Matadero Creek Flo~ContrQl project ~Bike Path Status Repqrt
Members of tne Council:
Report in Brie,!
This is an informational report on the status of Phase V of the
Katadero creek Flood control project and its potential impact on
the bike path and vegetation in the right-of-way between Matadero
Avenue and the Varian Associates property. No Council action is
required.
R~ckgrQund
In April 1988, the Santa Clara Valley Wa.ter District (District)
final ized a Planning Study outlining flood: control im.provements for
Matadero and Barron Creeks. One of the proposed improvements is
the Matadero Bypass, a 12-foot-high. 12-foot-wide box culvert that
will carry excess Matadero Creek flow during heavy stormS4 Because
the culv~rt ~ill be constructed in the location of a porti~n of the
existing Bol Park bike path, consideration l,dll be given to
temporarily relocating or closing the path.
Puring the early p!anning stage of the project, staff requested
that the District maintain bike and pedestrian traffic throughout
the construction period. This ~ill be particula~ly difficult in
the seqment between Matadero Avenue and the varian Associates
property because of the narr.o\omess of the right··of--...ray and the lack
of existing alternate routes (Attachment A) ~ The District proposed
building a temporary path parallel to the e~isting path location
(Attachment B). Since there was concern about the loss of
vegetation under this plan, staff a:sked the District to explore
alternative routes, including placement of a path across adjacent
private properties. The Oistrict contacted several property owners
on Matadero Court to discuss the possibility of acquiring a
temporary bike easement through their properties, but received
negative reactions4 On :March 6, 1991, Mso Kathr:{n Olmstead -wrote
~ letter to the Co~ncil objecting to the removal of vegetation for
-1-
--'L-·.! _)P't~-'''*'''''''-''--
------.,...~
I
f
I • I
r
"
...... 11, ..
-
o
the construction of a te~pcrary path. Staff responded on April 18,
1991. Both letters are atti!!llched (Attachment C).
The District has just begun the actual detailed design of Phase V
of the Matadero Creek Flood Control Project. The decision to
construct a temporary bike path has not been finalized, nor has the
exact extent of required vegetation removal been datermined.
Construction is not scheduled to st,art until summer 1'392. Eet'Ween
now and then, the District will 'Work vith th.e City and the Barron
Park neighborhood to resolve the bike path issue, as 'Well as any
other construction impact is-sues. The District plans to hold
neiqhborhood meetings prior to cOIIlpletion of the proj ect design, in
order to receive public input on alternate path locations and the
pos$ibility of path closure during construction.
Staff's initial request to the District to ma ir.tain bike and
pedestrian traffic along the route of the 001 Park bike path was
based upon the i~portance of this link in the bike path network.
OVer 400 people use the path daily, including stanford Research
Park employees, neighborhood residents, and Gunn High School
students. CUrrently there is no convenient alternate route. The
closest parallel routes are E1 Camino/Page Mill, which is subject
to heavy traffic, and Hiranda/Hillvie~/Hanover, which covers some
steep, hilly terrain. 1-.5 a result, there .... i 11 be substantial
impacts if access-is elizr.inated for the four montl".s it will take to
construct the culvert bet~een Matadero Av~nue and Varian.
Staff also acknowledges the ne';Iative impacts of removing the mature
veget~tion along the existing path and therefore ~ill direct the
District to investigate the follOwing alternatives:
• Explore further the possibility of obtaining a private
easement so that a temporary path can be rou.ted alor.g Matadero
Court and across private property.
• Identify alternative alignments (inclu~in9 a meandering path)
vithin the existing path right-ot-way .... ithout removing trees
or destroying significant and mature vegetation.
• Consider reducing the path "",idth from eight to four feet,
constructing the path with base rock instead of asphalt
concrete, and requiring bicyclists to .'alk their bikes along
this section of the path.
-2-
CKR: 396:91
.. ':-'"·L·-.
,
j
j
I
o
Staff will return to Council 'With a status report after public
meetings are held and before finalization of the design.
Respectfully submitted,
l/:;~f~
'''-r/l '
AblS' tant Director of Public works
~ ~ 1.e,~JV-U~
DAVID G. ADAMS
Director of pu~~orkS
> /, --/:~.I
JtJN~ FLEMING ",s~Jstant City
~tachrnents:
I Mana~er ,
A.
B.
c.
p showing Matadero Bypass bat ... een Matadero
Avenue and Varian Property
Typical section of Matadero Bypass along bike
path (sho~inq proposed temporary path)
Letter from Ms. Kathryn Olmstead and staff
response
cc: Ms. Alison Cherry Harer
Mrs. Rjchard Wolffer~
Ms. Kathy Olmstead
Barron Park Association
Santa Clara Valley Water District
-3-
CMR:396~91
,
f
,
I
I
j
I ,
j
I
!
I ,
I
I
I
I
I
I
I ,
L
LOCKHE
()
/"-......
LEGEND
EXISTING BIKE PATH
I>IATADERO BYPASS
TEMPORARY PATH
IPROPO'SEO~
IIIIIUIIiI
~
ATTACHMENT A
~!' p m&'-"
,,,':~i'E\'1;'C{,, L
-
..
',-",
"
-. .-
R/W A/W
80' -l 1-1 ~ _____ -...,.-:--=:---=-:::-=~~--:::--::-:-::--____ MA TADERO CT.
(COUNTY OF SANTA CLARA) RESIDENCES
EX.! ST. TREES ~ I 20' t I NOT TO BE : ,.. • •
DISTURBED 1
THIS SIDE EXIST. BIKE PATH
TO BE REPLACED
30' •
I
~--CHIMALUS DR.
RESIDENCES
PROPOSED 12'X12' __ ""1 ~ , PROPOSED SHORING
RCB CULVERT U~!_~' ~~'~I . DURING CONSTRUCTION
'-
2'~ ~2'
TYPICAL SECTION
BYPASS CHANNEL
VARIAN TO HATAOERO AVENUE
ATTACHMENT B
906 .Ka'tadero
Pale I.lto, Ca.
March 6, 1991
Attachment ~
STAFF WILL RESPOND
•
-
Members of Clry Council
250 HamIlton Ave,
Palo Alto~ Ca. 94301
Dear Kembe~1 of Clty CouncIl:
I am "wrIting tc ask all of you for your assIsta~e In oreer to save many
native trees and :;hrubs that are sched'.J.led tf'J be t.orn ow.t for 'the
Matadaro Creek F~o~~ Control Projeet. The area ~ffected is alcr.g the
Barron Park bicycle path between the Matad~ro Ave"/lAg~na St"
intO'lt:section and the Varian property line.
Lat~r this year, the Matadero Creek FlOod Control Project will be
placing a large drai~age pipe under the bicycl~ path. Apparently, tvo
or three years ago, City Council placed a cor-,dition on t.ne project. that
the bicycle path was to remain o~en. In order t.o meet this reqUirement,
the current plan 15 to t.ea= out all the native t.rees and shrubs along
one side of the path and to build a temporary bicyc.le path.
1 have walked thls area with Gary Fazzino to show h!~ the va~iety and
density of t.his natl,lral landscaping which includes several oak trees as
well as pInes, peppers, accacias, an olive, and many shrubs, all of
which are thriving inspice of the drought.. He has encouraged me to
bring this matter to the 6ttentlon of the councl1 as .. whole.
There. is precedent for the bicycle path to boe. c.losed for an exter.ded
perlod of time._ It is cut:rently closed and has beer: sir-,ce 2/11/91. In
additIon. my neighbo-r, Alison Marer, has pbotographs that I5"how that the
bicycle pat.b was elosed for a couple of months a year or two ago. I am
sure that with good planning, the Flood Control Project can minImize t.he
closure of ~e bicycle path.
In summary, these. nat.ive plants are "liorth saving. In ad(!~tion. if the
area does not ha.ve to be re-landscaped: &.nd if a tec~'nary bIcycle -path
does ~ot have to be constructed, our tax dollar5 will also be saved.
And very import.ant t.o !!lyself. the Itepact of t.he. fleod C~ntrol Proje.ct on
the ne1ghpors &l~ng Matade~o Ct. will be much r~d~ce~ If ~e. can keep
the landscaptn& which provides ~rivacy and a bufter to Lhe noise and
dirt. ~hat will come with th~ construction.
I thank yO"-l in advance and hope. t.hat the Council ,"'ill !!lake a change to
the eurrenC plans for the landscaping.
cc: Kr. William Zaner, City Manager
Mrs. Alison C. Mayer
Mrs~ Thelma Yolffers
2.
Sincerely,
~s~
..
'. ~ I' " ~: .'
I f i I
i
1
!
j
I
I
-
<;> Cit}' of Yolo ~lto
p 0 !OJ: 101')0
.',oI,L.O ..... 70. C"LlfO~N' .... 9~JC3
Transportation Division
F.O. Box 10250
9430:!-0862
April 18, 1991
Ms. Kathryn Olmstead
906 Matadero Court
Palo Alto~ CA 94306
Dear Ms. Olmstead:
2~O Ha~ilton Avenue
sixth Floor
(415) 329-2136
The city Manager has ask..:d me to respond to your letter of
March 6, 1991 regarding the possibility of closing the bike
path between Matadero Avenue and Varian during construction of
Phase V of the Matadero Creek Flood Control Project in order
to minimize the loss of existing native trees and shrubs in
the area.
The santa Clara Valley Water District (SCVWD) completed its
planning study for this project approximately -t.hree years ago.
At that time the city expressed the desire to have bike and
pedestrian acces~ through the area maintained ,during the
extended constroJction period (three months or more). Over 400
people use the path daily, including stan~ord Research Park
employees, neighborhood residents, and Gunn High School
students. CUrrently there is no convenient ~lterative route;
the closest parallel routes are El Camino Real and Mirenda
Avenue.
As you knoW', the District's study included provisions for the
temporary !:like path to be built directly adjacent to the
bypass channel betW'een Varian and Matadero Avenue. While the
District did propose an extensive landscape plan to restore
the visual appearance and habitat of the area, it is true that
TleW" .landscaping would take time to mature and provide the sa'Cle
level of screening for the adjacent properties as no· ... exi5ts~
In recognition of these impacts, we have asked the District to
explore all other reasonable alternative bicycle detours.
including those that ~ould require acquisition of temporary
easements from private prop€rty ovners.
This is a sensitive issue I given the trade-offs bet • .'een
accommodating the many users of the path and maintaining the
existing native vegetation and habitat. ·rhe District 'IoI'ill
begin design work for this phase of ~he Matadero Creek Bypass
•
·1
I
.... I ...... ··1
"----'-
. I :,
.,.:.J l
-
:.
o
Ks. Kathryn O!msteaej
April 18,. 1991
Page 2
thIs coming raIl (c:onstruction is not scheduled \,;;ntil late
1992). At that time these iss1;,&s .-i11 be subject to further
revie'W and evaluation by the District, the city and interested
pUl:>lic.
By copy of this lett~r, I am ~o~ardin9 your comments to Marc
Klemencic ot the SCVWD, the Project Engineer tor tbe Matadero
Creek I~prove~ents Project.
Thl\nk you for bringing your-concerns to our attention. Please
contact me at 329-21315 to further discuss this issu€ or to
check on the status of the desiq~ and construction plans.
Sincerely,
/~/Ci..ih'CQ
Gayle '-'Likens
senior Planner