HomeMy WebLinkAbout0588.000November 29. 1990 THE HONORABLE CITY COUNCIL Palo Alto~ California Greer Park pevelopment Project, ClP 18805 -Hydrose~ing Members of the council: Report in Brief This is an informational report will take place as part of Development. Background concerninq the hydroseeding Which the third phase of Greer Park council approved a constnlction contract on July 23.. 1990 for developing approximately 12 acres of Greer Park (CMR:40~:O). The landscaping portion of the contract includes hydroseeding the topsoil and installing a new reclaimed yater irrigation system . .t!.iAcussion The contractor has completed placing topsoil in the park. After the sand bedding is installed in the soccer field areas over the next three weeks, 11 acres ot the site ~ill be hydroseeded. Staff is acutely aware of tha ~ater shortage and therefore is striving to finish hydroseeding quickly in o~der to take advantage of any rainfall for seed germination. After the grass is fully established within two to four months, it will be irriqated ~ith a blend of 50 percent reclaimed and 50 percent potable water. Signs will be placed at the site notifying the public that reclaimed water is beinq used for irrigation prior to the park opening in eprinq. It is i_portent that hydroseedinq not be delayed until after the rainy season, and that it take place during the winter when the soil is cooler and less evaporative. These conditions will not exist in the late spring and su~er months, which ~ill result in -1- CMR:SSS:O v , the need to use more water to establish the grass. Also, vaitinq until spring will delay the park opening until fall 1991. This would make it extremely difficult to p~otect the site from foot traftic, as the adjacent established p~~k would be in heavy use. Respectfully submitted, 4nf/~ GEORGE BAGDON Assistant Director of Public Works ic Works (iV;~t~; ~ \ ~ ~5~= C'ii.t·'yV-"''''''''' ~~ted CMR: 409:0 CMR,588:0 -2-