~l _ ~~~'R :: : .. E.M 1110 "'" l'_~-M+R -_.V Il "-..', ---~ w ~ ~l U;: ct, --E+t .. hCA SN) "" ~ ill[ .~9~-.. !' •• E+M DRS _ f+M ~111 ir I; l:+M IDl K ~ , j5Jlllj :::.:~:; L ;:;::.;: l.;:~:; ~ D /I ,!.;?-r I oli~ 811 1"IILllj"E ~~,J liiT-r ,~L1JIJ }~L "I I~o -LLTIT-,---,J IT I I [J OIl I Sf ALMA hi Numtters ftl>rueftl """'. ~". d.lly '.falr", vulumri (AOT.'), I.. . .. I'IIHllllletJ ADT J, P. .. E.rlr;linl (yellt 19911). .. M -.~.OOO., MedlCIII F"'1I>dt!llc,,, {PAMF} £""'-"P"nll"''' rru~ct ~-tM I Ill! l...r..r R .. R"l."(Imm"'\d~ PI.'n (tam .... P, P'''(entd PIAn, III 9,.,1 Hill .. ",.., LIIE.MtR IUD rl...l Rercn.FigO.l) . .! IS ," Ii t II§e 3 SA. -Subll'Ulle PIli .. WI'h dOlln., In Ul('II!lnn A. (llI'rw ArJd,I(,n IIltd a..nninJ) ;). E+M+CA. IIIiO hit (qonIC .... Sln"fJlH11";.IfM:lR,,pnr1,FIIJ'(.l) . ." ~1'11"9 IIS91 1'0 CA-C..omhilwdt'llIn..-ilhrkl'lurelnlr0('8uc.nA TJ so -S>.alw.'"\I!e ,btl with t:kw",", In u.:..tkm D t""rw AoidIMlI1 ,"nd UftQ.l1n). (J) • Contbined PI_n ... ilh tlDlu,,, in I~."I)I'I D. wmpJ,<' On WIlYe,ler ~""'''n Cllannlnlllnd J\\ldl • .,n, nil"nll. ADT i. 3710. If the rA,Mf "~nlin" ,..."" h'li!!, AOT wlluld in(fr:u .. 10 42Jfl If bol'h I~ r",MF tl<v .. nlIDr. "M! in!. bl~"k-l:tOlI1\~_"'lO tl<t .. n~ion SUu..'\1\lle rh ... wil" (I,,.,,, .. \II ,"",Alioll A WI"" hulll, iU'tT would "'ernlt I,., ~AA$. Hi! III 1 r .' EXPECTED DAILY TRAFFIC VOLUMES ~" ...... ___ , __ .. _~ ___ , __ .. ", ...... ~~,~~. __ •. ~ .• ,"_" _ ._._ .. _.-, ____ .. m_ •. ~' _____ -..-__ ~ _. __ ~_-_.-____ ~ .~ L i;', ,:;!~i;fli"rl'~(;C ',\:,', \ " .... ~>:;\,i,;>" '. " "". '<" '"' .' ::'!~:,if'U:·~~,~·,:·-\l1¥;,;(, -·.,::';t; --------~-------.. ---- .. \ I I ;;; " ~J • '. '" ' ,111 1 I :,7. ~"""''-' ,~ ~.-',"" ,_,,,~~,,.-. ,'~m··'\'~"-'" I . ,,1----·.·,.· .. ' ~---;~I_ -. r 1 E.M '''' ~ E+M.. 194. [ji ! E+M.-R ,,60 S I, Si'l 'i!~ I i p~~-~ , E+M+CA 1S7.'1 _ I } .At .... 1 .... '~'. FY'i 'Rl~-I Q '."'''"'' "" v~ r", lin foo _ F-+MH'A r.·. ,p ---'--' IEb E'" E·/I,t+R " .. "" E+Mi'CA 200 ~R:7 ::!- fJ 8~Y I ~ .. ---, ....... , F-' TT-' rTT II CIIIlTllU". ~~ WAVERLEY 00 ~ .t.r ... to .. lo .. lIrOl ---l I n ~ ~:=~R ~~ R ~ . r;+~.h(A )4~ I-J g .. '. ~ "'trtljBJj~~ ~ ..... LLl ul 2 '1 .. kT B,3~~ T 1 SCHOt'll JI -.----P----I ~~ ~trt=d jl : I > I ~~ ~L::Jl-~u ~ '" u;= Numbell u~pnltnl "",'Ige da,ly IIlme ,"oiu""",, (AnTI). • • fllj'IIf1.I~d ADT E '" E.ultln, (Jur 1990). M • '$,000 If Medielj FOllndallon (P,4.Mf') i:.q.Il",inn Pr{lj(~L R -R~oornml"l(/ed PI.n (SlIm .. III P, Pldll'rred Plan, in Y!91 ui.~ llt'Jd Rftport, FIj; 9.4). SA • SLlbt.lllut~ PI." w(,11 ci..."ure In Ltx..Illun A (bt:rrw Mdillnn lind Chlnnllll!) (Nlm. .. S Ih 9191 Olh DI\-d Rfport, Fill 9,.). CA .. CQlJlbined f'a.n wilh (IOIUII' In Loclliion A SD _ SuMlllute Pilln "Vilh clo.ure ,n l,ll(IlUuo II (brrw AoJd'lllo IIr1U l.mrolroJ CD .. CumbhlOlo Pllh will'l ,loIule in U:x:llhon D. Wrn$: On Wllv".I"'J be""",,,n K",Uog aM Cl'IlI.ch,ll, ,.,,\in8 ADT .. 2600_ If Ihe PAMF .~.n.iur, we." bu.ll, AOT ~uld Incn:'1e lu 172.'i. If 1)011'1 th .. ____________________________ ..... __________ 11 PAM~ clpanalon Ind lhe hl")'tle t.uul""lld UIClillofl Comhlned Pilln with CIotUIC In III<'alion, A. ur D _u' hu'II, ADT wouk' 'nnto .. ~ 10 7:Qy~ EXHIBIT ] EXPECTED DAILY TRAFFIC v.uLUMES o , '8111 L"r~" " " ~d~ • • ,':.' '-., ' !.' :'_:_~:, t:; :1-,.( ~,'. " - • • ?lan R results in less trafti= diversion from Bryant to adja~ent stre~ts than Plan C. The primart traffic impar:ts of trdffic diver-sion froOm Plan C are concentrated in the blocks of Channing and Ackiison betllef.;l Waverley and Ram.ona, and the blocks of :Ramona and Waverley between Channing and Addison. As documented in the Environmental Assessment {90-EIA-28, page 12; attachea to CMR:4SS:91), only in the block of Ramona between Channing and Addison is this change in volume expected to Dc clearly noticeable to residents4 • Both Pla.ns C and R r-ed:uce traffic volumes on Brya:""t., 'Which is a primary objective of the bicycle boulev .:-d extension. EfFEct Of STOP SIGN CHANGES ON TRAFFIC VOLu~ES The changes in daily traffic volumes On eryant and adjacent streets under Plan C (Approved Plan) and Plan R are illustrated in Exhibits 2 and 3. These are based on the stop sign configurations Which result in no atop signs on Bryant between Cilanning and ~rcadQro. While the addition of one or more stop signs alonq Bryant would ~ expected t~ result in a limited amount of additional traffic diVersion from Bryant, de .... eloping a reasonably sound quantitative understanding of the amount of such increMental traffic diversion is problematic, particularly when otber significant changes are alBo involved. As il general indicator of the impact of step sign changes for either pl~n, the installation of a stop sign on Bryant at Lincoln {creating a four-way)., for example, would be expected to result in a 2-3 percent reduction of traffic on Bryant, north of Emharcader0 4 If the diversion was all to Waverley, the increase on Wa.verley would. amount to 1 percent co:rnpared to the nUl!1bers indicated in Exhibits 2 and 34 EFFECT Of STOP SIGN CHbNGES ON SPEEDS Apart from the traffic diversion erfects of changes i~ stop signs, concern has been raised reqarding excessive vehicular travel speeds alonq Br)~nt, ~nd possible conflicts between pedestrians crossing Bryant (particularly school children), and bicycles and automobiles traveling alonq Bryant. This concern i~ based upon the perception that travel speeds will increase along Briant street, due to the increased unimpeded travel distance created by removal of the stop signs, thereby creating an unsafe sit~ation. CMR:349:92 L 7/23/92 Paqe 3 f ,~ i '.>i: LJl.~ .. :~t~~~>r· -... :"~;~:~:~).{.--" -, : -::_~~:-·;k<~:~~~. zi ~ .. __ .~ .... __ ,_'C .. - - o The reversal of stop siqns from Btyant to Kingsley, and removal of stop siqn& on Bryan't at Addison, 'Would result in an unimpeded travel distance from Embarcadero to Channing ot 1700 feet. Measurements of travel speeds O~ segments of streets with travel related ~eatures and characteristi~6 similar to those that ~ou!d be expected on Bryant, if one or more stop signs were re~oved, are compared below to current speeds on Bryant Street: Speed (mphl Street Urimpcded Street Segment l<<mgth ~ §.llhl Waverley Street Embarcadero to Lincoln (1,100 ftl 28 32 Cowper Street Embarcadero to Kingsley {1,000 tt) 26 32 Newell street EaWarca,dero to Channing (1.950 ftl 29 32 Bryant Street Lo-.rell to california (2.,400 ftl 26 31 Bryant Street Lincoln to Addison (850 ftl 27 32 These data, as well as other speed ~elated studies, indicate that travel speed does not necessarily change due t.o the length of unimpeded travel distance, but rathe~ is related to a driver's perception of the features o~ the roadway and characteristics of the adjacent area. The information does not support the presumption that travel speed Yould significantly increase as a reEult of a longer unimpeded travel distance. Furthermore, the 8-xis.tir.q drainage. dip in the pavement across Bryant, near the Xingsley intersect.ion, effectively reduces the unimpeded travel distance to 1400 feet. The dip will be signed with warninq signs; and because the ohange in qrade is substantial, it will also serve effectively as a speed deterrent because drivers will be forced to reduce their speed. Since the removal of stop signs is important to help facilitate bicycle travel alonq the bicycle boulevard, but the concerns about their removal a~e also important, staff proposes to monitor actual conditions (speeds, volumes, conflicts, etc.) on Bryant at the locations where stop signs have been removed, and .,i11 specifically report back to th~ Council following an initial six-month period, or earlier., as conditions warrant. In that manner, problems, if they develop, are assured of .being ~ecognii:ed, identified and resolved. The proposed comprehensive =onitcrinq plan includes two distinct components: (1) an initial assessment of the immediate impacts of the project shortly after implementation, including t.efore and a~ter speed measurements and field observations of vehicle, pedestrian and bicycle activity each school day, tor a week after the street closure is installed; and (2) a comprehensive monitoring and evaluation of the siX-month trial street Closure, ~hich will include field observations, traffic counts, speed measurements, a CMR,349,n 7/23/92 Page 4 review of accident and complaint records, neighborhood survey. (Refer to Attachuent 1 for two monitoring progra~s.) EXISTING BICYCLE BOULEVARD -EVALUAT"1QN REPORT and a mail-o~t a sWIlZ'1ary of the The existinq section of the Bryant street Bicycle Boulevard (Churchill AVenue ~o Meadow Driv~) was first implemented in Hay 1982, as a six-month demonstration project. Attachment 2 of this staff report is a copy of CMR:5BO:2 dated December 9, 1982, which documents the evaluation of the bicycle boulevard, following the demonstration period. Subsequ~ntlYI Council designated Bryant street, between Churchill Avenue 5nd Meadow Drive, as a perman2nt bike boulEv~rd within the framework of PalQ Alto's adopted Bikeways Kaster Plan. The evaluation report concluded that: • the bicycle boulevard developed a substantial level of bike. ridership; • probleuts antiCipated prier to the demonstration failed to materialize; and • a predominately stop-free bikeway, local residential street, can ba effective route for ~icyclists. CONC!.US IONS on a less traveled an attractiVe and Staff supports the Approved Plan (a pproved by city Counc i 1 on December 2, 1992) for the implementation 'of the bicycle boulevard exte.nsion, inclusive of the installation of a temporary street closure and removal of stop signs at Addison and Kingsley, for a six-month trial period,.. and recomme.nds that counci.l take the appropriate actions to award the construction contract and approve related changes to stop e:iqns, parking restrictions and bicycle. routes, as presented in CMR:J2J:9J, dated July 2, 1392. CKR:349:92 L 7/23/92 Page 5 ":<~*~~. ~~:~ itiM~:; .~:;:.\..;:" ~~ - • I , , • t j o Respectr~lly submitted, MARVIN L. OVEl\WAY Chief Transportation Official Manaqer KENNETH R. SCHREIBER Director of Planning ana community Envi~onment Attachments: 1. outline of the street closure monitoring program 2. CMR:580:2, Evaluation of existing Bicycle Boulevard segment co: Palo Alto Planninq Commission Architectural Review Board Historical Kesources Board Palo Alto Bicycle Advisory committee Palo Alto Chamber of Commerce City of Menlo Park Stanford University CHR: 349: 92 7/23/92 page 6 r i.,;.; - L • • • IT. • • • o ATTACHMENT 1 BICYCLE BOULEVARD STREET CLOSURE MOl'-'1TORlNG PROGRAM MONITORING AND EVALUATION OF [MMEDIATE IMPACTS Take "before" and "immediately after" ~ measurements between 7 AM and 9 AM on Bryant between Addison and Lincoln and betv.;eer; Lincoln and King sley_ Each school day during the flI.n week after the closure is installed, observe vehicle a.,.'1d bicycle activity at Bryc::.n.tlAddison intersection between 7:4.5 AM and 8:30 AM:. Conclude if there ate a..'1Y safety probiems that need immediate attention. MONITORING AND EVALUATION OF SIX-MONTH IMPACTS Take 2-day "before" and "after" traffic count! at 15 locations in the area bounded by and including Channing and Kingsley and Emerson and Waverley. Take "before" and "after" speed measurements between 7 AM and 9 AM on Bryant between Addisoo ::.iid Lincoln and between Lincoln and Kingsley. Compare frequency and types of bicycle, pedestrian, and motor vehicle accidents in the area bounded by Charming and Kingsley and Emerson and Waverley before and aft...~ installation of the st:reet closure. • Determine impact of the street closure on governmental services, Urgent Care Center, and Nursing Home. • Observe and record motor vehicle and bicycle activity L."l the block of the barrier a:,d at the Bryant! Add:'SOn intersection d1lnng one school day. lncidents to be recorded would include vehicle U-turns, right-of-way conflicts, pedestrian activities, unsaf~ maneu.vers, and others. • Analyze complaints registererl in the Transportation Diyjsion. • Ask ior PABAC evaluation. • C.ondllct mail-out neighborhood survey of residents of the Professorville area regarding operation of t.1e street closure after ail above data has been gathered and reported to residents. • Conclude ifany changes sholJId be made in the street closure location or in any other aspects of traffic control in the area affected by traffic diversion from t1"1e closme. Note: The above data may be gathered 'before sh: month. .. , but 010 c~rlier th.a::! 411.1 months after closure installuion. Ow will also be pthered bef'We;en 4=1.1 and sil moDI'!l:s at other toca.tioru. ouulde the Proff:S&01"Ville area, i.e order 10 determi.ce impacts due CD the hicycle ooulev.rd eueosioa in those anws. O'e " ",,;-.,..;.", . ~~fEX - £~~I\~: ! ;o~~_~ .. -~"- - o.cemi>er 9. 1982 KONQRABl~ CITY COUNCil Palo Alt~t Ca'tfo~nil t llicy,'! BO!.J1@~.rd Demonstrilltfon Study ... E~eluatfon _ers of th. C""ne1l: On Oecembe~ 14, ]981, Council apprQved I dern~nstrlt1on study of the ·Bi~c7r Bouleva~d· on Br~ant Street from cnu~ch!11 Avenue to East Mtad~w D~i¥e. Counc.il sU'bseq~ent'y approved t:le specHic tmplementat10n plans on Marc~ 15. 1982. The demonstrltfon per10d began 1n May end tertn1nated October 31. 1982. Thh repbM provides an .nalys1s end' eVllu!tfon of ttle demol"lstrat1on period'~ Staff rec.omme~ds that the BrYMt Street Bicycle Boulevard be made I permanent part of the Pllo Alto BHew.y Sy.tem. b"t that no phy.ieal irnpro,."",U (i.e •• pe~nent barriers) be ~de .10ng the route ~ntil the new State legfslation ~egard;ng barriers 1$ ~nacted. [. RE~IEW OF THE IM.L[M~Nr~rION ~LANS The 1mp1tmentation plan approved by Counc" establfsM!d tne b1cycle bouleward demonstratton along Bryant Street from Churchill Ave-nue to Eut /tI\eado,,' Drive. The' torridor. prior to Hay 1981~ contained stops alon!il Bryant at seven fntt!rmedfary 1ntersec.tfons. tr,ree Df ~hlch were four-MlY stops. Upon f~lementatfo" of the bike bC'1I1evard in Hay • .stop sfgns were either removed or reversed at most of the intersectfons .long tne d~onstrltiGn r~tet lea~fn9 only fDiJ~ stops i!llong the enUre two ",,11e route. rn ad'dH fo;.. two barriers were installed along Bryant 1" order to dissuade f ncr-eased through traffic .rd cteate I sifer environment for bfcytTing. T(I sllTIfililrize. the fol1o""n~ fs a list of thi! stop sfgn and barrfer fnstalTat;ons Ilong the demonstration rQ"te (refer to Exhibit II, Citywfde stop .i90 map); Oomonstratlon Study Inter~eeti on Statu. Prior to Hal 1952 Implementatlon Plan Chureh111/SrYint Stop. on Bryant on 1.1' Fou ~ -way stop L .... ll/Bry.nt StDl" on Bryant on1y Barrier on Bryant. stop "gns on lowi!11 Co 11 foroi alB ry. nt Stops on SrYiI nt only Four.way s.top L~ Ve r de /Bry a nt Four-way stop fou~-~!y stop (ne change) £1 Verlno/Bryant Four-way stop Barrier on Briant Stop signs on El Ver-It')o tlst Meadow Stops on Brya nt only 4-way stop (no chan9~} ~;S80;2 L - .-,-:-',: .::1~~~it Additl"".l .leoents Of the demonstr.tion route Included dlre,tion,l lfgnlng to BrYlnt Street 110ng Dther b1ke rCXJtes end II new fIlrked bnf rc-ute south of Eut No.dow to Sa. ~tonlo 110ng r.sldentlal It,,otS. ll. CATA COL'ECTION METHODOLOGY . 1ft the December 10. 19S1 roport to Cou.dl ceo, . .,.lng the Blcycl. ~ulov .. d ·St"~y •• aluotfcn criteria (CMR:55S:11. sUff Indfcated thn evol".~lo. data ,""uld be coll.cted In two primary are .. (I) blcyclo counts on Brl',nt and (~) fthfclJlIr counts on Bryant Ind se'!'chd para"tl and cross streets. Stiff hiS .Tso <omplled a r.,f •• of the .ccldent history Ilo.g Bryo.t Str.ot. CoMP6r.t~vt bfeyele cou~ts were taken It three 10cat1~s on Bryant and It t~r!'e other location' prior to .nd during the bl,e ooul.,.rd ltudy. Count ... t. ta'.n during. t .. l •• hour period (7:00 •••• -7:00 p.~.) an mid wee, ~.ys. Bas. counu ... r. t,~.n 1ft May 1981 Ind Ajlrl1 1982; count. at the.e lotltlon. we,. tl'" 19a1n In Ottober 1982. T ... nt1-f ... r yehlc,"r tr.fflc count •... r. to'.n It .Ignt ... Tocatlons .Tong the bUt bou1evar'd corrfdor. These counts fneluded' 10Clt1ons illong Bryant I.S well I. -parallel and cross str"~ets where eh6ngu if! trlffic patt&rn.s were .nHclp.t~d. Base count< ... r~ tI'en In Hat 19S1 and 19S2; counts wor. t.ten again ;n October 1982. The results of t"ese be:forf Ind after veMcuhr Ind bfcyr:1e t!"'.fft, counts Ire sho"" In bhfblt 12. project locn!o .... p •• nd In ExhIbit 3, d.te collection s ...... ..,. II I. fiNDINGS I. Blc cl. traffic on Br ant h •• Incr •••• d drom.tlcall d,rln the emonstret, on ~,. o. esu ts 0 t.he e ore. ter t counts s ow that the rate of lnc.re.se 1n b~ teo tJ"lfffc on BrYI!'It &xc.eeds t~et stlown Of! Dt~er ltr.ets; converseT1. bike traffl. decl1n.d .Tong lIiddlefl.ld Ind ", ... Strnts (os ..... ured .t Meadow Orl •• ). during he ..... porod. Bryant/Churchl n on Bryant on Churchill Bryant/ClTlfornl. on 8..,lnt an ChurchliT ~lddTefl.Td/Meldow an iii ddl.flo1d on No.dow ATma/lle.dow on AI ... Dn. Meldow CIIR:580:2 12 Hour Bicycle Counts (1 ,,~ - 1 !'II Before Aftt!:i" 240 473 460 SS9 290 536 931 1009 457 210 •• 9 362 144 94 757 856 11/24/82 -2- - The highest b1ke ~9untS .1ong Bryar.t were retarded at t~e Lo~~'l Street bI~rfer (7ZS b1(es/dIY)~ The heay1rst usage of B~yant ccc~rs dur'~9 the lIIorning cOCI'IIlWJte h~rs of 1:00 1!.lfl a .9:00 I.m. The predomfMnt flow 1, n'rt~ound in the morning. Students c.ommuting to Palo Alto Hi gI'"l a,cou"t fo!' • sJgnificant portIon of the total. I" the eve!'lir!9 ttle predorr.inant flc'.( is 'Southbound, .1though the count!; do 'lot exh!bH the same tommute ·paak ... s;:.ce sthoQl and work commute ~ours 1.11 within differtnt time per'o~s. While th11 study did ~ot !ncompass I survey of the cyc1jsts usfng the r~ute. it appears. n~yertheiess~ that riders have grav1tated to Bryant from other I~j~cent neighborhood ~treets including Waverley Ind Emerson. and from the .are eor.gested Irter'ais (~iddlef1eld, Alm3)~ Although b1te r1d~rsh1p ~as th~s fncreas~d m4rledly along t~e route, some .eaving through ne1ghborhoods and ~se of fdjacent streets st;ll occurs. The personnel hired to conduct the Octob~r b1~e counts ~pec1fic~'ly noted that .. ny cyclists heading toward Pilo Alto High turned off of Bryant If tor t~e Lowell bJrrfer. and int!rsetted Churcnill at Emerson rat~er than at Brya~t. 2. The Bryant Street SHe Soule .... ard now carries 'Volumes of bicycles: com arable ro-olner we, esta I S e 1 e r"O\.ltes ~t n a 0 to 5 ~ ... ay system. The hst city-wfde tifcyc.le counts ~re taken: fn the Spr~ n; of 1978. At t~at time a nl.STlber of streets car"rfed "SOO/c.yc:l1.sts a d!y. Bryent Street, Whitt'! now carries 475-1'25 bites a day I d'jlI::H!~dip\g upon U'I! loclt 1 on, 15 cl l!'Hly ~n I par with other majDr b1 ke routes. Count lcclt i on l~ Hour BHe Counts 198~ Bryant Stre.t CIt 4lotit!o.s) 475-725 1978 Arastradero at CiJu10mbe SSO ~ark Boulevard It Fernl~do 587 North tal iternia It Newell 793 M;dd1ef;~ld .t Embarcadero 49; Wil1ow/S.n Mateo Orl.o Br;dge sa) 3. Traff1~ yoiwmes w1t~in the overa11 bite boulevard corrfdor-~av! remained fairly constant. Al I of thf streets counted !~cept Bryant (so~th ~ Oregon); Chlorldo. and Waverley carry traff1c vo1umes of cons1d~r.bly iess thin 1,000 v;ehi~les/day. These-lilT'i1ts are we1' witntn the accephb1e range for Tocal residenthl 5treiC!ts. Traffic on Bryant fn thf vicinity Df each of the barr-fers has declined by Ippr •• lrnotely fifty perc~nt (from 953 to 45) .. Mcles/dlY n." La .. 11 barriers, from 481 to 170 veh1cle5/day near the E1 Verano barrier). The 1nstallltfon of the two barriers on Bryant "itS, however. forced motor; sts continuing to use Bryant Street to detour from Brya~t between Tlnny5~n and Lowell and bet~en CI""ls1no and E1 Verano. At each of th.es~ t-o 'acations Dnly one of the cross streets exhibited a Marled increase in traffiC. CMR:saO:2 --..,.,..,"Y'c .... ·.· -._ .. ---- 1I/24/~2 -3- ".-- - 4. T~n~$on{Lowtil Diversion: Trlfffc: on Bry.nt louth of Ttnnyson declined by 5'0 nhiel.s per d.y (953/.57). R .... inlng trlffle forced to doto"r .t the new eul-6.-<lc ha. b.on dl <ttl buted hi rly oq"lly to the two aC1j acent blocks of T.nnylon, each o~ ~f,~ nDw Clrries .800 Y!h1"ts/~IY_ I vo1ume sHH lltu than Br,)"f)t tarried befort the detilOr'lstration projec.t. The two corresponding b10cks of lowell •• hlbltod only mlror fluctultion. in tr.ffic ,a11,11M!.. Trlft1 C 1101"""5 on Waverley .nd £merson 1l'1 the bloc\, par.' hl to the BrIant clDs~re h.~t r~1ned constant. ' .rYlnt/camp.slno Di.'slon: Tr,fflc on Bryant south of lorna Verde declined by 3O~ •• hlcl .. d.y (4711170). '"rOO$od traffic hIS be~n dht.,I>Jted to th. tdJIC-el"lt b'o~l$ (Iof C.:npesfno end Ramon._ 'Each of ttl!'S! strtets has borne In Incrta" of .ppro.imately 100-•• h~tlo'/day. Tr,ffic on the two blott. Of El Vo.ano clos.,t to t~e barrl •• ~a. slgolflcantly declined. cTe.. c.u.e. for t~ •• ",Idont., we ... ,top at1ons. or ~runk driving. In 19S1 tllere were throe reporto~ Icc1d.nts. Two of th ••• lnyoh,d bicycles end aotorist •• in which the IIOtorlsts fined to yl,ld the rIght-of-way. To dlte 1. 1981 there ha,. be.n fou. reported Iccidents. t~ree of which otc~rrtd .rter t~t demonstrat1on ptr10d begin. T-o of these 1n~olye~ a bIcyclist .lono. (The fIrst ,ccident octu".ed It I mldblocl lot.tion on I.yant south of Seal.; the second octur .... It the !latadero C.eek Brldge. J In .ath e •• , the cyclist lo.t <ont.ol of hIs blk, whe', no othe •• ,hlcl •• wer. pre.ent. The thl.d accid,nt Involvod .... torlst aod cyclist. with the farmer f.,llng to yl.ld the ,19ot-or ... y. No accidents .. ro reported I. the .'cl,'ty of the t ... trlffle b •• rlers. lV. PUlL!C RESPOKS, At t~. begln"lng or the deoonstr.tlon study. starr .ent a lett,. to .'1 r .. ldent. within I on. ~lock .. diu. of the SIk, Boule •• , •• oot •. All were .ncoiJraged to. rehy thefr comments to the Trans.port.tfer. Div1s1or. during the ,ourse of the study. To dett $tlff hiS reee1vld comme~ts from e!ghteen lndl.' ..... h. A ....... rl of the c""","nt. received 1. shown on Exhibit #4. Prlo'r to t~, ImplementatIon of tho demo .. tratlon study. stoff held. publlc ~ttfn; .rtt~ fnterested ne~9~borhDDd resfd~ntl. ~D expressed tomments in fD~r generAl Ireas of tonc.ern: 1. Increlse~ s e.d1~ on Bryant Ind other n~1 h~or~ood stretts~ 1ne Po11ce pl~t~nt reports t~4t severa comp I nts ~re recelved It the b!9~~nln9 ~f the study. but 'ttry (h c.0IIP1."nt.s have come 1" dur1ng the past ftw montns~ I:MR :580:2 11/24/82 -4- .. - 2. ~usfve be~I~1Dr b bit clfst!. motortyc'fs~s &t stop s~;~s. barriers, etc. r ng t.e course 0 e stu 'Y. re:;: ClenU commented tFiat tFiere was an fncrease in ~oped trlfffc along the 8ike Boulevard route. Given th1s 1~put. t.e'~e hour counts ~re t6ke~ It Hatadero Creek Bridge end at the lowe' 1 Street blrrier. The resul,s 1nd1c~ted that .oped end motorcycle v101atfons Irll=' IIfrdal : 21 mopeds o motorcycles Lo ... ll S.rrfer 58 ",opeds 4: motor:..ycle1i The behavior of bicyc11sts at th~ californi./Bryant intersect1~n was studied by Dawn Wijeo~, a member of the Palo Alto Bicycle Advi50r1 Committee. O~ October 19, 1982. Of the 300-400 cyclfst. obs.rved durfng e.ch of the •• m. and p.i1I.. t~tt hOurs. most $carmed for cross traffic 15 they appro4ched the fntersectfon (177/ •• m:-;-:fB/p.m.); some .connod a •• j slowed down, and a fe. (~6J to"" to full stop. Or.ly •• ery few wro'9 ",y cyel ists (7) were ObSerYEd .. J~ Mfndered Access to residences. Staff h~s recefved o~ly one complaint of thl$ nature from the pu611c. Th~ problem Occurred fn the closed Lowe" to Ten"yson block of Bryant. where motorists were obser~ed tu~fng around fn t~e c~'-de-slc at t~e lowell barrier; 10tal driver tr.fning schools were also ~s1ng this b10ck IS I pract~ce I~ea for stude~t drivers. Stiff subsequently contacted the local driving sthools who agreed to use other rout... The Pol fee a,d Fir. D.p.~nts report that thefr .bflfty to respond to emergencies kas net been seriously i~lired by the barrfers durf ng the study perf~d. 4. Length of t~e study and 1evel of mon1torfng. Pubiic 1nput and comments to the Transpo~tat1on b1~'$'On Ind police vepartment toave been minimal during t~e demonstr.tion perfod; no requests for fn'rea~e~ mon1tor1ng h.ve been fortncataing. Y. CO~ClUS10HS During th~ cour~e of the six month demonstration. the Bryant Stre~t Site BouTewar-d has ~eweloped 11 substanthl level of bike ridership thl!t places it (m I l!'¥el with other older. well estab'1s~d routes w1tt1fn Pa10 Alto's network of bikeways. The rate 01' groliith in bike trlvel on Bryant exc.eeds the rl!te of growth or, other bike routes where 'IJ/Jnts were tal:.i!'r •• ConYer-sely. the prob1ems anticipated prior t~ the demonstration have actually failed to ~terfllfle. Accidents n,.e remained It a low level; traffic hiS not created I problem on adjacent streetsj and ne1g"~orn~o~ react10n to the fnc~n­ venieRce of the barriers, I~d b1cyclist I~d motor1st behavior. has b!en It I onnh,um. This tnt of t~ b1cyc:Te bouTe'/ard' concept nas snowr. that a predominately stop-fr!e b1kewIY ,orrtdor on I less traveled. local residential Itreet tan be In CHR:58D:2 ll/ 24/82 -5- , • , i , t 1 • I • ,-I ~ n Ittrlet1¥1 and effettf,e route for biCl'11sts~ ~sed on t~~ ev1dene~ collected. the Bryant Stree:t dtfftOru,trlt1on rout, hIS proven to be I suctf'SS i Ind. therr ... tor •• It should H Incorporated Into PIlo~lto's exIsting blk .... y system, M Its ... tlng on OctOH' 23, the Pil. Alto Blcycl. M,horj C""",ltt .. (PABAC) revl~d tn, demonstrltlon stuQy findings and formu'.ted tho follOWing ... C OIII1IOnd.t 10ft: , "In December 1981, PAB.C Identlfl.d I set ef e.,'u,tlon c,lterl. for the bicycle boul.,.rd study. Of the crfterla wIllch ... re .t"dl.d, the c""""ltte. fInd. III the effects of the Bry.nt Stre.t BlclCl. Boul.Vlrd f.voroblo ond therefore recomme-nds its tOr'ltfn:.Jatton IS .. permdn!nt feature of ttlt P.10 Alto B1I: .... , Syst ... , FASAt further rec""",,,nds that the bite cres,lng ef Kat.dere C~eek be !~ro~d.· Should COURCn doslg •• te Bry.nt ... pe,,.,,.ent bIke bouleyard root,. stoff ""uld propose the foll owfn9 cour .. of Ictlo.: 1. Since tilt! OIIt=_ of p.""".o.t stlte legh1otlo. r.gardl.g trofflc barrio" Is still pendIng Ind tho statu. and dofl.ltlo" of on acceptabl. blrrler "1 net be ro.01.ed until January 1984, for thIs Interim period, tho barrlors shou1d be N1nta1ned in 'th:eir present fann end conf1glJr'It1Dn~ SUff would ,.tyro to Council with the fl.01 de.lgn pl.no I.d cost .stl .. to for tho porwonent barrier. It the •• rll •• t Ipproprllte tl ... 2. fol. ~,lto should .. t. IppTfcltlon to the ... t,-.polltln Trlnsportotlon COImIfs­ slon 'or TDA Artlcl. 3 fund. to construct I now blcyclo bridge Itro .. MaU· derc Cr •• t. The •• Istlng pedestrian bridge doe. net con font to state bike· way de,lgn standards for brIdge. ,nth shared ped •• trlan/bUe u,.. The pre­ H.'nary cost .,tINt. 'or a n.w ten-foot wid. brIdge Is $26,OOO-$3C,OOO. Stiff "",uld n .. d to ~turn to Cou",ll with. specIfIc grlnt prop05l' prior to suborlttlng In Ippl!cotlon to MTC. VI. DEV!lD~ENT Of BICYCLE BOULEVARD METo/ORK Program 34 of the Trlnsportatlon Element of the Co.~rehen'lye Pl •• r •• ds -Develop Ind JI\P1ament I NetlllOrl of Throu.gh Bicycle Boulevards-. The first test a! the concept. IS proposed 1" Program 3~. has been cond~ct~~ ~t~ success on Bryant. Tnts street .. s ,elected IS the .cst suitable demon,trltlon route .fter lengt"1 r •• lew Ind consultatIon wIth the PI'O Alto 81cyc1. AdvisOry CommItte •• A long t ..... plan for •• et .. rl: of pot.nUI bike bou'e~lrd rautes •• S hot developed. To d ... lop SUC" • plan, staff w111 n •• d to work .nth PAIAC to use .. the need for oddltlon.l bike boulevlrd rout.,. te doy.lop • prIorIty lIstIng of the most sultabl. bike 10cotlon5 and to ••• lult. the .~pr.prlat. trofflc .. nagement ~.sur~s to use .10n9 sv,h Toutes. While t~e usp of t~lfftt b4rrlers .as I~,cessful along th~ BrYlnt Street torrfdor~ 5taff be'~e~es t~at the .pproprilte CIIR:580:2 11124/t12 -6- . __ ._-,-------"--"" ".---""-~'"-''' L - , L ~ i I j j I ! o BICYCLE BOULEV4RD bh1blt #3 DATA COLLECTION SUMMARY I. BICYCLE COUNTS Bfcycle counts were t~Ken at the fc'lo~ifi9 intersection. Before counts were tlken 1n May 1981 Ind ",,-11 1982; .ft .. count, were tlken ; n October 1982. ~11 counts ~re condutted during a 12.hour per10d 7 I.m. - 7 p.m. en ~1d-w!~K days. t.ltept IS noted' otherwise. Location 8ry.nt/Churchlll on Br)'lnt on tn"reM I I Bryant It Lowell borrl.r Bry.nt/CalHornl. on B"Y.nt ctr, Cllffornh Bryant at MaUdero Cr •• , Bridge california Aye"ue underpass Alma/Meadow l on ,1,1 ... on Meadow Mlddl.fleld/Neldow 1 on M; ddleflel d on Meldow 1 Comparative 8 hour cooot, 240 460 290 931 360 1274 144 751 457 449 413 589 721 (58 moped,; 4 motorcycl., 561 978 546 (21 moped,. 0 motorcycl.s) 1517 94 856 210 362 II. TRAFFIC CQU~S SUMMARY Totl' YD1ume tr.fflc eOLJ"Its W~ tate!"! on th~ (o"ow1n; locltJons O~ or lijjlcent to the blcycl~ boulevlrd. All coonts .rt 24-hour tot.l volume counts_ Befor. counts wert tlktn 10 Octo~r 1982. Counter Laclt Ion ~ After , L ... ll % Bryant 446 383 L_l1 W /0 .rYlnt 242 314 Tennysor, ./0 !ry.nt 595 820 TonnY5Dn w/o Bryant 478 843 Ir11nt s/o Tennyson 953 451 We,erley ./. L ... ll 1100 1606 EJoerson 5/0 Lowell 564 473 Bryant s/o Ore~on 974 1153 Bryant sf 0 Col.r.d. «0 U2 Coloredo I/O BrYI.t 953 Ill! Col.rldo w/o Bryant 977 1076 Bry.nt s/o Loma ~rde 481 170 Composlno t/o Bry.nt 5C 107 Campt,10D w/o Bryant 33 149 South Court s,fo Comp .. lno 307 304 Ramonl sf. Comp •• lno 438 550 El ~ran. e/o Bryant 752 574 El ~r.no w/o BrYlnt 765 572 III. COMPARISOft OF VEHICULAR/BICYCLE COU~S 12 hoo, tot.,. Mornln; POI' [Yen' noS! Pelk (7 •• ".-7 p ••• ) {1 ..... -9 •••• } {4 p.II.-6 p.m.) Vltlnltl on art"nt Vehicles !!m Yet'i1 (.1 es 81, •• Vohicl.s Bnt, l.well-Sea" 390 627 52 248 82 154 Col 1 fDrnl.-Color.do 136 551 16~ 208 223 III Colorado-Matode,. Cr •• k 349 546 47 141 80 121 L .... Vorde-El V.r.no 143 546' 2S 141 36 127 'Uslni IIIUdero Creek bit. CO'Jots sinee no b1t~ eounts toten It !1 Voran. bar-rier • . ~~~'1~~;;: . " :;~:s'<, "-<. - o . "'. b~end of ~1kt and mQtor v~~fcle traffic on each fut~re bicycle bo~lev4rd route must bl! evah1ated fndepefldently. The traffic. management technfqlJ2S utfllzed on future routes (~uch IS t~~way st~ps. trafflC circles, divert~r5. or barriers, etc., shou1d be tlilored to the 1nd1y1dual characteristics of eac~ corridor. ]f d1rected by Council to develop t~,e overall plan .. staff would pro~ose to do so an I time permitting basis. in Ule c.ented of the currer.tTy establ1sheG priorfties and co~1tments within the Transport4ti~~ Ser~1ces Program of the Transport!lticn Dhfsion. Under these ccndHi:>t'ls. Itfth staff lI«lT"iing closely with PABAC. it 15 anticip,ted that it would take at least six months to de~erop the pl.n. If Cou:nc.11 assigns the study of Ii bicycie bouTeva,d network a higne-r priority~ other c~rrently program~d and prioritized projects under tn~ Trens~rtatfon Services prDgram, SYch IS Project f1obl1 ity. the bH:t locke,.. insta111t1on project in business dIstricts, and the 51~ Bus Plan imp~e~ntaticn~ would have to be deferred until work on the Bicycie Boule~ard project is comploted. VII. ENVIRONMENTAL I~PACT The Enviran~ntl1 Assessment of tht Bryant Street B;cyc1e Bou'e~ard which was provided to Council in December, 1981 (CMR:S5S:1) roc""""ended a neg.tive declaration. No furth~r environmentai assessment is req~ired. ReCOI'IIIendat1ons Staff recommends that Council: 1. Dts1gnate !~yant Street between Churchill Avenue ~nd Meadow Drive ~s a penmanent bike boulevard within the framewo~k of Pa10 Alto's adopted bU.tways master p1an. 2. Auttlor"'fze cOl"ltinu:!d u:se of the temporary barr-jers. at LOWlJ'll and' E1 Verano unt1l such time as staff 15 abie to return to Counc.il ~tl'i permanent deSign detl11s for permanent barriers. 3. D~rect staff to WJOr"'k w1th PABAC to develop .an overall plan for a networK of bicycle bouley!rds in PaiD Alto within the framework of current1y estab11shed project prf~rltie:; witnin the Transportation Servic.es ?rogralTJ of the Transportation Cfvislon~ Resp .. ctful 1y 5uilm1tted, ft/v~ GAYLE L1XENS S:Pl~~ J FLEM~ sfstant Cfty ~ger'" PASAC Residents attending March 2. 1982 meeting CMR:530:Z ~·lJr'/~ TED T. ~DGUCHl, 1". E. Director Df Transportation 11(24/8< • -... --./ ...... c-. ____ o •• _ ._--- jf~~7·' . , I . . ' ...... . ,. :,·:·····;··:-········r·· . . _.. . - .. ,--''i-#-/ --:: . ...,.' .. e 7$1$%\ Qg~~." __ ., .. ~ ___ ,_.~-., , .~.'~ ·,~tv}·· ,..-:~ ,..: '"1 ~lJ t· " II, IJ i - : tl. ,r ~~' I ,VI t "",! li-~ iFjF! I- !~ L.pl \ I· ~.- " I .. ::::-.. j,. i f-L • . I . '1 ~. "s! ~---:- 'bl~ \ ' I -'~LJ ::-"". ... ' . I ',; := ! = d$ Ii! ~ p IU. , 1\ r..", --=-?:: tr'l" ---.. i . 1 I V ''\", 1'1 ; '. ~ :<~;r i <4". '. ~~ '. ' l~,~ ~' 1= , . .~ ~, ~ :,..Iid~ .,~ -W ! ~r:"i3 , ~.7.:;: . ['1 , ',I , I ,f-1-:!I :-,.-~ I i ICt~ ~ II i_l"'r • I }~ :-ii , " l! I ~ .~ ... : .! ~.~ ~ I ~ 1-::" ~ rill I , ;'ij, ~ ?_', ~ -,.-, .n, \ - I e .--... , . ' ~.I I j 1-, .. • I • • ... '. ----r-.... _ .. ···.L ,-, - "' -'. o BIKE BOULEIARD CORRESPONDENCE REECEIYED 8Y T.AN5~0'TATION DIVISION MAY-OCTOBER 1982 .!1!!!. Add...,.. eonmont 513 300 block ~ale Up •• t with goner.l behavior of bicyclfsts'in P.lo Alto, objtcts to lowe'l barrier 5/17 2600 Bryant Requests speed limit signs [work order issued) 5/18 1700 block Bryant Drhlns scllools using Bryant for driver tr.inlng 5/19 2800 block Bryant Students riding four abreast to school en Bryant 5/20 P,l. Alto ~precfates b1ke bouiev!rd 51Z0 3100 block Bryant Bicyclists should confirm to Vehicle Code laws. Bik. bQule~lrd monies should have bP.en ,h!r.neled to bike educatfon progr~~5 5/27 SUnnyv.l. S/28 lZOO block Bryant SHe distanc. probl .... t Compesfno/Bryant. [Word order fss.ued to correct prahl em.) 5/29 Z700 block Bry.nt Observed more ~p.dS 6/15 Unknown Hotor1st5/pedestri~ns Ire not aware of stop sign chlnges 7/7 3200 bloclt Ra"ona Obse"ed traffic fncrea5. of sen; in block. Does not support bike boul.vard 7/19 3~OO block South Court Supports b1~e boule~!rd • yses Bryant far tr1p~ to CO'll'!1town and Stanford -feels safer 8/14 2400 bloc. Ramona Apprecl,tes bike boulevard .n~ US05 Bryant for bi'. travel wit hi n palo Alto 8/31 Stanford 9ne 300 bl.ck ClIurchill lO/4 300 block Tennyson Co~tes on b1ke boulevard to St~nfordd BiclCifst5 are not using bike lanes on Cnurchil1 Bike bouleyard fncDnven1ent {or area reSidents. 81 eye' hts often use other streets (Emerson & Waverley) 10/14 2900 block Bryant Not obs.rved In,r •••• in sp •• din~. As. bicyclist rnls b1 k.e trlvel eashr. safer on Bryant 10/28 600 block San Antoni ° Return Co 1 ot'aI do! El Dorado f nters.ect ; on t c 4 -way stop j concerned about _oped traffiC. safety 01 pedestrian bridge at Matadere Cre.k