Loading...
HomeMy WebLinkAbout0134.091'\ ~ • • . ;,. ". ,,::' January :)1, 1991 THE HONORABLE CITY CO"JNCIL Palo Alto, Cali~ornia Semi-Annual CIP Project st~tus Report. Decemhe~ 1990 Members of the Council: Attached i6 the semi-annual project status report of General FUnd, Refuse Fund, Storm Drainage Enterprise Fund J and Wastewater Fund projects in th~ Capital Impravement program. This report provides a brief update. of each project as of December )1, 1990, and is informational only. council action is not required. Respectfully submitted, VALERIE LEHRKIND A~inistrator of Public Works ~\ /.C,1/i II --J·-/~'t£XJJ k(.cX'~ r CIP Report CXR:134:91 , ITEM , P!lQJECT , 1. 2. 3. , . 5. 6. 7. B. 9. 10. 11. 12. 13. 14. 15. 16. 17. lB. 19. 20. 21. 22. 23. 24. 25. 26. 27. 2B. 29. lO. ll. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. 42. 43. U. 45. 46. 47. 48. 49. 50. 51- 52. 53. 54. 55. 56. 18508 18614 18617 18621 18805 18806 18510 18812 18S21 18822 18823 18811 18901 18903 18904 18908 18911 18915 IB916 18918 18919 18923 18971 18972 18973 19001 19002 19003 19004 19005 19006 19007 19008 19009 1S010 19011 19012 19017 19018 19019 19071 19072 19073 19074 19076 19101 19102 19103 19104 19105 19106 19107 19108 191~9 19110 19111 SEMI-ANNUAL CIP PROJECT STATUS REPORT DECEMBER 1990 TABLE OF CONTENTS PROJECT TITLE Public Buildings Structural Improvements Financial Oata Base Art in Public Places Bike Route Directional Signs Greer Park Oevel~ment ~enovation or Irrigation Systems Parks Site Access tor the Disabled Information Systems Development California Avenue Parkinq structure Geographic Information Systgms Midtown Traffic Improvements Traffic signal: El Camino Real Fire station Exhaust Removal Systems Side~alk Repairs Driving Range Tee Expansion HSC bite Improvements Heating/Ventilation at Lucie stern Center Fire station OVerhead Doer Modifications Fire Station Dormitory Modifications Harbor ImprOVEments Hearing Impaired System Sign Replacement l Downto~~ parking Lots Street Maintenance Traffic Signal , Intersection Modifications Traffic Signal , IntersectiGn Modifications Tank Removal/cleanu~ MSC Fuel Tank Kodif1cation Fire Apparatus Hearing Protection Rinconada Pool Improvements Tennis and Basketball Court Improvements Athletic Fields Renovation EVidence storage Expansion computer Room R.eII::ode 1 Finance Vault Remodel city Clerk Records Microfilming Records Management Payroll/Personnel System Civic Center Ener~· Management System CUbberley School S1te Building Code Modifications ITT Marsh Enhancement Traffic Signal at El Camino Real{Matadero Avenue Xinor Intersection Improvements Kajor Intersection Improvements Traffic Control Barriers Bike parking Facilities Tank Investiqation and Removal Arastradero Lake Dam Playground Furniture and Equipment Replacement Baylands Duck pond Filtration System Boronda ~ke Public Dock Replacement Terman School Site Development Mitchell Park Community Center Dance Floor Civic center Building Fire Sprinkler System Police/Communications Computer System Printinq Services Equipment Upgrade Inventory Control System 57. 19112 58. 1911l 59. 19114 6C,. 19115 61. 19116 62. 19117 63. 19118 64. 19119 65. 19120 66. 39590 67. 39591 68. 39593 69. 39594 70. 39595 71-39597 72 • 39598 73. 39599 74. 39600 75. 39700 76. 39705 17. 39710 78. 45100 79. 45120 80. 45690 81. 45790 U. 45791 83. 4580l. 84. 45802 85. 47702 86. 47703 o Warehouse Operations -Hazmat Storage U~lt MSC Garaqe Vehiole Lift New Vehicle Purchases PBX Software and Hardvare Upqrade Wide Area Networking HP 150 Personal Comp~ter Replacement Cable Television Equipment Civic Center Remodel and Relocation Middlefield Well Site Tank ar.d Building Removal lIAS'l'En.TlIJl :rt7IIl) System Flow Heterinq Replacement Program Plant ~~ip~ent Replacement Plant Grounds and Landscapinq Plant Water system Laboratory Facilities And Studies lion-Point Effluent Test Electric Distribution 12kV Loop Standby Generators Moat Recirculation and. Filtration System Replacement Barminutor Replacement W&s~ewater Reclamation Vibration Honitorill9 EquiplDent REFOBB FIIIID Palo Alto Landfill Partial Closure Permanent Landtill Flare Beautification i1yxbee Park Leachate Collection Syste. Refuse Adaini&trative Facilities Gas Condensa.te Collection and O"ispose.l Syste1Jl Landfill Levee Protection BTOIIX llRAniAGB Ell'tEJLPIIUI :rtnII) Collection System Improvements Storm Water Quality Improvement. •••••• 2 , . -',;; o SEMI-ANNUAL CIP PROJECT SfAT"';S REPORT DECEMBER 1990 1. 18508 PUBLIC BllIX.QINGS STRUCTt1!lAL IMPROVEMENTS A consultant report resulting trom the structural testinq at the senior Center and soils analysis at Fire station No. 2 was co~pleted in May 1990. As. result, it will be necessary to perform structural work at the Senior Center and foundation work at the Fire Station. The design work for the project is included in the FY 1991-92 CIP budget. Also, design documents for the structur61 retrofit of Wing -A-of the Lucie Stern Center ~ill be completed in February 1991 and construction vill start in late summer. The Police wing structural work will be delayed until summer 1991 due to inadequate funding. In the next six aonths., the plans for the wcrk will be reevaluated and additional fundinq will be sought in the FY 1991-92 CIP budqet. EXPECTED COMPLETION: NOT SET. 2. UI614 FINANCIAL DATA....8AU Testing and. modifications to IFAS VI continued (implementa.tion tL~eted for January 1951). A plan was developed to implement the training and documentation needs of City management concerning IFAS VI. A training manual J to be used in IFAS VI traininq sessions, is near completion. A contract for proqra.llliliinq and consulting services was procured to assist city staft in final testing and implementation of IFAS VI. EXPECTED COMPLETION OF PHASE II: THIRD QUARrER 1990-91. 3. 18617 ART IN PUBLIC PLACES The Brian Coleman neon GCulpture is installed at the Palo Alto Cultural center. During the next quarter, bases .. ill be prepared for the Linkoping sculpture and the David Bottini sculpture. A site will be selected and prepared for the Betty Gold SCUlpture. EXPECTED COMPLETION: NOT SET • • ~ 18621 BIKE ROUTE PIRECTIONAL SIGNS 5. The purpose of this project is to install improved Signing along Palo Alto's bikeways, identifying routes to major destinations and points of interest. Informational signs '-'ere pur-chased with state grant funds in september 1988. Installation of the signs will occur during the third quarter. EXPECTED COMPLETION: THIRD QUARTER 1990-91. 18805 GREER PARI( PEVELOPMENT The scope of work for Phase drainaqe of the entire site. , . . ". :2 includes the grading and Other improvements include .!: ' . o o reclaimed water irriqation.. landsc.apinq, pathways,. and a skatebo~rd facility. Constructicn is 90 percent complete. Due to popular demand .. the skateboard facility has been operJed to the public. EXPECTED COMPLETION OF C'JIlRENT PRASE, THIRD QUARTER 1990-91. E. 18806 RENOVATION Of IRBIGAT1CN SYSTEMS This project includes improvements to irrigation systems at Mitchell and Bowden Parks, Cogswell Pl~za .. and the CUltural Center. Imp~ove!llents to the Hitchell Park and CUltural Center systems were completed in ~ane 1990. The remaining systems will be completed durinq 91-92. EXPECTED COMPLETION, F'i 1991-92. 7. 18810 PABXS SITE ACCESS FoR THE DISABLED This three-phase project provides: access to city parks and open space for the disabled. Phase II consisted of additio:"lal on-site paved paths and modifications to drinking faucets and picnic tables at va.rious parles. Phase III is the installation of new equipment~ EXPECTED COMPLETION OF PHASE III: FOURTH QUARTER 1991-92. 8. 18-812 INfORMATION SYSTEMS PEVELOpMENT This onqoinq project will provide computer equipment and softYare for the continued development and expansion of the City's ce.ntralized computer facility. Planned improve!llents will (1) expand the workstation net-vork City-wide allowing controlled external access via telephone to computer resources (e .. g., Libraries, CUltural Center, Lucie Stern Center). (2) ensure ~dequate computer response time for users as planned expansionsjconver.sions take plac6. and (l) build incr-eased capability for exchanging computerized information between departments. The FY 90-91 project called for a major upgrade ot the three HP 3000s, which was completed in october 1990. EXPECTED COMPLETION, NOT SET. 9. 18821 CAL~FO&~IA AVENUE PARK1~G SrRUCTURE The project includes a feasibility study of a Parking Structure Plan in the California Avenue Business District. A consulting firm was retained to do the study. The consultant bas prepared the drafe final report I which is being revie~ed by ill Project Review Committee. After further review is completed, the final consultant report will be forwarded to Council , at whIch time Council will decide whether to proceed with the final design and constructicn of a parking structure, including the formation of a new parking assessment district. EXPECTED COMPLETION OF CONSULTANT STUOY: FOURTH QUARTER 1990- 91. 10. 18822 CEOGRAPHIC INFORMATION SYSTEMS This is ill multi-year-project. This year's work inCluded mapping of the area bounded by Middlefield Road, Oregon Expressway, Ri9hway 101, and San Antonio Road. Field data continues to be converted into digital form for transfer into the new qeoqraphical infonaation s~y&teJn {GIS) software. A 2 • / .. ,. , \ series of field and technical quality control checKs will take ~lace over the next few months. EXPECTED COIIPLETION OF CURRENT PHASE: FOURTH QUARTER 1991-92. 11. 18828 MIDTOWN TRAfFIC IMPRO~~ENTs This project has been completed. However, a follow-up Council assiqnment requires staff to review the visibility of the road bumps. staff has determined that some lIIodlfications in signing and striping are in order, and Council is expected to approve these chanqes in Fehruary 1991. These modifications will be funded from this project. EXPECTED COMPLETION: FOURTH QUARTER 1990-·9l. 12. 18871 TRAfFIC SIGNAL: EL CAMINO p~ This project provided for installation of & traffic signal on El Camino Real at Tamarack COurt/Hyatt Hotel driveway. Caltrans "",as the lead agency. A cost-sharing agreement between the City and State was approved by Council in January 1990~ Construction started in AU9ust 1990 and was completed in late 1990. PROJECT COMPLETED: SE.coND QUARTER 1990-91- 13. 18901 FIRE STATION EXHAUST REMOVAl. SYSTEMS This project covers installation of vehicle exhaust removal systems at fire stations to protect firetiqhters from dangerous diesel exhaust particulates.. Work has begun en stations 2 aTd 3. All stations will be completed during FY 90-91. EXPECTED COMPLETION: FOIJRTH QUARTER 19 9 0-91. 14. 18903 SIDEWALK REPAIRS This project provided for repairs to sidewalks in the areas bounded by Waverley street, Middlefield Road l Oregon Expressway, Embarcadero Road; and Alma street, El Camino Real, Embarcadero Road, and Park Boulevard .. PROJECT COl!PLETED: SECOND QUARTER 1990-91. 15. 18904 DRIVING RANGE TeE EXPANSION The project includes the extension of the driving range tee and the erection of additional fencing adjacent to a private parking lot. Construction was completed in October 1990 .. PROJECT COMPLETED: SECOND QUARTER 1990-91. 16. 18908 KSC SITE IMPROVEMENTS This Is a multi-year project. This year's work provides for the expansion of the Animal services Office to create a multi­ purpose work area to accommodate the office of a volunteer coordinator as well as a meetinq room for stafl ana volunteers. project construction started October 1990. EXPECTED COIIPLETION OF CURRENT PHASE: THIRD QUARTER 1990-91. 11. 18911 HEATING/VENTILATION AT LUCIE STERN CENTER This is a multi-year project.. This year's work includes heating and ventilation at the theater in the Lucie Stern Community Center~ This ~ill be included with the structural 3 o retrofit of wing -A-of the complex, as described in item #1, Public 8uildinqs Structural I~provement5_ EXPECTED COMPLETION: FI RST QUARTER 1991-92. 18~ 18915 fIRE STAT!ON QYERHEAD DOOR MOPIFICATIONS This proj,e.ct vill widen the two apparatus 4oors. at Fire Stations 3 and 4:. Conceptual desiqn has heen completed. Construction vill occur in apring4 EXPECTED COMPLETION: FOURTH QUARTER 1990-91. 19. 18916 lIRE STATION OORMITORY MODIFICATIONS This project funds modifications to five existing tire stations over a period: of five fiscal }'ears, and includes separste locker, bath, and dormitory facilitie& fer mal~ 3nd female firefighters. completion of stations 1, J and Swill be done fourth quarter FY 90-91. Work on the remaininq t~o stations will be done after completion and approval of the. Fire Relocation study. EXPECTED COMPLETION: NOT SET. 20. 11218 HARBOR IXPROVEMEN'l'S This is. a .ulti-year project a "Estimat.es for rt!lpair and restoration work to the Harbor Master's cottage indicate that the project .ay not be financially viable. Staff will return to Council in March 1991 with recommendations concerning the cottage.. and construction of a sailing station and marsh. Work continues on the Master Plan update {appro· .. lmately 60 percent ha s been completed). EXPECTED COMPLETION OF CURRENT WORK: 1992-93. 21. 18917 HEARING IMPAIRED SYSTEM This project funded the installation of listeninq assistance systems in the Lucie stern Community Theatre and the Children's Theatre for t~e hearing i.paired. PROJECT COMPLETED, SECOND QUARTER 1990 -91 • 22. 18923 SIGN BEPLACEJoIENT. DOWNTOWN PARKING LOTS This project provided for replacement of various signs at parking facilities in the downtown ~rea aI~ was completed in Septe1!lber 19 9 0 • PROJECT COMPLETED: FIRST QUARTER 199 0-9l. 23. 18971. 1.ti2!L STj!EET MAINTENANCE This project provides for the annual resurfacing and reconstruction of various City streets identified by the City's Pavement Maintenance Management System (PMMSJ as needing improvement. Seventy-seven streets were resurfaced in late summer as part or the 1990 pr-oqram. Construction is substantially completea A major street resurfacing project wil~ be accompli&hed during FY 9~-92~ EXPECTED COMPLETION: FIRST QUARTER 1992-93. 24. 18972 TRAFFIC SIGNAL AND INTERSECTION MODIFICATIONS This project provides: for Jtodifyinq the traffic signal and i.proving intersection confiquration at El Camino Real/Los .. ""'": • 25. 26. 27. 28. 29. "- . , "." / o Robles a Cal trans is the lead agency and is responsible for all the design and construction work. A cost-sharinq agreement between the city and State vas approved by council in February 1990a Work on this project was delayed due to higher than expected bids and resolution of additional fundinq. Construction i5 expected to start in .January 1991. EX?ECTED COMPLETION: FOURTH QUARTER 1990-91. 18923 TRAfFIC SIGNi'I. ANp INTERSECTION MODIFICATIONS This project provides for modifying traffic signals at four locations along El Camino Real~ Cal trans is the lead aqency and is responsible for all the design and construction work. A cost-sha.ring agreement betwe@:n the City and state 'Was approved by Council in January 1990~ Work on this project was delayed due to higher than expected bids and resolution of' additional tundinq. Construction is expected to start in January 19S11~ EXPECTED COlIPLETION: 1'0IJRTI! QUARTER 1990-91. 19001, 18604_ lSSel TANK REMOVALtCL~ some contamination was found at the tapx removal site at 1901 Embarcadero Road (airport). Definition of the extent of the contamination vill be completed in late winter. Based on the plume location, a cleanup project and timetable will be developed. Cleanup construction activities are scheduled tor sUJlJler .1991 .. EXPECTED COIIPLETION: NOT SET. 190Q2 Msc FUEL TANK MOQIFICATION The purpose of ~~is project is to modify the existing above­ ground fuel storage area at the MSC to include a self-closing valve at the storm drainage outlet to prevent any oil leakaqe from leavinq the secondary containment area.. The design ie 50 percent complete and construction is scheduled for completion this summer. EXPECTED COMPLETION: FIRST QUARTER 1991-92. llOO) FIR!L"HAMTIlJ; HEARING PROTECTION This project outfitted all fire apparatus with noise reduction headsets f"or firefighters to pr-event hearing loss. l'he headsets also contain equipment for communication between firefiqhters on the fire apparatus., and between the apparatus and the dispatch center. PROJECT COMPLETED: SECOND QUARTER 1990-91. 19004 RINCONADA POOL .LMPROV~~S This project replaces filter, chlorination and circulatory systems in order to maintain \!later quality" chlorinaticn., Circulation, and health and safety requirements of Santa Clara County and the state of California. ThE: filtration systell bas been completed. The nev chlorination system will be designed and installed in FY 90-91. EXPECTEO COMPLETION OF CHLORINATION SYSTEM: FOURTH QUARTER 1990-91. 5 • o :3 O. 19 Q Q 5 TUINI S AND BAsKETBALL COUR1' IMPROVEMENTS This project funds preventive maintenance for clty tennis ana basketball courts on a five-to seven-year rotatlnq scbedule~ FY 90-91 work includes placing new asphalt concrete overlay on the Peers, Boulware and (depending on tundinqJ Briones ~sketball courts. resurfacin~ of the Terman tennis courts, and re~tripinq courts at Seale, Ramos, Robles, Hoover, Johnson... and Scott Parks. Cesign of the project will be completed in early spring. EXFEC'rED COMPLETIOII: NOT SET. 31.. 19QQ§ ATHLETIC fIELDS RENOVATION This project provides for on-going' renovation of athletic fields to ensure sate and playable conditions. SOCcer fields at El camino Park.; Gree.r park and Terman Park will be renovated first quarter FY 1991-92. EXPEC'l'ED COIIPLETIOH: NOT SET. 32.. 19007 EVIDENCE SIQBAGE EXPANSION This project provided. f.or the expansion of the evid~nee storage room within the police garage. PROJECT COMPUTED: FIRST QUARTER 1990-91. 33. 19008 COMPUTER ROOM REMOQEL This project provided for the remodelin9 of ~he second floor co~puter room in City Hall to brinq it into co~pliance with current fire. safety codesj<' ensure internal and. external computer rOOD security., and better utilize available space. PROJECT COMPLETED: SECOND QUARTER 1990-91. 34. 19009 FINANCE YAULT RXXOOtL Remode1 of the Finance Oepartment vault will improve the work space area for Finance Department staff. The project is on hold pending design of the civic Center utilities/Finance move. EXPECTED COMPLETION: NOT SET. 35. 19010 CITY cr,EEK RECORDS MICROFILMING This project provides for microfilminq of vital documents fro'%l the city Clerk's office for secured off-site storaqe~ EXPECTED COMPLETION: FOUR1H QUARTER 1990-91. 36. 19911 RECORDS MANAGEMENT This project will fund a centralized re..::ords man.agem.e1" .. t system for the collection, controlling, indexing, protection, st'3rage, security, and destruction of City documents and records" First-year funding covered a study of various options and systems available, 'With recommendations for futurE: implementation. A ·~equest tor Proposals· for implementation of the system will be issued during FY 91-92. EXPECTED COMPLETION: FOURTH QUARTER 1991-92. 37. 19012 PAYROLLIPPSONNEL SYSTEK Needs assessaent has been completed, including use ot .a departmental questionnaire to aid in !t;nalyzing user needs., and 6 • .. ",'" .' \ a .urv~y of pay~oll software .ol~tions in other municipalities. staff recommendation to purchase and ~odify the source code of an existing software system,. through utilization of in-house programmers, will be presented to the Finance and Public Works coamittee~ EXPECTED COMPLETION: FY 1992-93. 38~ 19017 CIVIC CENTER ENERGY MANAGEMENT SYSTEM This project will install an automated control system tor civic Cen~er heatinq, ventilation and air conditioning, ~hich will provide energy savings,. increased ocoupant comfort, and will improve the li:!e cycle and performance of eCiUipment~ Design was completed second quarter 1990-91~ EXPECTED COMPLETION: FOURTH QUARTER 1990-91. 39. 19018 CUBBEBLEX SCHOOL SIT£ BUILDING CODE MODIFICATIONS This project provid.es for initial -work at the CUbberley School site to establish code compliance with current public tacili ty fire, life safety,. and handicap access regulations. EXPECTED COMPLETION: NOT Sl!T. 40~ 19019 ITT MARSH ENHANCEMENT This project is to restore a portion o~ the 150-acre former ITT site to wetlands and enhance its use iSS wildlife habltat~ Saltwater from the Bay and reclaimed water from the Regional Water Quality Control Plant will be used to creata both a salt marsh and a fresh water marsh~ The project is in the design phase, with construction to commence in June 1991~ EXPECTED COMPLETION: SECOND QUAATER 1991-92. 41. 19071 TRAFFIC SIGNAL AT EL CAMINO REAt'MATADEBO AVENUE INTERSECTION This project funds the installation of a traffic signal on El Camino at Matadero Avenue.. caltrans is the lead agency and is responsible for all design and construction work. A cost­ sharing agreement between the City and State was approved by Council in March 1990~ Construction on this project started in fall 1990 and vas completed in late 1990. PROJECT COMPLETED: SECOND QUARTER 1990-91. 42~ 19072 MTNOR INTERSECTION IMPROVEMENTS This project includes ill:provements at nine locations identified in the city-wide Land Use and Transportation Study to reduce congestion and ease traffic flow. These projects va.ry in nature. from minor striping' to modifying traffic si9nals~ and require coordination with Santa Clara County and Caltrans.. Although work on several intersections will be completed by the fourth quarter of F~ 90-91, the entire project is not expected to be completed until fourth quarter FY 91-92. EXPECTED COMPLETION: FOURTH QUARTER 1991-92. 43.. 19073 MAJOR INTERSECTION IMPROVEMENts This project provides for capacity improvements at nine locations and development of a new intersection identified in 7 • o the City-wide Land Uee and Transportation Study. The vork will reduce congestion and eAse traffic flo .... along major routes to the Stanford Re.se.arch Park~ preliminary design hao,s, bean cOlZlpleted on seven intersections a Final design is substantially completed tor the r~malnir~ two, including the Al:aa/Eaet Meadow and AlmajCh4rleston inters~ctionlJ. constructio-n is expected to beqin on the Alma/East MeadO\l' intersection in summer ~99.l. The other eight .int~rsection improvements vill be completed as tunds are budqete~ in the CIP program. EXPECTED COMPLETION: TIIIRD QUARTER 1991-92. 44. 19074 TRAFFIC QONTROL BARRIERS This project replaced existinq, temporary ~arriers with permanent barriers at various locations, includinq castilleja/Park Blvd.; Park AvenueiAsh Street; Leland/El callino Rea.Ii Oxtord/El camino Real; Bryant/Lowell; Bryant/El Verano; and Byron/Palo Alto. PROJECT COMPLETED: FIRST QUARTER 1990-91. 45. 19q76 BIKE PARKING FACILITIES The purpose of this project is to purchase and install bike racks and/or lockers at various locations in the business districts and at city facilities. EXPECTED COMPLETION: FIRST QUARTER 1991-92. 45. 1'101 TANK INVESTIGATION AND REMOVAL This project includes the investiqation, testing, d~siqn and removal of underground tanks discovered on City property or within the city right-of-way. The project also involves the removal of contaminated soils adjaeent to the existing landfill fuel tank. Staff is currently working on the removal of hydrocarbon fuel from an abandoned tank found in an alley near Alma street. EXPECTED COMPLETION: FOURTH QUARTER 1991-92. 47. 19102 ABASTBAPERO lAXE DAM This project will analyze the condition and adequacy of the dam to withstand $eismic forces ~~~ zajor storm conditions. Included are testing, soil borings, a &tability analysiS, cost estimates and a final report. The investiqation is scheduled to begin in spring 1991. EXPECTED COMPLETION: FIRST QUARTER 1991-92. 48. ln03 PLAYGP.OUND FURNITURE AND EOUIPMENT REPLACEMENT This project includes the replacement of playground furniture and equipment in Greer, Eleanor and Hoover Parks durinq ~~ 90- 91. The remaining replacement schedules include Boulware, Bowen, Bri~nes, Ramos, Robles, Rinconada, Seale, Peers, Athletic center and El Camino. EXP ECTED COJIPLETION: NOT SET. 49. 1'124 BAYLAHDS DUCK PONQ FILTRATION SYSTEM This project provides for improving the vater quality at the s • • I " \ Duck Pond to eliminate alqae blooms~ EXPEC'l'ED COMPLETION: FOURTH QUAATRR 1990-91. 50. 19105 8OR9NDA LAKE PUBLIC pocK REPLACEMENT This project will replace the 21-year-old public c:iock at ~oothills Park with a dock of si~ilar construction. EXPECTED COMPLETION: FOIJRTH QUARTER 1990-91. 51 • 191 Q 6 TERJtI.AN SCHOOL SITE DEVELOPMENT This project completes the City's portion of improvements as stated in the Tennan Specif'ic Plan. It includes remodalinq of Winq 30 (interior painting, carpetin9# wall a~ windov coverinqs, hardware, bandicapped restroom facilities, electrical improvements, retrofit of heating system boiler, removal of obsolete cabinets). EXPECTED COMPLETION: NOT SET. 52. 19101 MITCHELL PARK CCMMtJl'iIT'i CENTER DANCE rIME This project pLovidea for installation of a wooden dance floor in the game room to provide additional space for dance and exercise classes. PROJECT COKPLETED: THIRD QUARTER 1990-91. S3~ 191!)' CIVIC CENTER BUILDING FIRE SPRINlS'LEB SYSTEM This project provides for the enqineerinq analysis, design and installation of a fire sprinkler protection 5ystem for those areas of the Civic Center (including the Police Department wlnq and the city Council Chambers) 'Which are presently without a sprinkler system. This work will co~ply with the Uniform Fire Code requirements. EXPECTED COMPLETION OF DESIGN: FOURTH QUARTER 1990-91. 54~ 19109 POLICE(COMML~ICATIONS COMPUTER SYSTEM This multi-phase project will replace the current police computer system with a state-of-the-art int~rated police records manaqement and computer-aided disp~tch system. EXPECTED COMPLETION: FOURTH QUA!ITER 1993-94. 55. 19110 PRINTING SER~ES EQUIPMENT upGRADE 'l'his project will replace the obsolete duplicator in FY. 90-91 with efficient, upgraded equipment that will automate severai :manual processes .. thus increasing production capabilities. In FY 91-92 1 an offset press/duplicator and platemaker will be added to provide eddition&l productivity. EXPECTED COMPLETION: FIRST QUARTER 1991-92. 56~ 19111 INVENTORY QQNTR9L SYSTEM This project replaces the outdated stores inventory controls at the MSC warehouse with efficient materials inventory control and a related bar coding system. The schedule is dependent upon completion of related IFAS projects~ EXPECTED COMPLETION: NOT SET. 9 .. /' o 57. 151112 WAAEHOUSJ QPERAJ'IOMS -HAZMAT STORAGE UNIT Thi& project provides tor the purchase of .a containerited storage-unit to comply with feder-al and state laws ana regulations ror the storaqe of hazardous materials that are part of the XSC warehouse inventory. Two storage containers have been purchased, an~ the internal shelving is being purchased now. EXPECTED COMPLETION: SECOIW QUA!l.TER 1991-92. 58. 19413 MSC GARAGE yZH1ctE LIFT The project provided for the purchase of an above-qround vehicle lift at th~ City's MSC garage. PROJECT COMPLET£O: SECOND QUARTER 1990-91. 59. 19114 NEW VEHICLE PURCHASES This project provides for the purchase of new vehicles and equipment to be added to the city's fleet. A total of 12 units will be added during FY 1990-91. EXPECTED COMPLETION: FotJRTH QUARTER 1990-91. 60. 19115 PBX SOFTWARE AND HARQWARE UPGRADE This project is to upgrade and expand the NEAX-2400 digital PBX telephone system 1n order to maet departmental needs for telephone and data services by adding additional line ports, trunk and circuit cards, a T-1 channel ca~d and associated modems and software enhancements that will reduce the amount of technician time and improve efficiency in performinq moves, additions and exchanges to the system. The planned addition of hardware and software vill be installed in the thirO quarter 1990-91. EXPECTED COMPLETION: TIIIRD QUARTER 1990-91. 61.. 19116 WIDE AREA NEl'WORJ(ING This is a jOint project with the Utilitias Department to desiqn and install a wide. area network (WAN} tor computer data comaunications for a11 or the City's remote facilities that require the 'Use and cxchanqe of data. First year funding covers the study of various options and systems available~ and installations of modems and modem lines for remote locations during the study and design phase. EXPECTED COMPLETION: FOURTH QUARTER 1990-91. 62. 19111 HP 150 PERSOIlllL CO!!J>!JTER !<EPLACEMENT This project will replace the: 42 obsole:'t.e HP 150 personal computers with Vectra personal computers, which is the City standard for personal computer purchases. The first year funding covered replaCing 17 of the approved 42 HP 150s. All 17 units have been received and installedc EXPECTED COMPLETION: SECONO QUARTER 1991-92. 63. 19118 CARLE TELEVISION ~IPMENT This project will fund the purchase of portable cable television camera equipment l editinq equipment and a portable tape recorder aneS deck to be able to C3blecast other cOlDll'littee meetings beld in the Council Conference Room and other City 10 • • , ' i \ . , '---'.~:..~:~:,: ' ':'> -.~-.. locations. The firet year runding will cover the p~rchase of portable cable television c~era equipment to be installed in the Council conferance Room in February ~9S1~ EXPECTED COMPLETION: THIRD QUARTER 1991-92. 64 ~ l.lll.i CIVIC CENTER REMODEL AND RELOCATIOli This p::.-oject will address space limit.&tions on the second, third and fourth floors of the Civic Center~ The project components include space planning and desiqn,. construction remodelinq, voice/data wiring, and movinq4 EXP ECTEI> COMPLETION: NOT SET. 65~ 1912Q K]DD1.EFIEt.p WElL SITE TANK AND BunDING REMOyAL This project includes ~e removal of public improvements on a City site to make it available for future development. The work will take place in spring 1991. EXPECTED COMPLETION: FOURTH QUARTER 1990-91. 66~ 39590 SYSTEM FLOW METERING REPLACEMENt PROGRAM This onqoing project provide.s for scheduled replacement of system flow meters at the Reqional Water Quality Control Plant (RWQCP) to ensure reliability and accuracy. OUrlnq FY 90-91, a waste meter was purchased and put on-line. EXPECTED COI!PLETION. NOT SET. 67. 39591 PLANT EQUIPMENT RW.ACgMENT This onqo1ll9 project provides for scheduled replacement of RWQCP equipment for maintaining treatment reliability. EXPECTED COMPLETION. NOT SET. 68. 3iS?3 PLANT GROUNDS ~D LANcSCApING This project covers minor maintenance and repair of the reclaimed water irriqation system in order to maintain and upgrade the existing landscaping at the RWQCP. EXPECTED COI!PLETION: FOURTH QUARTER 1990-91. 69. 39~94 PLANT WATER Sy~ This projact will replace a portion of piping for the #4 water system to provide ~eclai.ed water for equipment washdown and landscape irrigation at the RWQCP. EXPECTED COI!PLETION: FOURTH QUARTER 1990-91. 70. 39595 ~BORATORX FACILITIES ~~D STUDIES This RWQCP project provid£s for new bioassay, efflUent characterization and data management, and replacement of certain laboratory instruments to JIIeet Regional Wat.er Qual tty Control Bo3rd requirements. The bioassay testinq rOOD was completed in July 1990. Effl~ent characterization is being conducted. EXPECTED COMPLETION: NOT SET. 11 .. ,. / '.-. , .•. ' 71. ]9596 HON-POINt EffLUENT tEST This RWQCP project provided tor effluent tests and development of eftlue~t and basin t.st plans 35 required by th~ Regional water Quality Centrol Board. PROJECT COMPLETED: SECOND QUARTER 1990-91. 72. 39598 ELECTRIC DISTRIRL~I9N 12KV tpof This project extends the preser.t electrical distribution system in a loop around the RWQCP p .... hich provides reliabilitr and the means of isolating specific sections without having to shut down the entire system. The project is approximately 95 percent complete. EXPECTED COMPLETION: 'l'HIRD QUARTER 1990-91. 73. 39599 STANDBY GENERATORS This project provides two 500kw emergency qenerators for increased reliability for RWQCP operations. EXPECTED COMPLETION: THIRD QUARTER 1990 -91. 74. 39§OO MOAT B2C1RCpLATION AND FILTRA1ION SYSTEM REPLACEMENT This RWQCP project replaced the 14-yaar-old recirCUlation and filtration system, which was unreliable. 75. PROJECT COMPLETED: FIRST QUARTER 1990-91. a year-old barminutors EXPECTED COMPLETION: ect to replace the present 25- more effective equipment~ FOURTH QUARTER 1991-92. 76. 32705 WASTEWATER RECLAlf.ATION This RWQCP project includes preparation of a plan to study the econcmic, techriical, environmental, and institutional feasibility of utillzinq reclai;:aed wastewater to irrig.ellte larqe turf and landscaped areas. The project also includes RWOCP modifications and purchase of equipment to produce reclaimed water. EXPECTED COMPLETION: NOT SET. 77.. 1971 Q VIBFJ..TION MONlTORI~OOIPKEN'l' 'I'his project .·ill ccver the pur-chase and installation of a vibration monitorinq system to monitor-and track vibration changes on each major piece of RWQCP equipment as part of the preventive maintenance program. EXPEt.'TED COMPLETION: FOURTH QUARTER 1990-91. REPOSE FOND 78. .f...5.1.Q.Q PALO Al,TO I,ANDFILL PARTIAL CLOSURE The project implements partial closure of 2(' acres on the southeast quadrant of the landfill. The placement of final cover· is in accordance with Reqional water Quality Board regulati01'ls~ EXPECTED COMPLETION: FIRST QUARTER 1991-92. 12 • /' 79~ 45120 PERMANENT LANDFILL DWL~E BEAUTIFICATION This project provides for construction of an aesthetically­ pleasinq enclosure around the stack of the permanent landfill qas tlare. EXPECTED COMPLETIOll: FOURTH QUARTER 19n -92 • 80. .'69Q BIXBEE PARK construction beqan in August after approval of the plans by the California Inteqrated Waste Manaqament Boa~d. Earthwork is substantially completed. Park improvements will be completed summer 1991. EXPECTED COMPLETION: FOURTH QUARTER 1990-91. 61. 45790 LFACHATE COLL~CTION SYSTEM Phase I of the three-phase project included a consultant review of existing data. on landfill leachate. Phase II included recommendations, co~struction plans and specifications. Phase Ill, construction of the system~ has been completed .. PROJECT COMPLETED: FIRST QUARTER 1990-91. 82. 45791 REFUSE ADMINISTRATIVE FACILITIES Phase I of this project includes installation of a new mobile office and personnel trailer l and con~ersion of the existing trailer for use as a tollbooth. Phase II included installation of weiqht 5cales at the landfill entrance. Construction has beoen completed. FROJECT COMPLETED: SECOND QUARTER 1990-91. 83. 4S801 GAS CONDENSATE COLI .. ECTIQN AND DISPOSAl .. S)"STEK This proje.ct is to construct a collection and disposal system tor qas condensate accumulated in the methane gas collection syste.1 vhich is required to comply with Environmental Protection Ag"e-nc1 requirements. The Agency has delayed implementation of this requirem~~t pending revisions. EXPE..'"'lED COMPLETION: NOT SET. 84. 45802 v.NDF:ILL LEVEE PROTECl'ION This project is to construct a flood protection levee on the northwest quadrant of the landfill to withstand washout from the loo-year Llood, as required by the Regional Water Quality control Board. EXPECTED COKPLETION: NOT SET. 8'rORM DRAINAGE B1iTERPRr&E J'DIII) 8S. 47702 COLLECTION SVSTEH IMPROVEM~ An erosion control project on San Francisquito creek funded jointly with the Saitta Clara Valley water District 'Was completed in November 1990~ A pump station telemetry study conducted with the Utilities Depart~ent will be completed in January 1991; desiqn phase may start in spr-inq 199.1~ Well abandomaent at the .former ITT property will be done as part of 13 !""""'----~------- , • . . ~ tha Marsh 'Enhancement Project starting in spring 199L A condition assessment of the existing storm drain system and development of an updated storm drain master plan viII begin in .pring 1991 and will extend over a three-year period. TO ensure compatability with the master plan, design of a neW' sterm drain alonq Everett Avenue will be delayed until FY 91- 92.. Construction of a ria .. pedlastrian/bicycle bridqe over Adobe creek at Duncan Place by the Santa Clara Valley Water District will start in early 1991. EXPECTED COMPLETION: NOT SET. 86. .770] STORM WATER QUAt.ITY IMPROVEMENTS Palo Alto continues to participate in the Santa Clara valley Nonpoint SOurce Pollution Control Progralll., an area-wide ooope~ative effort to reduce pollution from urban runoff. A five-year NPDES permit was issued to the Program by the. Reqional Water Quality Control Boord in July 1990. The permit requires the City to pertor= specific long-term activities, such as eli.ination of ill~g~l dUPIping and illegal connections to storm drains. moaific&tions to City ordinances and procedures, and monitorinq of stor.mvater runoff, to improve stormwater quality. This project;-thouqh subject to revision, will continue In some torm indefinitely. EXPECTED COKPLE'rION: NOT SET. 14