Loading...
HomeMy WebLinkAbout0241.091• ~, .. . ..<, • • ~ .: ',,", April 18, 1991 THE HONOFABLE CITY COUNCIL Palo Alto~ California / Natural Gas Procurement Progum Service Sc:hedul e Kember Service Agreement -Northern CJlitoroia Poyer Agency Members of the. Council: Report. in Brie f This report recommends Council approval of a Natural Gas Procurement Program with Northern California Power Agency (NCPA}. The Northern California Power Aqency has in ope~ation and plans to construct .acklitional natural qas fueled qeneration facilities which Palo Alto may purchase power Eram. This Agreement is the first phase in developing a source of fuel supply for these facilities at lover costs than av~ilable frOD the present supplier. This staff report presents a service SChedule to be added to the existing NCPA Kember service Agreement which provides the mechanism for Palo Alto to participate in NCPA's gas procurement activities as they relate to gas fueled projects the city participates in. staff requests Council approval and authorization tor the Mayor to eXec'.lte the Aqreeaent. Payments (estimated at $19J,~OO per year) will not be required until 1993 as discussed below. DiscU!?§ i on 'I'be chanqes that have taken place in the qas marketplace have or...curred at a pace that has not allowed time to fully develop agreements providing for the members of NCPA to participate in a gas procurement project. Therefore,. in order to keep pace with the aarket activity# NCPA members who are participants (Palo Alto is not) in the existinq NCPA Combustion Turbine Project agreed to initially support the first phase of the qas procurement project. The first phase consists o£ NCPA's tentative bid for 7000 HMbtu/day "0;- o ot pipeline capacity in Pacific Gas Transport IS (PGT} pipeline expansion project I!Iccessinq Canadian gas ~uppliers. A go/no <10 decision must be made with reqard to th·e success (or partial success) of NCPA1s bid by April 25, 1991 affirming the Agency's willingness to enter into a contract. rhe a~tached Member Service A9reemen~ schedule was developed in order to allow those members who are not in the Combustion ~~rbine 9roject to participate and to fir. up the support for the project. Prospective partiCipants in the qas procurement project must act prior to April 25, 1991. Next Steps The Member Service Aqr~ement Service Schedule will ultimately be replaced by a .formal Third Phase Agreement between NCPA and the participant _embers with percentage rights adjusted appropriately to account .for each participant's ultimate tuel need for their Sh~re o~ qas fired generation. Staff is presently evaluating t~e nMed for future base load generation that could be provided by a new STIG project being proposed for develop'ment by NCPA.. This project is entitled -STIG-which is an acronym for steam injected gas.. The unit will be part of NCPA's further development of caabustion turbine qeneration, scheduled for the 1993 tjme frame~ The-service Scbedule will be replaced wit..'t1. fl formal Gas Procurement Project AqreeJllent (Third Phase Aqreeuent) as soon as it can be developed. The Service SChedule provides for sale by NCPA on the open aarket of any surpluses developed at this staqe. Statffs gas experience tells us that tbere will be an active market for any surplus capacity. The Third Phase Aqreement 'Will provide Palo Alto with an opportunity to evaluate its continued participation or a cbance to adjust the level of participation in the tinal project. Staff feels the potential tor generation fue~ cost savings is significant and the city should support the concept by participating in the Service Schedule at this time. Actual expenditures are not scheduled until 1993. Financial Impact Palo Alto's proposed 10 percent share of the fixed costs in the service 8chedule is estimate~ to cost $193 f OOO per year in 1991 dollars, commencing in November 199)~ This cost would be part of qeneration fuel C06ts, which 'Would be lower under the purchase scenario as compared to relying solely on the pres ant supplier. ellll: Z C1 r n ", RecommeMation Staff rec01a'ends Council aWr.:Ival of the attached Natural Gas Procur~ent Proqra. Service Sched~le Member Service Agreement - Bortbern Cali~ornia Power Agency and requests that the Kayor be authorized to execute the agreement. Re5pect~lly submitted, Rc.,~«: tP :;£4,d RONALD P. BELVAL Manager, Energy Planning 4..e. A. "!.4~ ~ICtww L .• ouW ..I Director ot utilities ~ _ "-1/ ·-t-~u L\._ .,7Ll.,n .. On;(' J • - JUNE PLIOClNG Assistant City Manager CllRU41.'1 -, o RESOLUTION NO. _____ __ RESOLUTION OF THE COUNCIL OF TIlE CITY OF PALO ALTO APPROVING AND AUTHORIZING EXECUTION OF TIlE NA1'URAL GAS PROCUREMEII'r PROGRA.'1 SERVICE SCHEDULE TO THE MEMBER SERVICE AGREEMENT OF TIlE NORTHERN CALIFOR­ NIA POWER AGENCY WHEREAS" the Northern California Power Agency ,-NCPA-J has develope~ the -Natural Gas Procureaent Proq~am Service Schedule to the Meabfl:r Service Agreement of the Northern california Power Agency and its Members-{-Service Schedule-) setting forth its participating Hellbers I rights and obligations with reqard to a project for the procurement of contract and other rights to the transportation, storaqe, and supply of natural gas for use as fuel for the Combustion Turbine Project, the Combined Cycle (STIG) Project, and the needs at Members which execute tbe Service SChedule; and WHEREAS, the NePA COlmlliission approved that Agreement on March 28, 1991; and ~, the Servic~ Schedule requires Palo Alto, which is not A Projeet Participant in the Combustion Turbine Project, to evidence its agreement to participate by resolution specifying its participation percentage and executed on or before the earlier o~ presentation of the Natural Gas Procurement Proqraa Third PhlSse Ag?eement or April 24, 1991: NOW, THEREFORE, the Council of the City of Palo Alto does hereby RESOLVE as follows: SgCTION 1. The -Natural Cas Procurement Program service SchedUle to the Member Service Agreement of the Northern California PoWer Aqency and its Members· is hereby approved, with Palo Alto's participation percentage speCified at ten percent CIO~O'). , SECTION 2. The Mayor is authorized. and directed to execute an eIecution copy of the Aqreement on or before April 2'~ 1991~ SECTION )~ The council finds that there is no possibility that the provisions of the Aqreement will cause a significant effect on the environment~ and upon that basis and the bases set forth in the Service Schedule, find the project exempt from the provisions of the California Environmental QUality Act. INTRODOCEO AND PASSED: AYES: NOES: ABSENT: 1 ABSTENTIONS: ATTEST: APPROVED: city Clerk Kayor lU'PROVEt> AS TO FOIDI: APPROVED: city Attorney City Manager Director ot utilities " , ! . ! o NATURAL GAS PROCUREMENl PROGRAM SERVICE SCHEDULE . MEMBER SERVICE AGREEMENT NORTHERN CALIFORNIA POWER AGENCY Appr"ved by Commission Resolution No. 91-{)9 March 28, 1991 Section 1. Recitals. (0) This is !:he Natural Gas Procurement Program Service Schedule (Service Schedule) to the Member Service Agreement of the Northern California Power Agency (NCPA) aI1C its Members, . dated as of February 12. 1981 (Member Service Agreement). (b) NCPA and a.rtain of its Members have determined that procuring contract and other rights to the transport.tion, storage, and supply of natu:ral gas for use as ruel fO<' the Combustion Turbine Project. the Combined Cycle (STIG) Project, and the needs of MelI\bers which execute this Service Schedule, is in the best interests of NCP A and its Members. (c) NCP A hereby determines that this Service Schedule is an action ur.derlal<en by • public agency !elating to thermal power plants (STIG), including the expenditure, obligation, or encumbrance of funds foc the conditional purchase of fuel, which thermal plants are subject of an ElR, and therefore, pursuant 10 H CCR §15271, CEQA does not apply. Further, the Combustion Turbine Project has been constructed follo"'ing environmental review and the supply of fuel provided by this Service Schedule is an obvious consequence of approval of sur.ll project, without any substantial change, and without significant environmental i"'pacts. • / • (d) NCPA and its Members intend 10 prepare a Third Pha;" Agreement, as denned in Member Service Agreemenl, into which the terms and conditions of this Senice Schedule shall transfer upon approval of the Members and NCPA. (e) NCPA hereby declares the Natural Gas Procurement Program to be an NCP A Project. Sectior. 2. Combusnon Turbine Prokct Participants. The Project Partiapants in the Combustion Turbine Project shall support, as operating expenses of the project, the obligations of NCP A, and receive the entitlements to, the beneflts of the contracts or other rights (as third party beneficiaries), obtained by NCPA pursuant to this Service Schedule, in proportion to fr,eir respective Project Entitlement Percentages. The Project Entitlement Percentages of the Project Participants In the Combusnon Turbine Project,. with respect to the obligations and entitlements of Lllls Service Schedule, shalJ be adjusted. proportion.tely 10 reflect execution and delivery of this Service Schedule by Members who are not Project Participants in the Combustion Turbine Project, pursuant to sections 3 and 7 of this Service Schedule (Adjusted Percentages). The Adjusted Percenli!ges, if L"" CHy of Palo AlIO and Turlock Irrig.non District execute and deliver this Service Schedule, shall be as shown in the column entitled "'l{, Need PGT-ExJ' Bid" on Table 4(a) if Palo Alto determines 10 take 600 MMbtu/day and an additiona11000 MMbtuI day, or Table 4(b) if Palo Alto determines to take 700 MMbtu/day. Tables 4(a) and 4(b) are aHached to and Incorporated into this Service Schedule. -2- ,0 5«tion 3. Member Servlce Awwmerl Participants. Members who are not. Project Participants in the Combustion Turbine Project may execute this Service Schedule and then they shall support the obligations of NCPA, and receive the entitlements to, the benefits of the contrCicts or other rights (as third party beneficiaries), obtained by NCP A pursuant to this Service Schedule, in Adj-..lSted Percentages up to 65.72 percent of the sum of !he Project Entitlement Percent.ges in the CombUstion Turbine Project, and the obligations and . entitlements of the Project P.,-OOp.nts in the Combustion TUTbine Project. with respect 10 tllls Service Schedule only, shall be reduced proportionately. Sec\ion 4. Authorizafion to Contract. (a) The General Manager is hereby authorized, on behalf of NCP A, to enler into contracts and 10 take other actions to obtain rights to the transportation. slorage, and supply of natural gas. (b) The Firm Transportation Service Agreement proposed between Paclfk Gas Transportation Company and NCP A is hereby approved in the form attached to this Service Schedule al the meeting al which it was presented. (c) The General Manager shall pcesent e,ch rontract 10 the NCPA Commission Cor its approval prior \0 the effective date or the date of rescission of each contract. Section 5. Third Phase Agr""ment Ncr A shall p<esent 10 the Members a Natural Gas Procurement Program Third Phase Agreement to pool -3- .' , ,-.' / gas transportation, supply, and storage opportunities. Upon execution and delivery by Members which are .. .lfficient to support the payment of the obligatlo.-J undertaken. pursuant to this Service Schedule, the Third Phase Agreement shall supersede this Service Schedule, and the participants in the Natural Gas Procurement Program Third Phase Agreement shall su<:ceed to the obliganons and entitlements of this Service Schedule in accordance with the participation percent.ges established pur,,,an! to this Service Schedule. It is the in!<!ntion of L'le Project Participants in the Combustion Turbine Project and the Membe .... that participation percentages in the Natural Cas Procurement Program Th!rd Phase Agreement shaII reflect to,e Adjusted Percentages on Table 4(b) or Table 4(b), with provisions for pooling the benefits of the program. as the participants may agree. Section 6. InCOIpOfation Into Member Service Agreement This Service Schedule is hereby incorporated in and atlached to the ap:>ropriate Member Service Agreement Section 7. Member Execution. Any Member which is not a Project Participant in the Combustion Turbine Project who desires to benefit from this Service Schedule shall evidence its agreement to participate in the obligations and entitlements by resolution of its gOVErning body, specifying its participation percentage and authorizing exerution and delivery of this Senice Schedule before the earlier of pres."Iation of the Natural Gas Procurement Program Third Phase Agreement or A pril24. 1991. -+ -. .,.," .. • o Section S. Surplus Rights. NCPA shall be, and h .. eby is, aulhorized to market any gas transportation, supply, or stDrage rights surplus !o !he needs of !he Combustion Turbine Project Participants or the Members which execute this Service Schedule. Section 9. "binding Contract. As 10 Members whichexecuteor appr~ve this Service Schedule, it is a binding conirac~u"'condltion~ and' . . absolute, whose term. shall extend, and no! be tenr.inable for any , reason.. until all of the obligations of NCP A under contractS entered hereuruier, are extinguished or discharged. NORTIiERN CAUFORNlA PO'NER AGENCY By Its General Manager DATE: Crri'Of PALO ALTO By Its DATE: Tl1RLOCi: lRRIGA TION DI5TRJCT By· ____________________ __ lIS DATE: -5- i -".-. , ." .. <"j r-> Table 4(al , '-...;,..;' \ PGT -Natural Gas Pipeline Expansion NCPA's Open Season bid -7000MMbtujd (1991 costs) \ Need Fix Addtnl Total PGl'-EXP PGT-ExP Partie • MMbtu/d MMbto/d MMbtu/d Bid $lOOO/yr ------------------------------------------------ AL 11.22% 673 0 613 9.62% 185.7 BI o.oot a 0 0 0.1);)\ 0.0 GR 0.00\ 0 0 0 0.00\ 0.0 HE 1. 78\ 107 0 107 1.52% 29.4 LD 12.11% 727 0 727 10.38% 200.4 LO 2.6H l60 0 160 2.29t H.l PA 10.00t 600 1000 1600 22.86t Hl.3 PS 0.00\ 0 0 0 o.oot 0.0 lIE O.oot 0 0 0 o.oot 0.0 RO 12.22\ 733 0 733 lO.4U 202.3 sc O.oot 0 a 0 0.00\ 0.0 TO O.oot c a 0 0.00\ 0.0 TID SO.OOt 3000 0 3000 42.86\ 827.5 UK 0.00\ 0 0 0 O.oot 0.0 100.00% 6000.0 1000 7000 100.00\ 1930.8 * +--+------------"---------------+---------------------------1----------+ I Total Partie Total partie TID stiq in Bid? Phase II TID in Bid? Stiq Melded Phase II ~:':¥e5 Partic stiq l~Yes Partie Partie' ------------------------------------------------- AL 22.45t 1 22.45\ O.oot O.oot 11. 22\ B1 O.OOt O.oot O.oot 0.00\ O.oot GR O.oot O.oot O.oot O.oot 0.00\ HE 3.56% 1 3.5H O.oot 0.00\ 1.7Bl LD 24.22\ 1 24. 22\ O.oot O.oot 12.11t LO 5.33% 1 5.3Jt O.oot O.oot 2.67% PA 20.00% 1 20.00t O.oot 0.00\ 10.00\ PS O.oot O.oot 0.00% O.OC\ 0.00\ RE O.oot 0.00\ 0.00\ o.OOt 0.00\ RO 24.44\ 1 24.44\ 0.00\ 0.00\ n.n\ SC O.oot 0.00\ 0.00\ O.oot 0.00\ TO O.oot O.oot 0.00\ 0.00\ O.oot TI 0.00\ O.oot 100.00\ 1 100.00\ 50.00t OK 0.00\ o.oot 0.00' 0.00% O.oot 100.00\ 100.00\ 100.00\ 100.00t lOO.OOt +--+--------------------------+--------------------------+---------+ PGT -Natural Gas pipeline Expansion HCP~I$ Open Season bid -7000MMbtu/d (1991 cost.) t Need Addtl'll Total PGT-ExP Yilt PG'l'-ElcP PaJ:t.ic: ... l!Ml:>tu/d MHbtu/d .oo:>tu/d Bid $lOOo/yr -------- ------------------------___ w____ __* _____ AL 11.22t 786" 0 'a6 11.22% 216.7 III O.oot 0 0 0 0.001 0.0 GR O.oot I) 0 0 0.00'1 0.1) m 1.121 lH 0 124 1.7st 34.3 LD 12.1U 848 0 848 12.11'1 233.8 LO 2.67% 181 a 187 2.67'1: 51.5 PA 10.00'1 700 0 700 10.00>' 193.1 PS 0.00'1 0 0 0 O.OOt 0.0 RE O.OOt 0 0 0 0.00\ 0.0 P.O 11.12\ 856 0 aS6 12.22l 236.0 SC O.oot 0 a () o.~\ 0.0 TO 0.00'1 0 a a O.OOt 0.0 TIt> So.oot 3500 a 3500 50.00'1 965.4 tlJ( o.oot a 0 a a.ollt 0.0 lOG. Got 7000 0 7000 100.00t 1930.8 * ~--+--------------------------+--------------------------+---------+ o\L BI CR lI:i LD to PA PS lIE RO SC 'I'D 1'1 OK stiq Phase II n.4St O.OOt o.oot l.Sn 24.22'1: 5.33\ 20.00\ O.OOl O.oot 24.44\ O.oot O.oot 0.00\ O.oot 100. oat Partie in Bid? l=-=~es 1 1 1 1 1 :1 Total Phase II Partie Z2.~st 0.00\ O.OO~ 3.56\ 24.22t S.33\ 20. OO~ o.oot O.oot 24.4" O.oot 0.00% o.oot O.OOf 100.00l TIO Sti<] o.oot O.OOl 0.001 0.00\ 0.00\ 0.00\ 0.00\ 0.00\ o.oot o.oot 0.00\ O.OOl 100.00\ G. oat 100.00\ Partie:. in Biel? l=Yes 1 Total TID Stlq Partie 0.00\ O.GOt O.oot O.OOl 0.00'1 0.00\ O.OOl 0.00% 0.00\ 0.'10% 0.00\ o.oot 100.00', O.OOl 100.00\ Melded pa.rtie 11. 22\ O.oot 0.00\ 1.75% 12.11\ 2.67\ 10.00t O.oot o.oot 12.22\ 0.00\ 0.00\ 50.00\ C.OOl lOO.OO~ +--+--.-----------------------+--------------------~-----+---------+ • I