Loading...
HomeMy WebLinkAbout0204.091l • ~ ~ Karch 2:1, 1991 THE HONORABLE CITY corJNCIL Palo Alto, California / Attention: Finance and Public Works committee ~Sidewalk Replacement Program Members of the Council~ Report in Brief ....... -:" 5 This report recommends that Council revise portions of the criteria for City sidewalk replacement. The proposea revision vould reduce the a~~.t of d~maqed sidewalk currently targeted for replacement (rather than repair) by 44; percent, and would allow staff to concentrate on replacing sidewalk: where it 1s the most cost e.ffective. Background In ~978 Council reviewed and adopted crite~ia for sidewalk replacement. In 1982 Public Works staff surveyed the City to determine the amount of damaged sidewalk that met the adopted criteria fo:r replacement. As a result of the survey # council added $200,000 to the Public Works nepa~tment Operations Division budqet to supplement in-house sidewalk replacement p~oqra:ms. In 1985 Public Works staff resurveyed the City to determine what effect the additional fundinq had on side",-alk. requiring-repair. In 1986 staff met with the Finance and. Public Works COl!lJD.ittee to provide the results of the Citywide resurvey and review the c.riteria used for sidewalk replacement. Also in 1986, Cvuncil directed staff to pursue various alternatives for additional funainq for sidewalk repairs, including a 50/50 cost-shari119 program and use of general obligation bonds (CMR:159:6J. council chose not to implem~nt these alternatives. When the utility Users' Tax 'Was passed in 1'"'Y 1987-88 t Council approved $850,000 in additional funds. This, combined with the $200~OOO in the Operations Division operating budget~ provided an annual contract sidewalk replacement program of $1,050,000 for both F'i 1988-89 and FY 1989-90. 'I'he increased funding resulted in approximately 200~OOO square feet of sidewalk replaced annually. In FY 1990-91 the annual funding for contract 5ide~alk repairs was reduced by $500,000# leaving $550,000 for annual contract sidewalk replacement. -1- CMR:204:91 • \ •. 'J. o o piacuaaion Due to the reduction in fundir.q for contract replacement, statf evaluated the work completed.on sidewalk replacement contracts over the last five years I and reviewed the 1982 survey to determ.in~ what perc~nt of the sidewalk met the established criteria for replacement by defect type. Listed below are the current criteria for replacement and the percentage of damaged sidewalk Cityvide meeting that criteria: Ciiter-i!l for Replacement 1962 , of Oamaged Sidewalk ci.tywide step or Lip 1940' (> 3/4 inch) sunJcen or Lifted Slope 36.S\ (> 1 inch per foot) Spalling > 3/4 inch 25.5\ Opening 8. 6t (> 1 inch) Temporary Patched 10.0t (Step/Lip < )/4 inch) staft proposes to revise the replacement criteria to reduce the amount of sidewalk replaced Citywide. The current and proposed criteria are: Type of nef;ciency CUrrent Criteria Przrw Criteria step or Lip > 3/4 inch Replace No chanqe Sunken or Lifted Slope Replace 0l8rqed fr= > 2 inches in 12 inches 1" to 2" Opening ~ > 1 inch Replace Repair Spalling > 3/4 inch Re.place Repair By revising the criteria .from -replace ll to -repair'" in three categ-ories, approximately 44. percent of the side'Walks surveyed in 1982 would net be replaced I b*Jt 'Would be repaired. This 'Would allow staff to concentrate on those replacements Citywide which pre~ent the greatest need. Repairs of the sidewalk deficiencies formerly replaced include usinq concrete to level spallinq and fill openings. -2- CI!R: 204: S1 would Steps • ------~-~ I . , • o "r.­:,,' " .' .... - ----'< • / or lips less than 3/4 of an inch would be either qround down or temporarily patched with asphalt and not replaced. Recommendations Staff recommands that council direct staff to revise the current criteria for sidewalk replacement and repair as follows: 1~ Step or lip qreater than 3/4 inch -rep18ce. 2. sunken section greater than 2 inches in 12 inches -replace. 3. i..ift greater than 2 :i.nches in 12 inchE<s -replace. 4~ Opening greater than 1 inch -repair. 5. Spallinq of surface greater than 3/4 inch -repair~ Respectfully submitted, L//X,;:;J3h;yL MICHAEl. 8. MILLER Deputy Direc,tor ( Public Works operations ~JJj(jJ~ DAVID G. ADAMS Director of Public Works 0t~ 9}rlA\JA WILLIAM: ZAN~ -. -~;' city Manager Attachment: Criteria for Sidewalk R~placement and Repair Related CMR: 159:6 -3- CMR:204:91 ., S~WALK REPLACEMEM STEP OR UP GREATER THAN 3/4 INCH LIFT GREATER THAN 2 INCHES IN 12 INCHES SIDEWALK REPAIR OPENING GREATER THAN 1 INCH. ~.:.<::.:: :::: .. :,: c.:.:., f '.~., . '. ~i·· ··::·':7~ SPAlUNG OF SURFACE GREATER THAN 3/4 INCH f1EU> __ _ ..... "". ..... -­........ CRITER!A FOR SIDEWALK REPLACEMENT & REPAIR CrT'( OF PALO ALTO. CAUFORNIA A"""""' ____ " ' ..