HomeMy WebLinkAbout0406.091\ - August 29 I 1991 THE HONORABLE CITY COUNCIL Palo Alto, California Semi-Ai"nual elP Project Status Report_-lmmJunf§! ___ ..12ll Members of the Council: Attached is the semi-annual project status report of General Fund, Refuse Fund, Storm Drainage Ent~rprise Fund, and wastewater Fund projects in the capital Improvement Program. This report provides: G brief update. ot' each project as of June 30, 1991, and is informational only. Council action is not required. Respectfully submitted, VALERIE LEHRKIND Administrator of public Works ~~Lc(JtJ!~~ DAVID G. ADAMS Di ector ~iC Works i J;rNE nlMIllG • ,. ~ssistant City ~ ~ Attachment: elP Report CHR:406:91 , ll~ PROJE<;:L1 1-18508 2. 18614 3. 18617 4-18621 5. 18805 6. 18806 7. 18810 8. 18S12 9. 18821 10. 18822 11. 18828 12. 18901 13 • 18903 14 • 1.13908 15. 18911 16. 18915 17-18915 18. 18918 19. 18971 20. 18972 21. 1S973 22. 19001 23. 19002 2<. 190D< 25. 19005 26. 19006 27. 19009 28. 19011 2'. 19012 3D. 19017 31. 19:)1a 32. 19019 ll. 19072 34. 19073 35. 19076 36. 19101 37. 19102 38. 19103 39. .19.104; 40. 19105 41-19106 .2. 19108 43 • 19109 44 • 19110 45. 19111 46. 19112 47-19114 48. 19115 49. 19116 50. 19117 -c . SEMI-ANNUAL elF PROJECT STATUS REPORT JUNE 1991 TABU: OF CONTENTS PROJEC'T T!TLE Public Buildings Structural Impro'Jements Financial Data Base Art in Public Plac~s Bike Route Directional Sigr,s Greer Park Development Renovation of Irrigation System Parks Site Access for the Disabled Information systems Development California Avenue Parking Structure Geographic Information Systems Midtown Traffic Improvements Fire station Exhaust Removal systems Sidewalk Repairs MSC Site Improvements Heating/Ventilation at Lucie stern center Fire Statio~ Overhead Door Modifications Fire station Dormitory Modifications Harbor Irnprovern2nts Street Maintenance Traffic Signal and Intersection Modifications Traffic Signal and Intersection Modifications Tank Removal/Cleanup MSC fuEl Tank Modification Rinconada Pool Improve1'!1ents Tennis a~d Basketball Court Improvements Athletic Fields Renovation Finance Vault Remodel Records Management Payroll/Personnel Systenl Civic Center En~rgy Management System CUbberley School Site Building Code Modifications 1'1'T Marsh Enhanc~ment Minor I~tersection Improvements M'!jor Intersection Irnprovemer.t5 Bike parking Facilities Tank Investigation and Removal Arastradero Lake Dam Playground Furni~ure and Equipment Replacement Baylands Duck Pond Filtration S:r'stem Boronda Lake Public Dock Replacen~nt Terman School Site Development Civic Center Building Fire Sprinkler System Police/Communications computer System Pr inting Services Equipr,ent Upgrade Inventory Control System Warehouse Operations -Hazmat Storage Unit New Vehicle Purchases PBX soft .... ·are and Hard .... are Upgrade Wide Area Networking HP 150 Personal Computer Replacement 51-19118 52. 19119 53. 19120 5L 19205 55. 19206 56. 19207 57. 19209 58. 19210 59. 39590 60. 39591 61-39333 62. 39594 63. 39595 64. 39598 6':-. 39599 66. 39700 67. 39705 68. 39707 69. 39710 70. 45100 71. 45120 72. 45690 73. 45801 14. 458Q2 75. 4 5~OJ 76. 47702 77. 47703 -.... ;-. 0 o Cable Television Equipment Civic Center ~cmodel and Relocation Middl~field Well Site: Tal"lk and Builctin9 Rp.moval Fuel 1'ank Upgrade Water Rescue Equipment ." Barron Fark Drainage/street Impro~ .... ement Guidelines Golf Course Reclaimed Water Supply Self-contained Breathing Apparatus W)'ST!.WATER. FUND System Flo~ Metering Replacement Program Plant Equipment Replacement Plant Grounds and La~d9caping Plant Water system Laboratory Facilities and Studies Electric Distrib~tion 12KV Loop Standby Generators Barminutor Replacement Wastewater Reclamation Instrumentation and Alarm Distribution Control System Vibration Monitoring Equipment REFOSE FUND Palo Alto Landfill Partial Closure Permanent Landfill Flars Beautification By-xbee Park Gas Condensate Collection and Disposal System Landfill Levee Protection Hazardous ~aterials sarety storage STORK DRAINAGE ENTERPRISE FUND Collection system Improvements Storm Water Quality Improvements • ••••• 2 " .' ~-'"" :·:S2~T~~~·~~ -' l - 1. SEMI-~-UAL CIP PROJECT STATUS REPORT .Tl.."NE 1991 GENERAL FUND 18508 PUBLIC BUILDINGS STRUCT.URAL IKPROVEMENTS Design documents for t.he structural retrofit. of Wing "A'" of the Lucie Stern Center are complete and con5truction -will start in August 1991. Design documents for the Police wing st.ructu.r~l ... ork are being revised per Inspection Services Division review, and the project will be rebid in late summer. Additional funding will be available in FY 1991-92. EXPECTED CO~JPLETION: FOURTH QUARTER 1991-92. 2. 18614 rI~.AN.CI]a.L RATA B1\SE Transition fro~ the first version of the new Financial Data Base syste~ fIFAS IV) to the latest vendor-provided version (IFAS VI) was completed in January 1991. In June 1991, the vendo= provided an updated version of IrAS VI, ostensibly to include programming modifications identified by City staff since JaTl.uary~ During installation and testing r ho"Wever, numerous unrequested char-ges and other problems became apparent, resulting in substantial delays to th~ next phase of the project: refinement and further modifications of !FAS VI. Mean~hile. a contract for prog~a~~ing and consulting services was extended to assist staff in testing, using and improving InS VI. EXPECTED COMPLETION: NOT SET. 3 • .lJl.51 7 ART TN PUBLI C .?LA C ES Yjarran Vanner (Linkopinq sculpture) has been installed on a permanent base. -Albuquerque'" by Gale Wagner has been r.afllrbished and per-n-.anently installed. public Art CO!i\m.issicn is deferring installing Bottini and Betty Gold sculptures on permanent b~ses until elF funding is restored. That funding has been delayed indefinitely due to budget constraints. EXPECTED CO~2LETION: NOT SET • .c-. 18621,._~,Il<E ROUTE OIRECT..,1:.0~"'L SIGNS The purpose of this proje:ct ."as to install improved sign~ng alcng Palo Alto's bikeways, identifying routes to maJor destinations and points of interest. Informational signs .. ere purchased W'ith state grant funds in September 1988. Installation of the signs is complete. PROJECT COMPLETED: THIRD QUARTER 1990-91. 5. 18805 GREER PARK [)J;VE.~.OP}O!ENT Phase 3 included the grading and drainage of the entire site. other improvements included reclaimed ~ater irrigation, landscapil'lq, pathways, and a skateboard facility. Construction is substantially complete. The final phase, 'Which includes , ..... " ", ."," ;~;i~/I··· - 6. 7. 8. four tennis courts, lightin9, a parking lot, and restrooms has been delayed indefinitely due to budget constraints. EXPECTED COMPLETIO~ OF FINAL PHASE: NOT SET. 18806 RENOVATION OF lRB.:r..§_~_TION S"iSTQ1_~ This project includes improvements to irrigation systems at Mitchell ~nd eo~den Parks~ Cogswell Plaza~ and the Cultural Center. Improvements to the Mitchell Park and Cultural Center syste.ms ""ere completed in June 19S0. Completion of the remaining systems ~a5 been delayed one to t~o years due to budget constraints. EXPECTED COMPLETION: NOT SET. 18910 PARKS SITE ACCESS .fOR THE orSABLER This three-phase project provides access for the disabled to City parks and open space. Phase II consisted of additional on-sit~ paved paths and modifications to drinking faucets and picnic tables at various parKs. Phase III is the ir,stallation of new equip"'Olent over: a th,ree-year pCL"iod. EXPECTED COMPLETION OF PHASE III: F'i 1992-94. ~12_ INFORMATION SYSTEMS OEVEL:QPM,ENT This ongoing project ""ill provide computer equipment and software for the continued development and expansion of the City's central ized computer facility. ?lanned ilnprQVerr,ents 'Will (11 expand the ... o:r-kstation network City-.... ide allovinq controlled external access via telephone to computer :-esources (e.g., Libr-aries, CUltural Center~ Lucie stern Center), (2) ensure adequate computer response time for users as planned expans::ionsjconversions take place, and (J) build increased capability for Exchanging computerized infot'J!lation between cepartment5. The FY 90-91 project called for a ~ajcr upgrade of the three HP 30009, ,",'hich 'loras c01l1pleted in October 1990. The F~ 51-92 project ~ill purchase memory and ~isk drives to ensure adequate c01l1puter response time for users~ EXPECTED CO~FLET!ON: NOT SET. 9. lE,?...i ___ CALIFOPjHA AY.~VE PARKING STBUCTtJ"RE The project includes a feasibility study of a Parkir.g Structure Plan in the californiC!l: Avenue Business District. The consultant completed the study and has prepared the final report. staff "oIIill forvard the r,=-?ort to council 'With a recommendation whether to proceed regarding final design and constl'uction of a parking structure~ including the fermat ion of a new parking assess~ent district~ CONSULTANT STtlO'i COMPLETED: FOURTH QUARTER 1990-91. 10. 109822 GF::.Q9.MPHIC INfQRJI-h.TION SYSTEM This is ~ ~ulti-year project. Approximately one-third of the urban area of Palo Alto has been photographically mapped. ~his area is ~eing converted into digital form for transfer into the new geographic information system (GIS} soft~are. Testing and quality control checks are continuing to ensure 2 I , - that all graphic and converted. n<;m-graphic data are accurately EXPECTED CO~~LETION Of CURRENT PHASE: tOL~TH QUAR~ER 1991-92. 11. J8S28 MIDTP'!l" TRAFFIC IMPROVEMENJ~.~ This project has bee.!'!. completed. Howe .... er I a follQ~-up Cou.ncil assignment required staff to r€.view the visibil i ty of the: read bumps. Staff determined that modifications in signing and striping ~ere in order, and Council approved these changes in March 1991. These modifications .. ill be funded from this proj ect. The permanent striping changes wi 11 !'lot be made until current temporary striping fades sufficiently. EXPECTED CO~~LETION: THIRD QUARTER 1992-93. 12. 1~901 fIRE STATION EX~UST REMOVAL SYSTEMS This project covers installation of vehicle exhaust removal syste~s at fire stations to protect firefighters from dangerous diesel exhaust particulates. Work has been completed on stations It 2 and)~ Re~aininq stations will be completed ~uring second quarter, FY 91-92~ EXPECTED COMPLETION: SECOND QUARTER 1991-92. 13. 18903 SIDEW~_I:JL .. B.EPAIRS This project provides for repairs to side .. .'aD:.s in the areas bounded by Alma Street, Middlefied Road~ Lyttcn Avenue and Familton Avenue. EXPECTED COMPLETION": TH1RO QUARTER 1991-92. 14. 18908 MSC SITE IMfYOVEME~TS This is a multi-year project. FY ~O-91 ~ork provided for the expansion of the A.nimal Services office to create a multi­ purpose work area to accommodate the office of a volunteer coordinator as well as a meeting roam for staff and volunteers. This work Yas ccmpleted fourth qU3rte~ FY 90-91. A current project modifies the. "\.'ehicle ;.rash pad area to recycle "Wash 'Water into 2lI closed loop system, thereby containing grease and reducing ~ater consumption. EXP~CT CO~PLETICN: FO~TH QUARTER 1991-92. 15. 18911 nEATI_~_G....LY_E.NTlLATION AT LUC __ I.~n$_.TERN CENTER This. work. ir.cludes hea.ting and ventilation at the theater in the Lucie stern Community Center. This ~ill be included "With the structural retrofit of Wing MA~ of the complex, as described in item 11~ Public Buildings Structural Improvements. EXPECTED COMPLETION: FOUF:TH QUAFTER 1991-92~ 16. 18915 __ fIRE STATION OVERHEAJ:;;ImnPOQ_B MODIFICATIONS This project .... il1 "'Widen the b.'o apparatus doors at Fire Stations J and~. De5ign is 80 percent complete. Construction "Will occur in fall. EXPECTED COMPLETION: SECOND QUAF,TER 1991-92~ 3 • • · -, r .--,~.~> •.• .:..,.. 11. 18916 FIRE STATION OOR.."U't'QR.Y ____ ~ODIFICATI0NS 1fhis project funds modi.fications to five existing fire stations over a period. of five fiscal years, and inch.l.des separate locker, bath, and dormitory f~cilities to~ male and female fire.fighters. The constr:...ction contract has been awarded, and stations 1, 3 and 5 will he complet.ed second quarter FY 91-92. Work. on the retl'.aining t ..... o stations .. ill be. done after completion and approval of the Fire Relo.:::;ation study 4 EXPECTED COMPLETION: FOL~TH QUARTER 1991-92. 18. 18918 HAR.BOR.~rM.PROV.EMENTS ~his is a multi-year project. council approved the Site and Design application for the Harcor Improvements project on March lB, 1991. staff continues tc "ioIork 'With regulatory agencies to secure all necessary permits. A. time extension has been requested fro1l'l Bay Conservation and Development Commission to allow construction to begin in 1592. Staff ~ill return to Councl.l -with a status report after COm1I1ents are received from BCDC's design revi€~ board. EXPECTED COMF-L'ETION OF CURRENT WOPX: 1992-93. 1'9. 18971, 1B670 S'l'REET ~~IN.~ENANCE This project provides for the annual resurfacing and reconstruction of various City streets identified by the city's Pavement Maintenance Management System (PMMS) as needing improve!l'.ent. Sevent.y-seven streets 10iere resurfaced in late summer as part of the 1990 program. construction is co:rr.plete. A major street resurfacing project. will be accomplished during FY 92-93. EXPECTED COMPLl:."'TIOU: FIf\ST QGARTER lS92-9). 20. ll...9....l1.. TRAFFIC SIGt-lAL -W'A. __ JNTERSECT10N MOD.IFICA.TIONS This project provided for lllodifying the traffic signal and improving interse.ction configuration at. El Call'lino Real/Los Robles. Caltrans was the lead agency and ... ·a5 responsible for all tt.e design and construction work. PROJECT COMPLETED: FOURTH QU.lI.RTER 1990-91. 21. ~ __ IJ _____ TRAFFIC SIGNAL AN.P_f~TERSECTION MODlfJCATIONS This project provided for modifying traffic signals at four locations along El Camino Real. Cal trans ~as the lead agcn~y and ~as responsible for all the design and construction work. PROJECT COMPLETED: FOUR'!'H QUARTER 1990-91. 22. 19001, 186G4 __ -L-J .. 8B03 TANK REMOYA1ICLEM'UP Some contamination -was found at t.he tank rer,oval site at 1301 Embarcadero Road (airport). Definition of the extent of the conta~ination has been completed. Based on the discussion \oo'ith the Santa Clara valley water District, st~ft .... ill proceed -with a possible risk analysis or rer..ediation~ Design \!lor"\(. at the landfill fuel tank: also is undenray. Final cleanup of contaminated soils ~ill follow. EXPECTED COMPLETION: FOURTH QUAFTER 1991-92. -'~"~':.------ .. .,. :.:?- • , - ,.-- ~-, . 23. 24. 25. 26. 27. 19002 lise fUELTAUK 1I0DIFICAl.'JON "The purpose of this proj ec't is to modify the existing above- 9round fuel storage area at the MSC to include a self-closing valve at the storre drainage outlet to prevent any oil leakage from leaving th2 secondary contain:'lent area. The design is 50 percent complete and construction is scheduled for this summel:'. EXPECTED COMPLETION: SECOND QUAR~ER 1991-92. 19004 RINCON.1>..OA POOL IMPROV01.ENT~ This project replaces filter, chlorination and circulatory systems in order to maintain .. ater quality, chlorination, circul~tion, and health and safety requirements cf Santa Clara County and the State of California. The filtration system has been completed. The ne'j{ chlorination sj"stem has been designed ~nd the project bid. The system will be installed in FY 91- n. EXPECTED CGMPL[TION: FOURTH QUARTER 1991-92. 19005 _TENNIS AND BAS.K£T13AI,.L COURT IM:PROVE1't.EN'!'~ This project funds preventive maintenance for city te~~is and basketball courts on a five-to seven-year rotating schedule. F¥ 90-91 work has heen completed, and included placing new aspbalt concrete overlay on the Peers, Boulware and Briones basketball courts, resurfacing of the Terman t€nnis courts, and restriping courts at Seale. Ramos, ~obles, Hoover, John$on, and Scott ParJc~. Future improvements have been delayed indefinitely due to budget constraints. EXP~CTLD COMPLE7ION: NOT SET. 19006 ATHLETIC FIELD$.. __ RENOVATION This project provides for on-going renovation of athletic fields to ensure safe and playable conditions. Soccer fields at El Camino Park, Greer Park and Terman Park were renovated first quarter F"i 19SJl-92. Future renovation has been delayed indetinitely due to budget constraints. EXPECTED COMFLETION: NOT SET. 19009 FlN~CE VAULT REMODEL Remodel of the Finance Department vault will improve the ~ork space area for Finance Department staff. The project is on hold pending resolution of the Civic Center Utilities/Finance move. EXPECTED COMPLETION! NOT SET. 28. 19011 RECORD$. MANAGEMENT This project will fund a centralized records )J'~anagement system "for the collection, controlling, indexing, protection, storage, securitYJ and destruction of City documents and records. First-year funding covered a study of various options and systems available, with recommendations for futUre implementation. A ~Request for proposals· for implementation of the system vill be issued during FY 91-92, and a pilot i~plementation done in the Police Depart~ent and the Inspection services Division of the Planning Department. A 5 'L l , r , . i I I r i r -j i I ~ j - o pilot [or the Fin~nce Department has been delayed ons to two years due to budget constraints. EXPECTED COMPLETION: FOURTH QDARTER 1991-92. 19012 PAYROLL(PERSO~~EL SYS~ Needs Assess:aent bas k>cen cO"IIlpleted l including use of a departmental questionnaire t<"o aid in analyz.ing user needs, and a survey of payroll software solutions in other municipalities, Council approved staff's recommendatior. to purchase and modify the source code of an existing soft~are system through utilization of in-house programmers. Trle RFP bas been prepared and viII be issued in Jul:t 1991. staff .... ill return to Council in Octohe:r 1992 'old th a recomm~n<:htion on the system to be purchased. EXPECTED CO~~LETICN: Fy 1992-93. 30r .l.2 ... Q1LuCIVIC CEN1Ei::t ENEB~Y M~AGEMENT SYS'I'_~ This proj ect will install an automated: control system for Civic Center heating, ventilation and air conditioning, ~hich .... ill provide ene·rqy !Savings, increased occupant comfort, and will improve the life cycle and performance of equipme~t. The contract has been a'waT"ded l and the proj eet will be completed second quarter FY 91-92. EXPECTED COMPLETION: SECOND QUARTER 1991-92. 31. 19018 CUB1U:RL.¥Y SCHOOL SI'l-'_?.....m~P"1LDJNG CODE MQPl....fJCATIONS This project provides for initial "Work at the Cub~erley School site to establish code compliance "With curr-ent public facility fire, life safety, and handicap access r~gulations. Work is proceeding on prioritized projects. EXPECTED COMPLETION: NOT SET. 32. 19019 ITTm_MARSH ENHANCEMENT This project is to restore a portion of the 1S0-acre former I~T site to wetlands and e~hance its use as "Wildlife habitat. salt ..... ater frOTh the Bay and reclai!I'.ed "Water from the Palo Alt.o ~egional Water Quali~y Control Plant ~ill be used to create both a salt 1r.a.rsh and a fresh ... ater "Dlarsh. The project is in the design phase, loII"ith COilstruction to commence in August 1991- EXPECTED COMPLETlON: THIRD QUARTER 1,91-,2. 33. 19072 MlJiQ_P. INTERSECTION" I_M£'RQVEMENTS This project. includes improvements at nine locati·ons identified in the CitY-loII"ide Land Use and Transportation stUdy to reduce ~ongestion and ease traffic flo~. These projects vary in nature from !!1inor striping to modifying traffic signals, and require coordination ... ith Santa Clara County and Caltrans. Staff is currently developing plans in conjunction "With the county and State, and the .... ork is expected to be completed fou!"th quarter f"i 91-92. EXPECTED COMPLETION: FOURTH QUARTER 1991~92. 6 I ! I .. - 34. il..073 MAJOR INTE'RSECTJuQ!L_IMPROVEMENTS Ifhis project provides fo'r capacity improvements at nine locaticns and development of a ne* intersection identified in the City-wide Land Use and Transportation study. The .... ork ""ill reduce congestion and ease traffic flo .. along major routes to the Stanford Research Park. Preliminary design has been co:rupleted on seven intersections. Final design is substantially completed for the re~aining t~o, including the Alma/East Meadov and Alma/Charleston intersections. Construction is expected to begin on the Alma/East Meadow intersection in fall 199L The other eight intersection improvements viiI be completed as funds are budgeted in the ell' program~ EXPECTED COMPLETION: THIRD QUARTER 1991-92. 35~ 19076 BIKE PARKING FACIL.1TIES The purpose of this project is to pu"C\;hase and install bike racks and/or lockers at variou$ locations in the Duslnes.s districts and at city facilities. EXPECTED COI'iPLETION: THIRD QUARTER 1991-92~ 36. lllJ21 ___ TANK INVESTIGATION,u AND REMOVAL This project includes the investigation, testing~ design and removal of underground tanks discovered on City property or -...rithin the City right-of-way. The project al:;.o invol'tes tt'.e removal of contaminated soils adjacent to the existing landfill fuel tenk. An abandoned tank has been found in an alley near Alma Street~ Staff is currently ~orking with the santa Clara Valley Water District to determine the respcnsible parties. EXPECTED COMFLETION; NOT SET. 37. 19102 ABASTRADERO l,.N{~_ DAM This project will analyze the condition and adequacy of the dam to withstand seismic forces and major storm conditions~ Included are testin9. soil borings, a stability analysis, cost estimates and a tinal report. The investigation is 40 percent complete~ EXPECTED COMPLETION: FIRST QUARTER 1991-92. 38. 19103 r-UtYGROT,IND FURNITURE A."lO E:QUIPMEN'r REPLACpo!'E_NT This project includes the replacement of playground furniture and eguipment~ The vork at Greer Park is done~ Eleanor and Hoover Pa~ks ""ill be completed during second quarter FY 91-92~ The remaining replacement schedules (including Boulware, Bowen, Briones, Ra!!los, Robles, Rincorlada, Seale.. Peers. Athletic Center and El Camino) have been delayed one to two years due to budget constraints~ EXPECTED CO~~LETION: NOT SET~ J.9~ 19104 BAYLANDS m.:g::_J'.--....EQND FILTRATION S'i5_'r_EH This project provides for improvin9 the water quality at the Duck Pond to eliminate algae blocms. EXPECTED COMPLETION: SECOND Ql'ARTER 1991-92. , L • J ! - 40. 19105 BOROND ... VJ<LPtJBLIC DOCK REFLACE;MENT -'!'his project 'Will replace the 21-year-old public Foothills Park ~ith a dock ot similar construction. EXPECTED CO~~LET!ON: SECOND QUARTER 1991-92. 41. 19~ __ TERMAN SCHOOL SlTE DEVELOPMENT dock at This proj eet has been. delayed indefinitely due to budget constrair.ts. It provided for the city~s portion of improvements as stated in the Terman Specif ic Plan~ It included remodeling of Wing 30 {interior painting, carpeting, 'Wall and windo~ coverir,gs, hard""are, handicapped. restroom facilities, electric~l improvements, r~trofit of heating system boiler, removal of obsolete cabin~ts}. EXPECTED COMPLETION: NOT SET~ 42. J.91D8 CIVIC CENTER ~UILDING FIRE SPBINKL.ER SYSTEM This project pr-ovides for the engineering analysis, design and installa.tion of a fire spr-i:1Jcler protection s}'ste:m for those areas of the civic Center (including the Police DepartmeI"'.t -wing and the City CQuncil Chambers) which are presently 'iiithoLlt a sprinkler system. This '.'ork ... i 11 comply -with the uniform Fire code requirements. The design contract will be awarded in September 1991. construction has been postponed one to two years due to budget constraints. EXPECTED COMPLETION OF DESIGN: FIRSl QUARTER 1991-92. 43. 19109 POLICEI~QMWJNICAT!ONS C;.9MPVTER SYSTEM ~his multi-pnase project ~ill identify needs and implement solutions for improving police and dispatching information manag€.~.o;!;nt processes. CUrrent and anticipate.d informat.ional requirements have been identified; prioritized and evaluated in a cost benefit analysis report. EXPECTED COMPLETION: FOURTH QCAR'I'ER 1993-94. 44. 19110 flFi:I_NT!NG SERVICESm..x.QJJIPMENT UPGR.~ This project has replaced the obsolete duplicator with e£ficient, upgraded equipment that automate$ several manual processes, and thus increased production capabilities. In FY 91-92, an offset press/duplicator 2nd plateIllaXer 'Will be added to provide additional productivity. EXPECTED COMPLETION: FIRST QUARTER 1991-92. 45. }n~111 INVENTORY CQHI..E_QL SYSTEJ1 This project rap 1 aces the outdated stores inventory controls at the MSC ... arehouse .. ith eff icient :mate.r ials invent:ory control and a related bar coding system. The schedule is dependent upon completion of related IFAS projects. EXPECTED COMPLETION: NOT SET. 46. .l..~..l..1...2 W}.REHOUSE OPERA_TIC!'!n$.. -HAZI"".l!.T STORAGE jJNIT This project provided for the purcha.se of a containerized stor3ge unit to comply ~ith federal and state laws and regUlations for the storage of hazardous materials that are part of the MSC ~arehou5e inver.tory. PROJECT COMPLETED: FOUR?H QUARTER 1990-91. 6 • r I .. '-.~; ,-' .... - .~ ... ->- - o 47. 19114 NEW YEHICI,E PURCil.'SES ~his project provides for the purchase o~ 12 new vehicles and equipm.ent to be added to the City's fleet. Elever. vehicles have been purchased and are in service. The remaining vehicle will be in s~rvice July 1991. EXPECTED COMPLETION: F!RST QU~<TER 1991-92. 48. J 9115 PBX SOFT'o'lAF'-k ... lU'lD HARDWARE UPGRAP'.f; This project is to upgrade and expand the NEAX-2400 digital P8X telephone system in order to meet departmental needs for telephone and data services by adding additional line ports, trunk and circ,uit cards., a T-l channel card and i!lssociated modems and soft~are enhancements that ~ill reduce the amount of technician time and improve efficiency in performing moves, additions and excha."'lgl;1:s to the system. The planned ac:ldi tion of hardware and sott,,'are is currently being installed~ ~ith completion expected by August 1991. EXPEC'rED COMPLETION; F!RST QUAF.TER 1991-92. 49. 19116 WIDE AREA JIl.ETW.PRKING This is a joint project loI'ith the Utilities (;epartllJe:nt to design and install a ... ide area net ..... ork (Iooo'AN) for computer data communications for all of the City's remote facilities that require the use and exchange of data. First year funding covers the study of various options and systems available, and i'nstallations of 1nodems and modem lines for remote locations durinq the study and design phase. The General Fund portion of this project has been delayed one. to t ..... o years due to budget constraints. The Information Resources and Utilities Departments will continue to ~ork on a WAN solution bet~een civic Center and Municipal Service Center. EXPECTED COMPLETION, NOT SET. 50. 19117 HP 15\t PERSONAL COMPUTER RE:.PLA"CEMF.NT This project will replace the 42 obsolete HP 150 personal computers ...... ith Vectra personal computers, ~hich is th-e city standard ret" personal computer purct..ases. The first year funding covered replacing 17 of the approved 42 HP 1505. All 17 units have been received and installed. The second-year and third-year fundin9 for this project have been delayed one to two years due to budget constraints. EXPECTED COMPLETION: NOT SET. $1. 1911A. CABLE 1EI..E"J'ISION EQUIPMENT This project ~ill fund the purchase of portable cable television camera equipment~ editing equipment and a portable tape recorder and deck to be able to cablecast other cDmll'littee meetings held in the council Conference Room and other City locations. The first year funding ~ill cover the purchase of portable cable televisicn camera equipment to be installed in the Council Conference Room in february 1991. Tl"1.e second year funding has been postponed indefinitely due to budget constraints. EXPECTED COMPLETION: lJOI' SET. 9 • l- - ""';" "' 52. 53. 19119 ___ CIVIC CENTER REMODEL A..I>JD REnWC.i\.T.ION This project will address space limitations on tt.e second, third and fourth floors of the> Civic Center. The proj2ct components include space planning and d~sign, construction remodeling, voice/data "Wiring, and n',oving. The space plan has been compJ eted. The project is 0;) hold pending revie ...... of alternative space plans. EXPECTED COMPLETION: NOT SET. 1l..120 l'flDDLEFIELD WELL Sl'l'E TWK __ ~D BUILDI~EM:OVAL This project included the removal of public improvements on a City site to lt1.ake it available for future development. PROJECT COMPLETED; FOL~TH QUARTER 1990-91. 54. 19205 FUEL TANK Ul'GRADE This project ~odifies existing piping of underground storage tanks to current standards 2IInd insta 115 metering equipnent for remote ~onitoring cf fuel inventories from the MSC garage4 EXPECTED COMPLETION: FOURTH QUARTER 1931·92. 55. 19206 WATER RESCUE:" _____ ~ .. QJ,lIPMEN"T This project 'Will provide !Jater rescue equipment for Fire Department emergency response to ...... ater emergencies in the b3.Y. EXPECTED COMPLETION: FOti'RTH QUARTER 1991-92. 56. 19207 _PARB._Q..N PARJ( D~INJI.GE/Sr..e..f;.,~_T _____ IMPROVE.""IENT GUIDELINES This project wi 11 fund 211 study of the Barron Park neighborhood to develop guidelines for drainage and street improvements, .... hich ..... il1 be integrated 'With future storm drainage improvement projects. The study ...... il1 be done as part of an update to the Storm Drainage Master Plan. EXPECTED COMPLETION: FOURTH QUARTER 199]-92. 51. 19209 GOLF COURS~_C;_I,.AIM_~D WATER StIFPLY This project wi 11 install a reclaimed ... ·ater I ine from tbe Palo Alto Regional Water Quality Control Plant to the Golf Course. A reclaimed .'<:iter blending tank, irrigation booster pump station ani controls will b~ installed on Gelf Course property. EXPECJ:'EO COMPLETION: FIRST QUAF.TER 1992-9:3. 5$. 19210 SELF-CONT}.nr~..p BREATHING AFPARATUS This project will refurbiSh self-conta:ined breathing apparatus for Fire Department emergency respond~rs. EXPECTED COMPLETION: FOURTH QUARTER 1991~92. Wl\S1'E"iilATER FUND 594 ...li5~ SYSTEM npw METERING REFHA_~_EM~_~_'l' PROGR..z.M This ongoing proj ect provides for scheduled replace-rnent of system flow meters at the Palo Alto Regional Water Quality Control Plilnt (RWQCP} to ensure reliability and accuracy. During F¥ ~O-91. a ~aste met~r ~as purchased and put on-line, 10 L • - ." -----.-... ~" .... - and a new meter has b£en installed to measure flow from the East Palo Alto:> S.anitary District. EXPECTED COMPLETION: NOT SET. 60. 33591. 39_~J.~602 PU.NT EQUIPMENT REPLACEMENT This ongoing project provides for scheduled replacement of RWQCP equipl!lent for maintaining tre3tment reliability. FOUl" new replacement meters ~ere purchased for in£luent pumping. EXPECTED COt-rPLETION! NOT SE'r. 61_ 39593 PLANT_GRO~~ AND LANDS~APING This project provided minor maintenance and repair of the reclaimed .... ater irrigation systeDl in order to maintain and upgrade the existing landscaping at the RWQCP. FROJECT COMPLETED: FOURTH QIJAR.TER 1990-91. 62. 39594 PLANT WAJ'ER ___ SYSTEM This project will replace a portion of piping for the 14 ~ater system to provide reclaimed w<!Iiter for equipment-... ·ashdown and landscape irrigation at the RW~~P. EXPECTED COMPLETION': FOURTH QUARTER 1991-92. 6).. 39595 I~BORATOR'i FAr;JLIT:[ES AND STUDIES This RWQCP praject provides for new bioassay, effluent characteriZation and data management, and replacF!l'!tent cf certain laboratory instrunents to meet Regional Water Quality Centro I Board requirenents.. The bioassa~~ testing room .... as cOD'lpleted in July 1990. Effluent characterization is heing conducted. The project also provides for the remodeling of the laboratory to accommodate additional equipment and staff. EXPECTED COMPLETION: NOT SET. 64. :39598 ELECTRIC 01 Sl'IUBUT!9JLllJ0' T OCP This project extended the electrical distribution system in a loop around the RWQCP to provide reliability and the means of isolating specific sections without having to shut down the entire system. PROJEC'I' COMPLETED: FOURTH Q~uAATER 1990-91. 65. 39599 STANDBY GENERA_1'.QRS This project provided a 500xw emergency generator far increased reliapility for RWQCP operations. PROJECT COMPLETED: fOURTH QUARTER 1990-91. 66. 39 700 B~INt!T9R REPLACEMENT This is a two-year RWQCP project to replace t.he pres;ent 2!,l­ year-old barminutors with more effective equip~ent. EXPECTED COMPLEtION: FOL~TH QUARTER 1991-92. 67. 39705 WASTEWATER RECI.J.J1AT19.N This RWQCP project includes preparation of a plan to stUdy the economic, technical, environmental, and institutional feasibility of utiliz.ing reclaimed \oo'astelolater to irrigate large turf and landscaped areas. The project also includes 11 .--' - oS • RWQCP modifications and purchase of equipmeJ1t to produce 'reclaimed ",·ater. EXPECTED COMPLETION: THIP.D QUAR~ER 1991-92 . .1.2.201 INS':'RUMENTATION AND .kLhRM DISTRIBUTION_.S.9NTfiQJ,.~~ This multi-year project includes development and installation of a standardized distrib~tion control syste~ for Plant-~ide alarm syetem, pumping control system (three locations" f i It.ratior'., chlorination, dechlorination, in~inerationl polymer and lime/caustic control systems. EXPECTED COMPLETIO!<: 1991-94. 69. 39710 V:[BRAJ'ION" MONITORING EQTJ~J)JoI~~...1. This project purchGsed 3 vibration monitoring system to monitor and track vibration changes on each major piece of RWQCP e:;I'.:iprr,ent as part of the preventive zr:aintenance program. PROJECT COMPLETED: FOURTn QUARTER 1990-91. REFOSE FlJNI> 70. 45100 PALO~LTO LANDFILL PM'I'l.B"I:......GLOSURE The project imple.ments partial closure of 20 acres on the southeast quadrant of the landfill~ The place~ent of final cover is in accordance \<{ith Regional .rater Quality Board regulations. EXPECTED COMPLETION": FOUR1'H QUA..RTER 1991-92. 71. 45120 PERMA,NEt{'I' LA."'WFILL FLAB.~._l:teAUTIFICATION This project provides for construction of an a~sthetically­ pleasing enclosurE! around the stack ot the permanent landfill gas flare~ EXPECTED COMPLETIO~: NOT SET. 72. ~569Q BYX8EE F~ construction be~an in August 1990 after approval of the plans by the California Integrated ;,~aste Management Board. Park improvements are near cOl'r,pletion. The park will open to the puplic in late summer 1991. EXPEC1'ED COM.PLETION: FIRST QUARTER 1991-92~ 73. 45801 GAS C0NDENS.A.T.~. COLLECTION M'D DI~.POSAL SYSTEl1 This project is to construct a collection and disposal system for gas condensate accumulated in the methane gas collection system, vhich is required to comply ~ith Environmental Protection Agency requirements. The Agency has delayed implementation of this requirement pending revisions. EXPECTED COMPLETION: NOT SET. 74. 4580' LANDFILL L_~V~ __ E. PROTECTION This project is to construct a flood protection levee on the northW'est quadrant of the land[i 11 to wi thstar,d washout from the lOO-year flood, as required by the Regional water Quality 12 .. ; - () '-' Control Board. EXPECTED CO¥...PLET!ON: NOT SE'L 75. 45803 HAZARDOUS MATERIALS SAfETY STORA:::;E This project provides for purchase of small portable safety storage buildings .for City-generated hazarrious lraterials. EXPECTED COMPLETrON: FIRST QUARTER 1~91-92. STORM DRAIN~GE ENTERPRISE 'OND 76. "17Q..L.COLLECTION SYSTEM......IHPi<OVEMENTS A pump station telemetry study conducted with the Utilities Department was completed in April 1991; design phase may start in spring 1992. well abandonment at the former In' property has begun and will be cOlnpleted in su.runer 1991. A condition assessment of the. existing storm drain system and development of an updated storm drain master plan ~il1 begin in su~er 1991 and will extend over an IS-month per icd. To ensure compa~:'bility ..... ith the :master plan. design of a new storm drain along Everett Avenue .. as delayed until FY 91--;1. ':'onst!:uct.ion of a new pedestrian/bicycle bridge over Adobe Creek at Duncan Place by the Santa Clara Vallej· Water Oistr iet will start in early SUnl.:ner 1992. Curb and gutter repairs .,ill be done as part of the sidew~lk Repairs ClP starting in su~er 1991. EXPECTED COMPLETION: NOT SET. 77 ~ 4770) STORM. WATER QUAl.JoTi' IMPROVEMENTS Palo Alto continues to participate in the Santa clara Valley Nonpoint Source Pollution Control Program, an area-wide cooperative effort to reduce pollution from urban runoff. A five-year NPDES permit vas issued to the program by the Regional Water Quality Control Beard in Julr ~99D. Th-e permit requires the cit:t to ?erform specific long-term activities, such as el imination of illegal dU:I1ping and illegal connections to stor~ drains, modifications to City ordinances and procedures, and monitoring of stormwate~ runoff, to improve storm~~ter quality. ~his project, though subject to revision, will continue in some form indefinitely. EXPECTED COMPLETION: NOT SET. o.