HomeMy WebLinkAbout0197.092~ , . . . f:. . ..... .
April 2, 1992
(ITY (DUNe Il
Palo Alto, California
STANFORD USE PERMIT ANNUAL REPORT NO.3
Members of the Council:
Rep!lrt if) Brief
This is an informational report arId no a.ct ian is neEded. This report forwards
for City Ccunen review and information the annual report reCj'Jired as a
condition ~f approval of the Stanford University General Use Permit.
Stanford University General Use Permit
Tne Stanford University General Use Permit is a master use permit issved by
Santa Clara County IS I lneinS of def1l'1.ing th.e type and amount of additional
de\leiopment which may occur within the unincorponted portion of the Stal1ford
Campus not including the Central Campus area (see Figure 1).
The Use Permit allows for: J) 2,100,lOa square f22t of new academic, academic
support and housing usesj and/cr 2) an increase in the Adjusted Daytime
Populati~n (av~rage daytime campus population) on the Camp~s up to 33,905
people; and 3) corlstruction of l,2{lO a.:fditional new parking spaces.
The use permit als~ established cQnditi~ns neceisary to mitigate potentiallY
signincant environmental impClcts. The major mHigation measures identified
fer the lise permit include: 1) implementation of the vniversit)"s
Transpo~tation Demand Management '10M) Program, with a goal of ne ·net-new
commute trips over those existing in July of 1989; 2) continuation of existing
housi~g programs and provision of housing en campus for faculty and staff,
update of Mousing plans and pursuit of nousing projects off campus; and 3)
training of personnel and buildi~g upgrades for safe use of nazardous
materials 1 and preparation of Hazardous Materials Management Plans for all
buildings where such materials are stored.
General Use Permit ~.nnual R.eport
An annual report was requir~d as a condition ~f the amended use permit, as a
means of d~cume~tin; building and population growth and compliance ~;th the
h,ous;ng, transportation and hazardous materials mitigation m€asures and other
conditions of appro~al.
CMR:197:92
.. -.------
L
-
-
BUILDING AREAS
SPECIAL TTT,_,1\.,
CMR:191:92
P:\~\S,"se~
·~ ... ·.·L·-' .
. '.
0
~
EJ
[TIl
0
Ia
[i]
~"'S~Ii~~"'''''11
s..c.~~_ ....... ",
s.:-, c.c.o ... .ow. I .
~c..:..o._AI'II.e
s..Clli r:..o..o_ ...... 1) ........
• ..".,,~O<c~."i'" tao billl",
~IIC_III ....... '" ..
,..~~ .......
S'O": .. j~'o"...,ne
~O.,._I .....
bc....'~O" ... tl.
~.I~"'-
"..tc'.JIIII~A .. u
Ir, ••
4/2/92
Page 2
-
T~e information 1n Stanf~rd univers~t~ ~enerij Use Permit Annu&T RepQrt No.3
(1990-1991) shows that Stanford is i. compliance with ,11 of the conditions
established in the Stneral Use Permit. No additional square footage was
approved in 1990-1991. over that reported in Annual Report ~a. 2. A size
r~uctfon in a prev;ous1y ap~roved project (Advanced Materials Research
Building) actually reduced the net square footage increase by 80.10~ square
feet, for a cumulative t~ta1 of 680,3a~ s~uare feet. The 25-un1t
'aculty/staff housing project (Ryan Court) and a 199-bed undergraduate
dormitory (dmbal1 Hall, 133 net ne __ beds) have beer. completed, and .another
204-bed dormitory (Manzanita II, 81 net new beds) lS under construction.
The adjusted daytime populat!on was 30,)45, a drop of )60 from the 1990-1991
levels. TDM participation increased by 234 persons from 1,814 to 2,048.
This, ~nmb1ned wit~ the drop in adjusted daytlme popu1atton, demonsirates that
Stanford has met; ts TOM Sua' of 1'10 new commute trips.
Sta~ford has developed tri1ning progra~s for u~e of hazardous materials and a
hazardous waste manage~ent plan. Stanford also achieved a 25 percent
re~ycling rat~, exceeding its 19S0~199I goal af ~2 percent.
This year's ann~al report also includes a description of the ~se of temporary
buildings necessary to accommodate program activities displaced by earthquake
damage. A copy of General Use Permit Ar.nual Report No.3 is attached for your
reference (Attachment lJ.
Res~ectful11 submitted,
cc: Planning Commission
ArehitectYraT Review Board
KENNETH R, SCHREIBER
Director of Planning and
Community Environment
Santa Clara County Department of Plenning and Develcpment (luke
Stamas I Rans Bratter.)
Stanford University (Andy Doty, Julia Fremon, Diane Healey. Phil
Williams, Drew Oman)
CMR:197:92
'P; \()Q \:.", e~~
4/2/92
Page 3
Stanford University
Santa Clara Countv
General Use Perm{t
Annual Report #3
1 S~ptember, 1990 -31 August, 1991
•
General Use Permit Annual Report #3
1 Sep .. mber 1<;90 -31 August 1991
Tab:~ or Contents
Page
Introduction and Summary
I. General Conditions
1. Population and Square Foot2ge
Table I-Population
Table 2-Squiire Footage
Table 3--Earthquake Da.fllage
2. HO'J.sing
3. Trans:POr'"r.D.oonlCirculation/Parklng
4. Hazardous Materiais
5. Existing Conditions
6. Oth",
II. Specific CondiHons
A. Construc~on
B. I.andscaping
C. Solid Was", Disposal
D. Hazardous .... Vasre
E. Art:heologicallHistorical Resources
1
2
3
5
9
II
17
18
19
22
23
24
26
•
-
""'I
General lise Permit i\nnua{
o
Report
I!ltroduction and Summary
This is the third .A.nnual Report on me Stanford Ge"eral Use Permit which co .... ers t.:'":e fisc:J.i
and :iCa.demic-year starting September I, 1990 and e:1dmg August 31, :99L
Population
1990-91.adjl.lsted daytime population tS .30,345, down 359 people from the 1989~90
total of 30,704.
Sq~;3re F'ootage
1990·91 total additional sq:..lare footage is <80,102>. This, includes 67,370 net new
sqLl~ feet under cot'.structiOl1 (adjUS1-~·j down 59,472 $.f. from the demoiitior". of
ManzaniIa Park tralJers), as well a!; a detrease of 88,000 s.f. in the "net approved·
construction not started" categorj, targely the result of the reduction of!:Pe A.I\1R
project. The only facilities occupied in 1990-91 were counted in last year's squ.m:
foorage !otal.
Housing
26 unit Ryan Court faculty/staff homing completed.
199 bed Kimball Hall undelgradl.late student housing project comp1eted.
204 bed Manzanita II undergrad:uale student hous1ng pntiect under construction
(repladng 41 trailers 81 net n\!w beds).
Transportatiop Demand Management
TDM partidpation inc:re ased by 234 ri&.:rs ~ver 1989-90.
Hazardous Materials
University Committee on Health and Safery met 5 times in 1990-91 including one
public meeting. The Comminee membership includes a public member.
Ri~k assess.ment pnx:es.s study complere-d; decision analysis tedt;liques to be
implemented.
HazardQUS waste IT'..a..."lagemenr plan . waste minimization mechan[sms. for aU 3 types of
hazardolJS waste (biological, chemical and !Ildio!ogical) have been developed Training
programs for ha7ardous materf..als hai,dling in place.
Existing Conditions
The Mulri~jurisdiction group met throughl the fl..""5[ half r,f the 90-91. Although no
measures were identified that would improve trdific s.peed. noise or safety, the grOllp
did succeed ill establis.hing prOOuctive lines of COmmUf!1canOn between private c)[lzt:ns
and public agencies.
The newJ~r constituted Stanford Campus Res:denrial Leaseholders group(SCRL) wi11
act as liahQo with the Univen.ity and public agcm.ies on homeowner c[)ncern~. Both
entities hope that this Iiaison ~in rep lace ~IT AG. ""..; th the option of con ven~p g ad ~oc
some members of MTAG to address, specific issues. ~
I September 1989 . J 1 August 1990
, .
•
~ner31 US'~ Permit .\pnual ~pon
Use PerPJ,it Conditions
I ~ Gtneral Conditions
1. Population and
Square Footage
Tota! additional sqrJare footage for
prev1.uus year. occupied, under con
struction, approved bUl nor built, and
upcomir:.g.
I SepLembe: 1990 -31 Augus, 1991
CO!Jlplianc~ Status
Populat.ion
Tota1 Net AdjLlsteci Daytirnc Population for
1990-91: 30,345.
The n 11mber of Academic CDuncil faculty
increased In 1990-91, but L"US Ulcrea&e was
smaller uian the dec!inc: in 0'"..her Faculty.
The number of Other Facu.1r-y'--lecrurers..
accing faculty, visiting: fa.culty. etc.-declined
sllbsta. ... tia!ly between 1989-90 and 1990-91,
partly because we changed the way ~"C count
them. Previous!y, we had counted any
member who was 50% tL"11C or ~re for any
single quarter. Tha! dcflnitiorJ had signifi-•
c:-.mIly overstated the average number of Oiher
facL!hy on campus at any point in time
becau5.e a large number of these appointmems
(>Je only for oue q Ilmer, HowC:!ver, Other
Fa:-ulty would have declined in 1990--91 even
using the prior defirJtion.
(See Table 1, page 2, for deraiL)
'.Vnen u1e population reaches 33,400
Sranford is requi.."'ed to submit a stalUS report
Oil how fa!'.t W~ expect to reach the 33,905
projection.
Square Footage
Addi!ionaJ square f~tage i.") 1990-91:
Occupied: 0
(sp3ce C('cl.!pied in 90-91 was-counted
in 1988-89 rep-'Jn.}
Under Construction: 7,898
Approved --not started: 0
(demol"n, A~1R adj\) <~>
NeE new approved ~>
Total <80,102>
(to be counted agains! t)se Permlt threshold
of 2,jlJO.300.)
.j.
\
,,,_':-""7,>", __ ",.,,..._~_~~~", .. ,_,,,,,,~~,~~~~':'~{t;tiqlt.n::~_
. ,
Gener~! ~ pQit Annual Report 1~1991 TabQu Population
Stanford Uni~'eTSlt.Y Dl!yLime PopulitiQn Trend Forect51
1985-1>6 )986-87 !9S7·S~ 19&s-89 1989-90 1990·91 1999~2000i
DttaGrd Sununar, Acruai Actual A.:rual Actual Ac:ua1 Mtl,j<ii Projected I
Ad''''", Do moP ul.a"oo Po !a:-;on Po ulaticn PO!:lU!:uiOll Po ul;:ti-::m Po ulalion P latio P jJ~aLion
L Gfneral Campus I ,
A. Students 12,497 12.711 12,794 12,819 12.B5~ 12.8141 r2,~[
B. Fwllt)' 1,1'91 1.159 1.2.55 1~g8 1,4{)8 1.1 43\ -., ~
C. St>If 4,04-1 3,985 4.124 4,344 4,212 3,983 ~:~~
Ner wloll 11.731 17.%1 19~173 18jil :&,479 17,940-.'1 J 18,969j
n. Medical Center
I,S IIi A-StudenIS 92!J 968 1.045 1,046 1,20B 1,118
B. Faculty J46 J52 368 369 395 377 508
1 C, Medical School St>ff 1,189 1,293 1,419 1,419 1,3.\3 1,378 1,ISl
D. Sanford H..--.pila! Staff 1,l!21 2,852 3.1S8 2.927 2,140 2,013 2781
1 E. Clu1dreo'i!N<w CH@S 212 290 232 <14 689 674 363
f. P'aticms L-u1 Vls:itors 3,389 3~14 3.581 3.606 3,507 3,5121 3.%7
Net ~l4i 8.878 9.269 9.933 9.nl 9,282 9,.272 11,612
ill. S.L.A,C.
A-Graduate S ~nti 46 54 48 47 ., 35 ~~I B. Academic Counctl 28 28 27 "7 27 26 1 C. Staff 1.176 1,1065 1.095 1,054 1,288 1.302 1,,04
D. \-~J.Sitinl SchQiars 90 92 88 S4 75 «J 90
E. Contract Perwnncl 500 267 273 22& 201 125 \~I F. To-w Visltoo 40 40 40 40 43 45
O. Vendors 30 30 :;0 30 33 32:1 301
N~t loi4l 2,010 1,676 1,601 L510 1,712 1.625 1,692
IY. Other
A.. Em'plo~ of Ccmm1 Activ ities 296 255 229 220 258 307' 31"
B. General Visitors 110 267 432 142 11': 12\1 3g~,
C Vendors 200 200 250 300 3lS >JI 346 1
D. Construction W:Jtkers 200 550 .:00 m 169 :j47 2001
E Indepc:ru!c:nt Cc:nt.et:: 289 27l 2S2 195 309 293-332
F _ Non-resident Conferees 33 40 4C M 67 WJ 38
NellC!a.l 1~28 1.584 1,633 1.344 1.232 1,.\08 1,632 1
I ,
V. Net AdjllSttd Da,.timt: Population 29,948 30,4~ 31.~ 31,]46 30,705 30.345 1 13.905!
1 September 1990·31 AUgust 1991 - 2 -
-
",
General Use Permit Annual Report 1990:91 Tablr 2 ... Squ.are f'ootage
AC>'", I I
I I hh I Ap'''M" 'C,~, o,,"".~;,
I DeC'", lED , . "I ,;,,~,,"R.,..," ",
IG.bmB,;;\Oii B"', ""' .. , -61: ",_" 0«-89
:,,,-
By"il"
Y&ill
, , , '\X, ~1,_.-91 Jol-n
, Puk'iiil~-;;-.<.], ),'" , .......
is' _,DER , 'C , , "" "H,,,,,,
,
,
, -'0 I 7,,9& ',00, f,b 92
.... ,"",
1990-'1 "'"
, I
,"-,-'3' ! ,'5,'
I
~~TO'8E (0('/ FD .
ii9i r ~-o:
(,n"'-
eRe
,ruX
c. "'""'" . 'W,S,-,
I
-'K"",or
I
,." .. oJ .
,'!.''''"",
,
1 September 199O· 31 AUgust 1991 ,3 -
fun·"
M.)'"
"p-92
"
...........
............
~ I ,
-
o '-"
General Use rermit Annual Repor! 1990-1991-1'able 3 --E~rfhquake Damage
Program space ncated due to e:ilrthqu3k~ damage
QuadlBldg
1-]0
1-26()
1-300
l<!lO
1·320
2·500
3·200
5·300
7·20&50
8·350
Name
Afro .American Studies
LangoJ2ge Comer
BuildirJ g 300--Fr.glish
Plarll1in£ & :Mar.agement
GeolGg)' Comer
T e..""mM Lab Sollth Wing
Gree.,'1 Library West
the Kr1..,n
Anatomy &: Anraomy-HRP
Gradual Sc:hool of Busines'5
Net SQuare feet
1942
24,g86
4,011
3.088
27:376
4.538
02,826
3.375
37.238
77.735
248.021
Temporary bldg's installed in nsponse fo earthquake damage
2-500T
j·220T
4·655T
4-67,ST
5-91OT
6-45OT
6-451T
6-452T
7-971T
7·972T
7-973T
)-974T
i·91ST
7-981 T
8-35OT
8-355T
8-l6OT
8-36 IT
8-362T
14·%CT
500 Annex
Grun Library W~st &
Main Quad classrooms
Geology Corner &
Main Quad classrooms
Knoll
Language Comer &
Bldgs 30.300
reconsuuction
Anatomy replacements
GSB R«onstruction
Phases 1 and 2
Main Quad ReconSf.ruct'n
}."et differen~ between " .. cOiled space and
temporary/replacemcM sp",e
180
8,512
9.178
6.780
2.89S ..
5.884
5,322
6.217
881
881
881
754
754
l.SOiJ
!,547 •
1.160 '"
1.089 •
720
720
__ -00:1 •646 •
57.804
<190,217>
'" Tnese rnodulars were occupitd before me LOJ'fla Prieta earthquake.
1 Seplember 1990 ~ 31 August 1991 _ 4 _
,: .. ",::.' . c~,
. ,
.~
Jeneral Us/! Permit .\pnual Report
Total add'l square footag' (cont'd)
2, IIousing
a. Continue to pr(}vide on·-campu~
housir.g for facwty, certain
smff. and students:o the ex.ten!
feasible within the financial and
la.'1d use constraims of the
University and within the con~
straints of political approval,
1 S¢p~bec 1990 .. 31 Augw:t 1991
Application.s expected. 199 1;92-
Cancer Research CemeT r
Cer:tef for Inttgrated SyStems Exp'n
DAPER Spons Complex
EcOO/CEPR
H3..a5 Public Service Cenrer
Infonnarion Sciences
Sta .. .''1ford Au~iliary Library Exp'n
(See Table 2, pagr: 3, for detail. See also
Table: 3, page 4, for an informational repert
!'ho~ing an accounting of program space
vacated due to d~ge from the Lema Prieta
earthquake.)
The previous reporting for Kimball Hall :md
Manzanita II Undergrad Housing projects did
not identify the reduction in square footage
that would result from the displa~'ir.g of the
Manzanita Park trail= Each trailer is 944
s.f. In the case of Kimball Hall, 12 trailers
were displac~ resulting in a loss of 20,768
s.f. In the case of Manzanita IT, 41 trailers
"ere displaced, ",suiting in a loss of 38,704
~.(. Tho::se adjustmenr.s are reported this year
for th~ fIrst rime; the abo .... e figures and the
detail information in Table 2 reflect these
adjustments.
The Advanced Ma:erials Research building,
which was ~poned in the first General Use
Perrrir Annual Report at 173,000 s.f., has
be en redesigned at 80, 0Cl0, ;e.:;U 1 ring in a
negative: number for ntl new s.f. approved.
At t. ... e end of the repcrri ng period the furu.--c
ofws facility \lias uncenain. A fur.r.er
adjustment of p0lenrial allowable s.f. may
r.m to be made again L., next year's annual
report.
a. Faculty/smffm~rnbers housed on campus
1990-91: 982 units. including the
completed Ryan Court unil5.
.5-
Srudenrs housed or:: C·l.II1pLlS 1990-91:
U ndergrarluate 5.:
Graduates:
Total
5,730
292'
8,658
,.....,
'MneraJ Use Permil
a. Continue CO provide on
ca..~pus housing (confd)
b. Pursue housi..r.g project'i our·
side the UM: Permit area and
the University's work wi:h
local jurisdictions to maximize
the acc::ptable densitie s. on all
sites.
c. Update StaJ".ford's bou~1ng
plans.
I September 1990 • 3 i Augusl 1991
... -..... --~!"------.-.....~-..... "" ..... .:...,.. "L
The 1.99 bed Kunba11 Hall sru(knl hOllS·
i.."1g project is :..lnder cons.trucr:ion and will
be occupied Autumn 1991. The project
n::pial.."'es 22 trailers housing f.6beds for
133 net new beds.
The 204 bed Ma.":I7.anita IT student hous
ing project is under construction. This
project replaces 41 trailers hOl1~ing 123
beds for g 1 net ne", bed:;.
~. Sranfonfs Board of Trustees approved
Ihe key bUSL'1eSS te!lIlS for a 375 unit
senior housing project al Sranforri \Vest,
and staff continues to prepare pla.'1s for
up to 700 housing units.
Panola yaney has placed an o .... erlay zone
on the 'stanfo:d land tn Pc-nola Valley
{Por::ola Valley refers to it as the
"Stanford Wedge", Stanford I'!fers lO it
as the ;'Hor.!.ehead"}. The overiay allows
! 0% higher density in exchange for 15%
of the lots being turned over to a non
profit corporation for affordable housing.
c. The FacultyJStaff HOll~ing Office
(F/SHO) [s responsible for a'rl!lually
updating Stanford's existing housing
programs as well as for developiTlg a long
term strategic housing plan for the
University. The annual program review
for the 1992-93 academic year i.s com
plete, and a market demand srudy is
underway. However, \\o'ork or. the long
term housing plan is being delayed until
rr.e magnitude of ltle Urui1ersiry's ("um!nt
budget reduction has been set. and its
implications for the future an: under
stood. The census of faculty and senior
staffrru.y decrease, rather than mcrease,
which necessarily impacts on the numbel
of housing units requiTed. In lile near
term. there is a signifkant vacancy rate of
for-sale housing on campus. and half of
the Ryan Court units are uns.old. For
these Teasvns, the existing housing stock
is deemed ad.;:qtJate fOf the current popu
l.ltior. at pre.sen L
, ..
!
1
"1
Gen.,,-j,1 v.., Permit Annui!' Report
d. C.ontinuc: me furx:rions pr0-
vided by office£. of Real Estate
P:ugrams and Lands Man
age:oent.. Real Estate Devel
opment. a...,d Housing and
Food Service.
1 September 1990 -31 Augu.s: 1991
d. This year sa w the reorganization 0; L"'e
offices that addtess housing iS$ues for
S ranford. Tne Offices of Real Estate
De..,eloprnenr and La'1d.s :Management
were placed under the direction of me
Stanford. Management Company, while
the Real Estate Programs Office was
rena.-ned tl-,e F~ulty/Staff Housing
Offlce.
-7·
The F/SHO oversees Ofl-Ca.i"TlPUS residen
tlalleasc:holds and ad .. ninisteiS U ni ... mity
sponsored loan and fir..ancial assistance
programs to help facuTiY and senior staff
with the pW"Chase of a horne in the local
ilr"!a The Offlce manage 50 125 on-carn
pus housing units rented to faculry, staff,
a. .. d viSiting scholars. In a.M.i:tion, the
Office Ls mark: ting 26 :-tomes at Ryan
Court which were completed in April.
1991. Half of lhese hemes have been
sold.
Lands Mar,agem~nt manages ground
leases for t.~e off-campu.s hOLlsing on
Stanford la.'1d: Oak Creek Apartments.
Slallford Hilis and Stanford Creek
s.ubdivisioru;. anj the hQllill1g on Family
Farm Road in Vloodside.
Real Estate Development con tinues to act
as implementor of faculty(staff housing
programs, either as the deveioper or as
the ma!lager of the development process.
As such it is continuing planning for
Stanford West. a. housing project on a
portion of a 72 aC'!"! sile located on Sand
Hill Road. It is also invt'~tgating fac
ulty/staff housing to ao.;.-commodare
approximately 30 In.:1() units al the
fraternity sites damaged in the Lorna
Prieta ea....-nq uake.
Tne Office of Housing and Food Services
provides operational support: for all
studem housing on campus incl uding:
facilities management. maintenance,
repairs. new facilities funding, food ser-
.. ices and conference planning and
coordinatioi1.
~ner'l Use P .. mit Annual Rep<JO
e. MaintaiTl and wntinue rlevel
OP"",OI of programs of f=n
cia! assistance rO£ affordable
housing for eligible facult)'
and staff_
f. Continue work towards the
goal of providing housEng
affordable to employees and
'Students.
I ~ptcmbcr 1990·31 AUgu5l199!
e. Sta .. llford ha;; three fUl3JlCial assista.'\Cc
programs wb.ic~1 may be applied to on or
off carnpus housing. These pro,g:rrur.s
will c.:mtinuc:, but do not preclude the
development of ad.ditiona! program(s) or
rnodiii.catior-..s or existing 011 es.
COrN': a secor,d mortgage shared appre
ciario."l loan program availab!c: to eligible
facuIty and staff, imendM [0 'help off~[
the high COS! of housing by providing
additional purchasing power. 53 lo:rr.s
were proces sed in 1990/9 I..
DPAP: a down payment assistance lean
program des!gTled to assist qualified
indhiduals with the required down
payment to purch asc a horne. 49 loans
W.fe p.-ocessed in 1990;91.
HAP: a housi ng allowance program
which provides an income subsidy to
help offset the rJ gh cose of bome owner
ship b this area. 54 salary supplements
we,. processed in 1990!91.
f. 26 units for faculr:ylstaff at Ryan Court
were completed. The fmancing subsidi~s
listed above will increase their afforda bil
ity fo: f3CWty!Staff.
IGmball Hall, 199 beds of undergraduate
student housing, is c.xpeceted to opec. in
September (133 net new beds).
Manzanita II, 204 beds of unclergraduate
stUdeilt housing is under C()nstr\lction (81
net new beds). I[ will cop-sist of tvw'o, one
hur.dred and two bed residences, each
with its own dining faciHty located at the
central Man zanila dinine commons.
These projects rep] ace tla.i.Iers used fOf"
student housing.
An additional 125 new beds are needed to
replace those in three older houses on San
Juan Hill which were &maged in the
1989 earthquake. Two of the three are
slated for demolition; the third is to be
restored and renovated. At the end of the
reporting period the L'1n::c siIes were
inlended f{"JC'" faculty housing. but the final
decision had not been made. The 11lcimale
outcome will be reported in next year's
an~ llal reporL
,\
·u'eneral l1se Permit ~nual Reporf-
3. Tri\nsporlaticnfClrculation.!
Parking
a. Implement the Transportation
Demand Mlmagemem (ID!'.f)
program according to E~hibit
B of tie ~m:ral Use Permit
b. Provide bike parking at new
and remodeled bLllldii1gs and
recreation facilities.
c. Report on cor.str;Jction of
replacement or new parking.
I Seplember 1990·31 August 1991
a. Because previous tniflC mitigation.!. v.'("re
L'1 place before adoption of the General
Use Pe!mit, Lie Adjusted Daytime
Population w.hkh triggrTS TOM mitiga
tions is 31,914.
Since the 1990/91 popll1ction is 30,704, an
increase in the roM participation is not yet
required. Stanford has proceeded
nonetheless to rr-.onitor our roM
performance,
O<c.87 Oct 90 (kl9l
IDMQl~nt£ Ba~ BlQ~Il B.i~~s
Carpoo!: 133 313 4()S
Vanpoo!: 0 54 26
Buspool 24 24 12
Transit &sh~.lItre 239 3<i9 304
Bicyc1e 819' 8!9' 1074
Pedesaian m: m: 2H
Totals 1455 1814 2048
* Hrst counted Dc tober 90 and added to base.
b. Ford Field House 32 spaces
Gilbert Biology 53 spaces
subtmal, new bldgs. 85 spaces
various locations in the Med.
Center & Main Campus ill>l>=
Total add1 bike spaces 237 spaces
c. Thls year's reper: begins with some
clarLf.carions [0 previolls reports, -lhe
GeneraJ Use Permit Final EIR repor;oo a
total of 15.550 spaces in tl-.e central ca."'ll
pus. The first Annual Repol1 noted 1211
new and 475 spaces lost prior In grar.rjng
of the Use Pennit, bringing the baseline
tot al to 16,286 spaces.
.g..
The St"Cond report accurately recorded the
addition of 65 new spaces from tbe
reconfiguration of twO lots. It did nO{
report on spaces lost to eanhquak.e related
projects 01" consouction of Kimball HalL
The total at that point would have been
16,351 spaces.
_._._-.' -.-.. '"-~---..
;jf
.'~ r' :...
,
1
"" 'tfeneral Use Permit <\!Inua]
1""'\
Repol'l""
c. Report on ... parking (conl'd).
1 Seprembet 1990·31 August 1991
This year's P:port com bines the :Jnre
ported loss of parking at Kimball ""it!! tqe
new spaces g,-rinro al its activation,
sno"Wing a net lo~s from that project. The
sumnwy tabie below tracks the pamng
from me FEIR through. slJbsequent
reportS and shows OUI progress toward
the threshold of 1200 new (or 17,486
torci) s:pac~s_ lr.e parking impactS of
earthquake n:lated projects are :;how'!l 0n
a separate ttlble. as they are: not recorded
as perrr!anen t changes 10 the: systcn
B,l,
YC'.J r Ew~ Me Lo~s ~:l TmtJ,.
EElS 89 1< ~~Q lZ 11 4Zl lJ~ 16 .8~
9iE9-8/90 16,186 65 65 16.l5!
9,90-8/91 16.351 509 195 ill 16.664
Nl!t New Spaces 378
For the period between Sept I. 1990 and
Aug. 31. j 991, then: was a net increase of
313 pa.rlcing spaces in cen~ campus. The
table below lists the individual events C0I1-
tributing to tIut to:.ll.
H}.'LD (Annex) lCl-coroplet'n
eYRE l<J! '''Pansion--"
LPCH@S deck--activ'n
~£anzanita II-begin constr'o
Kllnb:l.l.i fl..al1-activ'n
TOTAL
Date
5191 sm
&91
6191
8191
lmpact
166
43
300
<91>
slJll?:
313
n.ese totals should now reconcile aU preYi.
Ol!S repons and (stablish a basis from which
fut>.l!t. rt.POr'"~ will be -prepared.
E"th~uake P>Ikin g Impacts
EYc:m
Wilbur modulars
Roble modular.;.
Eneina repairs
Museum repairs
Main Quad repairs
TOTAL
10-
Dare
~:"6;'
12/89
10/89
10/89
6i9O
Spaces
l.QSt
153
21
IS
22
...lD,
237
,-'
i
'''~
-
"(/eneral Use Permit .. \,mual Report
4. Hazardous Materials
a. Any actions lal:en by the
Univcrsiry-wide Ccmm!ne~
on Healrh and Safet"i. The:
Health and ,afety Commiltee,
reporting -:0 the }>resident of
the Universi.ty snoold be
operntior.al by Sprir.g 1989.
I Scptembec 1990-3.[ AugUS<.I991
B. The OniVO'Slty Committee on Health 8rjd
Safety mer five tlIIles in 1990-91, includ
ing one public meeting,
The general charge 10 me CQrnrnlttee is to
advi.se the President on the adequacy of
Stanford's health and safety programs,
policies and O!'ga.nizatio~ :0 recommend
needs., priOlities and strategies to promote
good hea:m and safety on campus; and to
re .. iew and recorT.mend to the President
University-wide policies 00 heaLth and
S2ietv matteI'S related to L'he use of haz
ardoUs biological, chemlcaJ and physical
agents w'n.i.ch are not addres~ byadrJ'lin
istrative panels,
The Committee is ccmpos.c:d of faCt.!lty
members,. a slUCent. representatives from
.. ..,e Dean of Res-:arch, Environnx:nta1
Health and 5 afety (EH&S), the GenoraJ
Counsel, Public Affairs., Planning and
Manago:.mem, a:J.c! a wember of the
community.
In 1'1;),91 the cOTl'lIDJttee considered the
fol..:owi.'g major policy is~t.les:
-new comp!'t'herls;ve health and safety
policies;
-facuity liability for health and safety f1 00-
compJ.j~ce, and the related issue of facilIty
indemniflCaoonJdef'!nse by the Ur....i.versrty;
anti-reprisal prot'!ctions [c·r employees
reporting health and safery Yloiations:
-health and safety training policy;
-review of rese.arch proposals i ilVolving
hazardous chemicals.; and
-review of com.'ni:tee ch arge 'dnd str\.lctun!'.
In addition to the above, the Comminee heard
and conside;'cd, many repon and information
items including reports of t"-e Administrative
Panel on Radiological Safety, [he status of
health and safety programs from each of the
"science" schools. the biosafery program,
laser safety policy, and oLher matters.
j ,
~n.r.! Use Permit Annual Repo.o -
I. Any actions taken by the
LTnivO'Slty-wide Cornrniue.::
on Health and Safety (cont'd).
b. Estabtish and maintain a.n on
going ri..~ asse~nt proce
dllI'C for new and existing
!tn..lcrnres. PrQCeduxes should
be imple:ncntod y..i.thin 2 years
of lbe adoption of the General
Use Pennit.
c. Develop a hazardous waste
ma.na.genleot pIan including a
waste IT'inimiza.t::ion element
and an on-gci. .. lg implementa
tion process withL'l 2 years of
the adopnoD of the General
Use Permit.
I September 1990·31 August 1~1
The Commluee feels that significa.'1t progress
has been made over t.~e past three years in the
identification a.Tld solution of health and
safety probiems on campus.
h. The University has cOffiEletcd work with
a facuhy member in r.'1e LJepa."tIIle.it of
Engineering Economic Systerr.s to design
a risk as~ssmeni: pnJC~ss. This process
Ulilizes dec-is:Ofl anaJys:.s techniques
comrnomv UY.:d in bu~i~~( ~rv! ;nQb
try. Decision analysis techniques allow
the U'M''::rs1!y to systematicaUy evaluate
Uie cos~ and benefits of the risk man
agement options it faces. The p:n:>eess
addresses new and ex.isting facility risk
a.s~.essments as part of an overili risk:
management strategy. During the repon
ing period this process was utilized to
evaluate :l variety of new and existing
fadlities issues.
c. There aR 3 types of w~ which may be
considered r-.az.ardol!s: Chemical,
Radiological, and Biological. There a.~
programs for each of these a."'US.
~12·
The University's Chen'..!ca! Wasre
Program (DIP) is responsible for cd
lc:ctia~ 2nd di$pC'sing of waste c-Mmicals
generated by University and Medical
Center laboratoriots. shops and studios.
The program also traCks all U nifonn
Hazardous \\0' sst!: Mamfests for y,·aste
ma!eri.aIs shipped from the campus.
Wastes. are picked up from individ'.lal
generating £ites by C\\tP te-."hnical per
sonnel Oi" by qualified contract personnel.
Tne wastes are transported in dedicated
vehicles to the U~verslty's
Environmental SafelY Facility (ESF)
where they are prepared fur shipment to
off-site permitted treatment, storage and
disposal facilities. Hazardous wastes
t."1a[ are shipped off-site are packaged,
marked, labelled and manifested in
accordance with applicable local, state
and federal regulations. Only registered
hlZal·;'~·'s waste haulers are allowed [0
tran.c;pon I aza..-dous wastes from
SrarJord to off-site treatment, storage
and disposal facilities.
:. -~-
•
rl
I
,j
-
General llst Permit Annual Report
c. Develop a lmz.:artio'-Js waste
management plan (conc'd).
1 September 1990-31 August 1991
Th.c ....... a.s.te minimization element of l~
hazardou!'. waste management plan has
~n dew: lopo:l as req uired by the
Hazardous WiI..5te Source Redocrlon and
Management Act (SB14).
No dlsurn.al of chemical wastes occurs at
Stanford and Stanford docs not intend to
di~oost of an ... wastes on-she in the
furure. Howel,'er, Stanford is exploring
the economic ar.dopernrional feasibilicy
of impieroc'ltii'1g se .. reral different treat
rr~nt and/or fe{;cr,,rery processe s [0 reduce
me amount of chemical wasteS shipped
off-site,
Thoen: are tvJo impedIments to implement
Eng chemical recycli.'1g prograrr.s at
Stanford:
1. Vl astes can be e:-:;n~ty van able ~"1
composition becall..')(: of the e)l;trtmely
di \'e~ types of research activities
conducted, a.'1d
2, Because much of the research at Stanford
is conducted en v'!ry smaIl scale. the vas.t
majority or wastes are gen.erated in small
quantities.
·13 ..
Given these !'.i!O fac[ors. it is diffocult to
develop "generic" IreattDe~t or recovery
processes that can be: pract1.cally and
efficiently utilized on a significant
pert:entage of the chemical ~'3Stes gener
::ued at Stanford,
A pilot~5Ca!e soh'eot recla.-narion program
commenced in 1991 and sol vents are
being reclaimed and rerumed ro generat
ing laboratories for reuse. A costlbenefit
analysis of the program is being con
du'-:ted. Feasibility srudies of low vol
ume acidIbase neutralization and treal~
men! of phoiographic fixers are being
conducted. Stanford ""ill apply to mod
ify the Environmental Safety FacJity's
waste handling permit if and when such
t:rea:ment or recovery processes are
incorporaled as an ongoing actio;ty.
, ""~'.--'
'~neral Use Permil ~nuaJ Repo-rP
c_ Develop. huardoos waste
managerrent pla."l {coilt'd).
1 September 1990 -31 August 1991 -\4-
The computerized chemical waSte inven
tory progrnn under development is
nearing completion. The system will
help to id::ntify and monitor waste
streaI!15 tr.J.t may be-candidates far waste
rnjnirruzatiOD prograrrls. atld wlll be a key
element of ta'1e hazardous was.te ma..'12ge
ment plan under d.evelopment.
\Va.5te generating processes have been
.:vaIuated in laboratories prOOl.ldng large
volumes of waste to determine options
for wun::e reductioo and !4'asre mini
mh41tion. Stanford's SB14p!an has
been developed. and is in the beginnLf1g
stages of implementation. Trait'jng has
'been conducted on waste reduction
options for ml.rnerou s generators. A pilot
che!Tl.icru redistribution system is being
conducted.
Radiological Wa!:tes are managed by the
HealL'M. Physi-cs division of L~e
Environmental Health and S.afety
Depa..""tment. All radiological materials
are tracked from receipt to disposal
Stanford minimizes the volumes of
nadioacUve waste by stOIing dry and
biological wastl: containing radioisotopes
with radioactive half-lives leu than 90
days until the 13.dioactivity is transformed.
to levels indistinguishable from back.
grtluT'ld The non-radioactive item; are
tilen incin erated to reduce the volumes of
materials discharged ~o a s.a.iltary landfilL
As a precaution, these ashes are analyzed
to ensure that radioactivity is below
levels permitted in drinking water. Dry
and biological ~'3S1eS containing oiourn
ar.d carbcn-14 an: also incinerated. The
perc:entages of waste picked up this year
that VI11l be incinerated are 99% of the
dry wastes and 79% of the biological
wastes. This significantly reduces the
amounts of radioactive waste which
need~ transport rn Lie communirv.
Effective the first of January. 1993, it is
probable tha: Wa.,)higton state and
Nevada v.~U not permit disposal of lew
le'l,'el radioactive wastes. 11ris .... 111
increase the volume of on-sit~ stonge
-
---.., ,.-..,
'Il.it-ner.tl Use Permit J\!tnual Report'
c, Develop a hazardous waste
managcl'!Jent plan (co.'"It'd}.
d. Tre-at wa:ste on-site inc:-Iuding:
incineration of hie>-wastes and
centralized control of haz
ardous wastes, reduce wastes
at the S(lUl'Ce, mi!urnize poten
tial for w:uc exposures from
uansportation of hazardous
wastes: through pi0peT p:.ick
aging. If on-site t:re.atment
becomes infeasJ.DIe for any
reason, report on transport of
wastes off sitt:.
I SepleJ"!1ber 199{) -31 August 1991
lliitil a site is avail at-Ie. A prolonged lack
of disposal si~s 'W'ill require Stanford w
develop addition.a.l on-sile storage.
The volumes ofrnedlcal and biolot,caJ
waste managed at the &.vironmenw
Safe:,. F;;;;ciliry are projecred to m...--rea . .;c
less, than five per cent annually for t."le
fore5eeabie f>.1run::, This grC",\'m
projection is based on i.-ncwn plans for
faCility e"1'a.'lsions, orl patient ca.'1!
cens.;s projections. or. anticipated
regulad.ons wl'..,,ich will broaden the
defir.ition of bionazardc·us waste, ar:d on
anticipated new resea .... cn prog;arns.
The generator of medicll a.,d biological.
wa.'ites are currenuy evaluating possibie
..... ays to mirtirnize the amounts of wasle
requiring. by law, disposal by incinera
tion. Some of these alternatives include:
more stI't. ... gent waste stream segregatkm
at L1e point of generari..,n [0 en sure the
biohazardol.ls wast~ stream docs not
!nc!ude gena-.J ref,j.-.e; continuing educa
tional progruns for biohazardous mate
ri als g~neratl'!:i on proper waste manage·
men! a.'1G minimization technique,S.;and
· ... ,h~re possible, llsing recyclable laoora
torv rr-..aterials ami/or biohaza:doLls wasle
c·:)nt.a.iners instead of disposable ones.
Such D'.easures a..'"'e being evaluated
according to their envi.ronmemal
soundness, ticlr oper::ltlona1 p.-a.: tic.alities
and their overall effectiveness in
mi.nrmi::.ing the amounts of mem.cal and
biological wa.<;:e generated that \f.·fU
reqLlirc: processing by incineration.
d. Tne En0 .. T'Qrum: nta! Saf::ty Faci1iry' Sta..i.1'.ed
the inci.neration operarions in i 98 7. All
hazardous wastes are managed ,enrr.illy
by the Environmental Healr..'l and Safely
Department
-15-
The Medical and Bio1cgica! Waste pro
gram i!l.cl udes colleen on ClIld incineration
of biohaz.adous wasles which are gener
aled by the Stanford University Medical
Center, Stanford University Hospital,
LucilJe Salter Packard Children's Hospi
ral, and Vniven.it)' research facilities.
, .,
~.
" Gen~r:al Use Permit Annua'1 Report
d. Treat W",SiC: on-she-(cont'd)
1 September 1990 -31 August 1991
Approx.ilnarely 725 tnns were inci.n.e!1!r~d
from September 1. 1990 to.&..ugus. 31,
1991. This in""'asc of 17 5 tons from Ihe
last rcporti.ng period is a result of t.i.~
expansion of the Stanford UI'.!lversit'j
Hospital and Medical. Center, of the
completion and start'Jp of the LUl,ilJe
Salter Packard Chi!dren's Hospital
(adjacent to the Stanford Hospital) and of
changing regula.l.Of)/ compliance
requirements.
Tne Ulci. .... eratoc conti.-med to 'be operated
en 3. double-shift bas~s (Hi-l'8 houn/dav,
6 daysiweek) during the reporting period.
Continued off-site transportation and
disoosal has remained and 'Will c.cntli1Ue
to iemai.."'! a necessity due to the requi..red
so:.-heduIed maintenance off·Hne periexis
and fur unscheduled operational
downtime.
The ir.cinc:rdtOf is designed to process
800 pounds per hour. The system has
been tested by the Caiifomia Air
Resoun::c:s Boa:d and extremely low
emissions were reported. Emhsions are
well beiow all permined reql.lin:ments.
Radio1ogicc.l wastes a..-e managed cen
trally at the En~ .. ironrnemal Safety
Facility. From s.plember 1, 1990 to
August 31.19914041 cubic feet of dry
waste and 1281 PVll.'1CS of biological
Wa5ie5 were collected and incinei.!red..
Approximately 500 tons of biolvgk-al
wastf: were tra."\sported off-site for L'1cin
eration during 1990-91 due to mainte
nance downtime or peaks in waste gen
eration. All Ul3.terials trans"'~ are:
tracked from point of generation to final
de5trucUon whether incinerated on-sit:.
or off-S~LC. During th~ same period, 114
fifty five gallon drwns of liquid low level
raruological wastes were:: di5POsed off-site
~n accordance with allloca1, sta;e and
federal stornge. o-ansportation ililC dis
posal requirements. 138 tons of chemical
wastes were dispos.ed off site in 1989-90.
, .
-.-'.
. .....
\..i'ene-ral Use Permit A...;;nnual Rtporr··
5. Existing Conditi(!O:s
Set up a multi-jurisdiction group
to a.ddre5'i existing traffic prob
lerru of volume, safety & noise
on Junipe:rc Serra Bivd. (JSB),
and Stanford A ... ~.
If traffir; mitigations are triggered
which affect ISB or Stanford
Ave., Stanford, with the panici
pation of the multi·jurisdicncu
group will evaluate the mitigations
and det...-nnine if modit1cations or
altemati.es i:\.."t: preferable
1 Septembu 1990·31 August 1991
5. The Multi-jurisdictional Traffic Advisory
Group o-ITAG), creared in September
1989 and describ-od in the 1989-90
Annual Report ... continued t"'uuugh the
first halfo! 1990-91. A .·"'king grO"P
consisting of homeowner n:presentatives
a.'1d eruversirj staff met momhly through
th·e faJl, repo~ing tva meetiI1g of me full
group in M<!.t.""Ch. Attivity has lapsed
sine.! L~n. due to the press of more
urgen! business for each of the parries
The group has failed so far to ide01tify any
measures that would make a pep.:epdbl~
long-term difference fn traffic speed,
noise: or safety on the t'4'O rows that are
aJso acceplabIc to the pllbuc agerr.::ies as
feasible and Warr2I1red. The group has
succeeded, however, in establishing pro
ductive lines of communication and
e ..... perimentation bet'W'een private citizens
and public agencies. The Universiry [s
com .. T.itted to hclpmg keep these lines
open. even in times of reduced staff.
Projects undertaker:; during this period were:
.p.
A CHP experin>ent \.L'itb "passive radar,"
1;\ hich aroused some public enthusiasm
bu.t produced no tanpble speed results:
Increay-d. CHP sDeed enforcemen t at
~i:~on School .1t -t.i.e beginning of
Stanford's fall qumer,
Sevcrd speed surveys or. Junlpero Serra
Boulevard by the Coumy Tr.msponation
Agency, to beip nomeO\l,Tlcrs decide
w he lher [0 request radar enforceme [] 4
Adoption by Stanford of routes for con
s.tructll'n O"Ucks that avoid neighboring
reSidential streets;
C'onti.'111.ing :raffie safety effort~ by the
Escor:.dido School PTA. the school d.i~
trict and the Ory;
Exploration by CHP of the rules and
practices governing speed. limits it1 the
Nixon School zone; a.rLd
"
-
'.-::
.~ (J
Gineral llse Permit 1/lncal Repori.~-
Ser up. ruulti-juri.>diction groop
(cont'd),
6. Otbe,
In elude a building summary
which cove:rs compliance with_
Specific Conditions highhghled L"
Section IL
1 September 1990·31 August 1991
Sound studies of Jllnipero SerT3 proper
lies ccnd'JCled under caMnle[ to [he
homeowners, }.'1int!)' funded. by Lie
Urn\l ersi~/.
JSB representativt::s t'e"iewed options for
a road widening al A!pine Road, wh~h
harl b<en triggered by Sranford', prior
mitigatior. agreements. and w'.Jl comment
di..-ectlv to Menlo Padt if and when the
city decide s to p~u-:: L"":Ie project.
A number of issues r-eIIl4in for further expto
rJ.tion, whenever the respe<:tive groups have
Ie s,ources to addn:ss iliem;
Radar enforcement on ISS (next step is
wnh homeowners);
Sound a...'11!nuaooo on JSB (awaiting
results c-fthe sound &rudy. then discus
sion betwetn bomeowners and the
Uni .... ~iry);
Priv~tely funded "pa..c;.sive r3dar" CarQ
paigns to heighten public awareness, and
Bi.k:: and pedesoian safery measures.
The newly COliStituted Stanford' Campus
Residential Leaseholders group (SCRL) ~i.1.1
have a. staff person whose responsibilities
include liaison 'Nith the Univen.ity and v..iLh
plJbJic agendes. on the whole range of home
owner concerns, including these. Both enti
ties hope that this liaison role will n:pl;::ce
'!-.ITAG, although some of ~ITAG's members
might be convened ad boc to address s.pe-cific
issues. The University's liaison ~rsOQ to
the leaseholder:;' a...;,sociation wi.il also serve
as liaiscn for Stanford Avenue neighbors, to
be their UnivelSlty conlac..1: person and to
facilitate communiciltions whenever Stanford
Av~!me neighb?rs request tJ'niven.ity assu.
tallce wit.' a problem.
B ui..ldings occupied 1990-91:
-]8-
Fore. Field HOIJse
Gilbert Biology Bldg,
Ryan Court Housing (26 units)
.>
~, '
-
Generai Use Permit Annu.al Report"
Include, building ,,,mmaI)'
(,o"t'd)
II. Specific C(tnditions
A. COflstruclion
!. Unpaved constructioo sites shall
be sprinklod ~ith water or tre.ated
in anOther manner 3ccep~ble LO
the: County as Deeded to dimir .. :ne
dust..
2. Dust resulting from stockpiled
soil. sand and olher such materi
als and from ;rucks bauling
debris, soil, sand or other such
materials shall be controlled.
3. Street!. surrounding cor.struccon
sites sh.aJI be kept free of dust,
sand and other construction
debris.
4, Sedimcn, <raps shall be con
S!I'1.lcted at each individual project
site to prt:vc!U soil from k~a ving
the sire. Ensurt that traps are
cleaned regularly.
5, Stockpiled soil Sllall have an
"angle of r~iXJse" that reduces
runoff. and shall be PTotec!ed
from erosion by appropriate
means.
1 Seplembc:r 1990 -31 AtJgust 1991
,', r:'-",
'd~·' <"~'c'
~
Under COt'1stTucrion:
Kimball Hall Vndergrul Hou,i;-,g
Medical School Lab Surge! Mogn,tic
ik<o"ance Spectroscopy
Golf Mainte nance Shed
Mo..'llaJ.1.!.la U Undergr~ Housing
See Sel.:rion II for how ~pecific ccndirions
appIl~d to !.o'J.ese projects.
1,2,3. Section 4.10.5 of the general condi
tions of Stanford's contraCt witll building
clJncra.,,:tors states "Q-..I\.·Poef (Stanicrd) 'It-ill
insist on rigid cootroi of dm:t,. storage and
waste disposal." Cor.rractors are monitored
by Stanford Cor.struction Adminisrrmors
who require: addi!ionaJ dust protcctioo as
needect
See response lO 1,
See response [0 1.
4,5,6. 'J1!e only soil stored on campus is the
aIi":ount 10 be use .. 1 for ba(·k:511. The rest is
hauled off c:.mp t;S. Tn.e tcpsoil stockpiled
from t.~e Girben Bioiogical Sciences project
was reused for planting 3.s.'""eas or removed.
fr .. n!] campus. There was no new bulk: soil
srorage at Stock Farm Road, There was;
temporary soil storage for minOt" utility pro.
ja.'rs. Scil excavated from these proj ecl5 was
returned ro the: sites from which it bad been
rc:mo~·ed.
See res.pense to 4.
-19-
-'
-> ~ '~neral Use Permit J\pnuaJ Repo~ ..
6. E=va:ed soil, except for badfiil
!!la~rials, shall not be stored on
Stanford lands unless a grading
penni t is obtainro from !he
County,
7. Construction activ1ties shall be:
scheduled to :reduce disruption of
acadc mic re~h or oc"ter
activities.
8_ Consttuctionequipmenl and
operations wirh a high noise
potential s.h.ould be muffled or
controlled 10 the extent feasible.
9. Energy management -cvmplia.'lcc
wiL~ California Ati.'TIinisrrari vc.
Cod< Title 24.
Note: The GeDeral Use Permit does
not require reponing on Condition 9
in the Ann l.lat Repon, but it is
mcluded for informational purpo:;es.
I September 1990 -31 AlogLlS1 1991
See response to 4.
7,8. Sectin!'i 10.2.9 of the Standard
Conditions of &.e cor..5tru;;tion Clintract Sl..ates.
"Contracoor shal.! exercise maximuiT: effort to
avoid dismption ""ith the academic
en\'~1"Qnment This sha.l.J. i..'lc!ude, at a mini
mum, using all feiL<;ible meLi.ods a.."d st:ri ct
di:>eiph."!e to ml.f1.:L.ilize danger, noise, \ibra·
rion, fumes. du~t and l.lt:~er pollution."
Campl aints were m.'eiv~d about lI1.e dust
generated as .a result of sandblastin g t.~e
paving at Gilben Biological Scie. .... 'ces. A
water washing and water blasting techniqu~
was substituted for the sandblasting tech
nique to mitigate dust
No other complaints Vw'C!e received about
noise, dust or fumes.
See re.sponse to 1.
9. Stanford Universiry continued it's
cornmjtrrn:nt ID use energy me-I"! em.
ciently in FY90-9L Effor"".s were fecused
in the fol1ov.ing areas: expansion of the
campus-wide cen!Talized energ)'
management and control system
(EM&CS" building scheduling, building
energy retrofit projects, plans reView f 01"
new construction. and wrnpus public
awareness. Expansion afme E~-l&CS
enables S cantoro to more precisely and
effldently control steam and chiUed water
in campus buildings. TI-js tighter control
also impro\'es occupan t comfon.
Expansion of the EM&CS is an on-gomg
effort:.
.:;0.
•
. ,
-
"-
~C'ne.raI Use Permit Annual Repo .•
~
9. E~CTgy rr..anagernc:nt (cont'd)
10. Enlarge or modify existi.'1g storm
drainage facilities to accOtlJIDO-
date ne\1i construction rilnQff.
Ally storm drainage improve
ments shall be plar.ned in consul
!aDon 'with City of Palo Alto rep
.resentacves and represemati\'es
from other affected agencies.
Such consultation shall include
discussioD of the possibilIty of
on-site retention and ground
water recharge of srorm water,
where feasible.
I Sept.embe: 199C • 31 August 1991
The ability to schoiuk enugy delivery In
\',mous building sy~t(:"l.'\.lS ano<i1er
irnportaf\t feature or the EM&CS.
Significam encrg:,r WSts are avo~ded by
shl..ming down the hearing and air-condi
tir)~i!1g sysrerns at nigt:.r., weekends and
h'Jlidays. In addition, buildiJ1gs: can be
scheduled LQ meet t~e spe<:ia1 needs of
student or research groupi.
Buildin g er.ergy retrofit projectS include
ilnprovemems tc :.,"',\:,: existing lighting or
air-conditioning systems to increa.-.e effi
ciency and there by reducc energY Con
sumption. An e .... ample of a retrofit pr0-
ject is t,e Center for Integrated S ysrems
(CIS) variablt speed drive project,. com
pleted tn FY90--91 L!J.at reduces energy
cons.umed in that buildirlg by Ol,rer 23%
or 2 million kWh per y=.
In adru:cicn to meeting the CabfrAnia Title
24 building energy requi.-etr.ents for all
new construction and large remodel p~
jects, each build!r-.g projeCi is: reviewed to
identify additional energy saving strate
gies chat can be incorporaled mlo the
pruje..::t. There is also a public awareness
program in. place which is designed to
educate the campus commUf'oity about
non-~echn.ical methOOs for reducing cam
pus energy cons.urnption.
10. 11lere was no activity on Phase III or IV
of the Storm Drain project dur'..I1g I 990-
91 which an:: phases !Jot considered nec
essary at this time. The first phase cf the
Palm Drive Storm Drnin project, the 01"1-
site retention pond and discharge channel
in the A~boretum area, wa.s. instalJed
during 1990-91.
R. Land""apinl
1. Mal.rmun C'JITent University site
lanasc.ping standa!t!.< of placing
high priority or. ~ser\'atiQn of
exi<:.ting mature treeS; tilher pn::
served or featurOO in design of
new buildings.
2. Replace ma.tu.n:: trees which are
lost as a result of cew building
construction ~ith new pianrings
of equivaJent long term quantity,
quali t'j, and value based on the
Intmwional Society of .4.:rbcricl.ll·
ture Guidelines and subject to the
approval of the c,unty.
:3. ~dscape plans for new prt'jects
shall tmphasize drought tolerant,
low Ol<'I.intenaIlce species.
4. lrrigalion systems shaU be:
inst:alled only afler ttVi.ew of
long-temI need and
appropriateness.
S. Mainta.~"1 a.,d -enhance the Footh.ill
~a'5 diversity Df native: vegeta
tion type!'.
I September 1990-31 AllgilSt i991
1. All 1990·91 building and roadway pro
jects were reviewed by land:)ca~ an.:hi
teets in the Stanford Phnning Office fC"f
compliance with Urti .... mity la1ds.;;ape
standards.
2. Trcerepbce:mem rt"quirtmenr..s are
determined duri.ng the review of the land
scape plans prior to the cOl'1srJ'uction of a
bUllding. LaI1ds.cape pla."1s are pan of [he
County Archi.ectural and Sit.e Approval
procl!ss.
3. Drought tolerant, 10.....-maintenance
spe;.-ies Y':ere empi"..asized in !andscape
plans.
4. Irrigation systems are reviewed by lz.nd
~ape architects in the Plwping. Office as.
weU as by qualified, responsihle person·
net in the f a,,-ilities Operations and
Mai.'1lenance Department to iI1SUP'! t1l!~ir
appropriateness on every new landscape
projer:t
Further, because of the ongoing drought,
as mu\...h of the ::,x:istitlg irrigation system
as possible was converted to lake water,
to red;Jce demand on the potable Water
supply for i.rrlgation needs.
S. We contir.UI! to pursl.1e our commitment to
revegetation with LIJ...'"'ee species of native
o-aks. We a..r-e continu~g to plant narive
bunch grasses as well as California native
wi1d£lowers in the area. (See a1~-O
response to 7.)
4-
. ,
, .
~e~era! Use Ptrmit ~nuai: Report
6. Minimize ret!'IO ..... ai of oak trees.
Set back d:velopment from exist
ing stands of oaks.
7. Cootinue regeneration of existing
oak vegc'larioo in me Foothills ir,
a;;conlance with the iidopted
Yegetl!lioD Management Plan.
C. Solid Waste Disposal
1. Stanford shall set and meet an
aMtW goal for its recycling pro
gram. to reduc.e the amount of
material disposed of at landfills.
1 September 1990·31 ALlgusT 1991
6. Bwlding ana. la..'l(hc3.pe pians ~""t:
reviewed by t<le P 1 an:ung Office to
minimize ~e ~mo¥a1 of oak trees. The
staJ1dard COi'lStrUcrion contt3C1 (Sectfon
10.2.1.3) states ili;n ''Th~ ~ontr3Ctor shJ..!I
taJr.e ali.rea..'Onable precautions for the
safety of, and shan pro¥"ide al' reasonable
protection to pre\'ef1t d3.rnage, injury' Qr
loss to: other property at the site or adja
cent tiere!o, including trees, shrubs,
lawns. _. not designated for remc .... a:l,
n:locaticn or rcplacemen t in d1~ course of
con:;tr.Jction." This 1S monirored by t...'1e
Star.ford ConsO"'.Jction Administrator for
each proj eel.
7. AppTO:\imateiy 1,0(0 acorm were pla.'"lted
in the a!lntmn of 1991 in t1-)c Foothilis as
part of the oak re-vegetation and
regcOCTdtion program. The program also
monitors the success and hilw-e of acorn
gro\l,1t.I-J due to drought, pre.dation and
vandalism. Modifications an: made to me
program accordingly.
1. The ~c)'ding goals and acr.;al recycled
amounts for 1990-91 solid waste are as
follows.
1990-91 1990-91
Goal Actual
kM Ilms
Total tons 2,996 4,121
Academic
'111:a.s: 2,370 2.372
FacuJ t:)'/staff
& groid Stud.
hOLL'iing area: 626 1,749
Percentage of waste s.tream diverted to
recycling; 22% 23.4%
The recycllng goa] for 1991-92;'s 26.4%.
•
""\ ~ntral USf Permit Annual ,""" R.po~
1. Tr.u.'l :personnel invol ved ~ith the
use and handling of hazardous
mateti.als.
I SepLember 1990 -31 August 1991
~
1. As mc:ntioiled in last year's re,P')rt.,
Stanford policy requires training or
employeu in hazardous materials
handling. Schools, Depa."'t:ments. and
Prir.cipal Investip.tors provide Va.';OllS
Jevel..s of training throughoUt the Uni-
-24-
' .. e!"5ity. fn addiaon to in hQuse staff
a'..'ailab!e to provide training. tie Envi
ronmer.ta1 He.a!1l ar,d Safety Depart:rnc:nt
'has ~e contracts in pI&.---e \1.'iLh individ
uals L-wolved in training program devel
opIT.em a...r'Jd deuvery.
Envil'omuental Heahh aJid Saferv per
so"",el sp<eificll11y respoo.'ble for
handling hazardous wastes a'ld emer
gency Uspor!5eS are trained by the Indus
trial Emergency CooI<lin2lir.g Council
and by professional EH&S staff in
ac::corda.'1ce with local, state, and federal
regulations. In 199().. 199 1 Environmen
t.1l Health .,-,d Safety personnel specifi
cally responsible for operating the
bioIogicaI waste incineratot"Mve received
intensive training in m~a1 wzsr.e L'1Cin
eration from professional EH&S staff
alld representatives of 1M, incinerator
manufacturer as required by state law.
Stanford's incinerator operators were the
flm in the state to fully and successfuny
.corr.plete the state~mandated certification
program.
Stanford is also developing was:.e man
agement and minirniz.ation tr.O.ni!lg pro
grams for ca.'11pus and Medical Center
fa.;wl¥. staff. and sntdents. Surveys
wen: ft:c.emiy conducted tv c:k:termine
chemical management and storage prac
tices. proces.ses generating hazardous
demical waste, and optio.'1S fer was!e
rr.inimization, and waste II!lll1agement.
By incorporating su.."'Vcy data in the
training material, laboratory perwl".nel
~~U receive practical. rather than tbeored
cal methods for implementing source
redaction and/or 'Waste minimi£alion pro
grams. Surve)" infonnation will also be
us.ed to develop a Source Reduction
Plan. and a Hazardous Wa5te Mat'la£e-
ment Performance Report ....
•
. ,
'I
!
-
"--ner.;' VS~ Permit Annual Report
!. Traii persc;mcl (cG!" .• 'dJ
2. Eli uip new f'eS<!a!'Ch and medical
fatilities \Vith cootral !ec1w.)iogy
s.cirabic to the pa."1:icularfr1ciliry
and the hazardous marerial (0 be
used !:herein.
3. ~pare Hazardous Materials.
.Management Plans for l2.bs \1,.' here
h az.ardous material S would be
stored. in compliance with
COWlty Health Departmen,
requirements.
4. Comply with Federal and State
regclatious n:garding hazatdous
waste managemenl
Ra;iiologEcal training progrd.t11S encour
age substiruticn of [1<Jn-radioacrive sub
sta.nces oNhenevcr fea.sible iilld instruct
c)'.pcrimemers to keep exrrar.eol1S i:ems
thai mav become conta.'TJi'-1ated our of
work a;eas.
2. ~-ew research ornd rneru-.:a1 facilities are
de-signed to meet the building codes
appropriate to their use. A.5 at! exa.'npI:::.
th, Medlcal School Lib Surge builcling.
scheduled to come on iinein 1992,
inciudes a number of safety design
fearu.res based' em t~ Uniform Building
Code Gmop H. Division 7 ,ha.urOous
oc("upancy sta."ldanis. Building C'x:hau.st
systems provided with ('rn~rgency
power, and the ov:::~l1 billlding layout
pro "ides a utility corrid!)r betw~n labs
without intruding on pc:::-sonnel corridors.
Additionally, each lab module includes a
full siu !ab fu.'"!le hood, a flammable
liquid and a corrosives storage cabinet
and SJ.fery shower and eye was!'! station.
3. Thirty (J<]) Haz.ardou, Marcial, Man·
agement Plans for labs were prepared
between September I, 1990 and August
31. 1991 and s:..;bmitted 10 the COWlry
Public Health DepaTUnent, Environmen
tal Health, Toxic Substances Contrci
Division,
4. Stanford's Environmental Safery Fadliry
is Ope7aled i:'J accordance ~;it." local, stare
a.,.,d feder.J regolarions. An operations
plan and annual report of hal2IdoLlS
was!::: handling is available at rhe
California EnvironmentaJ Protectioa
Agency·, (CaI·EPA) Deparunen' of
Toxic Subs-cances Conuul, Region 2
office in Berkeley, California. The
facility is inspected on a regular basis by
officials from the Palo Alto Fire
Depamnera. Counry of Santa a ara
Health Department. 'he Cal-EPA
DepartmeIil of Toxic Substance~ Control,
and th.e California Department of Heaki
Sef\rices Radiological Health Branch.
Rt:cords of tJ'1e inspections are available
at these agencies offices i.., Palo Alto,
San lose and Berkeley, California
respectively .
. 25-
•
-
'1 .-,
-j
General Vse PermIt AI11'PJal Report
E. Ar«:haeologicallHistorical
Resourcu
L County polic Y for ar<:haeological
::iit-cs s.hall be forIowed. [f hu.man
remains a..-e cncounl.erro, work
shall stop imm~diate1y and the
campus an:haeologi st and Cacm)'
Coroner shall be notified. Within
10 days, the County Englrlec<
wiJl issue a permit setting fon.h
th i! conditions for removal and/or
continued work at the slte.
Should any other paleomological
or a."'ChhecturaI specimens be
found, Stanford's policies r::l~ted
to artifacts shQuJd be followed.
2. Maintain the architectural charac
ter of the campus by adhering to
design guidelines which 3J'e
stated in a facilities design riocu
menL Such st&ndards insure tbat
new buildings will funher
~r.hance the architectural cha.racter
of the campus and its va..""ious
regions.
3. The Stanford Efu;toric Values
Index: shall be consult~ "",,·hen
( msidering demolition or
~modeling of building> with
historic mtere::,.t
1 Sl!ptember 1990 -31 Al!gl.lSl 1991
1. The SI2.iuord .A...rchaeobltist re .... ie"'-ed dlt
sites for budding prvjc:cts prior to C011-
srruction Ilnd determi;:ed that no a.1'Ch:!co
logical reSOLlrces w~!'e present. :1\"0
human remains were dis!urbc-J cu:ing
1990-91.
2. Si.tes and project design g'.Jidelines
reviewed and approved by the e niversity
Com..rnincc: on Land and Building
De .... elopmem during 1990-91 include.d:
Advm.;ed Materials Research Facility
(AMR)
Ca. ... ce:r Reseat"ch C~nter 1 (in St}MC)
D.I\PER Athletic CompleJl:
Economlcs/CEPR BulJdlng
F2Culrv Practice Clinic (in SU~:tC)
H.aas ten ter for Public Serilice
1\1anzanita II (undergradlJate housing)
Psychiatric Cemer Academic/Research
Building (in SliMC)
All projects were cons:stent with tD.e
Unlvcr~~ty's des.ign guidelines.
3. The HVr Group concentrated on recom
mendations rega.-ding older buildings
damaged in the Loma Prieta carthqua..\e.
The Group l..'1spected rhe Main Q.Jad and
made recommendations for elements to
be preserved or restored during renova·
tiens a.."ld repairs. Subsequent design
guidelines: and standards. f{)(" seismi.:
repairs and improvemems tel the !-.!air:
QU2.d were reviewed. The mos.t impor~
tara of the other historic stone and
masonry buildings. were ranked for rela
tive value. Five of the older Ro'~'
Houses. including Synergy, Delta Tall
Delta and Phi Psi (Cooksey Hou::;.e) were
evaluated as input to subsequent deci