January 24, 1991
Honorable ~ity council
Palo Alto, California
STQJ)J BE COJVItJlr.ITY MOISE IMPACT Of S~ AMPBITHf~ CONCERTS
Me.JIll)ers of the. council:
This is an informational report and no COuncil action is requested.
The city of Palo Alto has remained in contact with the City
Manaqer' 5 Office in Mountain View reqardinq sound studies conducted
in connection with Shoreline Park Amphitheater.
staff has recently received a copy of the consultant report,
-Measurements and Mitigation Xethods -Community Noise I~pact of
Concert Operations at the Shoreline Amphitheater-by smith, Fausa
and MCDonald, Inc. The ExeC"..ltlve. Summary of that report is
attached for your information, and the complete report is available
in the city Manager's Office.
COnnie Martinez, Assistant to the Mountain View City Manager, is
the contact person for this issue~ )Is. Martinez has infol'!l.ed staff
that the Mountain View City council directed amphitheater staff to
work with the performers to voluntarily reduce sound below 98 db on
occasions when the inversion is present. This weekJ Mountain View
staff will be mailinq the study information to the Palo Alto City
Council and each Palo Alto resident who has complained about the
noise. Also, Mountain View staff has indicated willingness to liIeet
with Palo Alto staff to discuss the report.
Staff will continue to coordinate activities regarding the
amphitheater noise and monitor progress on that issuea
Re;pectfully sab~itted, ... jzi ~~~:J A~stant City Ma~er
Attachlllent
CMR.130.91
-, -
o o
EXliCUTIVE SUMMARY
The purpose 01 this report is 10 provfde the City 01 Mountain V_ with a summary 01
finO"",s rogarding the cau."," 01 concert sound impacts which have been occurring in
neighborhoods up 10 four m,es WW3'J from the Shoreijne Amphitheatre !aolity in Moc.r.tain
V_ and 10 present a lsi 01 potential solutions 10 lTL~e these SO<..-1d impacts.
MEASUREMENTS AND METHOOOLOGY
The acoustical engineering firm 01 Smith. Fause & McDonald, he., (SFMQ was retair>ed
by !he City 01 Mountain VIeW during the 1990 Sherer"", Amphitheatre concert season
• oonduct !ield sound measurements 01 !he sound irnpac1s oc:curring in
neighbort.oods,
• determine 1he cause(s) 01 these concert sound impacts, and
• develop a list 01 potential solutions 10 mitigale the sound impact
A complete descripIion 01 the data and methodology 1JSed by SFM! to produce this report
-os provided in Appendix A cI the report.
AN DINGS
Upon review 01 historical and recent1y coIIec!ed data from sources indu<flf'lg
• puOrlC weather data,
• concert sound c:omp!aint maps prepared by City 01 Mountain Voew staff,
• sound level rroeasurements (Strip chart sound level recordings) taken by the
Sherer • .,., Amphitheatre sl¢f, and
• data coIIec:ted by SFMI during their synchronous recorclng during several concerts
during the 1990 concert season.
the report presents !he fDi10wing findings regarding concert sound impacts and
complaints
• peak concert sound romplaint activiIy does no! ciirectly relate 10 peak sound levels
within the Amphitheatre. Some 01 the Ioudesl concerts have produced no complaints,
• !he oca.nence 01 complaints appears 10 be highly seasonal. Peak complaints are
Shorefrne C<lmmunity Noise 1mpact
SFMI Project 670301.3
Measurement & M"digation Methods
; ,
•
, ,
,-... -
o
c:oncemrated In ~ and August, when t"mperature inIIersions are strongest.
, !he majority of the sound complaints occur when !he bottom of an inIIersion is reported
to be within 500 10.1,000 f<>et of the ground,
, sound levels within the Amp/litheatre do no! necessan1y rise significantly across IMe
time period from the final intermission 10 the end of tI'.e show, even though the majo<;ty
of oomp!aiots come dumg this period,
, r a strong 'sound chame!" !-.as been establIShed as the resuft of an ",version, the level
of sound impacts In !he neigI1borhoods can be direetJy controlled by so.;oo levels
within !he A,np"1itheatre,
, the use of contempo!'ary subwoofers Oow frequency speakers) is not tl'ie sole source
of sound impacIs In neighborhoods,
, low and very low frequency sound impact is the dominant impact of the Amphitheatre.
/4..~ e feSUit, ft:'i.abfe assessment using conventional noise ordinance limits is not
possible, and
• only significant reduction of the sound !eve!s leaving the Amphitheatre would be likely
to substantially reduce comp!aints. Ever, highly effective solutions may no! be sufficient
10 BIlminate complaints due 10 residual low frequency sound levels.
POTENTIAL SOLUTIONS
The report identifies and evaluates arch~ectural and operational solutions as pctentia!
methods to rMigate sound impacts i1 the neighborhoods located to the north of the
faeiiiIy. .
Architectural Solutions
, k1staIIation of a high barrier waIT at the back of the facmty.
• nstaftation of a permanent 'cage' to restrict the i1staITed location of the touring sound
speakers.
, hstaIIation of a "Dying canopy" to catch sound as I heads up through the tent arms.
• ntaJation of a permanent '!rani of house' (main) sound system,
Other potential architectural soI"JIions which were identified In the report, but are
considered impractical lor actual implementation lncIucIe
Shoreline Community Noise ImpacI
SFMJ Project 870301.3
2 Measurement & Mitiga~on Methods
•
. .
o
• i16IaIIation of a system of permanent up-dra!t fans to disperse the rwersioo layer,
• roIalion of the entire Amphitheatre to direct concert sound toward the San Francisco
Bay, and
• encIo&ute of the Amphitheatre.
Operalio1la1 Solutions
• Limit SOU!1d levels at the back wall of the facility
• Continue to improve weather and or sound propagation monitoring, i1 effort to
predict impacts.
• Schedule July and August events during the day time, or discontinue events during
these inversion prooe months.
Tr.e report does not specifically address mitigation of sound impacts to the South
(principally 0CCUfTing i1 a nearby mobile home complex), owing to very limited data and
the distinctly differenl nature of solutioos that may be required.
RECOMMENDED ACTION
The report recommends further investigation of permanent physical, arch~ecturar
solutions, rather than op6f8IionaI ones, given lI1e poor !rad< record 01 the latter at sim,ar
Iacilities and at the Shoreline facility.
As physical solutions may prove prohibitively eKpenSive, however, \he repoo1 recommends
that the next step fOr the City of Mountain Voew 10 be a cost assessment of the potential
solutions most favored by the City Council by parties quar.'lied 10 do so.
The report also recommends that given the refl8nCe cI. bot" this report and \he City 00
Ihe soundleve! data measured 00 sound mon.~Ofing equipment owned and operated by
the Amp/'.itheatre, that the mon~Ofing equipment be factory caJlbrated each year.
ShofefIll8 Community Noise mpact
SFMI Project 870301.3
3 Measuremenl & M"fIigatioo Methods
. '