HomeMy WebLinkAbout0228.091•
~.i ,. .
April 11, 1991
THE HONORABLE en", COUNCIL
Palo Alto, California
WATJR STATUS UPDAT, and DISCVSSIOB OP aLT1"A?IYB DROuGHT
RBSP058J fLAB
Members ot the Council:
'aport in Brief
This is an informational staff report which provides an update on
Palo Altols water consumption and conservation status and, most
importantly, describes t.~e proposed Palo Alto response to San
Francisco water Department (SFWD) plans to address this year1s
drouqht. The present SFWO adopted plan requires Palo Alto,
beqinninq in late May, to reduce its purchases by 53 percent from
1987 consumption. Recent storms and other events may induce the
SFWD to ease its adopted reduction requirements.. Nevertheless,
the city must be prepared to move forward with its own
comprehensive 1991 Drought Response Plan (Plan) to meet the 53
percent reduction mandate.. Additionally, Table 2 has been
developed to outline alternative response plans that would be
considered if SYWD were to ease their presently adopted reduction
requ i relnents •
At this time, staff is encouraqing public input and Council
direction regarding the ~:roposed. concepts and plans 'Which were
developed to achieve a potential 53 percent reduction in SFWD
purchases. Those concepts and plans are described in the Plan
attached to this report. In the event the SFWD eases its
reduction requirements, staff would similarly recommend easing
the components of the attached Plan as set forth in Table 2.. No
Council a~tion is required at this time; however, a council work
~ession is scheduled on April 15, 1991 to discuss these matters.
waTER SUPPLY STATUS
On February 26, 1991, the SFWD announced its ·~ndatory Water
Conservation Program-(SFWD Plan), which limits Palo Alto's water
allocati.on to 45 percent of its 19B7 annual usage (a 53 percent
reduction} beginning on May 22,1991. The San Franci5co Public
Utilities Commission (SFPUCj has called for a public hearing to
CMR:228: 91
,. '.' ,
tj -o
be held on April 23. 1991, -to consider adopting revisions to the
current rationinq proqram" and to adopt new water rates. The
current expectation is for these new rates to become effective
for Palo Alto purchases from SYWO as of June 22, 1991 and ~ould
be r~flected in the July 1991 bill.
The SFWD Plan was adopted prior to commencement of the hea~7
March precipitatIon, and before completion ot negotiations for
additional water purchases a The effect of the March
precipitatlon J the status of purchases, wholesale rates, and
actual runoff on the water supply is still uncertain. However,
the total amount ot water in usable storage has risen above the
threshold used by the SFWD to recommend its overall 45 per~ent
reduction. Changes to the allocations and rates ~ay be announced
at the April 23, 1991 hearing, but this is not certain. There
fore, Palo Alto must be prepared to operate under the adopted
Sl'WD Plan.
An additional effect of the drouqht has been a notable decrease
in water quality. The Karch precipitation resulted in silted
runoff into SFWD'S reservoirs. As a result, SFWO has had to
shift supply sources from mountain reservoirs to local
reservoirs. ~so SFWD purchases froD other sources do not have
the saae high water quality as normal Retch Hetchy water. This
chanqe in supply bas brought about lover water quality and
increased chlorination r~quirements. This poorer quality was
noted by our customers in mid-March.
On March 26, 1991, santa Clara Valley Water District requested
water retailers to make an overall redUction of 25 percent from
1987 use. These restrictions limit our combined water supply
from wel1s and SFWD to 75 percent of our 1987 water consumption~
eI" or nIp ALTO nUR IIBTORl:CAL CQIiSIDIPTIOIi:
DUring the recent dry winter Donths, Palo Alto's consumption
exceeded allocations. All previously banked water had heen
exhausted by the end of November, and penalties for ov&r
consu.ption had been assessed for each month, November 1990
through February 1991. Fortunately, the trend in consumption
overall has been decreasing during this time period. In the
interim, Palo Alto began operating ~ells in response to the
increasing need for alternative water supplies both locally ana
regionally. Through continued conservation and vell operation,
Palo Alto expects to meet allocations and also continue to bank
water prior to the implementation of the austere SFWD Plan.
Palo Alto consumption fiqures fc~ recent months are presented in
Table 1 below:
CMR:228:91 2
•
fULl l
a.Q~:g.l lilld ~glll1DmtlQA f!i!1: !1111J: &I!O ~I:ouu: XAI:211 1."1.
Feran1: il\IV , .. )
IItLf .. hWt "'" .. ttoc.etl~ A<tqo' .. tnItr-(-) ...... 'Y ~I.tian ---RIlL l!I!! icci'>-9fW I'cef).! ,J!\lDCftion <o:d ,-----<!L. ...... frw ["11
.N', ..... " JloIl.,. 20 645,24D 62S,5~ -S.on. 11/'-..... .Ilo1t" 21 .... " 648,"10 61e,051 -4,7(.1. 3C,1'59 .... .... '" Sept 21 66a~ 159 656,6l'5 -f.7l1 4i!,290 •. " ... ,22 Oct" 55T~ '783 S!I1,4n ·'.m 68,601 -Clot" _20 344,259 457,5063 32.91'; ?'9 .. 160 • ... _21 Doe'. 290,174 ]55,0515 l2 .... 191,9tO 0
J~ .,,"'0 J.-.18 .301,65Ci 336,621 1I.S9t 51,16C 0
"b J.,. 19 "lib 19 l1P,on 117,501!. '.m '9,521 , .... 'oO zo ." '" m,6" ,,",.m -12'.2U 39,616
-W ... PenatUH.-Id .t.cc.-..t .. tfve a.ntlng did not DC in~o effect U'ltH Palo Alto'. ,.~t tlH:ins
11"0. SF'oC.
om YSB OJU)'P"C'lS
The -Gush Busters· continue their patrols seven days a week. The
nuaber o£ violations has been dropping steadily and fell even
aore sbarply during the Karch rainy period. Flooding is still
the most frequent violation, followec:l by hosing down pavemen't ..
Very few citations are issued for watering at the wrong times 1 a
qood indication that residents and businesses are getting used to
the 10:09 a.m. to 6~OO p.m .. irrigation ban.
Througb the end of March 1991 1 a total of 538 warning notices
were issued.. The public continues to respond to these notices l
and stri~ter enforcement action (installation oE a flow
restrictor) has been required only in one instance ..
CIty r&eILI,!" !'P PA,I' 09RBBRVATIOR
The City Parks and Gol~ COurse Division has already implemented
extensive water use ~eduction~1 including eliminating sprinkler
irriqation in all but a few selected areas.. Please refer to
CMR:195:91 for a detailed description of actions taken and the
current status of the City's landscaped areas. Parks and CoIf
staff have completeQ a water audit on City irrigation systems to
facilitate decision-making on where and how to make further
reductions.
All City building facilities have been, or are currently being,
retrofitted with water-saving devices in toilets, sinks and
sbowers. Conservation stickers are placed in restroom facilities
CIIR:228:91 3
•
-".'
o o
to heighten employee an4 public awareness of the need to use.
water carefully and report any leaks. Leak detection and repair
are a top priority for fa.cilities maintenance pe'rsonnel. cooling
systems are being monitored and operated to minimize water used
in this process ..
cmrro.JIIR OUTRIACJ[ UP MSISDNCI
In addition to a continuing ad campaign, a series of mailings
were sent in January to customers ~hose utilities bill showed
high usage (residents usinq over 20 ccf/~onth ar~ b~slnesses
using over tvice their Baseline consumption Allowance). A
mailing was also sent to local corporate CEO's from the Mayor
ur9inq increased conservation efforts. Althouqh dry weather
continued throuqh February, consumption dropped; and thus it
appears this outreach effort was effective.
The list below summarizes additiona1 conservation activities and
assistance provided by Energy Services staff since the last
Council updat.e ira aid-Jan:IJary ~
• Pertormed 117 on-site water audits 4nd consultationst
provided 3,238 tel~phon9 consultations: and handled over 430
requests for conservation information and water kits,
including distribution ot 240 table cards and stickers to
local businesses. In addition to assistance provided by
Energy Services staff l it should ~ noted that the Customer
Services Center, which bas consistently experienced
increased call volu.e during the drought, has handled an
average of 100 to 150 extra calls per dey in recent months.
• Placed 13 ads in the palo Alto Weekly as part of ongoing
drought awareness campaign.
Issued five utilities ~ill flyers, and cQmpiled over 200
respon&8S to a bill flyer that requested customers to send
in their own water-saving ideas.
• An annual luncheon honoring corporate resource management
achieveaents, including avards for outstanding ~ater
conservation efforts, was held in late March.
A workshop on drouqht landscape strategies vas held for
large commercial customerst experts on indoor process water
use are being brought in to perform audits on major account
customers.
011<:228:91
.' .
Reviewed 25 landscape plans for conformance with city
Landscape GUidelines.
• Continued conservation videos on cable channel; made a
presentation to local school children; sponsored two
elementary school teachers to attend water conservation
training provided by the Santa Clara Valley Water District.
Assisted 10 other utilities, the Bay Area Water Users
Association l the Santa Clara Valley water District and
Stanford university by supplying water conservation planning
and program intormation; created a water conservation
program database containing program design and development
into~ation from throuqhout the state and country.
Later this month a workshop will be held to help residents
aanaqe their landscaping effectively under drought
conditions~
In reqard to the current rate schedule implementation, an
additional 43 applications for exemption have been submitted
since early January~ To date, a total of 29) applications have
been processed and 61 percent have been qranted.
PROPOSW UBPOJIfll 'l'O DI anD PBOOllAJ(
The attached proposed response, entitled "city of Palo Alto 1991
Drouqht Response Plan-, describes the drastic measures required
to .eet the SFWD S3 percent reduction Objective for Palo Alto.
The Plan consists of four major co~nents, including the use of
local wells plus introduction of mandatory water rationinq,
imposition of additional water use restrictions~ and increased
promotion of conservation services~
staff recognizes that the SFWD is likely to chanqe its plans and,
tharefore~ revisions to Palo Alto's response will be required.
The following table outlines alternative response plans~ which
viII ~ BOre completely developed when the SFWD Plan oecomes more
clearly derined:
CIIR: 22 8: 91 5
TABLE 2
PALO ALTO'S ALTERNATIVE DROUGHT RESPONSE PlANS
45%
35%
CMR:228:9l
53%
Palo A.."to
\Iz4udloo
35·4D%
35·40%
Staft' Proposal
City of Palo Aho 1991 Drough! Rcspon.\e Plan (attllched)
Staft" Proposals
Va..-i.ations(s) to 199] DrQugb~ R.esponse Plan
NO well prodLtCtioa
Cooser.'!Itioc required:: 35-40%
Drop M:mciatory Water Rationing
Re\oi~ residential targets dovorDward from the cum:Dt 7/14 (7
uruLs in winter, 14 units m summer)
lostaD flow restrittors OD large residential UloCn. that consume 50
units or more., Of • bWlness that exo::eds its 8CA b)' three times
Incr.eas.e price of the highest ral(:block from the curren! S6/ull'it to
$2O/unit
li1r.rease n:-taiJ rates tc offset SF\\'D wholesaLe: r.lle ioCl"easc: A!!.d.
io recover lost revenw= £rom re4uced sales
Other;.
MAfi'.,'TAIN wdI productlnc at I reduced leve! fr():!D thai: used
UDder t.be 53% redudloll sceDuio.
Conservation required: 25--.30%
Drop Mandatory Waler Rationing
Retain currCJ1l: 7/14 res1dentWlaJ"gets
Increase retail rates lO offset SFWD wholesale rate increase
IlW'ea..o:e price 0( the h.ipest rateblnd: from the current S6/unit to
$12/unil
lrutaIl flow re&rictors OD large rc&idenriaT U~TS that CQru;.umc 75
tl11it.1 Of" mor~ Ol'" .. businesos that e:teeeds its seA. by foU! limes
Drop resuic:.tLoD.! Ofl outdoor watering except for time limlts.
6
· .
./
.~ .
Recently, Palo Alto's water use has dropped significantly below
monthly tBrqets. Palo Alto was below allocation by 12.24\ in
March and A water bank of 39,616 ccf was a~cumulated. Palo Alto
ia currently 56~83' below allocation for the first IS billing
days in April resulting in ~ bank of 155,162 ccf. The total bank
achieved for March and the first part cf April is 194,179 ccf.
Staff attributes much of these reductions in water use to active
conservation by all customer classes and to activation of the
veIls in late March.
The attachea Drought Response Plan presents four basic components
suqqested to achieve the 53\ reduction required by SFWD. This
plan provides the basis for discu$sion only. staff anticipates
returning to Council after SFWD finalizes any changes in
reduction requirements at their April 23, 1991 PUC hearing.
Respectfully submitted,
'I 0·. j' ;r,--n i[)d;:,..".
RON BELVAL
Manaqer, Ene~ Planning r:i:Una. ~.~
DEBRA KATZ
Manaqer, Bnergy services
Chair, Water Xanaqeaent committee
~JU~--.-.
RANDY BALDSCHUN
Asaistant Director,
utilities Administration
CHR:228:91 7
•
. . -,
TABE OF CONTESTS
1. OIervieYo' .. ~ ...•.....•.......•....•.............•........
11 Water Supply Situation .................................... .
San Francisco Water Department (SFWD) Drought Plan .•.....
Palo Alto's Allocation ..........•......................
Santa Clara Valley Water D'.strkt Drought .•...............
Ill. Drought Response Plan De"gn ..................•......••....
IV. Palo Alto's 4-Poinl Drought Response Plan ..................... .
Operation of Wells ......••.........•.....•.......... _
Mandato!)" Water Rationing ........................... .
Customer Oass Targets ............................... .
Alkrnative MWR Plans •...•...•.......•...•..........
Alternative Plan I: Equal Allotment for Each Home ......... .
Alternative Plan II: Complete Per Capita Allotment Plan ..•...
Alternative Plan Ill: Default Per Capita Plan .....•.........
MWR Applicable to Multi-FaIluly Accounts. Businesses,
City Department •....•..••.........•............. "' •
Water Fund Revenue Analysis Under MWR ....•.......•...
Exemptions .••....••.......•................•.•.....
CUstomer Conservation Outreach and Assistance ................. .
City Facilities and Parks Conservation Program ...•. : ..•..........
Water Use Restrictions •....•...•..........•............•...
Restrictions to Prevent Waste .......................... .
Restrictions 10 Promote Alternatives ..................... .
Restrictions That Set a Tone ........................... .
V. Budgel and Staff Impacts ....•...•...•...•.......•......•....
T emponry Staff Need Estimates •........................
Other Budget Impacts '" . . . . . . . . . . . . . . . .•.............
VI. Future Notification/Changes to Plan •..............•...•.......
Review of Plan
Polk)' Issues .•....•.................................
Attachment I
Criteria 10 Evaluate Drought Response Mao
Attachment n
1
1
1
2
3
4
4
5
6
8
10
12
14
J5
17
19
19
2J
22
24
25 n
30
31
32
33
34
•
\
/
:I. overview
The winter of 1990-91 marked the fifth consecutive year of d~ouqht in
California. In ~esponse, Palo Alto's primary water supplier the Sa~
francisco Water Department (SFWDJ adopted a strinqent rationing plan
in order to preserve a two-year w~ter supply sufficient to meet basic
needs in the event of a sixth dry year.
Staff has prepared this 1991 Drought Response Plan to meet the most
stringent requirements. The proposed plan has four major components
designed to reduce the City's water purchases from SFWn by 53\ and
total consumption by 38l trom 1997 usage: it use of the four
operational wells; 2) introduction ot mandatory water rationing; 3)
imposition of additional water use restrictions; and 4) increased
promotion of conservation services.
n. .ater Supply ait ... U ....
SAN FJp.NCISCO WATER DEPARTKENl' (SfWDl DRQUGH1' PLA.~
On February 26, 1991, the San Francisco Public Utilities Co~~ission
adopted SFWO's -Mandatory Water conservati~n Program-(Proqram) which
imposes systemwide reductions equal to 45' of 1987 water usage. The
45\ systemwide reduction is calculated using a formula of a 33\
systemwide reduction of inside water use and a 90\ reduction of
outside water use. Since the inside to outside use ratio differs for
•
o
_," f· .. J
~ ..
o
each suburban retailer, the actual reduction targets vary from the
nO!YIinal 4.s.~
\
.L ..
SYWD's reduction target is based on information that WaS available at
the time the Program was written and includes available water then in
storage, known possible water supply purchases, an~ tbe strong
prospect of a very low runoff in 1991 coupled with a more normal
runoff in 1992. The intent ot the program was to provide an adequate
supply of water for the next two years.
•
The critical supply situation has caused the SFWD to contract for
additional water supply resources. Even with this additi~nal water.
data available in February indicated that 45' reductions in usage were
needed to bal~nce the water equation. Consequently SFWO's Program
urges all its resale customers to adopt water usage restrictions and
enforcement programs similar to those which are mandatory in San
Francisco. Significantly. the Progra. has a banking pr~vision which
allows water savings in any month to be applied aqainst water overages
in other months.
PALO ALTO'S ALLOCATIQN
The allocation formula described in the Program results in a reduction
from 1987 usage o£ 53\ for Palo Alto. In other words. Palo Alto's new
allocation of vater from SFWD is 3~715.793 hundred cubic feet (CCFj
which is less than half of Palo Altors 1987 usage. This new annUal
•
2
.'.
\
,.....,
'-_c-
~llocation beoome5 effective in Palo Alto's June billing period which
begins May 22, 1991~
Si'..NTA CLARA VA [·[n WATER DISTRICT DROUGHT PLAN
The Santa clara Valley water District (S~"OJ exacts a ~pv~p tax· on
underground vater use in Santa Clara county. On ~rch 26 the Board of
SCVWD a~pted a rationing plan which imposes reduction targets of 25t
of ~ater consumption frOB 1987 usaqe. SCVWD takes an all-source,
calendar-year view so this means that the sum of all our water usage
from all sources in 1991 cannot be greater than 75\ of our total use
of all sources in 1987. Under these guidelines Palo Alto is allowed
to supplement its SFWD water allctaent Yith 2,120,144 CCF from its
wells.
Base~ on operational characteristics, we anticipate that the four
wells are able to produce 1 1 229,679 CCF or about 15' of the 1987
usage. This figure is based on the conservative estimate that the
wells will operate at maximum capacity 50' of the time.
IU. Drought; .... 1Ipc .... P~'" Deai9'l
The general underlying qoal of City of Palo Alto Drought Response Plan
(Plan) is to provide reasonably priced water for the high priority,
most essential end uses. These uses include drinking, bathing,
cooking, busines$ production, and requirements for health and
3
•
. ' .
.
o o
sanitation~ The Plan recc=mends using all available resourc~s to the
fullest extent po~sible so long as safety, health, and security of the
~ater aquifers are protected a
The Plan disal1o~s wastefu~ water use and discourages the use of water
~or low priority, less essent~al end uses. Pri~ritization of
landscape irriqation is encouraged so that trees and other mature,
valuable plantings are preserved to the extent possible a within the
constraints of manaqeability, the Plan provides equity in distribution
of available water by application of consistent principles across all
customer classes.
Palo Alto's Drouqht Response Plan incorporates the use of four main
elements: 1) use of the four operational wells; 2) introduction of
mandatory water rationing: 3) imposition of additional wat~r use
~estrictions: and 4J increased promotion of conservation services.
OPERATION OF WELtS-
Operation of the vells began on ~arcb 20, 1991 in o~der to take
advantage of the SFWO banking provision and respond to SFWD's request
to put all au~illary water sources into service. It is estimated that
by beginning of June billing period Palo Alto will have bar~ed 350,000
to 400,000 eel. 'l'his bank viII provide a small cushion during the
";,' ,
" ) ,
"
early start up of the Palo Alto's drought management activities. The
Pian assumes operation of the four wells to the fullest extent
possi~le subject to safety, health and environmental constraints.
Staff conservatively plans for the wells to provide 15\ of the base
YQar (1987) total consumption.
MANDATORY WATER RATIONING
A key element of this Plan is Mandatory Water Rationing (MWR). Given
the substantially reduced supply ot vater available to Palo Alto in
1991, it is staff's opinion that .ajar cuts in the City allotment of
SFWO water will require MWR within the City. (Of cour-S'9., if SYWD
•
eases its 53 percent reduction target, staf£ will propose a different
course of action than described in this MWR section.) staff evaluated
a number of different water rationinq alternatives~ In order to
systematically evaluate the various plans and arrhTe at a plan whicb
best meets the needs ot Palo Alto, staff used a list of criteria which
is described on Attachment I. Staff recommends adoption of
Alternative Plan III: Default Per Capita Plan described below~
Similar criteria have been employed by the city in 1977, 1988 and
1990. While each criteria relates to an i~portant objectIve, certain
criteria conflict with one another. For example l the ability to meet
the ~water usage reduction criteria-is impacted by the ·cost
minimizing criteria Q with respect to enforcement and administrativQ
staffing COGts. siMilarly. the -equity criteria-may involve the use
5
. ----_ ...... -,=-
•
'.
"
o
of individual historical data or square rootage data which may be
unavailable except at qLeat expense~ Thus, any MWR plan can be viewed
as a compromise between partly conflicting objective$~ It is this
spirit of compromise which characterizes the staff's proposal to deal
with the diversity of needs and water consumption patterns by Palo
Alto residents and businesses.
CUstomer Class Targets
Palo Alto's allocation from srwo is based on a 33/90 formula which
assumes a 33 percent reduction in indoor use and a 90 percent
reduction in outdoor use for an overall reduction of 53' in use of
SFWD supplied water from 1987 levels. However, this 53\ target is
reduced to a 38 percent conservation tarqet for Pal~ Alto custo=ers,
assuming the City's wells continue in service. In arriving at
specific target allocations for Palo Alto customer classes, the
question arises whether to use 4 uniform 3ei reduction across the
board for all customers or to base the percentage reduction of the
customer classes upon the SYWD 33/90 fOrMula~
Requirinq the same percentage reduction of all customer classes sounds
fair but in practice may not be. There are six customer c14sses
served by the Utiliti&s Oepartment which differ Significantly with
regard to their ratio of indoor/outdoor water USe~ For example, the
ratio of indoor/outdoor water use for class 1 (single family
residential) and class six (city departments) is 57/43 and 33/67
respectively_ The average ratio for indoor/outdoor use for the
•
,
.~. -
I ,
!
\
;.
r""'"
remaining classea 2 throu9h 5 (~ulti-tamily, comme~cialt industrial,
and public ~acilities) is 79/21~ Requirinq a uniform percentage
(i.e., 38 percent) across tha board may result in those customers ~ith
higher ratios of outdoor use to indoor use benefitting at th~ expense
ot those customers ~ith lower ratios. A uniform percentage iqnores
the causal relationship between Palo Alto's allotment from SFWD and
the customer class usage patterns responsible for that allocation
result. Additionally~ the ability of Palo Alto to ~eet its SrwD
target is decreased since a unifol"l'. 38 ~rcent reduction does net
recognize t~e fact that seasonal indoor/outdoor water consumption
varies by customer class and the potential for reducing water usage is
greater vith outdoor use compared to internal use.
For the above reasons. the staff believes it 1.s prudent to utilize the
same SFWD 33/90 formula applied to Palo Alto customer classes to
arrive at customer class tarqets. In thi3 manner, custome~ class
targets viII mirror the required indoor/outdoor water reduction goals
that exist for the city as a vhole. Accordingly, tor each individual
customer class the percentage reduction targets vary in recognition of
their relative indoor/outdoor water use characteristics. The
resulting targets are illustrated below with and without the wells.
Augmenting the SFWD supply with our wells siqnificantly reduces
reductions for each customer class.
i' ": ..
7
-/.
o
customer CI ft.U
Approximate CUrrent
, Reduction from 1987
\ Re~uction , Reduction
WithQ~t Wells ~4t Wells
1
2
3
4
5
5
Sinqle Family Residential 29 59 44
Multi-Family Residential 16 49 32
Commercial 25 49 32
Industrial 37 49 32
public Facilities 25 49 32
city Departments 24 72 56
Total SystE!lll 25 5) J8
As discussed above the relative percentaqe reductions by customer
class vary because the indoorioutdoor water use characteristics
vary between the customer classes. Classes 2 through 5 will be
combined to make it easier tor the public and the staff to
understand by avoiding too many targets and because they are all
served under the same Rate Schedule (W-7J. As expected, the
largest percentaqe reduction is required by the City of Palo Alto
Departments since approximately 67 percent of their total use is
for outdoor wa~erinq (parks, golf course, island dividers, etc.).
Tba SFW~ allotment and resultinq Palo Alto allocations for
residents and businesses is based on a 90\ ~eduction in outdoor
water usage. Realistically, such a substantial reduction in
outdoor landscaping water use will likely ~esult in a loss of
investment in turf and other plant life due to the lack of water
in this fifth year of drought. CUstomers will be ~a~ing
important decisions between internal and external needs.
Investment in efficient indoor and Qutdoor water systems can make
8
•
•
a difference and should re~aive strong consideration by those
customers who have yet to install such conservation oriented
Qevices~ To mitigate the loss of our valuable trees, tanker
trucks will be used to transport and deliver reclaimed water to
trees located along the street curbs in Palo Alto~ Reclaimed
wate.r will also be available for residential and cOii:1mercial
irrigation when acquired by parties with proper permits issued by
the Regional Wate.r QualIty control Plant4
Alternative MWR plAns
is section of the report discusses three alternativQ HWR Plans
applicable to .inqle-family residents. While staff recommends
adoption of the third plan, the first two alternative plans have.
merit as well and are presented for Council consideration. With
regard to multi-family residents and busineeses, a separate MWR
Plan is addressed in a followinq section_
Attachment JI illustrates a comparison ot allotments between the
three alternative plans. It also indicates how each plan affects
households varying in fa.ily size. However, this information is
preliminary. includinq the rates and rateblock endings. until
the SFWD announces its final ~atas, Palo Alto retail rates cannot
be finalized. The city's current drouqht rate schedule charqes
are between $1 and $6 per unit depending on the rateblocx. A
preliminary estimate of the rates associated with the MWR plans
.;., .
•
•
\
/
o o
discussed in this report Is betwe~n $1 and $20 per unit and a
moderate price is approxi.ately $1.50 per unit. One unit of
water equals 748 qallons.
Before discussing the three alternatives below, it is worth
mentioning that consideration vas also qiven to MWR Plans which
base an allotment on a percentage ot past use. Such plans are
sometimes perceived as fair an<:. easy to administer. However,
staff believes these plans have two significant shortcomjnqs.
First, there is the problem of selecting the base year. If a
year is chosen when conservation was extensively promoted, those
customers wbo complied may feel penalize~ for conserving since
their allotment will be less than had they not conserved. In
Palo Alto 6 we have aggressively promoted water co~servation for
at least the past five years. To avoid the afore~entioned
inequity we would have to base allot.ents on 1986 consumption
data. Here lies the second problem. Each year the turnover of
new accounts is approximately 20 to 30 percent (mostly mUlti
family residents). Thus there is a large percentage of water
customers vhich would h~ve an allotment based on a previous
occupant's usage or some other method. The high volume of such
cases .creates administrative difficulties and perceptions of
inequjties as revised o. new allocations are assigned for many
residents. Therefore, MWR Plans which base allotment on a
percentaqe of past use were eliminated f.om for their
consideration.
10
•
"0,";
00-__ _
Alternatiye PlOD I; Equal Allotment FqC EAch Hom,
Since all bomes would te treated the same, this plan suggests
equity and fairness a In addition it would be inexpensive to
administer, uncomplicated to understand and easy to i.plement.
On the negative side it would probably be perceived as unfair by
those customers with relatively large families (5 persons or
more) or witb la~e lots. By the same tcken# this plan would
tend to be fa~ored by famili~s of three persons or less since the
allot~ent tor them would be larqer than under the two per capi~a
plans discussed later. To translate this into a customer count,
approximately 10,240 sinqle family homes out of 14,900 would
benefit under this plan compared to the per capita plans~ (See
Attachment II for a comparison of the three plans).
Approximately 3,000 homes (4 person families) would receive the
same allotment under plans one and three. Finally, approximately
1,360 to 4,660 homes vould benefit by the per capita plans
because of additional allotments.
Based on the SFWD allotment and Palo Alto's available well
supply, the single family class target {or the year is 1:670,000
units. This translates to 9 units per month per home for 14,900
water service accounts. Thus, there exists a direct relationship
betvee~ this target of 9 units per home and the single family
residential class required target~ A second rateblock is
rQcoamended to price the next two units in excess of the 9 unit
11
•
. ---
\
)
o c
allotment. This second ~atebl~k is needed to serve as a
~buffer· bet~een the third and last rateblock which may be
referred to as the penalty rateblock. The -buffer-rateblock
allows usage in the third rateblock to be pricea very high which
i$ needed to provide strong price siqnals for e~cess u&aqe.
W3ter usage in the third rateblock is usually for outdoor
requirements or indoor needs of customers who have not been
conserving effectively. (In this exa~ple, the buffer suggested
is only two units. The actual size of the buffer will require
more revenue analysis with actual rates). Onder ~ proposed
allotment target, there will be large numbers of customers using
less units or using .ore unit6 than the target. It is this
aspect which justifies a larqe rate differe~tial for usage above
the class target~ This same aspect also makes it difficult to
forecast water fund revenue under a MWR plan.
Under this plan_ hardship exemptions would be limited to those
who require more water for he51th or safety reasons. No
additional allowances would be provided for the number of persons
living in the household nor the landscaping requirements of the
particular size lot.. None of the plans presented in this report
recommend an additional allotment for lot size because of a lack
of data and the shortaqe of wate~ for outdoor use. Hoyever$
staff plans to evaluate the feasibility of using lot size data in
future HWR plans. It may be possible to link lot size
12
•
, .,
. .',
/
".
in~ormation contained 1n the Utilities Geographical Information
System (GIS) with the billinq .y.te~.
Enforcement under this plan would involve identifying those
accounts above the 9 unit allotment tbrough special reports
qene~ated by the Utilities Billing System with ~ollow up contact
by the staff. If customers continue to exceed the allotment
beyor.d a 2 month period, a flow ra5trictor say be installe~ on
the customers water s~rvice for an appropriate period of time.
The impact of a flow reetrictor will va~ tor a qiven residence
depending on su~ factors as pressure in the areas distribution
system# type of sprinkler system employed# number of stories (1,
2, or Jj and method used to restrict the flow. As a minimum, it
would be staff's intention to render outdoor watering by
sprinklers a futile endeavor. The cost of flow restrictot'"
installati~n and reBOval would be borne by the violating customer
and established batween $S~ and $100.
Conceptually, the rate structure referred to above would be as
follows:
Rateblock
10 -11 units
OVer 11 units
Moderate Price (MF)
2 times MP
S to 10 times MP (or $10
to $20 per unit)
•
o
Alternative Plan II; Complete P¢r capito Allotment Plan
Onder this plan each person yould be allotted two units per month
which translates to approximately 50 gallons per day per person.
In addition, each household would be allotted 2 units per month
for other essentIal needs including a base minimum amount for
outdoor watering of shrubs and trees~ Per capita information
would be based on into~ation supplied by the customers throuqh a
special mailing. Up to a. maximum of 10 persons would be provided
additional allowances.
The strength of this plan is that it woul~ probably be more
hoceptable to the community than Plan I because it takes into
account the relationship between water usaqe and the number of
persons living in a household. Prom past experience the three
most vocal ratepayers regarQing MWR are: (1) customers with
large families, (2) customers with significant landsc~ping
investments and/or large lots and (3) customers who have
conserved and do not want allotments based on past u6age~
It~-weaknesses are higher administrative costs associated yith
processing per capita data (14,900 data entries reQUired) and
verification of per capita information. To enter per capita data
for 14,900 accounts will require approximately 130 hours of data
entry~ This level of data entry would siqnificantly impact the
.,
.'
•
':,~ ..
t of
1
2
3
4
5
6
7
B
9
10
/
stafffs ability to perform their normal everyday Quties and is
corsidered a major drawback of this plan. However, once the data
is entered into the billing system, the billinq system would be
able to accommodate 10 different rate schedules.
The principal difference between Pl~n I and II is the recognition
of the number ot persons in a household. After the per capita
allctment is established, the rate structure would include a
buffer and hiqh priced excess usaqe rateblocks as described under
Plan I~ The hardship exeaption process would also be the same
since per capita allowances are already built into the rate
structure. Finally, enforcement would be as described under
Plan I.
Conceptually, the rate structure referred to above ~ould be as
follows:
Rateblock 1
Moderate price Rateblock 2 Rateblock 3
Persons eMf) 2 timgs MP 5 to 10 times _MP
0-3 4-5 over 5
0-5 6-7 • 7
0-7 8-9 • 9
0-9 10-11 • 11
0-11 12-13 • 13
0-13 14-15 • 15
0-15 16-17 • 17
0-17 18-19 • 19
0-19 20-21 • 21
0-21 22-23 • 23
Alternative Plan kII: Default Per capita Plan
15
•
i
/
o
sta.tt 1. r-ecommencUnq this Alternative. .as the most effect,ive,
equitable and ~dministratlvely feasible overall.
Ur~er this plan each household Yould receive an allotmQnt of 7
units per month, an allo~ance by default ror families of three
less. For households of four or more persons, an additional two
units per montt, is provided. Up to a maximu~ ot 10 persons yould
be provided additional allo~ances.
This plan shares the same advantage~ over Plan I as the other per
capita plan. In comparison with Plan II, this plan provides more
water tor households ot one or two persons £7,800 accounts) and
represents a compromise between Plans I and rI for households of
one or two persons. It also substantially reduces the number of
per capita data entries trrm about 14,9~O to 5,000. Thus this
plan has the advantage of reduced implementation C09t and Is
administratively more feasible.
Its weakness is its lack of detail or tine tuninq for households
of one or tva persons in comparison to Plan II. Under this plan,
like plan one, households of one or two persons would receive a
higher allotment than the standard 50 gallons per day per person.
This may be perceived as unfair by larger househo~ds. However,
it could be argued that ~ven with this plan, households of one or
two persons are receiving less ~ater than if all households were
allocated water equally (Plan Il. Furthermors, the staff does
... ._---
not believe that households of one or two persons will be any
less conserving under this plan. A difference in allotment o~
only 1 to ) unit~ between Plans II and III 1s not likely to
triqqer a perception by these customers that they can afford to
waste watera Besides that, they would not always be suee that
they will stay within their allotment unless they periodically
read their own meter.
MWR Applicahle to MUlti-family Accoynts. Businesses, City
Departments
With regard to MWR tor the five remaining customer classes, staff
p~oposes to utilize the Baseline Consumption Allowance (BCA)
concept which is already familiar to those customers. Each
custome~ account currently has a BCA which represents the indoor
usage =equireaents of their facility. This database is already
developed. rt is important for any MWR pl~n to ta~e into account
the specific needs tor these customer classes because of the
diversity and unique requirements of these customers. The Be."
does this.
As previously discussed, the redUction targets from 1981 usage
levels for these customers are as follows:
17
•
-;.
. .
/
o o
Required Percentage Reduction From 19a1
Class 2 Multi-Family Residential 32
Class 3 Commercial 32
Class 4 Industrial 32
Class 5 Public Facility J2
Class 6 city Departments 56
Given a reduction target ot )2' for classes 2-5, a rate structure
has been developed which will incorporate a very high rate for
usaqe above 68% of current consumption levels. Our analysis
indicate that this threshold is at 140 percent of the seA for
classes 2-5 as a whole. Accordinqly the proposed KWR rate
structure for classes 2-5 is as follows:
o
.90
over
Rateblock
.. 90 BCA
1.4 BCA
1.4 BCA
Moderate Price eMP)
2 times HP
5 to 10 times HP
With regard to City Departments, a reduction tarqet from 1987 use
of 56% is recommended. Again, this reduction target is higher
than the other customer class targets because of the relatively
high outdoor use by City facilities. To achieve a 56\ reduction,
18
•
a BCA threshold of 120 percent is recommended. Accordingly, the
propose4 MWR rate structure for Class 6 is as follows:
Rateblock
o .90 BCA
.90 1.2 BCA
1.2 BCA
Water Fund Reyenue Analysis Under MWR
Moderate Price {MP)
:2 times MP
5 to 10 times HP
with any MWR plan there will be more uncertainty with regard to
forecasting revenue than under the normal water service rate
schedules. The uncertainty arises due to the difficulty in
predicting human behavior in responding to a water crisis. The
fact that the MWR rate structure would be introduced for the
first time necessarily eliminates any benefits in forecasting
based on historical experience. Some key questions are:
1) How many customers ~ill use less than their al1ot~ent?
2) How many customers will use more than their allotment?
3J To what extent will excess uS4qe be offset by water
conserved by other customers in order to avoid SFWD
penalties on a system wide basis?
Recognizinq the uncertainty of foreeastinq revenues, it is
important to track revenues very closely each month~ A revenue
, .
/
o
surplus in one Month(s) may be eroded in the following month{s) ~
It is sta~~·. intention to design ratEs to be on the conservative
side wherp~y a revenue surplus would be more li~ely to result
than a deficit. The reason is due to tha tact that after five
years of drouqht and low sales, the Water Fund's reserves
(Transfer stabilization Reserve and System rmprovement Reserve)
are below their .inimums and could not absorb a deficit. In the
event a revenue surplus should a~ise beyond acceptable levels
(i.e. reserve level guidelines), state would propose to return
the excess to the ratepayers in the form of a rate decrease or
ere-oit.
Ex,Lmot i ens
Although the rates have been designed to minimiz~ the need for
cu~tomers to seek exemptions, exemption applications are expected
and will be reviewed usinq strict and equ.itable criteria. The
burden of proof for exemption applications or reconsideration of
allocations viII be on the customer. When appropriate, the
installation of conservation devices will be required before
granting exemptions.
A mUlti-account exemption will be available for those customers
with multiple facilities who wish to sacrifice in one area or in
one buildinq to use .ore in another. The City itself viII likely
e:~ercise this option by lookinq at all facilities and
20
•
'\ .-..... "-
prioritizing water use aaong taciliti~s. Multi-account cU9tome~s
will be able to add their individual account allocations and
redistri~ute ~here most appropriate as they see tit.
CUSTOMER CQNSPYATION ~CH AND ASSISTANcE
Using 1981 as the base year, over 3,000,000 CCF/year or 38'
conservation is needed to reach the SFWD 53\ requirement assuming
that wells can provide 15' of 1997 consumption. For comparison,
with restrictions in effect for 7 months, P~10 Alto achieved 23'
red"lctions in calendar year 1990.
To state the obvious, staying within the required allocation
limits will require significant conservation efforts by residents
and businesses alike. The City proposes to offer a variety of
direct services and assistance to ease the transi~ion to a more
highly water-efLicient li~estyle.
All curr~nt services (~ater audits t h~mQ ~ate~ kits, school
proqrams, infonaation and refoel:ral, consulting, workshops, etc.)
will be continued, and expanded~ OUtreach and pro~tional
ac1verti.!;inq will be increased to maintain consumer awareness of
hew Palo Alto is responding to the drought, and how to best
manage water use~
... -:
•
o
In general, reclaimed ~at~r has been made more re~dily available
for public use by 1) treating it to a hiqher standard BO that it
can readily be used for almost all residential and commercial
landscaping applications, and 2) adding a hydrant for city truck
-fill up· at Greer Park to reduce the truck t~affic waiting at
tbe Regional water Quality control Plant. Because ',,"ater trucks
are necessary to pick up the reclaimed water, staff yill help
coordinate residential and business qroups "a"ho want to m",ke use
of reclaimed ~ater trucksa The feasibility of additional
reclaimed "'·at.er Iffill-\lp· locations is beinq investigated.
one goal of this y~rts drouqht response strateqy is to preserve
valuable matu~e and historic landscaping to the greatest extent
possible. Of particular concern are the trees that help give
Palo Alto its unique character. To this end, the City proposes
to operate a reclaimed vater truck service during the summer
season to irrigate street trees. This effort will help preserve
these valuable trees and reduce the watering burden on residents
and businesses, which will leave them more water to preserve
other trees en their property. The street tree irrigation
prcgram will be available to people willing to mulch the ground
near their street trees. The City Hall plaza would be used as a
p+~lic demonstration of mulching techniques and materials.
In addition to short-term drought strategies, st~ff will seek to
promote long-term water conservation retrofits through
22
•
/
residential and commercial incentive programs. Taken from the
recently approved Urba~ Water Management Plan (CMR:129:91J. these
new programs will focus on ind~r reduction me~sures that will
directly improve customer ability to meet allocations4 These new
proq~ams will be presented for Council approval throuqh the aid-
cycle budget process later this fiscal year.
CITY FACII.ITIES l\,lIlD PARKS CONSER\?,TIOtJ PRPGRM
Tl'Le City itself has already installed a full range of ind-eor
conservation retrofits4 These have been described in the
periodic water manaqement status update sent to Council. To meet
the new S~1) allocations, City water use will have to be cut over
60t from 1987 use levels. This new reduction level can only be
achieved through the extensive loss of landscaped areas and by
extensively using reclaimed water in other areas~
Hore specifically. the only turf areas that will be effectively
maintaine~ are playing fields and the qolf course greens, tees,
and key fairways. Initially~ two water trucks will be rented to
provide reclaimed water irrigation for trees and shrubs at
selected Park facilities. It is not yet known whether two tru~ks
ultimately will be sufficient.
Projects to pipe reclaimed water directly to the golf course and
the City Municipal services Center will be developed. Projects
..
•
/
will be pursued to upgrade aging irrigation e~~ipment and link
tacilities to the Central control Systea~
WAtER USE RESTRICTIONS
Currently. Palo Alto has tyO water use ordinances in effect! one
establishing lonqterz £i.e.1 not drouqht-motivatedJ restrictions
and the other imposing emergency ~estrictions specifically
because of the drouqht. (CMR:305:9 and 302:0~ respectively.) In
meeting SFWDts increased reduction requirements, some chanqes in
these ordinanc9s are warranted.
Even though all customers will be limited by their allocations~
there are many good reasons to maintain restrictions on the way
allocated water can be used. First of all, regardless of orouqht
conditions, it is good sceial policy for Palo Alto to prohibit
water waste l such as gutter floodi.ng~ Secondly, restrictions can
stretch L~e available potable ~ater supply by encouraging people
to use alternatives (e4q., brocms to clean driveways, or
reclaimed ~ater on construction projects}. Thirdly, some
restrictions are designed to set a tone and/or create visual
reminders that drouqht conditions are severe anG c&reful water
use is essential. These latter restrictions, which include l for
example, fountain or lawn watering bans, can also help maintain a
-level playinq field-between equally conservIng custom~rs whose
24
di£ferent circumstances (family size, bUsiness necds l etc.},
affect the amount ot water they have for outdoor use.
The policy quastion is to what extent should control be exerted
over the way water is used versus the amount of water used. A
balance ~Gt be struck between social 90als and respectinq
individual rights and business economic needs. Another factor
that most water aqencies throughout the state have some
restrictions, although they vary both in content and means of
enforcement. There is benefit in trying to be consistent with
the restrictions of other agencies in the region.
The ordinance changes presented herein all fall into one of the
three categories mentione4 above. The least controversial
restrictions are those preventing wasteful practices and axe
strongly recommended without reservation. The next qroup of
restriction changes promote alternatives to potable water use and
are also recommended without reservation. The last two
categories of restriction changes are less straiqhtforward:
therefore, they are presented with a description of pros and cons
to facilitate Council and public discusaion of their merits.
Rest.rict i ODS to Prevent waste
The existin9 water use ordinances contain five provisions which
fall into this category. staff recommends those provisicns be
•
--'-~----
continued with the aoditications indicated. (Additions, in
underline, deletions in B~~ikee~_ type.)
• Except tor drip irriqation systems, so~ker hose irrigation
systems and handwatering, landscape irrigation ~ith potabla
~ shall not be allo~ed between 10:00 a.m. and S;OO p.m.
Irrigation at all times mtlst conform wit.:.'l the cityts
existing water use requlations.
ur run off into qutters, driveways, sidewalks, streets or
other unlandscaped areas.
• ca!"9, }:lea's, t.railers, )''ttlles; ether vzllieles, aieieoJal-ks,-
of water through a bose without an operating automatic shut-
of.! va.lve.
• Res~aurants and other {QQg service operations shall serve
water to customers only upon request.
• Any broken or defective plumbing, sprinklers, watering or
irrigation S)"ste.s which permit the escape or leakage of
./ -,
\
'-
water shall be repaired or replaced as soon as possible, and
not later than the time period established by the Director
of utilities# or his desiqnee, as reasonable after
observation of the broken or detective sys~em.
The falloYing two new ordinance provisions Are also recommended:
• Violation of any of the restrictions above may be considel"ed
prima tacie evidence that the customers allocation is
excessive and needs to ~e reviewed~
• No change in allocations will be granted to accommodate the
need to top-off, or refill eXisting pools, spas, hot tubs or
decorative ponas. Exemptions for refilling may be granted
for multi-user public and private pools which must be
drained for health or safety-related repairs.
B@strictioDS to Promote Alternatiy~
AI ternat.ives to the use of potable 'Water are nWlle,rous and include
recirCUlation of water, use of pressurized vater, use ot
reclaimed water and use of non-water consuming devices {e~q~ a
broom instead of a hose~) The following recommended restrictions
are d~si9ned to promote use of alternatives where p~actical~ The
first three restrictions are in Palo Alto's existing ordinances;
\
recommended additions are in italie~ an~ del~tions in e~~ikee~~
type.
• Potable water for consolid~tion of backfill and other non-
d~mestic uses in construction shall not be used if other
methods or water sources such as reclaimed water are
available, as determined by the Director of Utilities or his
designee. Applicants for hydrant permits from the City of
Palo Alto shall be deemed to have consented to restrictions
on water use which may be imposed by the Director of
Utilities or his desiqnee.
• Potable water other than when used trom containers o£ five
(5) qallons or less, shall not be used to clean vabicles,
sidewalks, walkways, driveways, patios, parking lots, and
other hard surfaced areas or building structures.
(Exemptions may be made to allow high-pressure 9teamcleaninq
from a self-contained water supply.)
• Potable ~ater shall not be used to operate. clean~ fill or
maintain levels in deoorative fountains or ponds, unless
supporting water fowl or aquatic life; 1f reclaimed water is
used, a sign so stating must be posted,
28
•
r '~
• Comm~rcial car wasbes must use recycled vater systems or
demonstrate to tha city's satisfaction that it would be
economically unfeasible to do so.
Restrictions That Set a Tone
Staff believe.s the followinq restrictions JI'Ierit consideration.
Issues pro and con are presented to rac111tate discussion. There
is one provision in the eAistinq ordinance which falls into this
category. It is recommended with indicated modifications:
o Newly constructed pools, spas and hot tubs may not be filled
with water supplied by Palo Alto Water utility ¥RIess a
lie} i., 1999 or adjacent jurisdictions 'Which have s1.lIar
drought restrictions in effect. EXeffi~~ions may be granted
for therapeutic/medical reasons.
Discussion: The reason to have this restricti~n is to
discourage the building of non-essential water-based
recreational facilities. On the other hand, few if any
customer allocations Would be sufficient to cover the
rillinq of such facilities and so the rastriction could be
considered redundant. The restriction ~ay hurt pool
industry cantractors~ Hovever r in consideration of the pool
29
•
------"" .-./'
o o
industry, new construction itself is not banned, only the
tillinq of the ~acility with palo Alto water is prObibited~
Several new provisions not in the current ordinances are also
presented for consider~tion~ The first three, dealing with ne~
landscaping and turf irrigation are only belnq proposed under the
conditions ot SFWD's 53' reduction requirement. The last three
provisions however, would be cons ide rea even if SFWO's
restrictions are eased.
o New landscape requirements associated with city building
permit approval will be deferred until drought restrictions
are lifted, at whiCh time the requirements must be
fulfilled.
o All new landscaping is discouraqed while drought
restrictions are in effect. The irrigation of new landscape
must conform to all other water use restrictions and
allocations will not be adjusted to accommodate such
irri9ation~
Discussion:
New landscaping takes a signific~nt amount of water to
become established, .ven if ~he plants a~e low-water-using
once established. The qoal of the first prOVision above is
to allow a project to be completea without new landscaping,
30
,
/\
yet guarantee that the landscaping deferral von't be used as
a Deans of permanently avoiding city requirements. Bonds
~ay be required to enQure this guarantee and this process
creates a staffing burden fer the Planning Department.
The second provision above represents a compromise
alternative to a tctal ban on new plantinq, the latter of
which would be difficult to enforce and hits the -green-
industry very hard. Most residences and some businesses do
not need to get a city permit for landscaping changes. The
goal of this provision is to raise awareness about the water
demands o~ new plantings and clarify that, while not
forbidding new landscaping, the City will not encourage it
by making allowances for the extra water needed.
o Turf irrigation with potable water is prohibited except for
golf qreenS I tees and landinq areas and recreational
activity facilitie~ such as park and school playing fields
of daycare centers.
variation 1: Apply ban to sprinkler irrigation of turn.
Variation 2: Apply ban to sprinkler irrigation in qeneral.
Discussion:
The reality is that very little turf irrigation will be
possible for most customers if they are to stay within their
31
..
... /'
allocations during the dry season. $0 it can be argued that
any sucb bans are unnecessary. Ho~ever, it is much easier
(less staff and dollar intensive, as well as quicker) to
enforce lrriqation limits than to enforce allocation limits
and, as already indicated, customers watering their lawns
will almost invariably be exceedinq their allocations. A
turf irrigation ban would not be in lieu of enforcing
al1c~ation limits, but could be a major support to that
effort. Also, such a ban decreases the peer pressure among
residents and businesses because if everyone -goes brown w ,
then one person's property doesn't look bad compared to
another's. On the other hand, there is the strong sentiment
that if customers are within their al1ocati~ns, thay should
be allowed co vater turf if they 50 choose.
A policy issue is also raised about whether axemptions to a
turf irrigation ban should be Dade for public or general use
facilities. On a pure equity basis, the answer is 'no'.
The reason to allow the exception is to provide functional,
aesthetic, recreational opportunities which may be even more
valuable when individual landscapes are deteriorated.
An alternative course to banning turf irrigation 1s to focus
on the ~ of irriqation instead. Hence, the 5ugqested
variations limiting sprinkler irrigation~ The theory here
is that sprinkler irrigation is more likely to be wasteful,
32
•
/'
Que to evaporation end unsupervised operation. Banning
sprirJclers wou14 force customers to more consciously
carefully water manually. However" this limitation would be
burdensome, especially to the city and large businesses th~t
wocld incur significant extra labor costs if all waterinq
ha~ to be by hand.
o Commercial establiShments, particularly hotels, motels 1 and
si.ila~ busines~es, must place notices of the drought
condition in restrooms and other public locations.
Discussion;
This prOVision makes a re~4irement out o~ what many
establishments would want or need to do anyway to meet
severe cutback tarqets. The benefit to the city as a whele
is tbe heiqhtened public awareness of the constant need to
be careful with vater use. Smaller businesses who were
concerned about the costs of developing aesthetic postings
would be supplie~ with camera-ready artwork.
o OWner/operators of private wells must adhere to the same
water use restrictions as other residents and businesses
dependent on the city's potable 5upply.
Discussion;
33
i""
.~~
~'i~~ ~ ____ .
Private wella are not a factor in setting Palo Altot.
reduction targets and so restriction of water drawn from
them is not required. The proposed provision would not
limit the quality of water used from private wells, but
would subject that use to the water use ordinances, e,g., no
watering between 10:00 AM and 6:00 PM, etc. It can be
argued that certain uses of any potable water during a
drought are not acceptable. On the other hand, such a
provision can be considered too controlling ot individual
rights.
o Grey water, defined as waste water produced by home
applianceo other than toilets, may be captYred and used as
long as no plumbing aystem changes are made in violation of
Palo Alto Municipal Code and the Uniform Plumbing Code.
D i "CUSS ion:
This provision doesn't chanqe current law, and so could be
considered redundant and unnecessary. However, it would
serve to reinforce the city's policy on the use of grey
water.
Previously. enforcement of the water use ordinances has consisted
of issuinq a series of warning notices, followed by installation
of a flow reatrictor for repeated violations. While current
procedures have been sufficiently &ffective thus far, staff
\ --<.:
1
r.\
halieves that under more severe drought conditi~ns, stricter
enforcemen~ procedures are warranted~ Basically, the less water
there is available l the less we can afford numerous viol~tions or
longer time frames ~or corrective action. Stricter enforcement
shoul~ reduce both the numbar of initial violations and the
number of repeat violations. Therefore it is recommended that,
in addition to warning notices, penalty tines be added to the
violatorts utilities bill after a second violation of the same
restriction. After a third violation, the cost of installing a
t'low restrictor as well as penalty fines 'Would be added to t1':Ie
violator's utilities bill charqes. rt is also reco~ended that
the Ordinances as a wbole be modified to allow exemptions from
any of the provlsiGns in the case ot proven health o~ safety
need.
Enforcement procedures are only as good as the ability of staff
to implement thea. Currently two temporary employees work as
-Gush Busters· to watch for violations. Staff recommends an
additional two temporary employees be hired full time through the
end of the summer season (October, 1991).
Implementing the proposed drought plan will require an even
greater shift in staff priorities than has already been made to
respond to current SFWD restrictions. Most of the work needing
35
•
to be done can be h.ndled by existing .tatt. However. additional
help will be requir~d and can De provided by sbort-term l
temporary e=ployees.
rEMPORAEX STAfF HEED ESTIMATES
Positions D-..lration
6/91 -10/91
2 5/91 -10/91
1 5/91 -E/n
1 6/91 -10/91
Department/PUrpose
Utilities/Gush
8usters
Utilities/Processing
exemptions, meter
reading, and flow
restrictor
inst.allatioTls
Utilities/Same as
above, but less
etatf wilL be needed
after 10/91 because
of the lower work
volume
utilities/Clerical
and field support
for additional
conservation
outreach programs
37
.
2 6/91 -10/91 Parks/Reclaimed
water truck
operation and manual
irriqation
1 6/91 -10/91 !'ubI!e worksl
Irrigating street
Works/Irrigating
street trees with
re1:1aimed water
(Minimum to
sta.rt proqram)
Temporary staff costs througb June 30, 1991 can be covered by the
existing utilities crouqbt burlqet. Total temporary st3ff costs
tor.FY 91/92, est}.mated at approximately $100 .. 000. will be
proposed as PY 91/92 bUd-qet adjustmellts4
OTHER BQDGET IKPACTS
The followinq list is an estimated extra-cost breakdown for
drought-plan t.plementation (covering the period from May 1991
through June 1992):
Direct CUstomer Hailings $ 22,000
38
•
-/
Publicity , Outreach ~aterials $ 150,.000
Supplies (Water Xits, workshops, etc., $ 30,000
Reclaimed water Truck Rental $-35,000
(2 for Parks and 1 for street Trees for 6
months minilllWi to Gtart proqram)
Computer Work Station (CUstomer Services) $ S,OOO
TOTAL $152,000
The funds to cover drouqht-plan implementation expenditures can
come from several 50urces, such as the general water rates or
from reserves built from excess use charqes. There will be a
proposal coming before Council requesting funds to cover drought
plan implementation as part of the normal buclqet process.
Additional costs associated with new water conservation programs
to be proposed in the FY 91/92 bu~et are not included in the
figures above because they are not part of the drought plan
itself.
REVIEW OF PLAN
39
-.
A.· ......"
if the Orouqht Plan 4S proposed is not producing the
required reductions, it will be reviewed to identify the
cause of the problem. The solution., of course., 'Wi 11 depend
upon what tbe probleMs are. but the following ~ctions may be
required it the proposed plan is not offective:
i. Reduce allocations for certain or all customers.
2. Expand the list of wa~er use restrictions.
3. Raise the penalty rates at the highest rateblocks.
4. Step up the speed and severity of the enforcement
process.
POIJ ex-ISSUES
1. Many other Suburban Purchasers of SYWD water do not
have alternatives such 8S wells. Critics claim that
Palo Alto is not doing its part in sharinq the burden
of conservation. However, if we choose not to use the
wells, others may claim that we are not pitchinq by
utilizing an available resource. SFWD has, indeed,
requested that Palo Alto use its wells to assist in
mitigating the area-wide cearth of imported water.
40
•
r\
2. The proposed Drouqbt Plan allows for outside use of
~ater tor v~luable plantings inclu4inq trees. Palo
Alto valu~s its many mature trees and, in f~~t, is
symbolized by a tree. The concept behind the proposed
plan is that the 15t available from the wells allows
alloca:tior:s large enough to ;"eep this large urban
forest alive.
3. ~ycnd limiting the quantity of water, the question
remains whether to have a few, many, or no restrictjons
on the ways watQr is used. On the assumption that some
vater use restrictions are desirable, the text of the
plan discusses the issues surrounding the more
controversial ones.
-,
·"'
.attacbment r
Criteri4 to Evaluate Drought Response Plan
1~ Reduce oVerall city consumption by 38 percent from 1997
usaqa Leyel -thi& is the etfective goal of the plan. To
accomplish this goal the percentage reduction for the
various customer classes will necess3rily vary becau~e their
ratios of indoor/outdoor use var-ies ..
2.. SUfficient water Av§ilable for oersQnal use -the most
important use of water is for hasic drinking, health, and
sanitary uses, and therefore, this is qiven the highest
priority of use.
3. Equity -it is important for any pl~~ to attempt to be fair
to all consumers of vater by treating custom~~z in similar
circumstances in an equal manner. The plan should not
penalize those who have already been conserving
significantly. To the extent practicable, additional water
allotments should be made available based on the number of
persons in a household.
4. AcceptaDCe by the community -many people tend to evaluate
or ~ccept a particular water rationing plan in terms of how
it ~ould directly affect them. It is this aspect which
makes it difficult to qain a popular consensus on a plan.
Ho~ever, any plan must be accepted by the community to ~
successful. One i.portant aspect of acceptance is the
public's understanding of the program: thus, it is viewed as
important to make the plan as uncomplicated as possible.
'\ . "
!,
f."?£i: ~~',
s. Minimize uDemplPVment or business loss -vher 1s
extensively used in both commercial and industrial
functions. If water is severely limited to these consumers,
increased unemployment and business losses could resu~t.
Staff intends that wherever poSSible, this should be
avoided. Still, outsi~e water use must be sacrificed
greatly if .iniau. indoor reductions sre required.
6. Landscaping investpent 1Qssn -because of the shortage of
water, it is expected thet significant landscaping losses
may arise~ Throuqh utilization of the Palo Alto well system
it is possible to euqment the SFWO supply and provide a
.inimun amount of water for landscapinq. This amount should
be enough to keep trees alive. Some shrubs and lawns may
die. CUstomers will be able to choos~ how they use their
allotment between indoor and outdoor uses. The use of
reclai.ed water should be encouraged for certain
applications.
7. provision tor hardship exceptions -any plan will not
automatically cover all special hardships and e~emptions;
therefore I a procedure &ust be inclUded to address
grievances and grant .xemptions .~en appropriate. However,
tha plan should not trigger an unmanageable number of
requests for exemptions. Each exemption granted stymies
achievement ~f our consumption goal.
B. Workable plan -in terms of having a plan actually
accomplish its qoal, it must be workable. This relates to
the four areas below:
a. Cost -t~cost of any water
be minim1%eQ~
-""''''---:......-~-
,r\
plan t~''"'the public should
b. Enforcement -enforcement is vi~ved as a key component
of any plan~ Those plans cequirinq less resources for
enforcement vould be preterable~ Hov~v~~. the success
or a plen is contingent upon effective enforcement,
then the utility must be provided the resources to meet
the enforcement objective unless the cur~ent sta~f can
absorb such additional responsibilities without
unreasonably impacting service to the customer.
c. The plan must be practical and feasible from a data
processing viewpoint and not subject to erroneous
results due to incomplete or inaccurate data bases. A
realistic ti2eframe must be allowed for to ~rform any
necessary data entry or customer programming functions.
9. Flexi~ility -the water shortage is a dynamic situation and
may get better or worse. Thus, it is necessary that any
plan be adaptable to & chanqe in target or adjusted to meet
expectations.
~O. Consistency with other Bay di§tricts -in the interest of
dissemination of public information. it is important to have
plans that are basically consistent with plans in
surrounding communities.
11. Allowance for Dey services -some provision must be made in
any plan to serve new establishments or those under
construction.
12. ~ Beppyer srwp Pe~ti.s -revenue should be ~bllected to the
extent neQessary to recover any SFWD penalties which may
arise.
-,>,',-.
'" • ® a.tt&ClU.nt. II '-'
JNIIl)er oL IIoDthl)' Mont-Ill), XODth1),
Jru:.iaber 0 f BOlls.hold. Allotaellt Allotaent Allot.eDt.
Pe.raons 1D !fitll IX) Oa.4erVJUlBa" Pla.a Vnder .laa
Sou •• hold ".raoU-l (Units) II CO»1\., t111 cpnit.)
1 1800 9 4 7
2 5800 9 6 7
3 2600 9 8 7
4 3000 9 10 9
5 1200 9 12 11
6 300 9 14 13
7 70 9 16 1S
8 70 9 18 17
9 10 9 20 l'
10 --.JJ! 9 22 21
14#860
*Ba3ed on sample of 1,200 sinqle family residents taken by
Utilities Department in 1990.