DuDcan Place Bicycle/Pedestrian Bridge. elF 47102 -status R~port
Arui Amendment No. 1 to Santa Clara Va 1 l!:'y_ h-ater District Aqr~
Members of the Council:
Roport in Brief
This report provides an update on the Duncan Place Bicyclel
Pedestrian Bridge Project and recommends that Council authorize the
City Manager or his designee to execute an amendment to Agreement
No. C0017013 with the Santa Clare:. Valley Water District in an
3lJ10unt of up to $50,000 for design and construction of a modified
:bridge and related i:rnproveme,Cits. Funds for this amendment ar-e
a~ailable from CiP 47702.
e a cJcqround
As part of its flood control program, the Santa Clara Valley Water
District (District) d~siqned a project to enlarge Adobe Creek to
convey the lOO-year flood. Oue to the lack of space in the rear
yards of properties abutting the creek, the District slected t.o
construct new channel walls, ex~endinq several feet above ground
level, rather than widen the channe14 Since the existing D~ncan
Place bicycle/pedestrian bridg~ would have int~rfered with
construc:tio!"l of the l"Jigher channel walls, the District agreeo to
replace the City-owned bridge as part of its flood control projt";ct.
The District proposed installing a p~efabricated bridge above the
new channel walls, with concrete ramps leading down from the bridge
to ground level~ Due to the impacts of the flood control project I
the District conducted a public outreach progrell'. and prepared a
tull environmental impact report (EIR), including an assessment of
the new bridge, -which would now be 2.-1/2 f~.'et higher than the
original bridge~ The EIR called for the installation of screen
fencing on the bridge and along the ramps, to mitigate the
resulting 106s of privacy for adjacent properties.
In August 1990, council approved a cost-sharing agreement with the
District for the replacement of Duncan Place bridge and approved
st.,ff's de.termination that, the project was SUbject to a Class 2
-1-
CMR: 332 :92
······21··
_ categorical exemptior: from CEQA cnder State Guidelines section
15302. (CK.~: 464: 0). Under the t.er:ns of t~le agreetoe1'lt, the District
is responsible (or the bridge replacement costs necessitateQ by the
flood control work, • .... hile the City p~ys for the betterments
in~luded in the project and the cost of the District's design and
con~ract administ~ation services. council approved the agreement
in the amount of $29,000, pased upon the uistriet~s cost esti~ate
tor !:he bridge replacement~ After the District received bids for
the work in 1991, the city's share ~a5 adjusted to $31,300.
By early 1992, the District's contractor had completed all wcrk
except the bridqe .i'eplacement and ne'W channel wall constructio.r'.
i1lllO.ediately upstream of the bridge. {to~ard Al~a stree-.t). City
staff became aware of the neighborhood's serious reservations over
the bridge, vhile seeking temporary ea$e~~nts necessary to
construct. the concrete ramps. In May 1992} Council received an
informational r~port from staff outlining tne neighborhood's
objections and describing a plan to h.:lst Ii corrur.uni ty D'leeting, in
order to hear the public's conc~rns and suggestions (CMR:251:9~).
The results of the 'lIleeting are described in the PDiscussion of
Community Meeting-section belo~.
In order t.o minimize delay and resulting contractor c:lairos, the
District has allo~ed all work to proceed, with the exception of the
bridge replaceruent and above-ground wall construction at the two
properties on either side of the channel upstream of the bridge.
This remaining construction has been rurposely held back to provide
Council flexibility in pursuing any of the options described in the
-Oiscussion of Alternatives" so:!ction below. In order to facilitate
the channel construction, the contractor ..... as permitted to remo.e
the old Duncan Place bridge on June 15. Statf developed a detour
route for pedestrians and bicyclists travelling between the
Greenmeadow and Walnut Grove neighborhoods and has posted
di:rectional signs for the r',ew rOute tsee vicinity map~ Attachment
A). Prior to the bridge closure, staff posted signs at the bridge
and mailed notices to neighbo::-hood residentE, local 5ch.-:;.ols/P'l'A's,
and the Palo Alto Bicycle Aovisary committee~
Piscussion of C~mmYDjty Meeting
sta.ff hosted a cOrM.unity meeting to discuss the Duncan Place bridge
on Wednesday, June 3, at the Cubberley Theater (see meeting
sumroary, Attachment B). District staff -.. ere. also present to
res~nd tc-questions on the project, flood control policy, and
hydraulics~ The meeting was publicized in advance through notices
Which vere mailed to all residents ..... ithin the area bounded by
Charleston Road/N'elson DriveiSan Antonio Avenue/Alma Street, as
well as the Grsenmeadow and Walnut Grove neighbor-hood associations,
the Palo Alto Bicycle Advisory Comrr.ittee, and local schools and
PTA's. Fifty-eight ~embers of the public attended the meeting~
-2-
CMR:332:92
. ;
!
-
.city and; District staft openeci the meeting by des-:ribinq the
background and current stat~s of the Duncan Place bridge
replacement and outlining several alternative courses of action.
Most of the session involved responding to questions and listening
to comm-ant.li from the audience. Although various opinions wer'!:!
expressed, there was rgeneral COT,sensus on the following key points
concerning the bridge:
• The Duncan Place bicycle/pedestrian br idge should ..:)e replaced.
• The proposed design (installing th~ bridge above the raised
channel 'Walls and providing screening fer privacy") is not
acceptable.
• The bridge should be installed as lev as pos6ible, that is,
'Within 6 inches of the original bridge elevation. The
District should determine to what extent the upstream channel
walls 'Would. need to be raised to contain the floodwaters which
would be backed up kecause of a lower bridge.
• The bridge should be. constructed at approximately the same
vidth as the existing bridge (approximately 5 feet).
• The bridge should be replaced as soon as possible (prior to
school resuming in September, if feasib~e).
Discussion of Alternatives
After the community meeting, staff 'Worked with the District to
develop a new alternative bridge design that will address the
public's concerns. Staff has identified the fo110'"in9 alternative
courses of action regarding the DUncan Place bridge:
• Riqh Bridge Alternative (original D8siqn)=
This alternative is to have the existinq contractor replace
the Duncan Place bridge as originally dEsiqnej by the
Distr-ict·. The alternative consists of a neW' a-foot-wide
prefabricated bridge installed approximately 2-1/2 feet higher
than the original bridge and requires construction of concrete
ra.mps from the bridge do'wo'!l to ground level (see bridge
profile, Attachm~nt C). In order to provide privacy to the
adjacent homeowners, screen fenCing would be placed along the
br-idge and its approach ramps. The screen fencing would be as
much as 10 feet higher than existing ground level in adjacent
residents' backyards. The massive structure could be viewed
as a "walled tunnel n by bridge USo:lrs and result in lowered
property values for adjacent homeowners. The ramps could
promote skateboarding and make it mere difficult for persons
with disabilities to use the bridge. For these reasons and
-3-
C1!R; 332: 92
-
due to strong negative public sentiment. staff recommends
'aqi::dnst 'this alternative.
• No Bridqe Alternative:
Under this alternative.. Duncan Place Bridge \ltl'oul':i not be
replaced. resulting in the loss of a convenient means of
access between the Greenmeado ..... and walnut Grove neighborhoods,
as well as a link in a City-designated bicycle route. Fifty
two pedestrians and 139 bicyclists ~ere counted on the bridge
during a 12-hour period on Tuesday, June 2. .'rea residents
indicated that use of the bridge on the 'WeeJt::ends is even
greater. If the bridge were eliminated, the closest crossings
over Adobe creek would ~e at Charleston Road a~d Alma Street.
The bicycle route could be changed to follow th.e temporary
route currently in use but Would be less desirable because a
seqment of it follo~s Charleston Road, a heavily-used arterial
street. Staff does not support this altertlative because of
its negative impacts on accessibility and safety.
• Removable B~i4qe Alternative:
This alternative consists of a replacement bridge installed at
existing ground level that could be raised or ~emoved during
high creek flows (e.g. a draw bridge, or sliding bridg<'!). The
rationale for the alternative is that the bridge need not he
elevated permanently above the channel, since the lOO-year
flood is an infrequent event. This alternative eliminates the
potential loss of privacy and the negative aesthetics of a
higher bridge, while ~aintaining safe pedestrian and bicycle
access.
The removable bridge a1 ternati ve has several 'Weaknes:ies.
First, the time spent researching and designing a remov~ble
bridge would delay the replacement of the bridge '.lntil next
year. !n additio~r the District has strong objections to the
alternative, "ecallse of its reliance 0:1 human. intervention and
its susceptibility to mechanical failure. If the bridge 'Were
not removed during high creek flo'Ws. it could obstruct the
flow of ~ater and cause upstream flooding. The District is
unwilling to commit personnel to maintain and operate a
removable bridge and ~ill not relinquish its responSibility
for flood protection to another agency, such as the City.
• At-Grade Bri~9. Alternative (Recommended Alternative):
This alternative ~as developed in response to the public input
received at the June 3 co~~unity meeting. It consists of a 5-
foot-.... ide concrete bridge structure constructed integrally
'With the channel walls (see bridge cross-section, Attachment
-4-
CHP.: 332: 92
-
.'
OJ. The bridge would ~e built at the same elevation as the
original ~ridge. The walls of th~ bridge wo~ld be built of
solid concrete to the same height as the channel wa 116 in
order to contain floodwaters. The need for concrete ramps and
screen fencinq ~culd be eli~inated since the bridqe deck would
be at approximately existing ground level. The bridge walls
'Would be 4 teet high 'With a safety railing on top. The
railing will be either cpen or solid depenalnq on the need to
prcvide additional privacy for adjacent homes. This could be
determined after the b~ldqe is constructed.
The at-grade bridge alternative impacts the-desiqr. of the
creek channel itself. Since the lowered bridge could
potentially act as an opstruction to flooQ~aters, the channel
walls would need to be constructed approximately 5 feet above
ths backyard ~round le:vel. ~~.P=t-::~~:::. ot the bridge. This would
result in increasing the o~iqinal proposed wall height of 2
feet by approximately another 3 feet for four proper~ies (see
loe ~ion map~ Attachment E;4 However, the 2-foot wall height
at these four properties, as originally designed, was among
thL lo'West ~lon9 the entire lenqth of the flood control
project. Increasing their height to 5 feet will result in
walls equivalent to tnose on adjacent properties. Staff has
discussed the at-gracle bridqe ;:alternative with the three
private property o'Wners affected by the change in vall height.
(The City owns the fourth property). The two property o~ners
immediately adjacent to the bridge are in support of the nev
proposal. Due to the concerns of the third property owners,
Mr. and Mrs. J~hn Wall, the Oistrict has r~evaluated their
hydraulic analysis, and has dete~ined that the 'Wall height at
th~t location can be reduced by 5 inches, thereoy resulting in
a: 4-1/2 foot wall height (see wall profile, Attachment F).
This is possible because the property is further upstream a~d
subject to a lower level of water backup in the lOO-year flood
event. Staff has made special efforts to find an engineering
solution acceptable to this property o'Wner but have been
unable to do so. An offer has bE-en made to provide
landscaping along the back of the property to mitigate the
effects of the higher wall~ however I to date, Mr. and Mrs~
Wall still do not support the at-grade bridge alternative,
yhich results in the 4-1/2 foot-high wall behind their
proper-ty.
The District ca., design the at-grade bridqe alternative so
that it can be installFd as a part of the District's current
constructior. contract. It is anticipated that the bridge
could be reopened for bicycles and pedestrians by mid-fall
1992. Staff has met with the residents liVing immediately
adjacent to the bridge and the presidents of the Greenmeadow
and Walnut Grove neighborhood associations to describe this
-5-
CKR:332:n
alternative and. has received their support. !.s the design
addresses all of the majol' issues raised in the public mee.tinq
regarding the bridge J staff recommends this alternative.
Discussion of R21ated Issues
Several other related issues were raised by the publJc at the June
J community meetinq. A list of these issues and staffJ s proposed.
resolution are summarized below:
• Bridge Appearance: In order to improve the aesthetics of the
bridge discussed in the recommended alternative j the District
will specify the use of brown-tinted concrete similar to that
used for the Adobe Creek channel ~alls through Mitchell Park.
In addition, the outer side of the bridge walls .""ill receive
the sam~ architectural texturing used on the channel wa11s in
the current project.
• Bridge safety: Several neighborhood residents ~ere concerned
that bicyclists and skatebcarders would not slow aown prior to
.entering Duncan Place 3!1d Creekside Drive from the bridge
sidewallc.. In response 1 baffles wi 11 be constructed at each
end of the sidewalk near the street ~£ part of the recommended
alt.ernative. 'rne baffles ... ill also disccul""age use of the path
and bridge by motorized vehicles.
• Bridge Width: The existing Duncan Place bl'idge and approaches
are approximately 5 feet ...... ide. Under the original design
approach~ the replacement bridge and approaches ...... ere to be
buil t 8 feet wide in o!'der to conform to current State
standards for t~o-w~y bicycle facilities. At the community
meeting, there was a c1ear consensus to keep the bridge at its
current width. Based upon operational considerations (safety
and convenience) for the llsers J the Transportation Division
staff recommendation is that the wIdth of the bridge should
not he less than 6 feet. HO'Jever, since City-funded
facilities are not obligated to conform to state standards and
since the existing bridge ~lIlidth has net been a problem in the
past l ~ 5-foot-vide bridge will ce installed.
• Path Lighting: A suggestion ... as made to install low-level
lighting tOl" night security. District personnel indicated
that they did not have the in-house expertise to desjgn a
lighting system for the project; and that time constraints
preclude them from hiring a consultant to pcrfol'!II. the work.
If directed by Council, staff would evaluate the need for
lighti:l9 after the b:!"idge is inst.alled and develop a futL\re
capital improvement p~oject for its implementation.
-6-
CMR: 332: 92
L
Bicycle RI')ute: The DUncan Place bridge is currentll" pa:!'t of
a desiqnat~d bicycle route bet~een San Antonio Avenue and the
Bryant street eicycle Boulevard~ The bridqe is also used by
local school children to acc-ess Jane Lathrop Stanford Middle
School and Fairmrad'O· ... ElQmentary SchooL Several resid.ents
su~qested that an alternate bicycle route be explored. The
nearest adjacent crossings of Adobe Creek are located at
Charleston Road and at Alma Street. Re.ro\Jtin~ i?icycle traffic
via either of these alternative ccossings WOuld provide a less
direct connection to the Br).-ant Street bicycle boulevard and
Stanford Middle School and ~ould require cyclists to traY~l
longer distances on a major arterial street.
The bicycle route across the Duncan Place bridge has been in
place since 19G2, and during the ensuinq y~ars the subject of
relocatinq the bicycle route has not been raised as an issue.
The bridge is used ~y a variety of people including
neighborhood residents, school children, and recr~ational and
commuter bicyclists. The total pedestrian/bicycle traffic on
the bridge is relatively low for a Palo Alto bik~way.
The existing alignment of the city bicycle route across the
Duncan Place bridge is consistent wi th th~ adopted bikeway
master plan, is convenient for both residents and most
bicyclists and has operated successfully for the past decade.
For these reasons and since the new bridge will not
demonstrably alter the characte: of the bicycle route,
Transportation Division staff finds no reasort t.o change the
existing bicycle rou't.e at this time. However # if council
wants to pursue an alternate route further, staff recommends
that this be more appropriately considered in the larqer
context of the. city' s bikeway master plan review that will
take place during the Comprehensive Plan update.
PiE:cussion of Ame1'1Q:ment
It is recommended that Council authori~e the city Manager or his
designee to execute an amendment to Agreement C0017013 with the
District to incorporate the bridge and channel ... all elements
discussed. in the At-Grade Bridge Alterr:.ative~ The maximum
estimated city cost for the at-grade bridge and related
improvements, including design and construction administration, is
$81#3CO. The increase of $50,000 in City cost (from $31,300 to
$81,300) is primarily dU2 to the construction of a new concrete
bridqe, remobilization of the District's contractor, and District
redesign/administration or the modified project. The District will
be responsible for the cost of raiSing the channel ~al1s, removing
the existinq bridge and reconstructing adjacent sidewalk.
-7-
Cl!R: 332: 92
-
• The cost is based upon prel iminary estimates obtained from the
Oistrict's contractor. However, the final City cost 'Will be
detez.mined on the basis of actual expenditures incu::-red by tbe
District for the work. The District will obtain a lump Bum price
quote from their contractor so that the work can be performed via
a change order to the existing contract. If the City and District
agree that the contractor's price c;:uot~ is too high j the City has
the option of requesting that the l)is-crict authorize the work on a
time and materials basis.
Staff also requests authority to 3mend the agreement regarding the
ownership of the new Duncan Place bridge. Under the origir.al
agreement, the bridge, which ~as to be free-standing and separate
from the channel walls, ...... as to be o ... ned and maintairled by the City.
Because the proposed at-grade bridge is to be constructed a& an
integral part of the channel .... alls and. in effect, has a flood
control function, staff recommends that ~he bridge be owned by the
District. The District ~ould be responsible for maintenance of the
concrete bridge st~~cture. The city would own and maintain the
bridge railing above the concrete bridge walls and ~o·..lld be
responsible tor the cleanliness of the bridge decK.
Environml!!:ntal Asses.:?ment
An addendum to the enviro~~ental impact report 'see Attachment G)
has been prepared by the District in conjunction .it."l the City
Attorney's office. It shows no substantial i~pacts resulting from
the revised project.
Recommendation
staff recommends that Coun~il authorize the city Manager or his
designee to execute an amendment to Agreement No. C001701J with the
Santa Clara Valley Water District in an amount of up to $50 1 000 for
design and construction of a modified Duncan Place
bicycleipedestrian bridge and related improvements, (for a total
maximum agreement amount of SSl,300} and further modify the
agreement regarding ownership/!naintenance responsibili ties and such
ot~er related matters as may arise during the negotiation of the
amendment.
Respectfully submitted j
/,. £/ !Jr.¥a~/7~
GEORGE BAGDON
Assistant Director of public Wor~s
-8-
CMR:3J2:92
-
o
'~~b'Ja~--• DAVID G. ADAMS
Di~ector of Public Works
, . .
" lb-O---~ *
cj
WI LL AM ZANER
City Manager
Attachments; A.
B.
C.
O.
E.
F.
G.
Relate1 Reports:
Vicini~y map
June 3 f 1992 community meetinq s~~ary
Original bridge profile
Bridge cross-section
Location map
Wall profile
Addendum to Enviro~ental Impact Report
CMR:464:0
CKR:251:92
ec: Residents adjacent to the bridge
June 3, 1992 co~unity meeting attendees
Gr~enmeadow Community Association
Walnut Grove Homeowners Association
Santa Clara Valley Water District
JLS Middle School
Fairmeaaow Elementary School
JLS PTA president
Fairmeado~ PTA President
Palo Alto Bicycle Advisory CQmmittee
city/School Traffic safety Committee
-9-
~,332 :52
.''''''. ,.co
--
.. :
r
,r-.
ATTACHMENT B
CITY OF PALO ALTO
DUNCAN.PlACE BICYC_LE/PEDJ;SIRfAN BAJDGE
AITENDEES:
City of Palo A!to sliLf1
Community Meeting
June 3, 1992 7:00 PM
MUTINJO SUMMARY
George Bagdor'l, Assistant Director of Public \V.')rks
Joe Teresi. Senior Enginoeer
Man Costigan, Eng!neer
Gayle Likens, Senior Planner
.cJ.n£...2t.Palp Alto CouflcilfT'lemJl""l'.£.S.
lanie Wheeler
Joe Huber
Sante Clara Vanev Wa:1M Distric1
Nai Hsueh, Flood Contre! DesJg'1 O:vis"ron Engrnee ....
Randy Talley, F~ood Control Planning Division Engineer
Roy Weese, Project Engineer
Kurt Flammer, A.ssistant PfCjcct Engineer
Tr . .:-community meeting '.vas Pllb~kcized in advarlce through mE!€tir"lg notices which
we:e mailed tJali residents within the 2rea bounded by Charleston Rd.lNelson Dr./S-en
Antonio Ave }AJmc St" as weH as the Greenmeadow a.nd Wainwt Gmve neighborhood
associat:ons, the Palo Alto Bicycle Advisory Committee. and local schools and PTA's.
Informational signs were posted at the bridge site. and a notice ."oIas publisrled' in the
Palo Alto Wee!9:l. A total Of 58 members of the public attended the meeling.
The meeting was conducted in accordance with the attached meeting agenda. It was
divided into two major parts. The first pai"t consisted af a presentation by City and
Water District stafi describing the background and current status of the propo~ed
replacement of the Duncan Place bicycle/pedestrian bridge. City staff also outlined
the previously identified key neighborhood concerns and discussed severar alternative
Courses of act'lon. During the second part of the meeting, members of the public
asked Questions and made comments concerning the bridge .
-
.-,
_ ... ...-~'*.!'. IIIIf~n"', •• "'''i'iI'';''';i .. ",,;l;:
OunC3Q Place SicycleJPedestrian Bridge
Summary of June 3. 1992 Community MeetinG
1'89" 2
Public CgmmE}nts
Ttle fonowing is a condensed list of the comments made b~' the pubUc at t,e
community meeting:
In order to slow down bicyclis1S and SKateboarders before they enter the: street, a set
of bollards should be instailed at each end of the path. The boOard installation at the
Oregon Expressway b!cycle(pedestrian overcrDssing is a good example to follow.
The bridge is a valuable asset to the Greenmeadow and Walnut Groy~ neighborhoods
and should be maintained.
The bridge is a convenient way for children to traver across the creek without using
Alma St. or eMsrleston Rd.
rf the bridge were removed, it wouid li"Iake it ha{der for persons with disabil:ties to get
arou nd t~ e ne i 9 h bo rhood.
Aren't the br~dges at Alma St. and the railroad tracks constructed V'o"ith less than the
standard amount of freeboard? If so, why can't the Duncan bridge be instafled at a
lower elevation as well? The District answered that tf1e Duncan bridge could be
lowered if 1) the channe! walls upstream of the bridge we,-e raised to accommodate
the backed-up water, end 2) jf the b6dge were built with solid wails to contain the
floodwaters to tne 5-=!me revel as the adjacent channe' walls.
The amount of iJicycle and pedestrian traffic on the weekends is double the traffic on
weekdays.
Build the bridge at a lower etevation and deSign it to break away when it is inundated
t.y flood waters,
Don't widen the bridge to 8-feet; leave it at its current Width.
Alma St. and Charleston Rd. are poor a!ternathle routes for bicyclists and pedestrians
because they carry more auto traffic.
The slope of the proposed bridge approach ramps is too steep for bicyclists,
Eliminate the Duncan bridge from the City bicyde route network, The bridge is
primarily a means fo( local tesidents to travel between the Greenmeadow and Walnut
Grove neighborhoods. S·lcycfists should be able 10 use the bridge, but should not be
directed to use it,
""'.~ .............. . . . -<-. ,.
'. ---,,.,.',
-
Duncan Place Bicyclell'ed.strian Bridge
Summary 01 Jun. 3. 1992 Community Meeting
Page 3
Mar-y bicycliSts travelling across the Duncan bridge continue through the
GreenfT1eadow community center, which 1s private property. It should be mad2 clear
that the pathway through the center is not a City t,jcycfe rOllte.
TextiJff!' the brkjge appraach ramps so that it wiil discourage use by skateboarders and
roJ!erbIClders. but wiJ1 'Stili be usable by-bicycles, wheelchairs, and strollers.
The proposed high screen fenclng will create a walled ttmnel that wiil be unsafe for
young children. No one will be able to see in or out of this "tunnel".
Make the bridge attractive, rather t"'an a waned tunnel.
If the bridge is lowered, it wi!! be more likely to ::ollect and trap debris during heavy
creek. flows, which could lead to large obstructions and flooding.
The project shourd includ6 the installation of low profile lighting along the path in
order to increase nighttime safety.
The sfope of the proposed bridge approach ramps, although in cO!'"JfOfmar,ce with
des;gn standards fo( persons with disabili.ti.e.s, would be very steep for persons in
wheelchairs.
The Impact of raising the height of the channef walls upstream of the bridge in order
to anow for the Jowering of the Duncan bridge would not be significant, since many
property owners are constructing six-foot-high wooden fences at the rt!ar of their
yards anyway. The wooden fences would screen the higher channel walls from view.
Users of the bridge make a lot of noise, sometimes even late at night. There is aiso
a littering problem at the bridge.
•
::~'.
~\; .
~"'
J"
o
bun con Place Blcycle/Ped •• trian B:idge
Summary of June 3, 1992 Community Meeting
Page 4
~eting Sum--.mary
Although a variety of cpil1[ons were expressed by the public at the communit'y'
meetiilQ.., there was general consensus en the foBowtng key points:
1.
2.
3.
4.
5.
6.
The Duncan Place bicyclelpedesHian bridge snourd be rep~aced.
The pm;>osed design (installing the bridge above the raised channel walls and
providing screening fo,," privacy) is flO! acceptable.
The bridge should be instaned as low as possible, preferably withrn 6" of the
original {pre-earthquake)bridge elevattorl. The Water District should investigate
furthsr the alternative of lowering the bridge, raising the channel wafls as
required upstream, and designing a solid bridge that will contain the
floodwaters 10 the same level as -;:he adjacent channel wcdts.
The bridge should be constructed at approximately the same width as the
existing bridge {approximately 5 feet).
The bridge should be replaced as soon as possible iprior to school resuming in
September, if feasible) and without a Significant cast increase to the City.
The sxisting bicycle route betw~en Charleston Rd. and San Antonio Ave.
shourd be rerouted so that it does not include the Duncan Place bridge.
~;j~;
_ATTACHMENT C
~
,'-",
REMovE EXISTING WALK
/ 6' SCHEEN F"ENCING
~ NEW
Ilf.TAWIHG IIALl
4n'RI\fOIf'
fliU lUll !UGI;
COllI' . !----------I i~II.III'[l lHI!,IG
-NEw l@ti~~f.6i)nmuuu~~~i~~mt)J~--~ CljArlrl[l \.lrjj~jG
\ \ I J
___ CREEKSIDE DRIVE
BRIDGE PROFILE
HIGH BRIDGE ALTERNATIVE iORIGINAL DESIGN)
, ."." ~ .... J'.~~ ... ~~,
NEW f1RIOGE
T(JP ul" tiEw
CQI'C, WALK
')~·~AMP -----
o
I
)
')
DUNCAN PLACE --
T: ~:
"
. ". ,,f/
"",_\\i'
!
1.5" CHAIN LINK FENCE
i
L ... .. .. ~,
ATTACHMENT D ~ BRIDGE CROSS-SECTION
AT-GRADE BRIOGE ALTERNATIVE
. ,
.1> l'>
...
· ,
CONCRETE BRIDGE
',:J •
· v '1 ... --~-.~---.--.5'-O.--.. -.. ,------__ 1
...
..
· b. ' ., ,
, .
".';"::',1
f/
NEW BRIDGE OECI< AT SAME ELEVATION
AS ORIGINAL BRIDGE
f.. • .. ,
to "
f,' "".
---.----~-~-----.-.. --~--------.~ .. ---,.-
."--CHANNEL WALLS BEYOND ~
/
FUTURE BRIDGE RAIUNG
TOP OF CHANNEL WALL
, ;. ~
o '/'
1
. '
•
. I
,
ATTACQENT E -LOCATION foIA."'-
,
.",n'" CHANNEL WALL HEIGHT TO BE INCRE~.SED PER AT-GRADE BRIDGE O\LTERNATIVE
-(5EO: ATTACHMENT G FOR WALL PROFILEI
_ .. ---_ .. --.-.------.---~ I!
r li------------------
I; I-
I
I KYLE ~ w z z
" '" u
i
PORTER
TO CREEKSIOE OR ----
U'--i --
FAY
',,-
ATTACHMENT F-WA.LL PROFILE
I TOP 'W C~A~HE\. Wt..U. t!-ROPOSf.;,O DESlo,l'ol)
l-!-j 1 i
3' -1"
2'-8"
~ 4-112'
1
-5'
I ' u--------,. t -. -. ': l ~O~ O~ C~:N~'~ :A1~ ~OR~OI:A~ D~S~N~ •• - -0
OPPOO"".,, O"OUNO LO,"L"" t 1
•••••••.•••••••••••••••••••••••• 6.~ •••• ! .................................................................. ~ .......... ~ ............. , .......... .
PORTER
" ~-.--.-----.-g
p.,PFROX\MAlE. (JRlJUND LEvEL --"\
~ •
FAY WALL
3'-1"
_1-_ I
lOP 01"" CHANNEL WAtl. {pqOf>OS£O DESIGN)
~ 5'
/" TOP Or: CI~AN"IEL WALL IORIGINAl QHltiNI I
.f ._. _ . _ •. . I
i
•••••••••••••••••••••• , •••••••••••••••••• , ..................................... I •••••••••••••••••••••••••••••••••••••• • ................... 01 •• ·.'
KYLE MORRISON CPA
.: d,
, .,
"
o
A'ITACtIME NT ~
Ac5dendup' to Environme:l1ta~ I.pAct Report to~
~dobe __ cre.k Cha.nn.l~ovem&l1t_e
.LCharl •• toil J:lcalS to 81 C'UI_ino Reali
'i'he District has reviewed the propos~d change in wall
height ~djacent to the Wall property along Adobe Creek in the City
of Palo Alto~ Based upon that review, it has been determined that
neither a sUbsequent nor supplemental EIR is necessary, but that,
pursuant to California Code ot .P.egulations, Title 14, section
15164, this document shall serve as an addeMdQ~ to the original
EIR.
The District finds that:
l~ The change in wall height does not involve new
significant envirorunental impacts not considered in
the previous EIR. While the ~all height change may
have some minor effect on the view fram Wallfs rear
) ... ard, that impact will be dg mini:mis in relation to
the impacts previously considered;
2. The change in wall height does not constitute a
substantial change with respect to the
circumstances under 'Which the project is being
undertal<eni
3. The change in wall height does not constitutp-new
information of sUbstantial importance about the
project.
The District has considered this addendum in ccnjunction
with the final E1R prior to approving any change in the }I.dobe Creek
FlOOd Centrol Project l as required by the CEQA guidelin~s.