August 2 .. 1990
THE HONORABLE CITY CO{)NCIL
Palo Alto, California
o
.f.ll.ts Site Aocess for the Disabled. elP 18810 -:"" Award of Contract
Members of the Council:
This report reCODllCends that Council aloiard a contract to AMBO
Engineering in the amount of $6~,,287.50 for the Parks Site Access
fo.r the Disabled capital improvement project. Funds have been
appropriated in elP 18810" Parks Site ~ocess tor the Disabled, and
CIP 18903, Sidewalk Replacement.
Background
The initial phase of this project" completed in January 198B ..
provided site access t.o 13 neighborhood par)::::;. .. the Lawn Bowling
Green, and College Terrace Library. Handicap parking spaces"
signs, stripi.ng, and handicap ramps were installed at various
locations for safe and easy ~ccess to the sites.
piscussion
IlIlprovements under this project will be at Briones, Mitcbell,
pardee. Peers. Ramos... and Rinconada Parks; and work includes
installation and modification of picnic tables. installation of
water lines and handicap accessible drinking fountains... and
construction of concrete pathways and ramps for-the disabled.
painting of traffic stripes, pavement markings and curb markings
for the handicapped also are included in the scope of ~ork.
Funds from elP 18910). Sidewalk ReplacelZ!ent" will be used for
construction of concrete pathways and handicap ramps" and
construction of concrete platforms for picnic tables. The balance
of the project. includinq ~ater lines" drinking fountains. picnic
tables and strIping" will be funded .from elP 18810 ... Parks site
Access for the Disabled.
Requests for bids were mailed to ten contractors. AMBO
Engineering, with a bid of $64.281.50, was the Oflly contractor to
respond. This bid is 10 percent above the engineer"s estimate of
$S!,325. Telephone conversations with several of the non
respondents indicated that the following factors influenced their
decision not to. bid: the wide range of disciplines (concrete ...
plumbinq, furniture, striping) involved in this project. the widely
-1-
CMR:H1:0
•
,
"·r .
,
I
J : I
~
-
o
dispersed work sltes l and the large number of bids baing prepared
by their firms tor other work this summera
Past experience has shown that rebidding of projects in an attempt
to solicit additional and/or lower bids generally results in higher
bids and reduced cooperation from. contractors.. I.s the sole bid
received froa AMBO Engineering is within an industry-accepted 1Q
percent of the engineer~s estl.ate l staff has determined that their
bid is competitive and recommends it be deter.ined by Council to be
a reasonable bid and the contract awarded accordingly.
Recommendat.ions
Staff recommends that council:
1. Approve and authorize the MayOl' to le-lCecute the attached
construction contract with AMBO Engineering in the amount of
$64~281.S0 for the par~s Site Access for the Disabled project ..
2. Authorize the city Manager or bis designee to negotIate and
execute one o~ IDOre chanqe orders to the construction cont.ract
,.,ith AMBO Engineering, the value of all of Yhich cha.nge orders
shall not excee~ $96500~
R~spectfully submitted,
'#d.L,~d'
MICHAEL H. MILLER
Deputy Oirector l Public Works Operations
(l~J QJo.--c--
DAVID G. ADAMS
Director of Public WorKs
Assistant city Manager
Attachment:
CMR:451:0
"I." . . ~' .. b..-
Bid Summary
Coot.ract paqes
-2-
•
-
--• • -~ · . ::! • •
· ·
" t
" ~ :
i • 1
• • " ~ · . it ...
0.
,
,I
.""~""":':~;;';~.': ; ......... .; ........ ,.~:"~.~"".'''-' ...... ~.,.-' ............... .:...: ..... ~: «-
... /
,-
o n '-'
---
8 8 .. ~
8 ~ ;: t g
Ii ; " ji
~' 'i
---
8 8 e
0 8 e e
Ii ..
N 0 ~ .:
0'
~ i
'i
•
:i
8 g 8 g ,,;
:1 l:: &
i
e
J"
g
,-
0 I 8 g
:: ::l §
'" •
: ;;
~
I
8 .;
;;
:i
~
!!
'i
g
~
;;
~
~
i
_J
:;:
,~
i
• • ~ I,
g
g
~
oj
!
!
i
0
0
~ .;
;;
0
0
c ;;
fl-~ ;;
L
8 g
0
0
..
0 • 0
i ;;
J
0
0 g .
§ .. "-• :<:
;; "-~
;; :If •
,
o o
CONTAACT
THIS AGREEMENT, ~ade and entered into... in duplicate J this
day of • 19 ____ , between the
city of Palo Alto. CalIfornia, hereInafter called ·City· and
AMBO En&ineering
hereinafter called ·contractor,· whose TaKpayer IdentIfication
Number is
WIT N E SSE T H
For and in consideration of their :mutual covenants, the
parties hereto agree as follows:
1~ Contractor shall do all the work and furnish all the
K'lat.erials necessary to construct and complete in a 9QOd,
workmanlike and substantial manner and to the satisfaction
of the city of, Palo Alto, the followinq:
2.
A.
B.
C.
O.
E.
F.
G.
B.
J.
J.
X.
PARKS SITE ACCESS FOR THE DISABLED, CH lS810
This cont.ract. shall consist of the following documents on
1'ile ,with the City Clerk... all of which are incorporated
herein and made a part hereof by reference thereto:
This Contract
Notice Inviting Sealed Proposals
Accepted Proposal
Standard Specifications dated 191~1 as amended r or as
superseded by other documents i~rporated herein.
General Provisions
Technical Specifications
Certificates of Insurance
'Performance Bond
Labor and Materials Bond
Affirmative Action Guidelines and Compliance Report
Any and all supplemental agreements which amend or extend
the vork contemplated and WhIch may ~e required to complete
the work in a sub~tantial and acceptable manner.
J. In consideration of such work, City shall pay Contractor the
amount specified in his bid in the manner provided in said
Standard Specifications dated 1972, as amended~
4.
5.
:"';-"'---.
Concurrently with the execution of this contract, contractor
shall provide City with the Contractor's Labor and Material
and Faithful Perforzance Bonds and certificates of insurance,
including any worker's compensation insurance required by the
laws of the state of california or otherwise required in said
specifications.
ThIs contract shall not be assigned by Contractor.
L
• \
\
~,. \-
.,
"
." t~-
'.
j
""'<
. ~ -..
-"~;.;> ,-'~> -
.···"~~~ti.·;'"'l-"-' •. --,-""-;--,,._ .-f. /
o
6. All claims by Contractor regarding extra york, charges", del~)"
or other disputes arising out of the Aqreement must be
submitted to City in writing within ten (10) ~orking days
after the claim arose", describing in detail the nature and
value of the disputed work or claim.
1. Contract.or hereby agrees to indemnify. defend and bold
harmless City, its officers", agents, employees from any and
all de.ands", clat.s or liability of any nature, caused by or
arising out of Contractor 1 s", its officers', Agents· or
employees' negligent acts", errors", or omissions", or willful
.isconduct, or conduct for wbich t.he law imposes strict
liability on Contractor in the performance or nonperfo:rmance
of this Agreement.
S. This Aqreement represents the entire Agreement between the
parties with respect to the purchase and sale of the
equipment.. materials, or supplies or payment for services
which :may be the subject of this Contract~ All prior
agreements, representations, st.atements.. negotiations and
undertakings whether oral or written are supersede~ hereby.
IN WITNESS WHEREOF. the Parties to these presents have hereunto
set their hands all on the day and year first a~ve written.
ATTEST:
city Clerk
APPROVED:
city Manager
Public Works
Risk Manager
APPROVED AS '1'0 FORI(:
city Attorney
-
CITY OF PALO ALTO. CALIFORNIA
BY __ ~~ __________________ ___
Mayor
CONTRACTOR:
BY~=~ _______________ . __ _
Title
TAXPAYER 1.0.' ________________ _
OATE: ______________ __
-. -
\
,