HomeMy WebLinkAbout0389.091,
-
August 15, 1991
HONORABLE CiTY COUNCIL
Palo Alto, Califo~nia
BRYAN~~I:ET BICYCLE BOU.IDiARD EXTENSIQN STUDY PJJBLIQ_ MEETING
Member$ of the Council:
This is an infor~ational report regarding a second public meeting
that was held on J'.1ne 6, 1991, as part of the Bryant Street Bicycle
Boulevard Extension Study. No council acticn is required at this
time.
An initial pt:.blic meeting for the Bryant Street Bicycle Boulevard
Extension Stucy was he)" on October 25, 1990. An earlier staff
report (CMR:615: 0; December 13, 1990) summarized the format a..,d
results of that l!1eeting, in ""hich staff received valuable input
fro~ the meeting partiCipants. Subsequent to that ~arlier public
meeting, staff continued with its evaluation and development of a
plan for tne extension of the SrY3nt street Bicycle Boulevard.
On June 6, 1991# a second public meeting ~as held at the Palo Alto
senior Cente, to share info=mation regarding an Inte,mediate
Preferred Plan, answer questions, and receive iurther cort'llnents.
Mr. Geoff Ball 'Was hired by the City to serve as the facilitator
for the meeting~ The meeting format included an overview of the
study with an opport"J.nity for general CO!!\l'!1erlts and questions,
followed by a more specific presentation of the Intermediate
Preferred Plan, on a segment by segment basis, including ~ perioC!
for questions and comments pertaining to each segr.lent. Meeting
participants 'Were also encouraged to submit 'Written comments.
AttachmP.nt 1 is a copy of the l:Ieeting notice that 'Was sent to
apprOXimately 2,100 area residents and other interested persons.
Attachment 2 is a copy of the meeting cgenda. Attachment J is a
copy of the Intermediat~ Preferred Plan Which served as the focus
of the presentation and discussion at the 3une 6th public meeting~
ApprOximately 70 people attended the three hour meeting. Of those
who siqned the attend~nce she~ts, 56 percent reside within three
blOCKS of the p:n::posed Boulevard extension and 19 percent live
within three blocks nf the existing Boulevard.
CMR: 389;91
",,' .
-
r
--..,. --,._---.... --
As 'With the first meeting, there 'W'ere individuals present 'With
strong e,entiments, both in favor and in opposition to the Bryant
Street Bicycle Boulevard. virtually all individuals, however.
expressed appreciation for having been provided information on the
proposed extension 3nd for the format ot the meeting, because they
were provided an opportunity to express their vie~s.
Attachment 4 is a copy of a recent transmittal that was sent to
each meeting participant as a follo~-up to the public meetinq. The
transmittal inclUdes comments and questions raised durinq the
discussion of each segment, as well as more gener31 comments and
questions.
Staff is proceeding with the evaluation and development of a
recomlr.:.ended plan, and completion of the study report for the
extension of the Bryant Street Bicycle Boulevard. At the present
time, it is anticipated that the study report, inclusive of a
recommended plan, ~ill be forwarded to council in September, for
referral to the policy and services committee tor review and
discussici. at its meeting in October.
Respectfully s .... brnitted,
¥~VIN L. OVERWAY
Chief Transportation Official
KENNETH R. SCHREIBER
Director of Planning and
Community Environment ~ f:a( I
~..--:;
JUlIE FLEMING
As~istant city Ma a r
V
Attachments: 1. Notice of public meetinq (June S, 1991)
2. Public meeting agenda
J. Intermediate Preferred plan
4. Transmittal to meeting participants providing
summary comments from the public meeting.
Related Staff Reports: CMR:615:0, 12/13/90, Bryant street
Bicycle Boulevard Extension study
Public Meeting
CMR:47B:O, 9/6/'9D. Extellsion of the
Bryant Street Bicycle Boulevard
cc: Palo Alto Bicycle Advisory committee
Bicycle Boulevard Mailing List
Attendees of June 6, 1991 Bike Boulevard Public Meeting
CMR:389:91
L
~i
8/15/91
Page :2
•
-
May 23, 1991
a
NOTICE OF PUBUC MEETING
June 6, 1991
PLACE AND T!M.E: Palo Alto Senior Center, 450 Bryant Street
7:00 p.rn, Thur>day, June 6, 1991
SUBJECT: Bryant Street Bicycle Boulevard Exlension Study.
ATTACHMENT 1
BACK.GRQlJND: L.2.st September, City staffbeg3.!!.:3 study "'ith the objectkt~ c! developing
• recommended plan fer the extension of the Bryant Street Bicycle Boulevard from it:;
present terminus Bt Churchill Avenue northward 10 and through dC'ATItOWD PaJo Alto, and
on to the emting bicycle/pedestrian bridge across San Francisquito Creek into Menlo Park.
last October 25th, an initial public meeting was held to pr",ide an opportunity for the
public to learn reore about the study and comment on preliminary CQiJcephlal alternatives
for the bicycle boulevard extension.
Since October, City staff has completed further investigation and analysis of a variety of
alternatives and issues, induding those that surfaced at the initial public mee ting. A DRAFT
report has been prepared, documenting the information and process that has compr.sed the:
study to date, including the prepar.tion of an lNffiRMEDIAIE PREFERRED PiAN.
PURposE OF MEETING; The purpose of this second public meeting is to share
informatio" regarding the lJ','TERMEDIATE PREfERRED PiAN, answer questions, aod
rc«:ive further comment:,., The public meeting will include a general presentation,
c!isc'-.lSSton., questions and answers, and a period of open comments. Written COITunents are
appropriate before, at, or forJowing the meeting. Staff will use the comments from the
IDet".tmg ill fnnher evaluating, {t".fiT1mg ';\.nd dev~luring 3 FlfI.al R~cr;'mrnendt:'d Phm for future,
presentation 10 the Oty Council.
A one page summary and related map of the INTERMEDIA IE PREFERRED PIA."! is
enclosed [or your information and reference. A copy of the DRAFf report is ava.ilable for
reference L"l the Transportation Divi.sio~ 6th Floor, Gty Hall, 250 Hamilton A~ ... enue and the
Downtown Library at 270 Forest Avenue. A copy of the DRAFT report will be ma~ed to
anyone. upon request.
This notice bas been sent to an residents within a one b~ock radius of the study corridor,
members of the Palo Alto Bicycle Advisory Committee, and other interested parties. A map
of the corridor and the locatio!:] of the public meedng is provided on the back of lhis notice.
CONTACT PERSON: Gayle Likens, Senior Planner, (415) 329-2136
Q
BRYANT STREET
BICYCLE BOULEVARD EXTENSION STUDY
PUBLIC MEETING
7:00 pm Thursday
11.ne 6, 1991
Palo AltO Senior Center
450 Bryanl Street
Palo Alto, CA
AGENDA
1. Introductions and Opening Comments
2 Genera] Presentation on Policy and Process
3. Overview of the Inte=edia Ie Preferred Plan
4. Presentation &0 Discussion of Intermediate
Preferred Plan
a. Segmc:nt Presentation
b. Qarification Questions
Co Group Discussions
d. G roup Responses
s. Open Period for Public Comments
6. Oo<ing Comments
Handouts:
A Description and map o( lnlermediate Preferred Plan
(O!apter 7 0( draft repon)
Copy of fun draft repon i5 available
Contact Person: Gayle Ukens, Senior Planner, (415) 329-1236
ATTACHMENT 2
(7:00)
(7:10)
(7:20)
(7:30)
(9:30)
(9:55)
. -.
) -
•
FIG U A E 7. ~
INTEI'IMEDL"TE
F-AEFERASD Pl"N
~-~,-. ci:~: ,~
, .,: (,~:;",.~
•
.• ··· .. i.J-__ ._-_-~_._. ..~~--
,
-
o Cay of Yalo ;lIto
p 0 &01: lono
~Al.C .t..l.1C CAUfOi:r.'A hl;;'J
Transportation Division
P.O. Box 10250
94303-0862
July 1.8, 1991
ATTACHMENT 4
250 Hamilton Avenue
sixth Floor
(415) 329-2520
I POllLXC nErUIG SUHXAlty COKHElr1'S I
Sul:lject: Bryant street Bicycle Boulevard Extension study
Dear Meeting participant:
The purpose
participation
Sryant Street
Enclosed for
made during
writinq.
of this letter is to thank you for your
in the June 6th community meeting ~eqarding the
Bicycle Boulevard Extension study.
your information is a summary of public comments
this meeting as 'Jell as comments submitted in
The comments proviaed will assist staff in further developing a
recommended plan and the study report. We anticipate tbat the
report will be available for public review in september, 1991.
Thank you again for your interest and participation in the
Bicycle Boulevard Extension Study process.
Sincerely,
.4dL i/{P-1<..a
GAyi.EJLIKENS
Senior Planner, Transportation
Enclosure: comments from the June 6, 1991 Community Meeting
VIAl Nt
,
,
-
o
PtrllLI c: COlOlEl/'l' 8
BRnN'l' SrRI!lU BIC:YCLIl BOtlUVARD UTEliSION srtJDY
PMlLIC MEETING -"tnI!I '. 1 U 1
I'GMJFt A; ChUrchill tq Emh&rcad~
1~ concerned ~ith hicycle/vehicle interaction at Churchill
and Bry~nt. What did analysis include?
2. Is parking near tha Castilleja school for drop off or for
day parking?
3. study conducted by residents -98 cars dropping children
off l and 50 cars travellinq north.
C. Need to address ad1ed delays to Churchill traffic.
s. Spacinq of bicyclist on
Churchill traffic to cross.
Bryant will easily allow
Delays should be minimal.
6. Leave well en~uqh alone. Keep four way stop. Residents
fOU9ht to get all these stops a long time ago. Bikes
don't stop anyway. Removal of stop signs may increase
number o~ accidents.
7. Let bikes jog to Waverley.
S. N~ed to tully address student bike and pedestrian
tr.affic.
g. Since it is not a do-or-cUe issue. staff should stUdy
further before recommending any changes.
SEGKE~ 8~ Jryant!Embarea~~ro Intersection
1. Why does this project cost 60 much?
break~own on costs?
Does staff have a
2. The more urgent intersection for a traffic signal is Paly
High/Town and Country. Safety at Paly is much higher
priority. Due to fundin9 li~itations. and proximity, a
signal at Bryant viII doom the possibility of ever havinq
a si9nal at Paly/Town and Country. Especially true since
every additional signal ~ill hurt progression along
Embarc~dero. Issue expressed several times.
~":"')!l!,piII._Ili. i._IS.' .'.1--------
, -
' .. ...,.
.
t
..;. .-.
__ ' .',",' ·~l~;.· _. _
I~··
~i~.·.·
,,,f'
-
3.
4.
s.
o
On Ore90n. the Bryant intersection is signalized:. Does
it work veIl ira terms of spacing? Is there a standard
.pacing of 5iqn~1.? The spaci~9 ot the signals on oregon
118811 to be 900d~ HoW" would oregon relate to Embarcadero?
consider one or the other tBryant signal or Waverley),
but not both. Perhaps even con~i~er one at Co·~er.
Did staff ever consider \Covinq the existing Waverley
sign.l to Eryant?
Additional siq-nals will cause delays, congestion and
.moq.
6. Reference to 6.2.1, page 35: hov did staff arrive at 6'
increase in stepped traffic? Did staff use a computer
program? Did delay computations include start-up times?
,. The siqnal at Melville and Middletiel~ does not creat~
siqr,ificant del~ys to traffic on Middlefield. Will the
proposed signal at Bryant and Embarcadero reslll t in
siallar del.eys?
8. To what extent vill the coordination ot the siqnals
effect the 25 MPH speed limit. Can the signals be
coordinated to control vehicular spee~s or. ~arcadero?
sta:tf should seek pro-active ways to reduce speeds~
Sboul~ even consider physical impediments.
9. Will a signal effect the 0Z!01t!ount of traffic on
Dab~rcadero?
10. Kotorists can currently turn
Embarcadero t.o northbound Bryant.
eliminated?
lett from eastbound
will this movement be
11. If ~ left turn lane ~ere installed, .hat vould be the
resultant lane widths? What is a typical lane vidth?
Has City e~~~ienced a history of sccident problems at
other ~oeations where the lane ~idths have been reduced?
12. Wants qreen arrows tor left turns~
13. concerned vith 9 toot lane ~id~hs.
14. Consider 3 lanes on Embarcadero.
15. ~enlo Park has good coordination of siqnals on El Camino
Real. Has staft looked at their program?
16. Question staft d.ata~ Since traffic on Bryant 'Will be
effected by both the signal and the changes on Bryant~
prOjections should be made tor every $cenariQ possible.
Do not shov ,:::'nanges in traffic, solely on the basis of
signal options.
2
L •"'"' ;~"", ,~ , ,
"
17.
o
Concerned that removal of stop si9ns on Bryant is not
reflected in the traffic projections.
l!. Nort.hb:;und traffic on Bry£.nt should not be prohibited
from turninq lett onto Embarcadero. Other northbounCI
streEts from. the neighOOrhood have already been
restricted from t~rnin9 lett. Data shows low left-turn
volumes 1!I:'ly.ay. Even with a s1qnal, these volumes should
not increase 5~stantially since there is a barrier just
a few blocKS to the south. If prohihited, all traffic
will need to qo to Waverley to enter onto Embarcadero
westbound.
19. Northbound traffic on Bryant shoulO! not be prohibited
from going straight to the Do~to.~ area. As proposed,
I!I motorist would be torced to turn right at Embarcadero,
and would then need to make a left at Waverley. Making
a left turn at the Waverley signal is difficult during
the morning rush hour.
20. Rather than restrict movements at the intf!,rsection of
Bryant and Embarcadero, staff should discourage traffic
by using a barrier or other physical device: away from tile
intersection.
21. If you have a signal and a barrier, then you do not need
restrictionsD
22. Without barriers, Bryant will provide a straight shot to
the PAKF. A barrier will do more to limit traffic than
restrictions at the intersection.
23. Motorists making a riqht turn from ~estbound Embarcadero
are going to be travelling at hiqh speeds.
24. Instead of turning at Waverl~y, some traffic may turn on
Bryant instead. Consider restricting so~e move~ents by
time of day.
25. Wants better details of bike islands and approach lanes.
Bow ~ill a bicyclist make. ,a right turn? Hov will a
bicyclist activate the signal?
26. Signal options, and Segment C options all reflect staff's
sensitivity to traffic on Bryant. Staff, however, does
not seem to show that same level of s:ensitivity to
Waverley. Impacts to Waverley need to be accounted for,
~hen discussing signal options, barriers, etc.
27. Regardinq a signal at Embarcadero and a barrier at
Addison, did staff look at traffic impacts and potential
increase of accidents to Lincoln and Xinqsl~y streets.
J
· .
I , , ,
~
[
:
f
l
-
28. How many and what percentage ot bicyclists noW' activate
the pedestrian signal at Waverley. Actl vat ion of signals
by bicyclists will certainly incr-ease delays to
Embarcadero traffic. In this regard,. we need to
consolidate all 600 bicyclists at one location only.
Either Waverley or Bryant.
29. Bov many people viII the light protect. 600 bicyclists
divided by 12 hours is only 50 per hour. Does this
justify impact to the hiqher number of motorists on
E::mbarcadero?
30. Pre.terence is tor a siqnal with right turns only to
northbound Bryant and a barri6r.
31. As a resident ot Embarca~ero,. I need to point out that
ears vill not stop for pedestrians. Fails to understand
how some people cannot be concerned about bad auto
traffic habits.
1. As a resident of Waverley~ a
desirable. Ther. will be
Waverley.
barrier on Bryant is not
too much diversion onto
2. Its OK and appropriate to divert traffic onto waverley
because it is a designated collector.
3. If all stops on Brya.nt are removed, tra.ffic 'Will travel
too fast.. Concerned. t..':Iat children (going to Add.isonJ
crossing Bryant will be hit by speeding motorists and
cyclists. This Concern mentioned several times.
4. Are there aocUlllented findings which show that tra.!fic
will travel faster When stop signs are re'lllove.:j? What has
been our experience on the existing aike Boulevard vhere
stop sighs have been removed?
5.. Bicyclists and pedestrians hav~ the same concern. They
do not wish to be hit by cars.
6. Bicyclists tend to drive defensively. Bicyclists have a
great incentive to a\."oid collisions since in any
collision~ they are vulnerable to severe injuries.
7. As a bicyclist~ we need to knov that cross traffic will
stop.
c
L
, I
-1
~'
i i
t~
, I
!
-
8.
o
Thirty year~ ago, we worked hard to get the qua,d and go
system ot stop signa ins~al1ed. Why can't we just leave
tbem alone? Thirty years ago, we had a lot of accidents,
but with the guard and go system, accioents have been
reduced. The consi~tency of stops at every other block
works well because it adds to driver expectation.
9. Why chanqe the stop at Kir.qsley and Bryant? Kingsley has
very little traffic that crosses Bryant and bicyclists
currently run the stop AI'l}"'Way. Xeep as part of the
syste:.
10. As a bicyclist, I do not think are Tleed to stop Kingsley
traffic. I do not bike fast. Speeding shcu.ld not be an
issue or 90a.l.
11. We need to keep the stops. We need to think about the
children that bike. Allowinq bicyclists to travel faster
does not increase bicycle safety.
12. No stop signs mean more traffic on Bryant, since left
turns are allo'Wed from El:lharcadero. So a barrier is
pref"erI'"ed.
13. Waverley has stretches of J or 4 blocks yithout stops or
signals, and is liveable. We'd a.l.l like harriers on our
street$ but they are not essential.
1.. The! neiqhborhood needs a barrier.. There are lots of
children, and the best way to control trat.fic is by
having a barrier.
15. Wherever a barrier is placed, there will be increased
traffic on the si~e (ea3t-west) streets. that need to be
accou.!ltea for.
16. Consensus at on~ table for a barrier some~ .. here on Bryant.
17. The substitute pl.ztn, 'With a barrier, shows that less
traffic will be on waverley.
18. Location -A-is preferable because it is located at the
boundary of the residential area and the commercial area.
19. Prefer a barrier at location -A-. A aidblock barrier is
better than one ~t an intersection. At an intersection~
& motorist on the cross-street may not expect to have a
blcrclist enter from the direction of a barrier.
20. A barrier at location -A-yill bloc~ off ~irect access
fI'"OD the neighborhood to the future urgent care site.
Preters a barrier north of location -A·, at Channing_
5
1: ;7
,.
-
21~ A barrier at location -A W will separate the neighborhood
~rom the clinic. With a potential 5 year construction
period, the barrier ]Day actually help to keep 'Workers
from parking in the r~sidential area.
22. Believe that residents would prefer a b~rrll!r at location
-A-, alonq 'tilth keeping the existing stop signs on
Bryant. stops are essential in maintaining reasonable
ear and bike speeds.
23.. Oppose a barrier at location -E-. This causes ill dead
.. nd.
24.. Prefer a barrier at location -D.... A barrier here will do
the eost to re~uce auto traffic.
25. While ill barrier can limit vehicular traffic, it should
not be mad~ so that it divides the neiqhborhood.
215. A barrier, at the north side of the intersection of
embarcadero and Bryant will not oivi~e the neighborhood
or block it ott from the medical clinic or the downtown
area. Similar to the one at Melville. Professorville
relates to downtown, not Embarcadero.
27 ~ Part of Professorville is to be able to walk to the
downtown area. A barrier will give a sense of sepaI"ation
(psycholoqical).
28. The new barriers on Bryant south of Emb~rcadero do no~
visually impact thP neiqhborhood.
29.. Need to reiterate that a barrier anywhere will thr-ow
traffic onto Waverley ..
30. 00 not limit diverter to just barriers. Also consider
road bumps, stop siqns, etc.
31.. Road or spee~ bwaps may be more desira_ble.. Tend not to
divide the community the way a b~rrier miqht ..
32. This segment, more. so. than any other-, has a qre~t
Shortage of on-street parking. A barrier will utilite
som.e or the parking areas and make this shortage more
severe ..
33. On Addison, many of the homes are rental with numerous
residents {Stanford students) having cars.
34.. This is an old neighborhood. Only have single car
driveways. The study needs to re-emphasize the
iQportance of maintaininq all on-street parking spaces.
Any plan must indicate that all par~inq will be
lDainti!lined~
6
..
t
-
o
35. Need to emphasize the need to maintain the character of
the neighborhood. Has staff contacted the Historic
Resources Board. Ba=riers may not be feasible.
36. Are there difterent types: of barriers? Are they designed
&0 that they will not give a sense of £eparation?
31~ As e resident and a bicyclist, believes that staff needs
to provide new figures (projected trafficj that reflect
chanqes to the complete system4 Inappropriate to expect
people to show a preference at this time.
38. As a r~sident and a bicyclist j I ri~e my bike n~rth and
south all the time. Everything is fine. I experience no
problems and do not Eiee a need for changes. Going to
Waverley to cross Embarcadero is not a problem.
39. As a bicyclist, requeE'ts that residents welcome bikes
through their neighborhood~
40~ As a resident and a bicyclist# preference is fo~ speed
bumps a
41. What is the difference" between speed bumps and road:
bumps?
42. Bicyclists shOUld just grow up. I rode bikes all my life
and never had problems. Its safe.
SEGMENT p: forest to Lyttop
1. Bicycle commutinq through the downtown area is greatest
concern~ with all the short term parking, there is high
turnover rate, Need to change angle parking to parallel
parking or remove it altogether and r6ally make it a Bike
Boulev~rd. Concerned both about backing out and doors
opening.
2. Improvinq bicycle. travel through the dO\lo71tOwn area vil1
promote more cyclists and reduce the parking demand~
Need to coordinate signals on Bryant for bicyclists.
Bike Boulevard traffic should have preference over east
west traffic on Hamilton, University and Lytton.
SEGMENT E: Lyttop to San lraneisquito Creek
1. Somewhere near the bridqe, need to put in sO~Ething to
stop cross traffic.
7
:L
•
-
o .--.
2. will Bike Boulevard siqns be installed directing bike
traffic from Menlo Park~
BIGKiIT 1; I.latea Cbapg •• 0; A41ac.pt 'tle.tw
1. None expressed (meetinq ti~e had expired).
GINlRA1. COXXEJlTB
1. 'I'his is a very e>epensive project. If this project 'Were
not pur&ued~ could the monies be redirected?
Has Palo Alto taken steps r~9ardinq the Federal Highway
Reauthorization Bill to get funds diverted from hiqh~ays
to transit and other alternative modes.
J. Bow did staff arrive at the 2 plans (the preferred and
the substitute)? A~e they intended as options for the
neighborhood to choos£ from? Will the neighborhood have
the final say?
5.
Have schools been adequately involved? Castilleja,
Addison I Paly., a.nd other schools 'Warrant addi tional
attention.
Concerned with small
boulevard. Especially
vehicle.s and bicyclists
children crossing the bike
if stop signs are removed and
are allo~ed to travel faster.
5. Potential loss of on-street parking is o~ concern. Why
~as on-street parking not addressed?
7. How does the timinq of the bike boulevard relate to the
development of the PAMF? Concerned that staff is being
reactive rather than proactive in bringinq both issues
together.
S. Will new ErR be required for PAMF?
9. Oisl ike of ·street closure-teno. Prefers "auto
barrier-, since bikes can still qet through.
10. Questions staff results and counts~ Counts conducted by
residents are different.
11. Counts vary. What is important is future traffic.
Projecticns need to account for complete scenarios. Not
segment by seqment scenarios.
12. High bicycle "Use on Embarcadero Road.
8
.. " . .. c'--·L· ...
•
", f
; ,
o
13. Were origin-destination studies conducted?
14. If all bicyclists were directed (force~) onto Waverley,
could Waverley handle the volume?
15.
16.
17 •
City should not be content with current bicycle
Rather, we need to encou~age more ridership.
number of bicyclists will help quality of life
of housinq.
nlllnDers.
Increase
and cost
For over 2 0 years,
lived harmoniously.
as they are.
bikes, cars, and pedestI"ians have
Why change things now? Leave things
city should recognize that many of the people in
attendance are non'"residents. Most are bicycle activists
and this i$ the!'r pet project. Many of the cODllllents mllide
durinq the evening do not retlect the consensus of the
neighborhood.. A ballot of the neighborhood residents
should he taken to properly assess their sentiment~
18~ Everyone 'Was invitec2. Residents had the opportunity to be
present.
19. How wide is the S.P. right of way? IS there room for a
bike boulevard. along there. It a boulevara is that
important for bicyclists, then it may be worth pursuing.
1. PAKF construction 1 i1cely to cause travel problems on
Bryant. Serious consider~tio~ should be given to leaving
bicyclists on Waverley, and hold otf on pursuing Bicycle
Boulevarc2 changes until after construction is complete.
2.
3.
Reducing on street parking Gn Addison is a real problem.
Rather, supports ba,rrier at location -A-along 'With a
barrier on Addison (at Scott). A ba~rier on Addison will
cut down on traffic and eli~inate the need for a marked
biJce lane.
Urge completion of the Bike Boulevard. Need to encourage
bicycling. Changes re~~ired are minimal compared ~ith
what was needed to put in oregon Express~ay. Not all
bicyclists ~re young. Stops, starts, and detours
discourage distance riding.
4. Both the preferred or substitute plans are acceptable~
5. The project is compatible with the: objectives of the
Cle.an Air Act.
9
•
,
..
--
.'f1,:_i'\, ~':;>~T:.·:.:.'?" .. ~: . . .
"". ,h.'
. ,
6.
7.
8.
9.
10.
11.
The Bike Boulevard extensit:m is a nice amenity, but
unneeded, and would increase air and noise pollution" and
neqatively impact Embarcadero Road traffic.
~e.idents: on Kellogg will be blocked in by increased
traffic on Waverley and Bryant, especially if lett turns
are prohibited from Bryant onto Embarcadero.
Leave the bike route the way it is.
Hove the traffic
Bryant/Embarcadero
traffic.
signal at
arJd close
waverley/Embarcadero to
Bryant to automobile
Minimize changes in Professcrville.
The substitute plan is preferable. T~e city should
consider installinq a tenporary barrier to determine the
impaot and acceptance by the neighborhood before
proceeding with a permanent installaticn.
12~ !n order to prevent speeding on Bryant under either the
preferrec1 or substi tl.lte pl ans, road bumps should be
installed. They have been very effective in the Midtown
neighborhood and pose no hindrance to hicyclists.
13 a The substitute plan (\iith barrier at Location !fA-) is
superior. The preferred: plan calls .for an unusual
roadway desiqn at Bryant/Embarcadero.
10