Kay 16. 1991
HONORABLE CITY COUNCIL
Palo Alto, California
IIWROYBMEHTS AT THE nrl'ERSEcrlON OF wtlr1i ROAD AND PASTEUR [)RIVE
Members of the Council:
REPORT II! BlUU.
The. purpose of this report is to provide information t'eqardinq a
.inor project desiqned to create a riqht-turn lane on Welch Road at
P~steur Drive. This is an informational report and no Council
action is required.
BACKGROUND
As a part o£ the -Master List of Intersection and Roadway
Improvements Aqreed to by Stanford University as Mitigation and
COnditions of Approval-(revised September 21, 1987}, stanfordis
required: Cal to prepare and submit an annual Level of Service
{LOS) Analysis Report for selected intersections, and (b) make
specified improvements When the level of service at any of the
intersections exceeds LOS -0".
The 1990 Level of Service Analysis Report indicates that conditions
at two intersections have triggered the need to proceed with
specified i1nprovements. One of the intersections is Welch Road at
pasteur Drive wbere the specified improvements include, {a) add a
traffic signa1, (b) add a right-turn lane on Welch Road (south
[west] bound), and (c) re-stripe pasteur D~ive to create t~o lanes
on each approach ~ 'lbe second intersection i6 at Alpine Roadl
Junipero Serra/Santa Cruz Avenue intersection where the specified
improvement is to add a separate right-turn lane on Alpine Road
(north [east) bound).
IMPROVEMENTS AT WEICH ROAD/PASTEUR DRIVE INTERSECTION
'!'he improvements. at the intersection of Welch Road and pa.steur
Drive will be implemented in two phases. As an interim phase,
CMR:271:91
-, ,
•
~:
-~-------~~---------
o
stanford will be addinq the right-turn lane on Welch Road by simply
re-atriplng the. lane lines to accommoda.te a right-turn lane within
the existing curb lines, along with ~elated siqning an~ bus stop
cbanqes ss illustrated in Attachment A. This is a low cost
improvement that 1& expect~d to produce a notable benefit and will
be accomplished within the next several weeks.
Tbe final phase will be the installation of a traffic siqnal at the
Welch/pasteur interBection~ includinq re-stripinq Pasteur Drive to
create two lanes on each approach, widening Welch Road to create a
right-turn lane (if lane alignments so dictate), and other
modifications related: to installation or the traffic signal~
Operationally. due to the separation between the two legs of
pasteur Drive, this is oS complex intersection for efficient traffic
slqnal control. Therefore, stafr believes it is better to
coordinate implementation of the re-striping or the Pasteur Road
approaches (and the ultimate resolution of the right-turn lane on
Welch Road) with the desiqn and construction ot the traffic signal.
staff is working with stanford to develop an appropriate design for
this final phase improvement and expects that it will be
constructed in 1992. Meanwhile, the interim phase project provides
some immedi~tel low cost benefits.
IMPROVEMENTS AT ALPINE RQAD/JQNIPIBO SERRA/SANTA CRUZ INTERSECTION
The additIon of a separate right-turn lane on Alpine Road appears
to be physically feasible and would significantly i~prove the flow
of traffic for right-turning vehicles I which are nov regularly and
unnecessarily blocked by throuqh vehicles waiting for the traffic
signal. Since this project is within the jurisdiction of Menlo
Park and not Palo Alto" staff requested that stant"ord pursue
discussions with Menlo Park regarding implementation of this
project. Discussion betWeen representatives from Stanford and
Menlo Pa~k resulted in a request from Menlo Park that any
improvements to the subject intersection be delayed until after the
Henlo Park City Council has approved a General Plan Amendment
(Attachment B).
ENVIRONMENTAL ), S 5ESSME,NT
creation of the right-turn lane on Welch Road is a minor operations
improvement that is categorically exempt under the California
Environmental QUality Act. No environmental assessment is
necessary.
CMR:271:9 5/16/91
Page 2
•
"
.'
Respecttully aubmitted~
~~"~
ASHOR AGGARWAL
City Traffic Engineer
~~
KENNETH R. SCHREIBER
Director ot Planning and
community Environment
AttaChments: A. Signing and bus stop illustration
B. Letters from Stanford and Menlo Park regarding
regarding the intersection improvements
cc: Planning commission
Stanford University (Andy OOty, Phil Williams, Mike Kuntz)
City of Kenlo Park (Don de la Pena)
CKR:271:9 5/16/91
Page 3
•
C>"''''''GE IHIH"I~G --7'"
TO ,.00 AH3HT rU''U1 l,.NE
~E'" pus -?'
$1'"0'" & eoNeM
.. ' '!, ~ .... , ,
(
•
AlTACRMENT A
o
C;
a:
PASTEUR DRiVE -
PASTEL.:R DRivE
f' t , • ~'.
~
li l'
~ t
I t (,
~: .. ,
,
•
,
"> : .
' ..
/
o
STANFORD UNIVERSITY
March 1, 1991
Mr.. Xenneth R. SChreiber
Engi r:u~ering Service'S
327 80nair Siding.
Stanford, Callfor[]il; 94305-;210
Director of Planninq and community Environment
city of Palo Alto
250 Ha.ilton Avenue
Palo Alto, CA 94]01
Dear Iten,
A1'TACmtENT :B
(Page 1 of 2)
.,.
As you know, the Alpine Road/Junipero Serra Boulevard/Santa CrYZ
Avenue intersection vas triggered in last year's Level of Service
Analysis. This intersection is under the jurisdietion ot the City of
Menlo Park.. We he-ve approached Menlo Park about constructing the
specified mitigation. They are not ready for usa to construct the
.itiqation at this tlae, as you ~n see in the attached letter fro.
Menlo Park.
We will aqain pursue this matter with Menlo Part this fall and viII
keep you inforaed ot the progress.. Stanford feels that these actions
are in accordanee with our aqreements vi th you and the County o.f
Santa Clara.
Zf you have any questions about this, please call De at (415)
725-3400.
sincerely
~ ?tt.:L/:;4---
R. Michael Kuntz, P.E.
Project llanager
Encl.
cc: Marvin OVervey
Julia FrellOn
Charlotte strem
Mike McKnight
""'... "'" _k_ ...,.. ... ...
.. IIW.D ... .....,
OOINC1' --.M"""
Febru.ry 12, 1991
Mr. Mite Kuntz
Engineering Services
Stanford University
327 Bonafr Siding
Stanford, CA 94305
Subject: Alpin. Road, Junipero Serr. Blvd, Santa Cro' Avenu.
Intersection l~roYelents
Dear Mr. ~untl!
Ve appreciate Jull. FreMin and you glYlng us the Infonaatlo. concerning the
conditions of your .greeoent with Santa Clara County, the discussfons with
reSidents .long Junlpero Serra BoulEvard, and the traffIc engl.eer's report
c.netTllng the subject fntersectlon.
\
As we stated, Menlo Park fs In the process of • General Plan AlendDent which
Include. an eVllu.tion of traffic conditions Ind proposed I~rov ... nts
throughout the City. this Gener.l Plan process Is not expected to be c~l.te
until August or Septe.ber of this ye.r. Therefore, we are not 18 • positIon
to proceed with any I~rov ... nt at the subject fntersectlon until approval of
the General Plan Alendoent by the City Council.
W. hereby request that further discussions concernIng traffic .'tigation
iapreYelents for the AlpIne Road, Junlpero Serra BoulEYard, Ind Santa Cruz
Ayenue Intersection be delayed until f.ll of 1991 .fter the Menlo Park City
Council has approYed a Generll Plan Amen~nt.
Thank you for your cooperation and patIence In this matter.
Yery truly yours,
c> ~,,-r:~ lauren [. Mercer
cc: Jan Dolon, Cltl Manager
Don de la Pena, Community Oe.elopoent Clrector
Jull. freaan. Stanford UnlYerslty
2758[
•