~t in Brief
This report recommends that Council
December 12, 1990 for structural
Department wing in the civic Center.
Background
reject all bids received on
modification to the Police
A project for the structural improvements to th~ Police Department
wing was approved as part of the 1990-91 CIP budget. The project
includes the addition of concrete shear walls on three sides of the
building wing, extending from level C of the parking garage to the
roof.
In November 1990 staff received bids f~r the work~ The low bid of
$1,0;1,000 was significantly above the project bu~et of $500~OOO.
As a result, all bide were rejected. In order to reduce project
costs, sta~f made modifications to the contract documents base~ on
feedback from contractors who bid the work. The changes included
extending the lenqth of construction time, allowing the use of non
union labor, reducing the scope of demolition work, specifying a
siaplified structural connection between columns and walls, and
peraittinq alternate methods of placing concrete.
Piscussion
on Oecember 12, 1990, seven bids were received for the modified
project which ranged from $929,092 to $~/177/515 (see attached bid
summary). Although the low bid is almost $150,GOO below that of
the original project, it is still significantly above the existing
budget of $500,000.
Given the budget shortfall, it is recommended that all bids be
rejected. Staff will investigate aiternate reinforcement methods
in an attempt to make further reductions in the construction cost~
Any new method would require a redesign and Architectural Review
-1-
CIIR'145,91
"
Board approval, delaying! the start of construction until n~xt
fi6(;.1 year. Due t.o this timing, if any addition;,.l funding is
required for t,he project, staff will include the project as part of
the 1991-92 CIP ~udqet review.
staff does not believe that a delay in the &tart of cons~ructi~i
will subject the building occupants to increased risks,
JteCOUend,at iAA
starr recommends that Council reject 311 bids received on December
12, 1990, for the structural modification to the Palo Alto Folice
Depart.ent wing.
~~
As. slstant Direc.~r Of. blie Works
. .. / ---Qf" <l ,. ~..;iN-..e c_-
ADAMS
of rJ'c Works