HomeMy WebLinkAbout0271.091• • Kay 16. 1991 HONORABLE CITY COUNCIL Palo Alto, California IIWROYBMEHTS AT THE nrl'ERSEcrlON OF wtlr1i ROAD AND PASTEUR [)RIVE Members of the Council: REPORT II! BlUU. The. purpose of this report is to provide information t'eqardinq a .inor project desiqned to create a riqht-turn lane on Welch Road at P~steur Drive. This is an informational report and no Council action is required. BACKGROUND As a part o£ the -Master List of Intersection and Roadway Improvements Aqreed to by Stanford University as Mitigation and COnditions of Approval-(revised September 21, 1987}, stanfordis required: Cal to prepare and submit an annual Level of Service {LOS) Analysis Report for selected intersections, and (b) make specified improvements When the level of service at any of the intersections exceeds LOS -0". The 1990 Level of Service Analysis Report indicates that conditions at two intersections have triggered the need to proceed with specified i1nprovements. One of the intersections is Welch Road at pasteur Drive wbere the specified improvements include, {a) add a traffic signa1, (b) add a right-turn lane on Welch Road (south [west] bound), and (c) re-stripe pasteur D~ive to create t~o lanes on each approach ~ 'lbe second intersection i6 at Alpine Roadl Junipero Serra/Santa Cruz Avenue intersection where the specified improvement is to add a separate right-turn lane on Alpine Road (north [east) bound). IMPROVEMENTS AT WEICH ROAD/PASTEUR DRIVE INTERSECTION '!'he improvements. at the intersection of Welch Road and pa.steur Drive will be implemented in two phases. As an interim phase, CMR:271:91 -, , • ~: -~-------~~--------- o stanford will be addinq the right-turn lane on Welch Road by simply re-atriplng the. lane lines to accommoda.te a right-turn lane within the existing curb lines, along with ~elated siqning an~ bus stop cbanqes ss illustrated in Attachment A. This is a low cost improvement that 1& expect~d to produce a notable benefit and will be accomplished within the next several weeks. Tbe final phase will be the installation of a traffic siqnal at the Welch/pasteur interBection~ includinq re-stripinq Pasteur Drive to create two lanes on each approach, widening Welch Road to create a right-turn lane (if lane alignments so dictate), and other modifications related: to installation or the traffic signal~ Operationally. due to the separation between the two legs of pasteur Drive, this is oS complex intersection for efficient traffic slqnal control. Therefore, stafr believes it is better to coordinate implementation of the re-striping or the Pasteur Road approaches (and the ultimate resolution of the right-turn lane on Welch Road) with the desiqn and construction ot the traffic signal. staff is working with stanford to develop an appropriate design for this final phase improvement and expects that it will be constructed in 1992. Meanwhile, the interim phase project provides some immedi~tel low cost benefits. IMPROVEMENTS AT ALPINE RQAD/JQNIPIBO SERRA/SANTA CRUZ INTERSECTION The additIon of a separate right-turn lane on Alpine Road appears to be physically feasible and would significantly i~prove the flow of traffic for right-turning vehicles I which are nov regularly and unnecessarily blocked by throuqh vehicles waiting for the traffic signal. Since this project is within the jurisdiction of Menlo Park and not Palo Alto" staff requested that stant"ord pursue discussions with Menlo Park regarding implementation of this project. Discussion betWeen representatives from Stanford and Menlo Pa~k resulted in a request from Menlo Park that any improvements to the subject intersection be delayed until after the Henlo Park City Council has approved a General Plan Amendment (Attachment B). ENVIRONMENTAL ), S 5ESSME,NT creation of the right-turn lane on Welch Road is a minor operations improvement that is categorically exempt under the California Environmental QUality Act. No environmental assessment is necessary. CMR:271:9 5/16/91 Page 2 • " .' Respecttully aubmitted~ ~~"~ ASHOR AGGARWAL City Traffic Engineer ~~ KENNETH R. SCHREIBER Director ot Planning and community Environment AttaChments: A. Signing and bus stop illustration B. Letters from Stanford and Menlo Park regarding regarding the intersection improvements cc: Planning commission Stanford University (Andy OOty, Phil Williams, Mike Kuntz) City of Kenlo Park (Don de la Pena) CKR:271:9 5/16/91 Page 3 • C>"''''''GE IHIH"I~G --7'" TO ,.00 AH3HT rU''U1 l,.NE ~E'" pus -?' $1'"0'" & eoNeM .. ' '!, ~ .... , , ( • AlTACRMENT A o C; a: PASTEUR DRiVE - PASTEL.:R DRivE f' t , • ~'. ~ li l' ~ t I t (, ~: .. , , • , "> : . ' .. / o STANFORD UNIVERSITY March 1, 1991 Mr.. Xenneth R. SChreiber Engi r:u~ering Service'S 327 80nair Siding. Stanford, Callfor[]il; 94305-;210 Director of Planninq and community Environment city of Palo Alto 250 Ha.ilton Avenue Palo Alto, CA 94]01 Dear Iten, A1'TACmtENT :B (Page 1 of 2) .,. As you know, the Alpine Road/Junipero Serra Boulevard/Santa CrYZ Avenue intersection vas triggered in last year's Level of Service Analysis. This intersection is under the jurisdietion ot the City of Menlo Park.. We he-ve approached Menlo Park about constructing the specified mitigation. They are not ready for usa to construct the .itiqation at this tlae, as you ~n see in the attached letter fro. Menlo Park. We will aqain pursue this matter with Menlo Part this fall and viII keep you inforaed ot the progress.. Stanford feels that these actions are in accordanee with our aqreements vi th you and the County o.f Santa Clara. Zf you have any questions about this, please call De at (415) 725-3400. sincerely ~ ?tt.:L/:;4--- R. Michael Kuntz, P.E. Project llanager Encl. cc: Marvin OVervey Julia FrellOn Charlotte strem Mike McKnight ""'­... "'" _k_ ...,.. ... ... .. IIW.D ... ....., OOINC1' --.­M""" Febru.ry 12, 1991 Mr. Mite Kuntz Engineering Services Stanford University 327 Bonafr Siding Stanford, CA 94305 Subject: Alpin. Road, Junipero Serr. Blvd, Santa Cro' Avenu. Intersection l~roYelents Dear Mr. ~untl! Ve appreciate Jull. FreMin and you glYlng us the Infonaatlo. concerning the conditions of your .greeoent with Santa Clara County, the discussfons with reSidents .long Junlpero Serra BoulEvard, and the traffIc engl.eer's report c.netTllng the subject fntersectlon. \ As we stated, Menlo Park fs In the process of • General Plan AlendDent which Include. an eVllu.tion of traffic conditions Ind proposed I~rov ... nts throughout the City. this Gener.l Plan process Is not expected to be c~l.te until August or Septe.ber of this ye.r. Therefore, we are not 18 • positIon to proceed with any I~rov ... nt at the subject fntersectlon until approval of the General Plan Alendoent by the City Council. W. hereby request that further discussions concernIng traffic .'tigation iapreYelents for the AlpIne Road, Junlpero Serra BoulEYard, Ind Santa Cruz Ayenue Intersection be delayed until f.ll of 1991 .fter the Menlo Park City Council has approYed a Generll Plan Amen~nt. Thank you for your cooperation and patIence In this matter. Yery truly yours, c> ~,,-r:~ lauren [. Mercer cc: Jan Dolon, Cltl Manager Don de la Pena, Community Oe.elopoent Clrector Jull. freaan. Stanford UnlYerslty 2758[ •