HomeMy WebLinkAbout0134.091'\ ~ • • . ;,. ". ,,::'
January :)1, 1991
THE HONORABLE CITY CO"JNCIL
Palo Alto, Cali~ornia
Semi-Annual CIP Project st~tus Report. Decemhe~ 1990
Members of the Council:
Attached i6 the semi-annual project status report of General FUnd,
Refuse Fund, Storm Drainage Enterprise Fund J and Wastewater Fund
projects in th~ Capital Impravement program. This report provides
a brief update. of each project as of December )1, 1990, and is
informational only. council action is not required.
Respectfully submitted,
VALERIE LEHRKIND
A~inistrator of Public Works
~\ /.C,1/i II --J·-/~'t£XJJ k(.cX'~
r
CIP Report
CXR:134:91
,
ITEM , P!lQJECT ,
1.
2.
3. , .
5.
6.
7.
B.
9.
10.
11.
12.
13.
14.
15.
16.
17.
lB.
19.
20.
21.
22.
23.
24.
25.
26.
27.
2B.
29.
lO.
ll.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
U.
45.
46.
47.
48.
49.
50.
51-
52.
53.
54.
55.
56.
18508
18614
18617
18621
18805
18806
18510
18812
18S21
18822
18823
18811
18901
18903
18904
18908
18911
18915
IB916
18918
18919
18923
18971
18972
18973
19001
19002
19003
19004
19005
19006
19007
19008
19009
1S010
19011
19012
19017
19018
19019
19071
19072
19073
19074
19076
19101
19102
19103
19104
19105
19106
19107
19108
191~9
19110
19111
SEMI-ANNUAL CIP PROJECT STATUS REPORT
DECEMBER 1990
TABLE OF CONTENTS
PROJECT TITLE
Public Buildings Structural Improvements
Financial Oata Base
Art in Public Places
Bike Route Directional Signs
Greer Park Oevel~ment
~enovation or Irrigation Systems
Parks Site Access tor the Disabled
Information Systems Development
California Avenue Parkinq structure
Geographic Information Systgms
Midtown Traffic Improvements
Traffic signal: El Camino Real
Fire station Exhaust Removal Systems
Side~alk Repairs
Driving Range Tee Expansion
HSC bite Improvements
Heating/Ventilation at Lucie stern Center
Fire station OVerhead Doer Modifications
Fire Station Dormitory Modifications
Harbor ImprOVEments
Hearing Impaired System
Sign Replacement l Downto~~ parking Lots
Street Maintenance
Traffic Signal , Intersection Modifications
Traffic Signal , IntersectiGn Modifications
Tank Removal/cleanu~
MSC Fuel Tank Kodif1cation
Fire Apparatus Hearing Protection
Rinconada Pool Improvements
Tennis and Basketball Court Improvements
Athletic Fields Renovation
EVidence storage Expansion
computer Room R.eII::ode 1
Finance Vault Remodel
city Clerk Records Microfilming
Records Management
Payroll/Personnel System
Civic Center Ener~· Management System
CUbberley School S1te Building Code Modifications
ITT Marsh Enhancement
Traffic Signal at El Camino Real{Matadero Avenue
Xinor Intersection Improvements
Kajor Intersection Improvements
Traffic Control Barriers
Bike parking Facilities
Tank Investiqation and Removal
Arastradero Lake Dam
Playground Furniture and Equipment Replacement
Baylands Duck pond Filtration System
Boronda ~ke Public Dock Replacement
Terman School Site Development
Mitchell Park Community Center Dance Floor
Civic center Building Fire Sprinkler System
Police/Communications Computer System
Printinq Services Equipment Upgrade
Inventory Control System
57. 19112
58. 1911l
59. 19114
6C,. 19115
61. 19116
62. 19117
63. 19118
64. 19119
65. 19120
66. 39590
67. 39591
68. 39593
69. 39594
70. 39595
71-39597
72 • 39598
73. 39599
74. 39600
75. 39700
76. 39705
17. 39710
78. 45100
79. 45120
80. 45690
81. 45790
U. 45791
83. 4580l.
84. 45802
85. 47702
86. 47703
o
Warehouse Operations -Hazmat Storage U~lt
MSC Garaqe Vehiole Lift
New Vehicle Purchases
PBX Software and Hardvare Upqrade
Wide Area Networking
HP 150 Personal Comp~ter Replacement
Cable Television Equipment
Civic Center Remodel and Relocation
Middlefield Well Site Tank ar.d Building Removal
lIAS'l'En.TlIJl :rt7IIl)
System Flow Heterinq Replacement Program
Plant ~~ip~ent Replacement
Plant Grounds and Landscapinq
Plant Water system
Laboratory Facilities And Studies
lion-Point Effluent Test
Electric Distribution 12kV Loop
Standby Generators
Moat Recirculation and. Filtration System Replacement
Barminutor Replacement
W&s~ewater Reclamation
Vibration Honitorill9 EquiplDent
REFOBB FIIIID
Palo Alto Landfill Partial Closure
Permanent Landtill Flare Beautification
i1yxbee Park
Leachate Collection Syste.
Refuse Adaini&trative Facilities
Gas Condensa.te Collection and O"ispose.l Syste1Jl
Landfill Levee Protection
BTOIIX llRAniAGB Ell'tEJLPIIUI :rtnII)
Collection System Improvements
Storm Water Quality Improvement.
••••••
2
,
. -',;;
o
SEMI-ANNUAL CIP PROJECT SfAT"';S REPORT
DECEMBER 1990
1. 18508 PUBLIC BllIX.QINGS STRUCTt1!lAL IMPROVEMENTS
A consultant report resulting trom the structural testinq at
the senior Center and soils analysis at Fire station No. 2 was
co~pleted in May 1990. As. result, it will be necessary to
perform structural work at the Senior Center and foundation
work at the Fire Station. The design work for the project is
included in the FY 1991-92 CIP budget. Also, design documents
for the structur61 retrofit of Wing -A-of the Lucie Stern
Center ~ill be completed in February 1991 and construction
vill start in late summer. The Police wing structural work
will be delayed until summer 1991 due to inadequate funding.
In the next six aonths., the plans for the wcrk will be
reevaluated and additional fundinq will be sought in the FY
1991-92 CIP budqet.
EXPECTED COMPLETION: NOT SET.
2. UI614 FINANCIAL DATA....8AU
Testing and. modifications to IFAS VI continued (implementa.tion
tL~eted for January 1951). A plan was developed to implement
the training and documentation needs of City management
concerning IFAS VI. A training manual J to be used in IFAS VI
traininq sessions, is near completion. A contract for
proqra.llliliinq and consulting services was procured to assist
city staft in final testing and implementation of IFAS VI.
EXPECTED COMPLETION OF PHASE II: THIRD QUARrER 1990-91.
3. 18617 ART IN PUBLIC PLACES
The Brian Coleman neon GCulpture is installed at the Palo Alto
Cultural center. During the next quarter, bases .. ill be
prepared for the Linkoping sculpture and the David Bottini
sculpture. A site will be selected and prepared for the Betty
Gold SCUlpture.
EXPECTED COMPLETION: NOT SET •
• ~ 18621 BIKE ROUTE PIRECTIONAL SIGNS
5.
The purpose of this project is to install improved Signing
along Palo Alto's bikeways, identifying routes to major
destinations and points of interest. Informational signs '-'ere
pur-chased with state grant funds in september 1988.
Installation of the signs will occur during the third quarter.
EXPECTED COMPLETION: THIRD QUARTER 1990-91.
18805 GREER PARI( PEVELOPMENT
The scope of work for Phase
drainaqe of the entire site.
, . . ".
:2 includes the grading and
Other improvements include
.!:
' .
o o
reclaimed water irriqation.. landsc.apinq, pathways,. and a
skatebo~rd facility. Constructicn is 90 percent complete. Due
to popular demand .. the skateboard facility has been operJed to
the public.
EXPECTED COMPLETION OF C'JIlRENT PRASE, THIRD QUARTER 1990-91.
E. 18806 RENOVATION Of IRBIGAT1CN SYSTEMS
This project includes improvements to irrigation systems at
Mitchell and Bowden Parks, Cogswell Pl~za .. and the CUltural
Center. Imp~ove!llents to the Hitchell Park and CUltural Center
systems were completed in ~ane 1990. The remaining systems
will be completed durinq 91-92.
EXPECTED COMPLETION, F'i 1991-92.
7. 18810 PABXS SITE ACCESS FoR THE DISABLED
This three-phase project provides: access to city parks and
open space for the disabled. Phase II consisted of additio:"lal
on-site paved paths and modifications to drinking faucets and
picnic tables at va.rious parles. Phase III is the installation
of new equipment~
EXPECTED COMPLETION OF PHASE III: FOURTH QUARTER 1991-92.
8. 18-812 INfORMATION SYSTEMS PEVELOpMENT
This onqoinq project will provide computer equipment and
softYare for the continued development and expansion of the
City's ce.ntralized computer facility. Planned improve!llents
will (1) expand the workstation net-vork City-wide allowing
controlled external access via telephone to computer resources
(e .. g., Libraries, CUltural Center, Lucie Stern Center). (2)
ensure ~dequate computer response time for users as planned
expansionsjconver.sions take plac6. and (l) build incr-eased
capability for exchanging computerized information between
departments. The FY 90-91 project called for a major upgrade
ot the three HP 3000s, which was completed in october 1990.
EXPECTED COMPLETION, NOT SET.
9. 18821 CAL~FO&~IA AVENUE PARK1~G SrRUCTURE
The project includes a feasibility study of a Parking
Structure Plan in the California Avenue Business District. A
consulting firm was retained to do the study. The consultant
bas prepared the drafe final report I which is being revie~ed
by ill Project Review Committee. After further review is
completed, the final consultant report will be forwarded to
Council , at whIch time Council will decide whether to proceed
with the final design and constructicn of a parking structure,
including the formation of a new parking assessment district.
EXPECTED COMPLETION OF CONSULTANT STUOY: FOURTH QUARTER 1990-
91.
10. 18822 CEOGRAPHIC INFORMATION SYSTEMS
This is ill multi-year-project. This year's work inCluded
mapping of the area bounded by Middlefield Road, Oregon
Expressway, Ri9hway 101, and San Antonio Road. Field data
continues to be converted into digital form for transfer into
the new qeoqraphical infonaation s~y&teJn {GIS) software. A
2
•
/
.. ,.
,
\ series of field and technical quality control checKs will take
~lace over the next few months.
EXPECTED COIIPLETION OF CURRENT PHASE: FOURTH QUARTER 1991-92.
11. 18828 MIDTOWN TRAfFIC IMPRO~~ENTs
This project has been completed. However, a follow-up Council
assiqnment requires staff to review the visibility of the road
bumps. staff has determined that some lIIodlfications in
signing and striping are in order, and Council is expected to
approve these chanqes in Fehruary 1991. These modifications
will be funded from this project.
EXPECTED COMPLETION: FOURTH QUARTER 1990-·9l.
12. 18871 TRAfFIC SIGNAL: EL CAMINO p~
This project provided for installation of & traffic signal on
El Camino Real at Tamarack COurt/Hyatt Hotel driveway.
Caltrans "",as the lead agency. A cost-sharing agreement
between the City and State was approved by Council in January
1990~ Construction started in AU9ust 1990 and was completed
in late 1990.
PROJECT COMPLETED: SE.coND QUARTER 1990-91-
13. 18901 FIRE STATION EXHAUST REMOVAl. SYSTEMS
This project covers installation of vehicle exhaust removal
systems at fire stations to protect firetiqhters from
dangerous diesel exhaust particulates.. Work has begun en
stations 2 aTd 3. All stations will be completed during FY
90-91.
EXPECTED COMPLETION: FOIJRTH QUARTER 19 9 0-91.
14. 18903 SIDEWALK REPAIRS
This project provided for repairs to sidewalks in the areas
bounded by Waverley street, Middlefield Road l Oregon
Expressway, Embarcadero Road; and Alma street, El Camino Real,
Embarcadero Road, and Park Boulevard ..
PROJECT COl!PLETED: SECOND QUARTER 1990-91.
15. 18904 DRIVING RANGE TeE EXPANSION
The project includes the extension of the driving range tee
and the erection of additional fencing adjacent to a private
parking lot. Construction was completed in October 1990 ..
PROJECT COMPLETED: SECOND QUARTER 1990-91.
16. 18908 KSC SITE IMPROVEMENTS
This Is a multi-year project. This year's work provides for
the expansion of the Animal services Office to create a multi
purpose work area to accommodate the office of a volunteer
coordinator as well as a meetinq room for stafl ana
volunteers. project construction started October 1990.
EXPECTED COIIPLETION OF CURRENT PHASE: THIRD QUARTER 1990-91.
11. 18911 HEATING/VENTILATION AT LUCIE STERN CENTER
This is a multi-year project.. This year's work includes
heating and ventilation at the theater in the Lucie Stern
Community Center~ This ~ill be included with the structural
3
o
retrofit of wing -A-of the complex, as described in item #1,
Public 8uildinqs Structural I~provement5_
EXPECTED COMPLETION: FI RST QUARTER 1991-92.
18~ 18915 fIRE STAT!ON QYERHEAD DOOR MOPIFICATIONS
This proj,e.ct vill widen the two apparatus 4oors. at Fire
Stations 3 and 4:. Conceptual desiqn has heen completed.
Construction vill occur in apring4
EXPECTED COMPLETION: FOURTH QUARTER 1990-91.
19. 18916 lIRE STATION OORMITORY MODIFICATIONS
This project funds modifications to five existing tire
stations over a period: of five fiscal }'ears, and includes
separste locker, bath, and dormitory facilitie& fer mal~ 3nd
female firefighters. completion of stations 1, J and Swill
be done fourth quarter FY 90-91. Work on the remaininq t~o
stations will be done after completion and approval of the.
Fire Relocation study.
EXPECTED COMPLETION: NOT SET.
20. 11218 HARBOR IXPROVEMEN'l'S
This is. a .ulti-year project a "Estimat.es for rt!lpair and
restoration work to the Harbor Master's cottage indicate that
the project .ay not be financially viable. Staff will return
to Council in March 1991 with recommendations concerning the
cottage.. and construction of a sailing station and marsh.
Work continues on the Master Plan update {appro· .. lmately 60
percent ha s been completed).
EXPECTED COMPLETION OF CURRENT WORK: 1992-93.
21. 18917 HEARING IMPAIRED SYSTEM
This project funded the installation of listeninq assistance
systems in the Lucie stern Community Theatre and the
Children's Theatre for t~e hearing i.paired.
PROJECT COMPLETED, SECOND QUARTER 1990 -91 •
22. 18923 SIGN BEPLACEJoIENT. DOWNTOWN PARKING LOTS
This project provided for replacement of various signs at
parking facilities in the downtown ~rea aI~ was completed in
Septe1!lber 19 9 0 •
PROJECT COMPLETED: FIRST QUARTER 199 0-9l.
23. 18971. 1.ti2!L STj!EET MAINTENANCE
This project provides for the annual resurfacing and
reconstruction of various City streets identified by the
City's Pavement Maintenance Management System (PMMSJ as
needing improvement. Seventy-seven streets were resurfaced in
late summer as part or the 1990 pr-oqram. Construction is
substantially completea A major street resurfacing project
wil~ be accompli&hed during FY 9~-92~
EXPECTED COMPLETION: FIRST QUARTER 1992-93.
24. 18972 TRAFFIC SIGNAL AND INTERSECTION MODIFICATIONS
This project provides: for Jtodifyinq the traffic signal and
i.proving intersection confiquration at El Camino Real/Los
..
""'":
•
25.
26.
27.
28.
29.
"-
. ,
"."
/
o
Robles a Cal trans is the lead agency and is responsible for
all the design and construction work. A cost-sharinq
agreement between the city and State vas approved by council
in February 1990a Work on this project was delayed due to
higher than expected bids and resolution of additional
fundinq. Construction i5 expected to start in .January 1991.
EX?ECTED COMPLETION: FOURTH QUARTER 1990-91.
18923 TRAfFIC SIGNi'I. ANp INTERSECTION MODIFICATIONS
This project provides for modifying traffic signals at four
locations along El Camino Real~ Cal trans is the lead aqency
and is responsible for all the design and construction work.
A cost-sha.ring agreement betwe@:n the City and state 'Was
approved by Council in January 1990~ Work on this project was
delayed due to higher than expected bids and resolution of'
additional tundinq. Construction is expected to start in
January 19S11~
EXPECTED COlIPLETION: 1'0IJRTI! QUARTER 1990-91.
19001, 18604_ lSSel TANK REMOVALtCL~
some contamination was found at the tapx removal site at 1901
Embarcadero Road (airport). Definition of the extent of the
contamination vill be completed in late winter. Based on the
plume location, a cleanup project and timetable will be
developed. Cleanup construction activities are scheduled tor
sUJlJler .1991 ..
EXPECTED COIIPLETION: NOT SET.
190Q2 Msc FUEL TANK MOQIFICATION
The purpose of ~~is project is to modify the existing above
ground fuel storage area at the MSC to include a self-closing
valve at the storm drainage outlet to prevent any oil leakaqe
from leavinq the secondary containment area.. The design ie 50
percent complete and construction is scheduled for completion
this summer.
EXPECTED COMPLETION: FIRST QUARTER 1991-92.
llOO) FIR!L"HAMTIlJ; HEARING PROTECTION
This project outfitted all fire apparatus with noise reduction
headsets f"or firefighters to pr-event hearing loss. l'he
headsets also contain equipment for communication between
firefiqhters on the fire apparatus., and between the apparatus
and the dispatch center.
PROJECT COMPLETED: SECOND QUARTER 1990-91.
19004 RINCONADA POOL .LMPROV~~S
This project replaces filter, chlorination and circulatory
systems in order to maintain \!later quality" chlorinaticn.,
Circulation, and health and safety requirements of Santa Clara
County and the state of California. ThE: filtration systell bas
been completed. The nev chlorination system will be designed
and installed in FY 90-91.
EXPECTEO COMPLETION OF CHLORINATION SYSTEM: FOURTH QUARTER
1990-91.
5
•
o
:3 O. 19 Q Q 5 TUINI S AND BAsKETBALL COUR1' IMPROVEMENTS
This project funds preventive maintenance for clty tennis ana
basketball courts on a five-to seven-year rotatlnq scbedule~
FY 90-91 work includes placing new asphalt concrete overlay on
the Peers, Boulware and (depending on tundinqJ Briones
~sketball courts. resurfacin~ of the Terman tennis courts,
and re~tripinq courts at Seale, Ramos, Robles, Hoover,
Johnson... and Scott Parks. Cesign of the project will be
completed in early spring.
EXFEC'rED COMPLETIOII: NOT SET.
31.. 19QQ§ ATHLETIC fIELDS RENOVATION
This project provides for on-going' renovation of athletic
fields to ensure sate and playable conditions. SOCcer fields
at El camino Park.; Gree.r park and Terman Park will be
renovated first quarter FY 1991-92.
EXPEC'l'ED COIIPLETIOH: NOT SET.
32.. 19007 EVIDENCE SIQBAGE EXPANSION
This project provided. f.or the expansion of the evid~nee
storage room within the police garage.
PROJECT COMPUTED: FIRST QUARTER 1990-91.
33. 19008 COMPUTER ROOM REMOQEL
This project provided for the remodelin9 of ~he second floor
co~puter room in City Hall to brinq it into co~pliance with
current fire. safety codesj<' ensure internal and. external
computer rOOD security., and better utilize available space.
PROJECT COMPLETED: SECOND QUARTER 1990-91.
34. 19009 FINANCE YAULT RXXOOtL
Remode1 of the Finance Oepartment vault will improve the work
space area for Finance Department staff. The project is on
hold pending design of the civic Center utilities/Finance
move.
EXPECTED COMPLETION: NOT SET.
35. 19010 CITY cr,EEK RECORDS MICROFILMING
This project provides for microfilminq of vital documents fro'%l
the city Clerk's office for secured off-site storaqe~
EXPECTED COMPLETION: FOUR1H QUARTER 1990-91.
36. 19911 RECORDS MANAGEMENT
This project will fund a centralized re..::ords man.agem.e1" .. t system
for the collection, controlling, indexing, protection,
st'3rage, security, and destruction of City documents and
records" First-year funding covered a study of various
options and systems available, 'With recommendations for futurE:
implementation. A ·~equest tor Proposals· for implementation
of the system will be issued during FY 91-92.
EXPECTED COMPLETION: FOURTH QUARTER 1991-92.
37. 19012 PAYROLLIPPSONNEL SYSTEK
Needs assessaent has been completed, including use ot .a
departmental questionnaire to aid in !t;nalyzing user needs., and
6
•
..
",'"
.'
\ a .urv~y of pay~oll software .ol~tions in other
municipalities. staff recommendation to purchase and ~odify
the source code of an existing software system,. through
utilization of in-house programmers, will be presented to the
Finance and Public Works coamittee~
EXPECTED COMPLETION: FY 1992-93.
38~ 19017 CIVIC CENTER ENERGY MANAGEMENT SYSTEM
This project will install an automated control system tor
civic Cen~er heatinq, ventilation and air conditioning, ~hich
will provide energy savings,. increased ocoupant comfort, and
will improve the li:!e cycle and performance of eCiUipment~
Design was completed second quarter 1990-91~
EXPECTED COMPLETION: FOURTH QUARTER 1990-91.
39. 19018 CUBBEBLEX SCHOOL SIT£ BUILDING CODE MODIFICATIONS
This project provid.es for initial -work at the CUbberley School
site to establish code compliance with current public tacili ty
fire, life safety,. and handicap access regulations.
EXPECTED COMPLETION: NOT Sl!T.
40~ 19019 ITT MARSH ENHANCEMENT
This project is to restore a portion o~ the 150-acre former
ITT site to wetlands and enhance its use iSS wildlife habltat~
Saltwater from the Bay and reclaimed water from the Regional
Water Quality Control Plant will be used to creata both a salt
marsh and a fresh water marsh~ The project is in the design
phase, with construction to commence in June 1991~
EXPECTED COMPLETION: SECOND QUAATER 1991-92.
41. 19071 TRAFFIC SIGNAL AT EL CAMINO REAt'MATADEBO AVENUE
INTERSECTION
This project funds the installation of a traffic signal on El
Camino at Matadero Avenue.. caltrans is the lead agency and is
responsible for all design and construction work. A cost
sharing agreement between the City and State was approved by
Council in March 1990~ Construction on this project started
in fall 1990 and vas completed in late 1990.
PROJECT COMPLETED: SECOND QUARTER 1990-91.
42~ 19072 MTNOR INTERSECTION IMPROVEMENTS
This project includes ill:provements at nine locations
identified in the city-wide Land Use and Transportation Study
to reduce congestion and ease traffic flow. These projects
va.ry in nature. from minor striping' to modifying traffic
si9nals~ and require coordination with Santa Clara County and
Caltrans.. Although work on several intersections will be
completed by the fourth quarter of F~ 90-91, the entire
project is not expected to be completed until fourth quarter
FY 91-92.
EXPECTED COMPLETION: FOURTH QUARTER 1991-92.
43.. 19073 MAJOR INTERSECTION IMPROVEMENts
This project provides for capacity improvements at nine
locations and development of a new intersection identified in
7
•
o
the City-wide Land Uee and Transportation Study. The vork
will reduce congestion and eAse traffic flo .... along major
routes to the Stanford Re.se.arch Park~ preliminary design hao,s,
bean cOlZlpleted on seven intersections a Final design is
substantially completed tor the r~malnir~ two, including the
Al:aa/Eaet Meadow and AlmajCh4rleston inters~ctionlJ.
constructio-n is expected to beqin on the Alma/East MeadO\l'
intersection in summer ~99.l. The other eight .int~rsection
improvements vill be completed as tunds are budqete~ in the
CIP program.
EXPECTED COMPLETION: TIIIRD QUARTER 1991-92.
44. 19074 TRAFFIC QONTROL BARRIERS
This project replaced existinq, temporary ~arriers with
permanent barriers at various locations, includinq
castilleja/Park Blvd.; Park AvenueiAsh Street; Leland/El
callino Rea.Ii Oxtord/El camino Real; Bryant/Lowell; Bryant/El
Verano; and Byron/Palo Alto.
PROJECT COMPLETED: FIRST QUARTER 1990-91.
45. 19q76 BIKE PARKING FACILITIES
The purpose of this project is to purchase and install bike
racks and/or lockers at various locations in the business
districts and at city facilities.
EXPECTED COMPLETION: FIRST QUARTER 1991-92.
45. 1'101 TANK INVESTIGATION AND REMOVAL
This project includes the investiqation, testing, d~siqn and
removal of underground tanks discovered on City property or
within the city right-of-way. The project also involves the
removal of contaminated soils adjaeent to the existing
landfill fuel tank. Staff is currently working on the removal
of hydrocarbon fuel from an abandoned tank found in an alley
near Alma street.
EXPECTED COMPLETION: FOURTH QUARTER 1991-92.
47. 19102 ABASTBAPERO lAXE DAM
This project will analyze the condition and adequacy of the
dam to withstand $eismic forces ~~~ zajor storm conditions.
Included are testing, soil borings, a &tability analysiS, cost
estimates and a final report. The investiqation is scheduled
to begin in spring 1991.
EXPECTED COMPLETION: FIRST QUARTER 1991-92.
48. ln03 PLAYGP.OUND FURNITURE AND EOUIPMENT REPLACEMENT
This project includes the replacement of playground furniture
and equipment in Greer, Eleanor and Hoover Parks durinq ~~ 90-
91. The remaining replacement schedules include Boulware,
Bowen, Bri~nes, Ramos, Robles, Rinconada, Seale, Peers,
Athletic center and El Camino.
EXP ECTED COJIPLETION: NOT SET.
49. 1'124 BAYLAHDS DUCK PONQ FILTRATION SYSTEM
This project provides for improving the vater quality at the
s
•
•
I
"
\ Duck Pond to eliminate alqae blooms~
EXPEC'l'ED COMPLETION: FOURTH QUAATRR 1990-91.
50. 19105 8OR9NDA LAKE PUBLIC pocK REPLACEMENT
This project will replace the 21-year-old public c:iock at
~oothills Park with a dock of si~ilar construction.
EXPECTED COMPLETION: FOIJRTH QUARTER 1990-91.
51 • 191 Q 6 TERJtI.AN SCHOOL SITE DEVELOPMENT
This project completes the City's portion of improvements as
stated in the Tennan Specif'ic Plan. It includes remodalinq of
Winq 30 (interior painting, carpetin9# wall a~ windov
coverinqs, hardware, bandicapped restroom facilities,
electrical improvements, retrofit of heating system boiler,
removal of obsolete cabinets).
EXPECTED COMPLETION: NOT SET.
52. 19101 MITCHELL PARK CCMMtJl'iIT'i CENTER DANCE rIME
This project pLovidea for installation of a wooden dance floor
in the game room to provide additional space for dance and
exercise classes.
PROJECT COKPLETED: THIRD QUARTER 1990-91.
S3~ 191!)' CIVIC CENTER BUILDING FIRE SPRINlS'LEB SYSTEM
This project provides for the enqineerinq analysis, design and
installation of a fire sprinkler protection 5ystem for those
areas of the Civic Center (including the Police Department
wlnq and the city Council Chambers) 'Which are presently
without a sprinkler system. This work will co~ply with the
Uniform Fire Code requirements.
EXPECTED COMPLETION OF DESIGN: FOURTH QUARTER 1990-91.
54~ 19109 POLICE(COMML~ICATIONS COMPUTER SYSTEM
This multi-phase project will replace the current police
computer system with a state-of-the-art int~rated police
records manaqement and computer-aided disp~tch system.
EXPECTED COMPLETION: FOURTH QUA!ITER 1993-94.
55. 19110 PRINTING SER~ES EQUIPMENT upGRADE
'l'his project will replace the obsolete duplicator in FY. 90-91
with efficient, upgraded equipment that will automate severai
:manual processes .. thus increasing production capabilities. In
FY 91-92 1 an offset press/duplicator and platemaker will be
added to provide eddition&l productivity.
EXPECTED COMPLETION: FIRST QUARTER 1991-92.
56~ 19111 INVENTORY QQNTR9L SYSTEM
This project replaces the outdated stores inventory controls
at the MSC warehouse with efficient materials inventory
control and a related bar coding system. The schedule is
dependent upon completion of related IFAS projects~
EXPECTED COMPLETION: NOT SET.
9
..
/'
o
57. 151112 WAAEHOUSJ QPERAJ'IOMS -HAZMAT STORAGE UNIT
Thi& project provides tor the purchase of .a containerited
storage-unit to comply with feder-al and state laws ana
regulations ror the storaqe of hazardous materials that are
part of the XSC warehouse inventory. Two storage containers
have been purchased, an~ the internal shelving is being
purchased now.
EXPECTED COMPLETION: SECOIW QUA!l.TER 1991-92.
58. 19413 MSC GARAGE yZH1ctE LIFT
The project provided for the purchase of an above-qround
vehicle lift at th~ City's MSC garage.
PROJECT COMPLET£O: SECOND QUARTER 1990-91.
59. 19114 NEW VEHICLE PURCHASES
This project provides for the purchase of new vehicles and
equipment to be added to the city's fleet. A total of 12
units will be added during FY 1990-91.
EXPECTED COMPLETION: FotJRTH QUARTER 1990-91.
60. 19115 PBX SOFTWARE AND HARQWARE UPGRADE
This project is to upgrade and expand the NEAX-2400 digital
PBX telephone system 1n order to maet departmental needs for
telephone and data services by adding additional line ports,
trunk and circuit cards, a T-1 channel ca~d and associated
modems and software enhancements that will reduce the amount
of technician time and improve efficiency in performinq moves,
additions and exchanges to the system. The planned addition
of hardware and software vill be installed in the thirO
quarter 1990-91.
EXPECTED COMPLETION: TIIIRD QUARTER 1990-91.
61.. 19116 WIDE AREA NEl'WORJ(ING
This is a jOint project with the Utilitias Department to
desiqn and install a wide. area network (WAN} tor computer data
comaunications for a11 or the City's remote facilities that
require the 'Use and cxchanqe of data. First year funding
covers the study of various options and systems available~ and
installations of modems and modem lines for remote locations
during the study and design phase.
EXPECTED COMPLETION: FOURTH QUARTER 1990-91.
62. 19111 HP 150 PERSOIlllL CO!!J>!JTER !<EPLACEMENT
This project will replace the: 42 obsole:'t.e HP 150 personal
computers with Vectra personal computers, which is the City
standard for personal computer purchases. The first year
funding covered replaCing 17 of the approved 42 HP 150s. All
17 units have been received and installedc
EXPECTED COMPLETION: SECONO QUARTER 1991-92.
63. 19118 CARLE TELEVISION ~IPMENT
This project will fund the purchase of portable cable
television camera equipment l editinq equipment and a portable
tape recorder aneS deck to be able to C3blecast other cOlDll'littee
meetings beld in the Council Conference Room and other City
10
•
•
, ' i
\
. ,
'---'.~:..~:~:,: '
':'>
-.~-..
locations. The firet year runding will cover the p~rchase of
portable cable television c~era equipment to be installed in
the Council conferance Room in February ~9S1~
EXPECTED COMPLETION: THIRD QUARTER 1991-92.
64 ~ l.lll.i CIVIC CENTER REMODEL AND RELOCATIOli
This p::.-oject will address space limit.&tions on the second,
third and fourth floors of the Civic Center~ The project
components include space planning and desiqn,. construction
remodelinq, voice/data wiring, and movinq4
EXP ECTEI> COMPLETION: NOT SET.
65~ 1912Q K]DD1.EFIEt.p WElL SITE TANK AND BunDING REMOyAL
This project includes ~e removal of public improvements on a
City site to make it available for future development. The
work will take place in spring 1991.
EXPECTED COMPLETION: FOURTH QUARTER 1990-91.
66~ 39590 SYSTEM FLOW METERING REPLACEMENt PROGRAM
This onqoing project provide.s for scheduled replacement of
system flow meters at the Reqional Water Quality Control Plant
(RWQCP) to ensure reliability and accuracy. OUrlnq FY 90-91,
a waste meter was purchased and put on-line.
EXPECTED COI!PLETION. NOT SET.
67. 39591 PLANT EQUIPMENT RW.ACgMENT
This onqo1ll9 project provides for scheduled replacement of
RWQCP equipment for maintaining treatment reliability.
EXPECTED COMPLETION. NOT SET.
68. 3iS?3 PLANT GROUNDS ~D LANcSCApING
This project covers minor maintenance and repair of the
reclaimed water irriqation system in order to maintain and
upgrade the existing landscaping at the RWQCP.
EXPECTED COI!PLETION: FOURTH QUARTER 1990-91.
69. 39~94 PLANT WATER Sy~
This projact will replace a portion of piping for the #4 water
system to provide ~eclai.ed water for equipment washdown and
landscape irrigation at the RWQCP.
EXPECTED COI!PLETION: FOURTH QUARTER 1990-91.
70. 39595 ~BORATORX FACILITIES ~~D STUDIES
This RWQCP project provid£s for new bioassay, efflUent
characterization and data management, and replacement of
certain laboratory instruments to JIIeet Regional Wat.er Qual tty
Control Bo3rd requirements. The bioassay testinq rOOD was
completed in July 1990. Effl~ent characterization is being
conducted.
EXPECTED COMPLETION: NOT SET.
11
..
,.
/
'.-.
, .•. '
71. ]9596 HON-POINt EffLUENT tEST
This RWQCP project provided tor effluent tests and development
of eftlue~t and basin t.st plans 35 required by th~ Regional
water Quality Centrol Board.
PROJECT COMPLETED: SECOND QUARTER 1990-91.
72. 39598 ELECTRIC DISTRIRL~I9N 12KV tpof
This project extends the preser.t electrical distribution
system in a loop around the RWQCP p .... hich provides reliabilitr
and the means of isolating specific sections without having to
shut down the entire system. The project is approximately 95
percent complete.
EXPECTED COMPLETION: 'l'HIRD QUARTER 1990-91.
73. 39599 STANDBY GENERATORS
This project provides two 500kw emergency qenerators for
increased reliability for RWQCP operations.
EXPECTED COMPLETION: THIRD QUARTER 1990 -91.
74. 39§OO MOAT B2C1RCpLATION AND FILTRA1ION SYSTEM REPLACEMENT
This RWQCP project replaced the 14-yaar-old recirCUlation and
filtration system, which was unreliable.
75.
PROJECT COMPLETED: FIRST QUARTER 1990-91.
a
year-old barminutors
EXPECTED COMPLETION:
ect to replace the present 25-
more effective equipment~
FOURTH QUARTER 1991-92.
76. 32705 WASTEWATER RECLAlf.ATION
This RWQCP project includes preparation of a plan to study the
econcmic, techriical, environmental, and institutional
feasibility of utillzinq reclai;:aed wastewater to irrig.ellte
larqe turf and landscaped areas. The project also includes
RWOCP modifications and purchase of equipment to produce
reclaimed water.
EXPECTED COMPLETION: NOT SET.
77.. 1971 Q VIBFJ..TION MONlTORI~OOIPKEN'l'
'I'his project .·ill ccver the pur-chase and installation of a
vibration monitorinq system to monitor-and track vibration
changes on each major piece of RWQCP equipment as part of the
preventive maintenance program.
EXPEt.'TED COMPLETION: FOURTH QUARTER 1990-91.
REPOSE FOND
78. .f...5.1.Q.Q PALO Al,TO I,ANDFILL PARTIAL CLOSURE
The project implements partial closure of 2(' acres on the
southeast quadrant of the landfill. The placement of final
cover· is in accordance with Reqional water Quality Board
regulati01'ls~
EXPECTED COMPLETION: FIRST QUARTER 1991-92.
12
•
/'
79~ 45120 PERMANENT LANDFILL DWL~E BEAUTIFICATION
This project provides for construction of an aesthetically
pleasinq enclosure around the stack of the permanent landfill
qas tlare.
EXPECTED COMPLETIOll: FOURTH QUARTER 19n -92 •
80. .'69Q BIXBEE PARK
construction beqan in August after approval of the plans by
the California Inteqrated Waste Manaqament Boa~d. Earthwork
is substantially completed. Park improvements will be
completed summer 1991.
EXPECTED COMPLETION: FOURTH QUARTER 1990-91.
61. 45790 LFACHATE COLL~CTION SYSTEM
Phase I of the three-phase project included a consultant
review of existing data. on landfill leachate. Phase II
included recommendations, co~struction plans and
specifications. Phase Ill, construction of the system~ has
been completed ..
PROJECT COMPLETED: FIRST QUARTER 1990-91.
82. 45791 REFUSE ADMINISTRATIVE FACILITIES
Phase I of this project includes installation of a new mobile
office and personnel trailer l and con~ersion of the existing
trailer for use as a tollbooth. Phase II included installation
of weiqht 5cales at the landfill entrance. Construction has
beoen completed.
FROJECT COMPLETED: SECOND QUARTER 1990-91.
83. 4S801 GAS CONDENSATE COLI .. ECTIQN AND DISPOSAl .. S)"STEK
This proje.ct is to construct a collection and disposal system
tor qas condensate accumulated in the methane gas collection
syste.1 vhich is required to comply with Environmental
Protection Ag"e-nc1 requirements. The Agency has delayed
implementation of this requirem~~t pending revisions.
EXPE..'"'lED COMPLETION: NOT SET.
84. 45802 v.NDF:ILL LEVEE PROTECl'ION
This project is to construct a flood protection levee on the
northwest quadrant of the landfill to withstand washout from
the loo-year Llood, as required by the Regional Water Quality
control Board.
EXPECTED COKPLETION: NOT SET.
8'rORM DRAINAGE B1iTERPRr&E J'DIII)
8S. 47702 COLLECTION SVSTEH IMPROVEM~
An erosion control project on San Francisquito creek funded
jointly with the Saitta Clara Valley water District 'Was
completed in November 1990~ A pump station telemetry study
conducted with the Utilities Depart~ent will be completed in
January 1991; desiqn phase may start in spr-inq 199.1~ Well
abandomaent at the .former ITT property will be done as part of
13
!""""'----~-------
,
•
. . ~
tha Marsh 'Enhancement Project starting in spring 199L A
condition assessment of the existing storm drain system and
development of an updated storm drain master plan viII begin
in .pring 1991 and will extend over a three-year period. TO
ensure compatability with the master plan, design of a neW'
sterm drain alonq Everett Avenue will be delayed until FY 91-
92.. Construction of a ria .. pedlastrian/bicycle bridqe over
Adobe creek at Duncan Place by the Santa Clara Valley Water
District will start in early 1991.
EXPECTED COMPLETION: NOT SET.
86. .770] STORM WATER QUAt.ITY IMPROVEMENTS
Palo Alto continues to participate in the Santa Clara valley
Nonpoint SOurce Pollution Control Progralll., an area-wide
ooope~ative effort to reduce pollution from urban runoff. A
five-year NPDES permit was issued to the Program by the.
Reqional Water Quality Control Boord in July 1990. The permit
requires the City to pertor= specific long-term activities,
such as eli.ination of ill~g~l dUPIping and illegal connections
to storm drains. moaific&tions to City ordinances and
procedures, and monitorinq of stor.mvater runoff, to improve
stormwater quality. This project;-thouqh subject to revision,
will continue In some torm indefinitely.
EXPECTED COKPLE'rION: NOT SET.
14