March 28, 1991
HONORABLE CITY COUNCIL
Palo Alto, Calitornia
Attention. Finance and Public Works Committee
JltD-IJAR Pl:llANCIAL REPORT -STORM DRAt:HAGE J'tnm
Members of the council:
Report. ill Br ie f
11
This report is in response to concerns raised at ~~e February 26,
1991 Finance.and Public Works Committee (F&PW) meeting on the Mid
Year Financial Report regarding the storm Drainage Fund~
Iackqroun4
F&PW Chair McCown raised a concern at the February 26 F&PW meetinq
regarding the Mid-Year Financial Report (CMR:160:91). The report
stated that bonds are not expected to be sold .for-the StOrr!
Drainage Fund until fall 1991 to ;:ore efficiently gr-o'J.P capital
projects together, thereby spreading the fixed legal, printing, and
other administrative costs associated with a sale over a larger
financinq packaqe~ That sale is now expected to occur in spring of
1992. Delaying the bond sale would also help the City avoid
possible arbitrage restrictions if all the financed improvements
could not be completed within the required three year time ~rame~
Therefore, funds would need to be advanced from the Reserve for
capital Projects to cover the Storm Drainage Fund capital projects
budgeted and appropriated this fiscal year until bonds are sold.
Chair McCown wanted to kno~ the impact of reducing the amount that
would need to be advanced this fiscal year ($1.3 million).
CMR:209:91
/
o
piscu··;\oll
with the chiJ.nqes discussed .in the midyear financial report, the
advance froD the General Fund to the Storm D~ainaqe ~nd for fiscal
year 1990-91 totals $1. 3 million~ To red.uce or eliminate the
advance, either the operating or capital budgets ~ould have to be
C\lt. Hoat of the stetlD Drainage Fund budget is for capital
projects ..
TWo ite.s budgeted in the 1990-91 Capital Improvement budget for
·Colleetion System Improvements· and ~Storm Water Quality Improve
ments· totalling $1.15 million have not yet been encumbered# and
the appropriations could be delayed until bonds are issued. The
two items are:
o Storm Drainaqe Condition Assessment $.9 million
o Storm Drainage Master Plan $.25 million
Consultant proposals for the storm drainage condition assessment
have a.lready been submitted ana an agreement is currently expected
to be awarded in ea.rly May. Oelaying the condition assessment
agreement would .ean that a cO'Dlprebellsive evaluation of the current
storm drainaqe system and its rehabilitation needs would be
~elayed. Enqineering st&ff is prepared to begin this studY$ which
is central to identifying and programminq future capital rehabili
tation projects tor the Storm Drainage FUnd for the foreseeable
fut:.ure. Althouqh the delay would not be debilltatinq, it would
cause siqni~icant inefficiencies.
Delayinq the Master Plan will negatively impact the identification
and future programming of needed capital work, especially in Barron
Park.
ll'OOM·noatiop
staff recommends thst the capital program as already approved for
the sto~ Drainage ~~ be left intact, and that the Reserve for
Capital Projects advance the necessary funds ($1~3 million) to the
Storm Drainage Fund until bonds are sold In the sprinq of 19~2.
This is the recommendation contained in the midyear report.
\
Respeot~~ submitted, .
~~ /A./ r . (/) flr.J ,,4-<..) (,C,'nL. ~~
K STEELE 'i::MILY fw<RIsON ~
udget Manager Director of Finance City Manager
Related Staff Reports: CKR:160:91
OCR: 209: 91 2
..
•
~.
"
""'." '.> ~
Karch 28, an
HONORABLE CITY COUNCIL
Palo Alto, Calitornia
Attention: Finance and Public Works committee
ItD-YD' lllOOl9IAL RIJIORT -aTOM DU:IJIIGI rDIfP
Members of the council:
'tppn fa Brit,
11
This report is In response to concerns raised at the February 26~
1991 Finance,and Public Works Committee (F'PW) meetinq on the Kid
Year FinL~ial Report reqardinq the Storm Drainage Fund.
Iac'qrcrqp4
F~ Chair MCCown raised a concern at the February 26 F'PW meeting
reqardinq the Mid-Year Financial Report (CKR!160:91). The report
stated that bonds are not expected to be sold for the Storm
Drainage Fund until fall 1991 to more efficiently group capital
projects together, thereby spreading the fixed leqal, printing, and
other edministrative costs associated with a sal. over a larger
financinq package. That sal .. is now axpected to occur in sprinq of
1.992. Delaying-the bond sal .. woulc! also belp the City avoid
possible arbitraqe restrictions if all the financed improvements
could not be completed within the required three year time trame~
Therefore, funds would need to be advanced from the Reserve for
capItal Projects to cover the Storm Drainaqe Fund capital projects
budgete~ and appropriated this fiscal year until bonds are aold.
Chair MCCown wanted to know the. impact of reducing Cle amount that
would need to be advanced tbis fiscal year ($1.3 million).
CI!R:209:91
I ~
I
------------.-,. -+ -'--'
Pi'QUI.lo1
With the chang •• discU5Sad in the .ldyear financial report, the
adVance rrOlO tlIe Genua! Fund to tlIe Stano Drainage Fund ~or fiscal
year 1"0-91 total. $1. 3 _11110n. To reduce or elim.1nate the
advance ... 81th" the operatinq or capital budget. would have to be
cut. Most ot tlIe ston. Drainage Fund bu"q"t b for capital
projects.
Two it ... budgeted in tlIe 1990-91 Capital Improvement budget for
'COllection Sy.t .... IlIlprovements' ane:! 'storm Water Quality Improve
ments' totalllnq $1.15 million have not yet'been enc~ed, and
tlIe appropriations could be delayed until bonds are issued. The
two items are,
o
o
Stors Drainaq. Condition Assess.ent
Stor. Drainage Master Plan
$.9 .,11lion
$.25 .illion
Consultant proposal. tor the stera drainaqe condition assessment
have alrudy been sUbmitted ane:! an agreement 1s currently expected
to be awarded in early May. Delayinq the condition assessment
agraea:ent would aean that a comprehensive evaluation ot the cutTent
&tor. drainage system. and its rehabilitation needs 'WQuld be
delayed. Engineering staff is prepared t~ begin this study, which
ia central to identifying and programming future capital rehabili
tation project.. for the Storm Drainage Fund. fer the tores~eable
future. Altllough tlIe delay would not be debilitltUng, it would
cause aignificant inefficiencies.
Delaying the Kaster Plan will negatively impact the identification
and tuture progra1DlD.ln.; of needed capital work, especially in Barron
Park •
•• qou.p«.j;ioQ
Staff recommands that the capital program as already approved for
the stor. Orainage Fund be lett intact, anI:! that the Reserve ter
capital Projects advanee the necessary funds ($1.3 million) to the
stor. Draina'le FUM until bone:!s are ",old in tlIe spring of 1992.
This i. the reco.mendation contained in the .idyear report.
Re.~~ubDittea, ~ ·4,dz~~uO
STEELE -~y HARRISON
dget Hanaqer Director of Finance
~
City lIanager
Related statt Reports: C1I11:160:91
CXR:209:91 2
•
Karch 21, 1991
HONORABLE CITY COIlHCIL
Palo Alto, California
Attention: Finance and Public Works Committee
IID=U!! rIJWrCIAL RIPORT -BTOJUI pM.IJQGI rmm
Kembers of the Council:
Bpgtl 1m Iri.,
11
Thia report is in response to concerns raised at the February 26,
1991 Finance.and Public Works Committee {F.PW} meeting on the Kid
Year Financial Report reqardinq the Star. Drainaqe Fund.
lIo'gr99n4
F'PW Chair MCCown raised a concern ~t the February 26 E'PW meeting
reqardinq the Mid-Year Financial Report (CMR:160:91). The report
stated that bonds are not expecte.d to be sold for the Storm
Drainage Fund until fall 1991 to more efficiently group capital
projects toqether, thereby spreadinq the fixed leg-ai, printing, and
other a4ministrative costs associated with It sale over a larger
financing package. Tbat Bale is nov expected to occur in spr ing of
1~92. Delaying the bond sale would also help the City avoid
posaible arbitraqe restrictions if all the financed i~proveRents
could not be completed within the required three year time frame.
Therefore, f~s would need to be advanced from the Raserve for
Capital Projects to cover the Storm Drainage Fund capital projects
bUdgeted. an4 appropriatec! this fiscal year until bonds are sold.
Chair McCown wanted to know the impact o~ reducing the amount that
v~ld need to be advanced this fiscal year ($1.] million).
CHR:J09:91
•
pllqgl'!91
with tbe chanqe. diBcuaaed in the 1:11dy •• r financial report" the
advance trOll the General Nne! to the StOrll Drainage Fund for t !sca I
y .... 1990-91 total. $1.3 aUlion. To ree!uce or eliminate the
advance, either the operating or capital budqet. would have to be
evt. Ka.ot of the Stor. Drainage FUnc! buc!qet ia for capi tal
projecu.
fWo iteao buc!qeted in ~~e 1990-91 capital r.provemant budget for
·Collectlon systeJI Improvements· and ·Storm water Quality I"mprove
..nta· t~talling $1.15 .illion bave not yet been encumbered, and
the appropriations could be delayed until bonds are issued. The
two items are:
o
o
Storm Drainage COndit!~ Assess»ent
stor. Drainaq8 Kaster Plan
$.9 million
$.25 lIillion
consultant proposals for the stor. drainsqe condition assessment
have already been subJlittee! and an agreement is currently expected
to be awardee! in early Kay. Delaying the condition assessment
.aqreement would aean tha.t .& cOllpreh~nsive eva.luation ot the current
stor. drainage oystem and ita rehabilitation neee!s would be
delayed. En9iMering staft i6 prepared to begin this stUdy. which
i. central to identifyinq and programming tuture capital rehabili
tation projects for the Stor. Drainage FUnd for ~e foreseeable
future. Although the delay would not be debilitating. it would
caus. significant inefficiencies.
Oelayinq the MAster Plan will negatively impact the identification
and future programming of needed capital work, especially in Barron
park.
1'29"".1I1,10p
Staff recoaDenda that the capi~l pr~~am as already approved tor
the St.-ora Drainage PUnd be left intact, and that the Reserve for
capital Pro,ect" advance the n.ce .. sary fund" ($1.) _11lion) to the
Stora Drainage 7und untl.l bond. are sold in the "pring of 1n2.
Thie 1. the reco.mendation contained in the midyear report.
fI"pect~ ~ubJlitted. ~ --d, 1h~~~{J
STEELE • ~y ilARiUSON
et MAnaqer Director Qt Fi~anee
('~:nL. ~ ~
City Manager
Rela~ Staff Report.. OIlU160.n
CKR.209:91 2
March 28, 1991
HONORABLE CITY COUNCIL
Palo Alto l california
Attention: Finanee an4 Public works committee
PP-DAR. rZlBJfCT!L RUQRT -STORK J)M.IDGI lt1)lp
Members of the council:
'pert iD gie'
11
This report is in response to concerns raised at the February 26,
1991 Finance.and Public Works Committee (F_PW) meeting on the Mid
Year Financial Report reqardinq the Storm Drainaqe Fund.
Mgqro1iDC5
F.PW Chair McCown raised a concern at the February 26 F'PW meeting
regarding the Mid-Year Financial Report (CMR:160:91). rhe report
stated that bonds are not expected to be sold for the storm
Drail'.aqe Fund until fall 1991 to mere efficiently group capital
project. together, thereby spreading the fixed legal, printing, and
other aainistrlltive costs associated lIith a sale over a larger
financing packaqe.. That .. ale is now expected to occur in spring of
1992. Delaying the bond ... le would also help the City avoid
po~sihle arbitrage restrictions if all the financed improvements
could not be completed within the required three year tl.e fra-e.
'l'berefore" funds would need to be advanced :from the Reserve for
CApital Projects to cover the Storm Draina~e Fund capital projects
budgeted. and appropriated this fiscal year until bonds are sold ..
Chair McCoWn wanted to know the i~ct of reducing the amount that
would need to be advanced this fiscal year ($1.3 million).
acR:209:91
\
o
piop1l •• iop
With the changes diacuI.ed 1n the aldyear financial report.. the
adVance from the a..neral .Fund tD the Storw Drainage FUnd tor fiscal
year 1990-91 total. $1. J .Ulion. To reduce or el1.1Mte the
advanc., either the operat:l.!"..q or capital budqets would have to be
cut. M08t of the stan. Oralnaqe P'Und bu4qet i. tor capital
project ••
Two items budqeted in the 1990-91 capital rmprova.ent budget for
·Collection Syste. Improvements-and ·storm Water Quality Improve
.ante" totalling $1.15 million have not yet been encumbered, and
the appropriatIDns could be del~yed un~11 bonds are issued. Tbe
two 1 tess are:
o
o
Star. Drainaqe Condition Asse.aaent
Stor. Drainage Master Plan
$.9 .1111on
$.25 lIillion
consultant proposals for the stora drainage condition assessment
have already been suwitted and an aqreelllent is currently expected
to be .wardelS in "arly May. Delaying the condition assessment
agreeaent would mean that a comprehensive evaluation of the current
.ton drainage system and its rehabilitation needs 'Would be
delayed. Engineering staft i. prepared to begin this Iltudy, which
is eentral to identifyin9 and proqraaaing future capital rehabili
tation projects tor the Storm Drainage Fund tor the foreseeable
future. Although the delay vould not be debilitating, it would
cause .lgnificant inetficiencies.
Delaying the Kaster Plan vill negatively impact the identification
and future proqrAJDIinq of needed capital work, especially in Barron
Park.
staff recommend_ that the capital program as already approved tor
the Stor. orainaqe Fund be lett intact, and that the R2sarve for
Capital Project. advance the necessary funds ($1.3 .illion} to the
stora Drainage Fund until bonds are sold in the sprill9 ot 1992~
'l'tIia is the rec ..... end .. tion contained in the midyear report.
RA~~:ul>aitted'
4STEELE -7Q~~ ~:t Manager Cirector of Finance
~
City Manager
Related staff Report .. , aIR, 160: 91
CKR:209:91 2
Karc:h 28, 1991
HONORABLE CITY COUNCIL
Palo Alto. California
Attention: Finance and Public Werks Committee
xr,-Y'!' lI,!PCJIL REPORT -'TOlM nRAXNaGI rvKD
XeaberB of the council,
uport. ill Mi.,
11
fbi. report i. in response to concerns raised at tJle February 26,
1991 Finance.and Public Works Committee (F'PW) meeting on the Mid
year Financial Report regarding the Storm crainage Fund.
MCkgrOUJI4
F~PW Chair MCCown raised a concern at the February 26 F'PW meeting
reqarding the Mid-Year Financial Report (CKR,160,91). The report
stated that bonds are not ex:pf!cted to be sold for the Storm
Drainaqe Fund until tall 1991 to more efficiently group capital
project. toqether, thereby spreading the fixed legal, printing, and
other .~1nistr&tive costs associated with a sale over a larger
financing package. That sale is no ... expected to occur in sprinq of
1992. Delaying the bond sale would a.lso help the city avoid
pos&ible arbitrage restrictions if all the financed improvements
could not be completed vithin the required three year time fro.me.
Therefore, funds would need to be advanced from the ~eserve for
capital Projects to cover the storm Drainage Fund capital projects
bGdqete4 and appropriated this fiscal year until bonds are sold.
Cllair MCCown wanted to MO\tl' the impact ot reducing the Uilount that
would need to be advanced this fiscal year ($1.3 .111ion).
QIR'209,91
•
,
"
pi'n·I'n
Witl:;, the chang •• discussed in the aidyear financial report.. the
adlvanee frOB: the General Fund to the Stor. Drainaqe Fund for fiscal
year 1"0-91 totals $1.3 _1111on. To reduce or elbinate the
advance .. either the operating or capital budgets would have to be
cut _ Moat of the stc.rll Crainaqe FUnd budget 1. tor capl tal
Pl'ojeet ••
TWo it8aa budgeted in the 1990-91 Capital Improvement budget for
·COllectlon System Improvements-and ·storm Water Quality lmprove
aente-totalling $1.15 .lllion have not yet been encumbered, and
the appropriations could be delayed until bonds are is.ued. Tha
two it... are:
o
o
St~ Drainage Condition A$sessaent
Stor. Drainaqe Kaster Plan
$.9 .illion
$.25 .1111""
Consultant proposals for the storm drainage condition assesa.ent
have already been su.baltted and an agreement i. currently expected
to be awarded In early Xay_ Delayinq the condition aSS •• SDent
agreeaent would .un that a comprehensive eva.luation of the ourrent
stora drainage ay.tem and its. rehabilitation needs would be
delayed. Engineer!n" start is prepared to be9in this otudy, which
1. central to !dentifyinq ano programminq future capital rrhabili
t.tiOD projects tor the Stor. Drainaqe Fund for the toreseeable
future. Althou9b the delay would not be debilitatinq, it would
C8uae si9ftificant inefficienciea.
Delayinq the Master Plan will neqatively impact the identification
and tuture proqra.a.lng of needed capital work ... especially in Barron
Park •
• eOOWMDhf;lpp
Staff reco.aends that the capital program as already approved for
the storm Drainaqa Fund be lett intact, a.nd that the Reserve for
capital Projects advance the necessary funds ($1. 3 aillion) to the
stono Drain.qe Fund until bonds are aold In the sprinq of 1992.
Tbi" i. the reca.aendation contained in the 3idyear report.
R"~a:ubaitted' ~ ~ lk,-,-<-iJ
STEELE ~y HARRISON
udqet Manager Director ot Finance
Uk:'" ~ IAH ZANER
City Manaqer
Related staff Report.: CXR: 160:91
CXR:209'91 2
-,
Jlarch 28, 1ft!
HONORABLE CITY COUNCIL
Palo Alto, california
Attention: Finance.nd Public Works committee
lIIP=rna rI.p,prs:rNt uPOIlt -HOD QUtDG' rmm
Members of the Council:
Report '. Iri.,
11
This r.port is in re8ponse to concerns raised at the February 26,
1991 Finance,and PUblic Works Co.aittee (F.PW) meeting on the Mid
year Financial Report reqardinq the Stor& Drainaqe Fund.
Bae);grOVp4
F'PW chair J(ccown raised a concern at the .February 26 F.PW seetinq
regarding the Mid-Year Financial Report (CMR:160~91). The report
stated that bonds are not expected to be sold for the Stor.!!
Drainage Fund until fall 1991 to morE efficien~ly group capital
project. together, thereby spr9ading the fixed legal, printilt9, and
other aa.inistrative cost. _sacci.ted with a sale ever a larger
financing """,,,age. That ... le is now expected to occur in .. pring of
1992. Delay in\! the bond s~le would a180 help the City avcid
possibl. arbitraq. r .. trictions if all the financed i.provements
could not be co.plated within tha required three year time frame.
Therefor., funds would need to be advanced from: the Reserve for
capital Projects to cover the Stora Drainage Fund capital prcjects
budgeted and appropriated this fiscal year until bonds are sold.
Chair KcCown wantN to knoW the impact of radu.cing the aJllount that.
would need to be advanced this fiscal year ($1.3 million).
CKR:209:91
•
>
•.. l; ,..,
.......
Pi_avAlloD
With the changes diacua8ed in the aldyear financial report., the
advance trom the General Fund to ~. Star. nreinaqe FUnd tor fiscal
~ar 1990-91 totals $1.3 .UUon. To reduce or eliainate the
.dvanDe, either the operating or capital budgets woul~ have to be
cut. Most ot the stor. Drainage Fund budqet 1s tor capital
project".
Two iteas bu4geted in the 1990-91 Capital Improvement budget for
·Collection System r.proveaenta-and ·stor. water Quality Improve
»ants' totalling $1.15 .illicn hava not yet been encumbered. and
the appropriations could be delayed until bond. are issued. Tho
two it ..... are:
o
o
Star.. Drainage condition Aases.ment
stars Drainage Kaster ?lan
$.9 million
$.25 million
Conaultant proposal. tor the .tor. drainage condition assessment
have already been submitted and an aqree.ment is currently expected
~o be awa:r-ded in early Kay. Delayinq the condition assessment
aqreuaent would aean that a comprehensive evaluation of the current
.tonl draiftaqe systq and ita rehabilitation needs WOuld be
delayed. Enqine.ril>9 .. taft Is prepareel to beqin this study. Which
i. central to identifying and programming future capital rehabili
tation projects for the stOrli orainage TUnd for the foreseea.ble
future. lUtbouqb the delay would not be debilitating. it vould
cause eiqniticant inefficiencies.
Delaying the Master Plan vill neqatively impact the identification
and future programming o~ needed capital work, especially in Barron
Parll:.
Statt recommends that the capital program aa already approved for
the stor.. Drainage Fund be left intact. and that the Reserve for
Capitsl Projects advance the neceosary funds ($1.] .. illion) to the
Stor. DraInage Fund until bonds are sole! in the spring of 1992.
This 1. the recoamendation contained in the midyear report.
R.a~~Ubaitted. ~ -d, ik~~ufJ
STEELE . ~y HARlUSON
udqat MAnager Director of Finance
~
city Manager
Related staff Reports: CMR:160:91
CMR:209:91 2
~ ...•. ~
March 28, 1991
HONORABLE CIT"{ COUNCIL
Palo Alto, California
Attention: Finance and Public Works committee
KIP-un lJJD.lIICIMr UiORf -'TOM pnnmql rmrp
Neaber& of the council~
Jteport ip arlt'
11
This report is in response to concerns raised at the February 26,
1991 Finance.and Public Work. Committee (F'PW) meeting on the Mid
Year Financial Report regarding the Stor. Or~inage FUnd~
lackgrappd
F'PW Chair MCCown raised a concern at the February 26 F'PW meeting
regardinq the Hid-Year Finar~ial Report {CMR:160:91J. The report
stated th.3.t bonds are not expected to be sold tor the storm
Drainage Fund until fall 1991 to mora efficiently group capital
projects together .. there:by spreading the fixed leqal, printing, and
other adlliniatrative costs associated: with • sale over a larger
financ::iFl9 package. That sa.le is nov expected to occur in spring of
1992. Delaying the bond sale would also help the City avoid
possible arbitra;e restrIctions if all the financed improvaments
could not be completed within the required three y~r time frame.
~erefore, funds would need to be advanced from the Reserve for
capital Projects to ccver the Storm Drainaqe FUnd capital projects
budqeted and appropriated this fiscal year ~ntil bonds are sold.
Chair MCCown wanted. to knoW' the impact of rel:3ucing tbe. amount that
vould need to be advanced this fiscal year ($1.3 .iIlion).
OIlU209:91
--------------_ ....
___ ._L... __ ~_. __ .
With the change. discusaed. 1n the .1dyear tinanci.l report.. the
advance trOll. the General Fund to the stor. Drainage FUnd. for fiscal
yaar 1990-91 totala $1.) .Ulion. To reduce or eliminate the
advance .. either the operatinq or capital budgets would ~ave to be
cut. Moat or the Stor. Drainaq8 l"und budqet is tor capital
project..
Tvo it ... budqeted in the 1990-91 Capital I.proveme~t budqet for
·COllection Syatu Izproveaent.· and ·StOl"ll Water Quality Illprove
.. nta" tota111nq $1.15 .illion have not yet been encumbered, and
the appropriations cOl.1ld be delayed unt11 bonda are issued. The
two It .... are:
o
o
Stora Drainage Condition Assess.ent
Stor. Drainage Master Plan
$.9 .ill ion
$.25 .illion
Consultant proposals tor the storm drainage condition assessment
have already been suhll.itted ~nd an aqreement is currently ezpected
to be awarded 1n early Kay. Delayinq the condition assessment
agreeaent ,,"ould aean that a comprehensive evaluation of tte current
stor. drainaqe system and its rehabilitatIon need. 'Would be:
delayed. Enqlneerinq staff is prepared to beqin this study, which
is central to Identifyinq and progr .... inq future capital rehabili
tation projects for the Storm Drainaqe Fund tor the foreseeable
future. Althouqh the delay would not be debilitatinq, it would
cauae significant inefficiencies.
Delaying the Master Plan will negatively iapact the identification
and future programming of needed capital 'Work, especially in Barron
Perk.
"99M'p llal io'
Staff rsco .. ends that the capital prograa as already approved for
the stor. Drainage FUnd be left intact .. and that the Reserve :fer
capital Projects adVance the ~eceBsary fUnds ($1.3 .illion) to the
Stor. Drainage Fund until bonds are sold in the sprinq of 1992.
Thi. 1. the r~ation contained In the .idyear report.
Re_~~tted, l ---rf!, &u<-{J
STEELE ~y HARRISON
.t Manager Direc~or of Finance
~
City Manager
Related staff Reports: CMR'160:91
CMR:209:91 2
~ ... ,. ~
Karch 28, 1.9'l
HONORABLE CITY COUNCIL
Palo Alto, california
Attention: Finance and Public Works Committee
I:D-TPP rxRNtC;XN. UPOItT -'TOM pnxPG' rmm
MeWbers of the council:
a'port 11 Iri.,
11
This re.port i. in response to concerns raised at the February 26"
1991 Finance.and Public Works Committee (F'PW) aeeting on the Mid
Year Financial Report reqardinq the Stor. Drainage Fund.
heknoup4
"PW Chair MCCown raised a concern at the February 26 F'PW meeting
reqardinq the Hid-Year Financial Report (CKR: 160: 91). The report
stated that bonds are not expected to be sold for the storz.
Drainage Fund until fall 1991 to more efficiently group capital
projects together, thereby spreading the fixed legal, printing, and
ether administrative coata associated with a sale over a larger
financing packag.. That sale Is .now expected to occur in sprinq of
1992. Delaying the bond sde would also help the City avoid
possible arbitrage restrictions if III the financed improvements
could not be completed within the required three year time fraae.
Therefore, funda would need to be advanced. froD the Reserve for
capital Project. to Cover the stor. Orainaqe Fund capit~l projects
bUdqeted and appropriated this fiscal year until bonds are sOld.
Chair McCOwn wanted to knoW' the impact of" reducing the aJIIount that
would need to be advanced thls fiscal year ($1.3 mlllion).
CMR:209:91
pl'qg •• lop
With the ehllnge. discussed In the midyear financial report, the
actva.nce fro. the Genersl Fund to the stor. Drainage :Fund ror fiscal
year 1990-91 totala $1.3 .Hlion. To reduce or eli.inate the
advance, either the operatifl9' or capital budqeta would have to be
cut.. Most of the stOrll Crainage Fund b\.Idget 18 for capital
project..
Two items budgeted 1n the 1990-91 Capital Improvement budget for
"COllectlon System r-.prove.ments· and ·stor. 'Water Quality Improve
_ants" totalling $1.15 .lllion bave not yet-been encumbered, and
the .sppropriatians could be delayed until bonds are i!Ssued. The
two it.... are:
o
o
Star. Drainage Condition ~8a.B.ent
Stor. Drainage Kaster Plan
$.9 million
$.25 million
consultant proposals tor the .tor. drainage condition assessment
have already been sUbmitted and an _gTe_ant is currently expected
~o be awarded in early May.. Delaying the cOndition assessment
agreement would •• an t.~at a CCDp~ehen8ive evaluation of the current
storm drainage systn and Its rehabilitation needs would be
delayed. Engineering statf ia prepared to begin this study, whicb
i. central to identifying and progra .. ing future capital rebabili
tation project. tor the Stor. Drainage Fund tor the foreseeable
future. Altllougb the dalay would not be debilitatinq, it """ld
cause siqnificant inefficiencie ••
Delayinq th~ Kaster Plan vill negatively impact the identification
and future proqr_inq of needed capital work, especially in Barron
Parle.
Statt recomaends that the capital program as already approved for
the storm. Dralnaqe Fund be left intact, and that the Reserve. for
capital Projects advance the nacessary funds ($1.3 million) to the
stora Drainage Fund until bond. an Bold in the sprinq of 19i2.
TbiB is the reCOlllllendation contained in the .idyear report.
Respect.A:Ubmitted. 4t --rA 1izJ.~{J
STEELE -~y IlARRlSON
udget Kanaqer Director of Finance
~
City Manaqer
Related staff Reports: CKR.160:91
CNR:209:91 2
•
March 28, 1991
HONORABLE CITY COUNCIL
palo Alto, california
AttentiGn: Finance and Public Work. committee
I:rP ... YQll I'IPNCIM. REPORT -STOJU( DM,IPGI rmm
Meabers of the Council:
l!pQrt ill U i.,
11
This report is in response to concerns raised at the FebrQary 26~
1991 Finance.and Public Works Committee (F'PW) .eeting on the Mid
Year Financial Report regarding the Storm Drainage Fund.
,.PM Chair McCown raised a concern at the February 26 F'PW meetinq
regarding the Mid-Year Financial Report (CMR:l~O:91J. The report
statei!S that bonds are not expected to be sold for the Storm
Drainage Fund until fall 1991 to more efficiently group capital
projects together, thereby spreading th~ fixed legal. printing, and
other adDinistrative costs associated with • sale over ill larger
financing package. That sale is now expected to occur in spring of
1992. Delaying the bond sale 'Would also help the City avoid
possible arbitrage restrictions if all the financed improvements
could not be completed within the required three year time frame.
Therefore, funds would need to be advanced from the Reserve for
Capital Projects to cover the Stora Drainaqe Fund capita.l projects
bUdgeted and appropriated this fiscal year until bonds are sold.
Chair McCown wanted to know the i.pact of reducing the amount that
would need to be a~vanced this fiscal year ($1.3 millionJ.
am: 209:91
pl.qu •• iop
With the changes di.cussed In the aidyear financial r.port, the
advance fzoOW! the (;etleral Fund to the Stan. Drainage l'un<S. far fisca.l
year lUO-91 total. $1. 3 .Ulion. To reduce or eliminate the
advance, either the opera"ting or capital budget. vould have to be
""t. JIoot of the storm Drainage FuneS bucSqet 1a tor capital
pro,.cto.
TWo It~ ~ucSqeted in the 1990-91 Capital Improvement ~dget for
.Collection Systea Improvements" and ·sto~ Water Quality Improve
.ants· totalling $1.15 .illion have not yet been encumbered, and
the appropriations could be delayed until bonds ara issued. The
two i teas are:
o
o
storm Drainage Condition A •• essment
stora Drainaqe Kaster Plan
$.9 million
$.25 million
Consultant pro~al. for the stor. drainage condition &sse~sment
have. already been submitted and an agreement. i. <:urrently expected
to be awarded in early May.. Pelayif19 the condition assessment
agree:ae.nt. would JI&&n that a comprehensive evalll8tion of the curreTlt
.torm draina!J" Bystell and iu rehabilitation needa would be
"elayed. Enqineering staff is prepared to begin th1& atudy, which
15 central to identifying and proqrUllOing future capital rehabili
tation projects for the Storm Drainage FUnd for the foreseeable
future. A1thoU<]h the delay would not be debilitating, it would
cause 8ignif.icant inetticieneias.
Delaying the Kaster Plan will negatively impact the identification
and tuture proqr~ng of needed capital work, especially in Barron
Parle.
MCOMen4'$,ig'
Staff rec~da that. the capital proqram as already approved for
th. storm Drainage FUnd be lett intact, and that the Reserve for
capital Proj.ota advance the necessary funds ($~.~ .11lion) to the
stor. Drai""ge ...... 4 unt11 bonda are Bold in the spring of 1992.
This b the reco_endation contained in the .idyear report.
Re .. pe~uboaitted, ~:g~gar ~~~ce ~
city Manager
Rel.tad Staff Reports, CMR :160, n
CMI\'209"1 2
•
.~.
o
Karch 28, 1991
HONORABLE ern CODNCIL
Palo Alto t California
Attention: Finance and Public Works committee
MXD-nap lIJWIlCIl.t, upon -StoRK PBAlpCI 7mtJ)
Member. ot the COuncil 0
11
This report is in response to concerns raised at the February 26,
1991 Finance.and Public Wor~s COmmittee (F'PW) meeting on the Mid
Year Financial Report rega~ding the Storm Drainage Fund.
J1gkgrDDDO
P'PW Chair MCCown raised. oS concern at the February 26 F"PW meetinq
reqardinq the Mid-Year Findncial Report (CMR:160!91)~ The report
stated that bonds are not expected to be sold tor the storm
Drainage FUnd until fall 1991 to more eftici~ntly qroup c&pital
projects together, thereby spreading the fixed legal# printing, and
other administratIve costs associated with a Bale over a larger
financing paekaqe. Tbat sale is nov expected to occur in sprinq o.t
1992. o.l&y1"9 the bond sale would also help the City avoid
~.sible arbitrage re.trictions if all the financed improvements
could not be completed within t.~e required three year time frame.
Therefore, funds would need to be advanced from th~ Reserve for
capital Projects to coyer the stono Drainage Fund capital projects
budqeted and appropriated thi. fiscal year until bonds are solQ~
Chair MCCown wanted t.o know the impact of reducing the amount that
would need to be advanced this fiscal year ($1.3 million).
CllRo 209: 91
\
, .
pi.cuI.loD
With the eha.nq •• discussed in the mid.year financial report, the.
advance trom the Gener61 Fund to the storm. Drainage Fund tor fiscal
y ..... 19S0-91 total a $1.3 .UUon. To reduce or elbinat. the
advance ... either the c.perat.inq or capit.sl budqets 'Would have to be
cut.. Moat of tha stor. Drainaqe Ft-.!nd budqet 1. tor capital
project ••
Two it ... budgeted in the 1990-91 Capital Improvement budq~t for
·COllection $yates Improveaent.-and ·stor. Water Quality Improve
.. nts-totallinq $1.15 .lllion have not yet been ~ncumbered, and
the appropriation. could be delayed until bonds are issued. The
two iteJa.s are:
a
o
Star. Drainage Condition A8S~Bsment
stor.. Drainaqe Master Plan
$.9 ",illion
$.25 !lillion
Consultant proposals tor the storm drainage condition assessment
have already been subaitted and an agreement is currently expected
to be awarded in early Kay.. Delayinq the condition assessment
aqreeaent would aean that ill cOlllprehensive evaluation of the current
ston drainage eyat_ anCS its rehabilitation needs would be
delayed. Engineering ataff is prepare<l to begin this study, "hich
1. central to identifying and programming futUre capital rehabili
tation projects tor the Storm D~ainage Fund for the foreseeable
future. Although the delay would not be debilitating, it ... auld
cause .iqnificant inefficiencies.
Delaying the Xastar Plan will negatively impact the identification
and tuture proqra..il19 of needed capi ti!ll work, especially in Barron
Parle.
Staff rec:o:maendB that the capital proqr6lll as already approved for
the Stora Drainage Fund be left intact, and that the Reserve tor
Capital PrOject. advance the necessary fUnds ($1.3 Jlillion) to the
Stora Drainage Fund W'ltil bonds al"~ !l":!l'd. -in the spring' of 1992.
This ia the recommendation contained in the midyear report.
Res~a:-"itted.
(}; STEELB ' ~~~ ~~t Manager Director of Finance
~~~ER
City )!"anager
Relate<l statt Reporte: CKR:160:91
CKR:209:91 2
~.'.
-.: .-,-, . •
-"
'if'
Marcb 28, 1991
HONORABLE CITY COUNCIL
palo Alto, California
Attention: Finance and Public Works committee
KID-XQB rpruCJAL REPORT -''lORN PMm;1 rmm
Kember. of the Council,
'apart. in Bri.f
11
This report is in response to concerns raised at the February 2E,
1991 Finance.and Public Work. Co~ittee (F'PW) .eetinq on the Mid
year Financial Report regarding the Stor. Drainage Fund.
F'PW Chair McCown raised a concern at the February 26 F&PW meeting
regarding the Hid-Year Financial Report (CMR:160:91). The report
stated that bonds are not expected to be lSold for the Storm
Drainaqe Fund until fall 1991 to more efficiently group capital
projects together, thereby spreadinq the fixed legal, printing, and.
other administrative costs associated with a sale over a larger
financing-pack.sqe. Tha.t sale is now expected: to occur in spring-of
1992. Delaying the bond aale would also help the City avoid
possible arbitraqe restrictions if all the financed improve~ents
could not be completed within the required three year time frame.
Therefore, funds would need to be advanced from the Reserve for
capital Projects to cover the Storm Drainaqe Fund capital projects
budgeted and approp~iated this fiscal year until bonds are sold~
Chair MCCown wanted to know the i-.pact of reducing the amount that
vou14 need to be advanced this fiscal year ($1.3 .illion).
•
:=.-'----'-... -----
o
plequa'!AA
With the changes discussed in the .idyear financial report, the
adva.."')Ce .era. the General .Fund to the Storm. Drainaqe Fund for fiscal
yur 1990-91 totals $1.3 lI!llion. To rloduce or eliloinate the
advance, either the operating or capital budgets voulCS have to be
cut. Xoat ot the stor. Drainaqe Fund. budqet 1. ~or cap! ta 1
project..
TWo 1tems budgeted in the 1990-91 Capital I~rovement budget for
·Collection $yet .. Improvementc· and ·Storm Water Quality Improve
.ants· totallinq $1.15 .illion have not yet been encumbered, and
the appropriations could be delayed until bonds are issued. The
two it ...... are:
o
o
stora Drainaqe condition AsseB._ent
stora Drainage Master Plan
$.9 zillion
$.25 lIi11ion
Consultant prqpoa31a tor the storm drainaqe condition assessment
have already been eubaitted and an agreement is currently expected
to t.a .,warded in early Hay. Delaying the condition assessment
a9r8eaent would Man tbat a comprehenaive evaluation ot the current
ston drainage syste. and its rehabilitatien needs would. be
delayed. Engineering statt is prepared to begin this stUdy, Which
is central to identifying and proqra .. ing future cap! ta 1 rehahil i
tation projects for the Storm Drain.g. f'u.nd for the foresell!!!able
future. Although the delay "auld not be debilitating, it would
cauae significant inefficienci.s.
Delaying the Kaster Plan vill negatively impact the identification
and future proqram:m.inq of needed capital work, especially in Barron
Parle.
I. g.4&t.ioD
Staff recommends that the capital proqraa as already &pprove~ for
the storm Drainage Fund be lett intact, and that the Reserve for
Capital Projects advance the necessary t~ ($1.3 .illion) to the
star-. Dr.,ina'1e FUnd until bonds are .old in the spring of 1991.
This i. the reco-mendatlon contained in the aidyear report~
~!~~ER
City Manaqer
Related staff Reports: <:HR: 160:91
G) • • .. ::
"r, t'
Karch 28, 1991
o
HONORABLE CITY COUNCIL
Palo Alto, california
Attention: Finance and Public Works Committee
IIlR=TPP r:rRMCDI. IIPORT -'TORN DMIJll"GI TtJJm
Members o~ the Council:
BtpOtl ill Iri.f
11
This report is in response to concerns raised at the February 26 ..
19S1 Finance.and Public Works Committee (F.PW) meeting on the Mid
Year Financial Report regarding the sto~ Drainage Fund~
F'PY Chair MCCown raised a ccncern at the February 26 F'PW ma6tinq
reqardinq the Mid-Year Financial Report (CMR:160:91). The report
atated that bonds are not expected to be sold for the Stcrm
Drainage Fund unt.il fall .1991 to IDOLa efficiently group capital
projacts toqether" thereby spreading the fixed leqal., printing, and
other administrative costs a~sociated with a sale over a larger
financing pacJr.: .. qe. That sale is now expected to occur in sprinq of
1992. Delayinq the bond sale would also help the City avoid
possible arbitraqe restrictions if all the financed improvements
could not be completed vithin the required three year time frame.
Therefore, funds would need to be. advanced froD the Reserve for
capital Projects to cover the Storm Dr4inage Fund capital projects
budgeted and appropriated this fiscal year until bonda are sold.
Chair McCown wanted to leno..., the impact of reducing the amount that
would need to be advanced this fiscal year ($1.3 .11110n).
CIIR:209:n
pi,n"loD
IIi th the chaJ>ge. .fi.cu •• ed in the aiclyaar financial report, the
advance tr,* the General Fund to the stora Drainage FUnd tor fisCltl
year 1990-91 total. $1. J aUlion. '1'0 reduce or eli.inate the
advance, either the operatin9 or capital budqets would have tc be
cut. ~t ot the sto .... Dralnage Fund !>udq .. t 18 for capital
project ••
'I've it ... budgeted in the 1990-91 Capital rmprovement budget for
·Collection System "Izprovel'IIe.nts-and: ·stOnD water Quality Iaprove
aents· totallinq $1.15 .illion have not yet been encumbered, and
the appropriations could be delayed until bonds are i .... ued. The
tvo it ..... are:
o
o
stor. Drainaqe COndition Assessment
Stor. Drainaqe Master Plan
$.9 million
$ • 25 aillion
Consultant proposals tor the stora drainaqe condition 8SS.8s.ent
have elready been submitted and an a'Jre_ent is currently expected
to be awarded in early May. Delaying the condition assessment
aqreeaent would .ean that a compr&hensive evaluation of the current
ato ... drainage .yat .... and ita rehabilitation needs would be
delayac!. Engineering statt i8 prep~red to be9in this study, which
'e central to identifying and pr09r ..... ih9 future capital rQhabili
tation projecta for the stora Drainage Fund for the foresee.able
future. Althougb the delay would not be debilitating, it would
cauae significant inefficiencies.
Delayin9 the Master Pisn will ne9atively impact the identification
and future proqra.ma.ing of needed capital work,. especially in Barron
Park.
staff recoaaende that the capital progra~ as already approved for
the sto... Drainage Fund be lett intact, and that the Reserve tor
capiul Pro'}ects advanca the nece ..... ry f\Ulds ($1.3 1IIillion) to the
stono Drainage Fund until bondll are oold in the sprih9 of 1992.
This 1& th" reeomendation contained in the .idyear report. bep:"a :ubaitted,
g4; STEELE . -ra~~ ~dq!t K4J1ager Director of Finance
Related Staft Reporta: 0IR:160:91
0IR:209:91 2
I I 0:01.. ~ ~~
City Xanaqer
•
'.
-. ,r"
March 2B, 1991
HONORABLE CITY OOL~CIL
Palo Alto, California
,---'.
Attention: Finance and Public Worka Committee
IW!=P"P lIDJlCI&L "PORT -'roM D8).:ng";E rmm
Kembers of the Council:
_sport. in 'ri'f
11
This report is in response. to concerns raised at the February 26,
~991 Finance.and Public Works Committee (F&PWl meeting on the Mid
Year Financial Report reqarding the storm Drainaqe Fund.
l,e'qr9Ud
P'PW Chair Mccovn raised IS concern at the F'ebruary 26 F'PW meetinq
regarding the Mid-Year Financial Report (CKR:160:91). The report
stated that bonds are not elCpected to be sold for the storm
Drainage Fund until fall 1991 to more efficiently qroup capital
projects together, thereby spreading the fixed leqa..l, printinq .. and:
ether ad.inistrative QOst. associated with a sale over a larqer
financinq package. That sale is now expected to. occur in spring ot
1992. Delaying the bond sale woul~ also help the City avoid
possible arbitrage restrictions if all the financed improvements
could net be completed ~lthin the required three year time trame~
Therefore, funds ~ould need to be advanced from the Reserve for
Capital Projects to cover the storm Orainaqe Fund capital projects
budqeted and appropriated this fiscal year until bonds are SOld,
Chair McCown want.ed. to knoW' the impact of ~educing the amount that
would need to be advanced this fiscal year ($1.3 million).
aOU209:91
•
Pilpp..,lop.
With the change. di.cussed in the .idyear financial report, the
Advance fro. the General Fund to the st'lr.l Drainaqe Fund tor fiscal
year 1990-91 tot.alll $1.3 aillion. To reC:""e or eliminate the
advance, either the operating or capital budqeta would have to be
cut. xo.t o~ the stOMl Drainage Fund budget iB tor capital
project:s.
Two It ...... budg&ted In the 1990-91 capital I.prov .... ent budget for
·Collection System l.provament~· and ·Stcra Water Quality Improve
aenta" totalling $1.15 million have not yet been encumbered, and
the appropriations could be d'ililaye.d until bonds are issued!.. The
t.vo it .... are'
o
o
stora Drainage Condition Assessment
stor. Drainaqe Master Plan
$.9 million
$.25 million
Con8ultant propesals for the storm drain~ge condition assessment
have already been aubmitt~ .and an agreement is currently expected
to be awarded in early May. Delaying: the condition assessment
a-;r .... nt would mean that a comprehensive. Evaluation of the current
stor. drainege a)"stell and its rehabilitation needs 'Would be
delayed. Engineering staff ie prepared to begi~ this study, which
is central to identifying and progr-.-ir.g future capital rehabili
tation project. for the Storm Drainaqe Fund for the foreseeable
future. Although the delay would not be debilitating, it would
cause aignificant inetficiencies.
Delaying the Master Plan will negative.ly impact the identification
and future programming of needed capital work, especially in Barron
Park.
1'99Mpdatiol
Staft reeo.aends that the capital program as already approved for
the stora Drainage Fund be lett intact, and that the Reserve for
capItal Projects advance the necessary fun-i. ($1.3 million) to the
Stora Drainage Fund until bonds are 80ld in the spring of 1992.
fbi. 1. the recoamendation contained in the midyear report.
~
City .Manager
Related Sta~f Reporta, CXR:160,91
CXR:'09:91 2
o
Karch 28. 1991
HONORABLE CITY COUNCIL
palo Alto, California
/
Attehtion: Finance and Public Works Commltte~
lap-me lIDNel"" RpoRT - B TOM: PRAlllAGI rmm
Members of the council,
hpgD 11 'riel'
11
Thi. report is in reaponse to concerns raised at the February 26,
1991 Finance.and Public Works Committe a (F'PW) meeting on the Mid
Year Financial Report regardinq the Storm Dr~1nage Fund.
'lg_oDp"
F'PW Chair McCown raised a concern at the Fe~ruary 26 F'PW meeting
regarding the Kid-Year Financial Report (CMR:160:91). The report
.. tated that bonds ar.e not expectea to be sold for the Storm
Drainage Fund until fall 1991 to more efficiently group cepit;',l
projects together. thereby spreadinq t.."le. fixed legal~ printing, and
other administrative costs associated with a sale over a larger
financinq package. That pale is now expected to occur in spring of
1992. Delaying the bond hle would also halp the City avoid
po •• ible arbitraqe restrictions it all the financed improvements
could not be completed within the required three year ti.e frame.
Therefore, funds would need to be advanced from the Res~e for
capital Projects to cover the Storm Drainaqe Fund capital projects
budgeted and appropriated this fiscal year until bonds are sold~
Chair KC:Cown wanted to know the impact of reducing the amount that
would need to be advanceg this fiscal year ($1.3 million).
CMR'209,91
pilev, •• tg
With th. change. discussed in th. midyear financial report, the
ad:vance fro. the General Fund. to the stOB Oraineqe !'\lnd t;:.r fiscal
year 1990-91 total .. $1.3 .Ulion. To reduee or .11.inate the
adva.."'!Ce, .ither the operating or capital budg_ts would have: to bg:
cut. Moat. of the Stora Drainage J'und, budqe.t ia r:t)~ capital
project ••
TVa it..-~.ted in the 1990-91 Capital Improvement budget for
·Collection System I-.provements· and ·storz. Water QU.e.lity Il'llprove
ment.· totalllnq $1~15 million have not yet-been encumbered, and
the appropriations could be delayed until bonds are issued. The
two iteas ar&;
o
a
stor. Drainage Condition As ••• sa.nt
star:. Dralnaqe Kaster Plan
$.9 million
$.2S million
Consultant proposals for ~~e sto~ drainage condition assessment
have already been subWlitted and an agreement is currently expected
to be a,.,-ard.a4 in early Kay_ Delaying ~e condition assessment
agr.~t VOQld mean that a c:oaprehensive evaluation of t.he-current
stor. dninag8 system and its reh .. bilitation needa would be
<lebyed. Enginowing staff is prepared to begin this study, "hieh
ia central to identifYing and programaing future capital reh~bili
t!.t.ion projects .for the Stor. Drainage Fund for the foreseeable
future. Al1:hou9b the delay would not be debilitating, it woule!
e&uae significant inefficiencies.
Delaying the Master Plan vill negatively i~act the identification
and future proqraaminq of needed capital work, especi.ally in Barron
Parl<.
'e99M_p4a1;:l°D
Staff recoa.ends that the capital program as already approved tor
the stano ~ain .. g. Fund be left intact, aM that the Re"erve for
Capital Projecta advance the neoee .... ry funds ($1.3 million) to the
star. Drainage Fur><J until boMB are 801e! in the spring of 1992.
'l'bla is the re<:o_endatlon eontained in the .idyear report.
, .
,\
. ~ " ,
Re"~a :ubIoltted, ~ .~ tk,-'-Z.D
S1'EELE -~r IlAltRlSON ~
.t Manaqer Director of Finance City Manaqe.r
Related Staff Reports: CJIR:160:91
;~ ., '"IF .
~ . , . ' ." " '
llarcb 28, 1991
HONORABLE CITY COUNCIL
Palo Alto, california
/
Attention: Finance and Public Works committee
MID-rnp IIV!'CI1J. lpou -STORM DpANAGE lowp
Members of the council:
.eport. ,. ki.t
11
This report is in response to concerns raised at the ~ebruary 26,
1991 Finance,and Public Works committee [F'PW) meeting on the Mid
Year Financial Report regarding the Storm Drainage Fund.
Maqroupcl
P.PW Chair McCown raised a concern at the February 26 F'PW meeting
regarding the Mid-Year Financial Report (CHR:160:91). The report
ate-teeS that bonds are not expected to be sold tor the Storm
Drainage Fund until fall 1991 to Bore efficiently group capital
projects together, thereby spreadifl9 the fixed legal, printinq., and
other administrative costa associated with a sale over a larger
finaneing pac:kaqe. That sale is now expected to occar in sprinq of
1992. Delayinq the bond siIlle would also help the City avoid
possible arbitrage restrictions 1t all the financed improvements
could not be ~ompleted within the required three year time frame.
Tbarefore l funds would need to be advancecS froll the Reserve for
capital Projects to cover the Storm Drainage FUnd capital projects
budgeted and appropriated this fiscal year until bonds are sold.
Chair Mccm.-:n wanted to know the i_pact of reducinq the amount that
would need to be advanced this fiscal year ($1.3 .lllion).
CIIlt:209'91
pi.qg •• lop
With the chanqe8 diBcussed: in th •• idyear financial report, the
advance fro. the Generel FUnd. to the Storm. Drainage Fund for fiscal
year 1'90-91 total. $1. 3 .Ulion. fa reduce or eliminate the
adV1L~e, either the operating or capital budqets would have to be
cut. Most ot the stOI"lB Draina,]. FUnd budget ia tor capi tal
projacu.
Two iteas bud~eted in the li'C-'l Capital Improvement budget fcr
·Collection system xmprovements-and ~storm Nater QUality rmprove
aents· totallinq $l.lS .111ion have not yet been encumbered, and
the appropriations could be delayed until bonds are issued~ Tbe
two items are:
a
o
Stora Drainaq. condition Asseaa.ent
storm Dreina'l. Mester Plan
$.9 million
$ .25 .. illion
Consultant proposals for the etorm drainage condition assessment
have already been submitted. and an agreement 16 curre.ntly expected
to be awarded in early May.. Oelayill9 the. condition ".66ssme.nt
aqreeJllent Would .ean that a cOlDprehenslve evaluaticn of the current
.tOnt drainage sy.tea and its rehabilitat.ion needs would be
delayed. I!nqineerinq stllff is prepared to be'lin this study, which
is central to identifying and ~roqramminq future capital rehabili
tation projects for "the stOrll Drainage F'Und for the foreseeable
future. Althouqh the ~elay voul~ not be debilitatinq, it would
cau .. siqnificant ineffici~~iaa.
Delayinq the Master Plan will negatively i_pact the identification
and future progra.ain9 .of need;ed capital work,. especially in Sarron
Park.
It·e 9Dufat.iDp
Staff recoaaends that the capital program as already approved for
the Sto .... Drainage FUnd be lett intact, and that the Reserve tor
Capital Pro,ects advance the necessary funds ($1.3 lIillion) to the
Storm Drainaq. FUnd until bonds are sold in the spring of 1992.
Thill 1. the recO!llJllel>daUon contained in the midyear report.
Reape~Q ~Ubmitted, ~ --rA Iiz,-u .. tJ
STEELE ~y IlARRISON
udqet M.n~9er Director of Finance City Manager
Relat6d Staff Reports: CMR:160,91
CMR'209,91 2
•
._----
.,;;..;...;;:........;.;...c. ____ "'_~-_._,, __ " ____ ' ____ •
~.
• • ,.. ::-
''-'': ,":
Karch 28, lUI
HONORABLE CITY COUNCIL
Palo Alto~ California
Attenti6n: Finance and Public Works committee
IUp ... ny. lIIWlCIAL REPORT -STORM PlU.lllA(i1 rmm
MeaberR of tbe council:
I.ttpcrt. in Ixi.,
11
This report is in response to concerns raised at the Fe~ruary 26 1
1991 Finance.and Public Works Committee (F'PW) meetinq ~n the Mid
Year Financial Report regarding the storm Drainage Fund.
BacJtgr9ud
F.PW Chair McCown raised a concern at the February 26 F'PW meet.ing
regarding the Hid-Year Financial Report (CMR:160:91}a The report
stated that bonds are not expe.cted to be sold for the storm
Dra.inag-e .Fund until fall 1991 to more efficiently qroup capital
projects toqetber, thereby spreac:Unq the fixed leqal,. printing, and
other administrative costs associated with a sale over a larqer
f" inancing package.. That sale is now expected to occur in sprinq of
1992. Delaying the bond sale WO\lld also help the City avoid
possible arbitraqe restrictions it all the financed improvements
could not be co.pleted within the required three year time fraDe~
Therefore, funds would need to be advanced from th~ Reserve for
capital Projects to cover the storm Drainaqe Fund capital projects
budqeted and appropriated this fiscal y~ar until bonds are sold.
Chair MCCown wanted to know the impact of reducin9 the amount that
would need to be advanced this fiscal year ($1.3 million).
CIIR:209:91
•
Qia9U aiop
with the chanqell discussed in the aicJy-ear financial report, the
advance froa the General FUnd to the Star. Drainage Fund tor fiscal
year 1990-91 total. $1.3 mUlion. To redl>ce or eUainate the
advance, either the operatinq or capital budgets would have to be
=t. Most of the stor. Drain .. ; .. Fwld budqet 18 tor capital
projects.
Two itea8 budgeted in the 1990-91 Capital Improvement budget for
·Collection Syst2JI Improvements-and -storm water Quality Improve
.. nta-totalling $1~15 .illion hsve not yet been encu~red, and
the appropriations could be delayed until bond .. are issued. The
two i tema are:
o
o
Stcra Drainage Condition Assessment
Storm Drainaqa Master Plan
$.9 ,.illion
$ .25 &illion
consultant proposals for the .tor.. drainage condition assessment
have already been submitted and an agreement is currently expected
to be awarded; in early Kay. Delaying the condition assoQssment
aqre..ant would lIlean that a comprehensive evaluation of the current
.tor. drainage system and its rehabilitation needs would be
delayed. Engineering staff is prepared to beqin tbis stUdy,. which
is central to identifying and programming future capital rehabili
tation projects tor the Storm Drainaqe. FUnd for tbe foreseeable
future. Although the dalay vould not be debilitating, it would
cau .. significant inefficiencies.
Delaying the Kaster Plan will ne<jatively impact the identification
and future proqr~ng of needed capital work, especially in Barron
Park.
staff recOlIImends that the capital program as .elre.~dy approved tor
the Stor. Drainaqe Fund be left intact, and that the Re&arve tor
capital Projects advance the necessary f<>nds ($1.3 aillion) to the
stora Drainage Fund until bond. are 501d in the spring of 1992.
This i. the recoazendatfon contained in the .idyear report.
Reepect~1JbAitted'
4 STEEU . -ra~~ ~!t Managar Director of Finance
~~:2-ER--
City Manager
Related Statt Reports, CMR:160:91
am:209:91 2
~ , . . " ,'"' -'. --~, ':'
11
Marc:h 28, 1991
HONORABLE CITY COUNCIL
Palo Alto, california
Attention: Finance and Public works Committee
XlP-XPR lZPJn;:tAL IBPORT -8TOM pRAIPC' lUJID
_s of the council:
Report fa Irl.(
This report ia in response to concerr.s raised at the February 26 ..
1991 Finance.and Public Works Committee (F«PWJ meetinq on the Mid
Year Financial Report regardinq the storm Drainage F~~.
Blel!jgroup.4
p,PW Chair MCCown raised a concern at the February 26 F'PW zaetinq
regardill9 the Mid-Year Financial Report (CMR:.l60:91). Th.e report
stated that bonc:lfi are not expected to be sold tor the storm
Prainaqe Fund until fall 1991 to mere efficiently group capital
projects toqetr.er, thereby spreadinq the fixed legal, printing, and
other administrative coats associated with a sale over a larger
financinq package. That .ale is now expected to occur in spring of
1992. Delaying the bond sale would also help the City .void
possible arbitrage restrictions if all the financed improvements
could not be completed within the required three year time frame.
Therefore. funds would need to be advanced frcm the Reserve tor
capital Project. to cover the Storm Orainage Fund capital projects
budgeted and appropriated this fiscal year until bonds are sold.
Chair MCCown wanted to know the impact of reducing the amount t.hat
would need to be advance~ this fiscal year ($1.3 million).
0IR:209:U
pi.qpallop
with the chang •• di&:cussed in the aidyaar finaneial report, the
advance frca the General Fund to the storm. DralnaqB Fund tor fiscal
year 1990-91 total .. $1.3 aUlion. 1'0 re<2\lCB or eliminate the
advance, either the operating or capital bUdqets would have to be
cut. IIost of the Ston. Drainage l'\IJIc2 budget is for capital
projects.
~ items buc2qet&c2 in the 1990-91 Capital Improvement budget for
·Collection Bystea Iaprovements· and ·storw: water QU~llty Improve
.ants-totalling $1.15 .illion have not yet been encumbered, and
tbe appropriations. could be delayed until bonds are iesued~ The
two it ..... are,
o
o
ston. Drainage Condition ~sae8 ... nt
storm Drainage Maater Plan
$.9 lIillion
$.25 million
COnsultant propoaal& for the star. drainage condition aaaessment
bave ftlready been sUbaitted and an Bqreeaent i. currently expected
to be .... ;ord .. d in early Hay. Delaying the condition aSS'""sment
aqreeaent would. -.an that a cOlDprebensive evaluation of the current
.tOnl drainage .yste. end its rehabilitation needs 'Would be
<2elayed. Enqineerl"'1 staff is prepare<2 to beg!n this study, wbicb
ill central to i<2ent1fyinq and ;>roqra ... dnq fut\lre capital rehabili
tation projects tor the StOril Drainage .Fund for th2 foresee:able
future. Although the <2elay would not be debilitating, it would
caUB8 elqniflcant inerficiencies.
Delayi"'1 the !laster Plan vill negatively iJopact the identification
and fUture programming of needed capital work, especially in Barron
Park.
Rte '.p"-1:iop
staff reco.maends that the capital program as already approved for
tha stora Drain"ge FUnd be lett intact, and that the Reserve far
Capital Project. advance the nec.ssary tunc2. ($1.3 million) to the
ston. Drainage l'\IJIc2 until bonc2a are 801<2 in the apr 1"'1 of 1992.
This is the recomaenc2ation containec2 in the mi<2year report.
R"~~~itt&c2, ~ STEELE . 1Z2~~ ~~t Manager Director of Finance
blated Staff Reports: CMR: 160: 91
CNR,209,91 2
March 28, 199.1
HONORABLE CITY COUNCIL
Palo Alto, California
Attention: Finance and Public Works Committee
)w)::DU. 7tJN!C!IAL .REPORT -'fORK ORAlnG. rpxp
Mellbers ot the Council,
.nort 1D Iri.f
11
This report 1. in response to concerns raised at the February 26,
1~91 Finance.and Public Works Committee (F'~} meeting on the Mid
Year Financial Report regarding the storm Drainaqe FUnd.
Mekqr0up4
"PW Cha.ir MCCown raised a concern at the February 26 F.PW meeting
reqardinq the Mid-¥aar Financial Report {CMR:160:91). The report
stated that bonds are not expected to be sold for the Storm
Drainage Fund until fall 1991 to more effiCiently qroup capital
projects toqether, thereby spreading the fixed legal, printinq, and
other administrative coats associated with a sale over a larger
finanCing package. That sale is nov expected to occur in spring of
1992. Delaying the bond sale would dso help the City avoie!
possible arbitrage restrictions it all the financed i.provementa
could not be completed within the required three year t.ae frame.
Therefore, funds would need to be advanced from the Reserve for
capital Projects to cover the storm Drainage Fund capital projects
budgeted and appropriated this fiscal year until bonds are sold.
Chair MCCown wanted to know the impact of reducinq the amount that
would need to be advanced this fiscal year ($1.3 Billion}.
QIR'209,91
/
pl'nA.iop
With the changes dia""86ed in the _idyaar financial report, the
advAnce frOll the c:.neral Fund t.o the stora Drainage Fund for fiscal
year 1990-91 t.otdo $1. J aUlion. To reduce or eliminate the
advUlce, either the operatlnq or capital budqeb would have to be
cut. Most ot the St~ Drainage Fund budget:: i. tor capital
project...
Tvo it.aas budgeted 1n the 1990-91 Capital Improvement budget. for
·Collection Syat .. rmproveaants-and ·stora water Quality Improve
.ant.s" totalling $1.15 _illion have not yet been encumbered, and
the appropriations could be delayed until bonds are issued. The
two items are:
o
o
storm Drainage Condition Assess.ent
stor. Draine;e Master Plan
$.9 million
$.25 .,illion
Consultant proposals ~or the storm drainaqe condition assessment
have already :been aut.itted and an agreement ia currently expected
to be a"arded 1n early May. Delaying the condition assessment
agree.ent would ~an "that .. comprehensive evaluation of the current
stara dr.ainege syst_ and its rehabilitation needs would be
delayed. Enqineering staft i8 prepared t.o beqin this study, which
i. central t.o iden~itying and proqraa.ing future capital rehabili
tation projects for the Storm Drainage Fund for the foreseeable
future. Although the delay would not. be debilitating, it would
cause 8ignificant inefficiencies.
Delaying the Kaster Plan vill negatively impact the i~entific.ticn
and future programming of needed capital work, especially in Barron
Park.
'.a -p41t;loA
Statf recommends that the capital proqram as already approved for
the st~ Drainage ~~ be left intact 4 and that the Reserve tor
C3pital Projecta a~vance the necessary funds ($1. 3 .Ulion) to the
Stono Drainage Fund until bonds are ",old in the spring of 1992.
Tbla i. the reOOBmendatlon contained in the .idyear report.
%',.~
W IAI'! ZANER
City Kanager
Related Sta f f Reports: CKR: 16 0 : 9 1
CKR.209:91 2
•
\
)(arch 28, 1991
HONORABLE CITY COUNCIL
Palo Alto, California
Attention: Finance and Public Wor~s Committee
UP-Dl' 'DNrClAA aaPORT -8TOBX DRAINAGe POJrD
lIembers of the Council:
"port 'I Irl.(
11
This report is in response to concerns raised at the February 26,
1991 Finance.and PUblic Works Committee (YiPWl meetinq on the Mid
year pinancial Report regardinq the Sto~~ Drainage Fund.
B.Ckqrop4
F&PW Chair McCown raised a concern at the February 26 F'PW meetinq
regarding the Mid-Year Financial Report (CMR,160:91). The report
stated that bonds are not expected to be sold tor the Storm
Crainaqe Fund until fall 1991 to aore efficiently group capital
proje~ts toqether, thereby apreadinq the fixed leqal, printing, and
other adll!nistrative costs associated with a sale over a larger
financing package. That Bale ia now expeoted to occur in spring-of
1992. Delaying the bond sale would al.o belp the City avoid
possible arbitrage restrictions if 411 the financed i~provements
could not be completed wi~bin the r~ired three year tiae frame~
Tber.fore, funds would need to be advanced from the Reserve for
Capital Projects to cover the Storm Drainaqe Fund capital projects
budqeted and sppropriate4 this fiscal year until bonds are sold.
Chair MCCown wanted to know the impact of reducinq the amount that
would need to be advanced this fiscal year ($1.3 million).
C!IR: 209: 91
o o
pl..qg. •• iP'
With the chang ... discuued in the .idyear tinancial zeport, the
advance fra. the General Fund to) the Stora Drainage Fund tor risc.l
year lUO-U totala $1.3 "UUon. To reduce or eli.lnate the
advance, either the operatinq or c.pital budgets would have to be
cut. Moat of the stOrD Drainage Fu~ budget Is for capital
project8.
TWo it ... budgeted in the 1990-91 capital Improvement budget for
·Collectlon Systea ImproveJlents-and ·stOrlll Water Quality Improve.enu· totalling $1.15 .i11ion have not yet been encumbered, and
the appropriations could be delayed until bonds are issued. The
two ite .. are:
o
o
stOrD Drainage Condition Assessment
star. Drainage Master Plan
$.9 .illion
$.25 .. illion
consultant proposals tor the storm drainaqe condition assessment
bave already been submitted and an agreement is currently expected
to be awarded in early Jlay. Delaying the condition assessment
agreuent would aean that a comprehensive evaluation or tne current
atorD drainage ayetal and its rehabilitation needs would be
delayed. Engineering etaff is prepared to begin this study, which
18 central to identifying and programming future capital rehabili
tation projects tor the Star. Drainaqe F1.1nd tor the toreseeable
tuture. Although the delay would not be debilitating, it .,ould
cau .. significant inefficiencies.
Delaying the Master Plan will negatively impact the identification
and future proqramminq of needed capital work .. especiallY in Barron
Park.
19sOMepA't ioD
statf reco-.ends that the capital program as already approved for
the Storm Drainaqe Fund be lett intact.. and that the Reserve tor
capital Projects advance the necessary funds ($1.3 lIillion) to the
Storm Drainage FUnd until bonds are aold in the spring of 1992.
This 1. the recommendation contained in the midyear report.
Re .. pect~Q :ubaiUed, ~ ·~dz~u£)
STEELE . ~LY IIARlUSON
Udget Manager Director of Finance
%~~2ER
city Xanaqer
Related Statt Reports: CMR:160:91
CMR.209:91 2
•
!larch 2e. 1991
HONORABLE CITY COUNCIL
palo Alto, CAlitornia
Attention: Finance and Public Works committee
XIP=Dp.! URpCIAL IIPOBT -STORM. DpIJIM' rmm
Meabers of the Council:
aaport. iA Iri.C
11
This report i. in response. to concerns raised. at the February 26,
19'1 Finance ,and Public Works Committee (FjPW} .eoting on the Mid
Year Financial Report regarding the Stor. Drainage FUnd.
IacJtqr0p4
F'PW Chair MCCown raised a concern at the .February 26 F&PW meeting
regarding the Mid-year Financiol Report (CHR:160:91). The report
stated that bonds are not Eoxpected to be sold for the Storm
Drainage P"und \Ultil fall 1991 to lIore efficiently group capital
projects together, t.hereby spreading the fixed legal, printing-, and
other administrative costs associated with a sale over a larger
financing pacltalie. Th .. t sale is now expected to occur in spring of
1992. Delayinli the bond sale would also belp the city avoid
possible arbitraqe restrictions if all the financed improve~ents
could not be coepleted within tba required three year t;'e frame.
~.fore, funds would need to be advanced from the Reserve for
Capital Project. to cover the Storm. Drainage Fund capital projee-ts
budqete4 and appropriated this fiscal year until bonds are sold.
Chair MCCown w3.nted to know the impact of reducinq t.he am.ount that
would need to be advanced this fiacal year ($1.3 .111ion).
CIIR:209:U
---~-----~---.
"
piaqu •• lop.
witb tbe chanq .. diacuaaed in the midyear financial report, the
advance frOB tbe General Fund to tbe st01"1lL Drainage Fund tor t hcal
year 1990-91 totals $1.3 BUlion. To reduce or elillinato tbe
advance, either the operatinq or capital budget. would have to be
cut. Meat ot the storm. Drainage Fu.nd budqet i. tor capital
project ••
Two it ... budgeted in tbe 1~tO-91 Capital Illprovement budget for
·COllection System Improvements· an4 ·Storm Water Quality 11Dpt"ove
_nu" t.otalllnq $1.15 .illion have not yet'been encUlIIbered. and
tbe apprgpriationa coulc2 be delayed until I:>onds are is."ed. Tho
two it .... ar .. :
o
o
Stora Drainage Condition ~se.sment
stora Drainage Master Plan
$.9 .illion
$.25 million
con8ultant proposals for the .torm drBinaqe condition assessment
have already been sUbmitted and an aqreeaent is currently expectsd
to be awarded in early May. Delayinq the condition ossessment
aqreeaent would mean that oil comprehensive evaluation of the current
.tor. drainage By.tea and its rehabilitation needs voulc:t l>e
d"layed. En<jinaerinq "taft is prepared to begin this stuc2y. which
i. central to identifylft9 and prQ9rammift9 future capital rehabili
tation projects for the stOr'll orainaqe FUnd for the foreseeable
future. Altbouqh tbe delay would not be debilitatift9. it would
cause siqnificant inefficiencies.
Delaylnq the Master Plan will n09atively illlpact the identification
and future progralllJDlng of needed capital work I' especially in Barron
Puk.
staff recomaenda that the capital prQ9Tam as already approved for
tbe stOnl Oraina98 Fund be lett intact. and that the Reserve for
capital Proj ecte advance tbe neceasary tunda ($1.3 lIillion) to the
stOrll DraInage Fund until bond. ere oold in the sprinq of 1992.
This b tbe reCOlllllandation contained in tbe .idyear report.
\
"
1Ie1l":"A :W-itted , ~ -d,d~u£)
STEELE -~'l I!ARJUSON ~
at Manager Director of Finance city Manaqer
1Ielated staff Reports: CKR:160:91
CKR:209:91 2
,r'.," .~,~:
,
aJ· . .
''-:, ::"-
0, ~'.
March 28 .. 19'1
HOBORAllLE crTY COUNCIL
Palo Alto, California
Attention: Finance and Public Works Committee
IIP-ypa FIQl!CIAL "PORt -'TOlUt Dp.InGI rmrp
_. of the CouncU:
hpqrt lA Briaf
".-
11
This report is in Tesponae to concezns raised at the February 26,
1991 Finance.and Public Works Committee (F.PWI .eeting on the Mid
Year Financial Report regarding the Stora prainage FUnd.
M"kqr01lD4
"PW Chair MCCown raised a concern at the February 26 F&PW meeting
regarding t.he "Mic!-Year financial Report (CXR.: 160! 91). Tha report
.stated that bonds are not expectad to be sold for the Storm
Drainage FUnd until fall 1991 to more efficiently group capital
projecte together, theraby epreadin9 the fixed legal, printing, and
other administrative costs associated vith a sale over a larqer
financing pacl<age. That sale 1& now expected to occur in apr ing of
1992. Delaying the bond sale would 81s" help the city aveid
possible arbitrage restrictions if all the financed improvements
could not be completea within the required three year time frame.
'l'berefDre, funds would need to be advanced from the Reserve for
capital Projects to cover the Storm Drainaqe Fund capital projects
budgeted and appropriated this fiscal year until bonds are sold.
C'tIair McCown wanted to know the ilDpac:t of redueinq the amount that
would need to be advanced tbi. Liseel year ($1.3 million).
aIR:209:91
piaep, •• loa
With the change. discussed in the aldyear financial report, the
adYanee from the Cene.ral FUnd to tbe storm Drainaq4J. Fund tor tiBcal
y...r 1990-91 total .. $1.3 Billion. ro reduce or elLainate the
advance, either the opec.tinq or capital budqeta voul4 have to be
cut. Most of the Storm Drainaqe I'w\d budqet i. tor capital
project..
Two it ... budgeted in the 199~-91 Capital Improve.ent budget fer
·Collection System Improvements· and ·Stor-. Water QUality Improve
ment." totalling $1.15 Billion have not yet been encumbered, and
the appropriations could be delayed until bond .. are issued. rhe
two ituas are:
o
o
stor. Drainaqe Condition Assessment
star. Drainaqe Master Plan
$.9 millIon
$.25 .Ulion
Consultant proposals for the storm drainaqe condition assessment
have already been sua! tted and an aqre.elIii;l!nt is currently expected
to be avarded in early May.. Delaying the conditio:1 assessment
aqreeae:nt would .ean th~t • comprehensive evaluation of the current
.tor. drainage system and it. rehabilitation ne.eds would be
delayed. Enqineering staff is prepared to bcqin this study, which
1. central to identifyinq and programming future capital rehabili
tation projects for the Storm Drainage Fund for the foreaeaabla
future. Alt.h0u9h the delay woulcl not be debilitating, it would
cauae siqnificant inetticiencies.
Delaying the Master Plan vill negatively impact tbe identification
and future proqra.ail"i9' of needed capital work, especially in Barron
Park.
_Kopepa·tipp
staft r~~nds that the capital proqraa aa already app~oved for
the storm Drainaqe FUnd be left intact, and that the Reserve for
Capital Project. advance the necessary funds ($1.3 _lllion} to the
stor. Drainage l'un<I until bonds are 801d il> the spring of 1992.
rhis is the reeomsendation contained in the midyear report. Rea".'"'*,a &uhlIi tted,
4STEELE ~ 12~~ ~!t Kana9er Director of Finance
Related Staff Reports: CXR:160: n
CMR:209:91 2
II O:CI.~~ ~ _ ~l\l! ZANER
City Manager
IlArch n, 1991
HONORABLE CITY COUNCIL
palo Alto, California
.--.
Attention: Finance and Public Works committee
I%p=m. PIJWfC"Il\L BIPOBT -STORK ORAlnGI! rmm
Members or the Council:
hppd. :1ft Bri.,
11
This report is in response to concerns raised at the February 26,
1991 Fi~ance.and Public Works Committee (F.PW) ~eetin9 on the Mid
Year Financial Report regarding the Stora Drainaqe Fund.
F'Y~ Chair MCCown raised a concern at the February 26 F'PW meeting
regarding the Mid-Year Financial Report (CMR:160:91). rho. report
stated that bonds are not expected to be sold for the Storm
Drainaqe Fund until fall 1991 to more efficiently group capital
projects together r there.by spreading the fixed leqal r printill9, and
other adainistrative costs associated Yith a sale over a larqer
financing pacJtage. That sale is now expected to occur in spring of
1992. Delaying the. bond "al .. would also help the City avoid
poasi~le arbitrage restrictions it all the financed i.provements
could not be completed within the required three year time frame.
Therefore" funds would need to be advanced from the Reserve for
capital Projects to cover the Storm Drainaqe Fund capital projects
budgeted and appropriated this fiscal year until bonds are sold.
Chair McCown wanted to know the impact of reducing the amount that
would need to be advanced this fiscal year ($1.3 million).
CJIR:209:U
piap •• ioa
With the change. di.cu.sad in the Ilidyear financial report~ the
advance fro-. the General J"und. to the Storm. Drainaqe lUnd f"or fiscal
year U'O-91 totals $1.3 _UUon. To reduce or elillinata the
advance, either the operatinq or capital budqeta would have to be
cut. Most or the stor. Draina.,.e FUnd budqet 18 r= capi t& 1
project ••
Two it ... budqatad In the 1"0-,1 Capital I~provement budqet for
·COllection Syatam xmprovements· 4nd ·Storm water Quality Improve
ments-totalling $1~15 .111ion have not yet been encumbered, and
tbe appropriations could be delayed until bonds are issued. The
two it_ are:
o
o
$tor. Drainaqe Conditi~n Assess~ent
stora Drainage Master Plan
$.' ",illion
$.25 million
consultant propos.ls for tbe stor. drainage condition assessment
have already been s.uaitted and an agreement is currently expected
to be .. warded in early May. Delayinq tbe condition assessment
ilqreeaent would aean that a comprehensive evaluation of tbe current
storw. drainaqe system and its rehabilitation needs would be
delayed. Engineering staff is prepared to begin this study. which
i8 central to identifying and programming future capital rehabili
tation projects tor the Storm Drainage Fund tor the Loreseeable
future. Altbough the delay would not be debilit .. tinq. it would
cause significant inefficiencies.
Delaying the Master Plan will negatively impact the identification
and future progr-...ing of needed capital work~ especially in Barron
Park.
statt recommends that th~ capital program as already approved tor
the stor. Drainage FUnd he lett intact, and that the Reserve tor
capiul Projects advance the necessary funds ($1.3 .UUon) to tbe
Stor. Drainaqe Fund until bonds are 50ld in tbe spring of 1992.
This i. the recomaendatlon contained in the midyear report.
\
Re~a :UblIlitted. ~ ~ikuuCJ
STEELE -~y H1.lU\ISON ~
udqet Manager Director of Finance Ci ty )(anaqer
Related staU Reports: CMR.:160:91
CHR:209:91 2
•
March 28, 1991
HONORABLE CITY COUNCIL
palo Alto, california
/
Attention: Finance and Public Works Committee
PP-"!' r;(lIJ.IICUI, BVOBT -BTQ1U( PBAIDGE lOHD
Heabers of the COunc 11:
Itpor, fp Bri.,
11
This report 1. in responae to concern&: raised at tbe February 26 ..
1991 Finance.and Public Works Committee (F'PW) meeting on the Hid
Year Financial Report regarding the Storm crainage Fund.
1.PW Chair MCCown raised a concern at the February 26 F.PW meetinq
regarding the Kid-Year Financial Report (CMR:160:91). The report
stated tha.t bonds are not expected to be sold for tbe Storm
Drainage Fund until fall 1991 to .ore efficiently qroup capital
projects together, thereby spreading the fixed leqal, printing, and
other administrative costs associated with a sale over a larger
financing package. That sale is nov expected to occur in spring of
1992. Delaying the bond sale "'<>uld also help the city avoid
possible arbitrage restrictions if all the financed improvements
could not be co.plet~~ within the required three year time frame.
'l'herefore, funds would need to be advanced froll the Reserve for
Capital Projects to cover the storm Drainaqe Fund capital projects
bUdgeted and appropriated this fiscal year until bonds are sold.
Chair McCown wanted to know the i.pact of reducill9 the aaount that
would need to be advanced this fisc~l year ($1.3 millIon).
CIIR:2D9 .91
"
, -="-'-_._.---.---.... ----_.
Oi·au·aioA
Vi th the changa.s di.cuaeed in the aidyaar f inanei.l report, the
advance from. the General FUnd to the storm Drainage fund tor .fisca.l
yaar 1990-91 total II $1.3 .. ill ion. To reduce or eliminate the
advance, either the operatlnq or capital budqets would have to be
cut. !lost of the storm Drainage Fund budget 1& for capital
proj.cta.
Two iteas budgeted in the 1990-91 Capital Improvement budget for
"Collectien ;&yst" ~mprovuents· and. ·Ston. Water Quality I"mprove
mente-totalli~ $1.15 million have not yet been encumbered, and
the appropriatIons could De delayed until bonds are issued. Tbe
two items are:
o
o
stor. Drainag_ condition Ass ••• aant
storm Drainage Ma.ter Plan
$.9 ",illion
$.25 .. illion
Consultant proposals for the stora drainaqe condition assessment
have already been liublaitted and an aqreement is currently expected
to be awarded in early Kay. Delaying the condition assessment
agree.ent would .ean that a comprehensive evaluation of the current
stor.. drainage Byst~ and its rebabilitation n~eds would be
delayed. Enqineering staff ia prepared to begin this study, whiCh
18 central to idanUfyi~ and. prog?&mIir"1 future capital rehabili
tation proj IRet. for the Storm Drainage Fund for the tores:eeable
future.. Although the d.elay would not be debilitating, it would
causa significant inefficiencies.
Delaying the !laster Plan will negatively impact the identification
and future prograJaZIing of needed capital work, especial1~" in Barron
ParI<.
tl·MJpe .. 4atiop
Staff recomaends that the capital proqra. as already approved for
the Stor. Drainage Fund. be lett intact, and that the. Reserve tor
capital Projects aelvance the necessary fUnd. ($1.3 million) to the
Stor.. Drainage f"und until bonds are 801d in the spring of 1992.
Thill is the reCOJOlIIandation contained in the midyear report.
Re~a ~Ublaitted, ~ -~ tlczu-z/J
STEELE ~y Ii1IAAISOIl
udqet Manager Director of Finance
~~~ER
City Manaqer
Related staff Reporta: C!!R:160:91
CIIR:209:91 2