HomeMy WebLinkAbout0186.092MaI"ch 19". 1992
THE HONORABLE CITY CO~~CIL
Palo Alto, california
Regional Water Quality Control Plant Laboratory Expansion -Award
of Cont.ra ct
Members of L~e Council:
Report in Br-ief
This report recommends that the Council approve and authorize the
Mayor to execute the attached contract 'With A &: A Mechanical
Contractors Inc. in the amount of $225,661 to install and furnish
additional laboratory facilities at the Palo Alto Reqicnal Water
Quality Control Plant ~PARWQCP). Funds have been appropriated in
elF 39595, L...aooratory Facilities and elP 39591, Plar.t Equipment
Replacement.
Bac)cgrour,d
The new permit a!id order from the Regional Board has imposC:lI a
stringent monitoring program on the pl&nt discharge and industrial
waste. The new program resulted in a significant increase at a
higher level of sophistication of sample analysis to be performed
in the plant's state certified laboratory. This project 'Will
provide additi~nal facilities to meet the new requirements and
relieve the existing overcrowded condition in the laboratory.
piscussion
Bids .... ere received from three qualified. contractors as shown on the
attached su.mIllary. Staff recommends that the. bId of $225/661,
submitted by A , A Mechanical Contractors Inc., be deteLmined by
council to be the lo~est reponsible bid and that the contract be
awarded accordingly. ,]lhis bid is 5 percent above the engineer's
estimate of $215,000.
Funding
eIP 39595, Wastew-ater Enterprise fund --$230, 000
ReCOlDJ!len d3. tJgns
staff recommends that Council:
-1-
CHR:1S6:92
#~~"l' .. " .. -"
5
~~
:1
1
1 ·1
; ,
i
I
1. Approve and lIutho.:-ize the Mayor to execute. the attached
Contract with A , A M~chanical Cont~actors rnc~ in the amount
of $225,661 for the LAooratory Expansion ~t the PARWQCP.
2. Acthori28 the City Ma~age~ or his designee to negotiate and
execute one or more change orders to the contract with A « A
Mechanics! Contract~rs Inc., the total value of which change
orders shall not exceed $20,COO~
Respectfully sUbmitte~,
WILLIAM l!IKS
Manage~~ water Quality Control Plant
Ou~t (] ai~<--
DAVID G. ADAMS _
Director of ~tic Works
/
ACJ/
. JiJRE FLFJUN~ ~
Assistant city ~nager
......... Attachments~
Clffi: 186: 92
Bid summary
cont"ract Pages
-2-
,
-.•.. '" ,:::,1 .' ."
• C . -
Cl'l'Y OP PALO ALT:>
RBGl:OIilU. ""Tn QUALITY COIITR01, PLAIl'r
~'80~~RY BXPANSIOH
lID SlJM>IMl:
March 7, 1992
81401. ... bOUDt. ot Bid
A & A Mechanic~l Contractors Inc $225,661
Gen-Con Inc $261,376
Redwood Plumbing Co Inc $268,585
Eftqineer'5 esti~ate $2:15,000
~,
-3-
CHR:186:92
...----->._-
-
CONTRACT
rtf15 AGREEM'"'clI.7 is made and entered into, in duplicate, this ____ .~day of _______ 19_
by and bet\veen the City of Palo Alto, California, hereinafter called "CiTY", and -.h __ & A Mecb.iL.ial
ContracteD Inc ~rcinafter caHed "Contractor". whose Taxpayer Identification Number is: ____ _
For and in consideration of their mutual covenants, the parties herltto agree as follows:
J. Contractor shall do 211 the work and fumish aJi the materials necessary to consLruct and complete in a
good, work..rrtanlike ar.d suhstantial manr.er, and to the s.a.ti::facLio:1 :Jf tlJe City (.If Palo Alto, the
following:
RWOCP l&OOrawry Expansion
2. This contr.::et shall consist of the following documents on flie 'l.Nith the City Clerk, all of "~.:hich .are
l.'loorporated herein and made a part hereof by reference therete:
a. This Contract
b, Notice Inviting Sealed Proposals
c. Ac.cepted Proposal
d. Standard Specifications dated 1972. as ameneed. or as superseded by other documents
incorporated herein.
e. General Provisions
r. Technical Specifications -Special Provisions
g. Certificate of Insurance
h. Perfonnance Bond
i. Labor and Materials Bond
j. Affirtrultive Action Guidelines and Compliance Report
t. Any and all supplemental agreements which L"llerld or extend the". work c.ontemplated and which
may be required to complete the work in a substantial and acceptable manner.
3. In C'CfIsideration of s;,}cl'l work, CITY ~ha11 pay Contractor the a~nount specifIed in h:s bid in the manner
provided in said Standard Specifications dated 1972, as amended.
4. ConclLrrentiy with t'le execution of 111is contract, Contractor shall provide CITY with the Contractor's
l.abor and Material and Faithful Performance Bonds and certificate~ of insu.rance, ir.c!uding any
workers' compen.llation insurance required by the laws of the Stare of Caiifornia or otheNise required
in said specifications.
s. This contract shall not be assigned by Contractor.
CONTRACT (Continued)
6. All claims 'by Contractor regarding extra work, cha1ges, delay or otheT disputes aris.ing out of the
Contract must be submitted to CITY il" writing within ten (10) werking days after the claim arose,
descnbrng in detail the nature and value of the disputed work or ci~im.
7. Contractor hereby agrees. to indemnify, defend and hold harmless CITY. its officers, agents, and
employee.s from any 'lnd all demands, claims or liability of any nature, c.aused by or arising out of
Contractor~s, its officers' > agents'. or employees' [1~gligent acts, errcrs, or omissions) or willful
misconduct, or conduct for which t.l1e !&W im}X)5eS sL.-ict liability on Contractor L'l the performance or
failure to perform this Agreement.
S. This Agreement represents the entire Agreement between tie panies with respect to the pmcha.se and
sale of Lie equipment, materials, or supplies or payment for :,emces which may be the subject of rnis
c.ontrnct All prior agreements, represrntalions, statements, negotia -tiOn5 and undertalings '.a.'heti!er oral
or written are superseded hereby.
9, No payment, partial payment, acceptance, or partiaJ 2.cc,eptance by City shall operare as waiver 'On the
part of City of any of its rights un6er this contract.
!O. Contractor agrees. to permit CITY to audit, at any reasonable time during the term of this Agreement
and for three (3) years. thereafter, Contractor's records J..'Crtaining to mattef'j covered by this Ag1eernenl
Contractor further agrees to maintain such teC()rds for at least Urree (3) years after the tenn of this
Agreement
IN WITNESS VlHEREOF~ the Parties have set their hands all OJ'! the day and year first above wTitten,
ATTEST: CITY OF PALO ALTO, CALIFORNIA
By: _______ _
City Clerk Mayor
APPROVED: CONTRACTOR
By' ____ _
City Manager Title:
Public Works Department Taxpayer 1.0.'
--------APPROVED AS TO FORM:
Director of Finance
--------..... -
Risk Manager City Attorney