WORK PROGRAM FOR UPDATING THE COMPREHENSIVE PLAN: SUMMARY
Qf PLANNING COMMISSIQN RECOMMENDATIONS AND DISCUS~Sul~ON,--___
Members Df the Coun~il:
~t in Brief
ihis report sYlTfnarizes, for the City (cunci1/Pl.Hlniflg Comission May 4-~ 1992
study session, tne Planning Commissior.;s disc~ssian on the draft work program
for updating the Comprehensive PTan. This report also provides additional
comment on the draft work program in areas where the Planning Commission
expressed particular interest. These subject areas include: I} composition
and function of Comprehenslve Plan Advisory Committee; 2) expected time span
for the Plan/s preparation; 3) use of consultant resources; and 4) estimated
costs for re~lsing the Comprehensive Plan above and beyond those i~entified in
the draft work program.
5ackarpund'
On April 22, 1'992, the Planning COrm'll sSion reli;ell:led the draft "~ork Program
for Updating the City of Palo Alto tvmprenensive Plan,-This work program is
the reco~ndation of staff. It ~as pr~pared as i joint effort, staff working
witn the assistance of th~ consulting team of Moore Consulting, Jeffery Baird
& Associates, and Hoore, !acofano and Goltsman. At the conc1usion of this
meetir.g, Chairman Bern Beecham summarized the principal areas of Planning
Comm~ssion interest in the draft ~ork Pro9flm. They Ire discusse~ anrl
(ommented on in the fc11cw;~g ~aragraphs. ~ile this report discusses the
consultant-related costs for revising the Plan, further informati~n on
internal costs for the Comprehensive PTan's revision will be provided to the
City Council prior to June IS, 2992, when Council is expected to take action
on tnis work program.
Comprehensjye Plan Advi.s,(I'e'"Y .Committee (CPAC)
The Plannin9 CommiSSion made the fol1owin9 recommendations regarding the
Comprehensive Plan Ad'visory Committee (CPAC) thdt was s~ggested in the draft
Work Program:
CMR:~
Z~e-:~z.
~"'.' ... ' .....
. -
,-.-
....,.-
_ J. ;:;~
"ttl ,
L
--------~.~~------------
" .
.--~.
1. That the (PAC. as it is d~scribed in t~e draft Work Program, is
important;
2. That this a.dvisory conrnittee should represent a broad
cOflstHuency; a;nd
3. That the ad¥1sory committee shouid include participation from both
the City Council and P1anr.ing CommissiQn. (The ?ian~ing
Commission also suggested thdt details on the specific siz€ a~d
representation of the committee cou1d be worked out later.}
Planning Commission discussion on the CPAC, prior to the appro¥ed ~t~on.
focused' on the function of the tOlTlTlitte~ and its representation, including
~he.ttvar tl'\e ef1t'ire Pla.nning Corrtt\~ssion should serve. an the corrmittee a.nd the
appropriate size of the Committee. A moti~n to include the entire Commission
on the CPAC failed {2-S-0-C, Marsh, Carras~o, Be~c~am. Gl.z1er, Schmidt
against; see the Planning Commission minutes of the Aprll 22, 1992 meeting
thdt are included in this packet).
Tnt'! work ,program suggested that the CPAC consist of a.pproximately IS persons,
including two or three City Countil and two or three Planning CommiSSion
members. The remaining CPAC membership ~as recommended tc include a balanced
group of citizens who li¥e or work in the community and represent a spectrum
of di¥erse commun1ty interests and val~~s. This committee would serve during
Phases I1 and III of the PTar. proces.s. Pro'tided the prop('sed scheduTe for the
Plan revision were followed, this advisnrj committee wo~ld serv~ between April
1993 and September 1994, when Phase III would be completed.
Staff concurs wiU~ the-Planning Corrmission regarding the importance of having
an advisory committee that r€presents a broad constituency. Staff also has
concern t~at the CPAC needs t~ be sized efficientiy, Dr the tosts of the worK
program will escalate. The projected budget is based on approximately a
1S r~mber Committee. Staff fy~ther supports the suggestiDn made by consu1ta"t
Anne l400re at the April 22. 1992 Planning COlTlTlission meeting, that the City
(c·uncil defer its decision on the cOlTIT!ittee's size and r€presentatior. until
Phase] is completed. At that tim€, the Plann'rng CQmissicn and City Council
will ~a. .... e re ... iewed: I} the results of a citizen sur'oley on poter1tia1
Comprehensive Plan issues; 2) a report on national. regional and local trends;
and 3) an audit evaluating the status ~f existing Compre~ersive Plan goals and
pol ides. Review of these items is intended to result in the Council
providing detai1ed directlon regarding which issues are to receive particular
attention in the Plan update. As a. result. it would appear that the City
Council would b~ in a better position to determine the size and composition of
the (PAC while holding the numbers to a manageable 1ev~1.
Time Span
Several Planning Commission members expressed concern o¥er the projected t~o~
and-three-quarter-year time frame th~t would be required fer cnmpleting a
revlsed Comprehensive Plan. Gi¥en the experience that other cit'~s ha'ole had
in reVising their general plans, staff believ~s t~is time frame is Quit~
CMR:23B:92
p:'C:""\C:Mp:-~
L
4/30/92
Page 2
r
-
realistic, if the work program is strictly maintained and staff r!sourc~s are
not diverted fro~ the task. Stiff previo~s11 not~d that several cities whicn
intt1ated general p'a~ revisions without realistic sc~edu1es and r~source
allocations ultimately experienced substantial delays 1~ (ompl~ting their
plans. So~ were sent bac~ to the "drawing board~ due to insufficient
torrtllunity p.articipatlQn, nbuy-in N and ca-ccrTlTlitm€!'lt~ costing them much more in
the long run (see 01R:116:92:"f Januarjl' 23, 1992). The If'ay tc achieve
significant time sa .. dngs wou1d be to curtail cHizen participl'tion
opportunities (i.e. the work.shops). Staff belie',tes that the rf.!.ks involved
;1'1 sh-ortcutting the cOlTl7lunity partitlpation porttons of th.e process are not
worth the tfme sa~ings.
Staff w;s~es to reaffirm what it stated in an ear-lier report to th'2 Planning
Cormtission on April 10 , 1992, that if a Comprehensive Plan revisic,n is ta be
completed on schedule, a commitmEnt has to be made fer a useable wo~k program,
slJffjcierlt ('f$o!.Jrces, and a realistic schedule. Furthermore, an add1tl0nal
c~mmitment has to be made not to divert allocated resources !o othff projects
during the Comprehensive Plan revisi~n process~ in order to stay on b~dget and
time-lines.
Use of Consultants
Several members of the Pla~ning Commlssion is~ed why so many areas of the
Comprehensive Plan or tasks in the ?lan re~ision process will require the ~se
of consult~!'1ts. 1:"'1 particular, they ~lJestioned tn! role of ttle lead
consultant. RespGnding to those inquiries, stoff noted that staff would have
the primary responsibility for Plan preparati~n. Nonetheless, Since t~e City
do~s not ~ave in-house expertise in a varlety of technical areas, outside
professional e~pertise would be required fer these sections. In addition,
speCial expertise would be raqu~red for such functions as conducting a
community surv~Yt preparing informational newsletters, and facilitating ~ublic
vorkshops.
The need for a lead consultant to manage tne subconsultants and coordinate
with City staff is standard (;perating procadure for the City. For exampla,
the Public Works Oepartm2rt, when contracting for co~struction work, ~;res a
Prime Contractor who then subcontracts for the vartous trade speciaTizations
(j.e, foundations, steel framing, etc ... ). This method of contract
administration is ~fficient. practicil, and costs less than hiring 50meon~
inter~ally to perform the contract administration and coordi~ation for the
duration of thp. project. For the Comprehensive Plan update, it is important
to not have City staff ~ealing with the paperwork and substantial coordination
time involved with hav';,ng eight or more consultant contrac.ts. At the sam~
time, it is very ilT:portant to emp~liSize that the work prG~ucts undertaken by
the consultants will be closely coordinated with staff, ar'ld all consultant
work. must be acceptable to staff prior to public review, discussion, and
deciSion making. Ali content recOrrmt!ndations on the Plan .. ill be staff
recomm€ndatfons.
C~R:238: 92
:J: \OfR \C~M..p r7"
L
4/30/92
Page 3
,
~ ..
"-' .
I
I
!
-
The attached table briefly ~escribes which functions in the Plan revision
would be assumed by staff, ~y i consultant, or by a combination of both, in
oro!r to clarifi t~e respectivt roles of each resource.
The ''I'\-hous.e costs of c;lJ?PQrting the C9mprel\e~si'ie Pian effQY't CiH', be
currer-,tl:; described 1'" qua1itative tenr.s and will be fortvarded in a re~uest
for approval of a biJdget amendment ord inanee opee they i'll\l! been spec; fi ed and
approved through the Finance Oepartment and the CHy Manager's office. In
order of magr.itude~ they are substantfally l~ss then the c~~t of the
consultants. if we exclude the staff positions current1y budgeted for.
In-House Stiff
It is projected that 3~ of E~ist1ng departmental resources will be
alloca.ted to the Comprehensi'f! Ph" eff~rt) i.l\d a.n add!tioflal cor,tra.ct
planner and 1/2 additional support staff position will be required. Key
staff from other departm2nts \ll!i11 be needed to complete work on speciflc
sections of the Pla~ as part of the Technical Advisory Group function.
Computer Needs
The contract ~la.nner will req~ire a personal computer work station which
is nDt currently in the di~ision budget. Additinnally, while the
Planning Di~isior. has budgeted for a Geographic Information System work
station (hardware) in the 1992-94 budget, supplement.l purch.ses will be
n@eded to brin9 the systeM up to full operation 1n time fQf the
Comprehensive Plan effort. These include the costs of a software
li(ense~ triinins, and a portion of the maintenance costs to be shared
with P\,lb1ic Works ii!'ld Utilities. The costs of di9iUzing the numelP"ous
maps identified in the Work Program is ~pelled cut and included in the
estjmate of consultant expenses. Howe~er~ achieving i system which ~1ll
be self-sufficient and; ndependent of ttle ccn.s.ultants would be tne goal
of the Pl~nnin9 Division s~ thlt staff can maintain~ update and build on
tne mapping program after the Compreher.sci-/e Plan is adopted.
General Line Item B~get Increases
The Plarlning Oi'flsionTs general overhead costs for such budget Tine
items as advertising ;nc publishing~ mailing, meeting room renta1,
supplies and l'JIaterials, etc., are expected to increase by 30% O!ler tne
term of the Comprehensive ?Ta~ update.
~ClrY and ~_~mc.lusion
In su;mary, much or the Planning COlTlTlission discussion Of! the draft Work
Pragra!t'l. for updat'(ng Palo Alto's Comprel1ens1¥e Plan fc,cl!sed an k.ey dec,sion
areas concerning ho. the City sho:.i1d proce'5!d on a Pldn revision. They
included content, resource allocation (i.e., areas of staff or consultant
resp~nsibilitY)9 time frame and costs. The intent of this report is to
provide additional information, particularly in identifying and clarifying
CMR:238:92 4/30/92
~.9. ,
•
t
f
'--.-'.;, .. , <.. :
, "-
i " ; .. ! " .~
"
i I
-
~,
are is ~f re~ponsib11lty bet.~en staff and consultants. T~is report aise
provided some prellminary information en estimated costs regarding th~ Plan
revision protess. A detailed descripti~n cf costs ~tl1 be submttted to th~
City Council prtor to Ju~e 15, J99Z~ when the ~ouncil is expect~d to act on
the work prGgram and funding for the Plan revision.
RespmfUlll suct •. d,
~q,
AssIstant ~ni .g Offi cia1
GEORGE Zl ERMAN;
cc; Pl i:nn ing Corrmi ssior.
Ardrftectural Re\{ie'" Board
Compre~ensive Plan Update Mailing list
CMR:23S:9Z
jl:\C";"CP'wkpr',JII
L
;&?l'ld f .Jd~ ~
KENNETH R. SCHRflBER /'"
Director of Planning and
(crrrnunity Environ'Wnt
4/30/92
Page 5
L
I
PALO ALTO COMPREHENSIVE PLAN UPDATE
ALLOCATION OF STAFF AND CONSULTANT RESOURCES
ClTY STAFF
Lead Department -Plann~ng -Manage project and budget~ direct consultants,
cQord~nate tc~?~ter and ~rs ma?ping. coordincte Tech~ical Advisor~ Group
(TAG), coordinate Comprehensive Plan Ad"isory C-onrnitte€ (CPAC)f collect data,
prepare issues, bac'k.ground a;,d policy directioll reports and associated staff
reports. prepare Draft Comprt!herlsive P1an text and coordinate graphics,
prepare bac(ground sections of Draft EIR, staff workshops and publfc hearings,
office and date management, report production; mi~utes. public notice and
mailings.
Sypport Departments -Serve on TAG, provide data and prepare an~ review draft
te~t for background reports, Draft Comprehensive Plan and background sections
of EIR.
Section City Department ConsultAnt Services
Governance Phnning
Land US. Planninq
Housing Plannino
[mplovn>ent ?1ann i "ll.
Econo1'l'1i c/F i SCi 1 Finance Economic consultant to evaluate
Resourc.es City' s shar~ of regional
economic activ1ty, develop
cost/revenue analysis data and
evaluate economic/land use
relatiDnship3
Transportation and Transportaiti en Transportation Engineer to
Tel!comrnunitations collect n~w traffic counts and
ass~st and train staff in
running eAisting traffic model
Urban Design Planning Design conEu1tant to prepare
genera ~rban design standards
and gll d~l;nes for City, Work on
E1 Cam no Real Area Plan
ParKs, Sch~cls and Socia.l and
Recreativn COlTlTlun; ty Sen'ices
libraries, Arts and Soc i a 1 and
Cultural facilities Community Ser~ices
and Services
L
~~~-------------.---.
Sedj •• City Department ConsuKant Senkes
Social Services Sod al and Consultant to assist ; n
Community Se~v;cfs documenting existing social
i . !
Fa-mil, service goa1s, pol ic; es. and
Sel"vi ce-s/Chl1dcare pro~nms
SeniQr Services
Homeless Services
1
I
Accessibil ity
Heal V, Care
~SDace Plannina
I Energy IJtil itie':;
! Water Utilities
Flooding and Public Works .
Drainaae
Water Qualih Publ ic Works
Wastewat~r and Publ ic Works and
Reclamation Util itiu
so~~~ Waste and P:Jbl i c Works
Rec clinD
Air Quality Pl ar,ni ng Air Qual ty consultant to run
air qual
air ~ual
ty mod~15 ar.d prepare tv orojections and data
Noise Po/ice Acoustical consultant tD make
noise measurements, noise
contour maps and pr~¥ide data to
Lmdate Nvise El ement
Seismic Safety I~spect;on Services Engineering Geologist to map
areas of seismic risk. .nd updste
Seismic sect i em
Police Services Pc 1 ice
Fire Pretectlen Fire
Paramedic Services Fire
Huardous/Tcxi c t:n .... ironrtlenhl Hazardous Materials consul tant
Materials Protect ion and Fire to document exist lng/potential
hazardous waste and ground water
contaminatil)n sites and assist
in development of Hazardous
Materials sect; on
-