Loading...
HomeMy WebLinkAbout0256.092L ----------- Kay 14, 1992 THE HONORABLE CITY COUNCIL Palo Alto, California Attention: Finance Committee Proposed Revisions to rrtility connection Fees Members of the Council: Report in sr'ief This report provides information on the increased cost of makinq utility service connections for new customers in recent year~ and recommends council approval of the attached Resolutior. revising Otility connection fees~ Ba c1sground The City provides service connections of ~uitable capacity to its distribution network in order to meet a customer's needs for water, qas, wastewater. and/or el~ctric service. These connections are -made, provided tha.t t"Jte city has inspected and approved all equipment installed by the customer, (i.e. contractor) and that the applicant has paid all required connection fees as set forth in the schedule of connection fees. The connection fees de not affect ~urrent custoltl.ers adversely but., in fact, help them by charging full costs at the outset to new customers. The fee schedules are intended to recover the costs that the Utilities Department incurs in providing facilities to serve nev customers 4 The present connection fee schedules W-S, G-5, 5-5, and E-S were revised in 1988 and are based on a cost-o!-service analysis performed at ~;at time. Considering the City's policy of recovering costs of facilities to serve new developments, a study was undertak~n to compare the present connection fees with actual costs incurred by the City. This cost analysis indicates a need to revise these fee schedules for all utilities. Attached as Table one is a summary ot the existing fees, together with the recommer.ded charges. The recommendations are based on the present cost analysis using recent work orders for w-ater-~ gas, ~a$tewater, and electric connections. For utilities connections. a primary increase in cost since 19$8 relates to baCKfill and ClUl:256,U L - poI!lvel':lent repair as ;Jell as eC;ll:ipJl1.-ant costs. Approxilllat.ely 15 percent of the proposed fee lncreases relate to these two components. Increased pavement repair costs no~ include the cost of saw-cutting ~hich previously was excluded. In addition the higher paveme.nt repair costs reflect "c.he trend il"'. re.cE;ont years to rely less on City field crews ".nd more on contractors to do this work. with regard to the :rise in equipment costs. the met.hodology to estimate this cost has been revised. HlstoricallYI the fees based equipment charges on a flat 35 percentage of direct labor c"Osts. The neW" method i temi.zes the equipment employed tot" ea.ch type of ccnnection and assigns a value to that piQce of equiment based on the 1992 "CU~rent ~onstruction costs" publication by Saylor Puhlications. Inc. Finally. risinq labor f material, and landfill dumping costs account for approximately a quartec of the overall increase. The sp"'cific :fee increases range from 3 percent to 93 percent~ Despite these fee increases I Palo Alto's connection fees compare favorably witt. these charged in surrounding areas. with these proposed fees, connection fee revenue accounts for approximately 0.005 perc~nt of the Utilities budget fer FY 92-93. Staff recommends couMcil approval of the attached Resolution ravisin9 Utility connection fees effective 7-1-92~ ~eapeetfully submitt~d, '-tv ~ ~/A<--~ w. RANDY BALDSCHUN Ma~ager, Rates and CUstomer Services ~1 '~£/);J«7 CHARD L. ·iDUNO- ~7~es ~s~~:~~ \ / \~~tachlnents: Table one Resolution ~ate Schedules W-5~ G-5, S-5, E-5 CIQ.,ZH:92 L \ - • ~. I , L SOHMARY 07 UTILITY CONh~CTION ,eES , E:< isting~_es .l:IQQQsed fees I..n:9~ l1~riJ! UttS; Domestic water sen"ice- l' service connection 1 1/2' service connection 2' service connection c" ser~ice connection 6' service connection S "service connection Fire ser~ice connection- 4" fire ser.rice connect:'on 6' fire service connection s' fire service connection Combination Fire & Water service- 4' .tire , I" water service ." fire , 1 1-/:2" -water service ," fire , 2" water service 6" fire , 2" 'Water service 6" fire , 4" water service 6" tire , •• water service s" fire , 2" water service S" fire , 4' water service s' fire , ." water service s' fire , S" 'Water service Master Water Service-." water serv/fire protection S" water sel~/fire protection !:ZM C:E;§; 1/2-Service connection 1" Service Connection 2" S~rvice Conne~tion WASTEWAl1,;B l~ES: •• Service Connection 6" Service Connection EL.E:~;[~ If/f;S: Residential- underground service connection OVerhead service connection commercial/lndustrial- Underground service connection OVerhead service co~~ection Temporary service- Underground service connectio~ OVerhead service connection exa.256.9Z L $ 750 $ 1,170 1,300 ne .. 4,100 4,600 new 2,370 2,800 ne" new new 3,320 new 5,31Q 3,790 new 5,860 6,340 3,380 4,030 900 940 1,060 1 1 360 1,450 450 2iO E75 270 ,15 230 1,300 1,810 2,350 4,640 5,250 6,250 3,500 3,870 3,980 3,640 3,770 3,930 4,260 5,830 6,100 4,550 5,950 6,330 6,500 6,080 7,250 1,700 1,720 2,010 2,30e 2,800 aoo 300 aoo 300 300 440 74 55 81 2S 36 63 42 2S 15 20 a 3 80 so a9 83 90 69 93 7S 11 18 11 40 91 .".~ ! ! • I • I I i ;-~--,., - RESOLUTION NO. __ _ RESOLU?lOH O~ 'I'HE COUNCIL OF THl:: CIT"i OF PALO "'LTO AMENDIN~ SCHEDUI£S _-5, G-5, 5-5, AND £-5 OF THE C!T"i OF PALO kL'I'C lITILI'I'IES RATES AND CHARCES PERTAHUNG TO WATER, GAS, WASTEWATER AND EI.ECTRIC CONNECTION FEES WKERi:AS, pursuant. to Chapter 12.20 of t.he. Palo ~l to Municipal Code, the City Council may, by resolution, adopt rules and req-.;.lations governing utility services other than communication services in t-he city and fees and charges therefore; and WHEREAS, City Council has d~termined to revise its present rules and requlations and tc adopt new rUles and regc11ations: NOW, THEREFORE .. the Council of the City of Palo Alto does RESOLVE as follows: SECTION 1. Pursuant to S';'::~~VJ! ..i..4:;.~u.Ol0 of the Palo Alto Municipal Code, Schedules w-s (Water Service) f G-5 (Gas Service), E-5 {Electric SeL~ice), and 5-5 (Wa6te~ater Service) of the Palo Alto Utilities Rates and Charges are hereby amended to read as shown on Sheets W-S-l through W-5-4, G-5-1 through G-5-3, E-5-1 through E-S-7, and 8-5-1 thrQugh S-5-3 attached hereto and incorpo­ rclted he.rein. ~ECTION..1.. The council finds that none of th.e provisions of this resl)lution yill have a si'3'r:i:ffcant environJllental impact. SECTION 3~ The foregoing changes to said connection fees shall become effective July 1, 1992. INTRODUCED AND PASSED: AYES: NOES: ABSENT: ABS'IEN'l'lONS: III 1 - WATER SERVICE CONNECTION FEES .l..!IU.lJY.BATE SCHEDULE W·5 A. TERRITORY: Insi<:le the incorporated flm~s of the City of Palo Alto ana on la~d owned ()( leased by t"e City of Palo Alto. B. FEES: All fees must be paid pri()( to the scheduflng of any construction. Depending on material avaJlab~ity ana scheduflng constraints. utility serviC<! will be instaned between 30 and 45 days ronowing receipt of run payment. 1. DISTRIBUTION SYSTEM EXTENSION CHARGE Street frontage charge per fool ........ . ................. $70.00 2. SERVICE CONNECTION CHARGES: category 1 . Domestic Water Service Hnch connection ........................................ $1,300 H/2 inch connection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,810 2-inch connection .... _ . . • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 2,350 4-inch connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4,6.-00 6-inch comecl1on _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...... ' 5,250 8-inch connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 6,250 ~ 2 -Fire SorviC<! 4-inch connection . . . ..... _ . . . . . . . . . . . . . . . . . . . . . . . .. .... $3,500 8-inch car.-.ection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3,870 8-inch connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3,980 CITY OF PALO ALTO UTIl.IT!ES Issued by the City Council Supersedes Sheet No. W-5-1 elated 7-11·88 ------.---,.--- ·L.· '. Effective 7·1·92 Sheet No W -5-1 ,-..., WATER SERVICE CONNECTIONFEES UTILITY RATE SCHEOULE W·5 (ConU[)ued) categiXy :3 ~ Combinatioo Domestic Wat~rvice aod Fire Ser ... ~ce These cI1arges appiy to the following oombination at Water Sarvi~ (W,S.) and Fire Service (F,S,): 4' F.S, 6' F.S. S" F.S, $3,640 11/2'\U ~ $3,770 $3,930 $4,260 $4,550 Category 4 • Master Water Servic~ $5,830 $5,950 56,100 56,330 56,500 Tnese charges apply to a COfi{\ection t..'I.5t serves domestic water seMce and fke protectiOn through a detector meter, Approval by the Director of Utilijies is required for this connection. 6' .....•..................... , ....... ' ............... $8,080 S" .......... ' .... , ............ , , .............. ' .... , . $7,250 For service connections of 4·incl1 through 6-inch sizes, the new owner must provide and install a concrete vau~ with meter reading ~d covers to house meters and other required centro! equipment in accordanoe with thG Water Utility's specifications. An approved backflow prevention device with bypass assemblies must be provided by ownef 00 all fire services. An exception may be made where only an automatic fire sprinkler system is served, provided the sprinkler control equ ipment is within ten feet of the end 01 the street portion of the fire servioa. In this instance, a detector meter may be installed around \he sprinKler system cI1eck vaNe, 3, ADOITlONAL METERS ON CONNECTION: With new connection """."""""." On existing connection . , , . . . . . , . . . . . . , . . . . . Per Meter $200 3CO CfTYOF PALO ALTO UTILITIES Issued by the Cijy Council Supersedes She<Jt No. W·5·2 dated 7·11·88 L " :~ Effective 7·' ·92 Sheet No W·5-2 L , , r 4. RELOCATION OF FACILITIES: ------------------------- WATER SERVICE CO~mECTiONFEES 1lII UTY RATE SCI:!WJ.!!.E..m (Continued) Approved relocation of ser,-,ce, hydrants, or other laCllties ",iii be done at !he cost of ~h.e pe<SOn requesting the location. Depos~ of estimated cost is reQ'Jired OO1or~ relocation wcr'~ 0091115. C. OTHER CONDITIONS 1. SERVICE CHARGES: (A) AdditiOnal Service oornections are available w~h payme~t of add~;onal service comection charge as shown in Section B. (8) Replacement of service connection made necessary because of ordi nary wear and deterioration wiU be made without charge. Replacement due to inadequacy because of additional detr.and or load will be charged as a new service connectiO<'. 2. INSTAllATlCN UNDER UNUSUAl CONDITIONS: {Al Any 00nd'1tioo which, in the opinion of the Enginee,",'9 Manager. Water-Gas· WastewatSf Wlll resu~ in a cost higher than the cr.arges set forth in Section B will be ciassified as unusual. The cl\arge for an unusual .~stanation will be based on Engine9Mg Manager, Wate,-Gas·Wastewater's estimate of the total costs of ell materials, labor and oiller costS incidental to the instanation. (6) In !he event water service to a premises is requested and insufficient capacity exists to provide such service, the applicanl shall bear \he lotal cost lelf enlarging the d1str~ system to accommodate serving the applicafll The Engil16ering Manager, Water-Gas·Wastewater may require \he applicant 10 make anangemenls for the design and oorstruction Dr said expansion in =rdat1Ce with City standards and specifications. Alternatively, the Engineering Manager, Water-Gas-Wastewater may elect for City forces or contractors to design and instell respectively such facilities at the applicanls expense. Fun credi: to the applicant will be provided lor any OVefSizing of extra facil~ies instaU ed to meet service demands above the spe.-"ffic capacity needs of the applicant as defned in Rule & Regula:Ton 17. CIlY OF PALO ALTO UTIUTIES Issued by the City Council Supersedes Sheet No. W-5-3 dated 7·11-88 L Effective 7-1-92 Sheet No W-5-3 .- ,.-' , .. ' ~: - 3. EXCEPTIONS WATER SERVICE CONNECTION fEES Wl!.JTY RATE SCHEQUlE W-5 (COfltnu&d) (A) Walel Service Areas 3 & 4. connections served directiy from supply main; The d'oslribution system charges (Sectioo B) wili be based on a maximum frO'1tage of 660 feet. This exception app(!6S to single appl;~tions for service end does not appl)' to subd'lVisions ortr~L"ts. (8) The suOd'lVision developer wil! fumish and install the ",,-site wa'er system at his or her expense end in ecco"jance with City's specilicatoos. CITY OF PALO ALTO UTIUTlES Issued by !he City Council SupersecJe$ Sheet No. W·S-4 dated 7-11-$8 }?L···· ... · . . {End} Effective 7-1-92 Sheet No W-5-4 - ---,~""-~ GAS SERVICE CONNECTION FEES J,JTILITY RATE SCHEQULE G-5 A. TERRITORY; Inside the incorporated "mils of t~e City 01 Palo Mo and on land owned or lease<:! by the City of Palo Mo. B. FEES; All fees mus! be paid prior to the schedunr>g of sny constrUC1ion. Depending on material avaHabilily and schedunng coostrainls, 1lIi1i:y service will be instaiied between 30 and 45 days foI!owing receipt of run payment 1. DISTRIBUTION SYSTEM EX'TENSION CHARGE: Street frontage charge per foot ........ . . . . . . . .. $SO. DO/ft. 2. CONNECTION CHARGE FOR SERVICE INSTALLED ON EXISTING MAIN: 1/2-ir'och <Xl<1MCtioo . . . . . . . . . . . . . . . . . . . . . . . . . . . '" . $1,700.00 l-inch connection ..................... _ ............. 1,720.00 2-inch connection .. _ .............................. ' 2,010.00 Excess Length Fee: An additional charge 01 $13.00/1001 will apply to an eldension greater than forti (4D) feet from the street properily line to the gas meier location, measured along a rone perpendicular to the street p!OpMy line. Service location: The service line will be installed along the shortes~ most practical raUle, as determined by The Utilities Department, from the gas main in the adjoining str~ aney, lane road, or easement to the nearest suttaDle meter location at the buu"'ng or structure. Services requirlr>g a connection greater than 2 inch shal! be based on the Ulil ity estimate. 3. ADomONAL METERS ON CONNECTION: With new connection . . . . . . . . . . . . . . . . . . . . . . . . . ..... . On existing metered connection ........ . . .... . CITY OF PALO ALTO UTIUTIES Issued by the City Counc" Supersedes Shede No. G-5-1 dated 7-11-88 Per Meter $ 50.00 125.00 Effective 7-1-92 Sheet No G·$-1 , "1 . i I 1 I 1 1 I , l , I - 4. SERVICE RELOCATION: Sarvice riser feloc8tior'l-.' GAS SERVICE CONNECTION FEES J,.ITllI1Y BATE SCHEDULE G-5 (ConMued) $300.00 Service riser relocations will only b<o performed on polyet~yrane pipe services, an 'other material pipe" selVlces mu~"t be replaced from t.o"e main to the meter at the fees listed in S. C. OTHER CONDmONS: 1. SERVICE CHARGES: (A) Add~.ior1al service connections are avaUabla with payment of additional service connection charges shown in Section e. (8) Replacement of seNica oomections made necessary because of ordinary wear and detenoraton will be made without charge. However, ~ the need for replacement arises due 10 meetng an increase in lead, the new service will be cnarged as a J'lCw service under Seeton B. (e) In commercial or InOOstrial areas where a surface meter inslanation is impractcal, meters may be placed in underground vaults. Vaults must be provided by the owner in accordance with the gas l.-uI~'S specmcations. The vau~ ~d sections shall not exceed 70 pounds. All fids shall be centered above the gas meler to allow visibility of the meter face for meter reading purposes. 2. INSTAlLATION UNDER UNUSUAL CONDITIONS: (Al A condition which, in the opinion of the Er>gineering Manage" Water-Gas· Wastewater wm resuh in a cost higher !I'IaJ1 the tees in 8 above will be cassified as unusual. The charge fOf an unusual ir,staflatjon will be based en the Engineering Manager, Water-Gas-Wastewater estimate of the IOta! costs of an materials, labor, and other costs incidental to the k~staJlation. (8) In \Me event gas service to a premises is requested and insufficient capac~ exists to provide such service, tne applIcant shall bear the total cost lor designing and enlarging the distributon system to accommodate serving the applicant The Er>gineering Manager, Water-Gas-Wastewater may require the applicant to make arrangemer;ts fo.-the design and construction of said expansion (Confd) CITY OF PALO ALTO UTILITIES Issued by the City CounCIl Supersedes Sheet No. G·5-2 elated 7-11-88 EffeClive 7-1-92 Sheet No G ·5-2 , . ~ \ -j - 2. (Continued) GAS SERVICE CONNECTION FEES UTILITY ~IUCH"DULE G-5 (Continued) (8) in accordance with Cit). standards and specifications. Alternatively the Engineering Manager may ela'! for City forces or contractors to design and install re3pective~t SUCh faciiities at the appli(Oafll's axpense. Full cred~ to the applicant will be provided lor any oversizing or e><lra facil~Jes ;"staned to meet service demands above the specifIC capa~ needs of the applicant as defined irl Rula arJd Regulation 17. 3. EXC(:PT1ON Gas Service lVea 2, COMections served directly from supply main: The distribution system d'.arges (Section B) will be based 00 a maximum frontage of 660 feet This exoeption apprres 10 single appflcatioos of senvco Md does rJof epply to subdivisioos or tracts. 4. MASTER METERED GAS SERVICE For master meter senvcas using high volumes o! gas. the epplicant must provide an required meters, sendirlQ un~s, regulators, ",1<1 other necessary flow control equipment as specified by the City end approved by the I:ngineering Ma~ager, Wster-Gas­Wast_r. CITY OF PALO ALTO IITIUTIES Issued by the C~ Coul'lCl1 Supers«ies Sheet No. G-5-3 dated 7-11-88 Effective 7-1-92 Sheet NaG -5-3 .':. .- WASTEWATER SERVICE CONNECTION FEES J.JTll!TY RATE SCHEDULE 5-5 A. TERRITORY: Inside the incorporale6 f1mitS of the City of Palo Alto aoo on laoo owned 0< leased by the , City of Palo Alto. B. FEES: All fees must be paid priOr to t'le schOOu ling 01 any construction. Oependi ng on material availability and SCheduUng constraints. utility seNice will be InsIaned between 30 a'1d 45 days lo!lowing receipt o! M payment 1. COlLECTION SYS1EM EXTENSION CHARGE: .street Frontage Cha~ Per Foot Wastewater ServiCe Areas 1 .. 2 ........................ ' $ 00.00 Wastewater ServiCe Areas 3 & 4 ........................ ' 100.00 2. SERVICE CONNECTION CHARGES: 4-inch connection ....................................... $2,300.00 6-inCh oonnection ....................•..........•....... 2,800.00 Sewer laterals over 25 feet in length will be charged for the adi:frtional footage al a rate of $100/ln. Ft for 4 inch connections and $104/Ln. Ft for 6 inch ccnnec:tiOOs. Spe<;ia! arrangement; must be made 10 provide lor the cost of a connection larger tMn sil<-inch. The City wi:! estimate the cost whidl will serve as the basis for a customer deposft. Upo.1 receipt of this depos~ the City ..... ilI install the COOneclion and the customer shan pey 1he actual cost net of the depos~. 3. RELOCATION OF FACIUTIES: Approved relocation of services or other facii~ies will be done at the cost o! the person requesling th<l relocation of 1ac"ities on services. Deposit of the esUmated cost is requ'"ed before work begins. CITYOF PALO AiXO UTIUT1ES Issued by the City Counc~ Supersedes Sheet No. 5·5-1 dated 7·11·88 L Effective 7·1·92 Sheet No S-5-1 - C. OTHER CONOmeNS 1. SERVICE CHARGES: WASTEWATER SERVICE CONNECTION fEES UTILlTf RATE SCH~..wl.EJ>:~ (Continued) (A} Additional service connections aroa a .... ailable wtth payment of additiooal ser.rice connection charge as shown in Section 82. (8) Aeplacement of service connections made necessary because of Ofdinary wear and deterioration will be made without charge. Replacement due to inadequacy because of ir,C1'ea.'~·ed demanc or load will be charged as a new connection. 2. INSTALLATION UNDER UNUSUAL CONDITIONS: tA) Any conditiOn which, in the opinion of the Engineering Manager, Water-Gas­ Wastewater will resu~ On a cost higher than t~e charges set tOfth in B above wm be classmed as unusual. The charge lor an unusual insta!lation will be based 00 the Erogineering Managers estimate of the total costs of all m"terials, IabO<, and other costs ind<iental to the instanation. See Rule 17, Section C (8) In the e_enl wasiewater service to a premises is recuested and insufficient capacity exists to provide such service, the applicant shall bear the total cost lor flow monitoring the existing main to determine remaining capacity, design of new sewer main and constructiOf1 cost for enlarging the coliectiO<1 system to accommodate ser'.ling the appficant The Engineering Manage" Water-Gas-Wastewater may require the appfican! to make arrangements fOf the des ign and oonstructiO<1 of s~id expansion in accordance with Grty standards and specifications. Mernatively, the Engineering Manager, Water-Gas-Wastewater may elect lor Gity forces '" contractors to design and install respectively such facilities at the appricants expense. Full credit to the appficant will be provided for any oversizing or extra facilities installed to meet service demands abo __ the specific capaciity needs of the appfiC@1t as defined in Rule and Regu18ti0l117. 3. PUMPING PLANTS: \Nhere pumping facirities are needed to drain wastewe.ter into the wastewater collection system, the capital cost of construction of the pumping plant and the on·going plant operation and maintenance costs will be "-t the expense of the developer. CITY OF PALO ALTO UTILITIES Issued by the City Coord Supersedes Sheet No. 8-5-2 dated 7·11·88 Effective 7·1·92 Sheet No S-5-2 - 4_ EXCEPTIONS: WASTEWATER SERVICE CONNECTION FEES UTILITLflATE SCHED\JLE $-5 (Cootirued) (Al Wastewater Service Areas 3 & 4_ c<lMections served directly from trunk mair1S: The collection system charges (Section 8) will be based on a maximum frontage of 660 feet This exceplioo appfles to single appfications for ser;ice and does not apply to sUOSlVisions or tracts_ (8) The deveioper will furnish and instaB the on-s~e wastewater system at his or her expense and in accordance with City's specifications_ em OF PALO ALTO UTILITIES Issued by the City Counci! Supers&eJ& Sheet No. 5-5-3 dated 7-11-88 Effective 7-1-92 Sheet No 5-5-3 - ELECTRIC SERVICE CONNECTION FEES !.!I!UD' RATE SC>iEDULE E-5 A. API'UCAB!UtY: This schedule applies to all connections. expansions, and upgrades to the City's electric t distribution system except those whicl1 serve street lighting or traffic signals. B. TEARITORY: Ai! territory within !he incorporated flmit5 of !he City and land owned or leased by the c,'iy. C. PREFAYMENTOF FEES: All fees must be paid ~ to the scl1edunng of any oonstruction or conne.:tions to the C itys electrical dlstr>bution system. Customer is responsible for the actual costs where an estimate is she"" herein. Adjustments will be made ~ actual costs vary signmcantJy from es~mated costs. D. SUMMARY OF FEES: The fonowing scI1eduie is for summary purposes. Section E herein describes me specific fee and oonditions in detal'. 1. UNDERGROUND SYSTEMS: (Al Service Connection Fee Residential -Single Family 200 ampere maximum ......................... $800.00 0Iher ................................. By Estmate Commercial/Industrial 200 ampere maximum ......................... $800.00 Other .................................. By Est mate (8) On-s.'te Oist'ibution System F e6 -Underground Residential -Single Family .................... . COmmercial/Industrial ....................... . By Estmate By Estmale (Cl Off-site Distribution System Fee· Underground Residential· Single Family Fou< lots or less ...................... By Estmate Other ........................ Per Rule & Regulation 17 COmmercial/lndustial Transformer on lot .............. Per Rule & Regulalion j 7 Other .................................. By Estimate CITYOF PAl..O ALTO UTILITIES Issued ~ 1M City CcunCll L Effective 7-1-92 Sineel No. E·S-1 • ... -.-1. ~ .~. :', ."< -: -;;-:~, ~. ,,'! . :~~~'8~;t •.... L­ I . ----_._'-..--._ .. ---- ELECTrlIC SERVICE CONNECTION FEES 2. OVERHEAD SYSTEMS: Overhead Replacement Fee Basic fee ............... , ..... , ....... ' .. No Charge Mid-span .... , ........... , .... , ....... , .... $300.00 DJfferent Pole , _ ......... _ .. _ ..... _ ..... _ .. $..'<00.00 O".her .... , .... , ..... ,' ........... ',.... By Estimate 3, TEMPOR4.RY SERVICES, Overhead Temporary Service Fee 200 ampere, 100 foot maximum .. , ..... ,' ........ $440.00 Other ................................. By Estimate Underground Temporary Service Fee 200 ampere .'...."......,...., ... ,..."... $300,00 ()!.her .................................. By Estimate E. FEES: 1. UNDERGROUND SYSTEMS Connection fees for new or replacement services to the undergroor'ld electrical system consist of ooa or more of the following: Service Connection Fee, OIHrte Distribtftjon System Fee and/or Off-site Distritxltion System fee, where app~cable. (A) Service Connection Fee -Underground: Where the Crty connects any Customer to the underground electrical distribution system, a service connection fee shall be charged. A waiver of this fee is granted for servlces connected dur'lng an underground cooverslon district. (1) Residential -Single Family These fees apply to development in which electric metering will be on a single­ family basis. (a) For a 250 va It maximum, 200 ampere maximum service the fee s<~alJ be $80000 (b) For any connection requiring greater capacity the lee shall be the estmate of the installation cost or $800.00, whichever is greater. CIlYOF PALO ALTO UTIUTIES Issued by the City caunc~ Supersedes S.~eet No. E-5-2 dated 7-11-8a Effective 7-1-92 Sheet No, E-5-2 -- L __ ~r _______________ - ELECTRIC SERVICE CONNECTION FEES !.IT!.LIiY RATE SCHEDULE E-S (2) Commercial/Industrial These charges apply to comme,cial, industrial, non-metered and mu~j.family t residential S<lNices. (a) For a 250 vo~ m",,;mum, 200 ampere maximum service me fee Shsn be $800.00. (b) For any COIll1ection requiring greater capacjty the lee shan be 1T!6 estimate of the installation costs or $800.00, whichever is grealer. (8) On-5~e Distribution System Fee Where the C~ installs or win instan the underground conductors (primary or secondary). switt:!les or transformer in and on facilities provided by the developer within the boundaries of a subOlVisron or ot!1er development, an on-srte oislribution system ree shall be charged. (1) Residential -Single Family These charges appiy to development in which electric metering will be on a single-family basis. (a) ".,. on-s~e distribution system fee for developments in which electric metering will be on a single-ramily basis shan be as oompuled by Rule and Regulation 1/ -Extensions of Main Unes or Other Facil,ties. (2) Commercial/lndustr~ These charges app~f to oommercial. industrial, non-melered and multi-fcmily residential services. (bl The on-site distribution system fee for mulli-family residential. oommercial and industrial development shall be the estimate of the installation costs. (el Ofl-5ite Distnbu'Jon Syslem Fee Where the C~ installs or will install an electric dlstributiOfl system, system extenSion, CITYOF PALO ALTO UTIUTIES Issued by the ~ Council SupersedeS Shea! No. 1'-5-3 dared 7-11-88 EffeCtive 7-1 -92 Sheel Nc. E-5-3 , ,!-. ~~:"~~~~}~ ·:\ji~:/~r . L ELECTRIC SERVICE CONNECTION FEES lITILITY RATE SCHEDULE c·5 or system reinforcement ~ the boundaries of a subdivision Oi other development to be served, an off·sHe distribution system fee shall apply. (1) Residential· Si'lgle Family (a) The d.f·site dis!nbutioo system fee for developments of four 5ingle·la'11ily units or Jess in which electric mete;ing will be on a single·family basis shall be the estimate of the installation costs less $1,200 per lot and not to exceed $1,000 per lot. (b) The off·site distribution system fee for developments 01 five single·family units or more in wIlich electric metering wil! be 00 a single·family basis shan be as computed by Rule and ReguletiOf' 17 • Extensions of Main Unes or Other Facilities. (2} Commerdal/ll'ldustrial These Charges apply to commercial, h")(justrial, non·metered and multi·family residential 5eI'IIices. (a) Where the transformer used to serve the development is located within the boundaries of the development the off·site distn'bution system fee shail be as computed by Rule and Regulation 17 • Extensions of Main Unes or Otner Facilities. (b) Wllers the transformer used to serve the development is located outside of the boundaries of the development, the off·site distribution system fee ~'"lall be the estimate of the instaIlation costs. 2. OVERHEAD SYSTEMS No overhead service for new constrlJC!ion s.'"lall be permitted except with the approval of the Elect<ical Engineering Manager and only alter a finding that 80 underground service is not feasible Replacement of existing overhead services with new overhead services wi II be allowed so long as the new service does not exceed the size of the existing service or 200 Amperes for single·family residential or 400 amperes for all other, whichever is greater. (A) Overhead Replacement Fee: CfTYOF PALO ALTO UTIUTIES Issued by the City CouncH SUpersedes Sheet No. E·5-4 dated 7·11·88 L EHective 7·1·92 Sheet No. E-5-4 - ELECTRIC SERVICE CONNECTION FEES UTiLITY RATE SCHEDULE E-5 (1) Replacement of existi"il 250 Vo~ maximum. 200 Aillp&re maximum. 3 wire services will be done at no cost to the Cuslomer ~ such a replacement does not rsquire re!oc8tion of the se"li"" connection point at the pole. (2) Replacement of any service by the City !Of maintenance will be done at no charge to the Cuslom",. (3) Replacement of existing 250 Voit maximum. 200 Ampere maximum, 3-wire services, ...mere replacement requires relocation of the service connection point at a pole or instaIlalioo of a mid-span connection, the fee shall be $300.00. (4) Replacement of any other service of greater vonaga or capacity when done tor Customer benelii. or when required due to damage by Customer. s.'1»11 be the estimate of the installation cosls. is) Overhead SeNice Fee: Where a new overhead seNice is allowed. an overhead seNice fee shall be charged. {1l For 200 ampere maximum. 250 Vo~ maximum. 100 foot maximum the fee shan be $300.00. (2) Any connection requiring greater capacity. vo~ge or length th& fee shall be the estimate of tha instaliation COs1s or $300.00. whicr.ever is graater. 3. TEMPORARY SERVICE A fee sI'.a1l be charged to connect temj)O'ary service. The C\Jstomer shall furnish all equipment up to the designated point-of·servlce. This point-of·service will usually be the weatherhead for o"emead tempora.., seNicBS in overhead distribution areas or the secondary conoec!ion box !or unce,grounc temporary services In undergroanc distrlblltion system ar&as. Tna City will no! supply overhead temporary servi CBS in underground service areas or uncergrounc temporary services in overhead distnb\Jtjon system areas. The City will supply: overhead conductors and mater for overhead temporary seNices; and meter only f(J( undargrcl\md temporary services. The City will connect both o'er head ar.d underground services 10 the City's electrical distTlb\Jtjon system. Any addhional offs~e facilities or work required shall be provided anc rannoved by the util;ty at the Cuslome~s expense. CITY OF PALO ALTO UTIUTIES Issued by the City Counal Supersedes Shoot No. E·5·5 dated 7·11-88 L Effective 7-1-92 Sheet No. E·5-5 -,--~: ,,:,---i;(:-: -.-~' '-fi~~11" .' ELECTRIC SERVICE CONNECTION FEES J.lILliTY RATE SCHEDJ..i)J;li (Al Overhead T6mporslY Service Fee: {Il For a 250 'O~ maximum, XlO ampere maximwT;, 3 wire, 100 toot ma><imum service the fee shall be $440.00. (2i The fee for a lelT1porary se(vi~'e at greater lengtl1, capacity or vo,~ag6 shall be the estimate of ths installation and removal CO.3ts or $440.00. whiche ... ·er IS greater. (S) Underground Temporary Service Fee: F. NOTES: (1) For a 250 "o'rt maximum, 200 ampere maximum, 3 wire service the fee shan be $300.00, (2l The fe~ for a temporary selVice of greate, capacit! or .ottage sha.~ be the estimate of the instei1ation and removal costs or $300.00, whichever is gtegter. • t ! 1. These fees apply to an vacant land except where the fees are recorded as previously paid. '.' - 2. v,'here a junction box, switch pact, vau~" or switch must be added to an existing s,stem in order to serve a development, this addrton shall be consi<Jered as a distributon system extension. 3. The Customer is responsible for the installanon of ali equipment from the facility to the designated point·of-ser ..... ice. For underground systems, thiS incliJdes conduit and conductors. For overhead systems, because the pcint-of-sef\llce is the weathemead or point of attach~ent to-ti",e iaciEt)/, this includes tr,e mast or riser and an conductors therein. 4. INhen the City replaces a service, the Customer is obligated to accept a shutdown of service during regular wor'<ing hours. The time of the shutdown shall be agreed upon as mutually acceptable . .... 'hen, lor the convenience of the Cuslomel, the shutdown is dUling other than reguiar working hours, it shail be done entirely at the Customers expense. The Customer shall pay the entire cost at the overtime iabor, r10t !he incremental cost em OF PALO ALTO UTILITIES Issued by the City COuncil Supersedes Sheet E-S-6 dated 7-11-88 L Effective 7-1-92 Sheet Number E-5-5 ELECTRIC SERVICE CONNECnoN FEES .l.1ruJIY R6TE SCHEDULE E·5 5. The City can generally provide service availability from 30 to 45 days 2fter an fees are paid except wnen long !eao·time equipment or mate'ial. are required. Consu~ the City for estirNl!8d lead·times. S. The City cannot ~ held flable for delays in seMce connection caused by con<f~ions beyond it's cc;r.trol, including, but not "m~OO to, delays in the arrival of equipment such as transtormers, 5W~ches and cabl •. CITY OF PALO ALTO UTlLlTIES 1=00 by lI1e City C.ounciI Supersedes Sheet No. E·5·7 da/ad 7·11·88 . , .. ,-.,'." Effective 7·1·92 Shee1 No. E·5-7