THE HONORABLE CITY COUNCIL
Palo Alto, california
Agreement with OSm2Se Wood Pr@serving. Incorporated, tor the
InspsctiOO and Testing of Wood Power PQ~
Members of the Council:
Report in Brie f
This staff report recommends that the City council approve and
authorize the Mayor to execute an aqreement in the amount of
$7'.400 with Osmose Wood Preservinq, Incorporated, for the
inspection and testinq of the Otility·s approximately 8000 wood
power poles. In addition, staff recommends that Council
aqthorize the City Manager or his designee to execute one or more
change orders for-related but un£oreseen work. The value of
these change orders shall not exceed $7,000. FUnds for this
project are available In the utili~les Electric Capital
Improvement Project 1990/1991 budget.
Background
In 1982 and 1983 Osmose Wood Preserving, Incorporated, treated
and tested many of the City's wood power poles. Since then,
there has been no testing or inspection of wood power poles.
Many of the wood poles in the city's Utility Power Distribution
systea are now more than 30 years old. In order to ascertain the
concUtian af these wood power poles, Osmose will inspect and test
our wood poles for structural integrity. To further the
utility'. pole .anaqeaent proqram, Osmose vill enter information
about each wood pole into our computerized database, compatible
with the utility's computers. All wood power poles viII be
taqqed with a nu.mber, allowing ta"ae utility to identify and track:
the history of each woad power pole. Oatabasing and taqging each
wood pole will allow the utility to keep an updated record of the
condition and equipment on each wood power pole4 Usi"9 this
CXR.595'0 1
•
. .
information, the utility ~ill be able to determine the number of
wood poles for treatment each year and to accurately locate wood
poles needing replacement in conjunction with the nominal
r.placam~~t cycle.
Specification Development
A Request for Proposal vas d~veloped for the inspection, Qata
gathering, ta9qing and testing and treatment of the wood power
poles. The RFP was sent to five companies.
Proposal Eval\.l~tion
One bid and three -no bids· were received. The bid was received
from Os.ose Wood Preservinq, Incorporated. The cost to inspect,
test, gather data, and tag one wood pole i~ $9.30. Based upon
unit prices, the cost to inspect and test all the Utility's wood
power poles is $7.1 '00. Osmose meets all of the insurance
requirements and has pertorme~ satisfactorily in 1982 ana 1983.
Tbey are a reputable firm with many references from electric
utilities throughout the United states. Starr recommends
selectinq Osmose to perform the inspection and testing of the
wood poles tor the City. The engineer's estimate, including the
cost of treatment,. was $90,01>0.
Funding
The amount of $89,000 is allocated for this project in the
utilities Electric Capital Improvement Project 1990/1991 budget.
Engineerts Estimate:
Osmose's Bid:
'$90,000.
$74,400.
There is a difference between the Enqineer's estimate and the bid
because initially 6t~ff included $15,000 for pole treatment as
part of the Engineer's estimate~ However, during neqotiations
with Osmose, it vas decided that it would be advantaqeous to
first inspect the wood poles and gather accurate data to ~anage
the poles rather than doinq comprehensive treatment. With the
inspection data, wood poles could be more selectively chosen for
CHR,SU.O
•
'.
,
J
Recopppendation
stafr recoaaends that Council:
1. Approve and authorize the Kayo~ to execute the attached
contract with Osmose Wood Preserving, Incorporated} in
the amount of $74~.OO for the inspection and testing of
the wood poles: and
2. Authorize the City Manager or his desiqnee to negotiate
and execute one or more change orders to the contract
with Osmose ~ood Preserving, Inco~rated, the total
value of such change orders shall not exceed $1.000.
Attachments: Short Form C~ntract
Bid. Sheet
CIIB'5n,o
, ..
..
-TO
Savillga Next IJ:M
Bid
I~
Si g
~.f
(PI leI
.'
\
;" 1.1.1' ;-/ .-,
,\
/
o
THrs AGREEMENT is made ~nd entered into, in duplicate, this ____ _
____ day ot ~~~-.~~~. 19 ___ , by and between the city of Palo
Alto, California, bereinafter called ·CITY·, and ~ __ ~ __ ~ ___ ~ __ _
::;;:===::-C~=:::7.,=~;-::::-:=::h:erelnaftar called ·Contr-sctor·, 'Whose Taxpayer Identiticatlon Number is: ______________________________ ~
For .nd in consideration of their mQtual covenants, the parties
hereto agree as follows:
•
1. Contractor shall do all the work and furnish all the materials necessary
to construct a~d complete in a good, workmanlike and substantial manner,
and to the satistaction of ~~. City of Palo Altc, the following:
Inspection Testing and Preserva~iv~ rreat~ent of Wood Powey Peles
2. This contract shall consist ot the t~llowinq documents on file with the
city Clerk, allot which are incorpQr~ted herein and made a part hereof
by reference thereto:
a. This Contract
b. Notice Inviting Se~led Proposals
c. Accepted Proposal
d. Standard Specifications dated 1972# as amended~ or as
superseded by other documents incorporatea herein.
e. General Provisions
t. Tec~~ical Specifications --Special Provisions
9. Certificate of Insurance
b. Performance Borul
i. Labor and I!aterials Bond
j. Affirmative Action Guidelines and Compliance Report
k. Any and all aupplemental agreements which amend or extend
the work contemplated and which may be required to complete
the work in a substantial and acceptable mann·ar ..
3. In consideration of such work, CITY shall pay Contractor the amount
specified in his bid in the manner provided in said Standard
Specifica~ions dated 1972, as amended.
4. ConC\lrre.ntly with the execution of this contract, Contractor shall
provide CITY with the Contractor'a I..abor and Material and Faithful
Performance Bonds and certificates of insurance, including any ~orkQrs'
compensatien insurance required by the laws of the State of California
or otherwise required in said specifications a
s. This contract shall not be assigned by contractor a
OO~ (Continued)
CIt)" IDf' hhl AUo: COrfTUCl (~.)
•
o
6~ All claims by Contractor reqardinq extra vork, charges, delay or other
disputes arisinq out of the Contract must be svbmi tted to CITY in
vritinq vithin ten (10) workinq day. after the claim arose, describing
in detail the nature and value of the 4iaputed work or claim.
7. contractor hereby aqrees to indemnity. defend and hold ha~le55 CITY.
its officers, agents, and employ.as from any and all demands, claims or
liability of any nature .. caused by or ariainq out of Contractor's, its
officers'. 6gentst, or employees' neqligent acts, errors, or omissions,
or willful 11lisconduct.. or cond\,l;ct for 'Vhich the law imposes strict
liability on Contractor in tha performance or failure to perform this
Ac;reement.
B. This Agreement represents the entire Agreement between the parties ~ith
respect to the purchase and sale of the equipment, materials, or
supplies or payoent for services vhich JIIay be the subject of this
Contract~ All prior agreE=ents, repr.sentations, statements, negotia
tions and undertakings whe~~er c~al or written are superseded hereby.
9. No payment, partial payment, acceptance, or partial acceptance by City
shall operate as vaiver on the part of city of any of its rights unde~
this contract~
10. c~ntractor aqrees to permit CITY to audit, at any reasonable time during
the term of this Agreement and for three (3) years thereafter,
contractor's records pertainin9 to matters covered by this Agree~ent.
Contractor further aqrees to maintain such records fer at least three
(3) years after the term of this Agreement.
IN WITNESS WHEREOF, the Parties have set their hands all on the day and year
first above written~
ATTEST:
City Clerk
IIPPROVl:O:
<:i ty Manager
Director of Utilities
Director of Finance
Risk llan.ager
CITY OF PAUl 11 LTO , CALIFORNIA
By: __________________________ _
Mayor
CONTRACTOR
~:~--------------------Title:
Taxpayer 1.0 •• __________________ _
APPROVl: 0 liS TO FORM:
City Attorney
·;~;'
.;~~~.,-.
;'~