HomeMy WebLinkAbout0388.091\ I " , ;-. . ~ Augus! 29, 1990 HOt'ORABLE CITY COUNCIL Palo AJto, California 5 " WARD OF CDNSELT ANT CONTRACT FOR PREP ARATI9N OF A S,,,"'\D H1LL ROAD ENVlRONME'ITAL IMPAQ REPORe Members of the Cou Iml: REPORT IN BRIEF The purpose of this staff repon is to recDmmend that the Cou[lcit: (1) ... \uthofi.i~e the Mayor to execute an agreement (A.ttachment 1) wilh EIP ksociates for the prepa:ation of an En'i\ronmenta! Impact Report ~or the Sand Hill Road project, in the amount of $299,777 and (2) authorize staff to execute change .orders to the agreement up to ao amount of $30,000, BACKGROUND CMR:378:91, dated July lB, 1991 (Attachment 2) pre:;ented a series of six changes to t'be subject agreement since Cnunci] first reviewed and took action to approve it, O!l NCNernber 19, 1990. These cha:ige.s" due to the passage of time, included the foUo .... ing: 3. A change in tile date of the agreement; b. An increase in the consultant's fee to $299,777; t. Pro·vision for addi1ional 24~hour traffic VO~U;1}~ counts; d. A revised budget to reflect the increased project CDsts; c. A revised comper,sation sd1eduie fDr current billing rates; f. A re"'-lsed project schedule which eX1ends the study from 1) ID 12 months and is. adjusted to reflect gathering of additional traffic volume data in trJe fa11. CMR38l1:91 • ,-,. '~t CURRENT VERSION OF THE AGREEMENT S1Jbseq~ent to the issuance afCMR:378:9f,i.t was brought to staffs attention that the staff report did Dot identify all of the char.ges from !he November version. Upoo further re .. iew, it '900~ discovered th.a~ .. "hUe '!.tafi had intended the July \o'ersion of the agn .. em~nt to be essentially identical to the November version (exct"pt for t11e 31xwe refer~nced changes).. the July verslon of the scope of sen-ices, in fact, failed to ,ndude some last ml!ll.lte changes. that had been purposefully made in the November version. These changes include the follO\I.ing: ]. Scope of Sef\~('es, Page 1, Paragraph 2: References 10 Attachment A and Attachment B were deleted in the November version. The), sbould also have been deleted in the July version and hal.re been deleted from the current vusion of the apeemem. 2. Scope of Service;;, Page 3, Subtask 1.3, Paragraph 3: Reference to ~e .... 'a}uatjon 'olo1th respect to a year ]995 time frame" was deleted .in the November version. 1t should also have been deleted in the Jill)' .... ersion and has beer: de1eted from th~ current \rersion of t:he agreement. 3. s.::ope of Serorices, Page 27, Task 7, Paragraph 2: The first tv.'o sen1::-nces uo.::l'er Methodotogy were reworded to remQ\'e the reference to "we" in the Ko"'cmber version. They shoilld also have been reworded in the July version and have been re~.'orded in the. current vers-ion of the agreement. RECOMME!'.'DA nON Staff recommends \hat Council: 1. Authorize: tne Mayor to exccuH~ the attached agreement "'-it'll EIP Associates for the preparation of an Envlronmemal Impact Report for the Sand Hill Road project,. in the amount of S299,7'77, and 2. Authorize staff to ex-ecute ,"bange orders to the agreement up to an amount of $30,000, Respectfully submitted, ~~ MARVIN l. OYERWAY Chief Transportation Official ~ V,1lLIAM ZA1"ER Cit}' Manager 'I' j/. ; .... ,r_ /.{ ?-/'. I <".:--f:'. .~, ~/ KE!'.7'ETII R SCHREIBER Director of Planning and Communi_y En .... iranment 8/29/91 Page 2 ---,---~-L - • 1 I I -, o Attachments: 1. Professional Consultafl! Services Agreement 2. CMR:378:~1, dated July 18, 1991 (without au.cbmen,,) Related Staff Reports: IL CMR:565:9, "Sand HiD O>rrklor Study Cooperative Agreement .nd Request foc Proposal foc EIR Preparatioc'" dated NDvember 30, 1989. b. CMR:153:0. "Coru.u!tant Selection Recommendation fot Sand Hm Read EnvironH1~ntaI Document," dated February 8, 1990. c. CMR:266:0, "Status 01 Sand Hill Road Environmental Study", dated Apr~ 19, 1990. d, CMR:567:0, "Awcird of Consultant Contract for Preparation of a Sand Hill Road EI1vtra~mental Impact Report", dated November 15, 1990. cc: Clty of Menlo Parle Stanford Vnivmity (Suzanne Schaffer, Robert Free1en, Andy Doty, Ju~a Fremor" Michael McKnight, La Thompson) Sand HiU Corridor Dislributi<>n US! Herb Borock CMR:388:91 8/29/91 Page 3 .- -- . '.~. o A G R REM E N T " BETWEEN THE CITY OF PALO ALTO AND EIP ASSOCIATES FOR PREPARATION OF A..~ ENVIRONMENTAL IMPACT RI'POP.T THIS AGREE.:.'!ENT is made and entered into this __ jay of , 1991~ by and between the CITY OF PALO ALTO, a ~unicipal ~c-o-rpo=--r=ation of California, hereinafter refer~ed to as "CITY,· and EIP ASSOCIATES, a California corporation (Taxpayer Identification No~ 941710558), with offic~s at 150 Spear Street, Suite 1500, San Francisco, CA 94105, hereinafter referred to as "CONSULTANT~~ W I ~ N E SSE T H: WHEREAS, CITY desires certain professional services hereinafter described; and WHEREAS, CITY desires to engage CONSULTANT to provide these services by reason of its qualifications and experience for performinq such services, and CONSULTANT has offered to provide the requireo services on the terms and in the manner set forth herein: NOW, THEREFORE, in consideration of their mutual covenants, the parties hereto agree as follows: s~rON 1 -PEFINITIONS 1 • 1 CI TV MNAG ~_B The t.erlll "City Manager" Ehall mean the duly appointed City Manager of the City of Palo Alto, California. or his designated representative. 1 • 2 CI TV CLFRK The term Mcity Cle~kN sh311 mean the duly appointed City Clerk of the City of Palo Alto. California, or her designated representative. 1. 3 RISK Y..J..NAGEB The term -Risk Manager" shall mean the duly i!ppoir.ted Risk Manager of the City of Palo Alto, California, or his designated representative. 1." PROJEC1' The term ·ProjectB means the preparation of an environ­ mental impac~ report for i~prove~ents to Sand Hill Road. 1 'lons We 0030021 " .L- .. ' ... -~ \."-. • ,- ---';;:> ., _ ,-"1-' '.- Jif~f}i ....... . ~CTIDI'I 2 • PR"~CT ~RD!NATION 2.1 £I.Ii -. The City Manager shall be representative of CITY for all purposes under this AgreeIilent~ Marvin Over.'ay is designated as the PROJECT MANAGER for the City Manaqer~ and he shall supervise the progress and execution of this Agreement. 2.2 CONSULTANT CONSULTAN'I' shall assign a single PROJECT DIRECTOR to have overall responsibil i ty for tl"'.e progress and execution of this Agreement for CONSULTANT. ,Russell Faure-Brae hereby is designated as the PROJECT DIRECTOR for CONSULTANT. Joan J<ugler shall be assigned as PROJECT COORDINATO:Et for CONSULTANT and shall represent CONSULTANT during the day-to-day \.Iork on the projec:t. Should circumstances or conditions subsequent to the executjon of this Agreement require a substitute PROJECT DIRECTOR or PROJECT COORDINATOR for any reason the PROJECT DIRECTOR or PROJECT COORiJH1ATOR designee shall be subject to the prior .... ritten approval of the PROJECT MANAGER. SECTION 3 -S~OPE OF PROJECT The scope of the project to be e>.:ecuted by CONSULTANT is; described in :Ex~ibit -h", entitled "SaT,d Hill Road Scope of Services·, attached hereto and made a part hereof. • , ; SE(;TION 4. -DlIT!E.L9F CONSULTANT .. - 4.1 BASIC SERVIC~ Unless otherwise indicated~ CONSULTANT shall perform those services described in Exhibit -A-. CONSULTANT shall perform or obtain any ~nd aJI of the following additional servic~s~ not included under Basic Services~ if so authorized in 'Writing :by CITi, and shall :be paid as provided in Section 6 of this Agreement: 4.2.1 Providing services as an expert .... itness in .connection 'With any public hearing, arbitration proceeding, or proceeaing of a court of record. 4.2.2 Incurring travel and subsistence expenses for CONSULTANT and his staff ceJiond those florIr1ally required under Basic Services. 4.. 2 ~ 3 P~rfonr,ing any other-services t.hat ma.':t be agreed upon by the parties subsequent to the e>..:ecution of this Agreement.. 2 L 4.3 GENERA!, DU'IIE!LQLCON~ULT_!:cN_T 4.3.1 CONSULTANT represents tl'lat it is e:>::perie1"!ced in the preparation of en'llironment.a.l impact r~ports a.nd is q'J.alified to furnish the services described under this Agreement. CONSULTANT further declares that employees of its firm ~nd tr.C's@: of its subconsul tants, if any. are 1 ikel.,ise qual i fied to perform their services and t.hat these ser .... ices +~-ill be performed by them Clr under their supervision. CONSULTANT .s~all furnish to CITY for approval, prior to execution of this Agreement , a list of all finrls cr corporations to be employed as subconsulta~ts. 4.3.2 CONSULTANT sh-all furniSh CITY with every reasonable opportunity for CITY tc· ascertain tt~at the services of CONSULTANT are being performed in acco!:"da)lce ... Ij th the requirements and intentions of this Agreement. 5.1 CITY shall provide full information regarding its r-equirements for the Project, cos \o'-ell as copies of 2]1 relevant studies, data and other infccmation which is in City's possession. 5.2 CIT')' shall examine doc;Ji'Cent.s sUlcmitted by CONSULTANT and shall render decisions perta ining thereto promptly, to avoid unreasonable delay in the progress of CONSULTANT's .... ork; provided, however, all written 'Work submitted by CONSULTA.",11' for revie ..... by CITY i!>hall have been ed i ted for gram:':'!atical and typographical correctness as ~ell as for sub~tanc~. 5.3 CITY shall furnish infct"~.ation required by CONSULTANT as expeditiously as possible. SECTION 6 __ -=--mJ'AXMEN'T Pa)"lllent shall be ~ade by CITY or,ly for services rendered within 30 days aft.e'r su"r;'n',issior, in t.riplicate of monthly progress payment. requests. Each cor:.thly i='rogr-ess paY!'1er,t request (invoice) shall be itemized as to tr.€ a~o\Jflt regues.ted fc'r t.he .... 'ork completed to date in each task a!"ea l the cumJ.la:ive amount invoiced, and the balance remaining in each task area. Invoices shall be directed to the attention of the PROJECT MA.~A::;ER. 6. 1 CONSULTANT r S FEES In considerat.ion for the full performance t;)i the aasic Services and reirobursable expenses described in Sect ion 4.1 of this Agreeme.nt, CITY agrees to pay CONSr;LTANT a fe'E' not to exceed TWo Hu.ndred Ninety-nine Thousand Seven Hundred seve;")ty-seven Dollars ($2~9,777) for the Project. The amount of CONSl'LTANT I S co-r.pensatic'n shall be :based on percentage cotllpletion of each task oeser ibeo in Exhi:Oi t "B n entitled "Sand Hill Road ErR B':Jdget". attached hereto. The Budget is intended to el!:pres$ the general ir,ter'.t of the parties .... ·ith 3 I r I f t ~; .. '. i I - o n .' respect to the allocation of th~ work and exnense to each task. It is ex~re~sly ackna~ledged that said proposed-budget shall net have any binding effect and that CONSULT~~T shall provide the services necessary tc-perfonn each task in accordance ... dth the requirements of the project and the Scope. of Work. Nothing contaihed in Exhibit "~IJIII shall be deemed to modify CONStlLTA..'lT'S obligation to perform all services s~ecifi~d herein for the total compensation set forth in this section. 6. L 1 subccnSo_llt::a.nts. Fees fer subconsul tant5~ hired directly by CONSULTANT. sball be included in the amount $et forth in paragraph 6.1. 6.1.2 For_---.A~_ditiQnal servtce_§:. additional services, as descriced in Section 4 compensation shall be as prescribed in Exhibit 6 • 2 FA YMENT uS CH_E DULE For CON5ULTA.."l'T I s of this Agreement, "cn. 6.2.1 Services shall Exhibit -8" and For ~asic Servir;:g_s>_. Payments for Basic be made in progress payments in accordance ...... i th Exhibit "Cll. Final payment shall be made bl~ CITY after CONSULTANT has submitted all required documer;t~ ar,d received approval thereon. 6.2.2 For Ad;l)'utioIJal Servic..,g_~. Payments for additional services of CONSULTANT as defined in Section 4 shall be made as part of the 1Ilonthly progress pay1l'lents for services rendered. 6.2.3 P.e.¥!!lent upon SUSD.,g_T:sion or Aban90nrnent of ~~. If the Project is suspended by CITY for mere than three (3) months or abandoned in whole or in part by CIT'i r CONSULTANT shall be paid its co::,~pensation fot" services performed p:-ior-to receipt of written notice from CIT'i of such suspension or abando~­ ~ent, together ~ith additional ~r.d rei~~tirsable expenses then due. If the Project is resumed after being suspended, CONSULT~~T shall continue to b2 paid in accordance ~ith the fees for basic services set forth in this Section 6; provided~ ho",tev9.r-. if thE' suspension contrit-utes to the inabil ity of CONSli'LTA..N'T to provide the services set forth in Section 6 for the "not to exceed~ amount set forth in Paragraph 6 .l~ any change in CONSC'LTAl';T's compensation shall be subject to rene'30tiation ar,d, if necessary, approval by the Palo Alto city ccu!"lcil. If this AgrE'e::-ent is suspended or termtnated for fault of CONSULTANT, CITY shall be obligated to compensate CONSULTANT only for that portion of CONSULTANT' s services ...... hich are of benefit to CITY in prod~cing an ErR t-hat is adequate and in co~pliance ~ith the California Er.~ironMental Quality Act. • L .. • .• .?'>¥-oo..._ \ .~;~;: ~}c - Sl.eTICN ] -PROGRESS <}flO COMPLETION 7.1 ~E IS OF THE ESSE~CE It is understood and agreed that time is of the essence of this Agreement, and that, follo ..... ing receipt of Notice to Proceed, CONSULTANT shall co~rnenc€ ~ork O~ in~tial tasks of study in accordance 'With the tir!te schedule set forth in Exhibit -D". Wor't. on slJbsequent tasks shall pr~ceed in accordance ..... ith said time schedule~ 7.2 l'JME CF COMPLETl9~l OF EACH __ PHASE CONSllLTANT agret;!s to perfo~ the phased ~ervices wi thin the time limits set forth in Exhibit "0" provided, hO'",ever, that any change in the scope of services or other changes due to CITY's requirements roay require a revispd time table. 7.3 CITY'S REVIEW:. AND APPRO','AL Between each phase of ."rark. there is a revie ... · and approval period by CITY. The CITY will exercise due diligence to co~plete these tasks: hOwever, it is recCignized that the intE'.rrelated eXChange of information a~ong CIT~!s various departments makes it impossible to set a specific time schedl.Jle. Normally, the CITY'S estimated period of re-,,'::ew a.'ld approval .... i 11 be furnished to CONSULTAh"T at the ti1l1e of sub!!'lission of each phase of ... ·orle.. 7. 4 ~JL't.ENSIQN OF TIM~_ OF CO~PLETI9B In the ev~nt the services called for u~der this Agreement are not completed by CONSULTANT ;,rithin the time specified, CITY shall haVe the option to e:.<tend the tim.e of completion. This para­ greoph doas T.ot preclude the recovery of dar.'lages for delay of either pa:t"ty. crTi :may order :major changes in scope or character of ,.-ork, either decreasing or ir:creasing the amount of CONSULTANT's services. In the ev~nt that such changes are ordered, CONSULTANT shall be entitled to full co~,pensatj on for all .'ork performed prior to receipt ~f notice of change. Increased compensation for major changes shall be deter~ined in accordance ~ith Section 6 of the Agreement, but in no event shall CITY be liable for pa)'"l:lent unless the a1!lount of such extra ccmp€nsdticn shall first h~ve been agreed to in "Writing by CITY. In. the event that majcr changes are ordered pursuant to this section, the schedule for progress and completion in Section 7 of this Agreement and compeilsation s~all be adjusted by :;egotia­ tion between CONSl:LTANT aOld CITY, subject to approval, if neces­ s~ry, by the Palo Alto City Co~ncil. 5 i t ~ - • -------._--,-------~~ -~--~. -> o .s1:crrON 9 -TERXTN)..TION O_B-$_~SPE'NSION OF AGREEMENt' 9.1 CANCELLATION: B'i CONSUI,TANT CONSULTANT may terminate this Agreelnent or ~uspend "'ork on the Project upon thirty (30) days' ~ritten notice to CITY, but only in the event of substantial failure of performance by CITY or in the event CITY abandons or indefinit€ly postpones the project. 9.2 CI>-.NCEi..l).TION BY CIT¥. Without limitation to such rigt.ts or remedies as CITY shall otherwise ~ave by law, CITY shall have the right to terminate this Agreement or suspend work en the Project for any reason. upon fifteen {15) days I written notice to CONSULTANT. CONSUL'l'ANT agrees to cease all work under this Ag~eement upon receipt of said written notice~ 9.3 COMPENSATJON OF CONStlI.'I'bJ.tt. IN THE EVENT OF JERMINATION OF THIS AGREEMn.;T In the event of termin~tion of this suspension of 'Mork on the proj€ct by either CITY CONSULTANT shall receive compensation as follows: Agreement or cr CONStlLT.\NT I 9.3.1 For appr-oved items of service under Section 4 of this Agreement I cc~per\sation shall be in the amount olltl ined under section 6 of this Agreement for the items of service fully performed by CONSULTANT. 9.3.2 For items of service on 'Which a notice to proceed ha.s been issued b J' CITY 1 but .... hich have not been fully completed and approved, CONSULTANT shall be compensated for said service in an amount ,,"'hieh bears the same ratio to the total fEe othervis-€ payable for the perforr.-,nce of said service a5 the service actually rendered bears to the total service necessary for the full performance of said item of s~rvice. 9.3.3 In no event shall the total conpensation paid in the immediately preceding paragraphs exceed the payment specified. in section 6 for the respective items of service to :b02 fUrnished by CONSULTANT. 9.3 . .( Notwithstanding anything in the preceding para- 9'raphs~ upon termination for !ault of CONSUL'I'ANT. CIT't shall be obligated to pay for only that pc'rtion of the service which can be incorporated in an adeq'uate emIl ronrnental lrT1pact report. Upon termination of this Agreement or suspension of ~ork 0."'1 the project by either CITY or CONSULTANT, all duties of CIT't and CONSULTANT, as set forth in Sections 4. and S hereinabove, shall terminate. 6 • . . , . -.:::;;. • " .; 1 i j ! - .'. Records project shall be accounting basis convenient times: o of the following expenses pertaining to the kept bY CONSULT}Ci'l'T on a generally recoqnizeorl and shall be available to C!T'i at '!tutually 10.1 Direct pe:r-sonnel e~penses, including consultant el!penses~ ,SeE section 6 of this Agreement.) 10.1 . .1 Expenses pertaining to Additional Services. (See section 6 of this Agreement.) SECTION 11 -OWNERSHITm 0; OOC[TMENT$ 11.1. Subject to t.he provisions cf Paragraph 11.2 belov, all documents prepared by CONSULTANT in the performance of this Agreement, although instruments of profeSSional service, are and shall be the property of CITY whether the environmental i:rnpact report is certified or not. 11.2 upon ter.mination under Section 9 of this Agreement an~ upon CITY's payment of the amount required to b2 paid under same section. the originals and all celculations. studies and si~ilar documents become the property of CrTY~ and CONSULTANT shall transfer them to CITY upon request 'Without additional compensation .. CITY shall have the rioht to utilize any information and documents prepared hereunder by"" CONSULTANT; ho'.'ever, CITY shall indemnify CONSULTANT a9ainst any loss which ~3y be caused to CONSULTANT by sue}) use and z--euse. SECTIONn _J2 -INTEREST OFmCONSULTANTj CQNSULTANT INOEPEN_:: DENT OF CITY In accepting this Agreement, CONSULTANT covenants that it presently has r.o inter-est, and shall not acquire any interest, direct or indirect, financial or oth~r .... ise, which '\oIould conflict in any manne~ or degree ~ith the performance of the servi~es here­ under. CONSULTANT further cover,cuJts that, in the performance of this Agreement, no ~ubcontractor or person having such an interest shall be employed. CONSULTANT certifies that no one ..... ho has or will have any financial interest under this Agrect'lent is an officer or employee of CITY. It is expressly agreed that in the performance of the prOfessional services required under this Agreement CONSULTA.hlT, and any of its subconsultants or employees, shall at all times be con­ sidered indeperldent contract'Jrs and not agents or employees of CITY. ~ECTIQli 13 -OUTSIOEmmCQNSULTANTS CONSULTANT shall be responsible for employing all outside consu.ltants (subconsultdnt:s) necessary to aiel CONSULTANT in the performance ot the services listed in Section 4 of this Agreement; 7 f I - o provided, ho"Wever, thC!lt all SUCh.5ubconsultants app:':"bval of CIT'i in 'Writing arid shall rel!1a:in during the term of this AgreemE~t. shall raceive prior acce~table to CITY CONSULTANT agrees to indemnify I defend and hold harmless CITY, its cfticers, agf'!'nt.s and employees from any and all demands, claims~ or liability of any nature, including death or injury to any person, property damage or any other loss, c~used by or arising out of CON'SULTA.~T IS, its off ieers·. agents I, su.bcontractors I or employees' :.egligent acts, errors, or omissions, or 'Willful misconduct, or conduct for ",.;hich the la' •• imposes strict liabi 1 ity on CONSULTANT in the perfonnance or failure to perform this Agreement. SECTION 1_5 -INSURA...~CE 15.1 LIABI[JIT¥ INSUP.ANC£ 15.1.1 CONSULTA.NT, at its 5=.011:: cost and expense, shall obtain and maintain, in full force and effect throughout the entire term of" this 1I.greern~nt, the inSUrdrlCe coverage described in Exhibit -Ell, attacued hereto, insuring not onlj~ CONSULTANT and it.s subcontractors, if any, but also, ~ith the exception of ~orkerst compensation and employer's li.ability ir.sl.:rdnce~ CITY, its officers~ agents and employees, and each of them, ,,rith respect to activities and '7>ervices performed by CONSULTANT for or on behalf of CITY under the proviSions of this Agreement. 15.1.2 Certificates of such insurance; preferably on the forms provided by CITY~ shall be filed with CITY concurrently with the execution of this Agr-eernent or, ltI'ith CITY's approval, within ten (10) 'Working days thereafter. said certificates shall be 6ubj ect to the approval of the CITY F.isk Manager and shall contain an endorsement stating that said insurance is primary coverage and ~ill not be canceled or altered by the insurer except after filing with the City Clerk thirty (30) days' prior written notice of SL<ch cancellation or alteration, and that the City of Palo Alto is named as an additional ir.s~r-ed (except in policies of professional liability insurance). Current certificates of such insurance shall be kept on file at all times during the term of this Agreement ~ith the City Clerk. SECTION 16 --";'JRKER~ CO,'"-:PENSA.TI0N' CONSULTANT, by eXBcuting this Agreement, certifies that it is aware of the provisio"s of the Labor Code of the State of California ,"'hich req:Jire every ernployer to be insured ag.ainst liability fer workers' compensation or to undertake self-insurance in accordance with the provisions o! that Code, and certifies that it ..,ill comply with siJch pr-ovisic.ns before carn~.encjng the perform­ ance of the .... ark of this Agreer.-.ent. 8 L I I I I I I I - .-... ,;...~.:-------"-........ ~.,,...,.-- o SECTION 17 -AGREEME~ __ BIN..Q.l.lill The terms, covenants, and conditions of this .\.qreement shall apply to, and shall bind, the heirs, successors, executors, administrators, assigns, and 5ubcor.tractors of both parties. SECTION 18 -NONA5.SIGNABILITY 18.1 PERSONAL SERVICES OF CQ~ULTANT Both parties hereto recognize th3~ this Agreement is for t'he personal sen,-ices of CONSULTANT and cannot be transferred, assigned or subcontracted by CONSULT~~T -,o'ithout the prior 'Written consent of CITY. 18.2 SERVICES OF SUBCONSJJL1'ANT !.N0 THEIR EMPLOYEES CONSULTANT shall be responsible for employing or engaging all persons necessary to perform the $ervices of CONSULTAN'r here­ under. No subconsultant of CONSULTANT will be recognized by Crri as such; rather, all subconsultants are deemed to be employees of CONSULTANT, and it agrees to be res~~nsible for their performance. CONSULTANT shall give its personal attention to t~e fulfillment of the provisions of this Agreement by all of its employees and sub­ consultants, if any," and shall keep the wc~k under its control. If any employee or subconsultant of CONSULTANT fails or refuses to carry out the provisions of this Agree:rnent or appears to be incompetent or to act in a disorderly or improper manner, he or she shall be discharged iI!lJnediately from the ,""ark under this Agreement on demand of CITY. SECTION 19 -:~~bIANCE UPON .EE.DFESSIONAL SKILL Q.E !:Q!§ULTl<J'3 It is mutually understood and agreed by and bet~een th~ parties hereto that CONseLTANT is sitilled in the professional calling necessary to perform the week ageeed to be done hereunder and tha.:' CIT~ relies t;.pon the skill of CONSL"LThNT to do and per.form the work in the most skill {ul ru.anr.er i and CONSULTA.~T agrees to thus perform the work. The acceptance of CONS1.lLTANT 's work by C.ITY does not operate. as ~ release of CONSULTANT from said obligation. SECTION 20 -WAIVt:RS. The · .... aiver-by either party of ar.y breach or violation of any term, COVen3I'lt, or condition of this Agreement or ot any provision~ ordinance i or la' .. shall not 'pc deemed to l:J-e a 'WaiVer of any other term, cove~~nt, condition, ordinance~ O~ law or of any SUbsequent breach or violation of the sa~e or of any other term, covenant, condition, ordinance, or law. 'rhe subsequent accept:ance by either party of any fee or ct,her money 'Which may tlecome due shall not be deeroed to be a ... ·aiver hereundEr by the other party of l.ny term, covenant, or condit ion of this Agreement or of any applicable law or ordinance. 9 -"'r: ..... iii .• , ..... '1 ........ "',.,Ml<f .. I ~ l . ..... ". ~' , _. SEc-fION 21 -NO IMPLI,r;D WAIVER No pa)1nent, partial rayment, acceptance, or partial acceptance by CITV shall operate as a ~aiver on the part of CITY of any of its rights under this Agreement. SECTIQN 22 -COSTS AND ATTQRNEYS I FEES The prevailing party in any action brought to enforce the terms of this Agreement or arising ou.t of th is Agreement may rec·o'/er its reascnabl-e costs and at.t.orney flE'es expended in connection Yith slJch an action from the other part}'", SECTION' 23 -NONDISCEI.MINATION'j PE~ALTY 23.1 .t:&l.TI_ OF CONSULTlLN'T No discrimin3't:ion shall be made in the emplo}"lllent of pe:-s,?ns under this Agreement because of the race, color, national ar1g1n, ancestry, religion or sex of such person~ If the value of this Agreement is, or may be, Five ThOusand Dollars ($5,000) or more. CONSULTANT agrees to meet all requirements of the Palo Alto Municipal Code pertaining to nondiscrimination in employment and to complete and submit the ~Compliance Report--Nondiscrimination Provisions of City of Palo Alto Contractsn on the form furnished by CITY as Exhibit 'IIF" attached hereto and incorporated herein by reference. CONSULTANT agrees that each agreement for services fro~ independent providers shall co~tain a provision substantially ~s follows: ·PROVIDER shall provide CONSULTANT ~ith a certificate stating that he (or she) is currently in compliance with all Feeeral and St3te of California la'io.'s covering nondiscrimination in employme!""t; that he {or she) 'Will pursue an affirmative course of actic-J'J as required by the Affirmative Action Guidelines of t.he City of Palo Alto; and that he (or she) ... ,ill not discriminate in the employment of any person under this contract :t>ecause of race, co!or, national origin, ancestry, sex or religion of such person.~ 23. 2 'p.&li~LTX ___ FoR DTSCRIMINATlO!,! If CONSULTANT is found in violation of the nondiscrimina­ tion prOVisions of the Sta~e of California Fair Employment Practices Act or similar provisions of federal lalJ or executive order in the performance of this Agreement, it shall thereby he found in ~aterial breach of this Agree~ent. Thereupon, CITY $hall have the power to cancel or suspend this Agreement~ in vhole or in part, or to deduct from the amount payable to CONSULTANT the sum of TVenty-Five Dollars ($25) tor eae:h person for each calendar day during ~hich such person ~as discriminated against, as damages for said breach of contract, or both. Only a finding of the State of 10 ,. '. o California Fair Employment Pr.ac~ices Commission or the equivalent fede'nl aqency or officer shall constitute evidence of a violation of contract under th15 section. It CONSULTANT j.:; found in violation of the nondis­ crimination provisions of this Agreement or the applicable affirmative action guidelines pertaining to this Agreement, CONSULTkVT shall be found in material breach of this Agreement. Thereupon, CITY shall have the polaler to cancel or susp€:nd this Agreement, in yhole or in part, or to deduct from the amount payable to CONSULTANT the sum of Two Hundred Fifty Dollars ($~50) for each calendar day during .... hich CONSULTA.\rr is found to have: been in such noncompliance as damages for said breach of contract, or both. SECTION 24 -~RBITRATION upon agreement of the parties any controversy or claim arising out of or relating to this Agreement may be settled by arbitration jn accordance ~ith the Rules of the American Arbitra­ tion Association, and judgment upon the a·.."ard rendered by the Arbitrators may be entered in any court having jurisdiction thereof. S:ECTIQN 25 -NOTJCES All notices hereunder shall be given in writing and mailed, postage prepaid, by certified mail~ addressed as !ollo~s: To CITY: Office of the City Clerk 250 Hamilton Avenue Palo Alto, CA 94303 AND Chief Transportation Official 250 Hamilton Avenue Palo Alto, CA 94303 To CONTRACTOR: Attention of the PROJECT DIRECTOR at the address of CONSULTANT recited above SECTION 26 -ALL COVENANTS ARE CONDITIONS All provisions of this Agreement are expressly made conditions. ~~j'_-:. AGREEMENT CONTAINS ALL UNDERSTANDINGS; AMENPME'~.1 This document represents the entire and integrated agreement cetlaleen CITY and CONSULTANT and supersec1es all prior negotiations, representations, and agreements, either vritten or oral. 11 LT .'-~'~ .-'t):-.,. - • --.. .---< •. -~. -", o o This docum~nt may be q~ended only by ~ritten instrurnent l siqn'ed by both CITY' and CONSllLTANT. ~CTIOll 28 -GOVERNING IA" This Agreell1ent shall be governed I:y the laws of the State of California. IN WITNESS ",,'HEREOF, the parties hereto have exe::uted this Agreement the day and year first above ",'ritten. ATrEST: CITY OF PAW ALTO City clerk Mayor APPROVED AS TO FORM: Assistant City ~ttorney APPROVED: Assistant City Man~ger EIPAS~ By: <' Its:~ Vo:wf1,;,k.t Risk Manager FiCO"n"'"'an'""'c-Ce--:D'"'i-re-c"""t-=-or----... - APPROVED AS TO CONTENT: Director of Pla~ning & Corrur,unity Environment Attachments: EXHIBIT "A": EXHIBIT liB": EXHIBIT "en: EXHIBrT "'D": EXHIBIT 'PEl!: EXHIBIT "F·~ tl0715 "'"" OO)OJlII SCOPE OF SERVICES PROJECT BllDGET COMPENSATION SCHEDULE PP.OJECT SCHEDVLE INSURANCE NONDISCRIMINATION COMPLIANCE REPORT 12 - o '. SAND HILL ROAD SCOPE OF SERVICES INTRODUCfION The consultant team will prepa:-e the environmental documentation for the Sand Hill Road EIR in full compliance ~1th the California Environmental Qualiry Act ,CEQA) and the appropriate procedures set forth by the City of Palo i\Jto that will ensure an accurate and legally adequate ErR. Graphic materials consisting of nmps. drawings and photographs ""'ill be pro\~ded in a consistent format throughout the report For each task of the EIR work program, we ha ... 'c descn'bed the wo!"k to be performed, methods to be used, relation to other work elements., 2nd the task products. Descriptive material for each task has been organized in the fol1owing manner: o o Objcctive~ A succinct description of the tas'k'$ purpose. Methodo1og:f: A brief discUSSIon of the methodology that win be employed to meet L'1e task: objectives, ~he tools needed, the analysiS techniques to be used, and the requisite subtas.ks. o Products: A de~cription of the: product resurting from each task. TASK I: PROJECr INITIATION, INHIALS1lJDY A'JD NOTICE OF PREPARATIO" Objec!ive The obje~tive.s of tnt!; task are to initiate the study process by setting Lip coordination and rnanabement procedures. In addition, rhe environmentar process ~ill begin v.ith data cotlection and the continua.tion of the scoping process through circulation of the Notfce of Preparation and Initial Study. AugUSl 29, 1991 L MelhQ!lolo &y The consultant team will meet witb the City to re\·iew the genersl scope of the project, the data requirements for the EIR and the work programs for the technica1 studies to be p~eparedas the basis of the EIR 111e project scheduie wi!] be finalized as to meeting dates, and City review per-iod! will be e~tabJished. Coordination and management procedures will be defined; thls \Iio;Il include coordination of project activities with design procedures being undertaken by the engineering design consultant. Subtask Ll: Review of Relevant Reppru and Data. Relevant reports 2nd sources of data ~ill be conected and reviewed by the members of the consultant team. A list of the needed documents will be provided to the City for as,slst3nce in gathering the reguested material. AIl known o.D data 2vai1able will be reviewed and compared. The traffle information generated for the recent Menlo Park General Plan Update-0,1,111 also be incorporated, U appropriate a meeting will be heid betv.'een the EIR team and the MenTo Park u'.]ffic consultant. Basellne transportation c!ata provided by the Cit.)' (i.e .. peak hour traffic volumes, 24-hour volumes, suppiemental 0-0 data, vehlc1e c1assjfi~tion and tr;'i\:el times surveys) v.iil be reviewed and analyzed. The consultant learn will conduct new 24-hour directional traffic volume counts at eight locations to supplement data pro\'ided by the City. Subtask 1.2: Assembly of Land Use As~umption~.:. The horizon year for the study and EIR v.ill be 1995 fOf detailed analysts of projecl. impacts and 2005 for evaluation of cumufative impacts. Existing land use information to the )'eaI 2005 .is generaOy available to use in the 3natys.ls. The City staff have updated the travel model to the 2005 horizon year and ~111 provide this information to the c.ons.ultant team. The lhre-e study entities will provide land llSC infonna!ion for both 1995 and 2005 thaI should not require: addltionar primar)' data ooI!e,ction by the consultant team. Such dala corJection, if requested by rhe City, \\1)] be in addition to the. scope of this contract. The City ""i]] conduct a comprenensrve review of 2 Augwl 29, 1991 \ - , I '" . "".'" "I~:?, • !I , ' t , -: - " .,. .,." "",' -. o "pipeline" (approved) and likely Ionger-teJlD projects and pro-.ide a list for use by th~ . -- consulta..TJ.t team at the outset of the emironmental analysis. Subtask 1.3: Establishment of Roadway AHgnment Alternatives. There WIll be three project alternatives considered in the: EIR: o The Two-Lane Alternative -The existing Norc-Iane road along Sand Hill and a tw<.>­ lane extension from Arboretum to EI Camino Real. o The Three-Lane AJternative . Sand Hill Road ~ldc:ned to three lanes from Santa Cruz to Arboretum wit.h a two-lane eX1ension from Arbcn:tum to EI Camino Real o The Four·lane Alternative . A four-lane extension of Sand Hill Road from Arboretum to B Camino Rea~ with a Vtldened four-lane roadway \/width along Sand H!ll Road from Arboretum to Santa Cruz. !n additioflt the consultant team will examine four aIternat:yes t:) the project These are: o No P:-oject, the do-nothing alternative, 0, The Quarry RoadJArboretumlSand HiH Road AJtemar.rve, with ex:isting Sand Hill Road widened to three lanes from Santa Cruz to .A.rboretum. {l The PalrnlGaJvez/ArboretumlSand Hill Rocd lJternative, V.11h existing Sand Hill Road widened to three lanes from 5an ta Cruz to Arboretum. o The Tramiponation Demand Management AJternative· Major increases in programs for demand management and pubtic transit in the project area. This alternative ""111 define the amount of TOM and transit ridership required to reduce the demand for roadway Unprovements so that the goals and objectives of the prcjeC1 could be mel The et'fects, a:ceptabJ1it)' and cost of such a program v.ill then be analyzed. The three project alternatives and the four alternatives to the project will an incorptJrate the existing level of TDM attained in the project 2rea as a resuJt of on-going progranJ~ as a part of the existing conditions. In a';!dition 10 the futI project alu:matives and alternatives 10 the proJ"ecl as defined abover the question of how the connectioll at EI Camino Real will be made must be addressed. Three options (A. B and C) will be eva!ual~d for the connection of the Sand HJIJ Road 340.89 Aug~! 29, 1991 ~, ,~ r:. "" "i<.tl'titc~~""--'-".- - Proje,ct to El Camino Real and Alma Stre~~ Option A would provide no access between Sand Hili and Alma; Sand Hili would have right and left turns only at EI Camino Real. Option B \Vould also not permit through movement between Sand Hill and Alm:>.; bm,,'ever, a left turn from Alma to southbound El Ca;nino Real would be allowed. Option C wouid anow fun access (through, right and left turns) on an legs of each roadway. These three options will be studied as "subaltemath'es" (\IIoith the assessment based upon relative dilIerences and the detailed design), and the dL~u~sjon ".,.jU include quantification of the travel implications. The combination nf alternatives and options is disct.<ssed mOTe fully iIi Task 2 -Traffic Impact Analysis . .AJong wlth the alternatives and options to be evaluaied for the eD\oironmental documentation, there are nine "'Nnat u" t)'PC: questions about \'arious aspects of the project that will be considered in the 1995 time frame. A semitivity anaJy~i5 of the environmental and traffic implications for each of the study questions will be performed. These study questions indu de the following: o '\\'hat if through trips on the proposed cX1el".sion grow at a faster rate as time passes? o 'What if the intersection of Sand Hill Road and Sama Cruz is upgraded to an uiban interchange at some point in the future? o What if a frontage road and sound waD is constructed along the residential area at the intersection of Sand Hill and Santa Cruz? a "What if the traffic signal al the ~mrance to the eXlslmg Oak Creek Apartments closest to Santa CrJ-z is removed arjd an internal frontage road is dc .... eioped? o Vw'hat if Oak AvenuI: were lObe completelyc1osed at Sand Hill Road and terminated in a cuI-dc-sac or traffic were restricted to turn right in, right out only? o "''hat if the inl~rsection of Oak A ..... enue and Sand Hill Road is modified to a'liow all turning movements? o What if movements at Sand Hi!! RJad and EI Camino Real are Limited to rignt turn in. right 1urn out? o Wl1at if the pro~d development at Stanford West wourd have three signalized connectio~ to Sand Hill Road (Pasteur, Arboretum and a midpoin~) rather than the n...'o currt:ntly envision~d? 3"189 4 AllgWit 29. 1991 L .. • • o o SaOm Road' Scope of Servlt:eS What if Stanford Shopping Centcl were allowed hn additional increment of . :revelopment in th~ arnourH of 185,000 square fe-et over the present cap (existing plus 651 ()(X) square (eet)? This analysis will be done to evaruate the effects of trip generation only, not to evaluate the other environmental effetb of expansion of the shopping center. Suhtask 14: Preparation oflnitial Stud\! (is) and Notice of Preparation (KOPt An Initial Study checklist and Notict:: of Preparation will be prepared lJsir.g the CEQA guidelines.2s a rde renee. Subta5k 1.5: Modeling Method'olo~. Technical consensus among City staff and the consultant team on the modeling methodology and specific techniques to be used "'ill be determined based on the be!".! combination of accuracy, accessibnir~y, and cost-cffectivene5..'io. Le .... el of SeMel: (LOS) anatY5is at signdllzed intersections win be conducted using the cahbralc:d TRe 212 method developed for the Paro Nto Ci~;de Land L'se and Transponation Study+ At unsigna\ized intersections, the 1985 Highwa)' capacity manual methods will be used. The com.ultant team wiU meet .... ilh tIan~POr1ation pTanning and engineering staff 10 develop an equiv2Iency !able or o!her conversion metbod' to translale the callbrated TRC 212 results in:o an approximation of the r;)clbod' u::.ed by Menlo Park i..., its General Plan transponation ana~is. Tl1e consultant team will re"iew technical working papers developed for the Menlo Park General Plan Circulation analySiS and the Palo A.lto Ci~ide Transportation Study related to LOS methodology for inte:-~c!jons. Products The products of this task would include;;: series of memorandum-style reports on the foIloy"ing subjects: o Coordination and Management Procedures. o Review of Procedural Frame\lt,'"or'k Products.. Origin.Destination Surve~s and Other Relevant Information. Thi~ memorandu.m .... ,11 documerH a re"iew of origin­ destination dala and olhe{ ii!\rallab!e LrctffK information, and idenlif,,' am subslanlial differences in 0.0 data collected for the procedural framework study as-.... dl as data collected for other studies. The memo ..... iIl describe the manner in which ~he .;.- ::~_~l,_: . ;~~if" a __ :: c .... :-t-w-· .... ·L 5 AugUSl ~9. 1991 - , P' '.:""'''';,0 ~~-~~~ "'----~. ._ ~1 J 1 I j ,.,.Ik- , -.,:-.-"'''-.-". ~--------.-- - o s.(;-iiIl Ro.ad Soo pc Df Services consulu:nt team plans to utilize aval1able O-D diita to model the attraction of traffic . -'to the various Sand Hill Road extensions and other alternatives to the project. Assembly of Land Use As.s.umptions. Tb ~s me morandllm will de tau the \lode rs.tandi ng of land use assumptjons for both 1995 and 200S and how they will he treated for the p~ of traffic analysis. Q Description of A1temati,,·es. This memorandum will defme the complele set of alternatr .... es and sut.k1.1ternatfves. to be analyzed in the Draft ErR o Modeling "'Methodology .. Th.t'i mernorandu.m "",in document the technical methodology to be used in forecasting future traffic \lulume" and diversion of traffic in resp{)nse to the \o'arious project ahernatives. o Initial Study and C1:Ieck!ist. A preliminary draft ""ill be delivered to the City for review+ and the City',s, comments \l>11J be incorporated into the fimtI copy. o Notice of Preparation. A~\Irr~th the Initial Study, a pretiminary draft win be delivered to the City for re'wic:w and the City's comments .... ill be incorporated into the final copy. TASK 2: TRAFFIC IMPACT A,\AL YSIS Qbjecti ... ~ The objective of this task \/\fill be to prepare a traffic impact analysis ba~d upon existing transportation survey data. including volumes, travel times., origfn·destination survey information and accidents. This technical analysis \11-111 ~rve as the basis for the Traffic and Circulation chapter of the ErR MethoogjQgy Three suNasks. disCllS~d bela ..... ·, constitute the ""hole of Swb!ask 2.1, Data Collection and .ATialy~is; Subtask 2.2, Future Trame Projections; and Subtasx 2.3, Traffic Impact Analy~is. Subtask 2.1: ExistingConditians Ma!vsis. The consultdIH team will update and supplement the descn"ptioIl of ex:isting transponatioli conditions in the Sand Hill Road project .. icinity. TIlis WIli be done throug~ analysis of 24-hour and peak period {a.m. and' p.m.) traffic vo1umes, travel times., ongin.destination information, and olher data fhat describe: current .conditlQns. The. consulta.nt team 1,Wj1\ Emit new data (:onection to assembly and !e<o.ie',1,,' of available information on traffic accidents in the project ,,;ciniry, transit routes and ridership. , AugUSl ::-9, 1991 • • - and s~milar secondary data. Collection of l;'rimary data (including 24-ho\Jr vol.urnes., peak period intersection cDunls, travel times l and origin-destination information) will be provided by tile City. 2-1.8.: Peak Perkld Co.r:-ditions. The consultant learn will assess the morning and evening peak period operating conditions of the transportatior, .,etwork thro'Jgh anaIysis of link and intersection volurne:s, transit rider..;hip. a.nd other measures. 2-l.b: 24-Hour Data. Daily roadway volumes will be analyzed Ie-establish a peak l'1our for analysis of project impacts., as weD as to quantify project impacts on r~sidential streets. 2-J.c: Origin-Destination Information. The procedura: framework origin-destination su.rvey fesUl!S will be evalui:ited te determine the !i1ce1y diversion of traffic resulting from the various altematrves. Additioilal origin-dcMination sUI\Iey data to be prmided by the City will be analjud to quantify other potential effects of the alternatives., such as a change in traffic yoiume through the sbopping center paridn2 area, or change in the number of V-turns at Cambridge Avenue. 2-1.d: Tr2.vel Time Information. Travel times on alternative routo:s win be evalua1ed to estimate the difference in tnwE:i time afforded by project alternatives. 2-1.e; Oassified Vehicle Count A 12-hour classified vehkle count will be ana1)'Zed to identify the number and type of trucks on Sand Hill Road near the project location, as 'Wen as to identify typical trucl( routes and destination! \1.;thin the project "'kiniry. 2-1.!: Acddent Data. The consultam team will assemble and rev"i.ew available acridenl records maintained by the City of Palo Alto, Menlo Park. and San Mateo Courlly to document accKlent experience on Sand Hill Road. , Augu...,t 29, 1991 L • • i , , - ~.-~------. ._, --,,-----_. Sab~~ 2.2~ future Traffic Projections. Vsing the Palo Aito Cityv.ride traffic rnode~ the consultant team will augment the Sand Hill Road' quadrant to include additional intersections and travel zones. F..xisting-condition traffic data in the model will be updated, including peak period intersection vJhJrnes and volume/capacity ratios. The land use assumptions defined in Task 1 will be reviewed by City staff and entered into the model so tn;:"t it will reflect projected de\le1oprnent between 1990 and the 5-hort-term horizon year of 1995, and the long.term horizon year of 2005. Traffic assignments for the years 1995 and 2005 will be developed for each of the project alternatives (two-lane .extension with two lanes on Sand Hill Road, tw"o-Iar.e exterlsion. 'with three lanes on Sand Hill Road and four 1,mes for both the extension and Sand Hill Road). Traffic aoc;signmcnts "ill also t-...e developed for the alternatives to the project (No Project, Quarry Road/Arboretum, Palm/Galvez./,I\rboretum and the Transportation Demand Management alternative). These assignments "'ill be based upon available O--D data and data conected as descnbed in Subtask 2.1. The consultant team "'ilJ wmk ~ith City staff to obtain concurrence DC key assumptions required for traffic assignments. Two cycles of future traffic modeling -.viU be preformed. The first "",iIl be used to assess impacts and differences among the alternatives. These initial resuTts 'Will be reviewed by the consultant team and the Cit-j. A second cycle of modeling will then be performed to finalize me trave~ forecast and impact assessment of each of the a1ternati"'es defiT'ed shove. Tne future :.rafflc projections will iTlclude the foIl~1ng scenarios: o Existing Conditions o Year 1995 "No Project" Conditions co Year 1995 'With Projec," Conditions for the major alternatives defined in Task 1 and below, I, 340.89 L The Two-Lane A1ternatjve -A two-lane road along eJCisting Sand Hill and a two-lane extension from Arborerum 10 Ei Camino Real. This alternative wjlJ be analyzed in conjunction with options A. Band C at the intersection with El Camino Real and Alma. , I f , " ~ - .' 2. 3. •• The Three·Lane Alternative .: A ~'o-Iane extension frum Arboretum to EI Camlno Real with ihe ~idening of Sand Hill RO.1d to three lanes from Arboretum to Santa Cruz. As with Alternative 1, this altern?tive wrU be analyzed in conjuoctmn with Oprions A., B, a.nd C. The FOllI-Lane .AJternative -The four-lane eX!ensior. of Sand HiU from Arboretum to EJ Camino Real vtith Sand HiU Road ~dened to four lanes from Arboretum to San!3 CrU7~ This alternative "'ill aiso be evafuared Vrrith Options A, Band C. The Quarry Road/Arboretum/Sand Hill Road Altermaive. 'ioI.·ith existing Sa,.,d HiD Road widened !o truee lanes from AItx.xetllm to Santa Cruz. 5. The Palm/GaJ..·ezlArboretumlS-:::.nd HiH Road .4Jtf'rnarjve, with existing 5..1nd Hill Road widened to three lanes from Arboretum to Santa Cruz.. 6. The Transportation Demand Management Alternative· Major increases in programs for transportation demand management (1DM) and public transit in the project area. This alternarrve will define the amounr of Wl'.-1 and transit ridership that would be required to reduce the demand for road ..... ay improvements in order to meet the goals. and Objectives of the project 7. the nine "what if' questions defined in SUb!,1SK 1.3 o Year 2005 "No Project" Conditions o Year 2005 ''With Projc~i" Conditions for only those three proje.cl alternatives ,:>f1d" four alternatives to tbe project defined in Sub task 1.3. Travel model results "\loll] include p,rn. peak hour forecasts of turning mo .... ements, evaluation of intersection volume/capacity ratios and J.e·.els of service, daily traffic voiume impacts at seterted kxations. AIl alternatives will refiect the eristing le ... e! of TDM aaained and/or probable due to current programs., binding agreements and mitigation mO>l.itoring programs. TraveT forecast and impact anaTyses will be conducted for each of the project alternctfve:.i and the alternatives to the project and Options A, Band C. 34(l.89 ;; .c"_:"j"~ • ."";." -------------- Subtask 2.3: 1995 Trame Impact Analj'Sls. Traffic impacts will be identified for the srx alterni1.tlves enumerated above, the three options and the study ("\\'bat if') ques:ioru !isted in Task 1. The analysis of 1995 conditiorn YllLI, and ·,A.'ithout the project -..ill be detailed as follows: -- 2.3a· Major lntersectKm and Roadway Impacts. Traffic impacts -will be ideDtified by comparison Df peak hour volumes ana inlersec!ion levels of service at all mdjer intersections in the project vicinity and at selected locations within the O\'erall study area. In addition to the capacity and service !evel comparisons, an evaluation of tra .... el rime savings >;J.lould be performed by estimating accrued intersection delay and rr.idblock average running speeds with future peak l10ur traffic le .... e1s. Average dati)' traffic (AnT) volume forC'cas.ts v.iJJ toe used to furthei lden!ify impacts both 10 major arterials and to neighborhood streets. These compari<;er.s will be based upon evaluation of each alternative, gi\t:n projected demand under a Single 1995 land me scenar}o. 2.3b: Neighborhood Traffic Impacts. Estimates of daily and peak hour traffic diversion wIll be used to assess potential impacts to adjacent residential nei.ghhorroods adja12ent to the project limits. Changes in traffic volume near seflsitNe receptors, such as parks, !,chools. s.::nior housing etc .. as wen as. meran str~et traffic Change, wilt be used fo evaluate the si gnificance of these impacts. 2.3c: Miligation of Impacts. Mitigation me-as .. .lrCS both v,ithin and out.!.ide the project !im;t~ -"111 be identified and e\lalualed, where fea~~le, to minimize ploJect·genera!e_d impacts. The most appropriate project arternative(s) and 'Volume forecast ~ill be used to evalua:e mitigation measures. AdditionaT mitigation measures or circulation mrxMications designed to limit impacts to residential Slreets in the project 'o-'kini:y will b"! considered as necess.ary. These mitigation measmes will be identified from meetings \1,."ith neighb<.xhood groups and in consultation v.rjth the respecti .... e City SHIff and "",ill be tes(ed in the model. 2.3d: Cumulativ~ Impacts. Year ~OO5 conditions. \\pith and "",ithout the three project alternatives and four alternatives to the project v.ill he identified. Impa::ts will be identified }.I().89 10 Augu.''o! 29. 1991 L \ I j 1 ! ! I 1 I , , - o Sa..0m Road Scope or Service:> by comparison of peak hour traffk VOlllm.~5 aod intersection le .... els of service Bt major .'", in~e,rsections in \he project area and at sele.cted. locations within t~1~ overan si:1,ldy area. Average daily traffic forecasts will be provided for m9.jo[ anerials. Products The products of 'hi' 'ask would include 'he followmg: o Tabulated peak period and daily traffic counts, with a summary of peak and daDy traffic volumes in the study area. o Future traffic projection., including daily &nd peak hour traffic volumes on key roadway segments and turning I:'jQvemcnts at important intersections in the study area. o TrafflC impact analysts, 'With traffic projections. for e'lch of the alternath'es, descnkd in tcnru; of pealt: period mtersectiod feveI of sen.;ce, estimated change in trave1 time on key links, change in traffic volumes, SYUOl)SIS of traffic diversion! and ether information necessary for t!Je EIR. o Mitigation measures identified and evaluated for effecl'\leness in reducing traffic impacts v.ithin the proje.:t limits and the Dveran project \oic1nity. o Cumulative impact analysis for the 2005 time fram" descnneo in 'terms of traffic vo1urnes. and level o~ service. TASK 3: SPECW" STUDIES Objectives The objective of this task. is to provide the. City with separate technical studies tn<::.t coutd be important in understanding the project ahematives and in selecting a prefer.ed alternative. Methodology The consultant team would prepare four separate tech!1ical stlJdi~!!o. These technical siudies would focus on partkular issues or geographic areas., and would include specific discussion of those issues. that CQ'.Jld repre~nt physica! or financial design cDnstraints or opportunities. as they relate 10 the alignment alternatives. This task would involve ihe foDo'ol.'ing sPbtasks: II c J j. .nnt' .-.-- - ~ill RoaCl Scope-or Seryices Subl3:Sk 3.1: CuJtural Resources Study. As il.r.:haealcgical resources have been found in the project 'area, special attention mu~t be gh'en to potential archaeological impacts of the project. The foDowmg work items "ill be co~pjcted by the consultant team: c Existing archaeoiogjcal archrval research fm the project aheinGl!i .... es will be reviewed and, if necessary, supplemented. The Quarr)' Road and tbc Galvez Road Alternatives may require field reconnaissance of areas to be affected. ]n addition, any project elements found n0t to be co<,'ered in the previous shldies 'Will ha .... e to be subjected to field survey. o Coordinate Vwitb local individuals and agencies with arcbaeoTogical interes!~ icciuding the Stanford University archaeologts.t, in order to locate ne .... ·• unpublished data. o New date on 1oc2.1 arcnac-ology from Stanfm-d Unrversity (drs.covered since the earEer studies) will be integrated. o On the basis of both existing: and newly generated data. we v.ill prepare an analysis of potential impacts on archaeologicHI resources attributable 13 each of the alternatives to be evaluated in the E[R. Subtask 3.2= Arbor Resources Stud\!_ Groves of trees currently exist in the "iciniry of EI Camino ReaI and &.t other locations Vt.1.thin the project area_ Impac:.s to the~ tree:. brought about by each project alternative W1.1! be identified. During previous studies 'Witr,ln the area, the biologkaJ resourc~s of the San Francif.quito Creek and its riparian areas were e ..... aluated and, more: specificany, an previously existing trees along Sand Hill Road were identified. Addittonal1y. since th;:: completion of the previous studies ther=: nl<1y h<l\'f' heen cil.anges to local tree protection poIlcK-s or regulations whicb mu~l be wns)dered. The foIlowing work items "'ill be completed: o The consultant team v..ill review previous tre~ studies conducted in the Sand Hill Road project area. In conjunction V,1ih the City, an area of iX)tcmia\ project effect for trees will be defined. The City ~i]j make available a tree inventory detailing all tree~ along the corridor and defining trees that m.ay need remn"·"l. The condit)on, age, diameter and spec~s of the trees 'l\ill he assessed in thls invenlol)'_ o A tree planting program (pan of the project) to be piOvided by the Cit)' will be reviewed for com:istency whh policies and programs rehlted tD vegetation in the vicinity of San Francisquilo Creek. N1 relevant t:lemcnt5 of the-Cit)· of Falo Alto Comprebensive Pl.an, the Menlo ParK Generai Plan, the Santa Clara County General 34(L89 " AugUSl 29. 1991 .L • -, ~iU Rood Srope or SefVi~ Plan, and the San Mateo County Geperal Plan, as weD as heritage tree or other tree ·:·protection ordinances of these local Jurisdictions, wl1! he considered. o All trees iliat are considered biologically important or important relative to local jurisdictionaJ regulations (it.., aD heritage trees) ... ill be identified and mapped. Any trees that would ha\'e to be remo'l.ed ... iln the implementation of a parJcular alternative route alignment ¥.'ill be identified and listed by alternative. Subtask 3.3: San FrancL)9uito Creek Crossing StUdY.._ The crt'rSsing of San Francisquito Creek with new bridge structures ¥oil] be included as a pan of some project alternatives. Both the three-and four-lane alternatives involve additional creek crossings: A smaIler pedestrian.bicyc:le structure wou!d be required ~itb the three-lane alternative and a larger 3utomobile-compatJble structur~ would be requ1red \lrrith the four-lane alternative. A creek crossing of this type raise" several issues, ir;c111ding impacts on archaeological resources, biological resources, contamination from construction and dIsturbance of sOlls with erosion potential. Th~ riparian habitat of the creek v..'iIJ require adJitional study to respond to the concern raised in tile seoping process. The fonowing work items \\oil! be completed: o The consultant team lOo11l map the area of impact in the San Francisquito Creek riparian area associated with each alternative in order to identify the potential disturbance ZOlle and the species and habitat to be affected. o o From Subtasks 3.1 and 3.2 descrtbed abo .... e. the consultant team will identify any potentiaJ arcnaeoIogi.:al resources and trees that could poteI1tially be dislurbed under the aTternati ... 'e hridge designs. The cOn5<.JTtant team "lll review prevlous studies of the bridge area and ""11] s'Upp!e.nent those earlier studies v.~th a comprehensive study of the bialcgical resources present in the area of impact. including flora and f<luna. The pre~nce of any endangered. threatened, rare or other species of concern will be identified and mapped. The potential for di~lurbance of the habhat of such sensitive species will be evaluated. Ne .. ' studies are necessary in order to confirm any changes in the biological character of the site. alld also to confirm the presence of species that may not have been com·idered sensitive al the time of those earlier studies. The Army Corps of Engineers will be contacted to define any wt::Jands iss.ues or permit reqt;irements. If any of the alternati .... es or options ~rifl affeci the: creek at El Camino Real, a study simiJar to that IL<;ICd above will be done in the area of that creek bcd. IJ I , t r f t I , r I ~~ .. .~ :-~' ~ < . • 1 I I i - o ~1il1 Road Score or $cr.'K:u o The consultant team will describe af)d evaluate the solls conditions in the vicinity of 'the San FrancLsquho Creek bridge, 'wirh an eye t:)Ward potential erosion controJ is5ues to be raised with brk!ge construction. Pre lim inary bridge designs Wl11 be analyzed. and potential erosion problems and solutions identified. Subta~k 3.4: Stanford Unh,;crsity Golf Course Impact S~udy. The (>lignment of a widened Sand Hill Road ""rill affect the Stanford Golf Cour.'ie and recruire modification of the current configuratic:1 adjacent to the projcL1 area. Design plans pro .... ided by the City will be evaluated. Tht right--of~way necessary and the potential changes to the golf course design will be analyzed. Starting with the existing work, the follo'Wing work items will be completed: o The cO:1suTtant team will be prrnided with an ~erlay of current alternative roadway configurations onto the existing golf course Jayo'Ut as well as proposed modifications to the course, with an ~eDtification of potential conflicts and incompatIbilities fOT their evaluatioIl for environmental impacu.. o A.,,} potential disturbance of archaeolClgicaJ reso'U[ces within the golf cour;,e area "111 be identified. (This analysis v.ilJ be a subset of $!Jbtask 3.1.) o Based on past biological surve)' wO{k., the potentially affected areas of the golf course "Will be resurveyed and potential impacts on vegetation or \o\:iTdlife species or habitat will be identified. Products The prodlicts of this task would include technical memoranda entitled as follows: o "Cultural Resources Study for the Sand HiiJ Road Project~ o "Arbor Resources Study for the Sand HIII Road Project" o ~p(1tential Effects of Disturbance Around San Francisquito Creek.,''S~nd Hlll Road Bridge" o "Potential Effects From Sand Hill Road Projec, 011 Stanford University Golf Course" TASK 4, PREPARATION OF THE ADMll'lSTRAT1VE DRAFI ErR Objectr..e The objective of this task is to prepare .f!n accurate, thorough, comprehensive and edited Administrative Draft EIR. complete wilh background documents, ''''189 14 , :; • , , : .. ~" .. ,:. -, • ,::,,~.-.. < - o s('")m R0ad Scope o( Services Methodology The consultant team will prepare: the Administrative Draft ErR in accordancf" with CEQA and City of Palo Alto regulations and guidelines. Each section of the re-pon will include: all sections required by CEOA An equal evaluation of the three project alternatives and the four alternatives to the project (as defined in Subtask: 1.3) and the three major options \110111 also be included in the EIR dOCuments. The project study questions (i.e., the "What If' que,~tions) will also be evaluated and discussed in the E~ although not in as much depth or detail as the project alternatives or options. The impacts of the project alternatives with the cumulative projects VIIill be clearly differentiated from the impacts of cumulative Jevels of development within the project area. The number of developments to be taKen into account in the cumulative analy~is ~i11 be determined in conjunctkm v.'ith the City (see Subtask 1.3). Mitigation measures that are proposed by the project appl:cant Wlli be dltferentiau~d from mitigatklD measures recommended by the: pre parers of the ElR. Economic, social and other considerations., as they relate to the feaslbility of mitigation measures., wilf be identified. The cumulative impacts will be categorized as to their degree of se .... erity in incividual sections of the EIR, cross-referenced where required betVI-'een sections, and summarized in the Summary section of the document The foOov.ing de:ioCnbes the topical e\'alua!ion of environmental impacts to be included in the Administrative Drdft ErR: SubIa'>}:: 4.1: Traffic and Circulation. Based on work completed in Tasks 1 and 2, the consultant team ~11l prepare ~n EJR Setting section describing the e~sting transportation system in the Sand Hilt Road proje •. :t area in terms of the fonowingo component. ... : o Roadway Network -Existing dally and peak hour condilion.c;, predominant travel paiterns., functional hierarchy. flow variation and accidents. o pubric Transit Ro'Utes and Service -Ridership k:ve}s, major destinations. o Bikeway N eN.'ork. 15 AugUSI N. 1991 "'"~t~~~,::~ '," • '-.:1 '. .. ..,. __ 1. \ttQl!'+ o Pedestrian Network. D Relationship to RegionaJ Transportat>on Facilities -Role of Sand Hill R(lad in kx:aI and regional travel A3 descn1>ed in Task 2, impact anaTyses \IIol1l be prepared rhEn (v.cstuate each project alternative (as defined in Subtask 1.3),. and inc1ud(;s an evaluation of lraffic L.-npacts within ,:he Sand Hill Road project area and other important connecting roadways adjacent to the project area, as well as the residential neighborhoods peripheraJ to Sand Hill Road in ,,,"!enlo Park, and Palo Nto, and at Stanford Ui1J~~n;!ty. TheS4: analyses ..... ilJ ~ in the 1995 and 1005 time frames as. d}scus.sed in Task 2. Mitigation measures will be developed as part of Task 2 for all iderltified significam impact .... Suc-n mitigation measures may indude traffic signal installation or elimination; intersection and Ioadw3Y improvements; roadway signt!1g and slrfping modifkations; <:Ilter-atlons to the existing or planned pedestrian and bi<-)'de programs; and desi£I1 feature~ to improve p~b!jc transit access in the project area. Subwsk 4.2: Land Use. The com;,.u1t2nllearn wilt prepare a setting sect jon that estab:i~hes the land use context for the projecI by surveymg, mapping, and describing. in text.. land use types. intensities, and patterns along Sand HilT Road ,:1110 in the immediate "idnity of the project are a. Based on work: complet::::d in Task t the EIR wliJ esta.blish 1he cuntcJ.1 for the land use projected for 1995 and the cumulati"c I~md use changes in the fU1Ul'f' (20(5) by identifying (in tabular form) an projects Iha! are appropriately addressed in the analysis of future cumutative impact.s,. (See Task 1.2). Inc ErR wilT pro\'ide a review of all apptvpriate planning documents tha: pQ\.;de guidance for development in the Sand Hill Road projecl area. including. but om limited lO the City of Paio Alto Cornprehens.ive Plan, the Staroford Land Use Plan., the Menlo Par\. General Plan, :he Santa Clara Count)· General Plan. and the San Mateo CounO' General Plan, The appropriate planning poficies rel2-live 10 the alternatives will be descr.ihed. )40.89 \6 \" . • i I I I I \ - Tne ~.nsu1tant team will descn1:>e potentiaJ~and us.c impacts related :0 changes in the type, intensitY or pattern of laild uses along Sand Hili Road due to t.r,e p:ojecr and other clJrnulative projects within tht' immediate ,,;cinity of the project area. De charactc:rl5tics of ~ project would be compared and evaluated for conformance witb the objectives, policies and programs of the rdated pla~ning documents descnbed in Subtask 3 above. In each case, the document will ascertain ~'hether the project is in conformance with ~ variety of plan policies relat::d to the alternatives. If signifil:2nt environmental effects are discovered, the consI.l1tant team wm develop meaningfu1 mitigation measures to diminish said effects. Subtask 4.3: Noise And Vibration. The consultant team noise analysts ",'ill prepare a noise and V1bration setting section descnoing the aW>.Istic env'Jonmenr of the project area, mc1udmg Sand Hill Road. ID residential areas within a.nd a.djacent to the pruject area (i..'1 Menlo Park and Palo Alto, and on the Stanford Univen.ity campus). and would identify a:1)i sensitive receptors_ Twenty-four~"our noise measurements 'Will be conducted at three kx..alions and supplemented by short-term me3!i1Jreme:nts_ The City has KJenrified the inters.ect~n of Sand Hm Road and Santa Cruz and the residential neighborhood acrO'li.s the creel: from the shopping center as nwo of the locations_ The consuham team v.iil seiect other ioeations and submit the list 10 the City for its reyjew. These data .".·iJI allow description of the e:ustir.g noise "!nvuonment in terms of the 24-hour avera.ge day/night noise level. aT Ldn, a.s required by the Noise Elemenu. of the Cit)' of Menlo Park General Pian and City of P.&.fo Alto Comprehensrvc:: Plan. Vlbration readings 'iII'lJI be taken, and th~ potential fDr vibrational effects ... ·m be dlsC'us.s.ed. The noise setting de~ripl;on win include information on s.en:;iti",e noise receptors in the vicinity of the project that CQuld be affected by no~ generated by the project. Thi'i infonnation wjJJ be presented in text and mapped for graphic presentation. , - o The coru;ult81lt learn will deta~ L'" City .of Palo Alto's Noise Ordinance .nd adopted >.. ' NOisei.and Use Compatibi1ity Standards included in the Comprehensive Plan, in additicI1 to those of other jurisdictions within the project area and other regulatory agencies l such as Caltrans. The noise impact anaJysis presented in the EIR 'Nill assess the potential new noise generation c.reated through development of the alternative~ both construction-generated a!1d vehicular-related noise sources. Particular attention iJoill be paid to noise-sensitive receptors, exlsling and planned, and long-term noise levels due to traffle and the cumulative development within the project \o'icil1ity. The noise analysis wili take into acccunt tile short term 1995 project generated noise and the year 2005 cumulative effects, Future noise levels for-the No Project alternative, as weD as for the other alternatives, 'Ioill be calculated using a traffIC noise prediction model approved by the U.S. Dep,u1ment of Transportation, Federal Highway Administration. The results wjlJ be displayed in the form of noi.~ contours. Noise level increases and/or decreases on streets experiencing :lltered traffic volum~s as 3 resui! of the project Wlll be calculated and the potential for adverse community ret.ponse evaluated. The Impact section wiH also address the potential for snon­ term COr.5'IUction noise impacts.. The consultant team 'Wl11 }dentify an noise-attenuating measures thai courd be undertaken to mitigate both shor.:-and long-term noise impacts of significance. Subtask 4.4: Nr Quality. The consultant team ","'ill prepare the air quality analysis for the EIR. The ana.lysis "Ior11t be ba:::.e~ on estimates of areawide smog precursors (Reactive Orj;anic Gases (ROGJ and Oxides of r-.,·itrogen [~OJ) emissions us-ing estimates of increased vehicle rrule.s traveled (\'MT) from the traffic analysis. Emis.sion factor~ v.iJI be obtained from the EMFAC-7PC computer pIO£ram. 340.89 " Allgw.! 29, 19")1 L • '.\ \' , I . - o ~ -!ill Road Scope of 5.uvi<:e$ The ErR Setting section Vwi.!1 inciude a: de.s>ription of th~ cJirna!e and meteorology of the '. . rroje~' area in terms of the Bay Area air bt'l_sin, hi:;torical air quality data. and the current efforts to attain and maintain State and federal air Gualiry standard~ The EIR will identify an sensitive receptors for air pollu~a:1t.s in the \icinity of the project The EIR will prO\ide a discussion of the rdative effects on regional and local air qualiry of the alternatives. The consultant team wI1J perform micro.-scale modeling of Carbon Monoxide (CO) levels neat an intersections pinpointed as having the greatest potential for CO problems using the CALlNE4 computer modeL This wll] include calculation of CO levels at al1 sensitr,.'e receptors within the proj«t area. The modeling will be performed for each of the alternatives. The modeling effort 9.011: reflect not only the traffic volumes associated with each alternative, but also the levels of congestion., which also partially determine CO generation. TIle anaJyses wi!! address the shon term (1995) and long term (2005) time frames, The EIR ~i]1 qualitatively descnbe the likely Jevels of CO at Lnter,'iections not modeled, anJ estimate CO levels at an jdentified sensitive reCep!OTs. The EIR wHl compare predicted CO concentrations with State and federal ~t<::ndards. Ttle ErR wm inchJde an analYSis of regional changes. in smog precursor (ROG and NOJ emissions due to adoption of each alternative for future years based on regional travel and speed data provided by the transportation analj's:s. The URBEMIS-2 computer program will be employed, and emission factors 'Wl1l be derived from the EMFAC-7PC computer program, The ErR will develop, together with the transportation anafysis, mitigation measures for air quality impac:ts., including those set forth by the Bay Area Air Quality Management District The effectiveness of alternatives on reducing air ~mi5siono; .. ill also be determined, l4O.89 19 Augu~1 29, 1991 - o ~k-hi1 Road Scope or Services Subt~s~ 4.Sj Cultural Resources. The wor~ ,completed for Ta~k 3.1 will be used as the basis for the Cultural Resources chapter of the ADEIR In the Setting section, an known existing cultural resources that could be affected by the: project alternatives will be documented. The potential for finC!ing ."lew cultural resources during e~rth-mO\ing phases of the project alternatives will be determined and descnbed. Based on the results of the Cultural Resources Study, tho::: ErR \\ill recommend mitigation measures., which could range fTurn limited monitoring b)' a qualified archaeologist during eanh-moving activities to precomtru",'1ion testing for archaeological resources and the development of an archaeOlogical resources preservation program, simIlar to th(~ programs that currently exist elsewhere in the Sand Hifl Road project area. Subtask 4.6' SoDs and Geology. TIje consultant team ",iii review an previous environmental studies to descn'be exls.ting soils. conditions on the project site. Site soils v.ill be de ... ,nbed in terms of their implications for cons11'tJ('tion and engin~ering of the projeC'L Based on previously prepared geotechnical studies in the project area, the consultant learn will describe the groundwater conditions on site, paying special attention to the height of the groundwater table. The geological characteristics of the project area \\;ll be identified and described. The EIR wi1J present any objec.ives, policies or program:-of th~ City of Palo Alw Comprehensivt: Plan, or other local planning documents, that relate to construciion in seismicany unstable areas. The EIR .. ill include a description of potential impacts of the project in relati()n to soils and s.ubstrate conditions. The analysis will focus on such haU:lrd::. as soil stability and s.ei"mically induced grouncishaking that could aff~ct the project improvements. The potential project impacts will be compared to the ,geology/.seismic policies of the Comprehensive Plan and the planlling documents of other kxal juri.<>dictions.. 20 L • ". I , • f' • ~ " , q I J I - . ~ ., o '" " """-. s..-. _ .. nlll Road' ....:...ope of ScJ'\o1CeS The EIR WIll indude mitigation measures for any significant impacts identified. .... . Subtasi: 4.7: Hydrology and Water Ouality. The Setting section of the assessment of impacts all the \vc.a1 hydrology and d!"ainage sys:em, and pott:ntiai water quaJit)' effects, '\l.ill be based on work previously completed In the project area, Lnduding the most recent studjes documenting Stanford's storm water drainage master pTclnning efforts in the San FranclsqlJil0 Creek watershed. Existing flaws and the capaci~ of the storT!l drainage system will be evaluated, and the fut'...lre cumulative context Vrill be presented based on estimated increased runoff due to bui1dout of other cumuJative devetopment in the same w3tershed. Planned improvements to the drainage system, affecting the capacity of the !!:ystem ~o accom!llodate runoff, WIll be descn bed. The potential for flooding, either from San Francisquito Creek aT from dam failure inundation from Searsville and Felt Lakes, \\ill be des-.:nbed. 9ased on existing informatXJ'l a\'aJlabJe from pre\oious studies in the area, or from more recent studies completed by the Oty of Palo AltO, Stanford UnNersity or the Regional "'later Qual.ity Control Board, the quality of "'ate! will be characterized ill San Francisquito Creek as will tile water being introduced to the Creek at the various outfaTIs adjacent to the project area. The proposed project would add increased impervious surface in the projeC1 area, and thL<S runoff would be expected to increase. The incre<.lsed contribution to the drainage flows, if any, 'AlII be calculated and pre&ented for each of th.: alternatives, both separately and in the (:DnteKt of future cumulative growth levels. The consultant team ..,.ill evaluate the po!enri31 for changes in runoff ~"-'i!er quality from the alternatives. Mitigation measures wi1l be recommended for Br.)' identified sigmficant impacts from both project·spccific and cumulative increases in drainage or chan,ges to v,'3Ier quatit)' in the Creek. 34'l89 21 "" .. - .'---' o S\Jbta~k 4.8.: Vegetation and Wildlife. On t~e basis of biological work cDmpleted in Tasks 3.2, 3..3 a.nd ).4, the consultant team's biologkal staff l,\oilJ documen! L~e number, s.pecies., and distnoution 0( arjmal and plant species that could be: cffec~ed by the alternatives. The evaluatioD WIll provide information on the size, age, and ovt:ralJ condition of trees. All trees on the potential alternative road',I;'ay alignmer.!s will be mapped. The EIR "ill provide a descriprinn of the role of on-site vegetation as habitat for local or trBI".sienl wtldllfe -.ilh special attention p?id to possible sites of nesting birds. SpeciaJ emphasis will he dir~cted at the San Francisquilo Creek: riparian h.::Jbirar areas both during construction and during cperational phases of the project. The consultant team will provide a review and description of efforu included in Stanford's Vegetation Management Plan 10 maintain and enhance vegetation and ~'lld]jfe habitats on Stanford University lands. as well as local policies and programs from the Cil)' of Palo A!tu and Menlo Park. Ba~d on an evaluation of pieliminary alternative designs. the ErR 'lA.ill assess and describe the potentia! impacts of the projut and ilS alternatives on the on-site \,cgetallon and WJ.ldlife habitat These impacts wHl be compared to policies contained in the Palo AJto Comprehensive Plan, the Menlo Park General Plan, and the Stanford Unrversity Vegeti::ltion Management Plan. The ErR will descdbe feasible mitigation mea$.l,;,es fm disturbance or elimination ofsensiti ... e habitats and tree removal. Subla!>k 4.9: Gro~'Jh Inducement. The EIR will documen! e~jsting planIled levels of gro~1h in the project area and areas adjacent to the projecl. The time framt.s to be analyzed are 1995 for project completion and 2005 for the growth reiated to the project and cumulatj· .. e projects. Based on each allemalive, the cDnsultant team will assess the potentia! for stimlJlation of additional grD~1h in and around the project <lrt:'a This v.ilJ include tln assessment of 341)89 22 , ·~. ~ : ~ f t , ~ 1 I , 1 J - potential future development that migh[ J?e considered to be dependent on increased capa;i~ in the Sand H,lI Road project area. The }Xitential effects of such induced grO"Nth will be evaluatl!d. The impacts associated with housing SlJPply~ schools and public services and 'Utllities (water, waste""'zter, solid waste, police and fire se£Vkes) Voill be discussed. The consultant team will de.s.cnbe feasible mitigation meas.ures for r~stricting any potential growth-inducing impacts of the proje\:t alternatives. Subtask 4.10: Community Services. This secticn of the EIR .... '11 focus on those communiry services that could be affected by increased capacity along Sand Hill RDad (primarily pol.ice and fire protection services). The consultant team .... 111 descnbe the existing conditions as they relate to the provision of poiice and fire services in the project area, including location of stations and response times. Additional areas of concern will be read maintenance, eff«11; to the storm drainage system, traffic signals, litle; control and street tights, Community services \A,ilI also be ass.ess.ed in the short term (1995) and long term (2005) fer impacu:. The assessment of impacts on police and fue semces \1oill be based on increased or decreased resfX)nse ttme to sites accessed through the Sand Hill Road prcjcCl area. 'Where necessary, mitigation measures ... i11 be presented tnat ~111 address impacts on the provision of polic..:: and fire services. SUbt3sk 4,11: AesthetiC'S and Visual Ouality, The consuttant team \A,iiJ describe the visual conditions in tl'le project area and -.wili graphically repres.ent important visual features and views. Existing conditions ",ill be documented lNith photograph!>. The EIR will evaluate the aesthetic impacts ofthe alternatives. This evafuation will take lhe form of the fonawing: l4<J.89 Al.lgUSl 29. 1991 • ~ ./ r ) J 1 i 1 I I - o o S< ~lill Road Scope of Services A textual description of the vis:u.<V(aes~helic relationship of the a.lternatives to 'Ileigbboring structures and space surrounding the roadway alignments. Of particular concern will be eft'ecL~ on eKistLng stands of trees.., the gorf course, San Francisquito Cre~k and 'Jle residential area along Creekside: Drive. o Evaluation of conformance ""irh design-related plaru and guidelines 0f the Falo Alta Comprehensive Plan. the Menlo Park Ge.ner~l P\an ?ono the Stanford University Land Use Plan. k descnbed abcwe, the consultant team will identify a11 trees. on the Soite and ",in evalu.ate any plans for tree removal and planting. The consultant team ""ill identic)' potential measures that could be implemented to mitigate any identified signifi'.::ant visual quality impacts. SUbt3,sk 4.12: <::umulative Effectt:;. Nrhough the cumulative aspects of each issue area 'oIro111 be diSClJssed within each section dedlcated to that issue, the consu1tant team v.iU prepare a chapter summarizing the potential cumulative eff.:-cts of the project. fn the Setting ~ection, the cumulative context for the road ... ,;ay impro .... ements ~ill be summarized, incTuding anticipated growtb in Palo AJto. Menlo Park, Stanford Unrversit~)i, and other surrounding jurisdictiOns. The impact analysis wm summarize tbe findings of the c~mlllati'\le analyses of traffic., air o~uality. noise j hydroIogy/wa:cr ql.lality, land use, and corr:.munii)' services impacts. A summary of ,potential measures that could mitigale cumulative impacts of the project will be incTuded. Subtas."k 4.13: Eval\lation of Aitf'!l)atr.·_~. The ahern;:,tr,..es to the project win be analyzed and then compared and contra.o;ted to the project alternatives. The alternatives u.ill be compared as 10 the short term (l9(5) and kmg term (2005) irnpacts in th~ areas such as traffic ~here the effects will differ. Those alternatives: anaTyzed and found not to meet the goab and Objectives or the project will be included in this chapter. The reasons for the rejection of these aile rn<l ti .... es ,.ilJ also be diM:"us~d AugU;;l 29, 1991 , I I I I ',-" SlJbta~k 4,14: Sta~\JtQ!l2ections" CEQA reGuires a lllimber of sections or discussions in the EIR These include a table of contents or index, a summary of the entire document (in text and tabula! form~ dis.cunions of the inten<led uses of the EIR, the areas of controversy and the issues to be resolved and a section on the l.Jn3voidable adverse impacts of the project. Additional sections will discuss the effects found DDt to be sjgnif~ant and llst the persons, orgwizations and references consult~d" S~btask 4.15: Production of Adm;nistrati\'f Draft. Graphlcs wiU be prepared to illustrate those aspects of the environmental study that are best presented in graphic form. All of the ter. discussions from Subtasks 4.1 through 4.14 will be complled in a single document fnc senior in·house revic-,Io'. Revisions v-ill be :nade as necessary. The endre document will be edi\ed. Products Thirty copies 0{ the Administrative Draft ErR ... ;11 be delivered to the City of Palo Aho. TASK 5: PREPARATION OF THE DRAFT EIR Objective 1be objective of this task is 10 prepare an accurale t thorough. and complete Draft EIR. Methodology After City staff has re\rjewed the ..a.dminis.ttative Draft ErR. the c()nsultant team will incorponte the revisiorIs into the document Ciod prepare tJ)e Draft EIR for public dist."1"bution. The consultant team 3l1tH::ipates that there \o\.iTl be a sing!.t: round of re";ew and that they \Ioill receive a single review documenl from the City cont.aining alJ reque-sted re .. isions to the ADEIR after the City Staff has reVi"e",,'ed and coordinated at! rCl<1eW comments.. 1t is anticipated that up to two meetlng~ ",ith City staff rna)i be r~quired to rewh'e iss.ues raised dliring the re'l.iew of the ADEIR. 25 .' 1 -. o ~·n[J Re.ed Seer< oI Services Products -. Three bundred copies of tbe Draft EJR ",11 be provided to the Ciry of Palo Alto for distnbution. TASK 6, PREPARATION OF TIlE FINAL EJR Objective The objecti· .. e of this task is tD prepare an accurate, thorough. and complete document containing written respomcs to aU comments received during the puhlic revie-01o' period and 10 cr~atc a mitigation monitoring rnat:ix. Methodology ,"Vfitten responses to the comments on the Draft EJR recei" .. :ed at the public hearing(s) and letters of comment received during the public re\-iew period will be prepared. These romments and responses will be prepared in a &eparal~ document and re\iewed by the City. A mitigation monitoring maim: wm be prepared as a;, appendix to lhe Final ErR; it 'Ail} det.Jil the mitigatien measures for Significant adyerse effects, the responsible impJ-:menratian agency~ the rnonitorii1g phase, the enfrJTcemerlt agency. and the monitoring agenC}', The consultant team Will send the Administrative Final ErR (AFEfR) to the City for r~ .... iew, AhcrCiry staffha"e reviewed fne AFEJR. the consultant team willmcorporale re .... isions into the document and publish the Final EIR for use by the public and decision m<:lkers, A" \o'1th the Draft ErR. the cOr\5ul!ant team anticipates receipt of a smgle document from the ciry containing an requested revisions to the AFErR. The consuTtant H~dm will meet 'I,l,1th City staff if necessary to expc:diliOl.Jsl}' resoh'e issues rai:<.ed in the re .. iew process, Products Thirty c~pies of the Administrative Finat EIR \0.111 be printed by the consultant team and submitted to the Ciry of Palo Alto for review. 340.89 Augw.1 29, l<,oc)l I ' • , ........ ' ~tl Road Scope 01 Service:s Two Ilundred COP"" of the Final ErR will \><: printed by the (onsultan! team and submiTted to the 'City for circulation. TASK 7: ATTEND MEETL"IGS Obiective The objective 0( this tasl:: is to ensure coordination ~ith the Cit), of Pato Alto, the City of Menlo Pa:k and Stanford University, and local community groups throughout the EL~ process. Methodology In order to address tbe need for a large number of public meetings during and after the traffIC analysis and !hroughout the EIR proce.ss., the foIJO\lring public meetings ~th preparation time have been budgeted: ~ Technical Staff Palo Alto City Council PaJo AIto Planning Comm. Menlo Pack City Council Menlo Park Planning Comm. MenJo Park Transportation Neighborhood Groups Palo Alto Bicycle Advisory Comm. Public Hearings Unassigned Meetings 6 Two-hour meeti:lgs 2 Four-houT meetings 2 Four-hnur meetings 2: Four-houT rneeltr.gs 2 Four·hour meetings 1 Four-hour meeting 6 Three-hour mee tings 1 Two-hour meeting 3 Four·hour meetings 5 Four-hour meetings The six listed meetings with neighborhood groups l\iiJ occur at two separate times during the: study process. One set of thrce meetings \1oi1l be hel-d early in the study during the trafHc analysis ponion (oil the end of the third month) so that the desaiption of the alternatives and the preliminary findings of the traffle analysiS may be discussed. The consultant team will prepare the presentatiGn and the necessary illustrations and graphics, including a design for a noti~ or flye., The City .... 'ill arrange for the meeting rooms, provide the proper 3<10.89 21 Atlgust 29, 1991 t:: til' " ,0," ,:-+ . • '~ . - o notifi~tions 10 Ihe public R:1d' attend LfJe pr~s.entations. The s.ecnnd set of three meetings will ~'held approximately six months into the study. The main topic at these rneetL.,ss will be the effects of [he project alternative'.i on the neighborhoods and !h~ mitigation measures being proposed. As with the first round of meetings., the consuTtant team will prepare the presentation and the necessary iHus.trations and graphics. including a design for a notice: or flyer. The City will arrange for the meeting rooms, prO\lide the proper notifications to the public and attend the presentations. The consultant team ",111 produce handout'!: for the public hr.:arlngs and community m~etings and minutes from each meeting. TASK 8: PROJECT MANAGEMEt>T Objective The objective of this task i£ to ensure <:oorainalion of the ErR process and proo.-ide stIm'!£; project management to ensure a comp;-ehem,r..e, legally adequate 2:)d on-schedule EIR. Methodolozy The goal of the project management will he to anticipate the issues that need to 'be resolved, communicate with an appropriate partin, and fonow through to see tha! the right things. are done by the right people on time. A Critical Path Method (CPM) type tOO wiLt be us.ed to identify in detau what tasb must be accomplished and in what sequence. !to that the schedule can be maintained. The project manager along with member!t of the consultant team technical staff, as appropriate, .. ill meet with the City on a regular ba~is to ensure efficient management and coordination with the various agenCies. These managemenl meetings. ""iii be in addition to the technical staff meetings listed above. On average, the meetings are e"pecte'd to occur Augll..j.! 29, lWI f - c-------. , "r ' ~ ~.$.---7--w_ll11_·-·- ti , i " , } ~ -., i 1 1 1 I I , I - ------"'--..,.-"'-~,.-~.--- () Sal C":'.m RoaJ Scope or Servlcai biweekly over the tour5e of the: EIR process,; however, meetings may occur as often as twiu '.. . • week in the early stages of the study. Products The consultant team will produce meeting notes from each manageme'rlt meeting. identifying action items, rc:sponslbi1ities and completion dates. \\!henever the schedule is revised, copies will be distnbuted to the City and the <:onsultant learr~ 29 AtJg\lSt 29, 1991 • , :c: ---'--~--"-'--.,- 0 I) t.XRIBt! ~ • , " SAJID BILL KO'AD Ell! BUDGET Archeo-Tot&! 9JbtotA.! Tote.! Task ..BL ~ -'!l:L L'R ~ _Labor El<J>enses Cost Cost fisk 1 1.\ %0 74 $ ~,400 I 6,400 L! 36 30 5, 'ZOO SiteD 1.3 16 26 3,290 3,290 1.4 ~2 8 3,HO 500 3,650 1.5 4 70 6,HO 6,640 Subtotal 108 208 0 0 0 24,680 500 $ :'5, taO :\". i Task 2 I ! 2.1 0 1« 9,000 800 9,80Q 2.2 4 320 2.(,275 ',200 26'.475 " , , 2.3 4 f2~ 18,655 1.000 19,655 I j SUbtotal 8 Sst 0 0 0 51,930 4,000 55,930 i Task 3 I 3.1 0 146 7,100 600 7,700 I I, M 40 :s.t OOO l,MO 3.3 )20 1,800 8,800 I 3.4 44 3,260 3,260 I &JbtoW 204 0 146 0 0 22,160 600 22.760 T!tsk 4 4.1 4 64 5,210 $,210 4.2 ~8 2IS~O 2,65-0 4.3 4 96 ',210 8,280 4.4 88 16 8,160 8,160 4.5 B 20 1,4070 1.0170 4.~ 32 2,790 2,790 4.7 48 3,280 3,!SO 4.8 52 3,560 3.660 4.8 48 3,2BO 3,280 4.13 52 ',400 3.'00 4.11 48 (.070 4,0,0 4.12 20 1,1170 1,t70 4.13 80 5,570 &,S'HI' 4.14 34 3,OOIJ 3,000 4.15 196 8.400 1.800 l(t,20G SUbtotal 742 64 20 96 16 65,090 1,500 66,890 Task 5 200 58 17 ,1Se 8,100 25,850 SUbtotal 200 56 C 0 0 17.150 1,100 2S t 8:S0 TasKS U6 136 8 10 33,780 5,300 39 , 080 SUbtotal 326 13. I 10 0 33,180 5,300 39,080 1 07/16/i1 ,1 "7 ·t!n.1'7··""'~---...... , - -. ,-",,,-.,,,~, "'".,'---------- fi 0 r--, .' " • q .. Ar{':heo-Toto] S,btotsJ TOtsJ , ....J!!!L_ ..lIE... Kor\ie ~ I/R DB Labor ~~es C¢l;t Cost Task T 160 130 28,500 1,100 29,500 SJbtotal 160 130 0 0 0 28,500 1,HlO 29, tWO Task a 204 19,717 19,117 SJbtotal 2~4 0 0 D D 19 J 1l7 0 ]9,717 AcJmWstratiQn 14" 770 ToW Projeet 1,952 1,280 17( IDS 15 2S3,OD7 n,oco $299,777 2 07(15/91 s.. 'frwllCilco Z'" Spar-Sacet SWIC lSQO Son_ CA 9410S ~ I!! 1,S0$6.-0600 FAX 243-037:3 COMPENSATION SCHEDULE Principal I Principal II Senior Associate I Senior Associate II Associale Senior Professional Professional I Professional II Technician I Technician j( Technician 111 Mileage is charged at Photocopies are charged at $ $ $ $ $ $ $ $ $ $ $ $ $ Don.!!l! C ." L :Zlci~ 10 So. Lake ~_ "'eJlue ..... 600 """"'" CA 9nIJ1 115 J S6,!·1363 f"X561·1.56t 1SOlhour ll5lhour l00lhour 90lhour 85lhour 75ihour 70lhour SOlhour 5S/hour 451hour 351hour .3 D/mile .IS1page '-C>OO 1';'01 ·21$1 Scree. SuilC 400 S"""''''''' CA 95'''4 916J32!i--'800 FAX. 325-t& to Oireo ~&1s (1. ... nWl~ meajs, obdgfrlg. luI~ I1Inlats, ~ril'\ti"". ~rapt.ic maI.n~ .• tG".and subec"'I:-aclOf feillS .arl! .$1,l!:l.fE.~ 10 ;II 10" .... aommtr.ltion chargB. • .. --' -.: ..... ---_ ..... -- Korve Engin~ering, Inc. HOURLY BilliNG RATES St8n.Q.![Q Ov§-rtJm~ Engineers sOd Planne rs Grade 1 $5Il 2 55 3 6,) ~ 65 5 70 6 75 7 80 a 85 S 90 10 95 11 100 12 105 13 110 14 I I 5 IS 120 16 125 17 130 18 135 Techrti::::ians and SU2eQrt ~aff Grade A $35 $ 5250 B 40 60.00 C 45 67.50 0 50 75.00 E 55 F 60 G 65 H 70 I 75 ComQIDeriCADD Per Hour $25 Project expenses wW be bmed at cost plus 10 percenl Jof sel'\ljce and M.ndli:.g. Project expenses include project--rela!ed costs such as transportation, mire-age @ $.30 ~r mOe, subsistence, reproduction, and subcor.tractOf' services. Each projeC1 may be subject to initial set up and coordination fees. In\loices ate due and payable w:thin 30 days after being sent Rates are subject to en ange. Effective May T, 1991 SAND HILL ROAD fIR SCHeDULE ~th' TBSks " , ~-'-, J ' , 1. Inilial Stud"," •• TraffIC AnaTy-s.is 2.1. Da'!a AlWfew a~ Counts 2.2. Projl!ldiorll 2.1. Analysis 3. Special SWOIftS 4. Admlnis1ralive Orah: EIR 5. Orat. EIA fl. Fi":)) EtR 7. 'L4M1ings J . ----------.------ ~ , . , . , r, -'-_I' -'-i1 , , , , I I , , , , , j ;"""n"i~' ErR Dl'1IftEI~ ' .. I ® ® T".:xTAS~ _1111 ~~ -; .. PTe WPPC t.lPPC 8. Pr;;ljecl Managemen:l .~ ;, .... ' :,'.<-\. :;:-;.--.' >.., . '"~fJ~~~0h'" fir!· t~~:;~>~.~,~ _, ::. ~~.l~j '-~~;i:~ -- Palo I\JIc cay COYne" ...w.w ~ Menlo Pil:rk C~ Council ® Men'o Pal"k P\a'1rJr'9 CCl.,.,mr~slon ® Mgnro PaMl Tr.!r'I~por1a:>on Com:nj1sh:m Neighborhood Groups • • • 1'--,-,1' , '~ , I , , , , . I I I ~ • 1'\l~"'I" I -.;. ® ~ <!~;> ® M""" ® PtJMc Heari-lg ("\ City or Palo Ajlo " Insuram:e Requirements for Conlra,,'ors EX1HZHT E CONTRACT CO-OROINATOIi CONTRACT OESCR:IPTtoN ""M;) AND IIUrlS CONiRAC'T'ORS 10 THI: CITY OF PALO ALTO, AT THEIR SO\.E EXPEr~SE, SI-iALl. OB1}\IN ,,6JJO MAINTAIN ~NSURANCE FQ>=l r ..... E TEPM OFTrlE CONTRACT. CONTB.ACT0FlS WJLL BE REQUIRED n) PROVIDE" /l CE~rnF~CATc EVIDENCING THE rNSUF.ANCE AND N.O\MING ~ THE C!TY!oS.A.N ADDITIONAL INSURED THE CERTlFlCATEOF INSURANCE MUST BE COMPLETED ~,ND EXECUTED BY AN AuTHORIZED REPRESENTATiVE OF THE CQM"PANl' PRO/IDING INSUP.ANCE, Rl..ED WITH THE Cln, ,.,ND APPRO'VEO BY THE CIT'f'S F\.:SK MANAGER BEFOP:.E iHE CONiRACT Will BE CONSIDERED COMPLETE AS RESPECTS INSIJRANCE THIS INSTRUCTION SHEET SHOVLD BE GIVEN 10 YDU'1INSUAANCE AGENTi8>=lOKER w:TH THE FlE"OVIR[O cer:rTIFICATE FORM RETURN THE COMPLETED CESiIFICATE TO THE CITY OF Pi'lLO KTO COrnR4.CTING DEPARTMENT THE INSURANCe COVERAGES CHECKED 5ELOW ARE RfOUIREO FOR ThiS CONTRACT. I ~ L()NG FORM Jo . SHORT~OAM S,ATUTOf1y " ro """ ...... I , ~ C~Ei4S1,.£. GC.NEAAl,. l,.\,\8\l.m IKCWOI\<tG· • ~R~"-L~UFIY • B~o...o FORM P~PEF!TY DAMAGE • BLANK£T CONmACTUo'ol BOOllY IN..!UI'1I' l "'~CP'ERrT • Fl."IE LEGAl. L1f,flILI'1Y I '00",' ".,U"' ~"""SO''', ' (~(~;" :'~~,\l'l-_;:~.:'=="'--b·.:.'·' I 'O:~'~'~:,~,~~~"""' I, \;:<~' == [i! PAOFESSlOfrtAL. LMtllLrnr iNCUJOING • EFlI'I-:lFlS"'rw OM::SSIOSS "'Lt C.A I,''''C rs • !Io4A.U'RA,CnCE CfF ""PL jCAEi"£i • W:GLlGEJlH PE.RFOI1)'IJoIKE g TI<£ CITY OF Pale ALTC IS T.:I Ie MA~E!) AS AN AOCll'IONAJ.. IN~OItEO o NO INS'J~NCt carnFlCUf R!QUI~ A. T~ Crt)' Q./ PeJo ,,~O, !b oNl~C$, Ige,,~~ I"'d empioyNi'o I'P ~i!!med as &:f:fi:n;'fl.( f~SU'!!'C, b(J~ 'il"J~ ilS kl """"ro: per~orrr.e'c! U'11cli3'r CO"I:",=! Sa,d CO",,"'dge .as ID tf1e C;ty aI' F"!II:o I.JIC, et(" Cl'l.all t>e' pnma,,)< c()'oo'erag.e' ..... 'lhO\Jl oN~ Igaln$l Clt)'"! e.,~~,,,; Irlsura"ce ... ,,1;' ilr-~ orr-eor m5ur.;r;ce r:<!r-,e:' C) tt>e C,l,' ~I;.g ellt"e'SoS ir1~wn,"e. """1 B W~re ttloE'.-ork ir1voi'lE'S ;.rad,nG, paVIr19 ~.ca\ja:'nSi d ,,11''''9, 0< 01""" u."j'e<gr'l,,'"H:l ... or~, r" .. pd' cy ,"crlld!!'~ C"'~i'!.;d ,on (J' .... ,,~s, (;O"~!J lS PI~~ mil',.,S or ol~e • .5Imn .. r pl"C{>ei1:\, or arlt appa'atus m connection t~ere","'~ t>e-i:;-.o.' the-5l:riace 01 rt1e g") .. mO ~h€'l~"" ow,,~~ til" third p,a..., e~ Of t"€ C.,." 0' Pa'Q A.II:: C W'here Ihe IIio'OfJI 1I't'(C1vt'S '-":avaimljl, ,ollil~Sl! co...eragE-15 provld.:!d IT" I~e am'~'."'15 at\o"'e o Thto t)Olicy ~c:IV'de5 1 "Sell¥r.abillty 01 lr1teresr" prO\l's'on E DeductlbJe~ CIve,' 15,000,000 m~s ~ in.:1,eatt!'d ar1d are SJ~,!ect I;;l apo'tNal F II sL,icra po1ot:i.es oil" carn::elled C)( C~a"~ .:I'LJ"nS; ,M per cod ~ !;CJVEr-age as S1ale(j here,,, '" ,,",ch a m,a-",e' a.s It .a~ect tt1,s Ce1,',Cille 1'1,"',' 1'3C':, doll'S Wfit1er1 noI.c. wi' bEmai1edlOltleClt).clP3ICAlttJ.FlluMiir.age!.POBcu102!>O.Pale-A.I:D.Ca:.h-. ..... So4JO:;: G The IC3blllty i"SVfiI"c. poIiey "'clu6fo~. contlactual jla!:lllll~ e"dorse.m€r>1 p'O~'r:'lr,g Inscra"~,,, ~'~rag. fer co"t'adOl'"s ilI5"E-emer:t 1<;, 1",:1emn.')' l'1p Crty H. The~ .. lHorde-d ""del tr>e pci""el;. 1$ 5U~l!!'C'I ttl 011\ the tI;'ms 01 \I'1e pCJ1lt'~~ di',>\:."'a\a~ 'M!'e,,., a~(l mee\~ all tl"1" pT,"~"\S)ons t<l'letl "'1 her,.,,., - 4 .. ·.·<,·,· .. • < • " "-:.;-' • .- AFFIRMAT~VE ACTION G~lINES r'""i:XHIB"!I F ~. """-4'ARD PHASE OP CONTRACT: 1. In addit~on to the Certificate of Nondiscrimination rcqujr~J to be filed under Section 2.30.~90 of the Palo Alto ~lur;,jciJl.Jl Code (herei113fter "FAMe"), the bidder shall C"ompl~te J que~t i~n~3ire f~rnished by the City setting forth t~e affirma­ tHe ::I.:t ions the bidder hiS taken or "'ill tale to: ~. R~'ruit minorities in its location~ for all levels of j 0 tls • I,. Select methods assuring equal employment opportunity fClT all persons. c. r,stablish a -training program for ne","' hires '.,l1ere n~cessary to assure ample opportunity for the less qualifi~d to more fully qualify. J. frovide adequate opportunity for upgrading and further training to assure equal opportunity in advan~ement and promotion 4 e. Provide counseling service for all ¥ho may need help to advance, especially lle~er employees. f. Educate supervisors ~egarding nondiscrimination practices. ... In additiCl!'1 to furnishing the completed questionnaire .JleJ for unJer 1. above, each biddeT for a construction or ser­ \IC~ (lTOjcct ~ithin the City shall submit the follo~ing information Inr hIJ~~{'lf and su~contractor~. This information shall constitute tIle !,j,ldlng contractor·s Minority Employment Program (hereinafter ·'~,~r.r'·) . 3. the estimate.:! tctal number by job c.lBssifi,ation of personnel who shall be used by the contractor and ezch subContTactor in performance of the contract. These numbers shall inc~ude the estimated breakdo~n of njinorities to be used in each classification. To the nest extent possible the contTactor shall estimate the n:jnority breakdo\oo"Tl by month iOT the life fo the c.ontu,ct. ~o estim3te furnished under this subparagTaph shall be c~nstrucd or enforced 15 a hiTing quota. U. Tn preparing these estimates it is expec.ted the bidder .ill take. OT agree to take. these a~ditionil steps to a~surc affiTmative action in the field of minority emplo),ment: Shf!'lI!'t 1 of ~ '.--!.-:;-~ ----- ( I ) RccruitJ~for needed help in the lr, .:JreaS Inhabite~'y minority members. inclu~lng open advertising and use of various established publJC ~nd pri~atc agencies. [Lists and advice furnished by 1hC" r:dCl Alto Uuman Relations C:oun~jl (lI':fC!rJ Ii't('r t',.~,il!~CI1· lrainin~ th~se le~s qualifieJ to assure ~J~~U,jtl pro~otional opportunities for all. (3) rroviding necessary counseling for upgrading. including use of outside training facilities 1n this area. (Lists available fTOlt. the P,\JiRC.) (4 ) AS5i~nin~ an Equal Employment Opportunlt)· (lEO) cO~Tdinator fulltime or as additional dut)' and assuring that all supervisors are ~~are of their responsibilities and that union repTesentati~es recogni~e their responsibilities in the equ~l employment program. t~) Ass,.Jring that all subcontractors are in cc~:p]iance with the federal and California state 13~5 and regulations relatini to nondiscri~ination. (~) ",.bere the-contract is of suffic:ier:t c1..;ration. assuring develop~ent of apprenticeship proir375 with union cooperation. 0) Upcn req'Jcst, furnishing the City 11 copy cf the latest Federal Form EEO-l~ or equivalent form. (H) r~cviding the name and address c~ all s~p;llers ~hose supplies ;nd/or equipment exceed S~ of the total supply cost for each contract and subcontract fOT the perfor~ance of the contrict. Any ~jdder not submitting an MEP shall net he cl~fJ~ed as a "Tf'sponslble bidder" and his bid .sha11 t-c di~­ iegarded in the n;anner no .... presc:-i~ed hi" tJ.{ City. J. The City M&nager ~ill analy:e th~ ~EP 5ub~ltted ~y e~ch bidding contractor ~ith the objective of deterrrinl~g if the program submitted by the contractor for Ill~self and his subcontractors presents a reascnable effort tD further minorJty employment~ c. If th~ City Manager has qu~sticns about a palticul~r hidder's prop(lsal. he may address such qu~sticJls to the bidder. Th~ City Manaier _ill be a~ajla~lc to ans~er questions rel.tivt to the guidelin~5 anJ to advise those se~~ing assistance of r~50urccs lno~n to him. He shall not be Te5ponsibl~ for the ~~rvicc OT Sheet: rf :'I ~' -,~ ~~+, ". i I I I I I I - g. " .-", -' .... ---. lack of service rendered by tne reSources reco~~ended. nor shall he be responsible for deve)orin~ an MEP for any bidd~r, or to serve as I recruiter for any bidder. Bidders shall be Illo~ed to revise their MEP after c.onsideTiticn. Jf bidders witbdraw their MLP for revision. their revised program must be resubmitted by a date ~hich s~all be estab1ished by the City Manager. Bidders failini to have their revised MEP submitted by the establisned date shall not be classified as a responsible bidder. The City Manager. pursuant to the guidelines, shall make a decision 8S to the responsibility of each bidder. B. AKARD PM5E OF CO,TRACr: Upon award Df the contract by the City, the recipient's MEr ,,'!'lic:n has been appTo ... ·ed and accepted by the City~ sha.ll be an integral part cf the contract and subject to Se~ticn 2.~D.093.of the rAMC. ~o contractor shall be dee'med in material breach of cor.tra't under PA.."K Section 2.30.093 ""'hen he has lr.ade a reasonable and substantial effort to comply with the MEP. C. POST -A~'ARD PHASE OF CONTRACT: 1. The contractor shall post in conspicuous places. avail­ able to employees and applicants for employroent. notices La be prDvided. setting forth the law prohibiti~& discrimination and advising anyone ~ho feels he is being di~cTimi~ated aiainst to advise the FEPC. 2. The ~ontractoT shall male ~Titten prCETtss reports en the performance of his MEP at intervals established by the Citr Manager. The contractor. however. is encouraged to suh~it ~rjttcn reports as often and ~hen he de~m5 it rel~vant tD his MEP. 3. The City Manager shall monitor the performance of the MEP until completion of the contract and ~ill report to the FAHRC on the proires5 of the contractor in living up to his ~irp_ 44 Any ~uestions of possible breaching of Mer shall be discussed with the contractor by the City Yanager. Re6olutia~a ~o. 4144 ~~d ,tlB Pale Alto M~~ieipal Code ~.J~.090 Ordi~a~c£ &0. ~12D ShrC't 3 of 3 > .tNAB~ING ORDINANCE - o O~CIN~CE or TaE COUNCIL or THE Clrv OF PALO AlTO AMF-NOING TKE PALO ~TO MUNICIPAL CODE ~G ADD PROVIS10NS RE~ING NONDISCAI~!NATION ]~ THE ,£~- Th~ C':Iuncil of the Ci ty of ".l~ Alto ~oe.J OF:.DA!1Il III foi l'~",.; SECTIoN 1. Ttlat: Secticn 2.]O.{)90 of the PalO' A.ltc .Mur,ic.1pal 1:04. boll .'MHl~e:d ;.~o reed .s f0110· ... 5: -1.30,e90 Lowest re'POnslbl~ blClder. In .d~itlO~ to price, in 6.termlnrn; the 'lowe.t re5pon'~ble bidder,' CQr..~d.%.tlo~ vill be: qiv.n ~o quality and performance of th~ supplie' eo be p~rch •• e~ or .~rvice. prov1~ed by t~~ .eller. Crlteri. (or de:termi~inq low bl~ .h311 lncJ~de. but not be limited to til. follololitlC): (1) The .bil1t!'~ capaejty ar.c:! .~ill of tl"te b;f,d·:!er, to ~rform the contr.ct or provide the .~~plle. or service! r~qui1'2'd . (2) the ability of the b~ddpr to pr~Y1~e tMe .upplies ar '.rvice5 promptly. or withjn the tl~e .pccif~e~, vithcut delay or i~te%feren=e. (lj The charactllU, integrity, reputation. judqmel'lt l experience and erf~~ien~y or thr ~iader. 1-4) The q .. al .. ty oI bicld~r 's performance or. prev~ous purchases er Contracts wIth th~ city. ,~) Ttle atlilit.y cf t.he bll~der to pro"lde ( .... ture IUH.­ tenanee, re;>ai~ partl and servicl!"s for tt.e uSe of t.nt' .upp11 •• purcha •• ~. U,) Current COl"'.plJ.4nce ~y the t-ido::J~r .... l th !e~er.l act. and ellflot'""tlve cr~ers an:! StatE" of c.liforni •• t.:. .... te. g::,."'''!'rn­ in; the subject of nondiaclirr,lnat.ioll ill .1"'p!cJ'!!le-r . .::. prc'vJdld th.at. t.he Cit}, lI'Iar:aqer ahall ret'Dgr.J:a:e .s proof of r'O!'.colf'1pUlnce only the fln .. l decillonl 4nd crder. of tnole fe~er.l .nd _t..te Igter-.ciea IHIprJ"'ered under-the 1 .... to make IIlCl'l fln~lr,q •. 111 Cert1f~~.t.ion by the ~idder that he ~111 pllrlue an &!fl~.tive eourle of .etjon a. r~qu~r~d by &rrl~&tIYe .et.i.cr:. quid~linl!' provide~ tl.ere1,.a!t~r rea"Oflatoly pert.lrll'1Q to the work of the contra~t an~ to t.ne natu:e .n~ ~lle of ~1' IiIfOrk force, to enaut'e that .ppliclnts .re lou.;1'1t anr1 ."'>,lr:"\'e~. and th.t e~plcree. are tre.ted dllrin~ emplo~er.t, ~lt~ou~ regard to t.heir rAce. color. ll4tlCl'I",1 orl.9'in or &:'.ce!'t.ry. cor re11g10n. fa) Under this '~CtlO~. ,p~~lflC 91l~d.line. will be .rjopte~.by cQunclI re50h;tior, flo~ t1111e to tl",l!', Jd~ntlryl.n9 t~~ n_tur~ 'l'I~ scope o! '.r!!rmatlye ertlo~' te s .u'ed b)' tne C.l ty. -1 - lbl Such ;'.Jl~e;lnc5 si,,1l1 t)€' 11"/1.:1:"" .valleble tc all :persons ~e51ru,g to tJj,-~ ;,n Clty t.I.iSP'lCSS,-~ SECTtON 2. that 51'CL101" 2.lC'.Q~1 be e, ... ~o::,; to the "alo "'lto toIu1'1c-ipal CC'dl': to rlP-ild as fdlo'Ws: -2.30.091 Crrti(lcatt of non~15:rlWl~~tio~. tilC~ ~ldder "~'411 enclose "'ltn filS 6r.r-.! certTITcate s-f.t1.ng ... ~@thl':: h. 1. C\lrrently :'n <::OlT.p! lance .... .d.~ a11 fecO!t.l oilt'1~ StiitE of Call-for!'l;! 1 ...... 11 ~overll'lg r,01''1~iscr.l-~;nat.ion ::.n e~?lo~@nt. and t.hat he .... 111 p\,;rS\,It an. .. ~flrtTlative courBe d' .c~ion as r@,;uired by .. fli~atlv@ action q~iel'li!'e5 ~s set f~rtM ln Sect.ion 2.J~.09a .nd resolutions adc~ted pursu~nt thereto, an~ that if .warded th~ contract he ~lll ~ol ~l5~rl~itl~te I~ t~r e~­ p!oyment of any persr.ll''l .. nde:-t.t.~ =c~,t_::.e,-t b!:csl,;se of racr, cclor, national orl~ln ~r ancestry. cr rellqlon, o~ I~ch per:lllQn, and th"t he ..,\11 partlcq-'ate, i.f re'~u('s'.:.I'!~, 111. pre-­ .war~ ~evi~w Qf ~lS q~allflc~tlor.5 un~~r ~r~vls~~n9 o! thll .eet.i.on. fhe .requirements of t!',-~S sect:.ol"1 ;;;1'1.11 apF,ly ~:'lly t.o contracts in eJO:cess O'f {-lve th:::,·"u.":'1d ~oUllr5 fot S!!':''''l':!!! or for. combination of :!II~r~ic!!~ a~d suppli~5.· Hl,l.nicipal Co~e to :rea:! as fDUO,,"'S: ·2.)O.O~2 Penalries for ~ISCl'lT!'.;r· ... tlor. ltl e"",p1Fi'l1':UH::t ..... r,y c:orJtta::tor .,~,c s~e--!O:un~ In V1C,!".t lon c! t. e nol':u:!:;s­ erl~lnatl0~ proYis~ons of the 5t~t~ of Call!ornia rai:r ~ploy:T'ent PraC"tl.ces Act or sl1l'111 ar pro"'isiCi~S of frderal la~ or e~ecutive cr~er ln the pcrfor~ance of any contract foIlth t."Ie city, tnt1r ... by s!'-.all b.~ found IT'l milt~r'l!I! b-reac!'-. o[ :!IiII1C1'l contr .. :::::t ar.~ thf!'r-('I1?~:'l t"e c~ty shall hllve FO'ol1!r to cancel or-ii1.l!>pe1'.d t'!",@ cur.tra~t, in ,,!'.ole or Hl plrt., or to ~ed1.lct frQ~ the a~c~nt pay~~,le to suc~ CGt,trl!l::tor the S'.lt'. or 'l"'!!r.~y-fl\·e dollars {S25.nOl for e<lc't'. ;:,>crso.r. f~r e.c~ calen<!!;i. ~ay chl!'"in.; wt.lci':: such T"'r,:,or, was ~:~(;rl~.lrLl:o:,ed ag.ir'1~t, a~ ~ol.m.11{'s for sl!Ild br~',:ch ~f c',".\ract.. or both. Only a fl1n:l\:.'1 of the Stdt.t' c,! Col 1 !"crn:o! :r~lr l~l'!Iplo"r"'e"nt Fractlce,;;; COI'""~15slcn or the ~":1.ll,.' ... lc:':t ~t":!rr",l a'Jen.::y er cCll.c€'r fi!'1.!ll C;:lIF,tlt1.lte c:vl<h .. n<.:·~ 1"1~ a v,-:-:.e·,IO:-' of (:"O:'ltr.e.ct. 1.l~~er t~:s ~ectlc".- ~2.)O.O'ilJ Pel"altlcs for vlc1~t:or,-of a!flr'Tat~· .. e .etl:>n prOV1Sl0r.S. -A:ii'y cor.tract.or "'!'.c, 5~I,jl • .be fo ... tlC it' t~:~ Clty Xenaqer to br l-fl vlolat-lon of his .gf~~~~~t to p~rsue an a!(lrnativc: C-;:'U1:~e of 6CL10r:: r-::-In. q .. c:auor, of I'n'l pro .. 'is;ior'l of the a!tl:nl1.at.l\'e act-lon qUldpllnO::-$ prrtalnUHi to t.1S con­ tract 'hall b~ fo~n~ In ~~terl'] bre~ch of su~~ contrlct and ther~lOlpon t.I"I1!" Clty shllll h"Vt, p)wer t<:, c.,.n(_l!"l or suspend the cor-tract, In w~ole or in part, t"r tc ~e~~ct from the a~oUnt pilya~l. to' sue)', cor.tf'a.ctor t.llf' "U'" C',! t ... o r-.unC~ed flfty doll.r5 (~=~O.CO) fel e~ch c.:~r'~~r day durlnq ~hlCh the contri!~tor J~ f01Jl"It! to t .... ve \..pcr· l!'\ n01';<::ol'";>llar;cC' ... s. c!a;'l'.­ .q0!5 fO'r 1.ld Lr@<s:::":. of -:ontr,<=l. or t'o~J.." -, - i n f I I : I I ; I l I - o JtCTION S. Thi. or41nance ehlll ~C~ .tteet!vc thllty day. lroft the d.t. of It. paE •• ~ •• J)lrFtODUCTO: Much II!. j9~S PASnD: AFrll I, 1968 A.ns: NO!S: .... rrlclo!, Bc-.. hrl, Berw.l~. (llrk. ComiUQck. CO'Jiey. 0"", Gi~ia.a~.tr Pelrt::;n. Sp.lrUl. Whutlry NOl1r ABSENT: NOT'If' c--.. PIO .... ~~ d ,o-.=...,;-~~ ••. --..:.-___ ., 's 4«,.«< ~~ hty clark Jifiyor APP.ROVl:D AS 'to reAl! I 9V~ .... ./' -, - - rhi. r~r"rt ~1~6' ~,~ c~~~;~~ei bJ, ,:,c,~tl"ar:t"t' ,.:i c.;;cl'l '~,'t "l~ .. ~·.tl :o~p!rt(" ,li; t I"l, t r .. ..:-t.. r-.i, ~·t~·.,.,;, ."'1'.-.::-~ :,ti .. -r .. i'tl' I,: .. 1~.J~ ~'."_':L" f/ "I;.tcea.ar,:.-, sr'':;-'':',,, R: ,-'''; 'il. I .... F :1'",}:: REPORT O=?E~:'LJ 10; D~rector cf hjr.::~a,,;~.s: S','""'ii.:.-:o<; C ivic C-~r.ter 250 ,",am; I tOM ;h"ero,-,(I' Pi!to r..ltl..'. {~1 ;fur'.,;::-, Nau,p of ;~~~on ?·"~,~"~r~ ~CT~. CT ?el~~l ~~ Cl,:.t~~~, __ . ___ .. ____ " ____ . __ ,-iJ:..:. -------_._.---------_._---------_. --------._----- Circle O,r;e: Pa rt FL1]l na,~~ 2"a ~~~res5 oi film ('T other Te~G llnj u~it ccver~~ by til:::; ~;'_ r. ,,:;: '""" , 3. ~~mc ~n{' ~~J~~~~ o{ princj~iJ r,ll'~e ,0 ,;,,:l:,; . -:"'..1'.( a,,' ..:, ITljJ ';'I"r Cnrpt"'ll:J ~~:-~~ of r~rfnt 'fLil :3tecl \:JIT" ,,:,,' ;I,~;;rl.':;~ r-r i,rj:rl1t c('n~riJClo !:,"·lp1e1.f: o~l)' 1f thi~ i<: .. ~,"\"". 'n'.fil'i:' tOT'S 1C,)('T: !)!:tc.07'l'lr;..::tcr b. Sienature ~nd tltle of zuthCT~ ized, representative. ·A. x ____ _ Da te: I'art II , . Attach a statem;:nt of YOiJT compan)"s peliC)' C~ ec ....... l eil;:jC)c,;:·~t opportunity to all persons ~jthout rE'iJTd to ra~e. cr~tJ. col0T~ national origin, or ancestry. ~nd describe ~h~l sters ha\'c ~~cn taken to put this policy into effect~ rart III Circle the proper ans~er I. y~s ~o Yes ~o '. I. )' c 50 .'\0 ) t' 5 ~o L Have yo~ informed co~pa~y officials a~d repT~sent~till~ r~garding th~ n~n-discri~ination prc¥i51:~S of City of Palo Alto Contracts? Have you E'.xamined your comrany's practlCE'-5 re.&.ar<!:,:~ ~' .~: ~ent5~ la,'offs or transfers of your emFlc)ffS fro" O~{ J I te anotber for evidence of <) pn:ctice or e:r-~~c:'~en! f'C'!t' :r. that might appear to be d~!criminatory and ba~ed u;~~ race, Teligion or national origin? Are they nDn·dlsCrl~!nJ!' r ~ Do you have educational or tTaining progrJ'T.!=o -;;-.:-r .... -rC'! fin2nc~d for the benefit of employees cr rrC5~tctl' employees? "--- b. Ho~ many are ~inorities? Doe~ your help ~anted advertising state that you art d" equal opportunity employer~ Are any apprentices obtained fTO~ Sources o~.~$:ee I~c employer's ~oTk force? If yes, have yo~ circwI3t{'~ :~f~1 at ion about apprenticeship openin~s or opport~~lt:{~ 1," the Co] io .. :ing? Yes ~o Yes ~o Yes !\o State Employment Offices ~e~spapers or Other me4±~ High S~hools. includi~i those 1n rrl~crlt\ ~: areas. Local trade or .... ocationOil scl~::-'c15. 1;,(! .'" ~ith minority group studfnt5. I I ..--"';.,~~. ~~~; t • , i ~. Yes No 7. ~es No s. rd 1't 1\' 1. Yes !I; 0 Yes No Yes No Yes No o Ai~ncies and/or OT,lnit.tien specializing in ~inority eIT_ployment. federal 0 r Stlt e Apprrnt iets" ip rep res ~;l tat j \.'l"S. \lrho ? ------------------- Oth.r~s ____________________________ _ If you are a prime contractor, ha~e all 5ub,o~trsctoTs covered by tbese co~pljance insptction rtp~rt5 been jnstructed as to their contractual obli,ation3 relating to the non­ discrimination provisioD3 of City of Palo Alto Cor.tracts? Expl.in: _____________________________________ _ Have all recr~itment sources been advised that all Q~aii{ied applicants ~ill receive consideration (OT em~loy~ent ~llho~t regard to race. color~ creed or nation~l cri,i~~ Identify (names and addresses) tbe emplcy~ent agencies. personnel recruitment organizations. ne~sraptr .d~~rt15ing or other non-union sources from ~hich th~ co~pany le~uits its personnel. Have yeu a collective bargainini airee~ent ~lth a l~~or unlcn or other organization? If yes, specify the Unjon(sJ or arganlz~tion(s) Have you advised the la.bcl' union and/or "'orler oq,;;.r.izat- ion of the company's responsibility undeT the non-di5'ri~i~Jit­ ion provisions of City contrlcts? • ~. --, ~ . Yes ~'o 5. Yes No o. ··L-.. ... ___ :o-.~ ______ """ .'-·'c • Approximately ",bst percentage of you.r en'r1c1YL'cs ('(""n'T, ,.J by union leree~ent5 are-refer-red by or hlrrl.l l":r"'i~..:11 tr.­ 'Unions? EJpl,a in procedure fOT hi T ing ba lance. ___________ _ Loes the c01'llpany' ... collective bargainH.,!: .:I-~r(,Crt"r t ,', other contract or understandini .. ith alar-loT unl'-" : 1'1 unions) or other loo'orl:cr's or,anilation ir;c1L.J~c .;J r'· \ J~I Ii for non·dis'Ti~inltion in ~mployrent? Is there ani labor union or vorkEr's cr~ani:~tlc, r0l1Cj ..·hich prevents you irom fulfillir'g ~·Ol.Jr chl U:atiCT;:' I:' :'_ r the non-discrimination provlsions of rlTf ccrtT:I:~·~ I; so. spe(ify" ________________ _ Specify the trade(s) or craft(s) i~\'ol,'eJ lr th:· ; " : t . ------------_._--- Usc this space for comment on any a~~~cr~ \" I hl\~ -. ,Co, '. • o lAC1~L ~K£UP OF ~PORTtsG UNl! ~a~ of r1rm~ _________________________________________ Su~~it~~j by __________ _ Pt <:' 1"[ t N .. mC" __________________________________________________ ~ ______ __ (l~~it.~c cnly for mon~~Iy ~eport. ~D. J) rhr.·~ t\r""~ l'f ~rll!t:;c,,1'O.i't'l IIr .. r~t'1UlrL!~. 1hlS form~' \l.!!eC: for al! t~,rl'lI!. (Cre~K) .1. PCf'l'1.;ment lukl!up of C'-"~:l~8;;y. ( ) ~2· £.!Itl~.at~.:' m.kll!u.~ f.or tHs pC'jc-rr. f,l' "".Ire t~ .;'h 1'.' • .1e !ll e1':'.~lo:,.e~s i1"l. [i.rE-t column, net j\l-st !,!"inc,:-it1t5.. ~c,~, 1 a:-.c, 0'::: ;1.: ill" requir.-a to bl! fille.d in .and subtllit.t.ed .. d.th CD .... ~liar,c ... Bl'port. Tdt.l .Il II Asjar. At:l("rj~ ---,------ " J " ~d r: ~ om 10 ce. re~<alll! !lal:'" ~-,e,itan 1 .... :. ~ a~, ~"":"'~Il-' ___ J0'> ,..,7Er;f11\ l~~ I 2 3 1 2 3 1 2 3 1 2 1 1 " ~-.1_ -. "i.,,~c:ment \ 1 , , Fr\"fIl!5!'i!'>T)als Clr-:-iol-Offi<:1I! ----1--, I \ , --t-- Field' ~ ~ ... [' r\": ~ ,,"' r , \ I I . SIo-.lll.:d 1 ist I ! I I I i~ -Ii i ! I i I , .. I -----r-- b. , I , , . I, I J \ \ I i , ----.--~ •• ------~ t'n 0,;" 'i lle1 t \st Ii I I i . I I • ! I J .. :! r I I -~------ b. I i i I I ---, I I I '-I I ---~ d. , I . , 1 , , T 1""1. Of J1.~r:\'t L-L_~ 1:'· d.t. bol!"b.., s.~c .... l d tho b. ,,, uded " <h. ,.,""r-o~r1.te c.t~l.orips .bovlII!. 0, Jo' J I Tr.i~i"'l! i !.--'w'fl I t e Ctllh. , , . Pr""ut:ti"ln I -~ I ±d This report ~u~r be completed by contr.ctcr _nd each ~ubcontr.ctor. T~e to rm "S~ .1I"oJ'1o Surn'~f'd" includes .11 person~ of Xextc.n, PI,.ll'ftO 1I:1,o"1n, C-,,:;' .. n. L .. tin A~~rjr~n nr Sp~nish oriRin. ilf'pon I'n1'1 "m;:l"'yrf''I I!"nr...,]lc-1 in format on~th\!'-job (r.1""1nl2: ~t"",Q:r • ..,s. Ie - • (._). I I I ;" \ . • ~ .... ! h" :.":;-:i A~Z~1!;f ____ ''-~_~" __ - July le, 1991 HONOPABLE CITY COUNCIL Palo Alto, California 21 AWARD Of CONSULTANT CONTMCT FOR PREPAF";'TION' OF A SANPJULL ROAD ENVIRONMENTAL IMPACT REpORT Members of the Council: REPORT IN BRIEF Tne purpose of this staff report is to recommend that the Council: (~) Authorize the Mayor to execute an agreement (Attachment l} with ElP Associates for the preparation of an Environmental Impact Report {EIR) for the Sand Hill Road project, in the amount cf $299~i77. and (2) authorize staff to e4ecute change orders to the agreement up to an amount of $30,000. BACKGROUND On November 19, 1990. Council dis~ussed the award of a consultant contract for the preparation of the Sand Hill Road ErR (CMR:567:0~ November 15, 1990) and took action to: {l) approve the se.lection of ElF Associates for the study, (2) authorize the Mayor to exec~te an agreement vith EIP Associates in the amount of $275~OOO, and (3) authorize staff to ~ake cbange orders up to an amount of $27~5CO. Council also stipulated a conditiot"~ that the subject agreement 'tori th ElP for the preparation of an environmental impact report not ~e Signed until such time that an existing, s~parate agreement (Sand Rill co~ridor Study Agreement) between Stanford University and the City of Palo Alto ~as modified to include a provision that would ~rotect the city in the event ot a lawSouit. On .:tune la, 1991~ council considered and approved an amendment to the Sand Eill corridor Study Agree~.ent (between Stanford and Palo Alto) with the fUrther stipulation that the agreement clarify that the Sand, Hill Corridor .Joint Policy CQmmi ttee (JPC) has been disbanded. Approp~iate changes have been incorporated into Amendment No. 1 to the Sand Hill corridor study Agreement (CMR:31J!91) which the council is schedul~d to consider and act upon as Item llo .. 20 on the same agenda as this particula.r item. CMR:37B:91 .. -,1 " .... , ! . ". . I ->:> .. <·t;...· --'-;:"--_:'" ... -_ ..... ------ - CHANGES TO AGREEMENT FOR PREPJ.B,,\.TION o~ staff has recently had discussions vith the consultant selected for this study (E'IP }..:ssocia 7es) regardin.g the current interest and availability of the pr:un.e cons\lltan":. and the sub-consultants comprisi~g the project team .as 'Well as any necessary changes to the Nove~er 1990 agreement~ From these discussions, it is evident that the consultant tints comprising the project team are available and ready to proceed with the study. However, due to tne passage of time,. the fol1ovinq changes to the agreement for the preparation of the EIR are necessary: a. Agreement. Pag~ 1: The date of the agreement has been updated fro~ 1990 to 1~9l. b. Jo.greemeot. page 3. _section 6.1. Consultantts Fees: The fee h~s been increased froD $275,360 to $299,717 ,+ $24.417). Part of the increase is due to additiC'nal traffic counts that ... i11 be In~de and the remainder of the increase is due to h·igher rates for the cor-suI tant staff. c~ Exhibit A. Scope of services. page ~ __ Subtask 1.1: The follolJing text has been added at the end of the third paragraph ~The consultant team ~ill conduct new 24-hour directional traffic volume counts at eight locations to supplement aat~ provided by the City.-These counts will be lJ.sed to help assess any general changes in traffic volumes since the time that previo~s traffic counts were made. d. Exhibit B. Projec;J;.. __ Budget. page 1 _and 2: Tbe entire b~dget has been revise~ as appropriate to reflect higher rates for co~sultant staff as ... ·ell as the cost of the adoed traffic counts. The total budget has increased hy $24,417 from $275,360 to $299~7'7. e~ Exhibit C. Con;p~nsation SC~_~: The exhibit bas been modified to reflect current billing rates. f. Exhibit p. Praject Schedule: The sChedule has been modified to reflect beinq able to make the added traffic appropriate time in the foll. The overall extended from eleven to t~elve months. CMR:37a:91 L the effect or not counts until an s~hedule has been 7/1B/91 Page :2 , I .~ I ;j 1 I I I o These changes have ~een incorporated into the agreement U~.ttachment 1) that is no~ before the Council. RECOMMENPATION" statf recommends that Council: l~ Authorize the Mayor to execute the attached .egreement (Attachmtmt 1) with EIP Associates for the preparation of an Environmental Impact Report for the Sand Hill Road project, in the a~ount of $299,777, and 2. Authorize staff to execute change orders to the agreement up to an amount ot $J~,OOO. ~ MARVIN L. OVERWAY XENNETH R. SC~J£lEER Director of Planning and community Environment Chief Transportation Official a~~~~w~ Assistant City Manager 1\ttachment6: 1. Professional Consultant Services Agreement Related staff Reports: a. CMR: 565:9. ·Sand Hill Corridor Study Cooperdtive Agreement and Reques': for Proposal far EIR Preparation~, dated November 30, 1989. b. CMR: 153: 0, "Consulta:lt Selection Recommenda.tion for Sand Hill Road Envircnmental Document,· dated February 8, 19::'0. c. CMR:266:0, "Status of Sand Hill Road Environmental study", dated April 19~ 1990. d. CMR::567:0~ "Award of Consultant Ccntract for Preparation of a~Sand Hill Road Environmental Impact Report·~ dated November 15, 1990. cc: City of Menlo Park Stanford University (Suzanne Schaffer, Robert Freelen, Andy Ooty, Julia Frernon, Michael McKnight~ Lee Thompson) Sand Hill Corridor Distribution List CHR:)78:91 7/18/91 Page )