Loading...
HomeMy WebLinkAbout0127.092_01ITEM # PROJECT # l. 2. 3. 4. 5. 6. 1. S. 9. 10. ll. 12. 13. H. 15. 16. 17 • 18. 19. 20. 2l. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31- 32. 33. 34. 35. 36. 37. 38. 39. 40. 41- 42. 43. 44. 45. 46. 47. 48. 49. 50. 18508 18614 18617 18805 18806 18810 18812 18821 18822 18828 18901 18903 18908 18911 18915 18916 18918 18971 19001 19002 19004 19005 19006 19009 19011 19012 19017 19018 19019 19072 1907) 19076 19101 19102: 19103 19104 19105 13106 19108 19109 19110 19111 19114 19115 19116 19117 19118 19119 19204 19205 SEMI-A.."J'NUAL CIP PROJECT STATUS REPORT JA.NUA,RY 1992 TABLE OF CONTENTS PROJECT TITLE ?ublic Buildings StrucLllral Improvements Financial Data Base Art in Public Places Greer Park Development Renovation of Irrigaticn System Parks site Access for the Disabled InforJaation Systems Development California Avenue Parking structure Geographic Information Systerns Midtown Traffic I~pr0vements Fire station Exhaust Removal Systems Side .... 'alk Repairs MSC Site I;;:provements Heating/Ventilation at Lucie Stern Center Fire station Overh8ad Door Modificaticns Fire Station Dormitory Modifications Harbor I:rnproverr.ents Street Maintena~ce Tank Removal/Cleanup (also includes 18604 &: l8B03} MSC Fuel Tank Modification Rinconada Pool Improvements Tennis and Basketball Court Irr.provements Athletic E'ields Rer.ovation Finance Vault Remodel Records Management Payroll/Personnel System civic center Energy Manage:r1ent syste:rn CUbberley SchoOl Site Building Code Modifications ITT Harsh Enhancement Minor Intersection Improvements Major Intersection Improve~ents Bike Parking Facilities Tank Investigation and Removal Arastradero Lake Dam Playground Furniture and Equipment Replacement Baylands Duck Pond Filtration 3ystem Boronda Lake Public Dock Replacement Terman School Site De:,velopment Civic Center Euilding Fire SpLLnkler System Police/Communications computer System Printing Services Equipment upgrade Inventory Control System New Vehicle Purchases PBX Software and Hard~are upgrade Wide P.rca Net',.,'orking HP 150 Personal Co~puter Replacement Cable Television Equipment Civic Center Remodel and Relocation Civic center Cool ing TO' ... 'er Rebuild Fuel Tank. upgrade U \1 J ~' 51- 52. 53. 54. 55. 56. 57. 58. 59. 60. 61- 62. 63. 64. 65. 66. 67. 68. 69. 19206 19207 19209 19210 39590 39591 39594. 39595 39700 39705 39707 45100 45120 '5690 45801 '~02 45803 47702 47703 Water Rescue Equiprn~nt Barron Park Drainage/Street Improvement Guidelines Golf Course R~claimed Water Supply Self-Contaified Breathing Apparatus WASTEWATER FUND Syste!!l FloW' Meterin:~ Replacement Progra:r:1 Plant Equipment Replacement Plant Water Syste~ Laboratory Facilities and Stlidies Barminutor Replacement Wastewater P,eclamation Instrumentation and Alarm Distribution Control System REFUSE FUND Palo Alto Landfill Partial Closure Permanent Landfill Flare Beautification By-.<bee Park Gas Condensate Collection and Disposal System Landfill Levee Prctection Hazardous Materials Safety Storage STORM DRAINAGE ENTERPRISE FUND Collection systerr. I!!:provernents storm Water Quality Inprovenents •••••• 2 · , 11 -.i : i , I I I 1-I 2. 3. 4. 5. SEMI-ANN'tlAL elF PRDJECT STATUS REPORT J.lI.NCARY 1992 GENERAL FUND l.~OS PUBLIC 81.:ILD!NGS _ STRUCTURAL IMPRQV_~ __ M __ EJ..;-'I __ ~ The e:tructural retrofit of Wing "All of the Lucie Stern Center is under construction and ·will be ccmpleted in February 1992. EXPECTEC COKPLETION: THIRD QUAP.TER 1991-92. 18614 FINANCIAL DA'rA eASE During the last t .... o quarters, staff has successfully incorporated the vendor's latest updated version of IFAS VIr the Financial Data Base system. Thi s led to a rela";.i vely smooth closing of the City's 1990-91 financlal accounts. With in-house programming support in place, staff ey.pects, during the remainder of ~991-92, to COl1dt.:ct more training of City staff in user departments, and to achieve operational stabilization of the various IFAS modules. Modifications and further customization of the Financial Data Base ..,·ould C'ccur in 1992.-93. EXPECTED COMPLETION: NOT SET. 186.;1 7 ART IN PUBLIC PLAC?.:::l Twenty four prints were donated to the city of Palo Alto by Philip and Paula Kirkeby, and Robert and Sharon Yoerg. Public Art Commission is deferring installing Bottini and Betty Gold sculptures on permanent bases until elF funding is restored. That funding has been delayed indefinitely due to budget constraints. EXPECTED COMPLETION: ONGOING. 18805 GREER PARK DEVELOPMENT Phase 3 included th~····gr~·cEng-and drainage of the entire site. Other improvements included reclail':"led ""Iater irrigation, landscaping I pathways, and a skat,eboard facility. Construc:-+:.ion is complete.. The final phase, ' .... hich includes four tennis courts, lighting, a parking loti and restrooms has been delayed indefinitely due to budget constraints. EXPECTED COMPLETION OF FINAL PHASE: NOT SET'. 18806 RENOVA.'r.::r:9N Of IRRIGATION SYSTEMS This prQject--includes irnprovel1:',ents to irrigation systems at Mjtchell and Bo~den Parks, Cogswell Plaza, and the Cultural Center. Improvements to the Mitchell Park and Cultural Center syste:iJls were completed in June 1990. COTI1pletion of the remaining systems has been delayed one to two years due to budget constraints. EXPECTED COMPLETION: NOT SET. 6. 18810 PARKS SITE ACCESS FOR THE DISABLED 7. 8. This three-phase project provides access for the disabled to City parks and open space. Phase II consisted of additional on-site paved p~ths and modification$ to drinking faucet$ and picnic tables at variou~ parks. Phase III is the installation of new equipment over a three-year period. New equiprnent has been installed at Hoover and Eleanor Park~. Phas~ JII ~ill be complet.ed oller the next two years. EXPECTED COMPLETION OF PHASE Ill: Fl' 1992-94. 18812 INFORMATION SYSTEMS PEVELOPHEN.T This ongoing project will provide computer equipment and software for the continued development and expansion of the City's centralized CCl1!lputer facil i ty. Planned improvements will (1) expand the workstation net· .. ·ork citY-''';ide allowing controlled external access via te1ephone to computer resources (e.g., Libraries, CuIt"c.lra1 center, Lucie stern Center) I (2) ensure adequate computer response ti:rr.~ for users as planned eX'Pansions/conver!;;io.'15 take place, and ~3) build incr-eased capabil i ty for exchanging computer ized infor:nation between departments. The F'i 90-91 project called for a I!':ajor upgrade of the three HP 30005, which was completed in October 1990. The F"l 91-92 project pu.rchased rneI;1ory and disk drives to ensure adequate cornpu~er response time for users. EXPECTED COMPLETION: ONGOING. 18821 CALIFORNIA. AVENUE PARKING STRUCTURE This project provides for the desjqn and construction of a eingle-level, above-ground parking deck structure at City Parking Lot 3 (on Cambridge }I.venue, c31ifornia Avenue District) ~ A new parking assessment district will be formed 1:.0 finance the project. Design is expected to begin in Marcn 1992. EXPECTED COMPLETION OF DESIGN: THIRD QOAP~£R 199~-93. 9. 1882 __ ~_3:>.E:OGRAPHl.G INFORMATION SYSTEM The purpose of this :multi-year project is to creat.e 3 computetized map of the entire City. Approximately one-third of the urban area of Palo Alto has been photogl: aphica 11y mapped. This area is b~ing cor.verted into electronic form for transfer into the new geographic information system (GIS) software. Testing and quality control checks are continuing to ensure that all graphic and non-graphic data are accurately converted~ EXPECTED COMPLETION OF CURRENT FHASE: fIRST QU~~LER 1992-93. 10. !p828 MIDTOWN TRAFFIC IMPROVEMENTS 'l'his project has been completed. Ho.,'ever, a follow'-up Council assignment required staff to revie ... ' the visibil ity of the road pumps. Staff determined that modifications in signing and striping ~ere in order, and council approvEd these changes in March 1991. These modifications w'ill be funded from this project. The permanent striping changes , • .,-i 11 not be made until current temporary striping fades sufficiently. EXPECTED COMPLETION: THIRD QUI',RTER 1992-9J. 2 . /~~4 ' - .. :: 11. 189Q1 FIRE ST.~TIGN EXHAUST RE~Q2.i~~"J,'._u~u¥u~'U:t-t5 This project covers installation of veticle exha~st re~oval systems at fire stations t~ protect firefighters from dangerous diesel exh~ust parti~ulates. Wo~k ha$ been completed on stations 1, 2 and :3. P.emai:1ing st-ations will be completed during third quart~rr FY 91-92. EXPECTED COMPLETION: 'l":'llRD QUA."'.T'ER 1991-92. 12. 18903 SIDEWALK REPAIRS This project provides for repairs to sidEwalks in the areas bounded; by Madrone 1-.venue, College 1;.ve.nue, Park Blvd. ~ and F.l Camino Real; and El camino :Real, Amherst Street, Stanford Avenue, and CaliforniZl Avenue. Additiona.l 'Work includes curb and gutter repairs throughout the City. EXPECTED COMPLE1'ION: FIRST QUARTEF 1992-93. 13. 18908 MSC SITE IMPROVEMENTS This is a multi-year project. fY 90-91 work provided for the e.xpansion of the A.. .. imal Services Office to create a multi­ purpose \,lork area to accommodate. the office of a volunteer coordinator as ~ell as a meeting room for staff and volunteers. This work was completed fourth quarter FY 90-91. A current pr.:>ject modifies the vehicle "~a5h pad ar-ea to recycle .... ash water into a closed loop system, thereby contair..ing grease and reducing water consllmptior .. EXPECT COMPLETION: FOtTRTH QUA.RTER 1991-92'. 14. 18911 HEA'I~~uJ:ll.c;,;jVEN.TulLATION" AT LUCIE STERN CENTER 15. 16. 17. 'l'his work includes heating a"d ventilation at the theater in the Lucie stern Co~~unity Cente~. Th~s is included with the structural retrofit of Wing "AII of the complex, as described in item 11, Public Buildings Structural Improve!!1ents. EXPECTED COMPLETION: 'I'HIF.D QUAFTER 1991-92~ ~1~8~9~1~5~F~I~R~E~S~T£'A&T£+I~O~N~O~V~E~,R~H~-E~A~D~"~'~O~OB MODJFICATIONS This project \rIill \rIiden the. t·wo apparatus doors stations 3 and 4. Canstructio:1 ;"rill b~ completed December. EXPECi'ED COMPLETION: SECOND QUP-.RTER 199-::'-92. 18916 FIRE STATION DORMITOR¥ .r:'.QPJufJu(:}.TIONS at Fire by late This project funds modifications to fiVe existing fire stations over a period of five fiscal years, and includes separate locker, bath, and dorroit.ory facilities for rt'ale and female firefighters. The construction contract has been awarded, and sta;tions 1 ~ J and 5 will be corr,plet~d third quarter FY 91-92. Work on the remaining t .... 'o stations • .... ill be done after completion and approval of the Fire Relocation Study. EXPECTED COMPLETION: NOT SET. '9918 HARBOR IMPFOVEMENTS This is a mUlti-year pro-J6ct. Council appro'.'ed t.he Si-ee and Design application for the Harbor IDpr-:.";ements project in 1991. staff continues to worJ..-. ·,.,ith regulatory agencies to J -"'-'""=':C',::::-:-":'-,cc ... _0-" __ ~". , .-L..... .. ':.' - - secure all necessa't"y permits+ A 'tirc;e extension has beel'l requested from Bay Conservation and Develop~ent CO~1U" iss ion to allow construction to begin in 1992. CO:7,rnissic'n consideratior, of the application is 5chedt:.led for February 1992. Staff 'Will return to Council with a status report after comments are r-eceived trom BeOC. The State ~ands Commission permit was obtained in September 1991. EXPECTED COMPLETION OF CURRENT WORK: 1992 -93. 18 ~ 18971, 18670 STREET )~.!o.INTEN_"...b'CE This project provides fo~ the annual resurfacing and reconstruction of various Cit~{ streets identified by the City's Pavement Maintenance Mana':;le;'-,ent Systelil (FMMS} as needing improvement4 Seventy-sever. streets were resurface:i in late summer as part of the 1990 prograr:l. construction is complete. A major streat resurfacing project will be accomplished during FY 92-93. EXPECTED COMPLETrorl: F!FST QUARTER 1992-93. 19.. 19001. 18604. 18903 '.rANK REMOVAL/CLEJI.NVE Some contamination was found at the tank removal site at 1901 Embarcadero Road (airport). Qcfinition of th~ extent of ~he contamination has been completed. Based on the discussion with the Santa clara Valley Water District, staff is proceeding with a possible risk analysis or renlediation, to be c<:lmpleted by February 1992. Results of the risk ana .... ysis \o'ill determine remediation process. Des ign wcrk at the landf i 11 fuel tank also is underway. Final cleanup of contaminated soils will follow. EXPECTED COMPLETION: FOuRTH QL·P.RTER 1991-92. 20. 19002 MSC FUEL TANK ~OQIFICAT:.t9nl'{ 21. 22. The purpose of this project is to modify the ~xisting above­ ground fuel storage area at the MSC to include a self-closing valve at the stcrm drainage outlet to prevent any oil leakage fr-om leaving the secondary containment area. Th€ design is 50 percent complete and construction .is scheduled for sumner 1992. EXPECTED COMPLETION-: fOURTH Ql1ARTER 1991-9'2. 19004 RINCONADA POOL IMPR0VEMENTS This project replaces fiiter, chlorination and circulatory systems in order to maintain water quality, chlorination, cirCUlation, and health ar,d safety requirements of Santa Clara county and the State of Califon"lia. The filtration system has been completed. The new.' cblorination system has been installed. PROJECT COMPLE'l'ED: SEcmm Qt:kP:TER 1991-92. 19005n_TE~lS MJJ ___ n_S:_ASKETBALL COlJR'I IMPROVn:ENTS This project funds preventive maintenance for City tennis and basketball courts en a fi'Je-tc. seven-year rot2lting schedule. F'i 90-91 work has been completed, and included placing new asphalt concrete overlay on the Peers, Boulware and Briones basketball courts. resurfacing of the Terman ~ennis courts, ,~ .. and restriping courts at Seale, Ra~os, pobles, Hoover, Johnson, and Scott Par)o{:;. Future j m~.rove!'lents have been delay~d indefinitely Que to budget constraints. EXPECTED COMFL'ETIO~l: NOT SET. 23. 19006 ATHLETIC FIELDS RENOVATION This project provides for on-going re:ilovation of attlleti<: fjelds to ensure safe and playable conditions. Soccer fields at El Camino Park, Greer Pack and Ter'r.lan Park were renovated first quarter FY 1991-92. Future ren':)Vation has been delayed indefinitely due to budget cor.straint&. EXPECTED COMPLETION: NOT SET. 24. .tlQQ;L.KINANCE_ .. VAULT REMODEL Remodel of the Finance Departrr,ent 'w'Ci.ult .... ill i:r:-.prove the work space area for Fjnance Department staff. 'I'he project is on hold pending resolution of the Civic Center utilities/Finance l:l.ove~ EXPECTED COMPLE'rION: NOT SET. 25~ 19~1l RECORDS MANAGEMENT This pr-oject will fund a centra lized records management syst~m for the collection, controlling, indexing, protection, storage, security, and destruction of City docu~ents and records. First-year funding cov02red a study of various options and systems available, .... ·ith rccC1rl~pndo.tions for future implelnentatior.~ A "Request for Prnposals n for impl~me:ntation of the system will be issued during F'i 91-92, and a pilot im.p1ementation done in the Pol ice Department and the Inspection Services Division of the Pl~nning Department. A pilot for the Finar:.ce Departmp,nt has been delayed one to t'ollO years due to budget constraints. EXPECTED COMPLETION: FOlJRT!i QUARTER 1991-92. 26. 19012 PAYROLL/PERSONNEL SYSTEM Needs assessment has been completed, including use of a departJr.er.tal questionnaire to aid in a'JalJ'zin-; user needs, and a survey of payroll soft'ware s::-lutions in othe:r municipalities. council approved staff's reco~~endation to purchase and modify the source cod~ of an e~isting software system through utilization of in-l",ouse programmers. The RFP 'Was issued in July 1991. Benchmark of top vendors was held Decel'lber 1991. Staff will return to Council in february 1992 with a reco~endation on the system to be purchased. EXPECTED COMPLETION: FY 1992-93. 27 .. 19017 CTVIC CENTER ENERGY MANA.G.~ __ M __ ~NT 5'iSTEM This project W'i 11 install an aut-.:>r.-,ated cOrltrol system for Civic Center heating, ventilation and air conditioning, •• hich will provide energy savings, increased occupant co~fort, and will improve the life cycle and perforTi1alice of equip~.ent. The contract has been awarded r and the proj~..:t .. .:ill be cO"~lpleted second quarter FY 91-92. EXPECTED COMPLETION: SECOND QUARTER 199!-92. 5 I , t • t .. I - 28. ~ CUBBE'RLE':t ______ ~c;'I::iOOL SITE BUlr,.DING CCD~ ~lODIFIC _ _8_TJ __ ONS Thi~ project provides for initial ~ork at the Cubberley Schaol site: to establish code compliar.ce loIith C"..lrrent public facility fire, lite safety~ ~nd handicap access regulations_ Work is procaeding on prioritized Frojects. EXPECTED CoMPLETION: ~OT 5£~. 29 • 1901 9 lIT HARSH J;»IJl..'I/!];!:!!D!J: This. project is to restore a portion of tnE: 150-acr€. former ITT site to wetlands and enhance its use as ~ildlife habitat. Saltwater f::-orn the Bay ar.d reclaimed ;..·~ter from the Palo Alto Regional water Quality Control Plant ~ill be used to =reate bot.h a salt 'marsh ano i!o fresh ..... ater marsh. Construction commenced in August 1991 artd is expected to be completed in February 1992. EXPECTED COMPLETIO~'~ THIRD QUARTER 1991-92. ~O~ 19072 MINOR INTERSECTION I~n.QYJ:_MENTS This project includes improver.lents at nine locations~ Two of the locations are done and one is on indefinite hold~ Construction of five of the rerraining locations '~ill be completed by July 1992. The work planned for El Camino Real/California Avenue is under the juris1iction of Caltrans. Council recently approved a c05t-sharing agreement between the City and Caltrans, 'Which permit.s Caltrans to proceed 'IIIith the work:. EXPECTED COMPLETION OF CITY WOR!<: fOURTH QUARTER 1991-92. EXPECXED COMPLETIOI; OF CALTRAJ'/S WORK: THIRD QUARTER 1992-93. 31. 19073 MAJOR IN'IERSECTIO~ IMPROVEMENTS This project provides for capacity improvements at nine locations and development of a new intersection identified in the City-wide Land Use and Transpcrtation Study~ The work will reduce congestion and ease traf f ic flow alo!1g major routes to the stanford Research Park. Preliminary design has been completed on seven intersectlons~ Final design has been completed for the remaining t''''o, ir.cludir19 the Alma/East Meadow and Alma/Charleston intersections. Construc~ion of remaining City 'Work on the Al-rna/East Mea'::IO'.. intersection has been completed. The: rail:c:oad ioprovernents are expected to be completed by summer 1992. The other eight intersection improvements will be completed as funds are budgeted in the CIP program~ EXPECTED COMPLE~ION: FOURTH QUARTER 1991-92. 32~ 19076 BIKE PARKING FACl_~JTr __ ~_~ The purpose of this project is to purchase ar,d install bike racks and/or lockers at. ~,1arious locations in the business districts and at City facilities~ EXPECI'ED COMPLETION: FOURTH QUARTER 1991-92. 33. 1'3101 TANK INyESTIJ~_b.TION AND REMOVAL This project includes the i.nvestigation, testing, design and removal of underground tanks discovered on City property or within the city right-of-~ay. The project al~o involves the 6 • "\ "'," 34. 35. removal of contaminated soils adjacent to the existi~g landfill fuel tank. J\n abandoned ta:1k. has been found in an alley near Alma street. Staff is currently working wi~h the santa ClaI:'a Valley .... ~dter District to determine the responsible part.ies~ EXPECTED COMPLETION: NOT SET. 191 Q2 ABASTRADERO LAKE D.r...M This project will analyze the condition and adgguacy of the dam to witnstand seismic forces and '!7.ajor storm conditions. Included are testing l soil bori~gs, a stability analysis, cost estimates and a final report. The iny~stigation is complEte, and a. ne'W project for irnproveme.:its to the dam '",-111 be proposed during the FY 92-93 elP process. PROJECT COMPLETED: SECOND QL'A.RTER 19':;:;"-92. 19103 PLAYGROUND FU&~I::rjIBLb_tm_ E01.,"IPMENT REPL).,CEMENT This project includes tile replacement of playground furniture and equipment. The 'Work at Greer Park is cOl11ple"t.€. Eleanor and Hoever Parks were ccmpleted second quarter FY~91-92. The re!!laining r-eplacement schedules (including Boul ..... are, Bowen, Briones, Ramos, Robles / Rlnconada, Sea le, P8ers, Athletic Center and E1 CaJl'.ino} have been del.ayed one to tllO ye.ars due to budget constrair.ts~ EXPECTED COMPLETION: NOT' SET. 36. 19}04 BAY~J)S~Oy'~K POND FILTRATION SYSTEM This project provides for improving the ,.,'atei:' quality at the Duck Pond to elirni!"late algae bloorLl.5. EXPECTED COMPLETION: FOURTH QUARTER 1991-92. 37. 19105 BORONDA LAKE Pl;E!_~JJ;;_P.Q_9!{ REPLACEMEtLr This project replaced the 21-year-old public dock at Foothills Park with a dock of similar construction. PROJl:CT COMPLETEO: SECOND QUARTER 1991-92. 18. 19106 TERM..l>,.,.~ SCHOOL~ SI12_.r;:~.:.~/E:_L9PMENT Tnis project bas been de layed indef in i te 11' due tc budget constraints. It provided for thE City's portion of improvements as stated in trle Ten:;";an Spec if ic Plan. It included remodeling of Wing 30 (interior painting, carpeting, wall and window coverings, hard .... are, handicapped restroom facilities, electrical improvements. retrofit of heating system boiler, removal of obsolete cabinets). EXPECTED COMPLETION; NOT SET. 39. 1.9108 C:{'y~,i:_9 ____ CENTER BUrLDI!JG __ ~FJRE~_~RINKL~~B _____ ~'($'JEM This project provides Tor the engineering analysis, design and installation of a fire sprinkler protection system for those areas of the Civic Ce,ter (including the Police Department wing and the city Counci 1 Chambers) which arc presently without a sprinkler syste::l. This .. 'ork .,.rill comply with the Uniform Fire Code requirements. The design cont..ract will be a ... arded in September 1991. Construction has been pcstponed one to two years due to budget const.ra ints. 7 1~" '"-. ., :-. }; - - h __ -_'''''" ',f ;0(' .• '-_ uet EXPECTED CCMPLETION OF DESIGN! THIRD Qt.'ARTER 1991-92. 40. 19109 POL!CE/COMMUNICA'fIO~S COMPUTER S;;:STE!1 '!'his multi-phase project \dll identif)l needs and implement 501ut.ions for improving police and dispatching information JDanagement precesses. Based on the c:;·mpleted needs analysis I the design, purchase and iDplem~ntation/testing of hardware and software will begin. EXPECTED COMPLETION: FOURTH QUARTER 1993-S14. 41~ 19110 PRINTING SEPVICES EQUIPMENT UPGP}I.DE, This project ha~ replaced the obsolete ch .. :.pl icator' .. d th efficient, upgraded equipment that automates several manual processes# and thus increased production capabilities. In FY 91-92, a duplicator and replacement equipment ... .-ill be added to improve productivity. EXPECTED COMPLETION: THIRD QUARTER 1991-92. 42 ~ 19111 ____ m JNVENTORX CONTROL SYSTEM This project re>places t;,e outdated stores inventory c0ntrols at the MSC 'Warehouse 'lIi'ith efficient materials inventory control and a related bar coding systern~ The schedule is dependent upon completion of related IFAS projects. Installation and testing are expected to be completed by the end. of F'l 91-92, 'With any :modifications to be made next year. EXPECTED COMPLETION OF PP~SE I: FOeR~H QUARTER 1991-92. 43. ~114 NEW VEHICLE PURCHASES Twelve ne ...... vehicles and equipment tlave been added: to the City's fleet. Three additional unLts ..... ill be purchased in September 1992. EXPECTED COMPLETION: FIRST QUAHTER 1992-93. 44. 19115 PBX SOFTWARE AND HARDI'rfi..RE UPGRADE This project is to upgrade and expand the NEAX-2~OO digital PBX telephone system in order to ~eet departmental needs for telephone and data services by adding additional line por-ts, trunk and circuit cards, a T-1 channel card and associated modems and scft'Waz"e enhancements that w"i 11 reduce the amount of techniciam time and improve eft icienc),-in per forming moves I additions and exchanges to the system. The planned addition of hardware and software was completed in August 1991. EXPECTED COMP~ETION: FIF.ST QUARTER 1991-92. 45. 19116 WIDE AREA NETWORKING This is a joint project with the Utilities Department to design and install a wide area network (WAN) for computer data communications for all of the city's remote facilities "that require the use and ex>=hange of data. First year funding covers the study of various options and s:;ysterns available, and installations of modems and modern lines for remote locations during the stUdy and design phase_ The General Fund portion of this project has been delayed one to two years due to budget constra ints. The Inforrr,ation Resources and Uti li ties 8 ',' ,', j ~ i t • ";;;;' I , Department:.; will continue to 'Work. on a I'IAN solution between Civic center and Municipal Service Center. EXPECTED COMPLETION: NO'!' SET. 46. 19117 HP 150 PERSONh,_Lm __ ~QJ1PETER REPL~~MENT This proje=t 'Will replace the 42 obsolete !"iF 150 personal computers .. i th Vectra persona 1 CC\!t',puters, -..:h ich is the. c~ t,:!, standard for personal co:r::puter purchases. The first year fU!'I.ding covered replacing 17 of the approved 42 HP lSOs. All 17 units have been .ceceived and installed. The second-year and third-y~ar funding for this project have beeh delayed one to t",'o yean; due to budget constraints, EXPECTED COMPLETION: NOT SET. 47. 19118 C.1lBLE TELEVISION EQUIPMENT This project will fund the Fl.lrchase of portable cable television camera equipment/ editing equipment and a portable tape recorder and deck to be able to cablecast other committee meetings held in the council Conference Roore a~1 other city locations. 'I'he first year fur~dil1g covered the purchase of portable caple t'=!levision camera equipr..ent ir:stall~d in the Council Conference Room in Februar:,.' 19Q1. The second year funding has been postponed indefinitely due to budget constraints. E>."PEC1'ED COMPLETION: NOT SET. 48. 19_!19 CIVIC CENTER REMODEL ANJ::\ BE-L:Q_G_~TION This project 'Will address space limitations on the seccno, third and fourth floQrs of the Civic Center. The: project components include space planning and design, construction L"em0deling, voice/data "..-ir ir;g, and !':loving. The space plan has be.e.n compl~_ted. The project is on hold pending re.view of alternative space plans. EXPECTED COMPLETION: NOT SET. 49. 19204 CIVIC CENTER COOLINC;mm':E'0W,;::E_ REBUILD This project provides for tte rebuilding/replace~ent of the metal framework, bas~p,'ns, wooden '",-ater baff:cs, and any deteriorated piping. EXPECTED COMPLETIOU: FOURTH QUARTER 1991-92. 50. 192Q5 FUEL TANK UPG&~.IJ.£ This project modifies existing piping of underground sto.cage tanks to current standards and in$talls ~ete~ing equipment for remote monitoring of fuel inventories from the MSC g~rage. EXPECTED COMPLETION.: FOURTH QUP.RTER 1991-92. 51. 19206 WATER RESt;JJ.~J:_QJ)_IPMENT This project will provide water rescue equipment for Fi re Department e.mergency response to ;.!ater cJ':"lcrgencies in the bay. EXPECTED COM?LETION: FOURTH QUARTER 1991-92. 5:::. 19207 BARRON PARK DRAINAG.?I~TR.~_!T IMPROVEMENT C;UIDEI,INES 'I'his projeC't funds a stl.<d;l of the B,;.rron Park neighborhood to develop guidelines for dra'1 nage and street improvements, ...... h ich • \ 53. 'Wi 11 be integrated -.0'1 th futut"e storm dra inage imprvvement projects. Th~ study is being done as pa~t of an update to the sto~ Drainage Master Plan. EXPECTED COMPLE1'!OU: FOURTH QL;ARTEH 1991-92. il209 CQLF COURSE RECLAI!'i~D W~T£R SUPPLY This project w1l1 install a reclaimed ~ater linG from the Palo Alto Regional Water Quo.lity Cont.rol Plant to the Golf Course. A reclaimed 'Water blending tank, irrigation booste:-pump station and controls will be installed on G~lf Cou:-se property. EXPECTED COMPLETION: SECOND QUARTER 19'92-93. 54. 19210 SELF-COrlTAINEP BREATHING APPAR.Ji,.TUS This project ..... i11 refurbish self-contained brEathing apparatus for Fire Department en-,ergenc'l respom.lers. EXPECT EO COMPLETION: FOURTH QUARTER 1991-92. WASTEWATER FUND 55. 1...9590 SYSTEM FLOW METERING,REPLACEMI:;N'I' PROGR.~ This ongoing project provides far scheduled replacement of system flow meters at the Palo Alto Regional Water Qualit:i Control Plant (RWQCP) to ensure reliability and accuracy. D~rinq FY 90-91. a waste meter was purchased and put on-line, and a new meter has been installed to measure flQ~ from the East Palo Alto Sanitary District. EXPECTED COMPLETION: NOT SET. 56" 395"9]. '9400, 39602 PLANT EQUIPM~N'I' ___ J?,EPLA.G.~.M'£NT This ongoing proj ect provides for scheduled replacement of RWQCP equipment for maintaining treatment reliability~ Four new replacement. met.ers 'Were purchased for influent pumping. EXPECTED COMPLETION: NOT SET. 57. 39594 PL.a.NT WATER SYSTE.."1 This project ",,'ill r~place a portion of p:ping fo!:' the 14 water system to provide r£?ccla !.7!1ed .,.rate::' for eguiprnent 'washdown ar.d landscape irrigation at the RWQCP. EXPECTED COMPLETION: FOURTH QUARTER 1991-92. 58 ~ 39595 LABORJo.TORY f.f;,CIL:tr:rJ __ ~_S AND STUDIES This RWQCP project provides fer ne'''' bioassay. effluent characteri :Z:8.ti-:,!"! .:J.nd data management, and replacement of certain laboratory instruments to T;leet Regional ;"'ater Quality Control Board requirements. The bioassay test i!lg room \Io'as comple.ted in July 199Q. EftJUE:.nt chat:acterization is be:inq conducted. The project also provides for the remodeling of the laboratory to accommodate additional equipment and staff. EXPECTED COMPLETION: NOT SET. 10 1 59. 39700 SARMINUTOF. R~ __ P __ t.ACEMt.!:IT This is a two-year RWQCF preject to rpplace t~e present 25- year-old barminutors with rare ett~ctive squipp:ent. EXPECTED CO~PLE-'rION: FDURTH QU.~RTER 1991-92. 60. 39705 WASTEWATER RECLJ..¥.ATION This RWQCP project includes preparation of a plan to study the economic, technical. environ~e~tal, and in8titutional feasibility of uti I izing reclainled wastewater to irrigate large turf and landscaped areas, The project also includes RWQCP modifications and purchase of equipment to produce reclaimed "Water. EXPECTED CCMPLE'l'ION: THIRD QUARTER 1991-92. 6-1. J--9707 INSTRUMENTATION AND ,~I,..~.I."I,. EHSTRIBCTION CON'IPCL S)~· __ S_'ff2]1. This !T!ulti-YE-ar project includes development and installation of a standardized distriblJtion control s)'stem for Plant-wide alarm system; pumping control system (three locations), f!ltration, chlorination, dechlorination, incineration, pol~.er and lime/caustic control systems. EXPECTED COMPLETION: 1993-94~ REFUSE FOND 62. 45199 PALO ALTO LANDFILL PARTIJl.L CLOSUP-L The project implemep.ts partial cJosure clf 20 acres on the southeast quadrant of the landfill. The placement of final cover is in .accordance ""ith Re?ional Water Quality Board regulations. EXPECTED COMPLETION: FOUP:I'H QUARTER 1991-92. 63. 45120 .P_ERMANJ:.?"T LANDFILL FLARE BF~.UTIFl<::.';TJ.QJ~ This project provides for construction of an aesthetically­ pleasing enclosure around the stack of the permdnent landfill gas flare. EXPECTED COMPLET~ON: NOT SET. 64 ~ .i..?690 BYXBEE PARK Park improvements are complete, and the park is open to the public. PROJECT COMPLETED: FIRST QUARTEP, 1991-92. 65. 4S8Ql __ GAS CO~.P~~S]l.TE COLI,ECIION AND DISPQ .. ?}\.L SYSTEM This project is to construct a collection and disposal system for gas condensate accunulated in the methane gas collection system, 'Which is required t.O c-omply with Environmental Protection Agency requirements. The p,gency has delayed implementation of this requirement pending revisions. EXPECTE~ COMPLETION: Ne)'l SET. 11 h oo ~. '.--~ i I ' .. , ,- __ ~,_~~_, ............. a_!I! •• ' 66~ 45802 LA...~OFILL LE"/EE PROTECTI0N This project is to construct a flood protection levc€ on the northwest quadrant of the landfill to withstand · ... aShO'l.lt froT:'! the lOO-year flood, as required by the Regional Water Quality control B03rd. EXPECTED COMPLETION: NOT SET. 67. 458Q3 HAZAP.DOUS MATERIA1 ... S SAFETY STORAGE This project provid~d for purchase of snall portablE safety storage buildings fer City-generated hdZ3rdo~s ~aterials. PROJECT COMPLETED: SECOND QUARTER 1991-92. STORK DRAINAGE ENTERPRISE FUND 68. 47702 COL~ECTION SYSTEM IM£EQYEMEHTS A pump station telemetry study conducted 'l;.rith the tltilities Department ~as completed in April 1991; design phase may start in sutt.mer 1992. ,"ell abandonment at the former ITT property bas been completed. A condition assessment of the existing storm drain system and development of an updated storm drain master plan began in summer 1991 and ~ill extend over an 18- month period. Des ign of a ne· .... storTIl dr-a in along Everett Avenue has begun with construction scheduled for su~~er 1992. Construction of a new pedestrian/~.icycle bridge over Adobe Creek at Duncan Place by the Santa Clara Valley Water District .. ill start in early sum.mer 1992. Fi' 90-91 curb and gutter rapairs are nearly completed. FY 91-92 curb and gutter repairs wi 11 be done as part of the Sidldwalk Repairs eIP starting in early 1992. EXPECTED COMPLETION: NOT SET. 159. :t-.]70J STORM W . .[!.TER OUALITY IMPROVEMENT.:; Palo Alto continues to participate i~ the Santa Clara Valley Nonpoint Source Follution control ?ro~raD, an area-wide cooperative effort to reduce polluti:Jr! fro~ ~rbar~ runoff. A five-year NPDES per!r'it 'Was issued to the PrograTll by the Regional Water Qualitj' Control Board in July 1990. The permit requires the City to perform specific long-term activities, such as elindnation of. illegal dumping and illegal connections to stOrll'l drains, modifications to Cit)' ordinances and procedures, and monitoring of storm"'ater runoff. to improve stormwater quality. This project, though subject to revision, will continue in some form indefinitely. EXPECTED COMPLETION: NOT SET. 12