July 19, 1990
THE HONORASLE CITY COUNCIL
Palo Alto, California
o
semi-MOual etp project Status RePOrt« June 199(}
Members of the council ~
Attached is the seDi-annual project status report of General Fund,
Refuse Fund and storm Crainaqe Enterprise Fund projects in the
capital Improvement Program. ~his report provides a brief update
of each project as of June 30, 1990, and is informat.ional only~
council action is not. required.
Respectfully sUbmitted,
VALERI E LEHRKINO
~~HO'OO"
tog Director f Public Works
Attachmants: C.IP Report
-1-
CMR: 435:0
•
•
"
"/
Iiiii ......... __ .... .,;" __ .~..;,,..\.,,_,~_=~,.,"._'~ ..... ".".",""""'-'.. ~,,::,,~ .... ,*~..(_;"'}Ji~t] JEttbtJJ!bccxi::; ....
SEIU-ANJruAL CIP PROJECT STATUS REPORT
O JUNE 199C1 0
TABLE OF CO!ITENTS
lTD • PROJECT • PROJECT TItLE •
1. 18~C9 PUblic 9Ul14i~s structural I~prove~ents
2. lUll civic center P &~& Improvements
3. 1861C Financial oata Base
4. lUll Art 1~ PUblic Places
5. 18621 Bike Route Oirectional Signs
6. 18805 Greer Park oevelopment ,. U8l0 Parka Site Access tor the Disabl.~ . \~,-e. 18812 tntoraatlon Syatems oevelop~ent ,. 18821 CalIfornia Avanue Parking Structure <"" 10. usn ce~raPb1c In~ormation Systems
11. 18811 Teo. tic Signal. El camino Real
12. 18901 Fire Station Exhaust ~emoval Systems
13. 18903 Sidevalk Repairs i', . 14 • 18904 DriviDg RaDge Tee EXponsion
1S. 18906 Renovation of Irriqation Systems
16. 18908 MSC site Improvements
11. 18911 Beatlng~ventilatlon at Lucie stern Center
18 • 18915 Fire Station OVerhead Door Modifications ,
19. 189:1.6 Fire station Dormitory Modifications
20. 18918 Harbor Improvements
21. 1&923 ~Replacement. Downtown parking Lots
22. 18931 1 site Improvements -Reimbursement to PAUSD
23. 18971 Street Maintenance L-, 24. 18972 Traffic Signal • Intersection Modifications
25. 1897) Traffic Signal • Intersection Modifications
26. 19001 Tank Reuoval/cleanui
27. 19002 MSC Fuel Tank Modif cation n. 19001 Fire A~ratus Hearing Frotection
29. 19C}04 Rlncona a Pool ImErovements
31). 19005 Tennis and Basket all Court Imp~ovements
31-19006 Athletic Fields Renovation
32. 19007 Evidence storage Expansion
ll. 19008 C~ter Room Remodel
34. 19009 Finanea Vault Remodel
35. 19010 City Clerk ~ecords Microfilming
36. 19011 Records Management
37. 19012 Payroll/Personnel System
38. 1901) Civic Center Ene~ Management System
39. 19016 CUbberley Kaster P an
40. 19018 Cubberley School Site Building Code Modificotions
41. 19071 Traffic Signal at El camino ~eal/Matadero Avenue
U. 19072 Kinor Intersection Improvements
U. 1907) Major Intersection Improvements
U. 190H Traffic Control Barriers
45. 19076 Bi~e Parking Facilities
REFUSE FUND
46. 45690 Byxbee Par~
47. 457;0 Leachate Collection System n. 4579] Refuse Administrative Faciliti~s
49. 45803 Hazardous Materials Safety Storaqe
STORM DRAINAGE ENTERPRISE FUND
~O. 47701 stora Drainage program
51. 47702 Colleetion System I~provements . ......
-
•
,
~
,
,
"
\ ,
\
\
\
\
\
, 'T'.
'-
HI . -?,";_.:.' ,
. .-". . . ~ -~
.. '. '.-
! .i,
~~
!
~
~ , • ~
1
-
..
o o
SEKI-AIINUAL ell' PROJECT STAl'llS REPORT
JUNE 1990
1. 18§QIf W»LIC BUILDINGS STRUCTUlU"L XMptt?ytXElfI'S
A consultant report resulting from the structural testing at
the SenIor Center and solIs analysis at Fire Station No~ 2 was
completed in May 1990. As a result I it will be necessary to
perfoD structural work at t.he Senior Center and foundation
'Work at the lire Station. This work is included in the FY
1991-92 elf budqet. Also.,. design docu!ients for the structural
retrofit of Wing -A-of the Lucie stern Center and th.e Police
Wing of the Civic Center vill be completed in tall 1990.
EXPECTED COMPLETION OF DESIGN OF WING "A" AND POLICE WING:
SECOND QOARrER 1990-91.
2. lBE1J CIVIC CENTER PlAZA IMPROVEMENTS
This project included a new de&iqn for t.he landscaping on the
plaza. New bencbes and furniture are in use.
PROJECT COMPLETED: FOURTH QOARTER 1989-90.
)~ 1B614 fINANCIAL QATA BAS:
Completed the 1990-92 two-year budget preparation in IFAS 6.
IFAS 6 1. the uP9ra~ed financial database system from IFAS 4
which improves budget control, enhance& automated purchasing
processing activitIes and information reporting, and increases
reportinq flexibility.. Automated the cash receiptinq process
in Revenue CollectIons, Animal services and the Gol£ Course ..
Beqan testing IFAS 6 and performed significant modifications
to the purchaSing and encumbrance modules.. Parallel testing
will begIn 5QCOnQ quarter 1990.. IFAS 6 implementation is
targeted for January 1991.
EXPECTED COMPLETION OF PHASE II: THIRD QOARTER 15>90-91.
C. 18~11 ART IN WaLle PlACES
The Byxbee Park project Is pending approval from the
California Integrated i7aste Management Board. The Brian
Coleman neon sculp-ture is being refurbished and prepared for
installation at the. Palo Alto CUltUral Center. During the
next quarter. base.s will be prepared for the Linkopinq
sculpture and the David Bottini sculpture. A site will be
selected and prepared for receipt of the Betty Gold sculpture.
EXnCTED COMPLETION: ONGOING.
5. l§§l) lnp ROUTE QIRECTIQNl"L SIGNS
The purpose of thIs project is to install improved signing
alonq palo Alto's bikeways, identifying routes to major
de.s't-inatlo-ns and points of interest. Infonoational signs were
purchase.:S with state qrant funds in September 1988.
InstallatIon of the signs viII occur during: the second
quarter ..
EXPECTED COMPLETION: SECOND QCARTER 1990-91.
,.. 18S05 GREER PAR]( QEVEI..oPMENT
The scope. of work includes the 9rading and drainage of the
entIre site, and other improvements includlnq reclaimed vater
•
\
-
8.
9.
,--. -
/
o
irrigation. landseep!nq~ pathways. and a skateboard facility. •
The design bas been completed. Construction will begin in
late July.
EXPECTED COMPLETION: SECOND QOARTER 1990-91.
1&&10 PARXS SITE ACCESS FOR THE prSABI%O
This project is the second phase of II three-phase project to
provIde aocela to City parks and open space to the disable~.
Phase II consists of additional on-site ~aved paths and
modifications to drinking faucets and picnic tables at various
parks.
EXPECTED COMPLETION, FIRST QOARTER 1990-91.
1 R 812 INFORMATION S XSTEMS m;yELOPHENT
This project vill provide computer equipment and so£t~are for
the continued development and expansicn of the City's
centralized computer facility. Planne~ improvements will (1)
expand the workstation network City-wide allowing controlled
external access via telephone t.o computer resources (e..q ...
Librarles~ Cultural Center. Lucie stern Center). (2) ensure
adequate computer response time for users as planne~
expansions/conversions take place~ and (3) build increased
-capability for exchanqinq computeriz.eeJ: information between
d.epartments~ This yea;t"'s planned addition of hardware and
50ftware was completed in Hay 1990~ achieVing all the goals
stated above.. The FY 1990-91 project calls for a major
upgrade of the. three BP 30005 ~
EXPECTED COMPLETION, FOURTH QUARTER 1990-91.
1BB21 CALIF9BIUA AVENUE PARKING STROCTllBE
The project includes a feasibility study of a Parking
Structure Plan in the California Avenue Business District .. A
consulting-fir. was retained to complete t.he study. after
Which council vill decide Whether to proceed vith the final
desIgn and construction of a parking structure.,. including the
formatIon of a new parking assessment district.
EXPECTED COMPLETION OF CONSULTANT STtJllY, SECOND Q01L"UER 1990-
91.
lO~ 18822 GEOGRAPHIC INfOEMAlION SYSTEMS
11.
The project includes tbe aerial phot.ography and map conversion
of areas surrounding University and california Avenues~ Field
data contin'Ues t.o be converted into diqital form~ tor transfer
into the new geographIcal informat.Ion system (GIS) softwar~.
A series of field and technical quality control checks vill
take place over the next few m~th5. A cont.ract to Install
permanent survey mon·uments is being prepared as pert of this
project~ Plans also are underway for lIaWinq of the area
bounded by Mi~lefield Road, Oregon Expressway. Highway 101,
and San Antonio Road ..
EXPECTED COMPLETION' FOURTH QOARTER 1990-91.
18871 TRAFFIC SIGNAL: EL CAMINO REAL
This project provides for installation of a
El camino Raal at ~amarack Court/Hyatt
z
-"~
traffic signal on
Hotel driveway.
~ .'-, .
,
\
c
\ \ . ,
\
. ,
'-'
~ I ' ,
r
o o
Cal trans ia the lead Agency and is responsible for all the
design and constructIon. A. cost sharing agreement bet'Ween the
city and stah vas approved by Council in January 1990.
construction is expected to start this summer.
EXPECTED COMPLETION: SECOND QUARTER 1990-91.
12. 1890) FIRE STATION EXHAusT REMOVAL SYSTEMS
This project covers installation of vehicle eXhaust removal
systems at fire stations to protect firefiqhters from
dangerous diesel exhaust particulates. Work will begin on
stations 2 and 3 within two months. The remaining stations
will be completed during FY 1990-91.
EXPECTED COMPLETION: SECOND QUARTER FY 1990-91.
13. 18903 srpEWAtJC BtPAIRS
This project provides for repairs to sidewalkS in the areas
boundeeS by Waverley street.. Middlefield Read" Oregon
Expressway ... Embarcadero Road: and Alma street ... El Camino Real ...
Embarcadero Road ... and Park Boulevard.
EXPECTED COMPLETION: SECOND QUARTER 1990-91.
14. 18904 DRIVING RANGE TEE EXPANSION
The project includes the extension of the driving range tee
and the erection of additional fencing adjacent to a private
parking lot. construction 1s underway and: completion is
expected in August.
EXPECTED COMPLETION: FIRST QUARTER 1990-91.
15. 18906 RENOVATION OF IRRIGATION SYSTEMS
This project includes improvements to irrlqation systems at
Kitchell and Bowden Parks, coqswell Plaza... and the CUltural
Ce.nter. .Improvements to the Mitchell Park and CUltural center
systems were completed in June 1990. The remaining systems
viII be completed during 90-91.
EXPECTED COMPLETION: FY 90-91.
16. 18908 MSC SITE IMPROVEMENTS
Under this project ... the current asphalt concre.te storage and
equipment parking area was expanded, allowing for a more
organized placement of ~terials and equipment. Construction
was completed in June.
PROJECT COMPLETED: FOUR'IH QUARTER 1989-90.
A separate project provides f~r the expansion of the Animal
Services Office to create a Ilulti-purpose work area to
accommodate the office of a volunteer coordInator as well as
a meeting rooll. for staff and volu...,teers. Project construction
will start August 1990.
EXPECTED COMPLETION: SECOND QUARTER 1990-91.
17. 18911 HEATINGtyEHTlLATION AT UOCIE STERN CENTER
Heating end ventllation ~ork at the theater in the Lucie Stern
Community Center will be included with the structural retrofit
Qf Wing -A-of the complex ... as described in item '1 ... Public
l
~.; ....... ----. -.-----------
•
~\
,.
I
I
•
,
'. I I
I
f
o
Bull~inqs structural Improvement ••
EXPECTED COMPLETION: FIRST QUARTER 1991-92.
11. 1891$ FIRE STATION OVEBHEAP pooR MOQIfICATIONS
'fbi. project vill wIden the two apparatus doors at Fire
Stations :3 and 4.. Conceptual deSign has been completed:.
Conotruction will occur next sprinq.
EXPECTED COKPLETION: FOURTH QUARTER 1990-91.
19. 1891, FIRE STATICN POBKITQRY MOpIFICATIONS
ThIs project tunds modifications to five existinq fire
stations over a period of five fiscal years, and inclU<les
separate locker. bath, and doraitory facilities for male and
female firefighters. Design work 15 underway on stations 1~
3 and 5.
EXPECTED COMPLETION FOR DESIGN: FIRST QUARTER 1990-S1.
20. IB911 HARBOR IMpROyRMljtlTS
In July 1990, council will review the latest hydrological <lata
relatinq to the feasibility of the sailinq station. If
Council approves staftls recoll1m-(:;;.Gation, c:onstruction is
expected in the summer of 1991. Similarly, work on the 4.S
acre marsh restoration vill begin during the same 1991 summer
construction season. Est.imates for repair and restoration
work to the Harbor Master'a cottage indicate that the. project
.ay not be financially viable. staff vill return to Council
with recommendations later in the year. Work continues on the
Master Plan update (approximately 20 percent has been
COlIlp 1 eted) •
EXPECTED COMPLETION: FY 1992-93.
21. HI 22 3 SIGN REPUCEMEtlT· DOWNTOWN PARXINV LOTS
This project provides tor replacement of various Signs at
parkinq facilities in the ®WDtOWD area.
EXPECTED COMPLETION: FIRST QUARTER 1990-91.
22. leg}l SCHOOL SIn IMPBOVEMENTS -REIMBURSEMENT TO pAusp
Under the amended elP project, the City remains respons1bla
for costs incurred in refurbishinq and replaCing irrigation
systems at school playinq fiel~s. The city will refun<! the
District as work is completed. Funding for the project c~es
from the utIlity Users Tax. This work is scheduled .for
completion by December 31, 1S9l.
EXPECTED COMPLETION: SECOND QUARTER 1991-92.
23. 18911, 11610 STREET MAINTENANCE
Thi. project provides tor the annual resurfacing and
recor.struct.ion of various city streets identified' by the
City's Paveme.nt Maintenance Management syste. (PMMS) as
needing i~provement. Seventy-seven streets ~ill be resurfaced
in late summer as part of the 1990 program. Construction is
scbedule~ for summer of 1990.
EXPECTED COMPLETION OF 1990 PROGRAM: SECOND QUARTER 1990-91.
c
--__ ":""' ____ .... _-,t"-;.
'L
-
•
\,
,
,
:;.-'
,
..
,
\
\
\
\ . ,'" .. y'
I '-• r---. ~,<-••
f.
'\
. ;"
l~ .... "",;," .. , .. ·.'.::'::,,·' j~~.::I:.:..,.:...;.., .... _ ..... ' _ ...•. """'''& .... .,.!!; .. '''.''.,''_''''~r~<'\··~ :_·!,i!'U" __ ~~.:rt".-j;!· ;<:-:' "'t . .,;:-. .".,r.; .... ~.-'--<.-~,::., ~:;'··t· .':,~<: ..,:,~_~G ..... ,:_;I£ .
~~j:
~: ~' r
"
-
o o
24. 18'72 TRAFFIC SIGNAL AND IllTtRSECTIQN MOpIFlCATIQNS
This project provides for modifyinq the traffic signal and
improving .intersection confiquration at El Camino Real/Los
Robles. Caltrans is the lead agency and is responsible tor
all the design and. cons.truction work~ A cost &baring
agreement between the City and State was apprcved by c~uncil
In February 1990. Construction Is expected to steart this
summer.
EXPECTED COMPLETION: SECOND QUARTER 1990-91.
25. 18'73 TRAFfIC SIGNAL AND INTERSECTION M9pIFICATIONS
This project provides for modifying traffic &iqnals at four
locations along El Camino Real~ Cal trans is the lead aqency
and Is responsible tor all the design and construction work.
A cost ahaririq agreement between the City and State was
approved. by Council in January .1990. Construction Is expected.
to start this summer ..
EXPECTED COMPLETION: SECOND QUARTER 1990-91.
26. 19oq1 TANK REMOVAL/CLEANUP
SOme contamination was found at the tank removal site at 190.1
Embarcadero Road (airport) .. A soil irr'J'estiqation Is underway
and must be prepared and presented to the regulatory asencies.
Definit.ion of the extent of the contamination plume is proving
to be more difficult than anticipated. Additional monitoring
'We.ll_ vill be installed before t.reatlllent options can be
finalized. Cle.an-up construction activities are sched.uled tor
spring 1991-
EXPECTED COMPLETION: FOURTH QUARTER 1990-91.
27. 19002 XSC FUEL TANK MOQXlIGAT!ON
rhe purpose of this project is to modify the eXistIng above
qround fuel storaqe area at the MSC to include a se-If-closinq
valve at the storm drainage outlet to prevent any oil leakage
from leaving the secondary containment area. The deSign is 50
percent complete-and eonstru~tion Is scheduled for completion
this summer ..
EXPECTED COMPLETION: SECOND QUARTER 1990-91.
28. 19003 fIRE ADPABATVS HEARING PROtECTION
This project outfits all fire apparatus with noise reduction
headsets ~or firefighters to prevent hearing loss. Headsets
also contain equipment for communication betveen ~irefi9hters
on the tire apparatus... and. between the apparatus and the
dispatch centera
EXPECTED COMPLETION: FIRST QUARTER 1990-91.
2!it. 19 Me RINC9NADA pooL IKPROytKEllTS
This project replaces tilter, chlorination and circulatory
systems in order to Ilaintain water quality ... chlorInation,
circulation and health and safety requirements of santa Clara
County and the State of California. The filtrat.ion system bas
been completed. The new chlorination system yill be desisned
and installed in FY 90-91.
L
. .
,
,
"\
\
\.
. ,
, ..
\
\ . ..
J
"
-
i
.. -~ -
~ -----"---------_._, --
o o
EXPECTED COMPLETION OF CHLORINATION SYSTEM: FOORTK QO!>.RTER
1990-91.
30. 19 D<! 5 tOOl S ANp BAS KETBA LL COURT IMP!!O\'EMENTS
Thi. project funds onqolng preventive maintenance for City
tennis and basketball courts on a 5·7 year rotating schedule.
199a~91 work includes replacing the basketball court at Peers
Park, resurfacing o~ the tennIs and basketball court.. at
Tantan and Brion •• Parks, and restrl.pinq courts at Seale ..
Jt.amos, R~leB, Hoover, Johnson, and SCott Street Parks.
Design of the project is schedule~ to begin in fall 1990.
EXPECTED COMPLETION: FOIJltTlI QUARTER 1990-91.
31. 1'006 ATHl.ETIC 71$100 RENOVATION
Thle project provides for on-going renovation of athletic
fields -to ensure Gate and playable conditlons.. Field.s a.t
CUbberley School, El c8lIIlno Park and Greer Park were renovated
during f~ 1989-90.
EXPECTED COMPLETION: ONGOING.
32. 190=07 IYIPENCJj STORAGE EXPANSION
This project. provides .for the expanSion of the evidence
storage rOOD within the pollee garage.
EXPECTED COMPIZTION, FIRST QUARTER. 1990-91.
33. J 'Q:Q8 MMPUTER ROOK BprmpEI.
Thi. proj.ct provIdes for the remodeling of the second floor
computer room in City Ball to bring it into compliance with
current tire .afety codes, ensure internal and ext.srnal
computer room .ecurity, and better utilize available space.
EXPECTED COMPLETION, FIRST QUARTER U90-91.
34. 19009 FINANce VAULT RE'MOQEL
Remodel o~ the Finance Department vault will ilftprove the work
space area for Finance Department staff. The project is on
bold pending design of the Civic Center Utilities/Pinance
meve.
EXPECTED COIIPLETIOII: NOT SET.
35. 19019 CIty CLEBX RECORDS 'MICBQFIUtIltG
This project provides for microfilming of vital documents from.
tbe City Clerkts office for secured off-site storaqe.
EXPECTED COMPLETION, SECOND (lIJARTER 1990-91.
36. 19C1l RECORDS HANAGEMEN7
This project will fund a centralized records lIIanagement system
for the collection, controlling, indexing, protection,
storage, securIty, and destruction of City documents and
records. First year funding covered oS study of various
options and systems available, with recommendations for .future
implBlDe.ntat.lon.. A -Request for Proposals-for ilbplement:at.ion
of the system will be issued during FY 91-92.
STU'DY COMPLETED: FOORTK QUARTER 1989-90.
•
\
•
,
\
\ .',
\
\ ,
, ,
,
~.
-
"_0 .,". '
31.
38.
..
o o
190)2 P~JRO!J,/PEBSONNEL SYSTEM
This project will fund a needs assessment and selection of an
automated payroll/personnel system for integration with the
City's Financial Data Base modules. Selection of vendo~ is
anticipated by f'el:>nlary an, with implementation of the
syatea occurlng in 1991-92.
EXPECTED COMPLETION. F't 1991-92.
1'013 CIVIC CENTER pn::BGY JMNAGEMENT SysTEK
ThiB project ,.,i11 install an automated control system for
civic Center heating, ventilation and air conditioning which
will provide energy savings, increased occupant comfort, and
improve the life cycle and per~ormance of equipment.
EXPECTED COMPLETION OF DESIGN: FIRST QUARTER 1990-91.
39. 19016 CYB8EFLEX MASTER PLAN
The public input process and the draft Master Plan have been
completed. The final Master Plan is in the last stages of
completion ancS 1. being prepared for submission t.o the
Planning commission and the City Council. It is anticipated
that the project wIll be broU<j'ht: to city CouncU during the
second quarter of F't 19 9 0-91.
EXPECTED COMPLETION: SECOND QUARTER 1990-91.
40. 19018 CYBBERLEY SCHOOL SITE BUILDING CODE MOpIFICATIONS
This project provides for initial work at the CUbberley School
sIte to establish code compliance with current public facility
fire~ life safety, and baT~!cap' access regulations.
EXPECTED COMPLETION. NOT SET.
4~. 19071 TRAFFIC SIGNAL AT EL CAMINO REALOlATADERO AVENUE
INTERSECTION
Thi. project funds the installation of & traffic signal on EI
Ca.ino at Hatadero AVenue. Caltrans is the lead agency and is
responsible for all dasic;:n and construction work~ A cost
sharing agreement between the City and State vas apprcved by
Council in Marcb 1990. Construct.ion is expected to start this
summer ..
EXPECTED COMPLETION: SECOND QUARTER 1990-91.
42. 19Q72 MINOR INTERSEctION IMPROVEMENTS
This project includes improvements a.t nine locations
identified In the City-wide Land Use and Transportation Study
to reduce congestion and ease traffic flow. Projects include
parkinq prohibitions to improve right turn lanes and
restriping of various turn lanes.
EXPECTED COMPLETION. FOURTH QUARTER 1990-91.
4l~ 1907) MAJQR INTERSECtION IMPROVEMENTS
L
This project provides for lIajor capacity improvements at eight
locations and development of a nev intersection identifi~d in
the City-wlc!e Land Use and Transportation Study.. '!'he work
viii reduce congestion and ease traffic flow alonq major
routes to the Stanford Research Perle. All eight intersections
1
•
I ,
I· ,
I' ,
!
,
. ",-,
t
,
• -i ..
j
.1
-
"
are in the 4 •• ign pba.e. Construction on the rirst priority
intersectIon, Alaa/Mead¢w, will take place in summer 1991.
EXPECTED OOMPLETIOK OF OESIGK PHASE: FIRST QUARTER 1990-91.
44. 12074 TRAfFIC QQNTROL BARRIERS
This project replaces exIsting, temporary barriers with
permanent barriers at various locatIons. including
castilleja/Park Blvd.: Park Avenue/Ash street: Leland/El
Camino Real: OXfor4/El Camino Real: Bryant/Lowelll Bryant/El
Verano: and Byron/Palo Alto. The project is in the
construction phase and will be completed first quarter 1990-
91.
EXPECTED COMPLETIOK: FIRST QUARTER 1990-91.
45. 19076 8XKE fAilING FACILITIES
The pu~Be of this project is to purchase and install bike
racks and/or lockers at various locations in the business
districts and at City facilIties.
46a 15690 BYXBEE PARK
The project was awarded by Council in November. Construction
is expected to st.art in summer pending approval of the plans
by the California Integrated waste Management Board.
EXPECTED COMPLETION: mIRI> QUARTER 1990-91.
~7. 45'90 T~ACHATE QQII£ctIOH SYSTEM
Phase l: of the thre.e-pbase project included a consultant
review of existing data on landfill leachate. Phase II
included recommendations, construction plans anet
specifications. Phase III plans hava been reviewed by the
Reqional Wa.ter Quality Control Board l and construction of the
system bas started.
EXPECTED COMPLETION OF PHASE III: FIRST QUARTER 1990-91.
48. .5791 REFUSE ADMINISTRATIVE FACILITIES
Phase I of this project includes installation of a new mobIle
office and ~ersonnel trailer l and conversion of the existing
trailer for use as a tollbooth. Phase II includes installation
of weight scales at tha landfill entrance. Contracts for bot.h
phases have been a'Warded and construction beg-an third quarter
1989-91).
EXPECTED COMPLETIOK: FIRST QUARTER 1990-91.
49. 45893 mIgnons MATERIALS SAFETY STOBAGE
This project provides for the purchase and installation of a
small, portable safety storage building for the storage of
city-qenerated: hazardous 'Wastes and for nece.ssary support
equipment. The bull.Hnq and equipment provide for proper
hazardous JIIaterials aoo wastes management to comply with
local, state and federal regulations.
PROJEC? COMPLETED: FOURTH QUARTER 1989-90.
8
•
.~ ..
•
,
_"':.
,
}
•
,
i -
\
~'"
\
" \:.-
j
-
, .
,. :~
o o
§TOM DRAINAGE ElfTE'RPBXSI nnro
so. 47701 STORK pRAINAGE PR9GBAX
on lfovember 6, 1989... Council approved an ordinance
establ18hing th. atono drainage enterprise and utility. A
resolution va. approved by Council on November 27... 1989 ...
establl.hing rules, regulatIons and fees for the storm
drainage utility. ~e storm drainage fees vere effective on
January 1, 199~, and billing began with the February 1990
utility billa.
PROJECT COMPIZTED: FooaTH OOARTEIt 1989-9().
51. 47702 CQI1.J:CTION SYSTEM 1l1'PROYEMENTS
ToxicIty monitoring. mandated by the Reqional Water q~ality
Centrol Board to evaluate sources of pollution in Santa Clara
County resultIng froll urban runoff, Is continuIng. A non
point source pollution .1tlgatlon prc'ect may result from the
ongoing toxicity monitoring. A joint cost sharing agreement
with the santa Clara Valley water District for erosion control
on San Francisqulto creek_ ",ill start in sprIng 199G" and a
pump station telemetry study vlth the Otilities Department
started in November 1989.. Both the erosion control project
and telemetry study will be completed in the summer of 1990.
EXPECTED COMPLETION: ONGOING.