This report. recommends that Cou·ncil award contracts to SCS Field
Services in an amount not to exceed '$50" 0.0-0 Eol:' landfill gas
collection system maintenance~ and to The Mark Group in an amount
not to exceed $SO.OOO for leachate collection and removal system
maintenance. Funds have been appropriated in the FY 1990-91 Refuse
Fund operating budget.
Background
A landfill gas collection system (gas system) and a leacbate
collection and removal system (leachate systeD) have been
constructed at the Palo Alto Landfill u·nder requlatory mandates of
the Bay Area Air Quality Management District and the California
Regional Water QUality Control Board. Each of these systems
requires ongoing maintenance as described below.
The gas system bas been leased to the Palo Al to Landfill Gas
Corporation (Corporation) under an agreement approved by Council on
November 20, 1989 (CMR:525:9}. The agreement requires the
Corporation to operate and maintain the gas system.. with the
exception of maintenance necessitated by on-going landfill
operations, or damage caused by vandalism. The contract covers
those maintenance and repair activities outside the corporation's
responsibility, ~bich includes disconnection of methane gas lines,
reconnections l and raising the system to accommodate landfilling
operations.
The leachate system .... as constructed at the Palo Alto Landfill under
the requirements of the California Regional water Quality Control
Board. The leachate system maintenance contract covers all related
maintenance and repair activities. Typical maintenance tasks
required for refuse filling operatIons include disconnection of
leachate 1 ines and air hoses, raising of wells and lWell :head
-1-
CMR:45,O:O
'C---"-·L":_~ < •• _:....'._.
•
• ~. .-,
--
\
\
~
2
,-
" t"o ,
,
J
~:ii~~t·
, :;' ~ '. r
""'i:'
o o
assemblies. bi-weekly inspection of all system components.
quarterly servicinq of the system compressor, and periodic
adjustments to individual pumps to ~aintatn optimum pumping ~ates.
Based on the type of maintenance required for each system, various
skills are required. Staff requested bidders to provide hourly
labor rates for various categories of workers (see attached
summary). The hourly labor rates, t.he markup percentage for
required materials. and expertise with leachate and qas collection
systems", were considered in determining the lowest responsible bid.
Bids were received from four contracto~s, as shown on the attached
summary. Three finns (Emcon, Laidlaw. and SCS Field Service)
de~nstrated prior experience with la~till gas COllection system
maintenance. Staff detel'11ined the. bid submitted by SCS Field
Service to be the lowest responsible bid for the 9as collection
system &aintenance contract.
Only two of the four contractors bid the contract for the leachate
collection and removal system. The Mark Group bas had prior
experience in designing and constructinq the present leachate
collection system at the Landfill. Based on their demonstrated
eKperience, staff determined The Mark Group to be the lowest
responsible bidder for the leachate collection system maintenance
cont['"act. .
The maintenance to be performed under these contracts viI) be paid
on a time-and-materials basis. Based on past Refuse operations
recot"ds and maintenance cost projections provided by the system
designers# staff est.imates that each contract amount yill not
exceed $50,000. Both contracts are for one year, with the option
of extending eacb contract for up to two additional years. The
exercise of this option is based on each contractor's performance
and council approval of funding for each additional year.
Recommend~
Staff recommends that council:
1. Approve and authorize the Mayor to execute the attached
contract with SCS Field Services in an amount not to exceed
$5-0 .. OO'i> fo:r the maintenance of the Landfill Gas Collection
System ..
2. Approve and authorize the Mayor to execute the attached
contract with The Mark Group in an amount not to. exceed
-2-
O!R: 450: 0
----..---._-. ---
. ,
:~!+~~~!:"
. ,
-
,
•
•
~-~
~ ".:t" ..
I .
..
/
o o
$SO,ooO tor lrIaintena.nce of the Leachate Collection and Removal
System.
Respectfully submitted,
.~/g;';:~£.
MICHAEL H. JIlLLER
Deputy Director. Public Wo.rks Operations
CMR:450:0
Bid Summary
C(){ltract Paqes
-3-
."
\
/ / .. -
L·
I
I ,
r ii .. . I ,
I
I
I
i
,c,-
L,
,-.-
n 1 0 SUMI,IM·!
Ptojoct &n~1neol": Bussell Re1:ierel"
Project: Landfill Eny1~onmental Cootrol System~ Mointenance • . CITV OF PALO AL,O
Punds Dudgatad :_L1QO.OI1ll~00,-__
SUI"iIARV OF ~ID5
Item I\tlpr •• , O .. crlptlo~ No. Quanti tv.
Go. Exuactlon , I . Lobor Stra1ght .
Ga. Extroctlan
2 LaboJ" Ove .... t1me .
Gas Extract10n
3 Tochn1clon Stra1ght
Gas ExtrdCtlon
4 TechnlCI.n Overtime
La.chot. Extraction
b Labor Straight
Leachate Extraction
6 Labor Overtime
Leachate Extraction
7 Technician Stra1ght
Leachate Extr~ction I B
Tech1cian Overtime
l.achate Extraction
9 Engineer Stra1~ht
Leachate ExtraCtion
, 10 Engineer' Overtil11e
L.achate Extraction
11 Iionthly Repoet
DireCt Co.t Mark-up
, 12 (overhead & prof1t)
-'--'-----. -'~ . ~ ..
,. ',: ,Y:
:'.
,. -"~I ': :<, .' -'/" "
,
. ~
.,.
ENGINEER'S
U~1t
Pr1e@
,-'-,
ESTIMATE
Totll
"'",,,-, ~
"'~" ..
\~
""
SCS F1eld Serv1ces
U~1t
Price Total
30.00hr
36.00hr
38.00hr
45.00hr
30.00hr
36.00hr
38.00hr
45.00hr
68.00hr
8LOOhe
58.00he
I 10% .1--:-. ___
f
-'r.,
R.R UY1_
1ho Mark Group
Unit
Prict! Totll
25.00hr
31.25hr
45.00hr
56.25hr
125.00hr
31.25hr
145.00hr
, 6.25hr
2.00hr
~o.OOhr
2.00hr
15%
" .. <I~.~
1"-7 "" '
..
, ~
Paget 1 of 2
UIU Oate: wmc
Ga. Recovery Sys tom,
, ,
Unit
P .. 1c~
9.44hr
~7.63hr
p9.44hr
7.63hr
28%
..... .-'"
Total
0
()
",.-,'-'
l~-f~~;.'l
'-MI-, (, ,-, ,"--
""',' .','
,~·t;'~_!-: ;":1-\
y ..... ,
" .',
/---", '
I
1 •• '/ :,'
l-~ l, , · , , ., :, ' " , , • I
I
l , • I· ,
I
•
,,:r,-',t 'j.,., t~ -.• ,
'~'i_;:'~"" .!.'.,';. '-I'.
" <,c,'"
( ! :,',"
I', ... ./
, . ~
0
" , ~~~ ,: ... ,>_.....--,','
,I
\,'.
1 ' .-'
1
l,1 '
L
" ------
'''r
'1,
~:
j
!
!.
r' ~,'
L
.-l
-.
OlD SUMI<IAR'/
Projor;;t Engi nec!": RusU) 1 Be1 serer
Project: [aM!' 11 EOy1 rpomental Control Sys'tems Ma.il1tenaf'l~_e ... . CITY or PALO AL,Q
run~s OiO~Q.teQ :,.1.100.000.00 .
SUI+IARY or BIDS E~GI~EER'S
ESYIMATE EMCON
Ite", ApprOK, O."rlptlon Unit Unit
No, Quantity, Pr1 .. Tot.l Price
G .. EKtraetlon
1 Labor Stra1Q~t 35,OOhr
Gas Extraction
Z Labar Overtime 40,OOhr
Gas Extraction
3 Technician Straight 45.00hr
Gas EKt .. ctlon
'4 Technician Overtime 51.00n.
Le.chate Extraction
5 Labor Straight
LeaChate Extractlon
6 labor Overtime
Leachat.e Extr"actiol'l
7 Tochnlcian Str.l~ht
Leachate Extraction
8 Technician Overtime , Leachato Extraction
9 Engineer Straight
~eachatp. Extraction
I 10 Engineer Oyertlme -LeaChate Extractlon ,
II Month 1 y Raport
Direct Cost Mark-up
I 12 (OYerhead & profit) 15%
• -, ... ----
,.', ' 'x ._
" -" " ." ,~.~l(· .
, i
.n, ,~ ." "",' ,. ",' .. ,'"y_,'''", -.... r.'-:".'.-_i, ........... -' ..... _.:~ __ Ie',", _'" ,-•.. i."\ .r;';;','~.'"
Page: Z of Z
R. n,. n.h. 7/17/90 Ij'l:~ Col IOJ ua\,lIfj
U -
Unit Unit Total Prtce Yotal PI"1CfI To~.l
n
I
0
' "
i ' .
--, .
I~, , " ... <II'\~,.,,,(
"i' _' .
''''~;'' J\~ , \,
--_ ..... -
,
~, --;}:
.. ~ i. ~¥. .. ~ '~., ," 'I,' :rf,~f,,:':--"<:1:r
"
'-' ' , "\
'01.··.· ,'.';~.""': l~' ' ' '
"
' .. r l ·" ' •
,
I f , .
i
I
I
\.
e'
I
!
,
i ,
I ,
"
~., r l
;",-" ,
, .
. -'~" •
~
----~-> .. ----'
"
• ;:,i\-;,", '~i ":' :._': _Ll,', ,:,~~ :~,'",N .~~ I .. --
..
.. _-~.-
o o
CONTRACT
THIS AGREEMENT 1 made and entered into, in duplicate, this
day of • 19 ____ • bet~een the
City of Palo Alto l California, hereinafter called ·City· and
SCS Field Services
hereinafter called ·Contractorl -whose Taxpayer Identification Number is ________________________________ ~
WIT N E SSE T B
For and in consideration of their mutual covenants., the
parties hereto aqree as follows:
1. contractor shall do all the work and fUrnish all the
materials necessary to construct and complete in a good,
workmanlike and substantial manner and to the satisfaction
of the City of Palo Alto, tha following:
2.
l.
C.
5 •
LANDFILL GAS CoLLECTION SYSTEM MAINTENANCE
A.
8.
C.
O.
E.
F.
C.
B.
I-
J.
X.
This contract shall consist of the following documents on
file with the City Clerk, all of whicb are incorporated
herein and ~ade a part bereof by reference thereto:
This Contract
Notice Inviting Sealed Proposals
Accepted Proposal
Standard Specifications dated 1972, as amended~ or as
superseded by other documents incorporated herein.
General Provisions
Technical SpecificatIons
Certificates of Insurance
Performance Bond
Labor and Materials Bond
Affirmative Action Guidelines and Compliance Report
Any and all supplemental aqreements Which amend or extend
the work contemplated and vhich may be required to complete
the 'Work in a substantial and acceptable manner.
In consideration of such work, city shall pay Co~tractor the
amount specifIed in his bid in the manner provided in said
Standard Specifications dated 1972, as amended.
Concurrently with the execution of this contract, Contractor
shall provide City with the Contractor's Labor and Material
and Faithful Performance Bonds and certificates of insurance,
including any 'Worker's compensation insurance required by the
lala's of the state of California or otherwise required in saId
specification&.
This contract shall not be assigned by Contractor.
. . ... --->::"·-L"--.· .
-
.\
•
,
I
I
l
6.
7.
;
o
All clal.s by Contractor reqardifl9 I"xtra work .. charges, delay
or other d.isputes a.rising out of the Agreement must be
submitted to City in writin<J within ten (lO] workin<J days
after the ~lal. arose .. describing in detail the nature and
value of the dispute~ work or clai.~
Cont.ractor hereby agrees to indemnify.. defend and hold
harmless city, its officers, agents, employees troD any and
all demands, claIms or liability of any nature, caused by or
arisiIl9 out of contractor's, its officers'.. agents" or
employees' neqligent acts, errors, or oDissions, or willful
Discooouct... or conduct tor ,..hich the. law-imposes strict
liability on Contractor in the per.!ormance or-nonpertonlance
of this Agreement.
8. This Agreement represents the entire Agreement between the
parties with respect to the purchase and sale of the
equipment, materials., or supplies or payment for services
which may be t.he subject. of t.his Contract~ All prior
agreements.,. representations, statements, negotiations and
undertakings whether oral or written are superseded hereby.
IN ~ITNESS WHEREOF, the Parties to these presents have hereunto
set their bands all on the day and year first above written~
ATTEST,
City Clerk
APPROVED:
City Manager
Public Works
Risk Manager
APPROVED AS TO FORM:
City Attorney
CITY' OF PALO ALTO, CALIFORNIA
BY __ ~~~~ ________ ___
Hayor
CONTRACTOR:
BY~-= ________________________ __
Title
TAXPAYER I. D •• ____ _
DATE' ________________ _
-. -
------------------
-'
-
\
~
,
•
-'
",' ,
;;
.. -'
. "-.
,
.~.
"
...J
~" ..
o o
CONTRACT
hereinafter cal ad ·Contractor.-whose Taxpayer Identification
Number is
WIT N E SSE r H
For and in consideration of their mutual covenants,. the
parties hereto agree as tallows:
l~ Contractor sball do all the work and furnish all the
materials necessary to construct and complete in a 9000#
workmanlike and SUbstantial manner and to the satisfaction
of the City of Palo Alto. the following:
LEACHATE COLLECTION AND REMOVAL SYSTEM MAINTENANCE
2~ This COfltr-act shall COl'lsist of the following documents on
file with the Cit.y Clerk.. all of .... hich are incorporated
herein and made a part hereof by reference thereto:
A. This C~tract
B. No,tice InvIting Sealed Proposals
C.. Accepted Proposal
D. Standard Specifications dated 1972# as amended. or as
superseded by other documents incorporated herein.
E. General Provisions
F. Technical SpecificatIons
G. Certificates of Insurance
H ~ Ferformance Bond
I.. Labor and Materials Bond
3. Affirmative Action Guidelines and Compliance Report
lC Any and all supplemental agreements 'Which amend or extend
the work contemplated aDd which may be required to complete
the 'Work in a substantial and acceptable manner.
J. In consideration of such 'Work. City shall pay contractor the
amount specified in bis bid in the manner provided in said
Standard Specifications dated 1972. as amended.
4. CODCurrently with the execution of this contract" Contractor
shall provide City with the cont~actor's Labor and Material
and Faithful Performance Bonds and certificates of insurance ..
including any worker'S compensation insurance required by the
laws of the state of California or ot.herwise required in said
specifications.
s~ This contract shall not be aSSigned by Contractor.
\
"
•
-,
--
... -"'" ...
~ .. ~.,....
-'
,
i
.j ,
1
f
i , ,
I
j
-
6.
7.
8.
o o
All claias by Contractor regarding extra 'Work" cbarges, delay
or other disputes arising out. of the Agreement 31USt be
submitted to City in writing within ten (101 ~orking days
after the clai. arose, describing in detail the nature and
value of the disputed w~rk or claim.
contractor hereby agrees to indellll1.ify, defend and hold
harmless City, its officers, agents, employees from any and
all demands, clal.a or lIability of any nature, caused by or
arising out of Contractor's. its officers', agents· or
employees' negligent acts, errors, or omissions" or willful
mIsconduct.. or conduct for which the law imposes strict
liability on Contractor in the performance or nonpert"or:mance
of this Agreement.
This Aqre~nt represents the entire Agreement between the
parties with respect to the purchase and sale of the
equipment, mat.erials .. or Eiupplies or pa)"l!lent :for services
which !lay be the subject of this Contract. All prior
agreements, representations... st.atements, neqotlations and
undertakings Whether oral or written are superseded hereby.
IN WITNESS WHEREOF .. the Parties to these presents have bereunto
set their bands all on the day and year first above written.
ATTEST: CITY OF PALO ALTO. CALIFORNIA
City Clerk
APPROVED:
Ci ty ~i1ager
Public Works
Risk Manager
APPIlOVEO AS TO FORK:
City Attorney
-----....
BY __ ~~ ________________ __
Mayor
CONTRACTOR:
BY T'i~t~l~e--------------------------
TAXPAYER I.O •• ______ __
DATE' ______________ __
.. -
1 ,
r
! r
~J ... ~