AWARD OF CONSTRUCTION CONTRlo"CT FOR BRYAN';
EXIENSION_ PROJECT ~l{D BELATED CHA"NGE'S
s~ BICYCLE BQULEVARP
TO STOP SIGNS r PARKING
RESTRICTIONS. AND BICYCLE ROUT~
M~mbers of the Council:
REPORT IN BRIEF
The purpose of this staff repcrt is to recommend that the city
Council take the :following actions relat~d to the implementation of
the Bryant street Bicycle Boulevard EKtension Project:
a~ Approve and authorize the Mayor to execute the attached
contract (Attachment 1) in the amount of $ 81,524, ~ith
Steiny and compeny ~ Inc. for the installation of a
traffic signal at Bryant Street and Embarcadero Road, and
modifi cations on fO\J.r other streets, and authorize staff
to execute one or more change orders to the contract in
an amount not to exceed $ 8,200:
b. Adopt the attached resolution (Attachl!lent 2) amending the
nCity~"'id2 Stop Intersect j on 8yste~ Map" as follows:
CMR:323: 92
'L
• at Bryant and Churchill, remove the existing stop
signs on Bryant;
• at Bryant and Kingsley, relocate the existing stop
signs fron Bryant tD Kingsley.
• at Bryant ar.d Addison, re:rnove the existing stop signs
on Bryant;
• at Bryant and HawthQrn~. relocate the existing stop
signs from Bryant to Hawthorne; and
• at Bryant and Poe~ remove the existi~g stop sign on
Br:lant;
~ ,'.:
-.:..: .
C. Adopt the attached Resolution {Attachment 3) modifying
on-street parking restrictions as follows:
• add "No Parking at Anytime" zones on both sides of
Bryant Street at the Err~arcadero Road intersection:
• add "No Pa.rking 7: 00 am to 7: 00 pm~t z:or:es on the south
side of Addison Avenue and Coleridge Aven:...e, between
waverley Street and Bryant street, and
• remove an -existing MNo parking 7: 00 am to 7: 00 pm"
zone on the so~th side of Churchill Avenue, between
Waverley Street and B~yant street;
o. AQopt the attached Resolution (Attachment 4) amending the
IIMaster Plan -urban Bicycle Route System" to provide for
the follo~'inq:
BACKGROUNQ
• add the extension of the Bryant Street Bicycle
Boulevard (Coleridg~ to San Francisquito Creek),
• add bike lanes on Coleridge {Wa\·erley to Bryant),
• remove bike lanes on Churchill (Waverle.i" to Bryan't) ~
a;"'!d
• add bike lanes on Addison (Waverley to Bryant).
On December 2, 1991~ the City Council approved a plan for the
extension ot the Bryant Street Bicycle Boulevard and directed 5t.aff
to proceed with the necessary steps for implementation. The
Council approved plan, illustrated in Figure 1, includes ~
provision for the installation of a temporary street closure, on
Bryant Street, on a test basis~ Staff is to eva!u~te the effects of
the 5treet closure after six months and return the :matter to
Council for furt~er action regarding the disposition (removal or
permanent installation) of tt.e street closure.
PLANS AND SPEC~FICATTONS
The plans and specifications for the proje'.:t "I,01ere developed i~
accordar.ce with the pIa.r: approved by the Cou.ncil and incorporate
more detailed information and further understanding of various
components of the project.
In the course of tne
several items arose
construction cont~act
following:
developing the plans and specifications,
that affected the final scope of the
for this project. These include the
CMR:323:92 7/2/92
page .2
,
l ..
i
'1
1
1
"
i ,
• ,
• I ,
i
I
I
I
!
I
! • I
!
!
, ,
i ;
= i • , ; ; · i I
!
I a
! • • ~ ! e I r ~ I • ~
I
0 fIGURE 1
• z
i "" ~ ;< • Q f w > ! 0
~ • • ""
" ~
;!
~ _ .
" 0
~
i w
4
\1 , " , ..
~ ~ w
! '" ~ ~
J ~
2 ',0' ~ ~ • i " • :-;: • I
~ • •
I
t.
~ .••.. . ..
I ..
f
t
i
One component of the approved Bicycle Boulevard ExtensioTl
proj ect included the t"llcwinq changes along Waverley
Street: (i) ::-emoval of marked bike lanes and signinq,
(ii) r~storation of on-street parking, and {iii) conver
sion fro~ parallel to diagonal parking in the downtown
area. i'he total estimated cost was $ 36}000.
Waverley Street is tentatively scheduled to be resurfa.ced
durinq the summer of 1993 (subject to completion of gas
main 'Work scheduled for 1992) and all of the above
changes can be implemented as part of the street
resurfacing project~ at little or no addlticnal cost.
Since the effects of dl!.laying the planned changes to
Waverle:,.' Street arE>, of little consequence, the proposed
changes are not inCluded in the current construction
contract, and 'Will instead be included e;s part of a
general street resurfacing p~oject in 1993.
b. Installation of Temporary street Closure
As part of the approved plan, council directed that a
temporary st~eet closure be included on Bryant Street.
The project budget inclUded an estimated cost of $3,000
for installation of a temporary street closure, and
$12,000 for the possible futUre installation of a
permanent street closure.
Due to the simple nature of a temporary street closure
(vis-a-vis a permanent street closure), it is more cost
effective for City staff to do the necessary 'Work, rather
than including it as part of the current construction
contact. Therefore~ the installation of the te~porary
s~reet closure 'Will :be done by Public Works staff, while
the possible future installation of a permanent street
closure would be done under a separate future
construction ~ontract.
c. Pre-Orderin~ of Selected Equipment
CMR:323:92
Normally f contractors do not stock such items as the
traffic siqnal controller z cabinet and poles that !Ire
required for this type of project. Furthermore, it takes
90 days or maLe to secure and test a controller, once an
oroer is placed, follOwing the a~ard of a contract. In
order to avoid this lengthy delay~ staff pre-ordered the
major traffic signal equipment for this project, .rith the
v.nderstanding that the equipment -will :be provided to the
contractor for installation. The pre-ordered equipment
-was ~unded through the existing F¥ 90-91 elP established
7/2/92
Pa.ge 3
.... _------,. ---~.~~---
'~i·L
..:,,'
-
-
o
for th!.s project. In the unliJcely event that tb~ project
is never implemented, the equipment that has been pre
ordered can readi ly be used in normal on-going
maintenar.ce and operatior-:-,f the City I S traffic signal
system. Provision of heslO! major tl:"a!fic signal
eq".J.ipment items is, th~re:::ore, not i!1cluded in t.he scope
and cost of the construction cont.ract currently und.er
consideration. The estimated cost, were the contractor
to provide ttll;!.se items, would be $-40,000.
d. Traffic Signal Tnterconnection
At the time that this project was first incorporated into
the Cit)"s Capital Improvement P::-ogram j the budget
included a sum of $24 1 000 for interconnecting this new
signal with t_he existing traffic signal at Waverley
street and Emba:-cade:-o Road, as 'wI'el! as the citywide
traffic signal monitoring and control system in operatio~
at t~e Municipal Service Center.
Installation of the necessary co-axial cable to 1 ink this
new signal into the city ... ide syste!jl and the ~'averley
street signal was completed in FY 90-91, as part of a
project that included four extens;'ons of the city's co
axial cazle system. Therefore, this component of work is
not included within the scope of the construction
contract currently under consideration.
AWARD OF CONSTRUCTION CONTRACT
The 5cope 0 of Work for this construction c~ntract includes the
followir.9:
a. Traffic signal installation, including pedestrian signal
indicators and buttons j
b. Traffic channelization islands a~d handiCapped ramps,
c~ Striping for crossvalks and turning pock~tSt
e. Removal and in6t~llation of various 5igns~ and
f. Removal and installation of bicycle lane mdrkings.
The plans and specifications were reviewed and approved by the
appropriate city departments. In addition, the plans were reviewed
by the Palo Alto Bicycle Advisory COTIl!:1ittee, including a. field test
of the proposed channelization islands an Bryant Street at
Embarcadero Ro~d, and the Committee's comments have been
incorporated into the design of the project.
CHR:323:92 7('192
page 4
•
',.." 'eo,
.. ~
I
1
~ .
i
I
I
-
Following the completion of the plans. specifications. and bid
documents, the project was advertised on May 26, t992. A pre-bjd
conferen~e was held on June 9, 1992 and the deadline for submitting
fOrJllal bids was June 16, 1992~ Bids -..rel:·e received from five
q'oJalif;ed contractors, as she-.wn or. thp. Bid Summary Sheet
(Attachment 5). Staff recommends that the bid of $81 1 524,
submitted by Steiny and. Company, Inc., be determined to be the
lowest responsibls bid, and that the contract be a~arded
accordingly. This bid is 36 percent below the engineer 1 s estim~te
of H>a,ooo.
PROJECT COSTS
The total project, as approved by COllncil, \o.'as estimated to cost
$243,000. Based upon the actual contract bid amount of S81,5~4, as
wall as the adjustments discussed in a previous section, the total
project cost is no~ estimated to be $148/724, including $12,000 for
a possible future permanent s~reet closure.
Contract Bid Amount
Change Orders
Pre-ordered Equipment
completed Co-axial Cable Extension
Temporary Stre~t Closure
Possible Permanent street Closure
TO'IAL
$ 81,524
8,200
20,000
24,000
3,000
12,QQO
$148,724
Table 1 provides a summary cf the relationship between the actual
bid amount of $81,542 and the estimated cost for the complete
project, inclusive of adjustments discussed earlier~
PROJECT FUNDING
Fu.nding for this pr-oject is included in t· .... o separate Capit2'.l
Improvement Projects {elP).
In ~une 1990, Council approved a FY 1990-91 CIP (Electric Fund -
Traffic Signals; Page 107) which provides for the installation of
a traffic signal and all related road""ay, sidewalk and other
necessary items~ at tLe intersection of Bryant Street and
Embarcadero Road. Approved funding in the amount of $174,000 is
available with $75/ CoOO corning from an approved 1990-91
Transportation Development Act (TDA) grant, and $99~OOO from the
City's Electric Fund,
In December 1991, Council approved
tor PI 91-92 to establish a new
Bryant Street Bicycle Boulevard
CMR: 323: n
an ord i na nee
crp (Street
Extension;
amending the budget
Improvement Fund -
No. lS212), 'Which
7/2/9>
Page 5
; .
I
o
TABLE 1 COST ES-rlMATE I ADJVSTME~'''!'S, A.1Il'D BID AMOUNT FOR
B,"AANT STREET BICYCL<; lIOULEVARD EXTENSION PROJEC'l'
PROJECT
;;QMPONEFT
INITIAL
ESTlKA]% CHaNGES
ENGINEER
ESTIMATE
CONTRACT
NQ
Traffic Signal $174,000 -$64,000
(l}
$110,000 $67,829
and relate~ items at
Bryant/Embarcadero
Siqnin'1 and. pavement 54,000 -36,000
(2)
18,000 13,695
~arkings along Bryant,
Addison, Churchill,
Coleridge , Waverley
Street Closure 15,000
on Bryant
-15,000
(l)
o o
TOTAL $243 r OOO -$115,000 $12a,OOO $81,524
Notes: (1) $40,000 estimate of cost tor 'contractor to have
suppliaa pre-ordered equipment; $24,000 due to
prior installation Qf co-axial cable extension.
{2) $36,000 due to integ~ation of Waverley chanqes
into 1993 Street Resurfacing project.
(3) $12,000 allocation for possibl~ futUre permanent
street ~losure; $3 /000 due to city staff (versus
contractor) installation of temporarj street
closure.
.--:...,-
-
proyides for the unfunded portion of the approved project;
including signing, pavement ~ar~ings, and street closure (on
Bryant).. Approved f1.mding in the amount of $69,000 is availahle
with 100 percent reimbursemen': from a pending 1992-9J
Transportation Development Act (TDA} grant ..
The santa Cla~~ ccunty Board of Super/iscrs has already approved
the $69,000 grant. While the Metropolitan Tr~nsportation
Commission is scheduled to formally approve TDA grants on July 23,
1992, action on the projects for Santa Clara County ~ill be delayed
until septe-mber, cue to the fact th~t. net all necessary documents
for some county sponsored TDA projects were £ubrnitted by the
necessary d.eadline. MTC te-chnical 5taff has discussed our
situation 'With their legal staff, and ther haVe agreed to insert
language into the MTC approval of our grant that, in e[f~ct, ~ill
allow Palo Alto to claim funds for .... ork performed after .July 1,
1992 and prior to the: actual grant approval date in september.
Sho*~ below is a summary of the current esti~ated allocation of
project costs to each of t~le tillO e!p proj ects:
fY 90-91 CIP .E.L91-9L£l.E TO'fAt.
PROJECT COSTS
CUrrent Contract $57,829 $1),595 $Bl,5~4 -Change Orders 6,800 1,400 8,200 -Equipment Pre-Order 2C,OOO a 20,000
-co-axial Cable Exten. 24,000 0 24,000 -Temporary Barrier a 3,000 3,000
Possible future 0 12,000 12 /000
permanent street ~losure
TOTAL PROJECT COSTS $U8,529 $30,095 $14S,724
FUNDS AVAILhBLE $174,000 $69,000 $2<3, 000
ANTICIPATED BALANCE $~5,371 $38/905 $ 94,276
The balance in the F'i 90-91 CIP will r-e:r;,ain in the Electric Fund
for other specified traffic signal improvements, as well as
possible adjustments or modifications to the Bryant/Embarcadero
signal during and/or follo~ing the evaluation period.
The balance in FY 91-92 CIP ~ill remain available through the three
'year TDA grant per-iod for possible U5e~ in the eVent that a
perttanent street closure on Bryant Street is eventually approved as
well as other adjustments or rnodifica~ions that may be necessary
for the extension project during and/or following the evaluation
CHR: 3:23: 92 7/2/92
Page 6
-
o
period. Any portion of these funds that remcins unexpended at th~
end of the three yea~ grant peri~dr will be reallocated to other
projects loy MTC.
fB-OJECT ?CHkDU~
The curren-c schedule fCl" i.rnpler.;entation of this proj ect is as
follo ..... s:
• council a .... ·ard of cont,ract July 6, 1992
• Notice to proceed/start work July 20, 1992
• construction period 45 calendar days
• Ceremonial opening cf bike blvd.
extension (tc coincide ~ith
Beat The Back Up Day)
September 17, 1992
Further actions I subsequent to the opening of the bicycle boulevard
extension include:
• Monitoring and evaluating.
• Bike lane
Street, in
Program.
and parking modificaticr.s along Waverley
conjunction .... ·ith the 1993 Street Resurfacing
• Disposition of teI:lporar.l street closure and possible
insta!laticn of a peLmanent street closure on Bryant.
• Various adjustments/modifications as required.
MOQIFICATION OF S_TOP SIGNS
A part of the Council approved plan tor the F.xtension project
includes -:hanges to stop signs a-.o;. fi-"e intersectio:ns. as follows:
• at Bryant and Churchill, remove the existing s":op signs
on Bryant;
• at Bryant and KingsleYI relocate the existing stop signs
from Bryant to Kingsl~y;
• at Bryant and Addison, ret:lo'..:-e the existing stop
signs on Bryant;
• at Br}'3nt .and Ha .. 'thorne, relocate the existing stop signs
from B~"yant to nal."thorne.; and
CMR:J23:92 7/2/92
Page 7
-
"
,,,",,
• at eryant and Poe, re'JIOVE; the Existing stop sign on
Bryant.
The attacl"led resolution (Attach:rnent 2} amends the "Citywide Stop
Intersection System Map" 'to appropriately reflect the above noted
changes.
MOPIFICATIONS TO ON-STREET PARKInG
A part of t1-~,g council approved plan for the Extension project
includes changes to on-street parking restrictions at several
locations, in order to add bicycle lanes on Addison and Coleridge,
remove bicycle lanes on churchill, a.,d establish turn restrictions
on Bryant at Embarcadero. The required on-street parking
restrictions are as follows:
• add "Yo Parking at Anytime" ZOnes on both sides of Bryant
street at ~he Embarcadero Road intersection;
• add ITNo Parking 7:00 a.m. to 7:00 p.m." zones on the
south side of Addison and Coleridge Avenues, between
waverley and Bryant Streets; and
• remove an existing IINc parking 7:00 a.m. to 7:00 p.m.
zone on the south side of Churchill Avenue, between
waverley a~d Bryant Streets;
The attached resolution (Attachment J), amends on-street parki~q
restrictions to appropriately reflect the above-noted changes. The
locations of these restrictions are illustrated on ·the exhibits
attached to the resolution.
MODIFICATIONS TO BICYCLE ROUTES
A part of the Cour,cil approved
change:s to the lTMaster Plan
provide for the following:
plan
Urban
for this project includes
Bicycle Route System'" to
• add the extension of the Bryant Street Bicycle Soul evard
(Coleridge to San Francisquito Creek):
'. add bicycle lanes on Coleridge (Waverley to Bryant);
• remove bicycle lanes on Churchill (Waverley to Bryant) ~
and
• add bicycle lanes on Addison (Waverley to Bryant).
CMR:3~3:92 7/2/92
page 8
'---
.;. ;-,;;~~li· •....
-
-.-0'. =--: __ .• :m:t1i"I!!IoR~""'''''''''"1''''''''''"'''''''''''''''<''''-
The attached resolution (Att~chment 4) amends the nMaster Plan -
Urban Bicycle Route System" to appropriately reflect the above
noted changes.
LOCATION OF TEMPCRARY STREET CLo.SlTRE
As part of the approved p13r. for the. Bryant Street Bicycle
SOulevard Extension "Project, CO\J.nc~l iTlcluded a provision for
installinq a street closure (parrier) on Bry~nt Street on a test
basis, at an appropriate loc~tion to b~ idgntified by staff.
Pre-:.riol.:$ information} developed during t_he course of the s~udy
leading up to this project, eil identified five possible locations
(Attachment 6) for a street closure on Br.l'"ant Street, and (ii,
concluded that locations A (between Channing and Addison) or D
(between Addison and Lincoln) were the roost suitable, if a Et~eet
closure was to be incl~ded.
On April B, 1992, staff held a public meeting for the purpose of
sharing information, genet"atinq discussion and assessin-;
preferences regarding alternative locations for a street closure.
Included as Attachment 7 is a handout used to st.are information and
generate discussion regarding the characteristics and trade-offs
for locations A and O. Meeting notices were sent to all resid~nts
of the Profess orville neighborbood within a one block distance of
the bicycle boulevard extension. Approximately 12 people attended
the public meeting, and by the end of the meeting there appeared to
be a dominate preference for location A .. among thCS2 is atte:nd'HlCe..
Location A is also the st"'.ft preference for the street closur-e.
Therefore., a temporary street closure, for a six-month tri3.1
pe~iod, will be installed at loc~tion A, near the south boundary of
the par-cel where the parking lot for the urgent Care Center is
located (Attachment 8).
MONrrOR:p.rG/EYALUATION PF1:.9GRA.!"!
As part of the approved plan, Council directed staff to !!'.ake an
evaluation of the temporary street closure atter a six-month trial
pe.riod, and report to Council for further consideration and action.
In addition. staff ~Quld normally monitor the effe.cts of a project
such as this, and prepare an overall evaluation of the project six
to twelve months follo~ing implementation.
In order tc monitor and evaluate the overall project~ and consider
whether there is a continued need for a street closure on Bryant,
staff has prepared a data collection and ~onitorin9 pro9ram that
will provide an appropriate information base for analyzing and
evaluating various effects of the extension project, and street
closure. The data collection, field observations. and monitoring
CHR: 323: 92
-,~; .... t!!"'· -, _.-' --,-""
7/2/92
page 9
. , . ,
are to include before and after information on v~hicular, bicycle
and pedestrian vol'.l:nes; .speeds; conflict services; and design
aspects, complaints, and violations as tney relate to on-street
parking .
Staft ~ill Ieport back to the council following an initial six
month pe~iod, or earlier, as conditions warrant.
OTHER RELATED ITEMS
Waverley/Adgison proposal -O~ May lS, 1992, the Council referred
a ~Prcfessorville Traffic Mitigation Proposal n (submitted by Bill
McGlashan and Michael Kast) to the P"l icy and Services Committee
:tor analysiS, evaluation and recommendation. The Pl'oposal includes
several traffic and parking-related ~easures proposed along
Waverley Street (Channing to Embarcadero) and Addison Avenue
(Cowper to Bryant). There is no evident confl ict between their
proposal and the approved plan fo~ the bicycle ~oulevard extension
project. Their proposal is scheduled for initial review and
discussion lit the August 4, 1992 meeting of the Policy and Services
Committee.
Parking Restrictions on Addison Street -Throughout the development
of this project, on-going concern has been expressed about parking
prohibiticn (7:00 am to 7:00 pC) on the £outh side of the )00 block
of Addison Avenue {Waverley to Bryant). At the April a public
meeting regarding the street closure location l the concern was
again expressed ~ith a comment that the parking problem is more
5evere at niqht and on weekends than during the day. Staff has
collecteCl adClitional information !'"egarding on-street parking in the
300 block of Addison Avenue preceding 7:00 a.m~ and follOwing
7:00 p.m. on weexoays, Saturday and Sunday, and has concluded that
SUfficient parking space is available on th~ north side of Addison
at various times, and that cars observed parked on the south side
could have been parke~ on the north side, in nearly all instances.
In addition, there a:t'e always excess spaces reasonably avai lable on
Scot.t, Bryant, and Waverley Streets. Sti?ff ....-ill include further
data collection as part vf the ~onitoring and evaluation program
follc~inq implementation of the project.
E~~IRONMEN1AL ASSESSME~I
An environmental assessment {91-EI}!·-2 8) was previously prepared for
this project l and Council approved a Negative Oecla~~tion for this
project at its regular meeting on December 2, 1991.
CMR:323:92 7/2/92
Page 10
-______ • ___ ",.0..
L
-
;\
:1
i
I
i
!
"1;;.-.
o
BECOMHENPAT10r
staff recomJtends that Council take the follo.'ing actions related to
the implementatiol"'l of the Bryant Street Bicycle Boulevard E>lter.sian
Project:
a. I-pprove and authorize the Mayer to execute the atteched:
contract (Attachment 1) in the amount of $81,524, 'With
Steiny and Company I Inc., for the installation of a
traffic signal at Bryant street and Embarcadero Road ana
modifications on four other streets, and authorize staff
to execute on~ or more change orders to the co~tract in
an a~ount not to exceed $8,200;
b. Ado! ~ the attached resolution (Attachment 2) amp-nding the
~Citywide Stop Intersection System Map" to provide for
the following:
• at Bryant and Churchill, remove the existing stop
signs on Bryant~
• at Bryant and Kingsley: relocate the existing stop
signs from Bryant to Kingsley;
• at Bry-ant and. Addison, remove the existing stop
signs on Bryant;
• at Bryant and Hawthorne l relocate the existing stop
signs from Bryant to Hawthorna; and
• at Bryant and PO€, remove the e~isting stop sign on
Bryant;
c. Adopt the attached Resolution (Attachment 3) modifying
on-street parking restrictions as follows:
• add ~No Parking at Anytime~ zones on both sides of
Bryant Street at the Embarcadero Road intersecti~~j
• add "NO Parking 7! 00 am to 7: 00 pm" :z.:ons:s on th.a
sout..;. side of Addison Avenue and Coleridge lwenup..
between Waverley Street and Bryant Street. and
• remove an existing ~No parking 7:00 am to 7:00 p~N
zone on the south side of Churchill Avenue, between
Waverley Street anj Bryant Street;
~. Adopt the attached Resolution (Attech~ent 4) amending the
lIMaster Plan -Urban Bicycle Route System" as follows:
•
•
CMR:323: 92
add the extension of the :9ryant Str-eet Bicycle
Boulevard (Coleridge to San Francisquito Creek),
add bike ~anes on Coleridge (waverley to Bryant),
7/2/92
Page 11
,.
-
•
o
remove bike lanes on Churchill
B ... yart} ~ ''H,d
(""~ave rl ey to
• add bike lanes on Adeison (Wa'lerley to Bryant) ~
Respectfully submitted I
MARVIN L. OVERWAY KENNETH R. SCHREIBER
Director of Plannin9 a~d
Community Environment
Chief Transportation Official
~ W~c..ZANER c;i~~;aqer
Attachments: 1. Contract ~ith Steiny and Company, Inc •
.2. Resolution modifying the "CitY-wide stop
Intersection system Map"
3. Resolution modifying on-street parking
restrictions
4. Resolution modifying the "Master Plan -Urban
Bicycle Route System"
5. Bid Summary Sheet
6. Locations for possible st~eet closure
7. Comparison of street closure locations A , 0
a. Location of Bryant street closure
cc: Palo Alto Planning Commission
Architect~ral Review Beard
Historical Resources Board
Palo Alto Bicycle Adviso~y Committee
City of Menlo Park
Stanford Universi t:t
CMR: 323: 92 7/2/92
Page 12
•
-
o ATTACHMENT 1
CONTRACT
This Cornract, dated ' ia .ntlr~ intO by "nd between the CitY
of Palo Mo,. municip.r corporath.:m 01 the Stitt of Ca1iforni; ,·City·,. and 5teirw 5: CQ:npanv,
;--__ :-:::;-:::7::===-~:::::::_;_~. ' ,·Contractor" J. whos.e
TuPl~ IdonlitiCltion Number is ____ -'9"S"-CJ1"S,,e,,9"'S,,2"'8 ____ _
For and in cons';dtration of the folIowi:lg !;:OYBr'liInts, lerm, Ind ctl.,cfition.s. City .nd Contractor
""!he J:jartiu"J agree;
1. !lm\. This Cor.tr.ct Il'Iin commenc, on. Ind be binding on the ~ni!:1i on, the Date of
Exetvtion of this. Ccntrzet, and chan expire on th. d.ne or ,,~orcf.l;on of thQ Notice of
Sub:;t3ntiaf Completion, Of, if no .such notice is required 10 ~ filed, on the dOltf! that fmal
JNyment i.s made hereunder. &ubject to ".:h! .,rlier termination of this Contract.
2, Gt'H!f,1 ScQP!!, of Project Ind Wprk. Contrae"l:OI' shall fumi$h Labor, Il!'r'lIicts. material.s and
equiplTlent in connection with the ccnstruct:on of the Prc-ieet !lind r;ompllte the Work. in
,~ord.mct: with the c:ov.nanu.. 1erms Ind Ct'lndilions of thi.s Con1nlct to the NtJs:faC1ion of
Cfty, The Project .nC: Won: is ger..rln., described IS feliows:
Tnle: BRYANT STr:tEET BICYCLE BQtA [VARD EXTENSIONITRAFf!C SICjNAL fNSTALLATION
a. .. Bid: $ _-'7..,4"-,"'-1"'79'-___________ _
Add Attermlte s (if an'l); • -'1",,,3c:',,SC-_________ _
3. tpmrjtr;t [)cx;umtlltl. This Contr;let .sP'lan cOflsist of the acc;umenU Ht forth below, whic~ are
on file with r:he City Clerk and are he~eby w,cDfPorared by r~f.renc.. For the pur;lO ses of
construing. interpreting Ind re.solvinQ inconsisltnc-ies between the provisions of this Contract.
these documents -1M the I"rovi.sioi"lS thereof a.r" let forth in the following descending order of
precedence.
g
> -_.
•. This Contract.
b. N otiee Inviting Form ai Sid.s.
c. ContraC1 SPt'cjfica'ti~n.s.
d. Otawings.
I. Change Orders.
f, Bid.
g. sup~rement'~ Conditions.
h. General Conditions.
i. ~Ulndjjlrd Drawings and Speciticatlol\J 11972L
j. Clllrtitic.ate of Il\$urlnce. p,rformance Bond .. nd Labor and Mater~l.$ Bond,
k, Affirmati". Action Guidelines .. nd Compfllnce Report.
I. Othei Spec:i1il:a1ioru.. 04' pan thereof, not e"",."I'I incorpor,ted ill the ConUict
~jfjeations 0( the SU!W:Iarcf Orawings .. 1ld Specifications 0972f.
m. Any ether document notllXpressly mention-ed t.ere~r"I which is issl!ed by City I)r entered
.Into by the parties.
, ol 7
c
-J
I
-
.c. ComMnutign. in t:OI'Isidoration of Contractcr'a performance of fts obligations ~~l!Iunder, Crty
allan p.a" to Contril'ctOf the .. mount nt fot"th ion Conuactor'. Bid in .. ccordJ;nce with th~
provisions of thJ$ Cor'\trae1 and upon the' rec-eip! of wrinert invOfc;U .. nd .n necnsan,
~portir)Q documentation within th. time set forth in the Ccntraet SPtcifae.afiot'>l Ind the' 972
SGlndard Prlwin:ls .!"Id Specificatlons. "'. if no tim! is Itaied, Wothin tNrty 1301 Oays of the
~t~ of receipt of Contractor', iIIvoicu.
6. Inl.~. Or:: 01' before the O~t!' of £.xec:ution, Contractor .!un obtain .. nd maintain the
pofteia$ D~ insurarn:e eoveriilge ducnD8d in the Notice Inviting FDmlII ~ds or; lerms and
e:onctrtions.nd in amoul'IU as may be required I:l~ the R:slr. ManaQ'er. City ahall nOI ~ cbtig;led
to take out insurance on Ccr.trac1;)r'1 Pflr$on~1 propen)' or t:he pe~so""~1 propertY cf any person
performino liIIbor Dr sorviees or-Supplying materials or eauipmi!n1 under the Praject. ConnOlctor
&hIll furnish City witt! the certif",c.ates 01 insura.nce and with criQinal er;dor~ements IHec:ting
co"'er1lge-required under this Corm;et O!'! or befoft" Ihe Date of he-cution. Th~ C:lrtifil:ates and
Indorsements for each insu-rancl!' policy Sh3~ be signed by' a person whe is authorized b, Ihat
insurer 'to birtd CQverage on iu blh-all, Proof of insurance Shltl be matled to the flrojecl
Manager to the Itddress let fOrT;P'l in Section l5 of this COntract.
6. Indemnificiltion. Contr;actor agflUs to .protect. defend. il'ldemnify and hold City. its C~ry COI,.!r1cil
members., ~fficers. Ind empfoyu.s. h~rml~ss irom .and' .a~ainsl an\,' In~ all c:,ims. demands.
If.a~lilteS, lolUS-, dillmagcs, casts, expenses, flens. penalties, luTU. Of ju<:iQ'menlS, ari,$;,..g in
","""ole or in part. directfy or indlr~Ctly, 11 any time from any injury '!o Dr dea!~ of per$:)1"IS or
~mace to .,rop9rty as .. resl,dt of the willful or negligent act Of omission 'Of ContraCtor, or
which res.ults from Contractor'. 1"Ior:comprl,"ce with Iny UW fnplctinQ me condition. u.se,
occupation or safety of t.~e Prcject site. gr any pan the reef, or which .rise$ from Contrac1or's
f.ailur~ 10 d:;) Irlything rlQuirad under Viis CCinVact Of for doing .nything whieh COrllrilCtOr is
.requlred n(lot 10 do under this Cont;r;ac;t, or which arists from conduct fOf which any law
.' mposes .striel riability on Contractor 1n the periormance of or failure to perform the terms .and
conDitions of this: Contract. I)(c:ept as ~y a[~e from tt, • .sole wiilfuf or negli~e nI act 0 r
omiuion of CiTv or ar.y of fU City c.c.uf"lci\ mamben" ot1iet:r$, Of tlm.pfoyees This
inde-mllifjcalion .hall extend' to an¥ .,nd an 'la.ims. demands. or Hens made or filed by reason
of eny c(tiiSb'l.lction. renovation. or remodetin'ij Work perlormed by Contractor uncfer t!"1i5
Contrillc:t iIIt eny time during the term of this Contract, or arisinQ lheruf1er.
7. A",sumctiqn of 'RISk.. Contractora~rees Ie vOluntarily Is'Sume ;.nyand in risk of loss, damiige,
Of injury to the proper'ty of ControilC1or which maV occur in. on, or about t~ 'Proiec1 si1e a' any
time Ind in .ny manner. uceptin~ 5uch 10S5, injury, or damage as mal( bot (iused by t!"1e sele
willfur Dr nl:9ligem act or omis.sion ct City Of Iny of it5 City Co..:ncw member.s, etf.celS. or
emp.{oveu.
S. Wiiy!!!r. The acceptance of any p.lymeM or performance, or any p..,rt ther-eo'. shan not operate
.s I waiver by C~ of ru righu under this Contract. ~ ...... aiver by City of any breiich of ilny
part .of proyis.lon of ,his Contract b.., Contrlctor ,hir! not operate-as a waiver Of continuinQ
wliyer Of ,ny aubsequent br .... ch of the $ilm~ =r any other pro\li:;ion, nor "hilll any custom Of
pt'ilc;tjce whicn milY .rise between thI partie$ in tha • c;Smini.ttrltion of any p.art or pro \lis io" cf
'!hili Contract be c~stru.d to waive or to lesS-fin the right of City to insist upon the
perf~ of Contrat:1.0r in I-trict t'ompliance with the covenants. terml .nd conditions af
ttdl Cantract.
2017
&. Comcfi'!1cr ..... ixh l'Wi, Cantr.lctcr &.hatl t ;:11,;, ML" .n lews r.ow in force or wt'Iich may
Mr4i1ttl!r bt In force pertaining 10 the Proj.c. ~nc1 Work and' tt-i.s CO:lt!.C1, wi":1'1 the rlQ,uirl!'ment
of .ny bond or fift underwriler, or olhor .. imitaf .bc'Idy no w 01' hlf&afnr COnstlIU,.1 d, with any
dilcr.tioNlry klnsllJ or jpVrmrr iuued pU1'luanl ':0 ,ny Law of ,n., pub.tic .ge-ncy OJ "ffie.al ioS
wors as ~ any promion ohl1 recorc$.~ dot\,lmenu ilffectin; the ProjK1l1ta. mol .. r as any
". ,eqlJired b.., r.non of 'the un or OC-::iJpancv of the Ptojeet aite, 1M' witt', all Uwi peruininQ
'10 nondi.scrimination .nd .ffirma~j'ie .cxion in tmploymtn1 .nd h.urdo'o,lS rNlterlals..
1 0 ~. A£ I COtidition preceO'tmt t(l City~1 tlobijgat1on 10 p.lv comper.sa~io:'l 10 CcntrilC10r, .nd
on or twtfore the tnte of beevtion, COr.trOlclor "hin fumish tha Bor,d.s; .5 require a under the
Notic. l"""tin" Form~l Bid, to the P'rojeet Manager.
11. f!'preunUtiQns and Warrjnties. In tta supply of ~ny mller)afs Ind flQulpmC!nt and the
rar.dering of lebor .nO lel"\liees during the t:ourse and' leaPt of thl!' Projeet ."d Work,
Conlractor represEnts and vlarrants:
a. Any materials and equipment which sh .. l1 b41 u.sed during the course and scope of the
Project and Work ,han be vested in Conlractor;
b. Ani matefials .and eQuipment whictJ shan be used during the eourse C!nd scope of the
Projl!e1 .nd Work .haf! be merchantab!e Ind fil to be uud for the ~ .. ~ieular purpose
for whict'1 the mltt'rials are reQ\lired;
c:. A~y I~bor Ind serotie:u rendered and maleri.a!s and equipment used I)r I)m~loyed durin\!
!he cour", Ind scope Qf the f'loject and Work .. han be free of de1ects in workmt1!"1ship
for I period of one n ~ yea' .fter 'the recordilion of the Notic-e o~ Sub,Hantial
Completion, Of, rf no IUCi'l tlotic-e is require~ to be m~, on tha d,ne traal flnar payment
it. made h-erevnder;
d. Any mlnu'faeturer-s warranty obtained by Comrilctor shan be obtained CIt shaU be
deemed obtained by Contractor for Ind on behalf of Crty.
I!. Any informaticn lubmined by :::ontract~r p~lcr to thE' award" or COntraC1, or theruher,
upon re~ .... est whetner or n<:lt lubrnitted under I ecnt~nui.ng obf;ga~'on toy the te~ms of
the Contract to do SQ, ~ trloJelnd CQrrect.at the time su~h inform!;tior'1 is submitted cor
miilde available to the City;
f. Contractor tlas not conuded. conspired', or IgoraeJ', directly or indirectly. witl'1 any
person in regard" '0 the '1erm.s Ind conditions of ContractDr', Bid, .... cept a$ may be
IPfrmin"d by the Notice Im'iling i=oflNl Bids;
g. Contractor hu the power Ind a~hority to enl.r into this Cootract with City. mal the
individual executing mil ContrOlCI is duty ILJthorized 10 do J.O by .ppro~riilte rl!5olutton,
e:-.d that tt'ois Contract .hall be ,x2'::-~ed, deli .... r.d end perlo/mld pursuant 10 the
power .and lu:thority confllrr.ad upon 1he person or petS o.r.s .authorized to bi rid
Contraclor;
h. CCntrlctOi has nOI made an Itcempt to eMen undue infh,HtnCe with the Purchasin~
Manager or Project Mana~er or any ether Ptrson who has directiv connibL)ted 10 CIt;" I
,·3 of 7
l
j.
k.
dec:ialon to IlNa;d ttl_ c onVilC1 to ConttilC1er.
Ther_ 8 ... no unre$¢l .... d' claims or disputes betwHn Contr.ctor .nd City which wculd
matl!llrialfy affect Comractor' .. ability to ~rfDrrn und.r the Contnet;
Contta~Of h.1I fumis.hed' Ind will fymis.~ true and accurate lutlmenu. rfcert$s,
repol"t$, fuolutlon.$, certification.s .• nd ether written infarm.alion as m!y be rec:;uested
of Contra.ctOf by Crtv from time to tim. durin, the term of thi.s Contract;
Contractor aM Iny person perfo:ming Ii.bQ~ and .. ervien undfi!r tl,i5 PrC'lject tS dul)l
licensed 1$ I cOt1t~al:aor w!tli the St2tt elf Cafifornia IS required by CaMomfil Business
& Professlons Code Section 7028, IS amended; Ind
Contractor has fully fIInmined' and inspect~d the Proje~t S:tE I"d has fun knC'wledge
of the physicill cor.ditions of the Prcject sTte.
12. AuiarHT'''ent. This Contr3e't and the performance req ... ired hereunde." j~ persor. .. : 10 Cor,tr.::tor,
and rt shan net b. assigned by Contr.actor. Any anempt~d alsignml2!:'I1 Sltari.bE nvii Ind ve~d.
13. Claims pf Contractor. All claims pe!'Uining 10 Utro!! work, addltionitl char~e.s. or delays w;thin
the ContrillCl Time or other diSputes .risln~ oui. of the Contract shal! be submlned by
Con!flC1Of' to City in writin~"by cenified Dr reQislered mai1 within. IIIn (101 Days a~er the claim
.rou or within such other time;as may b& ptrmined or reQuired by law, and shan be des.crlbed
in .. ufflC~nt deuiJ to give adequate netke of the .subsumc'I: of the claim to CitY.
14. Audiu by Crr.... D-Jring tl"le term of this Contract 1M for .. period of not le-u thilfl t"uee i31
years att.r the ellpirltion or •• rrier tl'rmination of this COl1tra~ City ,han have the right to
. .ludit Contractcr' ... ProjeC1·relaled and Work-rerated writings and busineu records, as s"en
terms 8re cSef.r\ed in Cerifomi .. hidence Code SeC1icns 2S0 and 1271. as amended, d:Jring t:he
regul.r business hours of Ccntrilctor, or, if Contraoctor ha.s no such hour.s, durif'l~ tne ~egular
business hour.s cf City.
15. ~. An a~re!'mer.ts. IPpointments, ap~rc"·;!I.$ .• LJthorizatio.ns, Criims, demino:s, Change
Orders. consents, dt!igr.ations, notices, offer.s, fequests and" stnement.s. ;i.,,~~ by ~ither pan:..,.
10 the other shalt be in writing and shalT be l"LJfficiendy giver: and served upor". the other ~.n.,..
t:' (1) perso~,ally served. (2) sent tly the United Slates m .. n. postage prepaid", 131 sent by private
express deli'clery .service. or (4) in the caose of a facsimile ltan.smi.ssiot'l. kf len:: to the telepMonii!
FAX r;umblr let forth below durin~ regul.r b\J$iness hours of the receiving party and" fonowed
wi&.in!¥Wo 121 Oily: by delivery of .. halrd copy of the mater~r ser.t tly facsimne transmission.
in Ice-ord.anee with (1). e2.1 or 131 Ibove. Personal .ervice sh.aln incl\Jde. witho\Jt limitiltion,
Mrvic:e by de-Tillery .nd urvice by fille-simile t:"ansmission.
To Crry: City of Palo Alto
City Clerk
250 Hamilton Avenue
P.O. Box 10250
Palo Alto. CA 94303
4 of 7
~.-<~ ......... , .. .
.• ,"
'. :
~i,
-
,
.1
o
Copy 10:
To Cont!"actor:
City of Palo Arto
Department of P1sooiOSt Iqnsppr-or i,':'n DiviSion
250 Hamillon A"enue
P.O. Box 10250
Palo Alto. C". 94303
(41 51 3:19 . ...,...,2,,5'-'75"-____ _
FAX: 14151 329·~1I,",'i",9 ___ _
ATTN: Project Manager for Project
Steinv & Company. inc
27 Sh~ridan Street
Vallejo, CA 9459D
UQLI_~55~2~-~~9~O~D~ __________ _
FAX: lTIUl~5~54~-~6~1~4~) ____________ _
ATIN: Brian Finley
Hi. Apprpwii!!Iion or City Fynds. This Ccntrar:t is subje~ to the fise.i P'ClvisiortS Df Artic~ iii,
Section 12 of the Cl'ulrte-r Df tM City of Pilla Aho. Any Charges "ereunder for tibor, ""vices,
materi;lls and t(lU'ipment rna,,-accrue only .. fter $uch eXj)end"iture$ h ..... e bee" Ippro"ed in
advance in writing in accordance with IPpflcable lIws. Thil Contr.et &h .. tl termin.itl without
peJ\ill!tv m It the .. f\d of '!"IV fiscal year jn,tt-..e event that fund's arlii! r'lO'{ IPprt>priated for the
fOflowing fisc::al vUr, 'Jf fiil It an, time within .. lise;1 year in the Ivent thilt fun..1s Ir~ on!".
ilPpropriiued for I portion of tne fise.iill vear arid funds (or tn;$ Cor:tr;llct are-M wnger a\·aitable.
TI':.iJ; SeC'tiw. , 6 Ihan control in thl!' .veorH o( II conflIct with any other JlfO'ii.siOf1. of thi~
COn1:rilct.
17. Migcnan,'2us.
•. Bailee Oisclaimer. Thl' ~rtie, understilr'ld and l&lrll'e ttwlt City does not pl.!rport to be
ContraclOf"' bailee. and City is. therefore. net tuponsi~ for an.,. damage 1e Ihe
pe flona! proptrty of ContTa!;1or.
b. CCn.J..!nt. \Nhen.e".er in this Contrlct the approvalOf' connn.t of I party is reQuired.
luch approval Of con,Sln1 'Nn be in Wo"hing Ind "han be exec .... t.~ by • per.on ha\lin~
the IXpr." lumority 10 graf\t such &l>Prova' or con.ent.
~. Controlling law. The partin a&l'ree milt Ihis Contr,act .shatl be gevlrrad and! con.strued
b\l ,nd in ,ccordance witn the Llw.s of the State of ClrHernia.
·5 of 7
d. tHifinhion.s. Thll definitioIU and' le~ms.set forth in Siletion 1 01 th4! SUndatd Df.ilwings
11">4 *cruc~ti().n$ tHnll of \his C~tract .r~ inCQlt)Cfilo\ed her.\n b., rehlftno::e
I. F()f'ce Majeure. Neithe! party Shill be d&eme-j!Q be> ir. de';lult Otl ac:r;ounl of .n)' deli)'
Of failure to perf'Jrm in obr.g;.tion.s under \his CO~tril~t wt1ich ~i(K\P.,. rtsuhs 'fom In
Ac:t ~f God or If! act ef I c.uperior govtm~er1ta; authority.
f. HfJoiIdir"lgs. The p.ara"raph headings are not a ,part of this ControilC1 and '!"l~n ~ve 1"10
effect upon me C"or!:struC1ion or interpreUtion 0' any pan of v,is CO"tr~C1
g. Incorporation of Documents. Atl dccume-rlts conslituting the Contract docume;"!t5
described in Sec-tior: :3 hltreof and ;11 dacuments which may. from lime 10 time, be
raferrec' 10 in any dIJ!Y executed amendment here-to are by ,u~h reference-incorporil1ed
in this Contri:ct Ir"ld shall be deemed to ~ pan or th;s Ct:intract
h. \rl"t't-graticr .. n.is Co~tnc't and an)' ame-r.d"ments here:to bei.weer, the partin tor.sti\\.l'.e
the .. nlir. a~re!ment bet ...... een ti")e ~.artres concer."ling the Project and Warl:.. Ind there
are no other prior ora' or written 'Qreemer"lts berweell the parties tn;!:t .are-"01
incorpOrated in this COntriCt.
i. Modification of A~r~ement. This CC!"l!rict :sha!! ~C1 tle modif:ed or tle b:r.dir'1!;l upor"~ the
/Jitrtin, unle.ss such modification ts ,greed to in wri1in~ Ind :s.i\llned by Ihe pilrtie.s..
i· Provision. A.ny '"rel'Jr:1ent. coveniJnt, condition, clau.se. QualiflC3!iofl, restriction,
r.sefYation. term Of ;other stipulatior: in tt,!" CClntract sha-Il d;;erlne or otherwise connol,
8sta:bflsh., or limit the performance HtCluired or permill!"d or to ~ r3Quired 0' or
permined by eithe'r J)iJrty, All ,provisions. wl'lether cover"'.;r'\ts or ecnd"itlons, sh~n ~
dHmed to be both ~~venanu JiM c:oncfitions.
~. Rnl)1\,I'f,icr •. CC!"'oua<:'tor $oM" submit 't'>/i\.h its Bid a eo-py Qf itny tClporate 01 pilnnershitl
resolution or tllh.er wr~ting, whic" authorizes any d~re::tor, officer or 01her employee or
j)ii"rtner to let rOor or on beha:f of Co;,\u;ctor or which liuthorb:es Contr.aC"10r 10 111m2!
lnto this Contract.
I. Seve-rability. If. court of compO!'tent jtHisdic:tion finds or r;Jleli that an,;, pravision of I":S
Con1ract i5 \toid or fo.H\enfCf!;eiible, the ~rDvi.siDns of this ContraC1 not so affected shat!
r-:m~in in full force and effect.
m. Status of COntriiLctDf. In the exercise of riQhU and ob:i\lations under thi.s Contra:::l,
Contractor acts as. Jln indep endent ccntrilctor an C' not as ;In age nt or employee of Clf)!.
Contractor ihatl not be entilled to any righI.' and bene-fits accorded or accruing to the
C~ r:~ncil members, officers Of employees of City, and Contractor expressiy w,ai ... es
any and III c:1~ims to such ri~hts .nd benefits.
n. SuecessOfS IiIncf A.ssigns. The ptC'I;jsjons of this Contr~ct ,hall inure !o the be-nefll of.
and aha!1 IPply to.rIG bind, the successor.:; .and assigns of the polrt;U.
0. Ttme of the Es.senc8. Tim~' is of the .~senc!" of \his Contract .nd uel'1 of ns
proytsions.. In the calculation of tj~c here-under, the time in which In Ict is. 10 be
·6 cl 7
\ :
rl
j
1
:1 ,
p.
o
perlonntld &hen be computltd by .:.:cludi"~ the first O.y and inC~lJdfr;~ the t.lt. ~f the
time in whk;P", an .ct !.s to be performe d fa I!s on • S~tl.J1'd.aY. SuM' y. gf • ny DiY
nbsltfVl<1 •• I Je.~11 hor.d.ay by CiTy. the time 10r perforrnl~e J~tl boe txtended to the
folJowina Business Day.
V.r'",ue. In the tyeonl Chit luit is brought by eith.r pal"'ty "-rtunder, the PI1,;U ~FE'e
that tri.ai of ,ueh action IhaJi be vrsted e".c1us;y.ly in the IIolr{~ COurts of Coiliforni.a in
me Counry of S"!'1U Clar.a in the CiTy of Soiln ":05!e or in the Unrted StiHts Oistr<,CI Court
for ~ Northern O~triet of C.~i1oml.a i1'\ the City of S.an Jose.
[N \VfTNE"SS V\o'HEREOF. the J)oiI"ies have exec".Jted this Con1!,lIC~ 'Ct", me d~'.t ('~$t ,boy! ,stated
in p~rc "no. Caflfornia.
ArrEST, CITY OF PALo:! Al TO. CAUFORNlA
City Clerk
CONTFiACTOA, ________ _
B,' ___________ _
City Manager N.me: ______________ _
Chfe1 'frensportaUon Of1lcTal Trrle: ______________ _
Oitector of Finance Taxpayer 1.0. No. __________ _
RI.ik Manager
APPROVED AS TO FORM,
Assistant City AttorT!ey
END OF SECTION
7017
.'
><' ••
-
ATTACHMENT 2
RESOLUTION NO.
RESOU1TrON OF THE COUNCIL OF THE CIT'l OF PAI.o ALTO
AMENDING THE CITYWIDE STOP INTERSECTI01i SYSTEM MAP
WHEREAS, pursuant to Resolution No. 4291, adopted Augus.t. 4,
1969, the city Council adopted the Citywide Stop I!'ltersection
System Map, showing all intersections at ~hlch stops are required
within the City of Pal¢ Alto; end
WHEREAS, on December 2, 199.1, the city council approved the
Bryant street Bicycle Boulevard Extension ("Praject~); and
WHEREAS, the Project necessitates an amendment to the
Citywide stop Intersection System Map to remove and relocate
certain stop signs;
NOW, THEREFORE, the Council of the Cit}' of Palo Alto does
hereby RESOLVE as follows:
SECTION 1. The modificatio~s to the existing stop sign
system, as shown in Exhibit "1-, attached hereto and incorporated
herein by reference, are hereby adopted as an amendment to the city
of Palo Alto Stop Inte~section System Map.
SECTION 2. The City council approved a Negative
Declaration in its approval of the Project on December 2, 1991,
finding that the Project would have no significant impact on the
environment. Therefore, no additional environmental assessment is
necessary~
INTRODUCED A.~D PASSED:
AYES:
NOES:
ABSTENTIONS:
A!'TEST: "'.PPROVED:
City Clerk Mayor
APPROVED AS TO FORM:
city Manager
Senior Asst. City Attorney
1
-,
o
2
Director of Planr~ing and
Community Environment
Chief Tran~portation Official
•
CITY OF PALO ALTO "', o TRANSPORTATION DMSiO~
July 2, 1992
-
.--1 ,
1 t
; J.
"," ,"","
.....J
•
· .
o
ATTACHMENT 3
RESOLUTION NO.
RESOLUTION OF THE COUIICIL OF THE CITY OF PALO ALTO
ESTABLIS/lIN:> AND REMOVING l'ARKItlG RESTRlCTIONS ON
BRYANT STREET, ADDISON' AVENUE, COLERIDGE AVEf":llE,
AND CliURCI!ILL AVEh'UE
WHEREAS, the council of the ci~y of Palo Alto
Bryant St['"eet Bicycle Boulevard Extension Project,
herein as ·PRCkTECTu, on December 2, 1991: and
t.pproved the
referred to
WHEREAS, the PROJEC1' inclUded. {ll insta.llation of bicycle
lanes on Addison and Ccleridqe Avenues, (2) removal ot bicycle
lanes on Churchill Av~nue between Waverley ana Bryant Streets. and
(3) improvements at the intersectio~ of Embarcadero Read and Bryant
Street: and
WH~~S, the City of Palo Alto is proposing to construct
the PROJECT; and
~r.reREAS, ~~ere is a need to establish zones where parking
will be restricted (1) on Bryant St.reet to facilitate traffic
turninq in and out of Bryant Street at Embarcadero Roac 1 and (2) en
Addison and Colet"idge Avenues to facilitate bicycle traffic; and
WHEREAS, there is a need to remove parking restrictions
from Churchill Avenue l due to re~oval of bicycles lanes; ar.d
WHE.P.EAS, Palo Alto Municipal Code Section lO~44.01G ena.~les
the City Council of the City of Pa.lo Alto to establish by
resolution such parking restrictions as may be necessary;
NOW, THEREFORE, the City COQncil of the City of Palo Alto
doeD hereby RESOLVE as follows:
SECTION 1. The Council hereby establishes "Na Parking at
Anytime" zones on the east side of Bryant street at Embarcadero
Road, to points approximately 45 feet to the south and 60 feet to
the north, and on the west side to points approximately 65 feet to
the south and 40 feet to the. north., as identified in EKhibit 1,
attached hereto and incorporated by reference.
SEctION 2. The Council hereby establishes -No Parking 7
a.m. to 7 p.m.'" zones on the sDuth sica ot Addison Avenue and
Coleridge Avenue, between Waverley and Bryant Streets, as
identified in Exi1ibit 2, attached hereto and incorporated by
reference.
SECTION 3. The Council heceby removes the ~No Parkin9 7
a .m. to 7 p.m." zone on the south side of Churchill Avenue, bet'Ween
Waverley and Bryant Streets, as identified in EXhibit 3, attachad
hereto and incorporated by reference.
1
-;1
~~ .. ~ ---~'""---
1
INTRODUC:OD AND PASSED:
AYES:
I
! NOES:
ABSENT:
ABSTENTIONS:
ATTEST:
City Clerk
APPRO'IED AS TO FOP.!>!:
Senior Asst. city Attorney
2
. '''.
APFROVED:
-~-----'---Mayor
City Manager
Director of Planninq and
community Environment
Chief Tr~nsportation Officiai
o CITY OF PALO ALTO ,~,
TRANSPORTATION DIVIS 10" '
T
I
____ 1 ____ _
EXHIBIT 1
I
I
July 2, 1992
I
I
I I~
!l I i
! I
I •
I I
i
I _J
Ii
, I
I I
! [ I '
I
SRVANT
ST.
BRYANT
ST.
o
CITY OF PALO AL10
TRANSPORTATION DIVISION
I SCOTT I I ST. / I
I
I
i , ! I
[ """'k',.~ .ER"~TT_~ __ J MftKINQ PE"..!!..~_~~!
81KE LAJliES
TO 1£ I!!o1STALLI!O
'-_____ -'-":::AlP.IO/lliG F'EA'-'IITTED
COLERIDGE AVE.
-T-·
I~ E""BLlSt-i ,,"0 AIoRKING.
IllitE LAN ES
TO liE 1~$TAlL~C
-_.'---'-
EXHIBIT 2
r
!
I
I
___ . ...J
July 2, 1992
•
M ..
:J
I
j
I
I
r----
i
I
I
i
I
I
i
_J
---,
I
I
i
!
i
o
CITY OF PALO ALTO
TRANSPORTATION DlVlSION
REWOVE BIKE
LANE LIN!:"
/
"------
---,---CHURCHILL AYE_
----------------_____ ~ -_-L-' .
~----------------
" > \ .... '
EXHIBIT 3
WIlIERl.EY
ST.
I
I
L
I
i ,
i
I
-,
I
I
'.
July 2, 199?
,
-.--.~-~--
o ATTACHMENT 4
RESOLt"XION NO.
RESOU:---ON OF THE COUNCIL OF THECIn OF PilLO ALTO
AMENDIM THE MASrER PLAN--tlRSAN BICYCLE S¥STEM TO
ADD THE BRYANT STREET BICYCLE DOULEVA.~D EXTENSION
WHEREAS, pursuant to p.esolutiol"l No. 4441, adopted April
19, 1.971, the city council adc>pted a plan for an ur-b.an bicycle
route SYliiitltm, known '15 the "Master Pl~n--tJrban Bicycle Route
system·; arid
WHEREAS, on December 21 1991, the city Council approved
the Bryant street Bicycle Boulevard Extension project ("project-);
and
WHEREAS, the Project as aoopted includes (1) extension of
the Bryant stre~t Bicycle Boulevard from its present terminus at
Churchill Avenue northward to the existing bicycle/pedestrian
bridge across San Francisqulto Creek., and (2) the addition of
bicycle lanes on Addison ami Coleridge Avenues and removal of
bicycle lanes on Churchill Avenue between Waverley and 'Bryant
streets t and as such, constitutes a change from the exist,inq
Bicycle Route System~
NOW, THEREFORE, the Council of the city of Palo Alto does
hereby RESOLVE, as fQllo~s:
SECTION l~ The additior.s and deletions to the existing
Urban Bicycle Route System, comprising the project, as set forth in
Exhibit -1-, attached hereto and incorporat~d herein by reference,
are hereby collectively adopted as an amendment to the City of Palo
Alto's Master Plan--Urban Bicycle Route System~
SEctION 2, The City Council adopted a Negative
Declaration in approving the Project on December ~, 1991. finding
that the Project had nc significant impact on the environment. No
further ~nvironmental assessment is neces5ary~
INTRODUCED AND PASSED:
AYES:
NOES:
ABSENT:
ABSTENTIONS:
ATTEST: APPROVED:
City Clerk Mayor
1
o
APPROVED lIS TO FORM,
Senior Asst. City Attorney
2
City Manager
Director of Planninq and
Community Environm~t
Chief Transportation Official
..
\"
1""'1 CITY OF ? ALO Ai. TO
""'TRANSPORTATION Orv.sION
BiCYCLE MAP LEGENQ
--... -Exfst(ng Primary Bike Rou~e
___ , Primary Bike Route To Be Removed
... ",,-.ro""""'" Proposed Primary Bike Route
'.
July 2, 1991
_________ ~ _ _... __ ~T~.". ______ .~. ___ ._ .... ~..:..~. _._. _~~_.-.
IlID SUMMA\{'i SHEET
Jlryan~re,' BIcycle Boul~~XryJtt!
8ids ~ec~jv@d: Ju~@ 16, ~992
Cupertino
EnqinalHr'u Steiny " Co ('iAB ConAt ('VE, Inc. Ell11ct-ric
L~_ ~T)..t.J..t--'l l.1..1£m D@s.;r.!.I1t;!.°ll(! l:l;lti!M.:tf: f--~1ll1tijo ~an Jose 6/!1n Jose fiunnr""'al'!'
1-I..uIllP SU!II. In\\M! tram .... Mgl\iIo\ at EmbillUnlCl'1II1
Brynnr S 80,000 _.~14i14 $ J9,S~~ ~J_~681 ~_8,944
7. Lump $U!\ Coml'\j!le 11.\1 ~\le rr~-pt.I"\h\l\, !,,[Itldlng
1\I'nd~ ~'\ir!) .nd gmter. hlndlelflred
rolm~, !jd"Wllk, N~ .• It EmlllrrlulUOI
Dryon •• $ JO,OOO 1--1-20,215 $ 2.~ 600 $ 2'1,356 $ 22,510 I-
L Lump Sum RCmn"~' rel,JCAII', an.d Itt~lilll dr."~ <'"
Rrv~nI between Chll..,"ill A~nlle And rue
Slreet $ 10,000 $ 6,350 $ 7.000 ~ 7.>oj $ ('.'""
'I'O'l'AL BID J'rEMS 1 'rHROUGli J IN'CI.USIVH $ 120,000 ;-'. "74,179 , '0., lCJU L-L ?5,(,_~ .. _L..2!..8r,4 I , l\.llD Al..1'ERrjArE ITE"MS
1. LUIllP Sum Renl')1o\: bUtt b\~ lin.eti. "lid reia\('~<1
§Ignln~ nn Chllo:ltlll AWIIUII IlCllIo'<'tn
Wlwtlcy lind Bi")'l!Inl SIICell. ~ 2,O()O t--L.~,H!> ~ 1,000 $ ~~_£_K~~ .. Lump SUm IMIIII bikt II~e Ilneli In.:l rj!l.rl"d !ljo!n1og
no ("()Ir!jdl" "'wnue I!cn"een W.,...:rlq rY.~" ''4-'--.'.. '-"-'--IIml Bryan. ::mu(j. $ ].000 r-L. 2,29') $ 2'~E_
J. Lump Sum ln~1111 bike hu.e liney .,," rflalr-d ~Ir,.nlnt I On A.'I<1i&<Jn. Alttnuc bet_en Wa\,<!,lqr lind
[)ry~~1 SmelJ, $ ],000 ~ $ 2 2'ls $ 2,5E~ I-~~_Z"..!.!.!!\ $ 2,275-
TOTAL AVO ALTERNATE rT!MS
1 THROUGH J INClnSIVt e
eRANO TOTAL (aaA~d on bld Item!> flhd
!I,OOO p_ 7.!~ $ 8,00(1 $ 8,'116 $ -',341'>
Add Al!:ernatf' I'tems) $ 128,000 $ 81,~?.'\ $ ~1.,l00 ~.!_~_51.0 _~~_,_209
Bt t'rancLI!I
t.l(fctric
Hityw~~
$ 30,000
$ 37.0~~
$ 6,4QQ
$ Ill,400
-~--~'!.~
_~!..~IO?_
, 1..1()O
$ 7,400
_t ...!!!!_fJOO
o
~
:J: ;::
~
'"
'., ,
•
... '::.~ ~~ ~ ~:'~",).
,:~·'~2~;'
,
' ...
b ,_--,,~. . At>~_-.
• __ ..-..;;i&'';;:;--'~.~:-_ .• ...",::-.'~5t""--'I!I''''' _otlm ___ .. • ... tr:o. ......... -'-....--,,",' ,~---••• ,.,---'---
:i
I
I ,
!
i
i
I
0
0
0
0
0
-.
o ATTACHMENT S
Location A: Zone boundary between channing and Addison
Location B: Bryant/ACfdison, north side of Addison
Location c: BryantjAddisoll, south side of Addison
Location 0: Bryarit/Lincoln, north side of Lincoln
Location E: Br./antl Li ncoln, south side of Lincolr.
EXHIBIT 4
LOCATIONS FOR POSSIBLE STREET CLOSURE
I
-~
"'r
~
1 ~
•
•
•
•
•
I.
•
i·
•
• •
B1CYCLR BOULEVARD EXTENSION
COMPARISON OF SlREET CLOSURE LOCATIONS A AND 0
!&~ATIQN ~ lBetw!&n Channille ag!! &!d1sonl LOCATION D t'Btt!mI.Mdlson Rod Unco!n)
(-Indicates statement applies Also 10 Location 8,) (hlndlcales .statement "pplll'S III~o to 1....cx:arloh C.)
Located at llCighborhood boundary and on property line. not • Located In middle ot nel,!"hrorhjtOt1. a IItlle nontl of URwin, due
directly in 'ront or I residence. Ir housing were constructed on 10 presence of Pllclfic Bell vaulu;, Located In front yard or
Urgent Car, slle, aUIO aCU'M via Bryant would be !lieplolrat~d rrom 611>51,
Prof~sl)rYille neighborhood.
There illi only enol,lgh curb length for II do~urc dcsl~n Illat leaves • There Is enough curb length [or .'IY cl06ure dcslgn."
the gUHer open,
'rmffic diven-ion conCl!nlratc-d more In norlhern pari of • Trame (liverdon ooncentralt!.d more in soulhr,m part of
nel!:htKlrhood (Le .• on Channing and Alfdl:\on. and On RamOl1l1 nelghoorhood (I,e" on Addison and Lincoln, .III1d on Ramona and
and Waverley berw Chnnning and Addison), Ramona betw Waverley belW Addison and Unr.oln), Ramonll hetw AddLson
Channing &. Addison 1$ I~s reAldentlal wiln (ewer cilildren thQn and KIngsley Is more rc"o;ldential with more children than b('.rw
hCtw Addison Hnd Kingsley.· ChRnnlng & Addl!lon ....
Traffic diver.'lion onlO Addl~on is aOOul the ~lIme as localloh D,· • l'rllfflc dlven;iot1 to Addl$on Jill about the same 111 LocatiOn A"
•
I
A three-hlock lenglh or Dryant with no Stop sign!> Is uniiT'pedecl A two-Mock Itmgth or Bryanl whl1 no stop signs I.!! unimpeded hy
lly the clOsure.-the dmurc,.-I
Drivrr.\ might enler the closed block from holh ends, • DrlVeI"'i might enter the cf~ l'Ilock from one end.
ros~itoly les!I deterrel1l 10 u'Brfic coming (rom Emharcadero, due • }>osslbly more delerrent 10 Ira(fie coming from Em~rcadero. due
10 longer distance of closure rrom EnIMrradt'J'o. to lesSer di!olancc of closure rrom Emban:.ttdero. .
Ore.ater lildlhood of parking removal on ellS! side or Ramona • Less Iikhhood Qr pDrkiQg removal un east side or Ramona
between Channing and Ad.Jjsor'l due to volume or fraffle dlvert'!d between Channing and Addj"l'n dlle to wlll'me of traffic diverted
10 Rartlona,-fo Ramvnfl,··
Clmure will di~JlI8C('! 3·4 on-!lrCCI parking ~IJat't'..'I In Ir". where, • Cimure will not SUbstantially dl~place_ on-Street pllrkhl.!::.
on-!ilrccl parking Is well-ullIized; could shirt to Addison.·
Impacl on t!mergency and other ~el\'lcc.~ same AS Lol,nlon 0,0;0 • Impaet on emergent)' and other services Slime Wi !.oCtlJon A"
N/Il traffic l1~s ~ cross !lueets to U~ for Mlout,· • Nib frame hu Z cross slr~u 10 usc. (or detour .••
.
, .. ---,,,-.-.~---.~--.,,.~,~.,------~~.~....,
-,,-,...,., .. ,,-'
o
~
l> o
:I: :s: m
Z
~ ..
~ .... ';: , 1':1 ,
~
\
I
\
"
" "
, ,-,
"j'"
'.'.,(" .. "." . . j"
, ;.
t;,_~
LO~ATIQN Of BBYANI SIBEEI CLOSURE
#940
Residence , PlOporty
'lin.
Uruont Care Center Parking Lot
i
_____ .... -..... _.-,.6~lt
--------------~/ ~ t 10' rod OU';"l"-~d CtJrb if
!~
\ -. ;1
~
/ __ ._ 10"-wJde berm
TO Addison
L
"
,
I
1~----;;; prukln~ 8pa.,;-"---->f-13, red ~rt,~t;.7L-
property
11943 line
Residence '
OJrb
.1.
Nursing Center
curh ~
To Channing
....
7
Bryant Street
o
l>
~
(']
:I: :: rn :z
-i
Q) 'T·"
•