HONORABLE CITV COUNCIL
Palo Alto, California
3'00 HILLVIEW AVENUE: site and {)esign AppJJ.cation
Members of the Council:
PROJECT OESCBlpttOK:
The Lovewell Company and Keenan Land Company are proposing to
demolish the existing 90,OOO-square-foot research and development
building at 3400 Hillview Avenue and construct five new two-story
buildings totaling 206,000 square feet with surface parking for
688 cars.
BACKGROUNP:
On June 13. 1990, the Planning Commission, on a 7 to 0 vote,
recommended approval ... with conditions, of the site and design
applic~tion for 3400 Hillview, and the Draft Environmental Impact
Report (DEIR). The Commission had several comments on the OEIR,
specifically requestinq inclusion of visual drawings of typical
water strippinq towers" mitigations to red·uce the visual and
aesthetic impacts of the retaining ~alls, inclusion of monitoring
and mitiqations related to the speed of traffic on the driveway
entrances. an explanation of the 10,O,O'O-square-foot e.xemption fo,r
housing and ~raffic Ditigation purposes~ and inclusion of a
statement z'egarding long-range 'Water availability.
The commission specifically requested that the ARB closely
scrutinize the colors and ~aterials and the design of the
retaining walls. The Planning commission staff report dated May
25 1 1990 is attached. The Planning Commission minutes of June
13, 1990 are included in the Council packet.
on June 21, 1990 the ARB, on a 4 to 0 vote yith one meu~er
absent, recommended approval, vith conditions, of the site and
CKR:U2
'-·,c __ · -""L~ ......... .
-
•
I
I
I ....
•
. ,
,
\
\ ,
\ .. ,
...., .. ,~'·"I-~
•
',-<'
,f/
~.,
.. ",
. -.,.:
. ,
, '
•
design applIcation and the DEIR. Some members of the ARB, as
veIl as the Planning Commission, expressed concern about the on
site hazarcSous lIaterial cleam ... p and the overdue need tor city
adoption of a Transportation Demand Management Program. The.~
also required th4t architectural details, ~aterials and colors be
approved by stantora University before returning to the ARB for
final approval and prior to submission for a Building Per.it.
The ARB Information Memorand·um is attached.
ISSUES OF QQNCEBN:
Environmental Impact Report:
The OEIR was forwarded to the Council in the June 21, 1990
packet along with all response ~omments.
Included in your packet is the Final Environmental .Impact
Report, with the responses to the comments made on tbe DEIR.
staff believes that the issues intended to be addressed by
the focused EIR have been covered and prcper Ditigations
proposed.
Architectural Design:
Stanford UnIversity and the ARB havQ requested that certain
design detail~ be approved by the University and the ARB
prior to SubmissIon for a Building permit. These teatures~
incl~iD9 architectural details# materials, and colors, do
not impact the site design# buIlding ~assinq or other
significant design elements of the project.
RECOMJo!ENDATION
staff recommends that the City Council certify the Environmental
Impact Report, and approve the site and design application yith
the following conditions. The applicant 1 s responses to the
conditions must be reviewed and approved by Stanford University
prior to review and approval by the ARB and prior to submission
for a Building Permit.
CONDITIONS:
1. Revision of the entry porticoes for buildings J and 4.
2. Revision and further refinement of all the buildings'
corner baloonies# related fenestration# and solar
screeni09 devices~
). SpecIfication of the hillside retaining .... alls final
design and ~aterials;
JG/l990/A/CMR3400H
CMR:U2
"
, )
2
•
,
j
1
•
'. \.
/
_'-__ " _..--o~~~"".L_'-_-L-::-.;. ___ ~".,tf __ ':$~. _~,'o~ ....... ,_~ ;. :r,;:-'l'""~"'_":;."':"P:.;~~~-"""~~_~ it!_&Q_;t __ ~.,
4~ Deslqn of the proposed hillside stairway oonnectinq
this site with Xerox's upslope site;
5.
6.
1.
Final landscape plans, including the grading plan and
details of the plans for recycling;
Final material and color palette for all exterior
development~ including the fire access easement;
Approval by Public Works of a preliminary grading and
dralnaqe plan:
B. RevIsion of the parking lot to provIde for landscape
islands after every te~th parking space and to further
study the creation of a more standardized visitor
parking/drop-off area at the front of the building;
9. AdditIonal information on the size, height, screening,
etc. of the required ground water extraction system and
air stripping tower;
10. RevIsion of the landscape plans to preclude the use of
any plant that will grow to a natural height above 30·
in all landscape areas adjacent to intersections in the
parking lots,
11. Provision for the bicycle lockers to be fitted with
tubular key lock mechanism:
12. Redesign of the 5ide~alks adjacent to each cluster of
bike lockers to a minimum of 5 feet vide;
13. Relocation of visitor bike parking adjacent to the
visitor auto coort as shown on the master site plan and
not near the employee parking lots as sho_n on the
courtyard plan; and,
14. Provision for an emergency fire access easement on the
adjacent property (xero~J, with the condition that no
fences or obstruction may be constructed between the
two properties.
In addition, appllcant must comply with the conditions and
Ditisations as defined ~n the Environmental Impact Report.
FINDINGS
Recommendation for approval is based on the follo~inq findings:
JG/1990/A/CMR340'OH
CMR:412 ]
.... -' ......... IfI ... ----.''"'''. "<; .... ~i." L
-
"
•
'i'),.., •
,
,
\
\
, .
..J
.
i
-
A.
/
Environment~l Findings:
In compliance with the Environ~ental Quality Act ,-CEQA-j
G~idelines, the council finds that:
1~ It has revie~ed and considered the Environmental Impact
Report prepared for the 340,0 Hillview Avenue Project ..
2. The EIR found that the impacts of the 3400 Hillview
Avenue Project itself can be feasibly mitigated to
insignificant levels, but that traffic and air quality
impacts caused by the CUmulative effect of all buildout
allowed In the EIR study area cannot be mitigated to
insiqnificant levels. This finding was based on an
environmental assessment using the Citywide Land Use
and Transportation Study Environmental Impact Report
,·Citywide Study/EIR-), certified by the Council on
Mar-ch 6" 1989 ..
l. Because the 3400 Hillview Avenue Project itself can be
fully aitigated, no findings of overriding
consideration need be made specifically for the
project~ H~wever, the council adopted findings of
overriding consIderation relating to the buildout
allowable as a result of the Citywide Study/EIR whIch
are appropriate in addressIng the cumulative impacts
caused by sU<:h futUre boildout. Therefo·re., the Council
hereby refers to, and readopts the Environmental
Findings made in the "implementing actions of the
Citywide Study/ErR, a copy of which is attached hereto
as Exhibit "A-.
B. Other Findings:
1. The office building design is consistent and compatible
with the Limited Industrial/Research Park District
Comprehensive Land Use Plan designation on the site.
2. The proposed building design, with its two-story
height, central courtyard~ and landscaped plaza are in
scale and character ~ith the surrounding land uses in
the Stanford Research park.
). The extensive landscape design concep,t for the site,
the added landscaping in the parking lots~ and the
campus-t)-pe layout of the buildings create a desirable
and functional environment.
The planning and location of the various functions on
the site create an internal sense of order and provides
JG/l 9 9 0/ A/CMRl4 ()OH
CHR:412
•
\
r
I
~ ,
f
~
. ,
"
-
...
~~-."'," ."".
-,
~
•
" > ••
•
-
\
\
\
'\ , ,
\
,
; i
l
-
a desirable enviro~ent ~or occupants, visitors and the
qeneral community in that landscaping, vehicular
parking, bicycle parking, and courtyard areas have been
dealqned to create a safe and convenient environment~
Respectfully submitted,
~~t/~~/J
J E. GILLILAND
, ) anninq Administrator
KENNETH R. SCRREl8ER
Director of Planning and
Co~unity Environment
. ~HMI.21 ~~:XIN~
Assistant City Manaqer
Attachments: Exhibit -A-Citywide Environmental Findings
staff report to Planning Commission 5/25~9a
ARB Info~ation Memorandum of 6/21/90
L4tter from Stanford University of Sj30j9Q
Plans and Final Environmental Impact Report
(Council ~embers only)
oc: Planning Commisslo-n
Architectural Review Board
Bob MOss, 4010 Orme street, Palo Alto, CA 94306
A1tcia C~erra, David J. Powers' Associates,
1885 The Alameda~ Suite 204 p San Jose, CA 95126
Perry Pal~er~ 700 Emerson street~ Palo Alto~ CA 94301
JOhn Lovewell, 700 Emerson Street~ Palo Alto~ CA 94301
Kenneth Rodriquez, 60 SQuth Market, suite 200~ San Jose p CA
Xirt Pruyn, stanford university Lands Management,
857 Serra street, Stanford, CA 94305-6225
David Newman, Stanford University Architect,
857 Serra street, Stanford, CA 94305-6225
Dr. Gary x. Beymann~ Old Trace Neighborhood, 4159 Old Adobe
Rcad~ Pale, Alto, CA 94306
JG/1990/A/CMR3400H
CMR:412 5
'-. -
\; .'
•
."
•
•
-" " ~;:.~;~:~
,~~,_c
:.--,.
E·
" " I ,
f' :-
k
r
r
I ,
i
i r
I
f ,
'j
"I
I
1
l
j
-
E.oQilSIT A
[NVIRONMENTAL FINDINCS
I. co.~llinco wit~ the (lllforll. [nvlrDnment.l Qu.lll, Act (tEQAI 6uldelln.s,
the Cltl Council f:nd. th.t:
WHERUl~, It h •• nlylewed and considered the '.f .... ll •• cont.'o.d ,. the
Citywide Lind Use Ind Transp.rtltl.n Study [.vlr.moent., Impact Report (EIRI
Inc'udlng the fl.al Adde.d .... d certified the [IR IS c.mplete •• March 6,
1989; and
WHEREAS, the commercial .nd resldentlol development level. proposed c.ll for I
sub,tantl., reduct'o' t. development potentl.l Ind nll.ted enylronm.nt.l
Impacts and c •• stlt.to • mojor lo.d Us. mitigation .. osur.; and
WHEREAS, the [II has shown thot .ve. the reduced development 1.vel, now
proposed will res.lt la potentlol1, significant Imp.cts on housIng, noise, .Ir
qual It, Ind tr.fflc conditIons, Ind
WHEREAS, ~it;9atlon .. Isures hIve been Identified that con reduce potentl.l
housing and noise Impacts to Icceptable lovels, Including: compliance wit.
the Clt]'s Housing Rltlgotlo. Ordinance; t~. redesignatlon of certola ~.rce1s
from comoercl.l to re,ldentlll .se, IS described on pages I'.D.-l through -9
of the Or,ft [I~; and noise ,batement technIques ond deYices Incorporoted Into
~r.ject designs, as described 00 pages If.S.-9, -I; of the Oroft [IR; and
WHER£AS~ flter5ectfon capacitJ fmprovements and Transportit~on Demand
Man.gement programs hav. been Identified that can subs!antlall, lesse. t~e
projected traffic Impacts Ind reloted llr quallt1 Impacts due t. Incre.sed
development., IS Ide.tlfled on p.ges IV.B.-1 through IY.B.-86 o.d IY.f_-11
through IY.f.-12 of the Drift [II .nd p.ges 1'.-8 though 1'.-11 and If.-23
through YI.-21 Dr the final Addendum; and
VHfRE~S, .11 r.lsonabl, fe.sibl. trlfflc, .ir quallt], noise and housing
mitfgatiDn ~easure$ In4 Dther m1tfgatfon ~isures ~ll be f~corporited ibtG
the project Ipproy.l and will be employed ,t the tl .. Dr new development I.
the ar •• , Including constructing 21 of the 38 Identified f.t.rsectfon copacit]
Improvements. I Citywide 1DK program t. be applied t. new de,elopment; ,
Stanford Res.arc. Pari TDK program to be .pplled to existing and new
deyelopme.t; and. new Transportatlo. Impact Fee t. fund selected loter.ection
1oprov_.ts ·/.,pacted by additional development I. Shely Ar .. 8; and
WHEREAS, the capacltl Improvemeots not pursued Ire tho.e that are consi~ered
to pro>ide llttl. benefit ~e. com~ared t. the .Igh environment. 1 and .,onomic
costs; arld
WHEREAS, the significant tr.fflc lnd .ir qual It 1 Impacts that cannot be
mltlg.ted will occur due to exl.tlng cu .. lotfy. conditions eve. If no
additional non·resldentlal deye10pment is peraltted I. t~. Cit!; Ind
8/1/B9
-1-
• ,
\
\
•
,
\
'.
• j~~
\
1
I
I
I
-
• • VKEREAS. the,e ffndlogs Irt supported bl the substlntlal .vldence contllned I.
tho [1~ I.d proJ.ct record. on fll. Ind Iv,It,bl. for review I. the tltl of
,.1. Alto's Deptrtoent of 'Il.nlni Ind Communlt, [ovlron •• nt; Ind
IIHEREAS. l110wlni n. IddlHon.1 dev.lopole,tt. the Clt)"s c • ....,rchl and
I.d",trlll Ir.as would ~llc, In unflir burde. on suc_ propertl owners and
Id.er •• I, affect the co.tl.ulni vlta'It, and .I.bll.t, of SUC_ Irea.;
TKEREFORE. the tltl CouncIl hereb, finds that the publIc benefIt of penal!tlng
Iddltlona' dev.lop ... t I. the tit,'. commercIal and Industrlll Ir •• s outweIghs
the potent III v.lvoldabl. Idvers. envlronment.l Impacts on traffic I.d air
qUlllt, thlt Irt therefore conSidered acceptable.
8/7/89 -z.
•
\
I
~. '.
. ·.·.-"L-· . "---'-----~'-,,-.--.. ~ ','
~. . .
•
, .
_. I
. I
" .' ;
-
TO: PALO ALTO RLIdQtIIIl'G COKKISSION PREPA.G.ED BY: J. Gill iland
FILE NO.:S9-AR3-211, 89-0-27, 89-EIA-48 DATE: May 25~ 1990
PBQJZCT DEscR1ptlQB
Locatiop~
Applicant:
Property OWners;
Requested Action:
PBOJBCT SOHMARY
340,0 Hillvie.W' Avenue
The Lovewell Company
Keenan Land Company
700 Emerson Street
Palo Alto l CA 94301
Q.T.C. Venture/The Love~ell Co.
Approval of Site and Design application to
demolish the existing 90,OOQ-square-foot
building and construct. a 206, o·Q.O-square-foot
otfice ~ilding for uses related to research
and development.
Applicant is propos1ng to demolish the existinq 90, OOO-square
foot research and development building and construct a 206~OOO
square-foot office building for uses related to research and
development. Redevelopment of the 16.3-acre site will include
the. construction of five two-story buildings~ parking for 68·8
cars, landscapinq, and other site improvements ..
RECOKKENOED ACTIO~ __________________ __
staff recommends that the Planning Commission comment on the
Draft Environmental Impact Report {DEIR) and recommend to the
City council approval of the Site and Design application subject
to the conditi~ns ~~t forth herein.. The application shall be
forwarded to the Architectural RevieW' Board (ARS) for its
comments on the DEIR and the project design prior to final revieW'
by the city Council.
SIT' INPOBKATIOB
Pare'} Size: 710~028 square feet
Assessor's Parcel Number: l42-16-0C7
JGj1990jAlPCHOOHI 1
,.
, ,
f
"
'c
"
t ,
-.
.~
.,·':It"
~"'~-
,
t
I
" ;,j"
\
-
T.
txistipg zoning: UK-S(D) Limited Industriall
Research Park vith site and desi9n
combining district
Comprebensiye Plan
Designation:
Existing Land Use~
Research/Office Park
Research and Development
SurrQUnding Land Use: Research and Development facilities
to the Ncrth l East and South with
commercia1 recreation (tennis club)
across Foothill Expressway to the
North and Agricultural Conservation
lands to the We$t.
ENVlRONHENT" IMPACT ASS£SBKtB'l'
A Draft Environmental Impact Report (DEIR) has been prepared and
is included in the packet. staff requested the preparation of a
focused En~ironmental Impact Report as a supple~ent to the
citywide Land Use and Transportation Study in order to address
four specific areas of concern distinctive to this site: 1J the
additional traffic and transportation impacts that could be
addressed on an interim basis until adoption and implementation
of the Golden Trlanqle reg,ulations and Stanford Transportation
Demand Management (TOM} program; 2) clean-up of hazar~s
materials from the eXisting site; 3} the visual and aesthetic
considerations due to the site location and topography; and 4)
the impacts on cultural resources~ specifically the adjacent
archeological site.
AllJI,L!8IS
PROJECT DESCRIPTION: The proposed project is the redevelopment
of a 164}-acre site in the Stanford Research Park. The project
consists of the development of 206, C'O:o-square-feet of office uses
related to research and development vhich ~ould replace the
existing 92',OOO-square-too,t industrial facility on the site 4
Acc~ss to the site ~itl be from the t~o existing drive~ay$ from
Foothill Express~ay and Hillview Avenue4 The ne~ buildings will
be located in the same qeneral area as the existinq buildings
yith additional parklnq areas being added to the ~estern portion
of the site4 Five t~o-story buildings are arr8nged in a campus
setting on the eastern half of the site. Total site coverage is
14.J percent~ with an FAR of 0.29J.
The t~o buildinqs facing Foothill Express~ay ~ould be set back
JG/1990/A/PC3400HI
_.
2
•
\
'.
'" c >
,
I
..J I
,
l
1
1
j
1
I
-
j. ;
--.. "" .. 0-. -.., ___ . __ , _. ____ .--' .. _.~.~ ... _ ..
approxi~ately 100 ~ •• t from the roadwayp ~hile the building
facing Hillyi~w Avenue Yould be set back approximately 200 feet.
Parking for 64J cars yilt be provided vith landscape reserve
parking for an additional 13 cars.
BACKGROUND: The proposed desiqn was revie~ed by the ARB on a
preliminary basis on September 21, 19S9~ The ARB vas very
supportIve of the project, particularly the site plan. The ARB
expressed .inor concerns related to the neeo £or ~ore substance
in the desiqn of the building yalls~ Minutes of the meeting are
attachecS.
The project has been revie1oro'ed and approved by Stanford University
with only minor concerns related to design of the exterior valls
and landscaping. These items will be addressed at the ARB
meet.ing ..
ISSUES OF CONCERN: "I'he primary issues of ccncern are covered in
the OEIR yhich found that all impacts can be mitigated to a :ess
than significant. level, e~cept for cumulative traffic impacts and
air quality impacts as previously stated in the CitJ~ide Land Use
ana Transportat.Ion Study. 'r'bese impacts are mitigated for this
project through the payment of the traffic i~pact fee adopted as
a part of the Citywide study. The following are the primary
issues a~ressed in the D£IR:
Traffic circulation impacts: Tbe citywide Land Use and
Transportation study addressed the impacts of full
build out of the Stanford Research Park. As a result
of that Study. a traffic impact fee is imposed to
mitigate the cumUlative effects of the added square
footage. Tbe Foothill Expressway/Hillview Avenue
intersection is identified for improvements to be Foade
from the traffic impact fees.
The applicant has also propos~d an interim TDM Program
to encourage ride-sharin9~ van pool parking, bicycle
use, and on-site amenities. In addition tbe
prospective tenants will be subject to the Stanford
Research Park TDM Program when adopted.
2. Employment/Housin9: The additional square footage is
s~bject to the City of Palo Alto Housing Mitigation Fee
to offset the project's contribution to the
jObs/housir.g imbalance.
l. Visual and Aesthetic Quality: The project bas been
designed to meet City of Falo Alto zoning regulations
and yill be reviewed by the ARB. Due to its location
in the lower Foothills area~ the devel~ment .. ill not
obstruct vie~s of the higher regions. In addition, .
significant landscaping and preservation of most of the
JG/1990/A/pC3400HI 3
" > .
. l
. ~'"
,
\
\
\
., ,\.
,
'---
.,
I
I
I
~~, , -..
\
, •
",. "
native veqetati~n will screen the building and provide
tor an aesthetically pleasing project_
4. cultural Resource Impacts: The known archaeological
deposit on the site ba~ been identified and the
buildings and pa~king lots located a~ay fro~ the area.
s. Hazardous Materials Impacts: Clean-up and remediation
of the soil and 9round water contaminati~n will be
implemented in conformance with Department of Health
Services (OOHSJ and say Area Air QUality Manaqement
District (BAAQMDJ regulations. Demolition of the
existing structures ~ill be coordinated vith DOMS and
construction of the project would be postponed if
deemed necessary. A detailed closure plan is currently
being revie~ed by OOHS and air saropling will be
conducted. as necessary to ~eet BAAQHD requirements.
Groundwater treatment will continue and an appropriate
area bas been set aside for location of the groundwater
extraction vells and e~~ipment.
Additional issues of concern to city staff that are not covered
in the DEIR are:
Fire Department access: In order to have sufficient access
for emergency vehicles, including fire apparatus. paramedics
and police, to the rear portion of the building. the
applicant is proposing to pave the existing emergency access
road on the Xerox site at ))33 Hillview Avenue~ This road
is currently surface_d 'With turf-block 'Which the Fire
Oepartment aoes not find acceptable to carry the weight of
fire apparatus~ particularly wben the turf-block becomes
soaked with vater 'While fighting a fire.
Entrance drives and entrance court: Transportation DiVision
bas minor concerns related to the length of drive required
to get ~o the front e~trance to' the project fer Foothi11
Expressvay and the layout af the parking and drop-off area
at the front entrance court ~ The concern is that the
visitor will find the access and visitor parkinq ar~as
confusing and disorienting. A possible solution would
require relocation of the Foothill Expressyay entrance to be
relocate~ to a point near the entrance to the building;
hc~ever, this solution could have adverse impacts on the
Foothill ExpresswaY/Hillvie~ Aven,ue intersection. staff
believes that the applicant should further review the layout
of the visitor parking area, prior to review by the ARB, to
determine if a more standardized layout of parkinq spaces
can be ~tained. (See attached memo from Carl Stoftel)
Parking lots: Transportation Division has a ~inor concern
that the two parking lots on either side of the building
JGj1990/A/PC340081 4
-"--~-, -~-.~---"
L
, "
.,
•
, '
.-.,
".~
.J , f
" 'I
I
I
I
i .
i' "
-
•
~~ receive car& on a balanced basis. In particular~
~~rn i. that the lo~ closest to Hillview viII fill
~ .• nd cars may spill i~to driveways and no parking areas
~r ~han utilile the more secluded west parking lot. The
,appUJcant has Indicate~ a willingness to assign some
,employee parking if this becomes a prObl~m.
Minor adjustments need to be made to the pa~king lot to
limit any single ro~ or cars to no more than ten before a
landscaped island is required.
COMPREHENSIVE PLAN COMPLIANCE
The project is generally consistent ~ith the Comprehensive. Land
Use Plan. In part1cular. the project is consistent vith the map
designation of Research/Office Park. the housing policy by
providing for housing mitiqation fees, transportation proqrams by
providing a TOM program and transportation mitiqation fee~ by
prolDO,ting bicycle use, and Urban Oesign Policies for main~ainin9
a visually aesthetic environment.
The project Is Dot consistent with the Comprehensive Plan in that
it does provide for an increased employment of approximately 350
new jObs on site and it does not provide tor child care
facilities on an industrial site.
JlECOKMEtrpMION
Staft recommends that the Planning Commissio~ comment on the
Draft Environmental Impact Report and recommend to City Council
approval of the site and design proposal, and forwarQ the
application to the ARB for design review and comment on the DEIR.
IIKpU1GS
Recommendation tor approval is based on the following findi~s:
f" ,
1. The project as proposed viii not have a significant
impact 00 the physical environment since the applicant
has agreed to incorporate ~easures~ described in the
DEIR# tbat will mitigate potential transportation~
housing and ha2ardous material impacts to an acceptable
level.
2. The offi~e build1nq design is consIstent and compatible
vith the LiDited Industrial/Research Park District
Comprehensive Land Use Plan designation on the site.
3. The proposed building design, with its two story
belqbt, central courtyard, and landscaped plaza are in
5
•
\
"
: ',".
t
i[
']
i
j
': ..
-
4.
,'-,
scale and character with the surroundiTI9 land uses in
the Stanford ~esearch Park.
The extensive landscape design concept for the site#
the a6ded landscapinq in the parking lots. and the
cam~s type layout of the buildings create a desirable
and functional environment4
5. The planning and location of the v~rious functions on
the site create an internal sense of order and pro .... ·ides
a desirable environment ror occupants, visitors and the
general community in that landscaping. vehicUlar
parking, bicycle parking, and courtyard areas have been
desiqned to create a safe and convenient environment.
CONDITIONS
In addition to co~plyin9 vith the conditions and mitigations as
defined in the OEIR dated April 1990# applicant shall address the
following issues prior to review by the ARB:
1. Provide a preliminary grading and drainaqe plan to the
satisfa~tion of the Public Works Department~
2. Revise the parking lot to provide for landscape islands
after every tenth parking space and to create a more
standardized visitor parkinq/drop off area at the front
of the building.
3. Provide tor additional information on the size. heiqht.
screening. etCa of the required ground vater extraction
system~
4. Revise the landscape plans to preclude the ~se of any
plant. that viII grow-to a Tlatural height above 30· in
all landscape areas adjacent to intersections in the
parking lots.
Sa Bicycle lockers must be fitted with tubular key lock
lI',echanism4
6. Sidewalks adjacent to each cluster of bike lockers must
be a minimum of 5 feet vide.
7. Visitor bike parking must be adjacent to the visitor
a~to ~ourt as shown on the ~aster site plan and not
near the emplo~ .. ee parking lots as sho'Wn on the
Courtyard plan4
8~ An emergency fire access easement must be Obtained from
the adjacent property with the condition that no fences
JG/1990JAJPCJ400HI 6
... -
"
I ~: '),
.~~~
f
,-:~, .
r
<,
" ~ -"
~
<-
~'-"
f
,
,-
.-
-1:
•
•
" ",
,,/ ~, • _ , __ r
:';':''--"~::l..!2.o!..:;.;:...;."",,,,;,..c._'''';,,;,,. ___ .,, _>,.:, __ ~~.1.-_£~ ~ ___ ~.;.._:iIt;i :2._
or obstruction may be constructed between the two
properties.
ATTACIMEMTR
Excerpt minutes of the ARB meeting of 9/21/89
Memo from Carl Stoffel dated 5/2/90
Memo frOD Gayle Likens dated May B, 1990
Letters of comment on DEIR
Stanford University Archeological Department dated 5/B/90
Metropolitan TransportatIon commission dated 5/15/90
Bay Area Air Quality Management District dated 5/15/90
Plans and craft Environmental Impact Report (Commission
Members only)
CQPIJ:S S! NT ro
Perry Palmey~ The Lovewell Company~ 700 Emerson Street 3
Palo Alto. CA 94301
30hn Love~ell. The Love~ell company. 700 Emerso~ Street,
Palo Alto l CA 94101
Kenneth Rodriguez l Rodriquez and Associates. EO South Market l
Suite 2~D. San Jose, CA
J(irt. Pruyn ... Stanford University Land,'$. Management" 851 Serra
Street ... Stanford" CA 94JOS-6~25
Dr. Gary M. Heymann, Old Trace Neiqhborhood. 4159 Old AdObe RDad,
Palo Alto, CA 94306
3G/ 19 9 0/ AI PCl 4 OOR! 7
"' -~.,,:-.,
I
I (
(
c
·--
A. ROLL CALL
Soard Members .Present:
Tbl.usd'ay, September 21, 19S9
SOOO A.M.
Civic-Cemel
2S0 H .. rni1loc Avenue
Council Conference Room
FaTo Aito, Ca.lilomia
Aino da Rc-sa, Bob E~'ans,
Michael L~\I .. a. jon Schink,
and Sf\Jrley Wilson
Nne: .. rc:fla~l lYZIl,'a ""~',5 00( present during Item It.' because be had lell
the meetini.
Board ATembers At-.sent: Ncne (except as nOled above)
Su.If Ple-sent; GiIliland, Jansen, and 'i:;uheit
B. APPROV-\l. OF Mf'tiTE!
The meeting min'Utes o( Se?tembet " 1989 ... ·ue APPROVE.D as presented ~"'i.th
correction 'to one 5eclion by Shirley Yt'ilson, a.S fono\lt,~
.~~~~~~ She corrected the sentence beginning on
:-to read as follows:
-She thought that lbe amOUIlt of paving at the lear couTd be reduced and
tandsca'pTne in front increased by shifting the building 10 the lear of [he
property plus (If 'min\Js 15" and at the same time I:.eeping the trees..-
Ms~ 'IIrtiJSOD ... tsc corrected the mistype of bel name OD that same page.
C. ORAL COMM,,'NKATlONS
Members of tbe public may speak to any topiC ... ·ithin Architectural Rt:viell'
Board (ARB) jurisdtcc~ Ilia[ is DOC listed as an A&enda item.
Nc-ne
9(21/89
Page 1 CG
". ;'.;;'->.;,· .... 11. "" ...... -.-~'--L
,.
-
•
\
·"'"-'t'·
t t·
.-,
,
1
f
:.';--'2::'<-~--, -.
';"'.0-:-:;
~ -.,
5.
..
-. , "
L.
3400 HILLVIEW 89-ARB-ll8
the Lovewell CoJKt enan land Co.
PREUMINARY REVIEW of Redevelopment of RLsearch and De .. et~me!1t Site
This will bE • maI.()( site ar-d desigc project requirIng Planning Commission ..
ARB ;pod City Council .revie ..... In addition, the project wiil require the :pte
parattoo. of • foe-used Erwiror.mentaf rmpact R'~pon that addresses J) traffic,
2) "haz.ardous maceria!s, .3) the arcneologi.c site ar.d 4) visual aesthetics.
Most Boare:! commen{S were' ruo,rable, puticular!y regarding the site plan.
Since this .. as a PREUMINARY REVIEW~ no fOimat aclKlo .. ·~·s taken. Board
members dir«led the applicant to the follo .... ing points:
Bob Evans: 1) Need to look carefully at cakutations and rear yard setbacks.
The Plan is easity readable, but don'l, see it in tfle elevations )'et. 2) The
cOf"ocep«: behind the site pTan and design are outstanding, and needs careful atten
t"ion to details of surface treatment and materiats to successrully come together.
Aino daRosa 1) Liked the landscaping and tf,e Ijute "iew into t]:le buil.-{inr;.
utE' the .... fole-band cont~nuin, are>t:nt'l i.n ito: rHlrurltl st8-te. 2) N,"ocd tl) rcnlWle
thf ice plant ..
Shirfey Wilsoo. 1} Atso enlflusiasti-c: about tne landSt:aping and site plan.
2) the aClu'ir an.:"itechlle of the .. all needs more substance; sugges-ted perhaps
additi.:>f] of • molding elt~menl. something simple but elegant in fOfm. 3) Think-.
appTKaf',[ is on riiflt uadc.
MK"aef .... pwa Jj Liked the she p!an--very 51 ron.g. 2) Thought verbal
descnpuons Of the carden .. ere quile nice. 3) First reaction .. as Inat the
buiJdin&s seem c'tunl;:y~ Needs something mo-re, something very special :hOtS
to-happen on the hcades. 4) Feet very comfortable .'ith the site plan and
cir<:ul.1tK>n..
9/21/89
Page Ii 0;
• ,. tl
"
.','" .
--~
.~ ..
•
.;-'
, ","
J -
-
/ ;.:,.ii;;:l;J;:.::.:.::. __ ::..: __ ........ __ "'-__ -'" .... .,.,..,~"""'=',.. = -ftl;l'
]on ~jlink 1) AITeed .... tth his c¢.tlea.i\l-es. Delighted with the tandscaping.
~-pta(l. with the formality of the entrance and the infOimality of tl1e
hinC e . 2) .... lso liked the .. tchltectufe~ Tired o( t7'le o .... er/deck buildings. Tbe
simplkitl 01' this arcrutecture is nice.
l'hc at't.'hite<t sa.id there is • strong. commitment [0 qU:1lity 0( surface Uf'at
menl and' materials .nd to flo .... they come Itogethet~ He said tbey are runy
ex.cited about this land plan.
-,,-""'-'
•
\ ,
.-
-
.-_.
CIT'! OF PALO ALTO
XNTEROFFICE XEKORANDOH
May ~, 1990
TO: Jia Gilliland
FROK: Carl Stoffel g
SUBJECT: comments 0l'J April 1990 praft ErR for 340·0 Hillvie .... Avenue
• * • * • • * • • • • • • • * • • • • • • • • • • • • • • • • • •
My comments on the Administrative Draft ~ere sent to you in a March
13, 1990 memorand·um. Most corrections and issues "Were addressed ..
but the following remain.
3.
4.
cs
..
Access to the visitor court/drop off area is indirect~ so that
visitor ana drop-off traffic ~ill have to travel all the way
through one of the two parki09 lots to reach the main
pedest.rian entrance to tbe complex. On page 26., the ErR stated
that moving the Foothill driveway nearer to or in front of the
main project entrance ~ould not be feasible~ but it did not
fully discuss this option. such a detailed discussion should
be provided ..
We had suggested that more spaces be provided in the eastern
parJtinq lot to preclude an imbalance between the two-lots. On
page 29 of t.he EIR., it is stated that the applicant "Will
monitor the situation and assign parking spaces in the "Western
lot if necessary. Though this is not the best solution., it
seems satIsfactory. ~
on page 2'. the first phrase of the third sentence should be
changed to read: WIn accordance ~ith the requirements of the
Palo Alto Zoning Ordinance •.. •
On page 21. the second sentence in the first paragraph under
·Off-Site Mitigation· should be changed to read: -This fee
would help fund improvements at eight intersections in and near
the Stanford Research Park., includinq the Foothill
Expressway/Hillview Avenue intersection.-The next sentence.
referring to the Citv-wide Land Use and Transportatipn Stu-dy
should be deleted# as it is not correct.
"-. '.
•
-.J< "
: ':.:1t. ,
\
I'
\ , .
I
-
, .
Kay 8 .. 1990
CIT"i OF PALO ALTO
INTEROFFICE MEMORANDUM
TO: Jim Gilliland
FROM: Gayle Likens GfJL .
SUBJECT: Project Review Comments for J~OO Hillview Plans (dated
April 30, 1.990)
• * • * • • • • * • • • • • • ~ • • • • * * • • • • • • • • • • •
My comments regarding the bicycle facilities are as follows:
1. ~he number ot Class I bike facilities shown on page 1 is 65
lockers. The locker5 co~e in ~ultiples of tvo. 1 believe
thQ correct number is 64 lockers, base~ on the estimated size
of each bite locker grouping.
2. The manufacturer 9iven for the Class X facilities, Bike
Lockers LTD •• Is acceptable. The lockers must be fitted with
tubular key lock mechanism. The barrel bolt lock wbich is
also menti~ed in the manutacturer's specifications is not
acc::ep,table ..
3. '[he sidewalk area surrounding ea.ch cluster of Class I bike
lockers must be a ainimum of 5 ft. wide. The plans now
indicate only 4 ft.
c. ~he visitor bike parking is shown on page 1 (Xaster Site
Plan) as ~inq adjacent to the vis tor auto court and drop otf
area. But on page L.2 {CQUrtyard Plan) the visitor bike
racks are located near the employee parking lo,ts. The latter
location is not acceptable. The V-Lok style of vistor bike
racks is acceptable, however.
5. Subsequent sets or plans must show the visitor and employee
bike parking areas in more detail.
•
.•
•
'::.~f. '
.~
'.
.-';.:::.
,,' ~~
-
Mr. James Gilliland
CiIJ ol Yalo Allo
Department 0( Planning and Community Environment
P. O. Box 10250
Palo AIIO, CA 9430H)862
RE: Cullural Re"",rces at 1M 3400 HiD";" ... Avenue Projecl
ow-Mr. Gi!Iiland,
n"SFORD t!NI .... ERSli't
'UPl,.DtNG 110
S'TAJ'II1'O!I:D, CAUFOJINl .... 901)(,~:! i4S
.c.snzs,1'l!S6
r'::' r: .-. ..-~ -:----;:.
I. ,i"-.' ,) .. lay 8.1990
lil.' rk~ 1C!;:lj,J :.::.'
; I }.¥ o/"pC~ ~co"~;:"\ .
Thi.letter ~spond. '" your April S, 1990 request for comments on lIle Focused Draf!
Environmental Impact Report for 1M XeenanlLoveweD projecl al 3400 Hillview_
The Cullural Resources section of Ille DEIR (pages 46-<17) gives an accurale
description of investigation.'" dale .t archeological sil. CA-SCL·3, located on Matadero
Crttk ., 1M project sile. The proposed .ite plan inelka.es Illat buildings, parking 100 and
watk-...·ays bavc beeR destgned 10 avoid disturba.nce \0 arc'heo1ogkal reS('>lm:es. Theref-ore.
Stanford's Office 0( Campu. Arc~eology is funy san.f",d tIl.t propooea construction and
gra<ling activities WIll DOl impact CA-SCL·J.
As noted on ptge 46 .. it is possible l11al wnstrucuoo activity may impact isoTaled
artifacts or human .remiUns outside the boundary of CA-SCl.p3+ To i<fentify and recO"'er 311,
isolated artifacts or .remains. the Campus Arcbeo1og:y OffICe will monitor an gradlng and
excavaJion wode. related 10 construction on. t1\e project site. We win a1so enSlJre that
appropriare mitigation measures are JOnowed in the even! that me project disturbs human
remains.
Than. you for til_ oppo<Iunity 10 Commenl on til. DEIR (heran we find tIlat the
project poses no sjgnirx:ant impacts '10 the cullural resourtd at 3400 HiDvie .... ,. Campus
Arcl:!eology would like 10 commend the Keenan/Love"Vrt'eD land Company for designing a
project wbiel! "'ill prese",ellle importanl arcbeologicaJ sire .t CA·SCL-3.
Since.n:1y.
Barbara ~k. P~.D.
Campus Archeologist
ce: Kin P",yn, SW1ford
,
l '".
--'."7:-
I
! .,;-:-.
I ,
I
,
I
t r ,
I
I
I c
l
1
l
, .'
"
-,-Aln G!\.H.JI<I
bwu.1. c.u,.,au
c...~c-.0. ... , L §C".ODn
STl .... WIOI
''''"''"" _.c-,
IQ.(U I. SIO(IlWtU -,-hiD Nr<; .. ...... -
CIfW_~
DotIl'W.&.o" ..
.... lIn G. 1.1"
s..._c_
,. .. IU[I
To. Noo. ...
s.....o...r_
)tJ.oa I.luu,)I.
100 DlaIDO ..
""--...... ,-
,. .... SotIIJWC; -,-
W'La ... L llK'<4
... _ ... _ ..
"'-'---0. ........ Mclltv. ...
1' ..... ~_ --<--"'",(;110 J.. SoI.o('\IS.Oo
.... ---'"------"'II:. lo.c .. lOf. D
r __ ... _o... ..
t..o. ...... -.a o. o.. .... ~
~r __ o-...
W"-II".'. H'I""
.. -
i,
MTC
M,ETIO'OU1"N.
TRANSPORtATION
COMMISSION
1:7'. i-,-' .. -"
,::-'1 h-
Mal IS. 1990
DepartmeDt of 'Tann!ng and Ccmmun1tJ £nvironment
250 Hl.llton A,onue
P.O. Box 10250
Palo Alto. CA 94303-0852
Attention: JamfS Gilltland
Subject: Draft £,,'ronm,,101 Imp.,t Report. 3400 HI I hie. Avenu"
Doar Mr. Gl11llond:
Ibts letter conta1ns Metropolftan TransportatTon Commlsstcn (MTC)
staff <""",ents on the D£III for the 3400 ~llh!o"',,enue ,rojoct.
rhe project .oul~ replace 92.000 squaro fe.t of Indu,trl.1 space
wlt_ 205.000 squore f.et of offl, •• paco. The ~roject ,It. Is
Io<ated near t~e ,out~w.st corner of the fot.r.ectlon of foothill
Expressway and ~111Yfew Avenue 1a t~e Sta~ford Re~earch Pari.
T~e O£I; contaf~s I comprenensfve discuss'on of transpo~tation
Issoes and impac~s whfc~ would res~lt from development of t~e
project. Our comments irE lim1ted to the following points:
1. Tran5PQftat'on Demand Management. Tht DEli emphasizes
Transportatfon Demand Management (TOM) strategies to reduce trips.
The TOK program meaSllres on p~ 2B could be e\l!n mo,re effecthe if U
~ere to consider ~referentfal parking for ranpools and carpools.
2. Siry,l, Cfrcplttfon. T~e DfIR describes several features of tne
project ~hfc~ would encourage bfcycle commuting. sucb is providing
bicycle lo<\ers. employee s~owers~ and bicycle pat~s ~ithiD the
sit •. The DEIR should also ~iscu" bl,ycl! acces,ibilitl to the
projett sltt from t~e surrounding resfde~tfil areas ~t~fl a
comfortable ~!cy'llng distance. Th. DUR should also discuss how
bfcyclfsts 'Would' (ross malo,r roads such as Footh'ill £.presswa,)'.
EllIYfe~Av!nue. and Page Mill Road.
3. Access t? Trans,t. The DEJR discusses existing transit ser~icE5
I. the .'cl.,ly of t~. proj.,t. Althoug" s.veral bus rout.s stop
neaf the fltersectfon of foot~"l [lpresswaJ and ~ilIYfe. ~wenue.
the DEli ~oel "ot speclflcall] 'iscus, ped.strla. "cess betw •• n tho
bus stop .n~ the buildings. A lack of good ped.strlan acc •• s
between bu'T~fngs and transft stops tends to discouragE transit
~se~ We recommend tnat such access be consfdered lB the sftt ~esfgn
as I strategy to promote transit WS!.
\
Josl, ... Po IOIr MnlOCINJU -101 (I(;HTI't Stun • O~.r;I.ANO. C" 94607-'100. 415/464-7700 • U.X nS/464-7148
-egA"' '0----
•
!
!
I
f .
I
•
•
,
".---.
Rf: ~, I hlew Avenu.
l1al 15, U*
fage Tw~
\
Tha"~ you for the oppc>rtunlty to eanmeot on the OUI for the 3400
Eillyiew Avenu. projoct. If you have .ny quostlons about t~ese
comments. pl •• s. eo'l Be ot (415) 464-7662.
lOI:rbp
6849p-1O
ee: Commissioner Dlrl60n
Canml.sloner Bo.I'
Sally Conoal., ABAG
~enrl ~llken. BAAQHD
Ha6. Creon., Ca,tr.n. Dl.t. 4
Very truly yours,
K.lth Mattson
[nv1ronment.l Revfew Officer
. \ .
•
.-;
'. ,
.,-.~~-.: .
C~i·
•
~ .. ' ... ' ..
t ..
, .,,~-. ".'
.1. .... 1£0 .. CO\ft<n'
£" ... ".dI" C."\Ilb<l~1
$" '!fo, J c.-..pOe~
IC""'pt<IIO"J
C .. ...c:k CO'OCI
Fr.~ M ~ ...
-, ;~. /. __ .... ~ __ .d.._.,.... ...... ____ M ......... _-_ ""."......~ ___ :-",,,,,-,-~ __ ,_,,,,,,,-.,
BAY AREA AIR QUALITY
MANAGEMENT DISTRICT
May 15,1990
,c'
\
CO~, j:U, COS," COUNT'"
Paull Cooper
!'Sec,,,lot'rl'l
S ... ~,.,. .r.g1l1 M-c~u;.
City 01 PaTo Alto ! r ; . i .~ L 8' -;, L 1 t-
t,'",R;IPI,I COU~i ... .. ,., .. ~ ..
,..A.P .... CO~T'I'
8ce a,7>'k
S" N n,,,,'llCrSC::> COUNT 'f'
" .. ", G e.rt!
.:l ,m (;Q<1lll~'"
S-'<N *'110 TEO COU'f\jT'>/
G~ J ""CO'~ .. lv:!o
""..,~ .. e .. "oCl
~~"'~" Cl ........... COI".,."rv
"'l'~" C'<!oI"iii""
'<;,'J 0,,-<:,-..,
I':,-:-·"'iI '-< "_eo--,"
S,,· v·-" "", ~.,....
~~JL:.-..r:'CCl"''''(
O'~. 0"."
"II"",C""?E-:5.<t"
S::"'O~'" CC"' .... TW
J.,"">;.~.,,;o<'
Department 01 Planning and Commun~y Development
250 Hammon Avenue
Post Office Bo. 10250
Palo Alto, Cal~orn;a 94303-0862
At:en!icn; Jarrnls E. GilIITand
~ AdminislIalor
Dear Mr. GmITand:
We tlave reviewed Ihe Draft Envlroomentallmpact Report for !he 3400
Hillview Avenue project The project proposes \he redevelopmenl 01 a 16 3
acre sfte in 1I1e StanTord Research Park and the construction 01 five
bu~c!ings comprising a Iotal area 01 206,000 square reet The proposed
project would replace a 92,000 square loot induslIiaT lacmtl.
The proposed project has incorporaled a streng Tran5por\aTion
Demand Management (TOM) program as 01'1€ m~igatlon of project-reTaTed
lraffiC and ak quanty impacls. We are pleased 10 sw !his commitmenllo a
TOM program. We commend 1I1e Cfty 01 PaTo Alto for making the TOM
program a COO<:f~ion lor project approval. r the project is approved, then
such a Program will helj:llo redt.i<;E lotaT vehicle Ir"ips and hence will help
redoce local and regional emissions 01 air ponutanTs.
In Ihe discussion on the proposed project's cooslsTency with local
and regional goaTs, plans and policies [pages 10 Ihrough 13 01 the DEIRJ we
nole lIlatlhere Is no reTerence made to the Bay Alea I-Jr Quanty PIa,,-The
Final Envlronmentallmpact Report (FEIR) shouTd include a cliscussion on
whether or IY.)( !he project is consiSTent with the assumptions and
preo'"lCIions contained in the Plarc Relatedly, we also would appreciate
being "'10fI!100 abolA Ihe starus o(!he Alr Ouanty Element v.f1ich had been
prograrr~ lor Palo Alto·. own General Plan Upc!ate. We !<.now that the
special study, incfuc!ing special carbon monoxide mon~oring, was
completed by consuftanls a lew years ago.
In OUt' fe"e< 01 February 13,1990 in respo<'1se 10 !he Notlce 01
PreparaTion oIl1le DEIR. we recommended thel any remediallon oIloxi<:
contaminants be completed prior 10 any excavaHon or construction laking
-~ ..... 'I ... ·1II75io1' ... "Cr"·-.-.. .---.
.. .
. " , ,
\
\
'-., . .,. . ~ \
,
, .
,-;,~
'.'-
.,
[
i
I
": -----:-
i -~/~" ~ 1~1rl' •
•
--:~"':~.M~: ~ ~ . )
IAIIJ~,,"~:;.;, "-..;..~ .... __ .~ ""'"_~_~"_""""""";:;k"'''(j"AII''' __ ''_''''_;''''~~-_
'"
1$
-
Mr. James E. GiIInand
Ma~ 15. 1990
PagE 2
place at fle s1le. We would again like 10 ma~e lhis rec6mmendatlOO as a
prudanI aftemalive 10 allowing construc'ion and clean-up 10 oea:"
slm<JftaneovsTy. We lee! thaI keeplf'\g \he two aclivities sepa,ate will help
minimize \he eKPOSU<e 01 workers 10 IOKie contaminanls .
• you have any questions, please can M'odlae! Mu<phy. Planoer al
(415)771-6000, extension 133.
ce:
SincererI'.
~~
Mihon Fe1dsleill
}Jr Pollution COntrol Offieer
BAAOMD Direclor Martha Clevenger
BAAOMD Direclor Rod Diridon
SMOMD Direclor Roberta H. Hughan
SAAOMD Direclor SusaMe wnson
MF:MM:1m
I
I
h· >. ~ .......• -
i
-
. ,
/
IMFDRHATIONAl ~rMnRANDU~
ARCHITECTURAL REVIE~ BnARD
JUNE 21. 1990
I • REGUUR AGENDO\
1. • as-ARB-2ll
89-D-1~
B9·[!~-4e
Kajor $ftr and desfgn re~few ~f demolition of a~ existing
90,DOO-square-foot rtsearck ~nd development building and constructiDn
of five new tw~-sto~1 buildings totaling 20S,OOD sQuare feet ~it~
surface parking fo~ 688 cars
REQUfSTEO ACTION
ARB review alid comments on Ue Of'aft Environmental Impact (DEIR) and
recommendatfcD to titl Counc1l on the site a~d design appl1catfon. Site
lDfo~ation. zonfn; desfg~at;on and fnform~t~on en the En~ironmental
impact assessment is contained in t~e attac~ed staff report to t~e
flannlog COl1l11lss!on dat.d l'Ial 25. 1990. The OfIR .as dlstr; outee! to the
ARB members on June 7. 1990.
BACKGROUND
The propos~d des'gn was rewiewed by t~e ARB as a preliminary ~n September
ZI. 1989_ The minute. are attached to the Planning CommissIon staff
report.
The prDject was rlvfewed by t~e Planning Co~fss;on on June J3, 1990.
The CommissfGD had minor comments on the OfIR, specificall, requesting
inclusion gf wfs~al drawings ~f typical ~ater stripping towers,
IIHfgiltions to redlJ(~ t~e ... isual and aBsthetit impacts of the reta1r:Jlng
walls. fncl~sfon of monitoring and mitigations related to the speed of
traffic Dn lhe drfwe~aJ entrances, an explar.ation of the
10,OOO-square-foot exem~tfon for housing and trifffc mitigation purposes
and ioclusfon of a statement regarding long-range water availability.
The Commiss~cn recommended approval of the site and design ipplicatfon
fnc~ud;ng ,ondllions I t~rcugh a is listed on pages 6 and 7 of the
enclosed 'lannfng Commission staff report. Since the colors ind
materials ~ad not been rev~ewed by the Commission. the CommisSion!fS
requested that the ARB closf1y stf~tinize them, IS well as tne design of
the retoiling wa1ls.
The project flu rece-h.'ed approval frora Stanford Uni'llersi ty fof' the basic
design fntluding the site plan. ~assin91 ~relfm1~ar) landscaping 1 basic
building walls and color palette; however Stanford ~a5 not giv~n final
Ippro'llal tG the desfgn subject to tne follo~ing conditions:
J~ Rewhfon of t"e entry porticoes for build'ings :; and 4;
2. RevisiDn Clf III the buildings· cornEr balconies. related
fenestritfo~. ind solar S(rfen~~g de'llices;
-5 -
•
,
t
,
1;-.
l
i
-
•
, .
\
. .
"",~.--~-",,,,~,,,"'\."""Qo,:!,~-~.~~
l. Spe,lflcatl~n.f the 'ill.14e ret.i,ing w.l1. fin.l design .nd
lI'Iaterf&1s~
4. ne.lg" of the proposed hillside st.irwa, connecting t_is .Ito w;t~
kerol·s upilope site;
5. final landsc.po plans Including the grading pl.n; an4
6. final &.torl,l an4 eolor pal.tte for ,II exterior development.
The l.ttor from Stanford Unlverslt, d.ted May lO, 1990 Is Included In the
pa,ket.
DESCRIPTION/ANALYSIS
Included I. the p.c~et or. three sets cf drawings rel.ted to the project:
I. A larger set of bloe line drawings dated April 30. 1990.
2~ An 1]-xl1-set Df (11or presentation drawings.
3. An 11-.1'· set of Xerox drawings. rl'S set has additional drawings
showing the stairs (IE). front elev,tlon. for buildings 3 and 4 (SA
.nd 86) .nd building wall secllons {9A .nd 9B}.
Related t. the deslg. of the building and .Ite. st.ff shares the c~n,ern.
expressed by Stanford Unlverslt,. If the projecl is being designed .s a
campus with the possibllit, of several lena"t$~ t~e secDndar¥ e~trances
co buildings 3 and C should reflect .n appropriate deSign. II addition,
the pro;osed sun screens prDYfd~ an eXiggerlted scale to an Ilready
~assive butldfng. The proposed round ctlumns at the entrances are not ;~
leeping with t~e project d.sign. V. beliov, that these entrance
elements, balconfes. sunscreen elements. and wall settions, need f~rther
design efevelopment.
I~ idditfo~ to t~e flfonmat~o~ req~ested by the Plann\~g Commission (or
the air stripping towers. st.ff believes that the applicant should
provide some details at this tf .. as t. how the .ir strlppl~g tower >rill
fil f.to the site fl the loc,tlon shown on the page 1 site pIa.,
Including any scre •• IDg. landscaping and additlon.l retai.iog .a11s.
RECCHMENDATION
Staff believes t~at t~e above design .lements are significant and that
design revisions should returl to t~e Boa~ prior ta sub~itting for I
building per&it. However, I. order to allow the proposal to be heard by
the (It 1 Council prior t. Cltl Council racalion (August 14 to September
10). staff \. recommending that the ARB comment on the O£IR .nd recommend
,pprov.' the site and deSign proposal with the f.110wing conditions whit.
Ilust be le"1ew~d and Ipproved fly Stanford UnhersUy Ind the ARB pri.ar to
submission for, Building Per.it:
I. Revision.f the entry porticoes for buildIngs 3 .nd C;
t. Rewisfon of III t~e buildings' corner balconies. rel.ted
fenestritfoD. ind solar screeniDg dtvfces;
-, -
I
I
[
,.; ",.i
,
-
). Speclflcatloo of the billsl~e ret.!,lng walls final desi~n and
lIilterhlsj
4. Design Qf t~e ~ropcs!d '1111~de stairway (onnectfng t~15 ~ite with
X~rcx~s ~pslope sfte;
~. fln.l landscape pl.ns Including the grading plan;
I. firla' lIiterfil and cclor palette for all u:te'r1or cfeveloprr.ent;
J. Approval by Public ~orks Df i1 preliminary grading and drainage plan;
8. ReviSion of t~e parking Tot to provide for landscape tslands after
ewer)' tent~ parldng space and to create a If·ore sh:ldardlZed visitor
parking/drop-cff area it the frent of t~e building;
9. Additional hforll'1ation on He size, height, screer~ing. etc. of the
requlred ground water e.tractfon 5y~tem and illT strippin~ to~er.
10. RevisfoD of the landscape plans to preclude the use of any ~lant that
will gr~~ to I natural height above 30· in all landscape areas
adjacent to r~tersections f~ the parki~g 10tsi
11. PrDvfsfon for the bfcycTe IDC~frs to ~e fjtte~ wit~ tubular key lock
lIechanism.
12. Redesrgn of the sfdewalks adjacent to each cl~ster of bile lotkers to
i mi~imum of S feet w1~e;
13. Relocltfon of wfsitor bTle parklng adjacent to the ~1sitor luto court
as sllown on the master sHe phr'l and not MaT the employee parklng
lots is shown on the courtyard pian;
14. Pro~fsion fer an e~ergency fire acc~ss easement on t~e adjacent
propert, (Xerox) with tne condition that no fences or obstruction may
be co~slr~ted between t~e two properties.
[~ additro~~ applicant must comp1y wit" t~e conditions ~nd mitigat50ns is
~efio.~ i. the DfIR dat.~ April 1990.
Recommendation for approval is based on the following findings:
J~ The project is proposed will not ~ave a significant impact on the
pbysical enwironment sfnce the applicant ~as agreed to incorporate
~easures. de~(ribed 51 t~e Di!Q. that will mitigate p~tentfll
transport.tron, houstng and hazardous materfal impacts to an
acceptable level.
Z. The mffice building design is consistent a~d compatlble .nt~ the
lfmited I"dust,ril/Researc~ Pari District Co~prehensive land U5e Plan
designation on the site.
). The proposed building deSign, with its t.o-story height, centr.l
court,)'ard. and hnds.caped phza He in sc.aTe and cl',arac.ter witll the
surrounding land ~ses in the Stanford Research Park.
- 1
~
I ,
f , -,
•
..
~~
I
•
/
4. ne oxtens've landscape desIgn concept for the sIte, tho added
landscapIng I. the parkIng lots, and the campus· type llyout of the
b~iTdi~9S crelte I desirable Ind functfonal environment.
5. The Fllnnlng and locltlon of the .arfous fuoctlons on th. sIt. <reate
In rBte~ll sense of order and provides a des;rable eovfronment (or
occupant •• Yflttors lnd the 9~neri' commun1t1 r. that '.nescaping,
•• bfc.hr FarUng. bIcycle parllng, .nd courty.rd .r ... h"e been
designed to create I saft and (onven;ent envtronment.
-8
:'~:~jxr·
. ,.-"".~-. -
•
. :
, .
-
Lands Mlln3f,ement
"'Y )(). 199Q
Kr. John Lovev~ll
The Lovevell Comp8ny
]00 Emexson Street
Palo .!lto~ CA 94>01
SubJect: Approval of tl-.c; neW' buildirlg de',·el.,pmene at: 3400 Eillvie .....
Q!C V~ntur~. 'al0 Al~o,
~e.olr Jobn:
This letter notifies '0;.1 of S'ta'(\ford's app["~va.l for the above
referenced proJect. This lIajor rebuilding pcojecc: encompasses c:be
demolition of the ex!st(ng building and tbe construction ~f the nev
flve builGin&~ 2'05.000 square foot comp1ex. Our approva.l is stlbject -to
Stanfol:¢'s satLsfa.c.tory subsequent: rl;vie. of t_he follo.,;ing.:
1) ~ev1sfon of tne ·front~ ~o buildings' entry portlcoes;
t) llevIsion of all of tnt. buildin.gs· corrj£r bal<::or.ies, related
fenestration, and solar screening devices;
3) Specification of the hillside ret~ining valls final d~sign and
.aterials;
4) Design of the proposed hillsIde ,Hain.:ay c.onr,ecting this site
vieb. X~ro-x:"s upslope. site;
5) FinAl landscape pla.ns including c.'he grading. plan; and
this approv~l is ba$ed OD our re?iew of the project"s architectural
elements tb~t Wer~ descrioed in the plans submittpd ~o my office. Any
alteta.t.ion.s of th~se plans 3l.US~ be simi lu: l, re~"ie",,£d and appt"cved b,
dds office.
AdditIonally, our appr~val 1s subject to ~he fpllo~i~g co~ditions:
1. All governmental approval. safety. f.rocedural, ane -':)ther
regulatIons and standards ~h~ll be met i~cluding the
5ilthbctor:t completioD of tne EIR,
. .
,
r t ,
" ~:.
i
!
f
I
!
\
, -~ .
~r. John Love~ell
Kay 10. 1990
Page. tvo
2+ Vrltten notice is required ten working &sys prio~ to
c:oZllllencln, construction so tbat an "pprcpri.3te N(ltice of
Nc~re5ponsibl1i~y may b~ ?os~e4 by Stanford. This t~lud~s
• notice prioy Co ~molft{oQ and a sImilar noeice prior to
building construction.
3. One set of as·built plan5 ~11 be fcrward~d to this ~ffice
with!_ thIrty day. of project eom91etlon.
4~ All r~asonable precaut{cns t~ safeguard existing trees viII
be te~en aurins Constructfon.
5+ A Stanford archeolo&t$~ (or suitable representative) may
Inspect .ny escavatfoo for the ~resence of s[gniflcant
archeolo,lcal artifacts. In exceptional cases, tbis
insp~cttou condition could t&~e the form of continual
monitorIng (at a nominal hourly rate to be cbarged Co you)
and PO$sllJle job stoppage.
6. Vh~re ~xc&v&tion Is necessary and tbe possibility exists of
encoun~ering existiog un4erground utility lines. the
Under&round ServIce Alerc org.ni~~t[oo will be called twa
vor~Ing days prior to ~xc&vatlon commencemenc
(SOO-t41-2444).
'lease feel free ~o call if you ~ave an~ questloos_
y~~I~~~ LIInds &n.a~lI!r
V'IQI;hr
c-c: !arbar. ~ocek~ Stanford Ancnropology
Car~ ~yaon~ Antbony K~ Ga%zardo & Associates
n.vid Jie1.Ul.an~ St.anfo·rd
OrevOman s Stanford
ken lodrigues, ~.nneth ~odrigues & Associates
Vir&infa ~aThelt, ARB
:~t~~~~4/:
';... J' -
--
'i "., •. .*
. .