Ci vic Center Bu] Iding EMS System _Additional DE'.s ian, CIP 19017 -
NP-erdmen'i; to Cousy.l tant ];,g.r~e.ment
Members of the Council:
p.eporj:. in Brief
This report recommends that Council approve the attached amendment
to Agre-ement No. C-58757 with orBrien and Associates, Inc. to
increase the consultantls compensation in the amount of $10,000.
Funds are aVailable in CIP 1'9 01 "'} , Civic Cente.r Building Energy
Manageuent System, and in the Facilities Management Division
operating budget~
Discussion
On February 5, 1990, Council approved an agreement in the amount of
$29,400 with O'Brien and Associates for the design of a central,
automated control system for ~he Civic Center heating. ventilating
and air conditioning system tCMR:141:0). staff is requesting an
amendment to the agreement in the amount of $10,000 to accomplish
three rel~ted aspects of this ~ork:
~. Additional construc~ion ~anagement. beyond that provided for
in the agreement) is ~equired to complete the project. The
rate is $65 per hour (as stipulated in the agreement); the
total will not exceed $3,520 for the additional construction
1'lanagement.
2. Additional design work is necessary to alleviate air flow and
noise problems in specific areas. This 'Work could not be
identified until after the 9roject 'Was essentially corr.plete,
bu~ is provided for in the agreement as additional services.
The cost for the design 'Work will not exceed $3,235.
3. Additional design work is needed to rnooif:1'
ventilating zones in the City Attorney's office.
this design ~ork ~ill not exceed $3,000.
the-existing
The cost for
The foregoing work will complete the design phase for the Civic
Cente.r Building Energy managen.ent System project. 'I'hese additional
services will net exceed $10,000.
CMR,192:92
1
""-'~-
staff recommends that Council ~pprove and authorize the Mayor to
execute Amendment No. 1 to Agreement No. C-58157 with O'Brien and
Aseociates, Inc~ in the amount of $10,000 for additional design and
construction management services for the Civic Center Building
Energy Management Sy.s:tem project.
R~fUl ~.~bmitted.
~'CORAN
Facilities Engineer
. ~~\ ~,jGj(;J/ \"") ___ 0_)" ;'} ,; K/e,( rzc ./... ~ ,Cr.. ~,,-A ____ _
DAVID G. ADAMS
Director of Public Works
Amendment #1
Related CKR: 141:0
CHR:192:92
2
-
AHENOKENT NO. 1 TO CONTRACT NO. C-587S7
EETWEEN ~ITY OF FALO ALTO AND
O'BRJEN l ASSOCIATES, INC. CONSULTING ENGINEERS
FOR. PROFESSIONAL ENGINEERING CONSUL~~ING SERVICI:S
THIS A!"IENOMENT to Contract No. C-587S7 i5 -made and.
entered into thj 5 day of ____________ , 19~2, by and between
the CITY OF PALO ALTO, a municipal corporati.:m of California,
hereinafter referred to as nCITY r -and O'BRIEN & ASSOCIATES, INC.
CONSQLTIN~ ENGINEERS 'Tax~ayer Identification Number 94-2624963),
a corporation, with offices at 305 So. 11th street, San Jose, CA
95!12, hereinafter r€ferred to as "CONSULT.~~N;
WHEREAS, Contract No. c-sa757 was pr~viously entered into
between CITY an:i CONSDLTA.l'fT for the pr:::;vision of design services
for an energy manageltent sJ'stem for CITY's Civic center; and
WHEREAS, t,he parties desire to amend said agreement to
allo~ for CONSULTANT to perform additional design and construction
management services in connection ~ith the system;
NOW, THEREFORE~ in consideration of their mutual
covenants, the parties hereto agree as follo~s:
SECTION 1. The first paragraph of Subsection 7.1 of
Contract No. C-58757 is hereby amended to read a~ follows:
JtIn conside.ration for the fl.!ll performance of
th-.a Basic Services and Reir.ili",nsable Expenses
described in sections 4 and 7 of this Agree:rnent~
crry agrees to pay CONSULTA.IliT ~ tetal fee !"lot to
exceed Thirty-nine ThOt.:i.sand Four Hundred Dollars
($39,400) for the complete Design staqe and for one
hundred ten (1IO} hours during the construction
Stage. Notwithstanding the foregoing, in no event
shall cITY pay CONSUL~ANT more than Three Thousand
Dollars ($3,000) for services related to the city
Attorney's office area air distribution system
renovation, Three Thousand ~'O Hundred Thirty-five
Dollars (S3, 235) for services related to air a.nd
noise problems ~ith the system, and Three ~housand
Six Hundred ~enty Dollars ($3,620) for additional
construction management services related to Project
completion~"
SECTION 2. A ne ..... subparagraph 16. L 3 is hereby added to
Section 16 of Contract No. C-Sa7S7 to read as fol1o~s~
1
-
'"16. L J In the event CONSULTANT prod .. ..lces 'ltl'l-itten
documentation to support CONSULTA.l.IT' s claim that
CONSLTLTA..'l'f is. unable to provide any or all of the
insurance coverage as required b::{ this section 16~ and in
t.he event CITY agrees to release CONSULTANT from t.he
obligation to provide ani' or :all such insurance coverage
as required hereunder, then CONSULT;'~'lliT shall be reI ieved
of such obligat,~o!"., provided, ir, consideration of CITY's
release of CONSULT.A.NT of the ~bligation to provide any or
all insurance covet'age as req..;.ired hereunde.r. COt_:;;ULT_"U';T
expressly covenants and agrees that CONSULTANT shall at
its sole cost and expe!"lse be respons ible a.l'J.d liClble fo!'"
the perfonr,ance of any and all rerosdial action deemed
reasonable or neces~ary to modify, repa.ir, 0::-replace any
d~fect in, or defect in the design of, the Civic Center
Energy Management System caused by or arising out of the
negligent acts, errors or c1i!lissions c-r willful misconduct
of CONSULTANT, its officers, agents, subcontractors or
employees in the performanc~ of any of CONSULT.lWT's
services hereunder. II
SECTION 3. The follo .... ing exhibits to Contr'9.ct No. C-
58757 are hereby ainended to re3d as set forth in the following
exhibits attached to this Amendment a~d incorporated in full by
this reference:
a. Exhibit MAn e.ntitled I'IScope of work.: civic Center
Energy Management System~.
b. Exhibit PC:1 entitled nlnsurance".
SECTION 4. Except as herein modified, aJI other
provisions -oiand e;;.h.ibits to Contract No. C-SC!7S7 shall remain in
full force and effect.
IN WITNESS WHEREOF, the
Amendment the day and year first
CITY OF PJUO ALTO
Mayor
ATTEST:
City Clerk
}.PPROVED AS TO FORM:
Assistant City Attorney---
2
parties hereto have execu'ted this
a.bove .. ·ritten. ~
O'BRr;-~ .. '~. ~TES' INC. CCNSUL'~~~~ NEEPS
By: _~y . _
Its: ViC!! -IkES lUI:"" r
Taxpayer Identification No.:
94-2624963
........ -·:"~~,~i;~~, ..
. ~,.
APPROVED:
Assistant City Mana3p-r
Director of Finance
Director of Ruman Resources----
APPROVED AS 1: 0 com ENT:
Director of PUblic Works
Attacht:lents:
Exhibit 'RA": Scope of Work::
Exhibit "'C":
Civic Center Energy Management system
Insurance
3
\
, '
,
~tQ EXHIBIT A -Under Am~ndm&nt No, 1 tQ contract No. 587S7~
scope of Work: Civic Center Energy ~anagement System.
The Consultant shall provide to the city the following
services in phases, as described below.
This phase shall encompass Consultant data gathering
thrvugh onsite surveys. information and dra.ings provided
by the city, and m~etings with Facilities Management
personnel. Consultant shall develop points list and
schematics. During this phase, Consultant shall
determine whether the city is constrained to equipment of
a particular man'Uiacturer based on its <::urrcr".t use of
existing equipment. Consultant will· assist the City in
vendor pre-qualification. Consultant .ill give a
prezentation on the progress of the project.
b) Design Development Ph~
Working from data obtained and/or approved schematics
developed by the Consultant during the preliminary phase,
the Consultant will proceed ~ith the development of the
EMS design, preparing dra .... ings , specifications J and other
related data for submittal to the city for review and
approval prior to finalization of the design.
1
. -
---
I
I
(I
I ., (City will coordinate closely with Consultant during tt: is
period to minimize re-dasign effort for the final design
phase)~
c) COhstruction.Documents Phase
Upon approval by City of -the Design Develop~ent docucents
(drawings and specifications), Consultant shall make any
changes, additions, deleticns l andjo.r-modifications to
the documents produced during the Final Design Drawings
and Sp=cificaticns for the proposed EMS a City shall
reviev these final documents and, upon approval, accept
them.
If required by the city, consultant shall assist in the
preparation of final design development phase to the City
Council and any council cO!lUllittee to .-hich the project is
referred. The Consultant will attend a minimum of two
meetings during this phase.
The Ccnsultant shall submit to the project engineer. in
triplicate, copies of any and all calculations, sketches,
diagrams, computer printouts and other documents used by
the Consultant in the design of this project.
d) Construction Phase
Consultant shall attend the pre-bid walk through to
~nswer contrac~ors' questions and for clarification cf
specifications~
C-ansul tant shall assist in evaluation of bid!:: for the
furnishing and installation of the EMS System.
Co~sul tant shall atte!'"Jd pre-construction meetings and
answer questions regarding the plans and specificdtions~
Con~ultant shall assist in the resolution of technical
and/or administrative matters that may arise during the
installation of the F.MS relativ-e to design
interpretations, fi~ld conditions, conflicts, and/or
errors or omissions in the drawings or specifications~
Consultant shall assist in evaluation of ... ·ork cO!:lpleted
by the installing contractor for est.ablishIl'..ant of partial
payments by the city to the contractor~
Consultant shall assist in the eVd.luation of the final
installation of the EMS for project. acceptance by the
City~
Consultant shall provide engineering analysis and design
to correct noise and air problems related to? the new
control system~ Consultant shall provide all required
3
au:
construction administration necessa_ry to cO>:lplete this
work, and the project. Consultant shall provida design
dra"Wings and specifications for alterations to the
existing air distribution system in the City Attorney's
offices. Such documents sh3.11 be sufficient ft:lr the City
to obtain competitive bids to accomplish the air system
alterations.
~. Time of ..::ompletion
All desi'1n work for this project shall be co::npleted by the
consultant by April 30, 1992.
3~ Scope and Characte~ist~cs of the EMS desiql1
The final design as prepared by the Consultant shall adores$
and encompass the specified fe3:tures ar.d capabilities as set
forth in Attachment aD~ hereto, entitled nRe~est for Proposal
for Design services for an Eneray Management Systerr. for the
HV/AC sy§>tem at the Civic _nee.pter Building. 250 nHamilton
Avenue, pa10 A:.l.to. California" (d~~tedn_.A.iJgust 17. 1989).
4
-L
;~~1~1:
~ : l_~::' -
CITY 0.. PlWO ALTO
FACILITIES MGMT DIV
A'l"I'N; KAREN SMIT"d
POBOX 10250
PiUD AIJl'O, CA 94303
L
fiXPft\T1oti ~1!! ~-(7c. !'HE ~ CQj,pAHY~ E:KPfA\IOA TO
IiWl. ----3"' .... WftfI'1I!)f ~TleETo 'n1E~pC.t,n; HC't.DDI MAYBlTO-ndi
LCI"T, auT fAfLUfE 'Tt),wA,jL.avcH rc.1lC£ ~ ~ MDoaucJ.'MH OR
QR~"'T!Ve'!l