January 23, 1992
THE HONORABLE CITY CotmCIL
Palo Alto, California
4
ResolutioD Supporting the Frie~d$ of J? __ ~ __ 1}L:t __ ~_n_gJsgui to Creer:: j cj ty of
Menlo Park Appl iQ_ation __ t.9X. an Urban strec>:ms Re:E"torat;-on GrCC'lnt
Mem~ers of the council:
~_rt in Brief
ThiS! report recollUllends that Counci 1 adopt the attachzd resol'ution
(Attachment 1) endorsing the Friends of San Francisquito Creek/City
of Menlo Park application for an Urban streams Resto-;:"ation grant to
fund San Francisquito Creek environmental enhance~ent projects.
Background
The California Department of Water Resources has made ~rdnt funding
available for local creek, re.storatioi"l projects through its Urban
streams Restoration PIograrn. The Program i$ intended to fund
projects 'With the primary objective of flood or erosion control,
while maintaining or enhancinq the natural charact.eristics of a
stream.. The Program also stresses community participation~ In
order to qualify for funding, grant applications must be co
sponsored by a public agency and a private citizens group ..
Applications are judged by the amount of support for the proposed
projects from local residents and other public agencies .
. Q:i,.scu5sion
The Friends of San Francisquito Creek and the Cit}' of Menlo Park.
are co-sponsoring a gr2.nt application (Po.ttachr.,ent 2) to fund
projects to enhance San Francisquito Creek. As Palo Alto is an
affected public agency, the Friends of San Francisquito Creek have
asked for a Palo Alto city council resolution endorsing the grant
application. The proposed projects include creek clean-up, removal
of concrete rubble, bank revegetation, and production of a
videotape documentary of the creek. as it currently exi~ts.
Staff endorses the proposed projects to enhance San Francisquito
Creek and 'Will cooperate ...... ith the City of Menlo park and the
Friends of San Franci~q~i~o Cr~~~ tc f&cilitQte the work.
Endorsement of the grant application requires no further action or
financial participation by the City.
-1-
CMR:126:92
Env i ronmenta l ____ J)~I.P:act
The City of Menlo Park has concl~ded that th~ p~oject proposed for
fundinq 'With the grant f'~nds is exempt from the Califorl'\ia
Environmental Quality Act (CEQA) under section 1~301 ~nd 15302 of
the CEQA Guidelines.
B§!_commendation
Staff recommends t~at Council ado?t the attached resolutiQn
endorsing the Friends of San Francisquito Creek/city of Menlo Park
application for art Urban Streams Restoration Grant to fund San
Francisquito Creek enhancE',ment proj ects.
Respectfully submitted,
~~
GEORGE BAGDON
Assistant Director of Public Works
DAVID G. ADAMS
Director of Public Works
Attachments: 1. Resolution
2. Grant Application
-2·
CMR:126:92
•
.T.
/
Atcachmerlt
RZ.sOLUTION NO~
RESOLUTION OF THE COUNCIL OF THE CITY OF PALO ALTO
ENDORS!NG APPLICATION 8Y THE CITY of MENLO PARK
AND THe FRIENDS OF SAN FRANC1SQUITO CREEK FOR AN
URBAN STREAMS RESTOPATIO~ GRANT FOR SA~
FRANCISQUI~O CREEK
'WHEREAS, the califorp.ia Department of water Resources,
Division of Local Assistance, Urban Streams Restoration Program,
has announced the availability of funds for certain grants; and
WHEREAS, said grants are intended to help
and erosion proble~s in a way that provides
enhancement; and
solve flooding
envirorunental
WHEREAS, the City of Menlo Park and t't'.e Friends of San
Francisquito Cr~ek have proposed to co-sponsor a grant application
to fund projects to remove debris from, revegetate, and produce a
videotape documentary about San z·rar.cisquito Creek; and
WHERL~, the City of Palo -Alto supports such cooperative
efforts to environmentally enhance San Francisquito Creek; and
WHEREAS, the City of Menlo park, acting by and through its
City Council, has conc1uded that the project proposed for funding
with the grant funds would be environmentally beneficial and
categorically-exempt from the California Environmental Quality Act
{~CEQA·), under Sections 15301 and 15302 of the CEQA Guid~lines;
NOW, THEREFORE, the City Council of the city of Palo Alto
does hereby RESOLVE as follows:
Th~ City of Palo Alto endorses the joint application of the
cit}~ of Menlo Park and the Friends of san Francisquito Creek for e::n
Urban Stre~s Res~oration Program Grant for environmental eriliance
ment of San Francisquito Creek~
1NTRODUCED AND PASSED:
AYES:
NOES:
ABSEN'r:
ABSTENTIONS:
1
910 I j 5 bdc 00204203
""'. --'''.---.~--
,
ATTEST:
City Clerk
APPROVED AS TO FORM:
Assistant City Attorney
2
APPROVED:
Mayor
City Manager
Director of Finance
DIrector of PUblic Works
Director of Planning and
Community Environment
,[
,
I
I
I
I
GRAH, A?PlICA110N
1992
state of Califor~ia
Q~part~nt of Wat@r Re~ource5
Division of Local Assistance
Urban Streams Restoration Program
Project i~entification information
Attachment 2
Proposal Ilumb~"r __________ _
AgenCies, city councils, b<lards of directors, districts, citilens groups; or
nonprofit orgiinizatlcns can submit an application. See brochure, grants, "The
lJrban Streams Restoration Program, 1992, for detailed instructic-ns for
c~lrt1ng this applicatiGn.
f. Project applicant and endorser
A. Organization or government agency submitting the applicatio-n:
~~~~~--~---------~--~~------Name of project manager Organization or agency
Ruben R. Hi no City 0 f Menlo Park
Stree-t address
~aurel Street
CDunt:y
San Mateo
City
Menlo Park
lip
9402~
Area code/Telephone
ill 858,342g
Date
January 9. 1992
'Mame of official representing ag~ncy or organization
Ruben R. HinD
Signature
8 Orgaflization or gO\lernment agency cosponsoring ttds application:
Co:nti!ct name
Rqbert H~s
Street address
Past Office Box 1400
County
San Mateo County
Hame of officia' representing
agency or organization
3579E-1
Organization or agency ~---------
Friends Qf San __ Jrand sgllitO CreeK
City Zip
Henlo Par~ 940<~
Are. code/Telephone
H~ 323-0941
Date
~_anuary 9. J992
Signature
· .
c.. Jf thO!" appljeant is--an un:i~co-;.porated--Citizen$ group and usIng a
nonprofit orglni2i.tieon ,as fiscal age~lt to submit the app1it.atioT'l,
indicate the following:
N/A
Contact name repr-esentiJ'lg nonprofH organizatioll
Name of Organization acting as fiscal age~t
Street addre:is City zTP---Area Code
TelephDne
D. list other" project endorsers and participants (please attach T"etters
from t'he individu.al~ or orgaT'lizath:rns listed "Iere}:
fRIENDS Of SAlt fRAllClSQUITO CREEK
CITY OF PALO ALTO
CITY OF EAST PALO ALTO
II. What is/are the name{s) of the str€am(s) or cr!:e"{s) you are planning
to restor~:? rn what c'ity ~'t cnincorporated area, county. arid
districts is your project 'ocat~d?
S~N FRAN,ESQUITO CREEK
Name of stream{s)
CITY: MEN! Q PARK. PALO ALTO. EAST.PAlO ALTO COUNTV:
City County
11th 20th & B2lst
Senate District Asse~~1y District
SAN MATEO. SANU CLARA
_ 11th & 12th
Congressional District
IIL If your project h. not in an area. already de.veloped for res'denti;a.l,
cOIDercial, or industrial 'Use, is it deSignated for suc.h delfelopatent
in an adopted general plan?
IILA-____ _
~-----p fe:-:.c:.".-'p:C:r:C:oc-v"i"d:-.-:.-=,,::,:."p:-Cl"o"c=-=."'t"icc"CCg-:"y"'o"u:-r~pr·ofe'-t site tha tine lll'des the
regional context and local access to the site. ]ncl l!de at least one
set of photograpns of the project site.
------------
3579E-2
Fr1end~ of San Fran~,squito Creek
Box 1400
Menlo Park
California 940,5
Jar.uary 18, 1991
Th~ Honorable ~iyor and Members
City Council of Menlo P,rk
Menlo Park, California
Dear Hr. Mayor and COuncil Members:
I ta ... e the pleasure to inform you that at a Berard of Dire-::t'O(s'
meeting Df the Friends of San FrancisQuito Cnek, a quorum being prEsent,
the following motion was passed:
RESOLVED: The Friends of San Francisquito Cree~ do support an
application by the City of Menlo Park. as the sponsor, to the Ca11fornia
Department of Water Resources, Di~i$icn of Local Assistance, Stream
Restoration Program for a grant ~f monies to fund certain stream
restoration and prese,~ation projects witMin the Menlo Par~ reach of San
Franc1squito Creek. FURTHER~ the Friends of San Francisqu1to Creek, as a
privatf, civic organization does agree to serve as cosponsor for this
application.
Very sincerely yours,
Rob~rt A. Hemmes, Chairman
Friends of San Francisq~;to Creek
:;591,
, ,
Tot.l Project Sudg.tI __ -:~ ___ _
TJtal Grant Request ~ ____ _
Proposal Number _____ _
3579,·3
" .
GRAAT APPLICATION
1992
State of C.allfornh
Department of Water Res~ur,es
Division of local Assist~nce
Urban Strea.s Restoration Program
page 1 of 8
Project Description
Except for IIlaJls, design sp¥cifications or eX1sting reports you may have,
please confine 5o!.:r information on the space provided on this application.
The pages are perforat~d for your convenience.
Summary st~ternent
1. Describe the purpose of your preposed project. Vour project must help
contribute to tMe ;"cduction of property damage from floods or bank failure
llt may do so by stabilizing t~e streaM ~ystes and watershed.}
The goal of this grant app:ication ls to maintain the-San Francisq.uito
Creek's flood control capabilities. pre'o'ent further erosion of its banks
and preserve the aesthetic values of this naturzl reso~rce. To accomplish
this goal, it is proposed to conduct a comprehensiv~ 5urv~y!e."a'uation of
the entire length of the creel<. i>1 order to identify priority areas most in
need of repa.ir or restoration INithout regard to po1itical jurisdiction.
The po1itical jurisdiction/agencies indude the City of Mo:nlo Park, the
City of Palo Alto, the City of East Palo Alto. the San Mateo County Flood
Control ~istrict and th.e Sante Clara Valley Water District and each has
agreed to support t~~ above described e~aluation procedure.
The urban reach of San Frarici squito Creek IN'hich i s address~d by the
project lies within the boundaries of Menlo Park. Palo ~lto arid East Palo
AHo. Most of the year, the creek 'oed is dry except for water introduced
by the drainage outfalis. During the rainy season, large ::;tream flews
occur, several times resulting in flooding of the banks ~long the eastern
end of the reach. The banks crt'! natural, except for lr;diV'idual and
uncoordinated bank stabilization prejects, some done by property owners,
and some by the cities of Menlo Park. and Pa10 Alto. There is natural
vegetation along tne banks, supplemented by plantings by pr-operty owners
and the citie~. Natural vegetatlon exists on the banks except INhere
erosion and bank stabi1ization projects have prevented its surviV'al. The
creek bed is generally compo)ed of rocks varying in size from sand through
graV'el to larger rock'S. Natural V'egetation tends to grow there during the
dry season.
"He c.omprehensive survey INi11 inclwce a V'ideo documentary showing the
condition of the creek a10ng the reach )hown on the accompanY'~g maps. An
accompanying narrative will poirlt out the areas 1r1 d:s.nger of collapse~
severe erosion, potential projects, prOblem areas, endangered trees,
vegetation, and examples of ecologically and structurally sound bank
restorations."
Attention will also be giV'e to stream flaw. In severa1 instances~ the
treatment to protect one area has diverted the stream so as to damage
adjaCEnt areas. These treatments are diverse and rm.ist be c.oordinated in
adjacent areas with the natural stream flow and with each other, both in
function and appearance. There are locations in the stream bed obstrutted
by ~egetati on. obstructed by a concrete wall del i berately bui 1 t to di \lert
the stream flo", to the opp(l~ite bank. It has eroded that bank so much
that three trees ha~e so fare fallen into t~e creek. The project will
'eliminate these irregularities in stream flow, and manage the flow so as
to pro\lide maximum flood control consistent with erosiQn cantrol.
3579[-4
·
i
I
J
I
I
2. Please describe Ule strea.rt restoration or watershed management techniques
YOij will use_ Ho~ will these techniques or manage~nt measures stabilize
the witershed and how will they restore, enhan.ce, or preserve i rlparhn
err,vironment? Attach drawings, d€sign specifica!iolls, Planagement plans,
EnvironlM!ntal IlIIPact Reports, or other documents that lIay ~el5) describe
the project.
3.
The techniques to be used for ballk stab1ilzaticn. in addition to the
planting, of lle9o:tati.on, are: stat:t..ed cOr\crete bags, rod. walls, soldier
piles, and gab~ons.
Stream now .. in be (ontro1led by the selective r€mol,lal of obstructions;
and, if necessary the a~di:t;on of rocks to slo_w the flow. 'The objectiye
wtll be to ac;hieye a consister,t an.d effectfve stream flow that w111
provide adequate flood contl"'ol, minimum erosion, and mosqlJito abatement.
The comprenensillf surlle-y already begun wit] contin.ue.
management plans will be based on the continuing surlley.
Long r'U'll]e
The Friends· of San Francisquito Creek will contir.ue to join the several
governmental bodies with ov~rsigbt of the creex in their annual ·creek
walk-in order to monitor the results of the project.
Is this project i supplement to or being planned in
cooperative 10u1 fe<ler.1 flood control project?
descr;be the igcnci.es and organizations invol ved,
planning process, and the c~rrently proposed plans.
Hell of a l.:1cI1 or
If it is , please
the ,tage of the
The-re are not now any local federal flood control projects ! . .mder"'Wi!Y. fro
U,~ past, floQd ccntro1 has betn undertaken b.y the Corps of Engineers,
Santa Clara County Valley Water District, San Francisquito Creek Flood
Co~tro' District of San Mateo County, and the Cities of Menlo Park and
Palo!) Alto. The subject project w111 b~ fully coordir.ated .... ith these
agencies, is well as the Department of FiSh and Game. All necessary
permits will be obtained.
page 3 of 8
3579E-5
4. Please describe the project's use of public participation in the
planniEtJI design, ar.d/or imp1ementation of the project. What citizen
organizations ire sponsor)nq or supporting this project?
The Friends of San Frar'lci~quito Cree~, the project cosponsor, consisting
~f lZS fam; 1y memberships, is the primary source of publ ic part ic~pction
in the project. Its members are conducting the comprehensive survey, end
are suggesting the-order of priorHies to Menlo Park, the sponsor. They
will monitor the progress and effectiv~nes5 of the project. Assisting fn
the planning, design, and irnpleme;'ltation are member~ who ere civil and
structural engineers, a professional !ita~ ~aker. a horticulturi5t. U1e
principle executive of a construction company w~th experience in th!s type
of project, birdwatchers (to prevent da~age to nesting patterns and
bena· .. 1or). a pr.ofessional gsclcgist, and an archaeolcgist.
5. What eOlJcation.al benefits w11T be deriyed for the public .and' wh.at
tedm1c.al contributions to tfle problem of stream N!storation or streaa
corridor management aight this proj~~t provi~e~
The San francisquHc Creek is a va1:.Jed asset in the cOlllTluriities of Menlo
Park. Palo Alto, fast Palo Alto, and ttanford University. The members of
these cOlTlTlvnities have already dem')nstrated tnat there are educational
benefits from the presence of this <:reek. ever the last two years the
Friends of San FrancisQlJ.ito Creek have presented well attended msetings an
eaer. of the following subje~ts; history of the creek, ecology of the
creek, archaeology of the creek, hydrolcgy of the creek, and the function
of a creek in an urban env; ronment (thi s 1 ast subject was presented at a
meeting of the 1'!!,;"i~IO Park City Council). It is antiCipated that this
project will corrtlnue to height{!n public awareness and interest in the
creeK, that our educational meetings will continue, and that ellen more
privat! citizens will enjoy nature walks and bird watching along the creek.
As f:Jof technical contributions, it is foreseen that our experienc~ with
this project will demonstrate the h~rmonious integration of several
diverse bank stabilization techniques which ~omplement, rather than
interfere with one another. An important contribution ~'ll be the use of
the principles of fluid mechanics and open dlannel flow to show that bank.
erosion can be prevented by management of stream flow rather than
expensive and unnatural structures on the banks.
4 of 8
3579£-6
\
6. What will you subi!it to the Oepartment of Water Resources that describes
the :net~ods and resu1ts of your project? The minimlJm rEQuired! j s
ca.pletlflg I; survey Que-stionnaire and submitting before and ifter
photographs of tne project.
In addition to the minimum re(1uirements of complet~ng a survey
questionnaire ;nd submitting before and after photographs of the project
(before photog~aphs are a'read~ in progress, see att~ched), W~ ~il1 submit
p1anned actomp'1shm~hts, tudget, and sched'jie of task basls. We will
des-tribe the methodo1ogy and rationale of each bank restoration,
protection, and ercsio'l control task. We will :iet measureable criteria
for judging thi! ~ffectheness of each task. We will conduct periodic
surveys of the (riteda parameters. Finally. we will eVJ.luate the cost
effect iveness cl each task.
7. What are your plans for long ten. management or maintenance of the
stream(s} you 're ~fla9ing or restoring?
The bank protection, restoration, and erosion control tasks will be
designed for the long term? that is, 50 year lives. Periodic if1spection
and survey will take place nat only {In the annual creek. walk mentioned
above, but during the annua1 Creek Clean·up Day sponsore~ by t~e cities of
Menlo Park, Palo Alto and Stanford University. Proje;ct fai1ures, if anYt
and stream aMmalies over time will be recorded. Routine clean·ups wlll
continue by the Friends of San Frar.cisq'Jito Creek. The cities cf Menlo
Park.. East Palo Alto and Stanford University have on golng creek
ma;r1tenance programs such as c'Jntinuing to plant indigenous vegetatfon,
irrigation, and emergency repairs. Annual reports will be made to the
California Department of Wat~r ResQwrces on the condition of the creek.
Note: Lone term operation and maintenance of the project site is the
responsiblillty of the grant recipients.
page 5 of 8
3579E-7
.'
B. If you do not receive your 9ri~t
tc lleet YOU)' proj ect obj~c t i VE s?
parthl funding, 1Iihat components
priority funding?
~equest, what other options do you hive
If your grant proposal l1li,15 selected for
Of your project would yOlJ c~oDse for
[f no grant mor:2Y is iillailable, annual clean-ups will be continued. These
c1'!an-ups address littt:'r, tires~ discarcied furniture, s~r)pping (arts, and
miscellaneous detritus. Emergency repairs may be rr.ade by the lcca.l
agerl(les~ but tnese would be pie(emeal and unCOQ.-dinated INith overil1
stream flow. Tt1e Corps of Engineers would probably assist in repairing
~lmages caused by f1ooding,
If we recedvcd partial funding. our priority would be to restore ar1d
protect the banJ.s and restore proper stream now at He Russell Reach (SEE
HAP) •
9. The legislation authorizing this program requires appl icants to prov~de iI
local contribution to the costs of tne project. This contribution can be
aonetary. materials , labor, volunteer labor, staff time. or land'
eisements~ Please state how you will meet this requirement.
See attached budget breakdown.
page6of8
3579E-8
1 ,
1
I
1
10. Please outline your proposed budge-t. Quantify. when possible, the
cOR!pOnents of your planning or design process, the arerll (hteral and
l1'near) extent of res\ofatlon Iofork, Tabor, materials, and equipment
rEQuir~nts. Indicat~ portions ot be funded by OWR and by other
SO\lrc:es~
See attached budget.
Have all of the Questions been answered?
An incomplete appli~ation will be disqualified.
Application (and seven copies) must be post marked by January 31, 1992.
page 7 of 8
3579E·9
._--------"--.. -------.. _---
~'. -.
· c · · • • • ~. c · • · " ! ~ < ~ ~ ! ~ • 0 < ! ~ · " ! ~ < > <
~ . ~ , .. • • N ;: ~
. · ~ ~
" : " · · ~ • ~ • ~ • < c ! · • • ~ r ;; • Q < ! , ~ , ~ -. · • E • ~ ~ " > ~ .:; • • • >
! !'
" ~ ~ .
~ • ~ • ~ ,; " .;