August 9 ... 1990
THE HONORABLE CITY COUNCIL
Palo Alto, California
Duncan Place ___ pedestrian/Bicycle Bridge Rf!!!plac!:,:!ment. err 47702 -
Santa Clara Valley Water Qistri~9§t Sharing Agreement
Members of th e council:.
This repo·rt recoIIUtends that Cou.lICil approve and authorize the Mayor
to execute the attached agreement with the santa Clara Valley Water
District (District) in the amount of $29,000 for replacement of the
Duncan Place Pedestrian/Bicycle Bridge. Funds have been
appropriated in elP 47702, Stcr.m Drainage Collection System
IJlprovements~
Background
The October 1989 earthquake caused extensive damage to a City
pedestrianjbicycle bridge located at Duncan Place and Adobe Creek.
Tw~ of the three main support beams and their cross members were
split and the third support member vas pulled from the bridge's
concrete abutment. Due to this extensive damage, the bridge was
Immediately closed. Prior to the earthquake.. the District: vas
planninq to raise and modify the existing bridge to accommodate the
new Creek improvements. However, due to the damage caused by the
earthquake, staff asked the District to install a new ..
prefabricated bri6ge and make improve!!!ents to the bridge awr-oaches
inclodi!l9 new pavement, bollards .. and bicycle signs at City cost.
Discussion
The attached agreement provides for a new bridge and improvements
to the pedestrian/bicycle path between Duncan Place and Creekside
Drive. The project limits are shown on tbe map marked -Exhibit A
attaChed to the agreement.
The District is preparing the plans and specifications and will
advertise for bids and administer the bridge construction as part
of a contract for improving Adobe Creek. The plan!;. have been
reviewed by the Palo Alto Bicycle Committee and their comments have
been incorporated into the plans. As with previous District
projects.. an extensive neighborhood outreach program is being
-1-
CMR:464:0
•. _.-• .c.
\
\.
\ '.
-, -.\, .";'~'''''):~
•
, ,
-
'-
.-
o
pursued to keep residents informed and to seek their input before
the desiqn is finalized~
The estimated City cost for the new bridge and bridge approach
iJllprovement.s including: design and administration is $29" GOO as
indicated on Exhibit B. Funds have been appropriated for this
purpose in CIP 47702... storm. Drainage Collection System
Improvements~ The District will be responsible .for all new
retaining wall costs as the need for this vork is caused by the
creek improvement project. The city's Public Works Inspector viII
monitor all bridge related construction to ensure compliance with
Palo Alto ~tandards. No substantial change in the scope of work
will be made durill9 construction 'Which raises the total cost. unless
the District receives prior written approval from the city.
The project. was expected to begin this summer; however, the
District has IlQt been able to ootain construction right-of-way
agreements from all the residents along Adobe Creek~ As a result~
the city vas notified by the District that the start of
construction would be postponed until spring 19'91.
The existing bridge can not he repaired due to the poor condition
of the wood deck and supports which have rotted. However, City
crews will construct a temporary wood bridge deck approximately one
foot above the existing deck -with asphalt ramps on both ends. The
temporary bridge will be opened by September l~ 1990, and will bE
removed next spring when creek construction begins. Although the
cost of materials is estimated to be approximately $2~OO'O, most of
the lumber can be salvaged.
E'nvi ronmeot.a 1 As s e S9 m~_n.t
The agreement states that the District will act as lead agency for
compliance with all applicable environmental la~6 and regulations,
including the california Environmental Quality Act~ Palo Alto will
act as a responsible agency for purposes of the Act~
Recommendations
staff recommends that Council:
1. Approve and authoriz.e the Mayor to execute ~he attached
agreement with the santa Clara Valley water District in the
amoont of $29,00,0 for" Duncan Place PedestrIan/Bicycle Bridq-e
replacement.
2~ Auth~rize the City Manager or his designee to negotiate and
execute amendments for services related to or incidental to
the scope of work or services, the value of all of .... hich
amendments shall not exceed $4,500.
Respectfully subDitted,
-2-
CMR:464 :0
\ . • \
\
-\
\
. ~ .
,
,
o
GEO~~
Assistant Director of Public Works
DAVID G. ADAMS
Oin;ctor of
I , I
IJ-........ ""'~ ,; E FLEMING ~sistant city
/
o
Attachment5: Santa Clara Valley Water District Agreement
oc: Palo Alto Bicyole Advisory committee
Greenmeadow community Association# Inc.
Palo Alto Unified SChoo1 Oistrict
-3-
CKR:C64 :0
•
·.;--;~---.. '-r n,..
1
I
---------
-
-." ...
o
AGREEMENT
BY AND BETWEEN SANTA CLARA VALI.EY WATER DlSTRJCT
AND (lIT OF PALO ALTO
SAA'TA CLARA VALLEY WATER DlSTRlCJ~;Ii pubric<:orporation. fLISt part)t~ bereinafter
coiled "District"; and
OTY OF PALO ALTO. I municipal corporation, second party. bereinafter~ caned "Palo Alto"';
AGREE Ihis as renows:
RECITALS:
A. Palo Alto owns and maIntains I footbcklge CfOSS"illg Adobe Creel: bet .... een Duncan Place
and' Creebtde Drive in Palo AM. Certalc. c:..':tannel improvement wori: planned by District (fu::eIn aftes
eaJ1ed Ole .... Project·") requ'ices thts foocbridge to be raiSed' and modified. Palo Aha bas requested District
10 include this wort in the Project.
B. This Agreement provides for the rost sharmg for raising and modification of the
iJo~e and surrou.oomg improvements and tfle insta11 atwn ()f betterments as [lated above (,bereinafter
caned "Palo AJtowl Work~' at PaIo AJto~s cost in conjullCtion ... ith rtJe Pr.oject. Betterments im,iud~;Ii
new prefabricated footbridge "'ith .railing and fencing, widenIng of the existing bile path behreeu Dunc.an
Place and Creetside [)dve and other improvements including Dew pavement, bonaros and bike signs.... District·, share includes costs to raIse the existIng bike path including retaining waDs. embankment,
fencing and other appurtenances _ The Project location is sbowl1 00 ;II m~ thereof marl:ed "Exhibit A ......
bereunto attached and made I part hereof.
L Plans and Spedfic:ations Preoarati.oo and Construction Adm inTstranon. Distrkt ",ill cfesigD
and prepare plans and specifications for the Project and submit <:apies thereof and engineer"s estimates
10 PaIa A1to fOe review and approval_ Fonowlng paro A1to"s approval, District wilt advertise for bLds
b--constructicn of the Project., and include Palo Aho·s Work.. Fol'lowing receipt of bids~ Distrl....; win
submit to Para Alto the bid DW.rkt totends to accept for the Proje<;t_ If PaIo Aha dlsapproves of said
bid, District Man revise the coc.tract so that instaI1aoo!l of I new footbr1dge and proposed improvements
o(!he existing fOO( path shan no longer be .. part of the constructJoc. contca\.."1... District shartlbeR iP'ard"
and administer the construction contract. No substantia) cbange in the s<:ope of Palo Aho's Woo shan
be made nor s!lall autfloriz.atioD be given to increase Palo Mo·s Work quantities for any extra: wori::
whiclt .... iII JuJve Ihe. effect of raising the cost of PaIo Aha"! worl: wlt1lout the prior" writteD approv.al of
PaIo Aho_
2_ ~.~Qjji. 11. is agreed (hat tIle estimated P.aJo Aho cost is $29,000_00 and me
mimaled District'"s cost is $34,800.00 of the $63,800.00 lOla!' contract cost in accordance lIo'ith Exhibit B.
so mmed and bereunto attaclled and made a part hereof. final C{Jst for PaTo Aho's worl: ~aII be 3..'tUaI
bhf cost pTus any possible extra .'od: cost as approved by Palo Aha and actuany incurred by Distrk't,.
plus 25$ of Pal'o Alto·, final' cost fOl" estimatoo design, contfa\-; adminlstrati(l!l~ and survey costs_
AG7&79
;j ;,.~ ,
)
-~, -..... , -.
•
, "
-
~ '"; -J .
-~.~..:'>'
o o
3. Projl'ld Coordjnat<.)lJ. The parties ~ree that ea.:h .... 'ilI ido!ntify a Proje-..."1 Coordinator and
DOtify the otller of b is Of her identity and tdepboae numher. AN correspond'ence. notkes and
rommuniQt1ons regarding Ihe Proje\.t shan b~ sent 10 the Project Coordinator at the l.>now\ng addresses:
Palo Alto:
District:
250 HamLhoD A\lenue. Palo AIlo, Ca!irornia. 9430 l
S7SO Almaden Express""ay~ San Jose~ CaTiCornia,. 95113
c. Qmosits by Palo AM. Prior to advertisement or the Froject, District shall prepilTe I
revised estimate oflhe cost of Palo Afro's Wort: and tnform paro Alto 0( same in writing. Palo A1to shan.
Ihea deposit with District sajd estimated cost.. During the period of deposit, interest earned Ihereoa b)'
Oistrid prior lO use in. paymeDl of Ihe construction contract sllafJ be credited to Palo AIto+
If the amount bid foc Palo Arto's Work: and associated percentage for design, contract
administration and survey exceed!. the deposit b}' iii Teast S 1,000, PaJo Alto wm~ upon receipt of in .... oice
Iberefor. deposir: the difference with Dlstrkt. Conversel,.. it Palo Aha's Work and associated percentage
b design.. contract administration and survejl is at least S I,OIXlless man deposit., Distrid: "ill refund 10
Palo Aha suelt additioDal amount with said statement.
Within 90 days foIlowing construction of the Projeo:."'l,. Distrkt YlaIJ submit to Palo Alto a certified
stZement of iremIr.ed cost for Palo Alto's WOCL If dle ("mal cost foc PaIo Alto'"s Work exceeds the
deposits made. Palo Alto ihan pay such addition~ amount to me District widl Ln t7l Lrty (30) daj of receipt
olsuc1l. statement. If the final cost for PaID Aho's W(.>:"" is less than tJle deposits, DLc:trict shan refund
to Palo Aha JUdi add"rtIonai amount with said statement.
S. Enyi .. vomcntaJ Law:; and Regulations,. The parties agree dial: District will act as lead
IIerIC}' lOr compliance with. an appUcahle environmental taws and regulations. incluamg the California
Environmental Quarrt)' Act. Para Aha wrn let as I responsible agency for purposes of said Act..
6. MaIntenance of PaJo Aho's Wort Uoon Completion. Upon completion and acuptance
ofeonstntctioob)' paro Alto and District of the Project., PaIo Aho shall immed'iateIj resume malntenance
and ownership responsibilities i:x the footbridge and appurtenances.
1. Final Drawings. District s1l.arI fumi~ paro ALto with .. set of reproducible record
drawings and copies of any soils reports for: paro AJto's Work.
I. Hold Hannl»,,;'!.. The parties agree mat each sllan indemnify and ho1d harmless the c.ther-~
tIlcir respective ~ agents, and employees, from any and aJ1 [lability, obligations. damages., costs,
injuM, including death., a.1')d' claims for property damage, arising in any manner from t!:Je perfonnance
or !allure to perform,. on the pan of the indemnifying party. the provls>Ons of this Agreement..
9. Liability Insurance. Dlstrkt shan require !fie contradof engaged to perform tbe Project
ao int!emnify am! defend £be parties heretu and each 0( them and to provide and maintain in fun force and
effect during tlle construction of tile ?rojet..""1 and until the acceptance of the Project by District and Palo
AJto, .. policy of pubr>c liability and' ,property dWlage insurance insuring eack of the parties, hereto, dleit
officers, agents and empToyees, in connectk>n II.'ith the construction oftlle Project. The terms, provisions
and conditions of suell policy will be mose whick Distrkt usuafly require:; wlth !:be type 0( constructioQ
contemplated for the Project.
Said poriey wan cuotaic. I provisioc dIal me insurar;ce afforded theret:y to eacll of the parties
Ile.relO and Ibeic respective offK~ and employees shan be prlm3C)' insur311ce to che fun timits of lial'lility
0( lhe poncy .and thar: if said' partIes hereto. oc the'~ respective officers and-employees, bave mher
insurance against iI Joss covered by sud" policy. su.;h other insurance ~an he ellcess insurance only.
AG7i79 2
,
• " , .,
\
" \
\ .~ \' , ,.
,
!
"
'-", .-
~
•
o
Suck policy sban abo wotain I provision or endorsement stating that e".rCa or tbe p1U'tie:s bereto are
additionaIl y insured uooer (he pol1ey_
JO. kol'ds and Accounts. District shan teep, QtJint.Jin and male available fOl'inspection
IIJ' aulhorizod' representatives of PaID A1to records and books .'bid! wilt provide i complete.and .accurate
account of all costs, fees.. Md e1l.pend'ttures made by DEstrk"t foc dle Project.
II. Termination. This Agreement sha..1 terminate 00 No .... ember ' .. 1992 if District bas DOl
IW3tded I contract fol' constr'\.lctioQ of Ole Project pdoc to rbal dale, unlw said date is ex-tended by
mutual' agreement. Ia the event of suck termination. District sbarl refund to PaIo Aha an, and an sums
advanced f,y ... less aD costs and expendirures 'IlIerewfore made by District for
Bems desaibed berem as part of Palo Aho·, Work. This Agreement ma,y be rermLnar:ed by eitbes part,
II: any time prior 10 tea days before award of contract fo£ Proje...'t COnstnJC60D by serving writteR DOcice
10 CfIe other party. subject 10 the aforementioned coOOlti0ns.
WITNESS TIlE EXECUTION HEREOF the day and year (U'st bereTnabo .. 'e wrineD...
APPROVED AS TO FORM
General Counsel
APPROVED AS TO FOR.'d
C"1Iy Attorney. Palo AJto
A<;7879
SANTA CLARA VALLEY WATER DISTRICT
By: ___ _
ChaIrman.,. Soard of Dire...'1ors
"District"
A TIEST: SUSAN A. PINO
-------~7::c,.------
Clerk of t!1 e Board of Directors.
CITY OF PALO ALTO
By:, ______ _
"'PaIo Alto'"
ATIEST:
--------------As.srstant City Oer\.,. PaT () A fro
•
•
:;' ... ,.-
' ..
\
EXHIBIT
NOT TO SCALE
;:":,
..•.•. ' "".:i
, .
-
o
6. Curl> .t Outler
1. Remo~e Em Bridge
I. ExcavaOOD
9. Embanlanoot
lQ. Remove Exist Walk
II. Bonards
12. Bile signs
Il. j'" Waterrme Valve
SUBTOTAL
Contingency (15~)
SUBTOTAL
Admjnistratio£l (25~)
TOTAL
AG7a7~
. .;..-
EXHIBIT B
ADOBE CREEK
o
DUNCAN FOOTBRIDGE CROSSING
COST ESTlMA TE
...L
EA
M
CY
:lOO
LF
l.3ilQ
SF
12
CY
ill
LF
LS.
.22
CY
W
CY
m!
SF
l
EA
J_
FA
...L
EA
UNIT
00S1
$)0,800.00
425.00
16.00
35Q
425.00
12.50
L.S.
20.00
15.00
1.50
150.00
150.00
350.00
TOTAL
.m:>:L
$10,800.00
10,200.00
4,800.00
4,550.00
4,250.00
2,625.00
2,000.00
1,809.00
1,209.00
1,200.00
300.00
300.00
350.00
$44,402.00
~,660.3O
551,062.30
12,737.10
563,800.00
CPA
00S1
$10,800.00
0.00
1.soo.OO
1,7!l6.25
1,593.15
0.00
2,000.00
0.00
453.38
1,200.00
300.00
300.00
350.00
SCVWD
.!Xl.S.L
$0.00
10,200.00
),300.00
2,843.15
2,656.25
2,625.00
0.00
1,800.00
155.63
0.00
0.00
0.00
0.00
520,212.38 524,189.63
3,O3\'!'6 3,62g.«
S23,244.H 521,llC.OJ
5,155.71 6,981.93
$29,000.00 $34,800.00
\.
" ,
•
, .