Loading...
HomeMy WebLinkAbout0257.091~ .. '. w KAy 6, 1991 HONORABLE CITY COUNCIL Pa10 Alto, California Attention: Finance and Public Works Committee Members of the Council: .gort. ip Brief This report transmits to the City council the amendments to the 1991-92 capital Improvement Budget which was approved in concept with the 1990-95 ca~ital Improvement Program (CIP) budqet. The Finance and Public Works Comm.itte.e. is scheduled to review the ameoo..ents to the capital IJlI.provement budqet at the May 30 budqet review lI.eeting~ Discu"iop Tbe following schedules are attached for review: o SUlIlIary of Changes to the 1991-92 CIP dOCUlllent (Attachment A) ~ This scbedule lists the projects in the 1990-95 CIP document which have changes in fUnding and new projects proposed. o A ravised. financia.l spreadsheet which details capital projects by fund, includinq reimburs~ents from other re~enue saurces (Attilchlllent B). o Project description and justification sheets for proposed new projectS 6 as well as for continuing projects which are cbanqinq in overall scope. A summary of the changes is shown as Attachlllent C. <:MR: 257: 91 I • -~ o o o Environmental impact assessment state~ent on proposed capital project amendments to the 1991-92 CIP budqet~ Ther~ are several new General Fund projects proposed Which adhere to ths interim budqet guidelines for inclusion as: health or safety issues, legialative mandates, or new Council priorities~ several projects alread.y approved in concept last year require augmented funding based upon ~ore precise estimates of required COBts~ All the cl1anqes proposed to the Ceneral Fund adhere to the guidelines for inclusion. Ne .. Proj ects o o o o Pire Water Rescue Equipment Barron Park street Improvement Gol~ Course Reclaimed water Fire Self-Contained Breathing Apparatus • reimbursement from Stanford Auqmented Fundinq o o o o o Harbor Improvements * reimbursement structural Improvements: Police Building Fire Dormitory Modifications Fire Station Exhaust system MSC Vehicle Washing Facility .. rei-abursement $ 40,000 10,000 50,000 37,000 (9,250) 127,750 50,000 (50,000) 170,000 160,000 50,000 30~OOO ( 15,OOQ) 395,0()() The 1991-92 General Fund capital program includes $1.6 million in proposed redUctions or funding delays due to the p~ojected General Fund deficit. The projects proposed for delay are divided into two categories: -Delay :Indefinitely· and -Delay One to Two Years. The projects in the -Delay One to Two Y6ars· category are shown in priority order, i.e., the first project on the li3t, Facilities Reroofing, is the first project recommended for re5toration should additional funding become available~ The second category, -Delay Indefinitely-, inclUdes projects that might be reprogrammed into fUture years or be dropped entirely. CXR:257:91 2 , , .- ~ .1 : / Delay One to Two Years o o o o o o o o o Facilities Reroofinq Park pathway Repairs HP 150 Replacement Records Management (reduct ion} • leBS reiabursement Wide Area Network Fire Sprinkler System Irriqation system Renovation Playground Equip.ent (reduction) • additJonal reilllburseDle.nt Mitchell Park Landscape Subtotal peloy Indefinitely o o o c o o Terman School Site Development Greer Park Oevel~nt Final Phase Athletic Fields Renovation Tennis/Basketball Court Improvements Cable Television Equipment « less reimbursement Art in Public Places Total General Fund Projects Delayed General Fund 1991-92 ClP Budget Change Prior year projected balances to be closed: civic Center Plaza Terman SChool 51 te Design Total General Fund CIP Reductions in 1991-92 . , $( 65,0(0) ( 70,0(0) ( 60,000) (100,000) 36,000 ( 75,000) (400,000) (125,000) (125,000) ( 40,000) (200,000) (1,224,000) (200,000) (125,000) ( 25,000) ( 24,0(0) ( 15,0(0) 4,500 ( 15.000) (399,500) $(1,623,500) (1,100,750) (337,500) ( 50,000) $(1,488,250) The street Improvement Fund Capital proqram includes a rep.ayment of the General Fund advance tor early implementation of the Alaa/Meadov intersection and deletes funding for the same project in 1991-92. o o o New projects (reimburse the General Fund) Additional fundinq for continuing projects Reduction in Major Intersection Improvements Total street Improvement CIP Chanqes 00:257:91 3 $500,000 15,000 (SOO 000) $15,000 • , . , . -." .-:-" :..f:(.'-.. -'-::::f~~~'-_"· o o Capital projects associated with various Enterprise Funds include five new, three .uqmented~ and two delayed projects. o o o II..... projects Additional funding for continuing projects Reduction in project funding tor 1991-92 Total ~IP chanqe. tor Enterprise Funds R'r9""MAat.lop $629.000 39S,OOQ (90 0 •000 ) $34,000 :It is recoallended that Council approve the attached chanqe.s to the 1991-9l capitol I»prov~ent Program. Respectfully submitted, ~~ IlELISSA BOOY --0 .~ daa~ial Analyst ~I!ARIUSO~ Oir or of CMR:2S1:91 4 '. '----.. ---.----~ '. ATIACHMENT A o A TTAC1KI!T A JOE s:a...uy OF lI..l CIWIGfS Tc thl 1991-92 tiP lIC1C'1amt ...... , .. 'n m ",. .... 'Nll.:t -""""', ••••• 4_ •• __ ._. .... ---.. - GEIIWI. """' " ii~ Part. 125,aoa C1i5,OOOi II AthtMfc: flIt .. ".'" C2S,OOO) ,. l.....nf. CCU't l~tl ...... (~.COO) ,. Ird .. tr., Iyst. 1ZS,OOC ,12S,OOC> ., Marbar l ... ~t. ....000 50.000 . n'''''_t (5:O~OOO) Z7 Pwi; 'Ithwy • .,.1,.. ?D. 000 (70,000) .. "IY11rotni IEcpf~t 165,OO<l (125,000) ·r.l~t (,",,000) l<) Mft~Lt hrt "'.000 (200,000) l6 Structl¥ll '..".--t. UO,ooo 17"C1,OOC 39 t.,...,.. SeMel "'.000 (200,0(10) .. !;lor. -.:fiHatior. • 161'l,ooo .. ~ Sit. • 30.000 • ,...f-"""-'t C1S,ro(l) " Ilf"OOfl,.. ".000 (65,0001 .. FI~ $pr1,.1,", «<>.'" (400,000) " Art In "bile places 15,(100 ,,5,1I(l(l) 50 --, ....... {100,OOO> ·1'"I',-......-..c e72,OOOl ".000 .. III iii-Ira "t~ ?'S .... (75,000) '" MP 150 COIIp.ItIrl" " .... (60,000) n Cebt. TW EqJ i~t 15,000 05,0001 ·"'f~t <'.500) '.500 . -.-....... ~ot.l o.enged 2,342,SOO (1,271,SOO) Contd Fire St .. tfoOn ~t R~l Sy>'-50,000 ... Wet",. lescl.ll!" f~l.-nt 40,000 -Barren Plrk Street l~~t 10,000 .... Golf Caurse lec:llf.ed 'Jeter-50,000 .... Set f-CGfIt.iMd IrMthirlS' AppIr.t-.. .57,000 -re.lIDor'a..ent (9,250) ----.. _--- htl1 .... Projec:la 1,7~1'50 Contl,."irog Project, 10 0Ir.ge 6.050~45<1 ---------- Gener.l FII'd CIP 'Toni 1,392,950 (1,100,1'50) Less WT projects (5,377,000) ---------- .5,015,950 (1,100,750) tIP prtor )'elr project. to btl etOUCl: Cfrlc Center Plazl (337,500) l"er.n Sdlcol Site Dnfgn (50,000) ._._-.-.. - hul Gmer-It F...-d CIP IIlfd.ctiQrl ".488.2S0l 5 1991-92 etp AI o<""od .-.. -..... • • • , 275,000 (50D,ooo) • 40,000 (40,000, • ""' .... • ,~.OOO "'.000 OS,OOO} • • , 100,000 (36,oooJ • • • • '.064,000 5C,noo "' .... 10,000 50~OOO 37, 0i)C (9,~) ---------- 121,1'50 6,~O,"~ ---------- 7.Z9i!~i!00 (5,387,000) - -__ A - -___ , ,905,i!C!l ~--------~-----~-~ .. 1M ...... , '" '''' Prolect 12 St",", Ra'nten&ncl 7] "Jor Intllr'UCtfcrw ~ GF.kMnct • .. stf"Mt I~I tiP Tota' •• ,.. to tlP FlI'd ble. to othe-r-Entef'pd ... I .... • .. h •• fIN tiP 1'ohl srOlN DRAIIIAGE RIrIl 19 • .. CoHee-lion tvat. lllp'~1 •• IIIb. to tiP in •• te. to Othllr £nClll'p'fee fll'dl .... IWf'On 'ark Dr.l ...... T, --.., " m OW, .. the 1W1-P2 !:IP Doc;:.-t .. , . 1991-92 tIP tIP ... ,-, Ch ..... "'----.,._. --" ---.--" ... . ........ , .... 000 15,000 "".DOC SOlI .... (5oo,oool • 500,000 SOO.DOC ---." ..... -._--.---.. --. __ .-..... "" .... 15,000 DOC .... 9,491 1,:UO,OOO (690,000) 670, DOC .. (.!oj " '.260 '."" '.360,o.a (610,744) 61'9,299 ....... • 2&2 .... 15,000 1S,OOO ',6to2,043 (665,744)' 976,299 • .. I~t. u th UP fiord In fCl" projects of joint benefit between the c.wr.t Flond InCI the Enterp.-iH Floi'd. TIll aoc.r.t i. dec ..... ing d..oe tD t!le p-cpoud deotolyl in ttt. General FIftI' ~IUl progr_. 1.I~tI to O!:Mr £ntt'rp-iM fll"6l ,. ~ to the Etectdc: fll'ld budget c.ontlfnfl'1/l the lIi* Area l.-c*,rt p-oJeet and tM t'Ih Utility lilt P~t Auto:3thn pl"ojec:t, but til. fu:-ding , • .ur-ed by other Ent_rprl,. FIrOs. rum 1 C F\.III 89 rr ... f~r. 107 n,"<lIftie Si .... l. •• illb. to CIP F-.nd 6 \IS.""" 50,000 <1!l,I57, 134,84] • ".000 191,843 5OO~OOO 151,000 50,064 701,064 '.489,000 6'3,000 7,l59,064 Q 0 ... fl.IIiIMr OF iU.L CHAltlQ!$ T.",," 1991-1J2 (:" D~~ ...... , .. In 1991-92 '" tIP elP .... > ... "rol_t ...-, """'" "'-.. ~--_ .. _ . .-.-_ .... -. ---.--... ... ro_ , .. Water Tr""'nion 'FKiLltr .. 300,000 '300,000) , ... IIIb. to CIP Fin! 31,t'5' {'~]51 ) 2:7,300 •• IIb. to Othr EnterpriM. ,1rdI IS,OOO 1,i!6D ,",26<l 346,65' {295,091) 51,560 Cclm:fra.lf,.. '"'iectl ur.c:f'IlI'vecf '. t98,100 '.1",100 -Golf CIU"f;I teela'.e! ... t .. ~ 84,000 ",000 -NSC lee-I.'_ wa.:.r ~t)" ",,000 SO,""" ~ter-fn CIP totl~ 1,54,.35! (131,0911 '."'4~Z60 ... 1LOII) t.,_. to C1P "....0 ",no. (S,1'TT) 33,957 Iter •• to OthlH'" fnttr-pt'"iM JU"dI 15,000 ",1'0 26,340 ",no. 5,563 60,297 C.om:ll'l.lfl'lliil Projectl ~ '~'OO.ooa • T ,400, 000 -"twit QlI VeI!fc.e ~Nlfan U1,OOO U1,OOO On f\rld" UP 'ot.\ , ,"54, 134 226,>63 \.~'.297 ~~TEI FUll) ". &.aboc'atory f-.:iLitil!!'S 250, 00<l 2S0,OOO lleflilb. to CCP fioTld 26~CUl (3,912) U,D18 .lefllll>. to OtMr enterpri5e ,.~ 7~SOO HI,460 17,!Jr60 33,510 2'56,548 290, asa COrItinul", prClj toet., LncI1qed' 1,710,760 ',7I1J,7'6lJ .~ GOLf COYI'M: 'ecL"I.c! lI,te!" 166,000 ~66. DOO v.tlllMtlt1" fLFld' I:[P Tcul '. 7"'~27G "22,541 2,166,118 ATTACHMENT B I' ---------. ---~------------------- o ------------------- 1 1 j i 1 I • 0 1 • ~ ! 1 " c • . : ! • ! . ! ~ ~ ~ ~ 8 • :;; i N 1 1 • 1 : ~ i . ~ ~ , . : ; : : F' : I, :i i, ~-' : : : : : 5 • ~. ~ . ~ i -~ , '" \'.., '.';,', .... twt·fl CMH"t nWJO'mlftjy f'lO.,lI;l:n "'dOf' V ... t'll' Cet'tyw.1' 199t~92 1m·" 199,-9!4 "9'~" TOtAl WITAL ',,"MIIIe.,T PItO,n!CTI ra:tt ill .. fety Corttlnuina ProJIIGU tf4ht.tl! hplfrl (Utility u •• ",. "'~"a9OJ) It" ... H.'1!t~. (Utllhy !JUrA fa .. -1m,) ... IfMI.tIV.tIM.'" II ...... ' (191D1) Iwtlt"'t.l. C""tl~/,... 'f'f1J_t. ~ ... 'toj",t. ~1Io"t" • .,.e"" EqulPlMf\t {19lO6' •• rron ... rk Clr.I!'Iat_ (utH it., man h"'19I01) ,ajIotot.l. N., ~roJHt. lI~t(lt.t I PUlot II! "I.ty 'arb , Open Cpa" cootl~fl'lll ProJHu Qr .. , ...... Il D.ntOfllllll"t (1&80S) AtM_tlll rI.leSt Ihrl'MWathl!"t 09OOb) f~l. And B •• ketbltll Court f~t. (~~; ftrlU'flon .""tMl RotnoW.tlon (lM(l4} IIsrbDr I~ro ... _u ('M"&) ••• I.bur ... .rn ff,. 'ry H_rl,ffU Hf.rMlo C_. l'M.MCi no,GOO Utl,lIM ....... 350,000 4;0,000 lSO,ClCIO 150,000 )50,000 I 1.400,000 I 6SO,OOO ~O.OOO 650,otIJ I Z,6/)G,OOO I lO,'" ,..... ,. .... I 1<0 .... I .. ···· .... ·· .. •· ...... ··· .... · .. ······· .. ·· .. · .. 1··· .. ·• .. ···, 1,\100,000 1,030,000 l,O)O,OOG 1,030,000 I I I I '.~40.~ I ) ) ) "".~ 40,Il00 I '.,000 I 1M" 1 .. · .. •••• .. ••• .... · .. ·•···· .... ··-· .. · .. •• .. · .. ·)·· .. · ...... ·1 te,ooo I 54,00(1 I · .. •·• .. ··· .. ••• .... • .. ··•···•· .. ······ .. · .. · .. ·)· .. · .. ·· .. ··1 1.*#000 1.0'O.~ 1,01Q,000 ',OJO,OOI:J f • • • • 215.000 (50,000) • • T., •• a.ulr.t~ 1~.Mt1 • )Ob,OOO liI .... I I I I , , 1 • I \ I I , ',HO,SlOO j I I I , , I • I • I • I 1~.W11 1"H:'!i~OOO f ('1<1,001.1)1 11~' ~'~:;- " " f) , , , - ~.~ • \''J. , " • , , I ,I I­ I i ! 0:;:0 g 1/: 10 8 ". ~ ! f • ! o ~~" ~ ---....... ~-... \' i h .t ~ ---------u i § i § ~.~:~!!~ __ l_l: __ _ : : § • . f!.' : : '" g ill i !!, !!l. • .... c .. 1 N I ~. § : § : ~ i i~' i E . . ~§:~:g ~ . ~ : 5 : I I j ! .. " --iiiiifii§§iii;;Yi ~ii~ii~iiiii~ :t :;; .... _ ... ..,,:::. f"I CiI ...... ~ : _. :~ ------------------- : I e L 11 ··-cc-~·-::------.-~--- • o i~i§!TiTiT--8-§-iT----§~i-~:i ~~i~~:;:i: i !: ·~i ~ ~ ~ i i 000 11 i N' ~ § § § ~§O ~ ~ ... ~ O~ i 'II i ~ ..... i ~ ~~ ~"'~1 ~~ ;;:;~ . • ~ , , , , ..-.... ~,i § g §1, ~! ~l,~ ...:-a" II'O~ ~ ;?: _..,-;j :·::t:1 ;;~ ~~- 12 · ! f • • u ~ I e-• , u i :: ! ! • i l • u ----------------------------.. . . ~ §§§:§ ~i §§§§:§i 2 ~~.·2.:0 ~= iiioIi! ift _ ::a • ;: ~. • ..... ....... lC • 0-• £ -.... :.. ~ .. : .:: ,.; E -------~-~--~------------~-~ , . . U!§1 § § 11 ~t ~ ~ ~ § ~ g ( § • 0" • : ~ : 13 .' . . = ;; . i l' • .--------~~.-------------------------~--~ .-, , -',; . o ----------------------------------!~j~.! !~! !. ~~l~! ~!!!-§_~~~ .,.... :""[ N~;:' -:~= :s;.:,Wi~N~if : = : : : ,.; __ ~_L ____________ ~_L ____________ ~_ o . E . 1 ~ L • i . ! t • ! .t 15 i ~ • 16 . i f • ! .. ..c .. -::. .. . ! f • ~ I • i 1 .;: i ;; ! ! I J : . ] 17 " · · ! · ~ .. q • i I • ii "f I . ! 18 ------------.....,.~ , , ~ ... 1M! GAs PROJECTI CDntlNllng PraJ.cu 0 •• Iyst .... Ext""lf_ ·-.j.,,.~t #1'_ CUltOMr. 0 .. M.ln "plltO_nt. Ii •• ''It.1'II , _..,I.to,. OHQr.pMo Infol'llllltlOf'l I.,.t_ O'OIrlflhlo I.,for .. tlon Vorkltltl_ Vtohf d, "'rohl •• , Slittot." Contlnuh'19 pf'olMlt. It.., Pralec't. It.tur.t GI .. V_lal. Conw!".lan '~fII'(, cal flll«! Continuing G •• ProJ_et. hw G •• 'rojact. It.' ..... ,....nh to (Ip'ta' I~rovw.nt ,Uotd ~.llIIburallMJltl tn I!IIIetria fund Totll 0 •• II'roJ ... ra L_a _.llIbur_'1 f,,_ e""h_r. Totll G •• fund 1'991-9'5 CAPITAL IMPlOYENI!KT P~OJr.CT' Prln!" Yel,.' Clrrvowr '",-9l ]40,000 U55,OOO) 755,GOO 20',000 l<J,OOO 35,000 ",'" 1992-93 n,'" (54,000) 2,100,000 216,000 1t,500 1993·" ".000 (56,2'50) 2,2fJO,OOO 221,OOG ",700 '994-9:1 79.000 1 (59,150) I TOT"- 566,000 I (424,5<10)1 2,]00,000 238,500 35,000 1 7,155,000 1 1 1 1 M7,500 I 110,200 I 35,()(!(I I 1 ",000 1 •·•••••••••••••••••••• .. • .. ••• .................. 1· .. • .. ·•·• .. 1 1,14'$,000 2,365,500 2,479,450 221,000 195,000 175,000 1,1,00,000 2''''9,500 2,515,100 221,000 195,000 1;0,,000 2,591,no 2,652,500 o a,5&l,2OG 1 1 1 1 591,000 1 1 1 1 9.007,700 1 1 ~91,ooa 1 1 , 11'0,'J49 i ~~ 1 ~~I :n,9)7 n,on 59,551 o • .. •·· .. • .. • .. •·••• .. •·••· .. • .. ·•••• .. •·•· .. •• .. 1·· .... · .. • .. 1 1,681,297 2,~1,S35 2,770,i!~1 2,652,'500 1 1 (2:~';,OOOl (54,000) (56,250) (59,250) I 1 ','26,291 2,637,515 2,'114,007 2,591,l'iO I 9,795,589 I 1 (414 .500)1 1 9,3"',(189 I ." ••....... ". ······························,,··········,,······1······· .. ·"··1 ~~ ,"'\ <., .~'j .:. '."" . J I . ! f ~ -----------ll~~UUUH o:iiiiiC~£9.·'i~~~· -----~-.. -­G- -----------§§U :e 5' §~. ~- 20 o i § ~ ~ g 'i ~·:i~f;~· .• _...: .c • '$!. . ---------- . ! f ~ . 1i I • : ---------------- 51 •• go te .. ~: ,. E o-i ~ a:: .... ~;;.: ..... ~rl ~ ~: ~.. ~ -: f:\ ~ ~: ~ i!;.: ~. : ~ : --------~------~ . i I = I f • ! 0'; ". g- o e: CI. o ."t : t ~ . 0-v ~ ! 2 ~ N ~ J -= . ! 21 . • ATTACHMENT C i ----~~-- GE!fERAL FllN!J ----------- -.~ , -"" "' ..... :, . ." 1.,1-'2 Capital r.proycsent P%oj.~t. CHANGE Itf FUNpING I. aU~aDte4 run4ing tor Continuing project. The following 1991-92 CIP projects are recommenced for additional fundinq in the ~unts noted: o Harbor Improvements $ 50,000 Increased funding is for renovating the harbor master's cottaqe; this expenditure will be reirwursed by the county Heritage Historic Commission~ o PUhlic Bldg: structural Improvements $ 170,000 The project funding was changed to include an additi~nal $600,000 for strengthening the Police Building and by delaying other planned projects. o Fire station Dormitory Modification $ 160,000 Additional funding added to complete dormitory modifications for Fire station #2 and #4, based upon actual design requirements for Fire station #1, #3, and 15~ o MSC Site Improveaents $ 30,000 Additional .funding to proceed with investigation of the vehicle/equipment washing facility to identify federal, state, a~d county requlations necessary for establishing design criteria. o Fire Station ~~aust $ 50,000 To coaplete the exhaust system improvements on Station 14 and #5. II~ ... Projectl New proposed General Fund capital projects tor 1991-92 net $127.750. All the projects recommended meet one or more of the guidelines established tor the 1991-92 interim budget. o Fire Water Rescue Equipment $ ~O, 000 Purchase of water rescue equipment for Fire Department emergency response to aircra.ft crashes in the Bay or sailboard ope~ators in need ot a vater rescue • .••. ~ , o o Barron Park Street Improvement $ 10,000 Funds a study of the Barron Park neighborhood to develop guidelines tor drainage and street improvements~ It is a joint project ~itt .. the Storm Drainage Fund and the General Fund expense if!' reimbursed fro~ utility user tax. Total project is $25,000. o Golf Course Reclaimed water $ ;~,OOO This is a Water utility project totallinq $300,000 'Which is reimbursed $50,000 troD the General Fund and $166, 000 from the Wastewater Fund. The project will install a reclaimed 'Water line from the WQCP to the Golf Course and install a blendinq tank, irrigation booster pump station, and controls at the Golf Cou~se. o Fire self-Contained Breathing Apparatus $ 31,000 Refurbish self-contained breathinq apparatus for Fire Department emerqe~y responders to comply with new safety standards. STREET IMPROVEMENT FUNp I. Decrea.ed/Augmented Funding ror continuinq Proj.~t. o o o street Maintenance Major Intersections payback: of General Fund Advance $ 15,000 $ (500,000) $ 500,000 Adds the General Fur..~ advance for implementinq the Alma/Meadow Intersection Improvements in ~990-91 and deletes funding for the same project in 1991-92. STORK DRAINAGE FUND %. Decre •• ed Fundinq for Continuing Proj.~t. o Collection SystEm Improvement $ (690,000) Eliainates the Chaucer Stree~ bridqe over San Francisquito Creek due to santa Clara Valley Water District objections; delays the Everett Avenue storm main one year; adds a curb and gutter program and a pump station improvement program; and contributes funds for the GIS computer system. XI. • •• Project. o Barron Park street Improvement $ 15,000 Jointly funds a study of the Barron Park neiqhborhood to devalop quidelines for drainaqe and street improvements. Total funding is 23 $25,000, of which $10,000 is reimbursed trom utility user tax. ltt.ECTBl C FUND o Transformers $ 95,000 Funding increa.ed to reflect current budget requirements~ o Trarric Signal Upgrade $ 50,000 Adds one pedestrian-actuated signal on Middlefield Road in the mid.town area. II. • .. Projeot. o utility Bill Payment Processing Equip $ 63,000 Automates the in-house processing of utility bill payments. WATEB Fl1I:IIl I. Decr ••• ed FuD4inq ror Oo~tiDulng projects o Water Transmission Facility $ [ 300,000) Oelayed one year to incorporate a change in project scope to include Electric Operation needs. II. • .. Project. o MSC Reclaimed water Supply $ 80,000 Installs a reclaimed water line from the existing tee in Greer Park's reclaimed ~ater line at East Bayshore Frontage Road to the XSC property Where a blending tank and booster pump station viII extend reclaimed wa.ter to all uses at MSC. o Golf Course Reclaimed Water $ 84,000 See the General Fund Gelf Course Reclaimed Wate~ project description. GAS FUNQ I. _ .. Projects o Gas Vehicle Conversion Pilot Proq. 24 --, --------------------------------:;:=--:'~ o Provides for a pilot program to convert tour venicles to natural gas fuel and construction of a fuelinq stAtion~ IfAS"1'EWATE8. FUND %. ~ate4 PuDdiag ror Continuing Project. o Laboratory Facilities ~ Studies $ 250,COO Adds the remooelinq of the wQCP laboratory in order to accommodate addjtional .quip~ent and st.ft. U. .." Projech o Golf Course Reclaimed Water $ 166,000 See the General Fund Golf Course Reclaimed Water project descrIption. Detailed descriptions of the auqmented and new proj~cts are included in the project justification sheets which follow. 2S , , . · .,.;... .. .,.: REYIS£D PAIIKS PROoI£tT MI!J9! !MrROYE!!E!!TS OMl8l Parlect llesc;rtotlon: 'rojoc:t EI...,ts Includ.: 1"1-'2 $275,000 Pro,.,.. ,lans fer a 7 acre wet1and .Itlgaticn bank, fer undergreunding exlstln, everhead utilitle.. and fer re.dwlYs, pathways, ~ikeways, obsorvatlon platfenos, other parkin, lets, and bus turnarounds. Renovate the Harbor "aster'. Cottage. 1992-13 $500,000 Construct .I_nt. described ""dor lUl-SZ 1993-99 $ 30,000 Deoolfsh public belt laomch ramp. 1194-95 UPS-9! Prelect; Justlflcatlgn: Projects authorized by Council as part ef the cle.ure of the 'alo Alte Yacht Harbor. lIpac1 Analysis: Envlronaental -Further envfronoental as.ess .. nt was completed at the tl .. of desIgn review of the now project. Underground!ng of utilitios I. categorically ex..,t. Deoolltlon of existing Yacht Harbor structure. lAS addrossed In the 8ayland> Master Plan and EIR. Operating -/lew Insurance pr .. l_ fo. sailing station Yill be required to protect City frca liability. C .... nlty Services [Parks/Operations) Yill haye additienal expenditures to .. Inta!n now fmproy_nts. o PAItICS PRO.l£CT !IARIIOB II\PB(\'lB!£J!IS 1189\1) (ctllltd.) ec..!'!!!!ensfye PlIn, Proposal. aMI C<IIISlstent with tho open sp .... 1 ... nt or the P.lo Alto Seneral Plan and 1a.l'1anc!s !!Utlr Plan. F1 Mosjll Ana] ys 11: Source or Funding: U9Z-93 1993-94 1194-95 1995-96 $Z15,OOO $500,000 $ 30,000 Capl to 1 I..,rOYellent Fund. ($50,000 rel"",ur ..... t rrOll the County Heritage Historic eoo.lsslon) -,,;,,:,;,.. . ,./ .-; , R[Y[S£I) PlJ8L1C au [LD IIISS PIIOJECT PUBLIC BUILDI.; mum'.' IprpBO'OlIEIT$ (8508) Pro'ect Description: lnc:lucIes design and constrlldlon 0' structur.1 and handicap lIop..-ts to pulllic bulldh.t' H Identified In I , ... II.lnor,. consultant report dealing with the physical eoncIltfon of Palo Alto's Hs.l,. buildings. The project also fnc:ludes ... Iocatlon of parsonnel If "'Iulred to ell.lnate wort disruption. Several projects cc.pltted H part of tills progr .. Include the naln LI~rar,., Cultural Center, and Theatres. Project Jystlflcatlpn: The strlldural adequacy of public bolldln9s needs to be Insured fro. I safety and City liability standpoint. !'Plct Anllys's: Envlro .... t.l -Categorically exeopt. Oper.tlng -Publlc Iklrk./Facllitfes Manag_nt -11111 reduee strlldur.1 .. Intenanee requlr_nts. Co!prlbens1ye "an: Consistent witll objectives of safety SUbsection: Reduces potential for Injury and loss of lIf. and possibility of property d ... ge. fina nc',] Ana)ys's: Source of funding: UI3-M 1994-95 1195-96 $600,000 $460,000 $610,000 $510,000 S960,OOO capItal h'prov_ Fund. Pollee lulldlng strengthening. Fir. Station 12 (Hanover Street) Investigation, design and construction; Senior Center design. ($40,OOO ... I .... sed fro. COS; funds.) Senior t.nter construCtion/relocation. College Terrace llbrlry/Dayear. tenter design and construction. Chlldren's library/Junior MuselOl design and construct Ion. 36 • ·- ---,--------------.-'--------- ,.:.;.. -, " ';c;,:;,;",,';"",""-' ,," ~);;<'~t .. ~,~ ~~. o JlEVJS8I PUBLIC BUILDINGS PItOolECT flBl,S!ATIOH DORMITORY BOQIFICATIQN t18911} Proitet DesgiptiOll: lIocIlfy flv. uhtin, fire stations t. pt'OYide separate lector, bath and donoitory facilitie. for .. le and , ... le flrafighters at fire stations. I'roposed Pl'Ojeet .... s dev.loped IS I .. sult of a labor and .... g ... nt te .. 's re' .,nded actions to addras. ,rlvacy concerns expressed by ' ..... 1. flreflghters. Prpject .Just! flcatlcn: In order to provide lIOdifled living quarters more appr~prhte for .. 1. and r ... l, firefighter •• station IIOdfflcltlons are requlr.d. I.paet Analysis: [nvlrDl'Melltal Operating - Calprehensjye 'lan: Cat.gorlcally exeopt. Mlnl .. , Incr •••• In custodial and facfllty .. Int.nonc. costs. Not Inconsistent with Plan. Flnanc!.l analysis: Source of Funding: 1.81-92 1992-93 1993-94 1994-95 1995-96 $160,000 Clpltal 1.,l'Ovaent Fund. (Stations 2 and 4) 41 ...;." ~ "'~~-:::;";~ ;';\;L::;'~""'-'-": . " • -: ~ 7<; .. - MUSED POBllC BU!LDINGS PROJECT NSC SITE IKPROYEMEHTS {!a,OI! . --" PrQ'tct. Description: IIIp1 ..... t I fiye-y.ar site ~lIIjlroyement phn at the Nunlclpal Service Center (MSC) In re.po.se to the MSC "aster Plan Report of May 1987. IllproYeoents oddress dep.rtDental spatlol needs, securIty, troffic flow, plrklng, pedestrlon clrculotlon, and landscape requir .... nts. Pre 'act C"UOf!!!lh Inc1 udt: 1991-92 1092-93 1993·94 1994-95 1995-96 S 30,000 o InYestlgatlon of yehlc1es/equipment washing facl1fty to' 1dtont i fy fedenl, stlte, and county regulat ions necessary for establishIng design crfterll. S 250,000 o landscaping to serve .s I buffer between "SC and 8ay1ands. D Roof Cilllopies t~ pro.ltect heavy equipment and work space from the we.ther. o Vehicie/equipment washing facility construction. $1,115,000 o Traffic circulation improvements to prevent delays in vehicles entering and exftlng and to increase saftty of bicyclists using bike troi1 fronting "St. Included would be: interior driveway median; East Ba,:;shore frontage road; and entrance improVelent5~ including turn lanes and landscaping. Parking area expansio~ to at commodate antiCipated ;ncrease in vehfcles. S 160,000 o Building A enclosure addition to meet Purchasing Departments additional storage requireaents. 42 o PUBLIC BUILDINGS PROJECT MSC SIT[ I!U'I!!lVEMOOS 118908) (eontd.) Protect Ju$t1ffCltlon: T~1s project addresses concerns rafsed by the Architec· turo1 Reyiew board and provides a coordinated .pproat~ to implementing nece .. ary MSC Improy .... nts. J'P'ct Analys1s: EnvlrorHlentil Cqlpre~en.i •• Plan' An Envi romaenhl lIepact Assessment was prepared and negative deelo.otlo" adopted ot time of approv,l of the MSC Ma.ter PI,n. Consistent wit~ Boylands Master Plan and Transportotlon Element Program 17 . To .ake operational i8prove.ents to improve trafflC flov on major streets. F1nane',l An,lysis: Source of Funding: Capital r_pr'(lvettent flJ~d wit" reimbursement from Enterprise funds as appropriate. 1991·92 U92-93 1993-94 1994·95 1995·96 $ 30,000 (ReioWurseaent of $20,OOC from Utilities) $ 250,000' (Reimbursement of $105,000 from Utilities) 11,115,000 (Reioburseoent of 1557,500 from Utiliti.s) $ 160,000 * 1he vehlcles/equiptllent wiI!Ohing facility construct;!)n cost may need to be adjusted as 0 result of the 1991-92 inYesti9.tlon. 43 R£YlS£D PUBLIC BUIlDl1IGS PROJECT Fm stATIOII £X!W!ST IEIIOYAL SJID!!S 089011 Project Descrhtlpn: [nstillatlon of .ehlcle ex~aust reIIC.al syst ... at sIx fire stations to protect firefIghters fro. dangerous die.e1 exhaust particulates. P!'!!.1ect .JustIficatIon: Diesel apparatus produce frDlll thirty t. one hundred tImes .. re soot than gaSOline engInes. The partkulate aatter produces' n_rou' organic substances plus known carcInogen •. IIMle the Issue of firefighter health and .afety Is the driving farce behind this project, a secondary Issue is that diesel exhaust coats the fire station with soot particulates whiCh accelerate stltlon repolnting. Thl. project addre.ses safety concerns. En.lronDOntal -CategorIcally exe~t. Operating -Increase In fire Oepartment budget for on-going system .. I.t.nonce, esti.ated to be '2,500 annually. '1!pprebens1y. 'Jan: Consistent with Polley 13 of En.iru_ntal Resou"e' Section of Ph. -to .itlgot. I~act of air quality prebl_ due to vehicle •• fln'nel.l AnalysIs: Source af Funding: Capital l~r.veoent Fund 1991-92 1992-93 1993-94 1994-95 1995-90 SSO ,000 (Stations 4 and 5) . ' . .. :~, '\" > . :.~ "'. ",' '< • IIDI PUBLIC SAFm ::;;- urn 'EWe: ElIJlfJIQI (l92QCil o· -;~" o Pro.itCli II!!sqjptjo.u 'ul'C~a .. of vater rescue equljlMnt _rgeney response to water _r~.,,~l.s fn the ~'1 suc~ .. 11 bolrd oporators j n need of • vator rlscue. for Fire Departlent IS a1rcraft crashes or lralpct Ju[tlfieatlon: ro provIde _rgency re.ponse capabIlity to water r •• cues In the bay. SaIlIng station Is ,lanned to be op.ratlng soon. AIrport s.fety cODllttee and the County Airport .ut~orlty are strongll rec .... ndlng that the FIre Department provide this level of service. A joInt study was conducted with lIenl0 'ark fIre Depart.nt. The IIIOU11t requested Is on. half of tho tot.l project cost.. lIenlo 'ark has receIved fundIng for their half in theIr current budget. [nv!ronoental -Rot I proj~~ under CEQA. OperatIng -$2,000 annual Increase for vehIcle replacement fund. r' Iehens;fn 'lan: Rot Inconsistent wit~ '1 "". Financial Analysis: Sourc. of Funding: 1991-92 1992-93 1993-94 1994-95 U9S-96 $40,000 Capital I~rov_nt fund. Re;aburseoent fro. County through airport Ie.,. being InvestIgated. Includes one aIrboat purchased jOintly with Menlo '"rk FIre Departaent, and on. rigid hull Inflatable craft pI", equljlMnt for 'al. Alto. -"-, ". -----------.~ 1 ; '1 1 ., /IEIf PlJSLlC SAfETY BMROM pm DMlllAiE/snm IIIPJ!OYE!!E!II 6UIDniNES !l!!2071 Project Description' Thl. project will fond a study of the Sarron Plrk neighborhood t. de •• 10p g"ldellne. for drainage and .treet I~rov.ment •. Klny re.ldent. of the Sarron Park neighborhood have expr.ssed concerns abo"t drainage and str.et aalntenance probl .. s In their ar.a. Secau.e no .Idewalk or curb and gutt.r Is pre.ent In lOst .rea., the str •• t edge Is poorly defined and large ar •• s of pondlng are pre.ent after eV.n .Inor rainfall. The typical street and drainage .tandards cannot be appll.d unifonnly I. this ar.a and still .. Intaln the City', coaoitment t. preserye the rural environment .f Sarron Park. This project will develop specific guidelines for street/Sidewalk Improvement. which will be integrated wltn a separate project t. update the st ... drainage Master Plan. Project Justification: This project has been authorized by Council i. response to t~e concerns of the Barron Park neighbor~ood. Creation of these guidelines .ill p.rmit consl.tency of improvements and cGapatlb!1ity with the neighborhood's character. I .. act Analysis, Envlron .. ntal -Categorically .x~t. ~rattng -Increased costs associated with .ainte~ance of storm drainage system. Oecreased costs responding to emer­ genCies due to drainage probleo./flooding. 9?'Prabens'ye 'lan: tons'stent with EnYironmental Resources Policy J: Maxi~ize water retention and .Ini.ize the quantity and .ff.cts of wat.r runoff. Consistent with Transportatfon Element Program 37 . to f~rove pede.trian safety. Financ"l Analysis: So"rce of Funding; General F"nd (Utility Users rax); separate fund­ log of SIS,OOO Is also Included In the Storm Drainage Enterprise Fu~d. 1991·92 1992·93 1993·94 1994·95 1995-96 $10,000 To Be Det.rmlned To Se Determined To Se Oetermined To Be Determined . --'" ,-,'", '. J.., . .i--~., .' , II£V PARKS PROJECT -,. o GO!.f CO!!!!SE RECLAIIIED WAIn supPLY !l920PI Predect DescrIptIon: Inst.ll a r.clal~ water lIne froe tne PlIo Alto RegIonal W,ter QUlllty Control Plant (PARWQCP) to the Golf Course aod Install on Golf Cours. property • recl.l~ water blending tank, Irrigation booster pump st.tlon Ind controls, Protect JustIfIcatIon: IrrIgatIon of the Palo Alto Golf Cours. Is fe.slble and beneflcl., to the CIty of Palo Alto. A 1989 e.aluation of turf tolerance rec .... nded usIng. blend of reclal~ water and potable water for Irrigation at the site. The '.10 Alto Golf Course conswoes approxi.ately 500 Acr. F •• t of potable water (163 011 lIon gallons) .nnually. Construction of thIs project ,,"<old allow blendIng of ""chilled water with pohble water .t I rltlo of 1:1. At this rate of .ixlng the Golf Course onnual demand for pot.bl. water would be reduced by 250 Acr. Feet. Further reductIons In us. of potable water •• y be accomplished .fter the Golf Course ,,'ntenance staff gal". experience in operltlng the .Ixlng/pumplng statIon and IrrIgatIng the course with blended water. [pet An.l ys I • : fn'W; roRlienta 1 Ope .. tlng - CCIpr!btn$1y' Plan: further envlron.entll assessment ma1 be required depending on design and location of system. Utilities Department -No additional resources r.quired. Golf Course -SI6,OOO ongoing el.ctrlcal and $lS0 ,0CO water savings. $50 ,000 maintenance of pu.plng station set-up replacement plan. Consist!nt with Policy 3 and Program 6 of Environmental Resources Section of PTan to encourage the re-~se of treated wastewater for irrigation. FInancIal Analysis: Scurce of Funding: j991-92 1992-93 1993-94 1994-95 1995-96 $300,000 Water Fund. wit" reimbursement from Genenl fund and Wastewater for improvements on Golf Course. S 50,000 -General rund 84,000 -W.ter Fund 166,000 -Wastewater Fund .. NEV N ISCnlNlIOUS PROJECT SUf CQIITAI!!m PfATHlNIj APPWIIIS (l!?.l2l ProJoct Dtscrlpt!""' .. t.T~fsb self conu'ne4 "r .. thlng apparatus torF!r. DeJIa-_r,....,,. responclel'S to c0IIP11 with new s.fety stamlards. Prgjtet Mtlflcltl..s!o: To CCIIP11 witb new safety shndards related to self conhfne<l "roathlng apparatus. To Iliprave sa10ty and recluce the potential for dls41>11ng injurl .. for fl~flgbtors. laad An,lYS1s: Envlro.-ntal Operating - '.rtbrm1ye 'lan: !lot • prajoct under CEQA. Jopraved .afety for firefighters. IIot IJlCQI1slstent with Plan. ',",",i.l Anllysis: Source of fun<!1 nl: 1991-92 1992-93 1993-94 19M-iS U95-96 $37,000 capital lopro • ....,nt fun<!. 25S rel.burs_nt fr .. Stanford contract. Refurblshlent onl1. .. , , $TOM DIlAIIIAG£ PROJECT COll£CT IQII 5lmll I!!PROVE!!OO5 o prgfPCt Po'cr!pt!gn: provlcIH I""rov_. to tho stonl Ir&ln syste.t wh!ch lndude: 1991-12 1993-94 1994-95 1995-96 o Design a now sto ... Iraln alont Everett Ayenue. o Join In oro.!"" control and otller ste ... dra!n !~roY_nt co.t-sharlng agreeoent. with the santa Clara Yalley Vater District. o Rep lac_nt of pu.p stat I en equl pMnt . o Develop the 6roplllc InfoJ"llatlon Syst .. , which is JoIntly fundel by the PublIc worts and Utilities Departoents. o Curb and tutter r.pl ..... nt prog .... a COn.truct I now .t .... drain along EYerett Ay.nue. o JoIn In erosIon control lnd otller sto ... dr.!n I~rov_nt cost-SharIng .greaent. with the Santa Clara Yalley Water DistrIct. o COnstruct !~roYaent. to tile tel_try 5yst .. for the sto ... Irllnage _ staUons. o Develop the Graph!c Infol"'llat!on 5yst., wh!ch is jointly funded by the Pub If c WOrics and Ut III U.5 Depal't8ents. a CUrb aM gutter r.ph .... nt progr ... To Ie Detenllned To Ie Dete .. 1 ned To Be Detel"lllned , ! t l I SIDf!!! DRAIIIW PROJm' COI.L£CTI!!!I SISID! IIU'RDVE!!El!Tj (COIIt~.) prRlm .Jystlflgtfan: provIdes needed '1St. ' ........ _nts, expansIon, and erosIon control to .1.I.fzo clt,-""do floodln!!. IIp.st anAlysis: Eny'ro~t.l FlIl"ther •• ylr..-ntal assos_nt lOa)' be requIre<! for work vitMn In, creek rlllht·of·wa,. Operotln9 -Public IIorks Depan.ent/Stono O'l'&lnoge: Reduced .. Intanance and .Inor repaIrs as s1St. Is uP9rade<!. Caaprlhtnt've Plan: COnsistent viti! EnYlroneental Resources '01lcy I: Naxl.h. water retentIon and .Inl.lze the quantIty and effects of Wlter runoff. FInancIal Anolysls, Source of FundIng: Stc .. ~r.'n'ge Fund. 1991-92 n92-il l'il-M 1914-95 1895-96 $670,000 To Be Dete .. , ...... To Be Deter.lned* To Be Dotenol ...... To Be Detenolned* • Dependant upon completIon of .. ster plan and condttlon o •• e .... nt. 80 _._--------. ------------------------------ -' . . ' . -. REII STORM DRAINAGE PROJECT o o M8I!l!It PARK DRATNAliEISTREEI IIIPROyEIIEIII GUIDELINES Project DtsCX1Rt!Rn: Tols project will fund a study of the Barron Park nefghbo~ood to develop guidelines for drafnage and str!et improvements. Nany residants of the Barron Park ne1ghborhood have expressed concerns ibout drainage and street .aintenance probl ... In their area. Secause n. sIdewalk or curb and gutter is present in most areas, the street edge is poorly defined and large areas of ponding ire present after e~e~ .incr rlinfal'. The t~piCl1 .treet and draln.ge standards cannot be applied unifonoly in this area and still .. intal. the City's commitment to preserve the rur.l environment of Barron Park. Tbls projoct will develop specific guidelines for streel/sldewa1k Improvements which will be integraled wilh a separate project to update the stor~ dr.lnage Kaster Plan. Project JustIficatIon: This project has been authorized by Council in response to the conterns of the Sarron Park nei9hbor~ood. Creation of these guidelines will penoit consistency of improvements and compatib1llty with the neIghborhood's ch.racter. 1!p&Ct Analys's: Envlremoental Operating - fQ'"rebens1ve PJan: Categorically exempt. Increased costs iSSoc~ited with ~aintenance of storm drainage system. Decreased costs responding to emer­ gencIes dYe to drainage problems/flooding. CC~s;5tent .nt~ Environmental Resources Pal fey 1: MaxJ.ize water retention ind .iD1.ize the quantity and effects of water runoff. Consistent with Transportation [loment Progr .. 37 • to improve pedestrian safety. fl".ncfal AnalysIs: Source of Funding: Storm Drii~age Enterprise Fund. Separite fund­ ing of S10,000 is also included in the General Fund. 1991-92 1992-93 1993-94 1994·95 1995·96 S15,000 To Be Determined To Be Determined To Be Determined To Be Deteroined .. rJ -, ! REYlsrD IITltlTY PROJECT ;..< .. :.~ .> ':-,,;, .. Pr9.1tct DesglRtlon: PurdIas. and Install distributIon t .. Mf..,...rs IS required to preville adequate H .... lce t. the Electric utility's cust_rs. prRject Jystjflcatlgn: 511-. ...,Iow are ""upl.s .f four tn1cal t .. nsf ...... r fn.tallatlons with the ........ ue prodLiCed by lach t1Jl'! of cus~r. After subtractIng utilitIes purchase., ~llllng. aalntenance, and operating costs, n.t revenue Is adequat. to p&1 off each tran.f ..... r with recent experience .f custa.er need Ind tr.n.f ..... r price •• Cust.". Size Transf ..... r. Enert1 Used for I ,..aT IQIH Installed Transf. Cost !let Revenue" Approx. PI,.ff P.rfocl of Transf. Tnlcal tond .. ln. Z units UUA" 42,000 $ $ 227 4.x yrs • Kilo Y.lt Ampr .. Tn lcal Fin -SIIb ID!L. 37.5KVA 63,000 S 1,018 $ 340 3 .... .. '.sed.n Net Revenue Ratoj1(l/H • .0054 89 Tnl.ll Office .ldg. Tnlcal Stanford t....rcial Indust.P!( IUlld!ng 100000A 300KVA 4,665,000 864,000 S 17,778 S 7,141 S 25,1'1 $ 4,666 8 .... I.S yr> o UTILITY PROJECT IM!!SF!II!I!OS (cont.d.) ~Ana1nb: tategorlca11y exe.pt. EIlvlr_ta1 OperatIng • Utl1ltle. Doparboent • ElectrIc UtilIty Incr .... '" .. Intanance of additional plant. ea.p'ehensiya r1an: Consistent w1 th p1 an. Flnancll1 601)ysl •• Souree of fundin" 1991-'2 1992·93 1193-94 1994·95 1995-96 $500,000 $425,000 $445,000 $467,000 E1."r'e fund. 90 , , , ----~,,---,--- '/ ./ RfVlSfll UT 1 LIlY PROJECT IWfIC SIWLS PrDJICt DescrIptIon: Upgrade existing aod Inst.ll new traffic .ignal systems .5 required for safety and reliability. Included ire Instoll,tlon of sampling detectors, signal heads, poles, signal controllers, ind r!lited equip~nt. All work will be coopalibl. with tne tr.fflc slgn.l coordination syste~. In 1990-91, the coordinating system requires upgrading to repl.c. old com­ ponent. tnat are no longer .v,llabl •• nd ~ •• o a high failuro rate. Also in 1990-91, tne fin.l two Intor •• ctlons will be connect.d to the coordinating sy.t~_ In 1991-92, funds ar. included for pedestrian .ctuated sign.ls on Middlefield Road In the .Idtown irea and to study replacement of controller. ~sed in t~e downtown area ~fch are not longe~ .anufictured and for whjc~ spare plrts are difficult to obtatn. Project JustIficatIon: To Improve traffic flow and safety within the City. Provfdes a reduction fn accidents t travel time, energy consumption, and air pollutlon_ lwpaet An"ys1$: Envi ronmenta 1 Operating - Cqlprebensl •• 'Ian: Categorically exe~pt. Utllitle. Department -Electric Utility Slight ;ncreise in aafntenance expen~e. tonslstent with Transportation Policy Progr .. 17 -Hat. operational and intersection i~rQve.ents to ease trafffc flow on major streets; with Program 37, bicycl. and pedestrian safety; and with progr .. 34, to dev.lop and i~l~nt , network of through bicycle boule.,rds. flnanci.l Analysis: Source of Funding: 1991-9l $157,000 1992-93 1153,000 1993-94 1160,000 1994-95 $170,000 1995-96 ElectriC Fund. 175,000 TDA gr.nt relmbur •• ment for Ellbarcadero/Bryant in 1990-91. St~dy downtown controller upgrade Upgrade existing signals Midtown Pedestrian sigr..ls Upgrade existing signals Downtown upgrade ph... I Upgrade existing signals Downtown upgrade Phase [I Upgr.de existing signals Downtown upgrade phase [II 107 $ 57,000 I SO,OOO I 50,000 $ 50,000 1103,000 I 55,000 1105,000 I 60,000 1110,000 • " "\ " , I [ I I o o TrltCis signal plan (1991-96 C1P) PROJECT 1. Embarcadero/Bryant Siqnal Xnstall.tion 2. Upgrade signals Fiscal 91-92 $50 (EF) I Year/cost (in 000'5) I 92-93 93-54 94-95 95-961 $50 (EF) $60 (U) $60 (EF) I I I I I I I I 3. Connect &n Adaitional 2 Signals to Master Computer $60 I CEF) 1 I I I I I I I I I C. Upqrade VMS 5. Replace DoWn.town COntrollers (study) 6. Welch/Pasteur . $57 $103 (E:F) (EF) $100 $110 (U) (EF) ------stanford to fund (EF) signal Xnstallation and construct-------- 1 .. Midtown Pedestrian Siqnal Xnsta11ations LBGBJlD BY: Electric Fund $50 (EF) TOM Transportation Developaent Act Fund ! I 'J '.i / IIEII UTILITY ~ UTIliTY IILL ,moo ""qUI. AllIOIIAT!ON """'oct Pr'rr1ptfDl1: This ,ro,feet WOIll4 _te the In-hous. proce$Slns of utll1t)' .,I1,..,...,u. ThIs .111 be a""""IIs"'" bJ' purdleslng an S-4C ... ,uanc. Processor Syst_ Ir .. Unhys. '"'1m .!I!stff!catlgn: The last thrH utlllt)' pe,..m: processIng vendors have ceasN ojleratlgns aM havo caused the tlty to ute lIIjor changes to Insure sl1'Ylce continuity. As of IIDvaber UIIO. the tit,. has been pr""eoslng the pe,..m:s .." .... 11,. In-house with thrH ~.r,. .... 10_.. Staff deto,..Ined that the 1 .... 1 of Sl1'Yfcl provided b,. In-house .'taff was .uperlor to that of the preyl .... yendors. IIlth the new IInlsys S-4C systoa. staff will only need one lull-tl .. -oqulyalent to post ~ and utI .ank deposIt. on the same ,,&,. that they are roc.hed. This will live the City better controls of the procesSing of oyar $100 .,lllon dollars I year In utility p~c. •• and Insure S01'Ylce continuIty to the c_ity. IFF! Analysis: EnYI--.tal -Not a project undor CEQA. Operating - tzs=trn'm'$1ye Plan: Cost ... Intenonce for the syst_ Is $5,600 per )'Oar. It Is Included In the Utllity.111 P~nt Processing Protr .. within the fIn ..... Depart.ont·, budget. Which Is reillbursed b)' the Enterprise fUnds. !lot I nconsistent with '1 an. f1nancial Ana]D": Source of Funding: 1191-92 1992-93 1993-94 1994-95 1"5-96 $13.000 El_rlc Fund. IIlth relooburs ... nt fro. the other Enterprise Funds. '. " I o i:: , .' ' .. "'""".:':-.~.~~~.-':---. REVISED "/ UTIlIH PROJECT MAllJ TRANSMISSION FACILITIES o project DescrIptIon, Relocate the UtilitIes Departn:e"t ~ater Trans.; .. lon personnel and facllitie. froe t~e ~ater Qua1ity Control Plant to the Municipal Service Ce"te~. Prq1tcl JustIficatIon: The transfer of responsIbility for the Water Quality Control Plant fro. Utnities to Public Work. In Noveillber 1988, ,od the subsequent addition of per.onnel, created the need for DDre aVIIlable office space at the T~at.e"t Plant. The MuniCipal Se~.ice Center Master Plan Included provIding f.cilltle. for the relocation of the Water Trins.lsslon Group fro. the T~at.ent 'lant to the "unlclp.' Service Center. This would p ... lt all of the UtIlities Oepart.ent', Operation Division to be l.seMbled .t the Munlclpil Service tenter and would roduce trav.' and labor costs and lncrea.e efficiency. The clo.lng of the four well ,ites necessit.ted reloca­ tion of .. ny record. and equlp.ent stored .t those site. to the facilltie, at the Water Quality Control Plant. The relocation of t~ese items to the "unici­ pal Service Center will occur io F1 1990-91 .s well. l.papt Analysis: Envlronment.l -Not a project under CEQA. Operating -Water Utility: No additional resources required. Pn'nrehensfv. 'lan= Consi,tent with Plan. Flnanel.l analysIs, Source of Funding: S 50,000 Water fund. 1990-9i 1991-92 1992·93 S 300,000 5"op and Offlc~ facilities. [$250,000) Reloc.tlon of eqUipment. [S50,OOO) 1993-94 1994-95 126 •. -. --~~-~------. ~ '. ~ ... / .-.-, ;;;..;,.,;:~~ ____ ~~ _~~ ___ ~'--_ .~ __ ':":::':::E lIEV UTILITY PIOJEtT Prgftct DescrIptIon: Install I recl~l_ ... tar 11 .. f,... tile exIsting toe In Gre<lr Park ..... hl_ watet-line at fist kysllore F~,. load to the """Iel­ pal Sa,..,lce Centor (lISe) ,roperty. Install. rochl_ water blendIng tank and baosur JUIP statIon witl! controls to extll14l rechl_ watar Sl$t .. to all _ at IISC. Pr91m;t JllSt1tle.tlon: The """'cl,.1 ServIce tantor usos .ppro.lutoly 6SO cd .... r 1Ur of potllll. watar to .. et varIous Dlltdoor uses IncludIng equlp.ant ... ~Ing. dust control, stroet swooper fillIng. backfIll condltlonfng and other ul~ r.lated actlvltlos. ConstructIon of thIs project -.uld eneourage the use of reel.l_ wator for non-potable usos In P.lo Alto and help the City ... t Its SflII) .11oc:otlon. 1II!I!et Anal .. ,.: [nvlr ...... ntal Operating - CoIp re ben s1 yt 'lan: Further envlronlental assessoent IIa1 be requfred depending on desl", and locatfon of snt •• UtIlIties DepartMnt -No additional resources reqUired. Consistent witl! Polley 3 and PrOV" , lit [nvl_tal R.sOU1"C9s Seetion of 'Ian to encourago the re-uso of treated wastewater for IrrigatIon. Flnancl., Anilysl •• Source of Funding: 1991·12 1912-93 1993-94 1994-15 1995-U $80,000 Water Fund ~~ ,; ~ ~~f~~~< '- .: ... .. ~. 1 _~ __________ L ---~------~---- --'-~ lID! LIT [L1rt PROJECT o o iOj,F C!J!!RSI: IlECYlm !16m SUPPLY Project DescrIptIon: Instoll 0 reclaIMed •• ter lIne froa tne Palo Alto Region.l Water Quality Contrel Pl,nt (PARWQCP) t. the Golf Course and install on Golf Cours. property, reclal .. d .ater blondlng tan., irri9.tlon booster pump ,t,tion and controls. ProJact ~.t!f!c.tlon: [rrig.tlon of the p,10 ~lto Golf Course I, feasible ,nd benefichl to the City of P,lo ,lito. A 1989 evoluation of turf tolerance rec .... nd.d u'ing 0 blend of reclol-.d water and potable w.ter for IrrIgation at the site. The P.lo Alt. Golf Cours. consumes ,ppro,;.otol, 500 Acre Fe.t of pot,ble .ater (163 mIllion g.llons) onnuolly. ConstructIon of this project would allOW blending of recl,lmed water .It~ potable •• ter at , ratio of 1:1. At t~l, rate of mixIng the Golf Course annu,l deaand for potable .ater .ould be reduced by 250 Acr. Feet. Further reductions in .se of potable .at., may be accoapl1shed after the Golf Cours~ .aintenanc~ stiff glins experience in oper,tlng the mi'in9lpumplng ,tatlon ,nd IrrigatIng the course with blended water. lIptet AnalysIs, Envlronmenhl OperatIng - fUrther e"v~ronmentll iisess.ent ~y be re1uired depending on design and locatIon of syst.m. UtilitIes Depart .. nt -No additional resources required_ Golf Course -S16,OOO ongoing electrical and $150,000 .ater savings. S50,OOO .ai.tenance of pumpIng st.tion set-up replac ... nt plan. CQn$~5tent with Polley 3 and PrograM 6 of Enyiron~ntal Resources Section of Plan to encourage the re-use of treated wastewater (Dr irrigation. £1 ".nei ,1 A,;-:§ 1 "i5: Source of funding: 1991-92 1992-93 1993-94 1994-95 1995-96 $300,000 Water fund, with reimbursefI'lent frOll General Ftmd for l~royements ~n Golf Cour5e. S 50,000 -Generol Fund 84,000 -W.ter Fund 166,000 -W.st .. ater Fund • --------~-~-- ><;~.-::.,:-'" !lEV UTILITY PRDJ£CT g ..... mf!! MT!I!A!. lAS m!IClE COII'IERSI!M :~~" .... J.;. lrR1!Fl Doscrlrt1aD: Instltuto a pilot progr .. to convert four city vehicles to natural flS fuel and con,troct a fueling statIon. Pnliost JUstlf1catlpn: ro I.provo air qu.llty by substituting natural gas .s an alternative tran'portatlon fuel. Federal and 5toto legIslation Issoclated wltll _.lIIoants to tho tlun Air Act recognize natural ga. IS I .... ns to lowe • .. ls.lons. PISt and pending Callfornl. legIslation Includ •• , o Senate 8111 IIZ3. passed In IgSg. requires that the C.llfornla Public UtilIties C ... I •• lon (CPUC) provide Incentive rates for IIIIVs and .."d.tes that 251 of gover ..... t fleet use clean fuels. o $I 2600 which ..... 1. provide I tax credit for ",Vs of 55:11 of conversion costs t ••.... 1_ of $1.000 per vehicle. o $I 2331 which would allow Air Pollution Control dIstricts to 1~laoent fleet aandlte •• If desired. 'met Anal"'s: Envlr~tal -Further envlr~nt.1 .ssess ... nt Day be required prior t. l:opl_ntotl on. Operating' Utilities Departllent . Gas UtilIty: No addItIonal resources required. Not.. Stortlng wlth FY 9Z/g3. the Maintenance ludllt will Include $10.000 for esti .. ted annual fueling stotlon .. Intonance. t _pt" PlIft: ConsIstent wlth Plan. Fll!II!!:lal AnaI!S Is, Soul'ce of Funding, IUI·92 IU2-13 1993·14 19M-g5 In5·g& S2~I.OOO 195.000 175.000 Sa, Fund. FuelIng Station and 4 Vehicles .- 'Jr: ,:t, --'100- -"', ~f~: . ~:-';I'! o REYISED IlA5TWTEl Tl£A1lIOO PROJECT I..A8Ot!AIQRJ FAliILITIES AIIl SJ!IIIES o h~:~~:;! wlll eons 1st of "-lIng of the lIQCP .. Iddltlonal equlplllnt ancI .toff. II flOlll- ~~~~'~~!:~ and .ffluent .. ~lo.11ltl testIng .... Illtl .. for ~la,ssl1 ch~anle tostlng and Nductlan t •• :tl ••• Is plamed fo~ FY 1192-13 and FY 1193-t4. projort Jult1fleatlon: This project fs needed to _t the Roglanal Vater qualIty CGntrol Board's ~equlr .... nts for .... surlng Pl .. ,t ciseharge par ... tors ancI oanltDrlng Industrl.l waste and sDurce eontrol plr ... ters. lwact Anl1 w1 s: Envlronoentol -Categorlcolll exaopt. Operating -Vastewater Enterprise fund: One additional lab anal1St Is beIng requested for FY 1991-92. CM' .hansiy. 'lan: Consistent wlth Plan. Flnanel" Anal,.ls: Source of funding: Vastovater Enter,rlse Fund. 1911-12 1912-U 1993-14 1914-95 1195-96 $250,000 S 60,000 $ 50,000 138 ~,-'~-~- -::: ·~:~~r~' , -.~ !lEV "/" WASTEWATER TREATMENT PROJECT GOLF COIIRSE RECLAIMED WATER SlJPPLl PrGtttt Description: I,.t.ll • reclolMed water line froo t~e fARWQCP to tne Golf Course .nd Inst.ll on Golf'Course property a recl.lDed water blending tank, Irrlgltlon boo.ter pu.p st.llon and controls. Proftct Jystlflcatlon: Irrigation of the f.lo ~lto Golf Cour •• Is fe.sibl. Ind beneflcl.l to the Clly of P.lo Alto. A 1989 evaluatIon of turf toleronce rec .... nded using. blend of reel.ioed water Ind potable witer for irrigation .t the site. Th. P.lo Alto Golf Course consu~s .pproxl •• t.ly SOQ Acre feet of potable witer (163 .Illlon g.llon,) onnually. Construcllon of this project would .llow blending of reol.iled water with pot.ble wlter at a ratIo of 1:1. At this rite of .Ixlog t~e Golf Cour •• annual demand for potable water would be reduced by 250 Acre feet. further reductions In use of potable .ater may be lccoopllshed .fter the Golf Course .. fnt.nance stiff gains e'perience I. operatIng the .Ixlng/pu.plng st.tlon .nd Irrlg.tlng the course with blended water. IlpIct An,I.,I.: E"vlro_ntal Ope"t tog - CoIpnllenslye Plan: Furt~er env1ron.entil issessment M~ be required depending on design and loc.tlon of syst ••. UtIlities OeplrtDent . No addltion.l resources required. Golf Cours •. S16,OOO ongoing electrical and .5150,000 water'siVings. $50 ,000 li;ntenance of puoplng stltlon set·up r.place .. nt plan. Consistent wl~ Policy land frogr .. 6 of Envirenment.l Resources Seclion of Plan to encourage tilt-t"e~use of treated wastewater for 1 rdgat jon. Financ1al Analysts: Source of Funding: 1991-92 1992-93 1993-94 1994-95 1995-96 noo,ooo Water Fund. w;th reimbursement fr~ Generil fund (or f~royements on Golf Course. S SO,OOO -Gen ... l fond 84,000 -Vater fund 166)000 -Wastewater F~nd .' J ~ o Environmental Oocuaent. -City of Palo Alto ENVlRONII!J!TAL ,l,lli~ o ·~ . .,-~:o;; : -"~. ,,,,~~".:;. -; Project Description/Title: Amendments to tity of Palo Alto C'pital Improvement program (tIP) to add Z new prpiects and modify funding and timing gf other protects in the Cjty'S tIP for maintenance, improvements and m1nQc expansions of tbe CHyls tiDa)] improyemtnts inc1ydjng the yf,ilit't systtms. par~s, streets ind sfdtw31kS and Dublic ra,ilities. location/Address: -kt~lt~!W~ld~.~ ______________________________________ ___ Sponsoring Agency/Applicant: City of Fal. ATto (415) 329-22ea Address and Telephone of Applicant, 250 Hamilton Avenue, Palo Alt.o CA 9430! Application for: Amendments to Capital I!provement program Zoning at Project location, varjes Fee Receipt No.; MOTICE Of DETERMINATION Based upon review of t~e project files~ the underSigned member Df tne Planning Oepartment has concluded: I] Negatjve DetJar.tion: The p~oject ~as no significant environmental impact~ No [nvfronmental Impact Report ;s required. the reasons for a Declaration are: On the attached sheet 4 record of project action is a~ai13ble for r!vlew b!twten the hours of 8:00 a.~. to 12 noon and 1:00 p.m to 5:00 p ••. at tne Palg "ltD Fjnance Department at the Palo Alto City Hall __ located .at 2'50 Ham'flton Avrnue. 2nd flgor. Palo AHa. ____ _ The project ~ay have i significant environmental impact. An Environmentil I~act Report w· be prepa Planning Oepartment 0 Planning D;rector~ The project has been approved. The project has been denied. <lA9! 13. NOD Dato: Date, Date: 91· E1A-!J P,ge I • ~-,i·"t. -..... -" The aajorltl of amendments proposod to the 1990-1995 Capital Improvement pnogr .. (CIP) Ine1ude 18 projects t~.t Involve timIng c~anges or funding reducttons to projects previous11 reviewpd for their environmental impacts in the ooylron .. ntal issessment prepared for the 1990-1991 CIP (90-EIA-13). Seventeen projects, proposed for funding reductions, will have no direct adverse p~ys1cal impact on the environment, and are not projects subject to t~ C.llforni. Environment.l QualIty Act (CEQA). However, one project, i.e., Stano Orainage C.l1ectlon Systems, will be DOdifled to include the design of a storm dra1p. line for Everett Aven~! and, is a result, may need further environmental assessment. Of the seven new projects proposed, four projects, the purchase of wat~r rescue eq~ipment, self-contlined breat~ing apparatus, completfo~ of a study to develop guidelines for drafnage and street improvements for the Barron Park neiq~borhood, ind a utility payment processing automation system are also not projects subject to CEQA. The three other new projetts, including water line extensions fram the Regiona, Water Quality Control Plant to both the City's Municipal Service Center (MSC) and tbe Cit] gol' course. and a naturil gas vehicle conversion -'1 need further environmental assessment prior to implementation depending on the specific design and location of each extension. These Tast tnree projects Ire considered to be exceptions to t~e recommended adoption of a Negative Declaration and are identified as being subject to furt~er environmental assessment 1a the tIP amend8ents. £lA9113.NOO 91·EI"-13 Page 2