Proposed Revisions to rrtility connection Fees
Members of the Council:
Report in sr'ief
This report provides information on the increased cost of makinq
utility service connections for new customers in recent year~ and
recommends council approval of the attached Resolutior. revising
Otility connection fees~
Ba c1sground
The City provides service connections of ~uitable capacity to its
distribution network in order to meet a customer's needs for water,
qas, wastewater. and/or el~ctric service. These connections are
-made, provided tha.t t"Jte city has inspected and approved all
equipment installed by the customer, (i.e. contractor) and that the
applicant has paid all required connection fees as set forth in the
schedule of connection fees. The connection fees de not affect
~urrent custoltl.ers adversely but., in fact, help them by charging
full costs at the outset to new customers.
The fee schedules are intended to recover the costs that the
Utilities Department incurs in providing facilities to serve nev
customers 4 The present connection fee schedules W-S, G-5, 5-5, and
E-S were revised in 1988 and are based on a cost-o!-service
analysis performed at ~;at time. Considering the City's policy of
recovering costs of facilities to serve new developments, a study
was undertak~n to compare the present connection fees with actual
costs incurred by the City. This cost analysis indicates a need to
revise these fee schedules for all utilities.
Attached as Table one is a summary ot the existing fees, together
with the recommer.ded charges. The recommendations are based on the
present cost analysis using recent work orders for w-ater-~ gas,
~a$tewater, and electric connections. For utilities connections. a
primary increase in cost since 19$8 relates to baCKfill and
ClUl:256,U
L
-
poI!lvel':lent repair as ;Jell as eC;ll:ipJl1.-ant costs. Approxilllat.ely 15
percent of the proposed fee lncreases relate to these two
components. Increased pavement repair costs no~ include the cost of
saw-cutting ~hich previously was excluded. In addition the higher
paveme.nt repair costs reflect "c.he trend il"'. re.cE;ont years to rely
less on City field crews ".nd more on contractors to do this work.
with regard to the :rise in equipment costs. the met.hodology to
estimate this cost has been revised. HlstoricallYI the fees based
equipment charges on a flat 35 percentage of direct labor c"Osts.
The neW" method i temi.zes the equipment employed tot" ea.ch type of
ccnnection and assigns a value to that piQce of equiment based on
the 1992 "CU~rent ~onstruction costs" publication by Saylor
Puhlications. Inc. Finally. risinq labor f material, and landfill
dumping costs account for approximately a quartec of the overall
increase.
The sp"'cific :fee increases range from 3 percent to 93 percent~
Despite these fee increases I Palo Alto's connection fees compare
favorably witt. these charged in surrounding areas. with these
proposed fees, connection fee revenue accounts for approximately
0.005 perc~nt of the Utilities budget fer FY 92-93.
Staff recommends couMcil approval of the attached Resolution
ravisin9 Utility connection fees effective 7-1-92~
~eapeetfully submitt~d,
'-tv ~ ~/A<--~
w. RANDY BALDSCHUN
Ma~ager, Rates and CUstomer Services
~1 '~£/);J«7
CHARD L. ·iDUNO-
~7~es ~s~~:~~
\ / \~~tachlnents: Table one
Resolution
~ate Schedules W-5~ G-5, S-5, E-5
CIQ.,ZH:92
L
\ -
•
~.
I ,
L
SOHMARY 07 UTILITY CONh~CTION ,eES ,
E:< isting~_es .l:IQQQsed fees I..n:9~
l1~riJ! UttS;
Domestic water sen"ice-
l' service connection
1 1/2' service connection
2' service connection
c" ser~ice connection
6' service connection
S "service connection
Fire ser~ice connection-
4" fire ser.rice connect:'on
6' fire service connection
s' fire service connection
Combination Fire & Water service-
4' .tire , I" water service ." fire , 1 1-/:2" -water service ," fire , 2" water service
6" fire , 2" 'Water service
6" fire , 4" water service
6" tire , •• water service
s" fire , 2" water service
S" fire , 4' water service
s' fire , ." water service
s' fire , S" 'Water service
Master Water Service-." water serv/fire protection
S" water sel~/fire protection
!:ZM C:E;§;
1/2-Service connection
1" Service Connection
2" S~rvice Conne~tion
WASTEWAl1,;B l~ES: •• Service Connection
6" Service Connection
EL.E:~;[~ If/f;S:
Residential-
underground service connection
OVerhead service connection
commercial/lndustrial-
Underground service connection
OVerhead service co~~ection
Temporary service-
Underground service connectio~
OVerhead service connection
exa.256.9Z
L
$ 750 $
1,170
1,300
ne ..
4,100
4,600
new
2,370
2,800
ne"
new
new
3,320
new
5,31Q
3,790
new
5,860
6,340
3,380
4,030
900
940
1,060
1 1 360
1,450
450
2iO
E75
270
,15
230
1,300
1,810
2,350
4,640
5,250
6,250
3,500
3,870
3,980
3,640
3,770
3,930
4,260
5,830
6,100
4,550
5,950
6,330
6,500
6,080
7,250
1,700
1,720
2,010
2,30e
2,800
aoo
300
aoo
300
300
440
74
55
81
2S
36
63
42
2S
15
20
a
3
80
so
a9
83
90
69
93
7S
11
18
11
40
91
.".~
!
! • I
• I
I
i
;-~--,.,
-
RESOLUTION NO. __ _
RESOLU?lOH O~ 'I'HE COUNCIL OF THl:: CIT"i OF PALO "'LTO
AMENDIN~ SCHEDUI£S _-5, G-5, 5-5, AND £-5 OF THE
C!T"i OF PALO kL'I'C lITILI'I'IES RATES AND CHARCES
PERTAHUNG TO WATER, GAS, WASTEWATER AND EI.ECTRIC
CONNECTION FEES
WKERi:AS, pursuant. to Chapter 12.20 of t.he. Palo ~l to
Municipal Code, the City Council may, by resolution, adopt rules
and req-.;.lations governing utility services other than communication
services in t-he city and fees and charges therefore; and
WHEREAS, City Council has d~termined to revise its present
rules and requlations and tc adopt new rUles and regc11ations:
NOW, THEREFORE .. the Council of the City of Palo Alto does
RESOLVE as follows:
SECTION 1. Pursuant to S';'::~~VJ! ..i..4:;.~u.Ol0 of the Palo Alto
Municipal Code, Schedules w-s (Water Service) f G-5 (Gas Service),
E-5 {Electric SeL~ice), and 5-5 (Wa6te~ater Service) of the Palo
Alto Utilities Rates and Charges are hereby amended to read as
shown on Sheets W-S-l through W-5-4, G-5-1 through G-5-3, E-5-1
through E-S-7, and 8-5-1 thrQugh S-5-3 attached hereto and incorpo
rclted he.rein.
~ECTION..1.. The council finds that none of th.e provisions
of this resl)lution yill have a si'3'r:i:ffcant environJllental impact.
SECTION 3~ The foregoing changes to said connection fees
shall become effective July 1, 1992.
INTRODUCED AND PASSED:
AYES:
NOES:
ABSENT:
ABS'IEN'l'lONS:
III
1
-
WATER SERVICE CONNECTION FEES
.l..!IU.lJY.BATE SCHEDULE W·5
A. TERRITORY:
Insi<:le the incorporated flm~s of the City of Palo Alto ana on la~d owned ()( leased by t"e City
of Palo Alto.
B. FEES:
All fees must be paid pri()( to the scheduflng of any construction. Depending on material
avaJlab~ity ana scheduflng constraints. utility serviC<! will be instaned between 30 and 45 days
ronowing receipt of run payment.
1. DISTRIBUTION SYSTEM EXTENSION CHARGE
Street frontage charge per fool ........ . ................. $70.00
2. SERVICE CONNECTION CHARGES:
category 1 . Domestic Water Service
Hnch connection ........................................ $1,300
H/2 inch connection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,810
2-inch connection .... _ . . • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 2,350
4-inch connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4,6.-00
6-inch comecl1on _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...... ' 5,250
8-inch connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 6,250
~ 2 -Fire SorviC<!
4-inch connection . . . ..... _ . . . . . . . . . . . . . . . . . . . . . . . .. .... $3,500
8-inch car.-.ection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3,870
8-inch connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3,980
CITY OF PALO ALTO UTIl.IT!ES
Issued by the City Council
Supersedes Sheet No. W-5-1 elated 7-11·88
------.---,.---
·L.·
'.
Effective 7·1·92
Sheet No W -5-1
,-...,
WATER SERVICE CONNECTIONFEES
UTILITY RATE SCHEOULE W·5
(ConU[)ued)
categiXy :3 ~ Combinatioo Domestic Wat~rvice aod Fire Ser ... ~ce
These cI1arges appiy to the following oombination at Water Sarvi~ (W,S.) and Fire
Service (F,S,):
4' F.S,
6' F.S.
S" F.S,
$3,640
11/2'\U ~
$3,770 $3,930
$4,260
$4,550
Category 4 • Master Water Servic~
$5,830
$5,950
56,100
56,330 56,500
Tnese charges apply to a COfi{\ection t..'I.5t serves domestic water seMce and fke
protectiOn through a detector meter, Approval by the Director of Utilijies is required for
this connection.
6' .....•..................... , ....... ' ............... $8,080
S" .......... ' .... , ............ , , .............. ' .... , . $7,250
For service connections of 4·incl1 through 6-inch sizes, the new owner must provide and
install a concrete vau~ with meter reading ~d covers to house meters and other required
centro! equipment in accordanoe with thG Water Utility's specifications.
An approved backflow prevention device with bypass assemblies must be provided by
ownef 00 all fire services. An exception may be made where only an automatic fire
sprinkler system is served, provided the sprinkler control equ ipment is within ten feet of
the end 01 the street portion of the fire servioa. In this instance, a detector meter may be
installed around \he sprinKler system cI1eck vaNe,
3, ADOITlONAL METERS ON CONNECTION:
With new connection """."""""."
On existing connection . , , . . . . . , . . . . . . , . . . . .
Per Meter
$200
3CO
CfTYOF PALO ALTO UTILITIES
Issued by the Cijy Council
Supersedes She<Jt No. W·5·2 dated 7·11·88
L
" :~
Effective 7·' ·92
Sheet No W·5-2
L
, ,
r
4. RELOCATION OF FACILITIES:
-------------------------
WATER SERVICE CO~mECTiONFEES
1lII UTY RATE SCI:!WJ.!!.E..m
(Continued)
Approved relocation of ser,-,ce, hydrants, or other laCllties ",iii be done at !he cost of ~h.e
pe<SOn requesting the location. Depos~ of estimated cost is reQ'Jired OO1or~ relocation
wcr'~ 0091115.
C. OTHER CONDITIONS
1. SERVICE CHARGES:
(A) AdditiOnal Service oornections are available w~h payme~t of add~;onal service
comection charge as shown in Section B.
(8) Replacement of service connection made necessary because of ordi nary wear and
deterioration wiU be made without charge. Replacement due to inadequacy because
of additional detr.and or load will be charged as a new service connectiO<'.
2. INSTAllATlCN UNDER UNUSUAl CONDITIONS:
{Al Any 00nd'1tioo which, in the opinion of the Enginee,",'9 Manager. Water-Gas·
WastewatSf Wlll resu~ in a cost higher than the cr.arges set forth in Section B will be
ciassified as unusual. The cl\arge for an unusual .~stanation will be based on
Engine9Mg Manager, Wate,-Gas·Wastewater's estimate of the total costs of ell
materials, labor and oiller costS incidental to the instanation.
(6) In !he event water service to a premises is requested and insufficient capacity exists
to provide such service, the applicanl shall bear \he lotal cost lelf enlarging the
d1str~ system to accommodate serving the applicafll The Engil16ering
Manager, Water-Gas·Wastewater may require \he applicant 10 make anangemenls
for the design and oorstruction Dr said expansion in =rdat1Ce with City standards
and specifications. Alternatively, the Engineering Manager, Water-Gas-Wastewater
may elect for City forces or contractors to design and instell respectively such
facilities at the applicanls expense. Fun credi: to the applicant will be provided lor
any OVefSizing of extra facil~ies instaU ed to meet service demands above the spe.-"ffic
capacity needs of the applicant as defned in Rule & Regula:Ton 17.
CIlY OF PALO ALTO UTIUTIES
Issued by the City Council
Supersedes Sheet No. W-5-3 dated 7·11-88
L
Effective 7-1-92
Sheet No W-5-3
.-
,.-'
, .. ' ~:
-
3. EXCEPTIONS
WATER SERVICE CONNECTION fEES
Wl!.JTY RATE SCHEQUlE W-5
(COfltnu&d)
(A) Walel Service Areas 3 & 4. connections served directiy from supply main; The
d'oslribution system charges (Sectioo B) wili be based on a maximum frO'1tage of 660
feet. This exception app(!6S to single appl;~tions for service end does not appl)' to
subd'lVisions ortr~L"ts.
(8) The suOd'lVision developer wil! fumish and install the ",,-site wa'er system at his or
her expense end in ecco"jance with City's specilicatoos.
CITY OF PALO ALTO UTIUTlES
Issued by !he City Council
SupersecJe$ Sheet No. W·S-4 dated 7-11-$8
}?L···· ... · . .
{End}
Effective 7-1-92
Sheet No W-5-4
-
---,~""-~
GAS SERVICE CONNECTION FEES
J,JTILITY RATE SCHEQULE G-5
A. TERRITORY;
Inside the incorporated "mils of t~e City 01 Palo Mo and on land owned or lease<:! by the City
of Palo Mo.
B. FEES;
All fees mus! be paid prior to the schedunr>g of sny constrUC1ion. Depending on material
avaHabilily and schedunng coostrainls, 1lIi1i:y service will be instaiied between 30 and 45 days
foI!owing receipt of run payment
1. DISTRIBUTION SYSTEM EX'TENSION CHARGE:
Street frontage charge per foot ........ . . . . . . . .. $SO. DO/ft.
2. CONNECTION CHARGE FOR SERVICE INSTALLED ON EXISTING MAIN:
1/2-ir'och <Xl<1MCtioo . . . . . . . . . . . . . . . . . . . . . . . . . . . '" . $1,700.00
l-inch connection ..................... _ ............. 1,720.00
2-inch connection .. _ .............................. ' 2,010.00
Excess Length Fee: An additional charge 01 $13.00/1001 will apply to an eldension
greater than forti (4D) feet from the street properily line to the gas meier location,
measured along a rone perpendicular to the street p!OpMy line.
Service location: The service line will be installed along the shortes~ most practical
raUle, as determined by The Utilities Department, from the gas main in the adjoining
str~ aney, lane road, or easement to the nearest suttaDle meter location at the buu"'ng
or structure.
Services requirlr>g a connection greater than 2 inch shal! be based on the Ulil ity estimate.
3. ADomONAL METERS ON CONNECTION:
With new connection . . . . . . . . . . . . . . . . . . . . . . . . . ..... .
On existing metered connection ........ . . .... .
CITY OF PALO ALTO UTIUTIES
Issued by the City Counc"
Supersedes Shede No. G-5-1 dated 7-11-88
Per Meter
$ 50.00
125.00
Effective 7-1-92
Sheet No G·$-1
,
"1 . i
I
1
I
1
1
I ,
l ,
I
-
4. SERVICE RELOCATION:
Sarvice riser feloc8tior'l-.'
GAS SERVICE CONNECTION FEES
J,.ITllI1Y BATE SCHEDULE G-5
(ConMued)
$300.00
Service riser relocations will only b<o performed on polyet~yrane pipe services, an 'other
material pipe" selVlces mu~"t be replaced from t.o"e main to the meter at the fees listed in S.
C. OTHER CONDmONS:
1. SERVICE CHARGES:
(A) Add~.ior1al service connections are avaUabla with payment of additional service
connection charges shown in Section e.
(8) Replacement of seNica oomections made necessary because of ordinary wear and
detenoraton will be made without charge. However, ~ the need for replacement
arises due 10 meetng an increase in lead, the new service will be cnarged as a
J'lCw service under Seeton B.
(e) In commercial or InOOstrial areas where a surface meter inslanation is impractcal,
meters may be placed in underground vaults. Vaults must be provided by the
owner in accordance with the gas l.-uI~'S specmcations. The vau~ ~d sections shall
not exceed 70 pounds. All fids shall be centered above the gas meler to allow
visibility of the meter face for meter reading purposes.
2. INSTAlLATION UNDER UNUSUAL CONDITIONS:
(Al A condition which, in the opinion of the Er>gineering Manage" Water-Gas·
Wastewater wm resuh in a cost higher !I'IaJ1 the tees in 8 above will be cassified as
unusual. The charge fOf an unusual ir,staflatjon will be based en the Engineering
Manager, Water-Gas-Wastewater estimate of the IOta! costs of an materials, labor,
and other costs incidental to the k~staJlation.
(8) In \Me event gas service to a premises is requested and insufficient capac~ exists
to provide such service, tne applIcant shall bear the total cost lor designing and
enlarging the distributon system to accommodate serving the applicant The
Er>gineering Manager, Water-Gas-Wastewater may require the applicant to make
arrangemer;ts fo.-the design and construction of said expansion (Confd)
CITY OF PALO ALTO UTILITIES
Issued by the City CounCIl
Supersedes Sheet No. G·5-2 elated 7-11-88
EffeClive 7-1-92
Sheet No G ·5-2
,
. ~
\
-j
-
2. (Continued)
GAS SERVICE CONNECTION FEES
UTILITY ~IUCH"DULE G-5
(Continued)
(8) in accordance with Cit). standards and specifications. Alternatively the Engineering
Manager may ela'! for City forces or contractors to design and install re3pective~t
SUCh faciiities at the appli(Oafll's axpense. Full cred~ to the applicant will be
provided lor any oversizing or e><lra facil~Jes ;"staned to meet service demands
above the specifIC capa~ needs of the applicant as defined irl Rula arJd
Regulation 17.
3. EXC(:PT1ON
Gas Service lVea 2, COMections served directly from supply main: The distribution
system d'.arges (Section B) will be based 00 a maximum frontage of 660 feet This
exoeption apprres 10 single appflcatioos of senvco Md does rJof epply to subdivisioos or
tracts.
4. MASTER METERED GAS SERVICE
For master meter senvcas using high volumes o! gas. the epplicant must provide an
required meters, sendirlQ un~s, regulators, ",1<1 other necessary flow control equipment
as specified by the City end approved by the I:ngineering Ma~ager, Wster-GasWast_r.
CITY OF PALO ALTO IITIUTIES
Issued by the C~ Coul'lCl1
Supers«ies Sheet No. G-5-3 dated 7-11-88 Effective 7-1-92
Sheet NaG -5-3
.':.
.-
WASTEWATER SERVICE CONNECTION FEES
J.JTll!TY RATE SCHEDULE 5-5
A. TERRITORY:
Inside the incorporale6 f1mitS of the City of Palo Alto aoo on laoo owned 0< leased by the ,
City of Palo Alto.
B. FEES:
All fees must be paid priOr to t'le schOOu ling 01 any construction. Oependi ng on material
availability and SCheduUng constraints. utility seNice will be InsIaned between 30 a'1d 45 days
lo!lowing receipt o! M payment
1. COlLECTION SYS1EM EXTENSION CHARGE:
.street Frontage Cha~
Per Foot
Wastewater ServiCe Areas 1 .. 2 ........................ ' $ 00.00
Wastewater ServiCe Areas 3 & 4 ........................ ' 100.00
2. SERVICE CONNECTION CHARGES:
4-inch connection ....................................... $2,300.00
6-inCh oonnection ....................•..........•....... 2,800.00
Sewer laterals over 25 feet in length will be charged for the adi:frtional footage al a rate
of $100/ln. Ft for 4 inch connections and $104/Ln. Ft for 6 inch ccnnec:tiOOs.
Spe<;ia! arrangement; must be made 10 provide lor the cost of a connection larger tMn
sil<-inch. The City wi:! estimate the cost whidl will serve as the basis for a customer
deposft. Upo.1 receipt of this depos~ the City ..... ilI install the COOneclion and the customer
shan pey 1he actual cost net of the depos~.
3. RELOCATION OF FACIUTIES:
Approved relocation of services or other facii~ies will be done at the cost o! the person
requesling th<l relocation of 1ac"ities on services. Deposit of the esUmated cost is
requ'"ed before work begins.
CITYOF PALO AiXO UTIUT1ES
Issued by the City Counc~
Supersedes Sheet No. 5·5-1 dated 7·11·88
L
Effective 7·1·92
Sheet No S-5-1
-
C. OTHER CONOmeNS
1. SERVICE CHARGES:
WASTEWATER SERVICE CONNECTION fEES
UTILlTf RATE SCH~..wl.EJ>:~
(Continued)
(A} Additional service connections aroa a .... ailable wtth payment of additiooal ser.rice
connection charge as shown in Section 82.
(8) Aeplacement of service connections made necessary because of Ofdinary wear
and deterioration will be made without charge. Replacement due to inadequacy
because of ir,C1'ea.'~·ed demanc or load will be charged as a new connection.
2. INSTALLATION UNDER UNUSUAL CONDITIONS:
tA) Any conditiOn which, in the opinion of the Engineering Manager, Water-Gas
Wastewater will resu~ On a cost higher than t~e charges set tOfth in B above wm be
classmed as unusual. The charge lor an unusual insta!lation will be based 00 the
Erogineering Managers estimate of the total costs of all m"terials, IabO<, and other
costs ind<iental to the instanation. See Rule 17, Section C
(8) In the e_enl wasiewater service to a premises is recuested and insufficient capacity
exists to provide such service, the applicant shall bear the total cost lor flow
monitoring the existing main to determine remaining capacity, design of new sewer
main and constructiOf1 cost for enlarging the coliectiO<1 system to accommodate
ser'.ling the appficant The Engineering Manage" Water-Gas-Wastewater may
require the appfican! to make arrangements fOf the des ign and oonstructiO<1 of s~id
expansion in accordance with Grty standards and specifications. Mernatively, the
Engineering Manager, Water-Gas-Wastewater may elect lor Gity forces '"
contractors to design and install respectively such facilities at the appricants
expense. Full credit to the appficant will be provided for any oversizing or extra
facilities installed to meet service demands abo __ the specific capaciity needs of
the appfiC@1t as defined in Rule and Regu18ti0l117.
3. PUMPING PLANTS:
\Nhere pumping facirities are needed to drain wastewe.ter into the wastewater collection
system, the capital cost of construction of the pumping plant and the on·going plant
operation and maintenance costs will be "-t the expense of the developer.
CITY OF PALO ALTO UTILITIES
Issued by the City Coord
Supersedes Sheet No. 8-5-2 dated 7·11·88
Effective 7·1·92
Sheet No S-5-2
-
4_ EXCEPTIONS:
WASTEWATER SERVICE CONNECTION FEES
UTILITLflATE SCHED\JLE $-5
(Cootirued)
(Al Wastewater Service Areas 3 & 4_ c<lMections served directly from trunk mair1S: The
collection system charges (Section 8) will be based on a maximum frontage of 660
feet This exceplioo appfles to single appfications for ser;ice and does not apply to
sUOSlVisions or tracts_
(8) The deveioper will furnish and instaB the on-s~e wastewater system at his or her
expense and in accordance with City's specifications_
em OF PALO ALTO UTILITIES
Issued by the City Counci!
Supers&eJ& Sheet No. 5-5-3 dated 7-11-88
Effective 7-1-92
Sheet No 5-5-3
-
ELECTRIC SERVICE CONNECTION FEES
!.!I!UD' RATE SC>iEDULE E-5
A. API'UCAB!UtY:
This schedule applies to all connections. expansions, and upgrades to the City's electric t
distribution system except those whicl1 serve street lighting or traffic signals.
B. TEARITORY:
Ai! territory within !he incorporated flmit5 of !he City and land owned or leased by the c,'iy.
C. PREFAYMENTOF FEES:
All fees must be paid ~ to the scl1edunng of any oonstruction or conne.:tions to the C itys
electrical dlstr>bution system. Customer is responsible for the actual costs where an estimate
is she"" herein. Adjustments will be made ~ actual costs vary signmcantJy from es~mated
costs.
D. SUMMARY OF FEES:
The fonowing scI1eduie is for summary purposes. Section E herein describes me specific fee
and oonditions in detal'.
1. UNDERGROUND SYSTEMS:
(Al Service Connection Fee
Residential -Single Family
200 ampere maximum ......................... $800.00
0Iher ................................. By Estmate
Commercial/Industrial
200 ampere maximum ......................... $800.00
Other .................................. By Est mate
(8) On-s.'te Oist'ibution System F e6 -Underground
Residential -Single Family .................... .
COmmercial/Industrial ....................... .
By Estmate
By Estmale
(Cl Off-site Distribution System Fee· Underground
Residential· Single Family
Fou< lots or less ...................... By Estmate
Other ........................ Per Rule & Regulation 17
COmmercial/lndustial
Transformer on lot .............. Per Rule & Regulalion j 7
Other .................................. By Estimate
CITYOF PAl..O ALTO UTILITIES
Issued ~ 1M City CcunCll
L
Effective 7-1-92
Sineel No. E·S-1
•
... -.-1. ~
.~. :',
."<
-: -;;-:~, ~. ,,'! .
:~~~'8~;t •....
L
I
. ----_._'-..--._ .. ----
ELECTrlIC SERVICE CONNECTION FEES
2. OVERHEAD SYSTEMS:
Overhead Replacement Fee
Basic fee ............... , ..... , ....... ' .. No Charge
Mid-span .... , ........... , .... , ....... , .... $300.00
DJfferent Pole , _ ......... _ .. _ ..... _ ..... _ .. $..'<00.00
O".her .... , .... , ..... ,' ........... ',.... By Estimate
3, TEMPOR4.RY SERVICES,
Overhead Temporary Service Fee
200 ampere, 100 foot maximum .. , ..... ,' ........ $440.00
Other ................................. By Estimate
Underground Temporary Service Fee
200 ampere .'...."......,...., ... ,..."... $300,00
()!.her .................................. By Estimate
E. FEES:
1. UNDERGROUND SYSTEMS
Connection fees for new or replacement services to the undergroor'ld electrical system
consist of ooa or more of the following: Service Connection Fee, OIHrte Distribtftjon
System Fee and/or Off-site Distritxltion System fee, where app~cable.
(A) Service Connection Fee -Underground:
Where the Crty connects any Customer to the underground electrical distribution
system, a service connection fee shall be charged. A waiver of this fee is granted
for servlces connected dur'lng an underground cooverslon district.
(1) Residential -Single Family
These fees apply to development in which electric metering will be on a single
family basis.
(a) For a 250 va It maximum, 200 ampere maximum service the fee s<~alJ be
$80000
(b) For any connection requiring greater capacity the lee shall be the estmate
of the installation cost or $800.00, whichever is greater.
CIlYOF PALO ALTO UTIUTIES
Issued by the City caunc~
Supersedes S.~eet No. E-5-2 dated 7-11-8a
Effective 7-1-92
Sheet No, E-5-2
--
L
__ ~r _______________ -
ELECTRIC SERVICE CONNECTION FEES
!.IT!.LIiY RATE SCHEDULE E-S
(2) Commercial/Industrial
These charges apply to comme,cial, industrial, non-metered and mu~j.family t
residential S<lNices.
(a) For a 250 vo~ m",,;mum, 200 ampere maximum service me fee Shsn be
$800.00.
(b) For any COIll1ection requiring greater capacjty the lee shan be 1T!6 estimate
of the installation costs or $800.00, whichever is grealer.
(8) On-5~e Distribution System Fee
Where the C~ installs or win instan the underground conductors (primary or secondary).
switt:!les or transformer in and on facilities provided by the developer within the
boundaries of a subOlVisron or ot!1er development, an on-srte oislribution system ree shall
be charged.
(1) Residential -Single Family
These charges appiy to development in which electric metering will be on a
single-family basis.
(a) ".,. on-s~e distribution system fee for developments in which electric
metering will be on a single-ramily basis shan be as oompuled by Rule and
Regulation 1/ -Extensions of Main Unes or Other Facil,ties.
(2) Commercial/lndustr~
These charges app~f to oommercial. industrial, non-melered and multi-fcmily
residential services.
(bl The on-site distribution system fee for mulli-family residential. oommercial
and industrial development shall be the estimate of the installation costs.
(el Ofl-5ite Distnbu'Jon Syslem Fee
Where the C~ installs or will install an electric dlstributiOfl system, system extenSion,
CITYOF PALO ALTO UTIUTIES
Issued by the ~ Council
SupersedeS Shea! No. 1'-5-3 dared 7-11-88
EffeCtive 7-1 -92
Sheel Nc. E-5-3
,
,!-.
~~:"~~~~}~
·:\ji~:/~r .
L
ELECTRIC SERVICE CONNECTION FEES
lITILITY RATE SCHEDULE c·5
or system reinforcement ~ the boundaries of a subdivision Oi other development
to be served, an off·sHe distribution system fee shall apply.
(1) Residential· Si'lgle Family
(a) The d.f·site dis!nbutioo system fee for developments of four 5ingle·la'11ily units
or Jess in which electric mete;ing will be on a single·family basis shall be the
estimate of the installation costs less $1,200 per lot and not to exceed $1,000
per lot.
(b) The off·site distribution system fee for developments 01 five single·family units
or more in wIlich electric metering wil! be 00 a single·family basis shan be as
computed by Rule and ReguletiOf' 17 • Extensions of Main Unes or Other
Facilities.
(2} Commerdal/ll'ldustrial
These Charges apply to commercial, h")(justrial, non·metered and multi·family
residential 5eI'IIices.
(a) Where the transformer used to serve the development is located within the
boundaries of the development the off·site distn'bution system fee shail be as
computed by Rule and Regulation 17 • Extensions of Main Unes or Otner
Facilities.
(b) Wllers the transformer used to serve the development is located outside of the
boundaries of the development, the off·site distribution system fee ~'"lall be the
estimate of the instaIlation costs.
2. OVERHEAD SYSTEMS
No overhead service for new constrlJC!ion s.'"lall be permitted except with the approval of
the Elect<ical Engineering Manager and only alter a finding that 80 underground service is
not feasible Replacement of existing overhead services with new overhead services wi II
be allowed so long as the new service does not exceed the size of the existing service or
200 Amperes for single·family residential or 400 amperes for all other, whichever is greater.
(A) Overhead Replacement Fee:
CfTYOF PALO ALTO UTIUTIES
Issued by the City CouncH
SUpersedes Sheet No. E·5-4 dated 7·11·88
L
EHective 7·1·92
Sheet No. E-5-4
-
ELECTRIC SERVICE CONNECTION FEES
UTiLITY RATE SCHEDULE E-5
(1) Replacement of existi"il 250 Vo~ maximum. 200 Aillp&re maximum. 3 wire services
will be done at no cost to the Cuslomer ~ such a replacement does not rsquire
re!oc8tion of the se"li"" connection point at the pole.
(2) Replacement of any service by the City !Of maintenance will be done at no charge
to the Cuslom",.
(3) Replacement of existing 250 Voit maximum. 200 Ampere maximum, 3-wire services,
...mere replacement requires relocation of the service connection point at a pole or
instaIlalioo of a mid-span connection, the fee shall be $300.00.
(4) Replacement of any other service of greater vonaga or capacity when done tor
Customer benelii. or when required due to damage by Customer. s.'1»11 be the
estimate of the installation cosls.
is) Overhead SeNice Fee:
Where a new overhead seNice is allowed. an overhead seNice fee shall be charged.
{1l For 200 ampere maximum. 250 Vo~ maximum. 100 foot maximum the fee shan be
$300.00.
(2) Any connection requiring greater capacity. vo~ge or length th& fee shall be the
estimate of tha instaliation COs1s or $300.00. whicr.ever is graater.
3. TEMPORARY SERVICE
A fee sI'.a1l be charged to connect temj)O'ary service. The C\Jstomer shall furnish all
equipment up to the designated point-of·servlce. This point-of·service will usually be the
weatherhead for o"emead tempora.., seNicBS in overhead distribution areas or the
secondary conoec!ion box !or unce,grounc temporary services In undergroanc distrlblltion
system ar&as. Tna City will no! supply overhead temporary servi CBS in underground
service areas or uncergrounc temporary services in overhead distnb\Jtjon system areas.
The City will supply: overhead conductors and mater for overhead temporary seNices; and
meter only f(J( undargrcl\md temporary services. The City will connect both o'er head ar.d
underground services 10 the City's electrical distTlb\Jtjon system. Any addhional offs~e
facilities or work required shall be provided anc rannoved by the util;ty at the Cuslome~s
expense.
CITY OF PALO ALTO UTIUTIES
Issued by the City Counal
Supersedes Shoot No. E·5·5 dated 7·11-88
L
Effective 7-1-92
Sheet No. E·5-5
-,--~: ,,:,---i;(:-: -.-~'
'-fi~~11" .'
ELECTRIC SERVICE CONNECTION FEES
J.lILliTY RATE SCHEDJ..i)J;li
(Al Overhead T6mporslY Service Fee:
{Il For a 250 'O~ maximum, XlO ampere maximwT;, 3 wire, 100 toot ma><imum
service the fee shall be $440.00.
(2i The fee for a lelT1porary se(vi~'e at greater lengtl1, capacity or vo,~ag6 shall be
the estimate of ths installation and removal CO.3ts or $440.00. whiche ... ·er IS
greater.
(S) Underground Temporary Service Fee:
F. NOTES:
(1) For a 250 "o'rt maximum, 200 ampere maximum, 3 wire service the fee shan be
$300.00,
(2l The fe~ for a temporary selVice of greate, capacit! or .ottage sha.~ be the
estimate of the instei1ation and removal costs or $300.00, whichever is gtegter.
•
t
!
1. These fees apply to an vacant land except where the fees are recorded as previously paid. '.'
-
2. v,'here a junction box, switch pact, vau~" or switch must be added to an existing s,stem
in order to serve a development, this addrton shall be consi<Jered as a distributon system
extension.
3. The Customer is responsible for the installanon of ali equipment from the facility to the
designated point·of-ser ..... ice. For underground systems, thiS incliJdes conduit and
conductors. For overhead systems, because the pcint-of-sef\llce is the weathemead or
point of attach~ent to-ti",e iaciEt)/, this includes tr,e mast or riser and an conductors
therein.
4. INhen the City replaces a service, the Customer is obligated to accept a shutdown of
service during regular wor'<ing hours. The time of the shutdown shall be agreed upon as
mutually acceptable .
.... 'hen, lor the convenience of the Cuslomel, the shutdown is dUling other than reguiar
working hours, it shail be done entirely at the Customers expense. The Customer shall
pay the entire cost at the overtime iabor, r10t !he incremental cost
em OF PALO ALTO UTILITIES
Issued by the City COuncil
Supersedes Sheet E-S-6 dated 7-11-88
L
Effective 7-1-92
Sheet Number E-5-5
ELECTRIC SERVICE CONNECnoN FEES
.l.1ruJIY R6TE SCHEDULE E·5
5. The City can generally provide service availability from 30 to 45 days 2fter an fees are paid
except wnen long !eao·time equipment or mate'ial. are required. Consu~ the City for
estirNl!8d lead·times.
S. The City cannot ~ held flable for delays in seMce connection caused by con<f~ions
beyond it's cc;r.trol, including, but not "m~OO to, delays in the arrival of equipment such
as transtormers, 5W~ches and cabl •.
CITY OF PALO ALTO UTlLlTIES
1=00 by lI1e City C.ounciI
Supersedes Sheet No. E·5·7 da/ad 7·11·88
. , .. ,-.,'."
Effective 7·1·92
Shee1 No. E·5-7