July 2, 1992
TIlE HONORABLE CITY COUNCIL
Palo Alto, California
Attention: POL!CY AND SERVICES COMMITTEE
ArAstradero C~ek Access Road I~provements project
Membero of the council~
Rgport in ki.U.
This report requests that the Policy and services Committee
recommend Council approval of the Arastraderc Creek Access Road
Improvements Project and the a~ard of a contract in the amount of
$168 1 000.00 to Raymond J. Bragato, !ncH In addition, staff
recommends that Council authorize the city Manager or his designee
to execute one or more change orders to the contract t~r additional
related, but unforeseen, ~ork. The value of these change orders
shall not excaed $25,200.00. Funds for this proj~ct are available
in the FY 91/92 Capital Improvem~nt Prog~am Budgets of the Water,
Gas, Wastewater and Electric Utilities.
This project vas presentea to council May 11 and referred to the
Policy and Services Committee because of Council concerns regarding
the need for a minor site ana design review of the project and
related environmental easement. The environmental impact
a~sessment (EIA) has been prepared and is attached. The ErA 3nd
project will be revieved by the Architectural Review Board
followinq committee review.
~kgrQUDd
In 1962, the city installed a 14-concrete cylinder pipe (CCP)
water main, a 10 W vitrified clay pipe (VCP) sanitary sewer and 12Kv
overhead power 1 ines through the property )mown today as the
Arastradero Preserve. In 1968, an 8" steel gas main was installed,
prOViding the foothills area vi~~ a complete utility system, partly
in anticipation of futuJ:'e residential build-out. Although the
foothills have remained open space, the foothill utility system
sarves custo~ers in the Palo Alto Hills area, the Hewlett
Subdivision, Los Trancos Foad, Foothills Park and homes on Page
Kill Road, and is an integral part of the total utility
infrastructure.
CMIU118,U
h
I,
"j"
-~":'~"
~,---
-
Initially, the City operations crews 'Were able to access the
system, (e.g. 12Kv poyer pcles, sanitary manholes and valves),
using th~ construction access roe~. OVe~ the year5, City crews
u'sinq loaders would "'plow" their way through the brush to cle;3.r a
pa.th for vehicles 'When maintenance was necessary on tho!! sy5tem~
Fortunately, ths foothill utility systems ~ere well designed and
mcj or maintenance problems in the past have been minimal. NoW' I
however, the foothill utility sYEtem is over 30 years old anQ the
need to safely ~rfQrm major maintenance work has ~ecome a reality.
construction access from Corte Madera Pump Station on the
Arastradero Preserve to Foothills Park was fabricated in the early
1960's wh~n tha utility linEs l reservoirs and pump stations were
initially installed .. The '-_::istruction access was not improved to an
all-weather maintenance I"::lad: at that time, and. it has become very
d.ifficult to use and hazardous for utilit:'7 maintenance access in
certain areas along the util ity al iqnments.
The present aCC~6S is unsafe for vehicle passage and a hindrance to
both normal and emergency operations. The old construction access
road has become so overg-r-own that: City cr-ews are unabl.e to mo ... te
equip.ent safely over it to the utility lines to perform needed
maintenance~ The sanitary sewer has problems with root intrusion
that have caused sewer stoppages. The City crews cannot qet the
maintenance equipment to the manholes to clean these lines
mechanically. Consequently, only minimal line openings with hand
tools have occurred. Durinq the rainy season, the present access
road becomes a q~aqmire and parts of it resemble a stream and lake
instead of 4 maintenance access road.
The wooden poles supporting the overhead. 12,470 volt power line
serving the foothills area are in need of major rehabilitation. A
wood pole inspection, performed by Osmose Wood Preserving, Inc. in
1991, showed that a majority of the wood PQ ... er poles in the
Arastradero PreserVE area require replacement. Replacinq these
poles cannot occur untjl a safe access road is restored.
In addition to' the access problems, another concern is that of
fil"e. Eguipment is driven as :far as possible on the existing
overgrown access. The limited stretch of access road negotiable in
the summer months is covered with dry weeds, vhich could b~ ignited
by a hot spark or equipment ~uftler. The present limited access
only accentuates the possibility of an extended pover -outage or
exten&ive system damage, especially during acute fire hazard
season.
Restoring the original constr~ction access as an all-weather
surface alon9 the aliqr~~nt of the existing utilities will enable
ClIR:318: 92
•
,
h· I
l
l
. -.~.-'"
~ ;X$'itir_ ~Ah_
I •
1
-
operations staft to maintain these facilities safely yeer round,
iDcluding during inclement weather.
Project pescription
The propoaed maintenance project is approximately cne and one-half
:miles long and will include the following: maintaininq t.he access
at 10 f~et vith 12 feet at turns, compacting a Subbase, installing
6 inches of ~ase course and overlaying th~ base with a chip seal to
control erosion ar.d blend with the rural environment. Road
geometric design, pipes, cul~erts and drop inlets will be used t~
drain and prevent erosion while maintaining, as closely as
possible, the. surre-und.ing environment in its eXisting natural
condition.
!'he project concept has been extensivelY fie-ld reviewed and
approved by Planning Oepa~~ent staff. Upon review of the project
by .staff .. the proposed 40 foot tu_t"narounds tor vehicles in the
orlqinal project design vere eliminated because no mitigation could
be found for their construction. The attached EIA assessment ~ill
<]0 to the Architectural Review Board (ARB) for minor site and
deSign review following considerations by t~e Policy and Services
COlILIDittee. The o:ity Arborist reviewed the-project in the field antl
the Arborist's comments were included in the project design. The
project alignment was changed in oreer to save eJCistinq 'Wild
plants: the width of the original access road was reduced from 14
feet to a minimum of 10 feet in straight alignments and ~2 feet in
the turnst protective structu~es were added to improve drainage at
the bases of 23 trees: and a chip seal coa~ing over base rock was
aOded to control erosion and reduce the visual impact of the
proje<=t.
Prgject Justificatio~
The bid docwnents included a chip sea,l coat as an add alternate.
The purpos~ of this add alternate was to allow the elimination of
the asphalt layer over the road base, if the bids ~ere not within
the project budget or Council decided asphalt was not an
appropriate surface ir. the Arastradero Preserve. The 2" asph~lt
overlay on the base would provide the .best all-weather surface
access with a minimum of maintenance~ The chip seal over the base
course vill provide an all weather surface also, but mere
maintenance activity on the access road would be required than with
the asphalt overlay.
ClOlIlU:92
•
,
, i
-
.1
'.' I .
-
General Orde.r 95 (OVerhead Electric Lir,e Construction) ot the
Public utilities commission for the state of California mandates
(Se..::tion Jl.l) "Electric supply systems •.. shall :be maintained in a
condition which 'wIill enable the furnishinq of safe, prC'lper and
adequate service.1I and (Section 31.2) "Lines shall be inspected
frequently and thQroughly for the purpose ot ensuring that they are
in qood con,jitlon so as to conform with these rules.-These
mandates refer to normal, ncn-emerqency, operating circumstances.
In the event of an emergency .. such as a power outage or fire,
electric crews must be able to respond safely in a timely and
~fficient manner to restore service ana/or protect the public from
d.anqer, in addition to limiting the City's liability against
possible claims.
The Federal Depa.rtment of Transportation (oo'1'j pipeline Safety
Requlatiol'1s Part 192, Sections 1512. 70S and 192.706, require the
City to patrol and obser~e surface conditions on and adjacent to
the qas line right-of-~·ay, for indication of leaks and other
factors; affectinq safe.ty and operations of the pipeline.. The
surveys required by the DOT could be conducted more efficiently and
safely when the access is repaired~
An all-weather road, with drains. needs to be restored to service
ability on the Arastradero Preserve from Cort~ Madera Pump Stati¢n
to Foothills Park alonq the existinq utility easement.. It is
imperative that emergency and routine maintenance vehicles have
access to the utilities to preserve the inteqrity of the utility
system. The road should be improved to support the 37200 GVW (gross
vehicle weight) Se .. er Main Cleane.r and. the Electric Division'S
38000 GVW line truck and t~ailer.. These vehicles are 40 feet in
length and need the proposed minimum road improvements for safe
utility maintenance access a The safety of the City employees
expected to perform routine maintenance work and. emergency repairs
should be a high priority when considering whether or not to repair
the e~isting access to an all-weather access~
Envirgnmental Assessment
An environmenta.1. assessment has been prepared and recommends a
~indinq of no significant environmental impact.
aid Evaluation
The project was sent ou~ for competitive bid~ Bids vere received
from ten qualified bidders on April 14, 1992, as indicated on the
attached. bid summary. The bids ranged from a low of S168.0CO.OO to
a higi.i of $302,114.00. The Utility Engineer's estimate is
CKIUU8:t2
L
•
~~ ... , ....... ,:1,-j
I
I
•
I ,
t ..
I
,
. .J" .' '.' r
o
Th~ lowest responsible bidder was Raymond J. Bragato. Inc.
finds the low biader to be qualified to perfor.m the
satisfactorily.
Reco;rmendf,tion
Staff
work
staff recommends that the Poli~y and services committee recommend
that the Council:
1. Adept the attached Negative Declaration recommeno1ng a
finding of no significant envir¢~mental impact, approve
the Arastraaero Creek Access Road Improv~~ents project
with a chip seal surface without a 2" asphalt overlay
and, further, authorize the Hayor to execute a contr.act
with Raymond J. Bragato, Inc., in the amount of
$~58,OOO.OO, and;
2. Authorize th& City Manager or his deSignee to negotiate
and execute one or more change orders to the COi1tract
with Raymond J. Bragato, Inc., the value of which change
orders shall not exceed $25 ,200.00.
Respectfully submitted,
, -~J ..q7/Wt%, A! ~-~ ---/
,/~' •• / ,"-;:O-"'1.-,,",/\"c.....
ROGER CWIAX
Enqineerlng Manager
Water, Gas and Waste~ater
'A; .:j,-",,-J_ :t. "4-~ .-~-(/<-
¥CHARD L. YOUNG J'
Director of utilities
~~
Assista.nt Cit}" Manager
Attachments:
cc:
CXR:318:92
EIA
CMR:246:92
Speakers at Council Meeting
.~ 'L~t~~~f' ........
-
o
[n .... i rnnmental Dt;)cl..!me;-rts -City of Pa10 Ji.1tc
ENV!RONMENTAL ASSESS~[NT
Project DEScription/litle:: imprO'v'ements to an Exi$tiM 1 112.1l'!i1e lor,g
utility access road i'i the Arlstndero Preserve. T{'j.e, i:r:prcved road ... 11 i b~
10 feet wide. ]2 feet wide at curves. U1i! cross sectia~ to con!isJ o,,-t,--.,...,...-_
compact subbase. si~ inches of base courlli....-and an overlay Qf chip seal to
.l2.1end with the 10ql soil color.
Location/Address: Arastradoera Preserve. Ara.:tradero Road, Pa.lo ,~lto, CA
Sponscring Agency/Applicant: ~f Pa1p AHa. Utiliti.~s Departmer,t
Mdl"'e.s.s and TI!1epho!le of Appl'car,t: 250 Ha~ilton. AlJenlJe. Palo AHo. CA.
94301. Contact Roger Cwi C!k~ 3,,2,,9,,-"'2.26.'-1 .. 2 _______ _
App 11 cat i or; fa r; \I"; nor s it"'.~an'i'd:':-'<!"."'"i,.g':'no_r':'.,,v,,· i"."'~~=c;-;===;--::=7-::-C-",,-__
(e.g. ~ zoniJ'lg change, su:bc!ivision of property. ardlitectura1 revie· ... , use
permit)
Zoning at Project location: PF WI
NOTICE Of DETERMINATrON
Based upon review of the project fi1es, the undersigned member of the
P1ann1ng Department has concluded:
IXI Negative De~'a:-"atiD!"I: The project has no significant el'l'f'ironmental
impact. NQ Environmental Impact Report is required. Th~ reasons for
a Declara.tion are: documented in the attacn.ed Enllironmenta.J tmpact
Assessment 19Z-EIA-2?'.A record of Dro~ect action is ~yailable for
rev; ew a t the pac:l=O~A~'t, t~o~p~l~'~nn~i n~g'='D~e~p~a'::rt=m=e=n=t~.~l~o~ca~t~e~d::=a t 250 Ham i 1 'c.01"J ,,"venue! Pal c A 1 \!LSA.,
An The project may have a significant environmer.tal impact.
Environmental Impact Report will be p:epare~1 I'
Phnning Department Official: ..,.jj'f.,~ ... 11r~
Pianning Oir~ct~r: A~~~~'1:;"'-d~~~'~ Date: June 2.9, 1992
The project has been approved.
The project has been denied.
Revised B/I/79
Date:
Date:
file No.: 91-EIA-12
, i
ENVIRONMENTAL DOCUMt:l -PALO ALTO
1. Project Title/Address: Arastradero Creek Access Road Imnrc'o'ement.;.
II. Project Description: !mprove-ments to existing 1 ~mi le iil(.cess
road for t~s purpose of proylding all weather iCCe-sS f,:,l" mairrtenance
of gxisting water and sanitary s@wer lines and over-head power lines.
Th! road improvements inc~ude a gra~el ba!e with chip seal surface 10
feet wid-!, witf'l 12 feet '.ddt~A. t'Jrns. the cross section to consist
~09Ct s~bba~~t six inches of base course. and an cver1av of chip
seol to blend .jt. the local soil color.
Environmental Setting: The Road runs through the ArastradetQ.....
Preserve from t~e Corte Madera Pump Stat jon to Foothill Park. The
Ari$trade;Q Preserve 1S in undeve19pfd natura' area which include$
grassjands. woodlands and Arastradero Creek.
IV. Environmental Impact Checklist {Explanation of all "yes" answers are
in Section \0')
l. E.rth. Will the proposal result in: rES
a. Unstab1e earth conditions or d1anges -L
in geologic substructures?
b. D;sruptjons~ displacements, tompac~
tion or overco'ltl:ring of the sed J _L
c. Ctange in topography or ground
surface rel ief frii.tures? _X_
d. Tne destruction, co~ering or modi
fication of any unique geologic or
Physical features? ~
e. Any increase in wind or water erosion
cf soils, either on ~r off the site? ~
f. Exposure of people or property to
ge'Jlogi, hazards such as earthquakes.
Tindslid~s, mudslides, ground failure
or similar hazards? 1-
g. Changes in siltation, deposition t or
erosion which may modify the channe1
of a river or the bed of a bay or
inlet? -X-
'* Adapted' from Appendix I, California Guidelines far Implementation of
CEQA. December 14. 1976. *. Updated May 1982. Jun. 1983
p;\"N\:uestra.e ioll Page 1
92-EIA·21
'--,..,..,....-'--~--" L
-
•
1
I
I
-
1.
o
Air. Win the proposal reslJlt in:
L Substantial air em1Hions or de
terioration of ambi~nt air quality?
b. The creatlon !If .objectionable odors?
C. Alteration of air mQY~ment. moisture
temperature, 'Jr any change in cli
mate, either locally or regional?
3. Water. \lin the proposal result in;
li. Changes. in absorptiCrn rates, drainage
patterns, or tne rate and amou~t Qf
surface water runoff? ..L
b. Alterations to the co~rse o~ flow of
flood waters?
c. Discharge into surface waters, or in
any alteration of surface water
quality, including but not limlted to
temperature, dissolved oxygen or
turbjdity?
d. Alteration of tM! directton or rate
of flow of grDund waters?
e. Expos.ure of people or property to
water related hazards such as f10Qd
ing Or tidal wave?
f. Change in the Quant it), Df ground
waters, Either through dir~ct
additions or withdrawals, or through
interceptions of an aquifer by cuts
or excavations?
4_ Plant life_ Will the proposal result in:
a. Change in the diversity of species, or
number of any species of plants 'in
clJding trees, shrubs, grass, crops,
microflora and aquatic plants)?
b. Reductior. of the numbers of iny
unique , rar~ or endangered species
of pl ants?
See Explanation 14a.
Page 1
91-EIA-21
, , .
r
t r'._ ~"'-'''--'-'''''' ... ~-, -.-~,,;--,.-,-"--.--*,,,-.
c. Intr~du~t1on of new sp~c;es of
plants into an area. or in a ba~rier
to the normal replenishmont of
existing species?
d. Reductio" in acreagt of ani
agricultural crop?
5. Anima' l if.. Will tn. proposal result in;
a. Chang~ in tne diversity of species,
or number of any species of animiTs
{birds. 1i:fIC animals intl1,lding rep
tiles, fish ."1 shellfish, benthic
organisms, ins!cts or mfcrofauna)1
b. Reduction of the numbers of any
unique, rire or er,dangered species
of animals?'
c. Introduction of new sp~cies ~f
anim~ls into an ~rea, or result ~n
2 barrier to the migration or move
ment of animals?
d. Deterioration '''1 existing fish or
,~ildlife habitat?
6. Nojse. Will the propos.' result in:
7.
8.
a~ Inc.reases in existing noise levels?
b. Exposure of peop1e to severe nOlse
1evels1
light and Gl,re. Will the propos.'
produce new light g1are?
land Us.. Will the propos.l result in
a substantial a1teratfcn of t~e present
or planned l~nd use of an area?
9~ Energy/Natural Resources. -Will the
propos,l result in,
a. Use of substantia' amounts of fuel
or enel"9Y:
See Explanation. la.
Page )
92-El~'21
•
-
o
b. Substantia! increas~ i~ demand upon
existing sources of energy. or
rt!quire the d~\lelopment of :lew S{lurces
of e~ergy?
c. increase in the rate of use of ariY
naturil resources?
d. Substanti~l de?l~tiGn ~f any nonra
~ewable natural resource?
10. Risk ~f Upsgt. Does the propos a'
involve a risk of an explosion C~ tne
release of hazardous substancES (in
cluding. but n~t limited to, oil,
pesticides, chemicals OT radiation) in
the event of an accident or upset?
11. Pdpu1at1oD/Hou5ing.
a. Will t~e proposal alter the lo~.tion,
distributiDn, density, or growth rate
~f the hUman popuiation of an arEa?
b. Will the proposal effect existing
housing, or create a demand for
additjonal hOllsing?
12. !ransportation/Circu1ation. Will the
proposal result in:
a. Gen~ration of substant,a' ad~itiona'
vehicular movement?
See Explanation 112a.
b. Effects on existi~9 par~in3 facil~
ties, or demand for new parking?
t. Alterations to present patterns of
clr~ulation or movement of p~op1e
a.nd/aT goods?
d. Increase in tra.ffic hazard's to moto)""
venicles, bicycli~ts or p~destr)ins1
Page 4
92-EIA-22
-
o
liS.
13. ~S.~rvlcB. Will t~e propos.al have-
an effect upon~ Or resu1t in a nfed for new
or altered go~ernmental services ~n iny of
the following ar~o.s:
•• FIre protect ion?
b. P~lfce protection?
c. School.?
d. Parks or oth~r recreational
f!c.iHt1es?
e. Maintenance of public faci1ities,
inc11Jding roads.? . J....
f. Other governmental SH'I}c.es?
14. Utjliti~s~ Will the pr,posal re~u1t in iii
ne€d for n~w systems, or substantial
alterations to the following ~ti'ities:
a. PCIt"er or natu"Tal gas?
b. Comrnunit~tions sJstems1
c. Wate-r1
O. Se~er Or septic ta~K?
e. Storm water draloage?
f. Solid ~a5t. and d;,posal?
IS. Human Hea1th~ Will the proposal resu1t
in:
ii. Crea.t ion of any health hazard or
potenti.l health nazard (excluding
mental health)?
b. Exposure af people to potential
f'H~aith hazards.?
Page 5
92-EIA·22
•
f
t i~
:1
;i
I ,!
:\
·1
1
1
j
I
!
-
16.
17.
18.
o
Aesthetics· ~i 11 the p roposa 1 r£:sult
in the obstruction of any scenic vista
or vie __ open to the J:ubl ie, or lIIin the
proposal result in the creation of an
aesthetically offensive site open to
pllb~c v1ew?
~ecr-eation. Will the proPQs.a1 result
10 an impact upon the quality or q~ant1ty
of exist1r.g recreational opportunities?
CiJ1tural ResDu;--:.:es:.
a. Wiil th~ proposal result in the
alteration crier thE destruction
of a prehfstoric or historic
arc~aeo1og;,al sHe?
b. Will the propos.l result in .d
verse physical or aesthetic effects
to a prehistoric or historic
building, structure; or object?
C. Does the proposal ndve the potential
to cause a physical change ~hicn
would affect unique cultu~al values?
d. will the proposal restrict existir.g
religious or sacred uses within the
potential impact a-rea1
19. Mandatory FindiQ1§ of Sigr.Tffcanc~.
P:\VW\ilras.fra. eo; a
a. Does the project have tne pntential to
degrade Ue 'Quality (If the em'ironment.
suostar.tialTy reduce the habitat of a
fish or wildlife species, cause a fish
Dr wildlife popul.tion to drop below
self-sustaining levels. threaten to
eliminate a plant or animal community,
reduce the nu~ber or restrict the
range of a rare or end3.ilgered plant or
animal or eliminate 1~partant examples
of the major periods of California
history cr prehistory?
ill
See
tt'·YBE ~O
_X_
bplanation 1l6.
__ x_
..L
..L
..L
Page 6
92-EIA-22
•
,
• t ,
t
c
t
f
~;
il ;.J
I
'I ,
1
'J i
f
I
I
I
!
'""",
Does the project have the pot,nti.)
t~ achiev€ short·term, to the dis
advantag@ of long-term, environmental
goaTs? (4 sh~rt-term impact on the
enyiron~~nt Is one which occurs in a
r!latively brief, definitive period
of time while long-term impacts will
endure well into the future.)
c. Does thE project have impacts whicn
.re individually limited, but
cumulatl,ely consid.r.ble? (A pro
ject may impact on -two or more
separlte rescurces where the i~pact on
eich resource is relatively small, but
whore the .ffect Of tho
total of those impacts on the
environment is significant+)
d. Does the project have environmental
effects whfch ..,ill cause substantial
adverse effects on human beings,
either directly cr indirectly?
V. explanation of ·yes R answers in environmental checklist.
See attached.
_x_
_1_
Page 7
92-EIA-22
•
'.
-
"
o
1. farth LILs.! The road impr~v('m€l"Its wi', I folIo .... th~ path of the
prelliously graded constrLJction road. l~e road will be graded to minimize
("ange5 from existing grace and to balance cut and fil1. me improved
road, 10 feet wid~ lrIi;th a width of J2 feet at CUr""!::i, II.'ill havE' .a compac.t
subbil.se, 6 inch ba~e coJurse and chip seal surface. The cnip seal surface
of the access road irlil1 reduce etos~on \I/.hic:h is pres.ently OCCt"p"'ring 0'-1 the
unpa'Yed f{]ad.
3. Water raJ The gravel and chip seal pa~ing of the road w~ll result in
an increase 1~ imp~rvious surface on the site. However, the amount ~f
imp2rv10lls surface will not change ab$ar.pt10~ rates. dnir.age patterns or
iurface \:.'ater runoff. Water will sheet drain across the road in most
lociitions~ Where.required, water \l.Iill be collected by headwalls and drop
ir;1~ts on the upn i1l side of the road and con .... eyed under the road by pipe.
The o~tfalls will be stabilized by ~atural ro~k r;p·rap to prevent future
erasion.
4. Plant life :a) T~e project nas been reviewed in the field by tne city
.arborisL No trees are being removed. The arborist's specifications. for
protection of 23 trees that are near the area of c:onsttl.'ction have been
incorporated in the pl ans. The proposed improved road has been reduced to
10 feet from the 14 feet of the origina1 graded road in order to min~mize
impacts DO the natural envircmme"t. A field inspection in june, 1991, of
th~ proposed area of work disclosed one location where a Targe ~umber of
wild roses would have been destroyed. The project alignment was changed to
preserve tnese plants. When the ar~a of work has beer; staked and before
any work commences, a field survey ~ill be made by tne city arbarist end
city naturalist to confirm that the work ·will not resuH in detrimental
fmpacts on trees and other natural features. rf any cGnfl ict is found, th~
proposed road improvements \l/ill boe modified as required to protect natural
features. locations for construction staging and storage of machinery and
equipment will be determined in co~sultction with the city arborist and
city naturalist 1n order to avoid sensitive areas and minimize impact on
the natural environment.
8. land use The rOad imprc .... emcr1ts "-111 not result in a substantial
alteration in hnd us~. The area is pr€sentTy open for hiking and
horseback riding. The improved road may increase opportunities for members
of th2 pub11c to e~joy these currentlY allowed uses by serving as a niKing
tran ~
J2. (01\) transportation/clrcul ation The proposed road i:npro\'ements will
not result in substantial additional v~hicular movement, becausp. the
e~istjnq lOCKEd gate at the ~ntrGnce to the road will rema!o tn place,
limiting vehicle access to service vehicles, as is presently the case. In
the past, some required maintenance on the existing utility lines has been
deferred. The improved road will facilit~te maintenance of the lines, and
some of tf1e deferred maintenance is expected to be implemented when the
rD~d is complete. It js expected that this will result in an increased ~se
of the road by maintenance vehicles while tnis work is being done.
~E) public services The road improvements will greatly facilitate the
p:\ ...... \.r.ttr •. ei. Page 8
91-UA-lZ
L
.~. '.
--
Inaintenance of plJbl ic. faeil Hies by pro'o'iding access t.) the existing
sanitary sewer, gas line and oV'erh~ad .electric line. The sanitary :;E:wer
llne and c ... erhead ele~tr;' line were insta1"led in 1962 and the gas line in
1968. In the years fonowin9 installation, the lines ... ere maintained using
the construction road. Tnis road has deteriorateQ ttl the po~nt that it is
no-longer possible to get maintenance eq:Jlpment to so!'!! part~ of,the
utilities lines. At the same time, the aging of tn! lines nas resulted 1n
increased maintenance needs. SOJ"iIe substantial maintenante, such as
~~chan;cal cleaning of obstructed sewer line~, has been deferred due to t~e
difficulty of getting equipment to the site. The improved road will
facfHtate hllpleli.entation of botn routine and emergency ma.intenance of th~
existing utility systems.
HL Aestneti cs The road 1rr,provements hav! been designE'd to ~i"imize
aesthet'c impacts by reducing t~e width of tne original construction road
fra. 14 feet to 10 feet (12 feet on curves). minlmiz;ng grading. protecting
trees and other plants wiU,;n the area of work and surfacing the road iIIith
chip seal similar in color to the soil in the area. Two turn<lrounds
originally proposed adjacent to the road ~ive been eliminated from the
proposal in order to minimize environmental and .aesthetic impac.ts,
~ See item IS? land use.
p:\V\oI\arastn,e[. Page 9
92-EJA-22
L
May 7, 1992
THE HONORABLE CITY COUNCIL
Palo Alto, california
Cgntract 'With RaYlnond J, z,rag2lto, Inc. fer Axastradero Cref'k Access
Road Improvements.
Members of the council~
Report in Brief
This report req~ests that Council award a contract in the amount of
$168,000.00 to Raymond J. Bragato, Inc~ for Arastradero Creek
Access Road Improvements. In addition, staff recommends that
Council authori~e the City Manager cr his designee to execute one
or more change orders to the contract for additional related, but
unfor~seen work. The v.alue of these change orders shall not exceed
$25,200.00. Funds for this project are available in the FY 9~/92
capital IMprovement Program Budgets of the Water, Gas~ Wastewater
and Electric Utilities.
BackgrQund
construction access from the Corte Madera .PuIcp station on the
Arastrade.ro Preserve to Foothills Park was built in the early
1960'S when the utilities lines, reservoirs and pump stations were
initially installed. The construction access was not improved to an
all-weather road at that time and has functionally disappea~ed as
a utility maintenance access in certain areas along the utility
alignments. Improving the original construction access to an all
weather surface along the alignment o£ the existing utilities will
enable Operations staff to maintain these facilities year round and
especially during inclement weather.
Project pescription
The proposed project is approximately one and one-half miles long
and will include the following: widening the access to between 10
and 12 feet, compacting a subbase, installation of 6 inches of base
course, overlaying the base with 2 inches o! asphalt concrete and
a chip seal to blend lo7ith the rural environment, Road geometric
design, pipes, culv&rts and drop inlets ~ill be used to drain and
prevent erosion while maintaining, as clcsely as pcssible, the
surrounding environment in its existing natural condition.
CIIll, 2" , t2
I
!
I
'.
'::
. ..J.
'1-,
~ -:
-
,.;.:
The above project concept has been ~xtenGively reviewed and
approved by the Planninq De.partment~ The project alignment was
changed, in order to save existing wild plants~ the width of the
oriqinal access road va. reduced from 14 feet to a minimum of 10
.and 12 feet: protective structures 'Were added to improve drainage
at the bases of 23 trees, and a chip seal coatjnq over the asphalt
was added to reduced the visual impact of the project~
Bid Evaluation
The project was sent out tor competitive biQ~ Bids were received
from ten qualified bidders on April 14 J 1992, as indicat -~d on the
attached bid summary. The bids ranged from a low of $15e,OOO~oO to
a high of $302,114.00. The Utilities engineer's estimate ilS
$223,504.00.
The lowest responsible bidder was Ra}~ond J. Bragato, Inc. Statf
finds the low bidder to be qualified to safely perform the work.
Recommendation
staff recommends th5t Council:
1. Authorize the Mayor to execute a contract with Raymond J.
Braq.ato, Inc., in the amount .of $.168,000.00 for the
Ar~stradero creek Access Road Improvements; and
2. Authorize the City Manager or his designee to negotiate
and. exe-:lJte one 0% more change orders ~o the contract
with Raymond J. Braqato, Inc .• the value of which chanqe
orders shall not exceed $25,200.00.
Retfo~tU~~/ed'
" . CWiak
E I .. eerin g Manaqei
/i-<-<. h~~( .~ ·t:/~4
Ri~"rd L. Youn~ ;/
Oiietor O~f' U.tilities
~.-, , ~e Fleming
,. Assistant City qer
Attachments:
CJOII2U: '2
·L'.
.Bid Summary
Contract
, ... ,;/,:i~'f' .;,4;~~;>;~.:
'; '1!..".... . . .,.... .. " .. ' ":';' ,.;'",' .: ~ . "
j
1
.-~-~-~.----.. ~ .... ,., .. ~~.-,,-'-"~-..~~--"----------------.
ARASTRADERO CREEK ACCESS ROAD IMPROVEMENT
BID SUMMARY
by PH on 4115192
MAIN 'OJD g EUOINEER'S ESTIMATE
. --QUANT~iIJJl.NIT PRICE iTOTAL
';;;CONTRACTOR'S BID l
DRAOATO TNC. I
~ !-iNiT'm~'-'rrOT~~ i
[I~~~J
'-----
DESCRIPTION
-'~-, I Clellrin8 grubblitl./!: ArrroJ{ ~'--.-----~
2 hc!,:~ol\, Comp"ct~!J
3 Back(ill .tld COttJpe.CtIQR 'I
4 Sl.bitizui~n fa.brlc
imllt'!!L!..OO,OOO S-F. ~=r~ Lump ~!!!I-Lu~;;·~~·-;;-T. -~$)O,OCJ,).oO¥"~-----r~ ~!3i~
,ppro'limaiely 1450 CY ~I_. Lump Slim. Lump "Urn! 58,000.00 Lump t'llIlQ $lt,(J(lO.OO
pprQf\\mlltely 950 C-Y--';-'--Lump 111m Lu';p-;;';;--$~OOo.OO r;;~p slim --$9.500:"00-
----[30, Roll --"$450:-00 --$'13;'500.00 -'--~:iJO:OO 1 •• 900.00 ._-------I--~ Blue Coone
• 12~CMPJ.;'StlllI.t~
_____ ·_-_-_-_-\220i)'Th;; ----wLOO --.J .... OOO~OO $14.00 --=:'_S;,1O,8(1O,~
162 Ln,Ft. S22,00 $).,64.00 $20.00 $3,2<0.00 "----
H= IS"CMP IIt'ltll.lla.tiol\ 1=:;--'----Drop In..!!!~~ ___
rioncrele Headwall
'23 Ln.';,~. -, $)O.~ .s5.19~,~ --$il:OO I $4,32;~ _____ g_i __ -;9~EC' •. '------__t_-__;$500.00 $4,500.00 $700.00 , $0,300.00
2 Eo, $350,00 $700.00 $1,500.00 $3.000:00
b~ 10 'Alprap ~~---.---$25,00 ---$25<,,00; M~$Wo:"()() --j~oo
8311 ;~':! PJ~lOn ~~_ •. __ . mo.oo S.5}so.()(H ___ .!.IOO~ _~J'~.OO
12 Mflnhol~ Adjulltlng , 3 Ea. $100.00 $JOO.~]-= $300,00 S9OCl.OO
13 2"'AC Oyerljl}:---r ~2~_T(01l __ ~}75.00 S9J,1S0:..@L~-$40~<!-> -.!~-,~,~
TOTA', $714,504.00 $146,000.00
ADD ALiERNA.TE If I [-~JctHp.!t:al '-'---''------------~--TJ~ Sq,Ft~ __ ]_~~_.!l.~ i -$~ooo~lT---S(~IL=_J_2~~D
GRAND TOTAL $223.504.00 $168,000.00
PAGE I
o
)
~
J '<~t:~ "".~:';'i;i'" ""il'l ,,",'if ,~,"", ' ':":~}" j' /: -:~:.' ~ "-1"'-;ft",}:,'J\,.l; ARASTRADERO CREEK ACCESS ROAD IMPROVEMENT
BID SUMMARY
-
,>rll
;{, ~'f "':,)i.~\
""""Ilt
:... "r' " -;~""\1,,,&!:-,_;,,_, \ ,', _.,_,;,:'<
\~ '. \,.
,
MAIN BIJ) MAIN BII) r-----nw-CONT!tACTOR'S DID CONTRACTOR'S DID CONiRACTOR'S hID CONTRACTOR'S 8J0=1
ITEM O'GRAOY PAVING INl'ERS'fA'fE fiSK PIRENZH MCLEAN MUNKDALE OROS
i ,UNITPRICE.Ji:9TAL UNIT PRICE [;"OTAL UNIT PRICE TOTAL UNIT PRICE TOTAL,
i ~1 Lump IUID $2S.000,OO Lump I~m ! ~~'.~ !Lu~p sum $44,OOO.0? Lunlp sum I S14,0CI0""JXiJ
t I 2 Lump llim _ .$10,000.00 LuOIp .sum T 116,000.00 Ut,!,p_l!IlIm $11,000,00 ltImp lum ~O,~:20 ;1
t
i.: I
J Lump&um S15,OOO,00 l.ump8u~-:= $J4,615.oo LlJmp,luni Sll,OOO'~F~ ___ ~i ___ .~,280.00
4 $500,00 $IS,OO(),OO $392.00 $11,760.00 \410.00 Sll,300.oo S4l5,OO $12,150,00 ~, _~r-f"~~~~,610,()() Jf6.i,-r-, SJ5,7>0.00 $~~ .-Jl1,oOO,()() $I7.0C! _~7,400.oo
6 $21.00 $4,)74.00 In.oo 14,374.00 142.00 $6,804.00 140.00 $0,480.00
7 S31.iiiJ S5,363,oo $3~,(;;'~. SS,36J.00 $~"oo E,.3.,oo ___ $50;~t-_,~_l!,6~~00
8 800 ,$7,200.00 740 $6.660.00 900 $8,100 00 l4OC~$11'600.00 ',) "OC:+ $2,200.00 llOO t----'$2,200])O 164) Pi&6oo i600 ~200 00
10 165; $1,650.00 158 $1,580,00 ~19S ~-II-;9"0,OO t-'~-5()() --~$>:iiiio-oo, "_-+--$5()(),OO~ ,1~()().00 $1:il~t----$2,875,00q= $75.00 $1,7.2.f~_[-----;.mooo' S,'.7'000-' R ; $500'~I----,!I,S2?.oo S250.~_ $750.00 I J25'c~ _, $76> 00 SI,!l(l(),-00-!-._$3,OOO.tj " I $3"'~,-, $J1,5~~ c------':'.7JO_L-S46,875.00J, $)5.00 $4J,7'O,OOJ 143.00 ! $5J,750,00
TOTAL $161,917.00 $169,637,00 $185,119,00 $188,860.00
ADD ALTERNATE If I I 514:00T--'S-07trr=$i-i}OO:oo] $o:'i45T
GRAND TOTAL $18],417.00
rAGE l
,!",,>()().OO I
$184,137.00
$076J Ei;,~OOJ $Oc19I::::::Ii2 .. 000c'!"J
$W,1I9.oo $217,860.00
. 'l
o
)
1,
1 ;
"
, ,
i
-.---~-~............:-----
_._-_. __ .... --.-.-.-~-,.---------.. -.. ---~--.-,~~~.--.. 1~
ARASTRADERO CREEK ACCESS ROAD IMPROVEMENT
BID SUMMARY
MAIN DID
iiiJ:)jCONTRAdoifSilm--jCONTRACTOi.;s BID ~-'ICON1RACTOR 's DID
ITEM !LlONSOAl'E -:--;------*ES MCDONALD O. C. JONES
tf~IT PR'C~ iTOTA~ jHNIT PRI(:~~-Jrci~~!~-_ UNrrp~ICE
CONTRACTOR'S 8115"'-i.CONT~ACTOR'SBID-
COLLISHA W IWlLUAM BLOMQUIST
lJNIT-PW-fulTA~ __ -::JlINIT-PRICE ]fOTAL--
:',",?"""'" i ¥ t
. ~~ .. ",.:; '\'l"':' '; ...•.. , ~,: 'b :;:);:f2 ':"'~.'i!I'·. ~ .. ,1:;.-"., '.' """";:" .. ' t'.'i" '"iI)" " ""':' I','i' 1"ii>'.:V 1,: , ~:;l~"!!'" I' ',' t·~;:.;.. .. -;~\:~, h~,~· '\~i\'. ':\.';ii-~;~~~·;;";{':!'i~~I(:1! 1, ';t"'d'~' '.'n,.,i", ,
' , • ", l
c '"~. ___ "'.~~'i.·'_1 ",,"00 ~.=-' .'."00'.""-I ""-@m,,,",,,, T 3~.~~oo" ~.~' 2 Llill1p !!ium $14,500.00 Lump !!ibm $]J,(.(l().OO Lump SlIm $20,000,00 Lump !lU", ' $17,000.00 Lump I(t.Illl !-$4),200.00
J l:.~~ sum _ ,~~,~~oO Lunlp BU~ -~-ii~l'?O.cJO I..;-mp S~T~. -$9,950'00_ i..me '~m 1_ $~i)OO(X) ,I. .... p~~"' I 139,<,0000 ~
4 _1'00'(1() _115,000,00 ~~.OO ,~~~J()().OO ~2,1)) m,J5<),OO _~_$]0000 ,-.-$~,(J()()'O<!..E $'70,()?j~!17.1~~ £
I 5 ~~20.00 $44,~.OO $11).00 $44,000.00 $(6,20 $35,640,00_ ~..:1l~ _t/O,400.00 ~2S:.~ ! J.~PX)·~ :i
56 ~_$lO,OO _g,'40.00 ~~I)()' _--.!'~4()2,00 __ $S7~OO $9,234,00 S'(j.OO $8,100.OO_L ___ S23.'OI ,1:J,~£1.<l"J
7 $25,00 ,14,32'5.01) $23.01) $3,979.00 $57.00 $9,861.00 SSO.oo S8,65(1.00 $Ji.OO i'5,36),OO!
._L,. $fooooor$I8!~.-:-· -..... 00 ._:.",0000 "-.I3S:-00 Tt~lOO' •. _ '~il <ow. e,00 .:.... 1',.7.1[001 ->6.,~O~~
[
$2'()(DXI'OO~ $4,000,00 $2,900,00 $5,800,00; $2,800.00 S5,6OO,(l0 I 12,O(x),(X) . $4,000.00 $3'600'OO§'7'200'~ :~ +---I~:~ -:: ~:~~~ t, !~:~ !;:~1 II~:~: I J'i.~l-$~~;. $4~1-1.:] -lgj:~;~' \
12. 1500,00 $1,500.00 $.150.00 $1,050~00 1315,00 11,155,00 $400.00 II'>OO~OO 1"0.00 1540.00 '
-i----,,-,-----------,--.-, --,--_.------;;;1--'--
13 i 140,,",? ~O,OOO.OO I S40.oo I $jtJ,~.oo $37.50 $46,&75.00 __ S5L~,_J6J,7S0.00 _, __ $49",O<!..L S61,250~OO
"rOTAL $189,165.00 $204,811.00 $230,(190.00 $'M'T,200.00 $278,114.00 )
AnD ALTERNATE III
[,'<]:='--Sll2Zj SU,~~~ $O.,~O_LsT<i:iKJo.~_,:}l'J.61 $2~,()()()oor-'-SO~4CS~4~j>I--$~i:,r":'}"~,()()J
ORAND TOTAL 1211,165.00 $'14,811,00 $156,090,00 $1"1,200~OO 1302,114.00
1'.\GE]
., . \ ..
i
I
~I,
•
" , .. .-r-;---,
, ,
..
I , I
I
i
I
o
PART II -CONTRACT 00500
COI'IITRACT
This Centract, dated , is entered into by and between
the Crty of Palo Aho, a municipal corporation of the State of California {-City") • and
Raymond J. aTagClto~ Inc. > a , '''Contractor'')'
whose Taxpayer Identification Number is _________ _
For and in consideration of the fol~owing covenents, terms and conditions. City
and Contracto( {'''the parties"} agree:
1. Itml. This Contract shall commence on, and be binding 00"1 the parties on, the
Date of Execl. ... tion of thiS Contra.:t. and shan expire on the date of rew;ordation
of the Notice of Substantial Completion, or, 1f no such not'lce is required to be
filed. on the date that final payment is made hereunder. subject to the earlier
termination of this Contract.
2. General Scope of PrQject and Work. Contractor shall furnish labor, services,
materjafs and equipment in cor.!";~ction with the construction Of the Project and
complete the Work in accordance with the covenants" terms and conditions o(
this Contract to t.~e satisfaction of City _ The Project and WOfk is generafly
described as fol1o",vs:
Tit~e: Ar"astraderc Creek Access Road
Improvements
IFAS No. _8_91_5 _____ _
a.seBid: $ __________________________ __
Add Alternates lif a.oy): $ ____________ _
3. C9t'ltract OCCY!!\U!U· This CorHfaC1 shan consist of the documents set forth below, which are
on fiia with the City CI"rir. and ;are her~by incorpOr3te~ by reference. For the pUrpO:i8$ 'Jf
construing, interpreting and' resor .... ing inconsistencies between the provisio."'s of this Contract.
tnese documents and the pro .... isions thereof are set 10rth in the follOWing descending crder of
precedence. ..
b.
c.
d. ..
f.
g.
L
This Contract .
Notice Inviting Fam;al S~dS.
COl\tract Specific:,atior.s.
Drawings.
Change Orders .
Sid.
S u~p'ementary Cond~t.cns.
00500-1
, ..
-
PART II -CONTRACT 00500
/ ..
L
j.
k.
t
m.
Gero.e·a! Conditions,
197:2 Standard Sl"e~~"catjons.
Ceniflcate ~f Insurance, p~rformance Bond' and Labor and Ma~erials Bond.
Affirmative Aetion G1Jidli'r;nes ,and Ccmp'iance Ra~ort.
Other $pec:i!'ic.ations, 0:'" par"! tt'lereof, nat expres:sly incorporated in the Contract
Specifictitians or the t 972 Standard Specifications.
Arr" other dOC\lment nOt expressly rr.en'icn~d herei.rl which is issued by City or la'ntered
"Into by the parties.
4. Cmpensiftjon. In con!ideratior"; of ContraC":(l"S ~rformilf'ce of its obfj~a:tiCI"i$ hereIOnder. City
ahal! pay to Comr_etor the amount set forth in Contractor's ~d in accordance with the
pro"';sJons of this Contract and upon the rec~ipt of written invoices and all necesur\"
SUPPOrbrl\! documentation within t~, time set forth in the Contract Sp~Cifici!tions and the 1 99.2
Sta(,dard Drawings and S~ecifications, or, if no f.me i.s stated, within thirty (301 Oa.ys of the
date of ~ec!'ipt of Contractor', in .... oices.
S. Insyrance. Or"' or before the DatI!' of Execu:ion, Contractor s!'lal! obt.in OInd maltl't2in the
policies or insurance C-QVer2Q"EI descnced in me Notice In ... itin,.. rcrm-il 8id$ on term.s and
conditions and i.., amounts as may be rec;uiref:l by the Risk MOInager. City shan not be obr.gated
to taka Out insurst'1ce on ContraC::or'$ pe!sonai proper.y or the persona! property of any person
performir.g labor or servic-es or supplying matEori;)j's or eQuipment unaer the Project. Contractor
shall fumish: City wtth the certrficat&.s of insurance and with onginOl' endornmflnts affecting
eo .... ~rage reQuir1!d r,:nder this Contne! on or befor. the Date of .Execution. The certificates and
ondorsements for eac-h iOlsurance poricy shari be signed by a PErson who is authoriz~ by that
ir,suret to bind C'Ov&TaQ"e on its behalf. Proof ot insurance shan be mailed 10 thE'! Project
Manager 10 the address set forth in Section 15 of this Contriilct.
6. Indemnifie;ttlpn. Ccnrractor agrees 10 protect, defend, indemnify oiIInd hOle) City, its City Council
members. office-ts., Bnd' employees I'\armle$~ from and against ally and al'l claims, demands.
liabilities. ~J.S.e" damag", costs, expenses. liens, penatties, suits. or jydgmenu, ariSing in
whole Dr in part. directly or indirectly. at any time fr(:m IMy injury 10 or deam of per$ons or
cfaJ"Nge 10 propertY 2.S iii resUlt of the willf\J1 or r.e~r;"ent act or omission of CQntractor. or
which results from Co.1tractor', nom:omp:rlance with any Law res~cting the condition, use,
occupatio,., or sCltety of the Project site, or an,.· part thereof. or which arisu from Contractor',
fallure to de. an'(thing reQuited under tflts Contract or f~( doinp ilrtythi.ng which ContracI.:)r is
required not to do under this Contract, o. which ari$~5 trom conduct for which any Law
impO$!:s striet liabiiity on Contractor in the pe;fOrm2t'1Ce of or bllure to perform the tarms and
eond"~or..s of this. Contra~.. excepi as may arise from the sole wmful or n~rigent a ct or
omission of City or any of Its City Council members, officers. or emplove~s. T!'lis
indemnificatioM lohan extend to any and all r;laims, demands. or liens made or filed by reason
of any cons1ruction, renovation, Oi remodeling Worle. performed by Contractor under th~s
Contract at any time O:ur'n~ the term of 1his Contra::t. or arising thereafter.
7. A:HiYmQlion of R"lsk. Contrac~or a"rees to voruntilrily assume any and an risk of loss, damage,
or injl..lry tc:. the property of Contractor whtch may occur ~. on, or about the Project -"oite at an'"
time and in any manner, excepting such loss, i.njury, or cian"lige as may be c31.!sed by the s¢re
wiIJful or M.egligent act or omission of City or any of ns Cit)' Council members. officers, or
employees..
00500-2
-L
-
o
PART II -CONTRACT 00500
s. ~. The acce!)unce of any payme:-:t or performancE'. or ar:y ~art thereof. sMarT not operate
;as • wai'oler by Ctty of in ri~hts u ..... der this Contra<;t. A ...... ei·/et by City of any breach of an)"
part ar provisioll of this Contra:::! b-y Contractor shall net \:l,perare CIS , waiver or continulr.g
waiver of any .subs!Qvent br8ii1ch of the same or any other provtSio'"l. nor shan i!ny custom 'Ot
practice which may arise betwe-en the oarties in 1he administration of any part or pn:l\liskl''1 of
this CCIl~ct be cO:"S!rued to waivE or to lessen the righ r o! City to insLst upon the
perio.-mance of ContractOr in striCt COf'0~liance with the cco .... enal1ts. terms "rid conditJons of
this Contract.
9. Cgmof'iir";;;e with la'"«S.. Contractor shari comply with all laws now in force or which may
h¥8after be in foxe lJeft,;,jining to th~ Project and W-ork O!r:d t<"lis ContTa~. with the requirement
at any bond Of fire underwriter~ or other similar b"dy ("lOW or hereafter cC!nstitutltc!, with My
di.scretionary license or permit iS$ued pursuant to My Law of any publiC aQ6ncy or offici.ar as
wen IS wtth IiIIny "rovis1on of all recorded documenrs affecting the Project site. insot;r as ai"lY
are requited by reason of the use or occupa"cy of the Project she, and wit' a!1 u ..... s peminfno
te nondiscrimination and affirmative act1-on in employment and hazardous materials.
10. ~. As a cond"iti"n precedent to City's Obn"8tlo~ 10 pay compensation to Contractor, and
on or before the Date of Execution. CO:'1tractor shari furnish the Sonds as required under the
Notle~ rl1viting FormaT Bids to t!"le PrOjeet' Manager,
11. BiitOrcnntftions and WRrral"l'tiu. I.., the supp!y of an'll materiars and ISQuipmMt and t~e
J'Mdering of l<ib"r ar.d services durir:g the course and sCope of tne ProjeC't iilnd Work.,
CO:'ltra~or represents and warrants:
•. Any m3teilals and eQui;:lment whict'1 snarl ba used durir\1;l the course and scope of the
Proj(llct Ind ""lork shali be vested in Contracto,..;
b.
c.
d.
e.
f.
Any materials and eQuipment whiCh Shail be used during the course iind scope of the
Project and Wo;k I$han be mercnantable and fit to be used for the partieulaf purpose
for wtljch the mauriafs are required;
Af'lY lab::)r and services rendered and materials and eQuj~m~mt used or employed during
me c'Ourse and scope af tMe Proj~ct al"ld Wcrk sh~11 be f~ee of de"ects in workmanship
for .. periOd of one !1 j yeiir after tt'1:!! recarda"[ion of tt'1e Notice of Substantial
Compfetion, or. if no such notice is rec:wired ~o be fil~d, on the da'e that final payment
is made here'Jnder;
Arly mallufacturer"s warranty ob!ained by Con~ractor shall be obta:ned or shari .be
deemed obtained by Contractor for and Oli bena\f of Crty.
Anv 1r.forrnation submined by ContrC1:ctor cuiar to the award of Contract, or thereafter,
Ltp(ln reQuest, wh~Hher or not submitted under a eontinuinl;l obng;Hion by the terms of
the CorHra~ to dG so, is true ar.o correCT at the time sucl'1 information is scbmitted or
made available to the C'rty.
Conu.actor has not coiluded. conspired. or agreed. directly or ir\di{il~ly. wittl ai.y
pitr50n in regard to the t,zrms and conditions of Contractor's Sid. e)tcepl as mOly be
"ermined bv the Notice Jnvitlng Formal Bids;
00500-3
I
1
~
1
i
I
i
l
-
PART II -CONTRACT 00500
Conu'actor hn the po",,·.r a:'l{1 author;ty to e"1.ter il"\to tf"Jis COf'tr8ct wit~ City, that the
indh/l.d'Llalax8cuting thi$ Contract i.s duiy autMrized to do e~ by apprc~rii!te ruclution,
Ind mat thfs C~ntrtlC1 :oho~ be ueculed, deli"ered and performed pursuant to !:he
power an" autnorirv confl6-rred u~on t!1e person or ~ersons autnor:nd to b;nd
Contractor;
h. CClntraC1Qr !'las no~ ", .. de 811 'U2'mpt to exert undue influer'1,CB with the Purchasif'~
Manager Dr Project Manager or any <ltner person who has d}reetJy contributed to City's
decision to award me contract to COr')uactor:
I. Then; are no unresol\'ed cl.aim.s or disputes between CO"~r.aC1or and City which wou!d
mat~ric:ily affee1 ConUactor'.s ability 10 p.erlorm 'Under the Contr.;.,;t;
j. COntrilc+& has fumished a~ wit! furnish true an.d 4IIcetJrate statements, records,
reports, resolutions, certifications. en(4 other minen infOr.!lation as mOl'; be reque$teQ'
of Contractor by City from time to time durina !t,,.~ term of this Contract:
it. Contr:llcto( and any person perfcrmil'lQ labo.' and services und.r this ProJect is duly
licensed as I contractor ¥.itt-. tne State of Califofl"lia as r8quir~d by California Bus,ness
& Professiol"l;: Code Seelion 7028. as IimeM~; an"
l Cgntractcr "15 ful1lj e.l(amined and inspect~ me Projet:;t siti and h.s fuR ~nQwleo\;lf!
of me ;:hysical condltiol"ls ,,~ the Project site.
12. Ayignment. This Cor-.tract and the perfOormancfI required he"tlunder 1.5 per,.;onallo Contractor.
and it sha~ not be assigned by Contractor. Any anempt~ aos.signment shari be nun and \loid.
13. Claim$' of ContGI!;iQr. AIl ciaims p!ilrtainil"lg to UUiI work, add":'!iortal r;nilrges, or deJa.,.s within
the Contract Time or other dlspU1es arising CIll: .of the CO:"ltrilct shan be submineo-Dy
ConVoletQt'to City in writing bv cenifittd or registered m"ii within '1:&'" (1 O~ Oa';$ after th& claim
arase 0( wfthin such other time "s may be permined or reqUired by law, and shan be c1esc6bed
in sufficient detail to ~ive ad~uate nOlice of the-Sub:ttilrlCe of the claim to City.
'4. Aurfru by City. During the term of this Cor,tract iltld fer a peried of not less than tt-,~ee (3)
years afier me e:cp:rstion Q( earlier termirHrtioli of thi! Co,.:ract. City shan !'Ia"e the riQht to
audit Cont!"JctDr'1 Project-related' ii!n~ Work-related writings and buslne!J! record!, as suC'~
terms are defined in Cafifomia E"id~nce Code Sections 250 and 1271, a~ amended, during ttle
reguJlr business hours of Contractor, Or, it COntrOictor t\a$ no sucn hours, during the regular
bl.lsine.u ho!JT's a1 City,
15. ~. Art agreements, appointn"lerlts, a~p(Oyals, authorfzations. claim.s, demands, Cnanlle
Orde<J, ~onsents, oUignaticns, notices, offers., r~Quesls and stitemenTS Qiven by either !;larry
10 me other shari be in writing and shan be suHiclentf'l' \:I'lven and &erved llpon th~ other pa'"ty
if (1) "ersonarly se-rved, 121 sent by thE United States mail, pos":~Q'e prepaid, (3) sent ty private
eXI)re$.S deti"'ery service, or (4) iI"', me case of ill facsimile tra!"lsmiSSlon, if sent to the telephone
FAX number set forth below during re"vlar business hours of the receiving party and tofiowed
within twtI (2) DilYS by delivery of Ii hard cGpy of the materiaf sent by facsimi1e transmission,
in accordance wittl f11, (2) or ~3l above. Person;1 service shall inClude, without l'imitatiol"l,
service ty celi"ery and .service bV facsimile tran.smiss!on
00500-4
L
-
•
..• -.-----
o
PART II • CONTRACT
To City:
Copy to:
To Contractor:
Cit.,.. of Palo Aito
City Clerk
250 HamHtor. Avenue
P.O. Bo. 10250
Palo Alto, CA 94303
City of Palo Aito
Department of ..!.!Ii1l!.lu
250 Hamilton Avenue
P.O. B<;x 10250
Paio A!to, C~. 94303
14151 329·W2.,
FAX: 14151329·~.
ATIN: Roger Cwiak~
Project Manager
L--, ____________________ _
FAX: I_I ______________ _
00500
ATIN: ______________________ __
Hi. Accrggrjatior", of City Fur.gs. This Contract is subject to the fiscai provision$ of Aniele III,
Section 12 of the Charter of the City of Palo Alto, Any charges h~reiJfld~r for labor, setvices,
materiar, and equipment may ilccrue only after .such expenditllres l"Iav& been approved in
advance in writiC"lg in aC':Qrdance-with applicable Laws. Thi$ Contract shall terminate without
penslty fi.I at the end of Iny fisc;)J yea' in the event that funds. art nol appropriated for the
faliowillkl fiscal year, or (ii) ilt any time within iii fiscal year in the event tt1at funds are only
apprr.lpriated for .. portion of the fiscar year and 'funds fclt this Contract are no longer available.
This Seetion 1S shan control jn the event of a confl'lct with any other proY-ilion of this
Contract.
17. MisceCanU/:l.!:;.
a_ Baile-e Disclaimer. The parties ur.derstand and ilQree that City does not purport to '::Ie
Contractor's bill1ee, and CIty i.i, therefore, not responsible for any daIT'a~e 10 the
00500'5
-
o
PART II -CONTRACT 00500
persena: prOf,lerr-., at Contract01'".
b. Consent. \fo/heneV&r in this Contract the a~'pro\laT Qr c-onnnt of J party is reQuirttd.
,LJ.l:h .ppro ...... ! or eonsaont ... hall be ll'l writing and shan be ex('eut~ by a pars-on havinp
tile express authority to "rant such .ppre ... ;! or COl'lSent.
C:. CentraDinc Law, The parties agree tt,at this Ccntr;act sharr ~ gov.med ar,d constr>.led'
by and in accordanc-e with me Laws C'f:he Stilite of Cilifomia.
d. O&finmor.s. The-ditfinitions and t8t'1'115 sift forth in Section' of the 1972 Standard
Specifications of this Centrict Ire incorporated nerein by reference.
8. Fall:e Majeure. Neither pany eh.an be de:!med to be in default on account of Iny delay
er fail'Ure to Pi!'rform its obfigat,ion.s under -mis Contract which directiv ri.3U1ts from an
AC1 of God or an act of ill superior wovemmental authority.
f. Headings. The ~aragraph ~ead1nQs are not a part of this Contract and .shail haltle nQ
effect upon the construction or interpretatio" of any part of lhis C Ol")tran
g. Inr:tlrporatien 'Jf DOC\Jmll!rlts. An oocvmenu con.stituting the Conuact documents
cfescnlled in Semion 3 h,!'reof and ali documents which mOly, from time to time, be
r&f&trac Ul in any duly executed amendmel'lt I'lereto are by sueI'! reference incorporate~
in th~ Contract and £nijj1 be deemed' to b~ ~art of this Contral:'t.
h. fmeg-ration. This Contract and any amend'ment:s t:efllto berween the pattiel censtitute
the entire agreement between the parties conceming: ~ Project: and Work. and \.t!er9
ilf1I :10 other prior Qla: or writte:'l OIgreemenu between thtI parties that iUI mr.:
incorporated in this C.e,.,traC1.
i.. Modification oi Agreeme~t. This Contract shaN not be modified or be bincftn; upon the
partin, unkln such modification is acrried te in writing .ami ii;, ... ed by ttle parties.
j. PTo'IJision. Any aOlrHme!"lt. CQItli!'l"!ant. condition, clause. Quarrfication, restriction,
re.servatior., term or ether stipl.ilalion in me Contract shOll!! define or oL .... erwi.ie centrol.
esUbliih, or limit the performance require::l or pe-rmitted Of to be reQuired of or
permlned by e.ither party. A!i j:lfov!sions, "'Jl;et.~er eo ..... enants or c:cnaitions, shan be
deemed to be beth covenants ",nd conditions.
Ie.. Re.soJution. CO~trilC!or shan submit with its Sjd iI copy of any corporate or partnership
resofution or other vvritinljl. which alJtnorizes any dire-ctor, officer or other employee or
parmer to act for or on behalf of CClI'Itraetor or which authorizes COmrielOr to enter
i.· .. 'ltO this Contract.
I. Seltierabif'l'ty. If a court Of competent iu .. isdictio~ finds or rules that any provi$ion of this
COl"!tract is \loid or unenforceable, the provisions of this Contract not so affected sMall
remain in furl force and eHeer.
m. Stat",! of Contractor, 11'1 the exercise of rights and' obligations under this Contract.
Contractor aets 1$ an independenr eontractor and not as an agent or employee of City.
oosoc·~
-"
o
~NfT 11 • CONTRACT 00500
COOlrKtOr shall no. ~ entitled to:l an\" riahts and benefits leee-ded or ac-cNing: to IMe
City Council membeis, officers or employees of City, ,nd COl' tractor exprltssly ,,"'.aivu
any fond ilt .claims to s~ch nQhts .nd benefits.
n. SlJC'cess.ors and A.ssigns. The p~oV'is;on.s of this ContriC! shall inure i:C ttl, benefit af,
and shan apply to and bind, th. su{;ceSSDrs Bl1lj u'ignl r::af the p'rti-9$
o. IItTl. of the Esslnce. TlITle is of the essence of thi' Contraet r:nd" elleh ", its
;:IfovisiOns, In the calcuiation of time hereunder, the time if' ...... hkh an act is to b~
per10rmed shan be eompvted by excl\.u:fmg the fjfSl Day and including me \3St. If t.~a
tim~ In which ,jim act is to be Deriorm;ad ta!ls CJn a Silwrdav. Sunc'I)'. or any Oa',
observed as , legill holidey by City, the time for performance shaN be axt..,ded' to the
foRowing BuSiness Dey.
p. V.flue. III the .... .,f'1t that suit IS brou"hr by either Pilrty hereunder, the partiES .a;;ree
that m.jJ1 of such action $h .. n be vested exc1vsiv{lly !n the .state CQ'JrtS of CalifOfflia in
th. Cexlilty of Santa Clara in !:he City of San .1058 or in th~ United Suus DistriCt CCt.lrt
for the Northern OistriC't 01 California In we City of San Jose.
IN WITNESS WHEAEOF, the parties have executed this Cont,act on the date
first abQve stated in Palo Alte, California.
ATTEST: CITY OF PALO ALTO. CALIFORNIA
City Clerk
BV:~~ ______________ ___
Mayor
APPROVED: CONTRACTOR: __________________ __
By: ____________________ _
City Manager Name: _______________ __
Tille: _________________ _
Taxpayer LD. No. _____ _
Director of Utilities
Director of Finance APPROVED AS TO FORM:
Risk Manager Assistant City Anornev
END OF SECTiON