Consultant services for 'l'A~.g.~;t .. j:"nergy storage Monitoring Project
Members of Council:
This report recommends that Council authorize an agreement with
California Micro Utility. Inc .. (oro) in the amount of $41 .. 10'0" to
provide specialIzed consulting services for the expansion of the
Thermal Enerqy Storaqe (TES} Monitoring project.. Council is also
requested to authorize $4,110 for change orders to cover
additional costs if necessary.
Although funds were approved in the 1989-90 budget, this project
was inadvertently left off the list of projects submitted to the
Finance and PUblic Works (F'PW) Committ.ee (CHR:312:9) for
deter.in~tion o~ committee interest in consultant selection
approval. 'lihis project is being submitted directly to City
council for approval for the folloving reasons:
1.. Cost of Project: Cost red·uctio..'1 is contingent upon
approval date. F*PW revie~ would delay Council
approval and. s·.lbsequently. start of the project until
late July. This ~ould cause staff to miss ~he window
of opportunity in the design phase for at least one
customer and add approx-imately $~. 00,0 to the installed
cost ..
2. Type of Project~ The p.roject is staightf"onrard. It
is an expansion of an existing council-approved
project. It will connect five new customer sites to a
monitoring system that presently collects data for two
customer sites.
CKR:3H:O
•
l '.(
\
,
,
\ ,
\
\
\
"\1<.
-
.~
.. "~
-!"
I
I
I
I
I
I
I
I
r-I -
----r-
e .. .: ~ • _-_-__ -_-_---__ -~~_~ __ -, _____ L __ -"
-
J.
Background
o
Consultant [or Project. Consultant selection is
uncontested. ~he same consultant is reoorn~ended for
tbe expansion that designed t~e existing system~ The
consultant is ~ell ~alified and will perform the ~ork
at a reasonable cost.
On December 11 .. 198"1 Cou·ncil, authorized: (CMR:564:7) an agreement
with CMU to design and supervise the installation of a custo~ized
TES monitoring system at tyO of Palo Alto Utilities' customer
sites. CMU was selected as the proj~~t manager because of its
unique experience vith TES monitoring~ The system has
successfully collected customer data since September 1988. The
final deliverables of the initial project ~ere completed April
18.. 1990~
The Objective of this current project is to expand the monitoring
systen to include the five new TES systems installed since the
start of the monitoring project. The expanded syste~ would
p~ovide the Otilities Department with valuable electric load
research data. The air conditioning loads measured by the TES
monitoring systea are a representative sample of the significant
load Which drives the City's electric demand peak. The
comprehensive data profile yould be used in electric load
forecasting. Monitoring the new TES systems also ~ould determine
~etber the customer's systeD performs for the five years
required by the PARTNERS TES installation agreement. The data
can also be used to verify the accuracy of Time of Day demand
billinq for TES customers as provided in the Utilities' E-2 rate
schedule. Tbe data ~ould also be used tor evaluation of the
PARTNERS electric incentive program.
To accomplish Palo Alto's objective in this project~ it is
necessary to hire an experienced ~sultant familiar ~ith TES
~onitorin9 systeD desiqn. CMU has comprebensive kno~ledge in TES
monitoring and bas designed 15 sites for Pacific Gas and
Electric. CMU bas previous experience vith Palo Alto's custom
monitoring system and would provide the City with a compatible
expansion to the original project for a reasonable cost. The
oonsultantls work is specified in the attached proposal. The
work for each of the five sites includes: ,'l.ssessmcnt of site
feasibility, productIon of design specifications. project
Eanagement during the installation phase~ addition of the
CMR,)H:()
--
•
,
....:
,
.'
'.
'.
-,
\,
.,.',
\
\
\
-,
~~,~,
\
,
" . ,
. '. -
.~ " < .-. , .
feasible sites into the system software and modification of the
user's aanual .
CMUls quote of $47.10G is reasonable for the scope of ~ork
requested. Funds are budgeted in the fiscal year 1989-1990
operating budget~ Hardware requirements will be deterained
subsequent to the consultant's design work and will be funded
from fiscal year 1990-1~91 funds.
Recommendations
staff recoJlUlleoos that council:
1.
2,
Autbori~e the Mayor to e~ecute tbe attacbed aqreement
with California Micro utility. Inc. in the amount of
$41 .. 100 to p·rovide specialized consulting services for
the expansion of the TES monitoring project~
Authorize staff to execute change orders in an amount
not ~o exceed $4,110.
Respectfully sub.itted~
-----'}
rtA·., V oove<,<-1.:1 i-? r
PETER GOVEA
Program Coordinator,
Energy Services
/~~_M .
RICHARD L. YOONF"
Director of utilities
Assistant city Manager
Attachments
QIR:]U:G
"",---'"7 L
\
-
•
. ,
I •
[ . : r·.·
I
I I
-' _ c .. '-
• • -.--"--
/'---
AGREEMENT No. __ .
(l1!;:tt 'll<M':tFl RV'e:RRED TO AS CONTRACTOA'.; "'" G(Jt.;.SIDEqAi.o~, Of' iKEI," iIoIUTU.o.L CO\. EV!'.c:i, T-IE f>A"~'E:S H!:.RETO AGJltEE ".S FOUOl'iS
• CONTRACTOR SHA.LL ",ROVrne CoR FURN.'S~ T!-1E F':lI .. :JJWi'I',G s.PEC;IFIE D ,'>C",'.1CE S "'<C"Qt'.~! C of' ":11 :.5 5?~If";E ~ IN E"HI8.IT ______ ~
A r f ACHl; t' ><~"I£10 AND 1NC000000000TED "ERErJ\l 81' THIS RE:';;Ei"E:"K.E
~nlcEs shaH be pravicf€d by Contractor, ""hose unique qualiffcations the City is re1ying
or.. S.enices to be prollfded for de\lE:loping tr,ermaT er,ergy st,Jrage me,r;itorfng at five sites
1'1 Palo }i,lto,. ;111 accordance with co,nplete scoiJ€ of .... ork. set f,jf'th 7:'1 Exnibit A~
• EXHl~TS THE .FOllOWING .t.TIACHED EXd18lTS KfF;t:SY ,~~E ~,l,!,)E. P",-'1, O. T"'~S A'J':kE~E'\;T
A "Sr.:ope of \Jark"
B -·Contract Bu~get·
• TERMS THE SERVICeS AND~ lOlA i£R~S FUR~SH.t(j. U~IDEA nilS .l\c-.. ~(t:·JE·oIT SH~~L CCi,!~,I(:-o.:::,,; c~, t.:~.e d _~ . .t~ 5 hawn abo ~ e
ANC-5!-'.I\L1 13.( COM"'t.ErmElEFOl'IE __ Ju.ne ~ .. 1991~ _ .. _~_ ..... ~_ -
• COMPENSATK>N FOf'I '!h'EFUU.F'~RFOfNA~E"G~ T""S""-'R1.[~::·lf
ill:. ClrYS.t.l\i-LPMCDNTAACTQR. a total amO(int net to eKceed 547.100 u!',<ioe.r th,ls. Ag<!"eement. Co(,tract'Jr
shall SlJ1:lmH montl:!1, il'woice;;; to City for paymef1t~ in accordaTlce \ljHh the budget set f0-rth
~J~~It:'OhUJ~U~U 1111 Exll1'ib; t B attached hereto o>'1d inccrpc)rated hE:rein by tM1S
reference~ Citj s~dll pay Contractor witnin thifty (30) days of
receipt of such imroices.
• PAYMENT RECORD ~ARmEi'OT USE 'F\EVf.RSE 5'0t-.•
• GENERAL TERMS AND CONO£TtONS P.RE rNr".;'.UD£D O~. BQ;rK SfOES OF TroiS D·CtCUI,.~.ro.T
rw<; AI"RE::~I~~F SH,;,j.L BECOME F"mcTlI.'E UPG~ ~H A?PftQ'.'il,j. J\'jiJ E.(f':lii,O~ S" cln. 1-'" W'T·I~SS.l:-"R, )~. T~E PAP-TlES H,I'/E n~C',,'!D r,.:5
M.iF',uIlOl1:'] f:1!: OA'I.li1JN.fH. A/IOO YEAR FIRST w;'=IIITE:'Il .!2D'JE
t4::-11! flARftI'lfSS, (r)fIJ.rF:,lI,CTOR .:I\l't:eS ro inj.mr:ifl; Qol"ml Jntj ~cl~ ~~r'n:e,~ Cil'! II~, ~l"ico":> a-;,r,~, anc ~,,·~;n'.,,'"~ I::," a<')' aJ'l[f dn [fema"~ cla'r1'S 0' II~I;I;':J' ,~
~"'. n ,trLr:~ 1·1(:u.-llng w'[)n~JI d~~!h. tJ<I,tC !:l)' (lr JI'! >I;l~ c~1 ~I C ,.,.",.,c,,~ :0" So, rt, ~~,,:""S a~-:! '1S (II e''''p:':'f~ '" ""';:' J~1t l1:.1'!, e"c.,,", (l' O'"JI',.l'U"~ r;;r ""IU
rr,'" Jr':h:, ,J< c""rI'JCI tur 1lI'1>ctl:Jle :"'IIIr.-·.D'~se~ ~,,-;1 :lJ~II,t'i ')11 C-:'~~~:'!'( f.)R 1r1:tl~ ~"~"-m,Jn-:e-::v ~JII",,-, rlJ ~~""j"r'''' . """"~"~"11 ~ CCJ~I;F.II:iC.R
till LRf ~CRFEME ~T. HII'. "M;l r~e In~nt iJllUtlJ:Je'-(rs .JI.) j:1l.n~I~.llin.:; or-:·h~ .. 'l:.';"r.,:; .. !";~':":if ·~w·:~~n! it;~ "n:,,? J';~ ;,~ ,~': n.· ... ~I:r, 11', • .0,1 ~>t:5 "'!~ :e".Jl~r.r ~') ..... ;J [J'JI~ ,~
,wli .:~:~ ." t!1. e :1111~nl~:II. matfflals (]I' su;op:ies ur pJj "'~1I1 t()r >1;1 ", ~ \'o'!'1!':h "':l~ ~ :ll~ >utJ,;,-;1 ,:rI ~,:; ';0:1,,': ~,., r.,:;,,' '-ilj"~~:l1';~1!, rep--e~~n:a! ": :IS ":~':".:'" ,I
II.':; ,1!.It",;", oj'~ ulld~"dklll~~ 1IIt1t;1l'er olrar ()T '.-"tl"l1 J:~ s:lDer; .. d~(l "=r~!,)~
• >L i'T
L lftdsay JoyE' -----
~~ i) ; ~ 1_ ~.?I Ene ~.gLS.~E~_.!.ce s
F 0 80)( lC2!:lO
PALO At. lO, CA 9-:1303
Tclc-,:.hone _329-.2.~.el'_
• iNVOICING 50: NQ "'l.l tN\lOC-ES Xl THE CIT 0( ~J';'" fR~-J.'(;:T ~'''~'''''--,E''
. a fV OF PALO ALTO APPROVALS~ lf1Jo.f:: fC,R ;;1(,;,rJII." .. 'p",s ACCOR(qt>.c" TO '.c: • .1'*'l~~". "?FFtCI/b,l80xl$SELO\"{; r. ,.,,; "" . (jr":;~;'~:"t~ ":;,;';Ci;
II" ',~V;,: ;~~i ".':."","'" en'> ""NAGE~ ss'o'ru"'_ t---
a ~ _ -----~ "C'fYii ....... GER 161
r ;;~'JC:-
I "
'"':#-""'-~. 'L
-
l
I
I
[
I
I ,
r
t
I
r
•
~-
\ .,
•
-
I
£)
~
Scope 0/ Won
This scope 0( work describes fr.e taslcs required for Cont! actor 10 add Ii_.
3dd'~tional thermal cnerg) storage: (rES) cust0mer sites to tbe exi ... tTng Cit)' of P2to
MI.) TES monitoring system.. It co\;ers initial site visits to determine: feasibility.
Jonowed by the deve\opment of. monitoring ptans, equlpment specifica60os..w and project
management of the instanatFon. Finany~ it includes connecting the sites to the existing
ddta S\'stem in the same manner as the t\Iw'o eristing sites. The exlsttng site
descriPt;oru;, additional sites and the TES monitoring system are dcscnbed in
Appendices A, Band C to this Exhibit A, which are made a part hereof by Ibis
reference.
C-ontractoc shaD perform an worK required Co complete scope as defined herein.
Project scope is d""tvided into three phases: site feasibility, design
specificationsTproject management and start-llpldocurnentarlon.
Site Feasibility
to include: but Dot limited '0:
a. Site Sa rvey
Contractor shaD:
i Verify the prellminary data aboLit each site and
collect additional rete\lant data. Th'is may require
several site visits. Initial vis.i-t '\With the ClJstomer is 10
be scheduled -with uty Utilities" staff.
n. &amine the c~tomer'5 monitoring ~quipmen~ if
aD),. and .evaluate: the potential for h"1terfaC( .,.ith
City monitori!1g system.
iii. Determine if the e.;s.ential equipmt=nt loads are
me:a'Sur:ab~e.
iv~ Ex.<'l.minc the space constraints and equiprncut
proximity 10 the electrical panels.
..... Determine any access constraints. This includes.
availability of phone line access ;and any seCUT~ty
res.tri...--tions.
b. She Evaluation
Contractor ~ban:
i Provide a brief report d'~$(.TibLng rea.sons fO! any
non-fc::aslble sites.
1
. "
•
\ , "
\
"'
,
I
f
, ,
';' ,
t
I
i r
!
, : .. ----'
.' .
2 c.-n.......d:
o o
iL Produce a preliminary monitoring equipment list and
cost estimate lor bard\l,'are requirements foe feasible
sites. as. weD as preliminary cost estimate for any
centra! station programming required.
Consultation
Contractor sbaD:
i Discus'S site feasibility with C~ty representat.':ve.
ii. Upon City appr",'at. proceed tD Dert pbase ol scope.
Design Specif)Ca~onslProlect Management
Contractor-shan:
a. Produce drawings and equipment specifications sufficient foc
an t:lectncal contractor 10 supply, assemble and instarl tbe
components. The electrical contractor shaD be contracted
separately with Oty.
b. Provide project management services. during the ins-taDatioo
pnase of monitoring equlpment.
Start-uplDocumentation
Contractor sball:
Program Central Station software 10 retrieve data from new site5
and to proouce repacts.
Produce scbernatic diagraiTI or metering equipment and instaTIation
foc each monItored site.
Update operations manual to indtide identiffCar"ion paramerers 0{
new sites and any otner cnanges. This includes pulse counts,
rou Ttip uers,. e t.c.
~onlract Schedule
' ...
Contract inItia ted
Srte Feasibility pb<l5e completed -
DesignJSpeciflCations phase completed -
ElectrkaI cootraC1oc contract irUtlated
Hardware instaTIation
Start-uplDocumentatioc phase cornf"kted -
2
June, 1990
July 30, 1990
August 3{} .. 1990
September 15, 1990
(}. .. tober 15, 1990
November 15, 1990
~---.. -
t
~-.'.j., -
.~
~:. ~~:,
,
" f . '
f.-s
r , ,
!
Contractoc shall provide the fQlIowing DeUverables
A!> de~d in Scope:
<:;'~f~lc i .
~,. ".':.::~l:!,-~ ~ ~~; .",
1.
2.
3.
4.
5.
6.
Feasibility Repoct
L NarratIve for nOD-feasible sites. (see Scope: 1,bJ.)
b. Narrative and preliminary cost 'estimate for fe.sible sites. (Scope: l,b,ii.)
(:. Narrati. ... e and preliminary ~ost estimate {C\{ Central Station programmjng
contingent upon cost e.tirn.tion. (Scope: 1,b;1.)
DesignJSpeci&ations ror all feasible and cost-justified sites. (see Scope: 2, a.)
Project Management (as de.cribcd in Scope: 2,b.)
Central station progr.mmlng (Scope: 3, a)
Schematic OJagrams (Scope: :>, a.)
Update operations manual. (Scope: 3, c.)
3
' .... ,.~
'.
1.
2.
1.
•
\
o
Appendix A 10 ExhibIt A
F.xisting Site Description
Cb~nning House • 8~ Webstec. The TES sy>tem is • full stor.ge sy>tem that uses
ice stOrage tanks manufactured by Calmac. The s}'stem bas been operational since
May 1981. TES Monitoring regan September 1'lS8 .Dd CDnecls data on eIght
channels: I) compressor kW, 2) glycol pumps kW, 3) chilled .... ter pumps kW, 4)
coodenscr pumps kW, S) cooling load Ions, 6) maIn bu~ding meter kW, 7) .mbient
lemperature and 8) lotal cooflng tW.
•
AJza -950 Page Mill: The fuD storage: turbo ice-harvesting YES system has been on
line: since January 1988. TES monitoring began September ]988 and conects data on:
1) compressoc tW, 2) chilled "'ater pumps kW, 3) condenser pumps kW, 4)
recirculating pump kW, 5) cooftDg load IOns, 6) room temperature, 7) ambient
temperature and 8) total cooling tW.
AppenclL~ B I<> ExhibIt A
Additional Sites
Varian.. BUilding 1 -611 Hansell Wa'Ji": The Calma<: ice storage: tanks instaTIed in
Oc!OOer 1988 prcMde fun .torege for Builcfmg 1'. peal< load of 66(} IDTIS. Varian has
a TraDe Energy Management System .,.,rues. monitors,:
o compressor status
o pumps status
o COOling tower fans status
o TES valve posi60ns
o chilled water supply and return temperature
Reports from this monitoring system sbow Dumber of c-'hille£ starts and runtime llou[s
per month. No load data (m 1ions) is conected. Acces.s to -ars. requires
S[I.!ARTCOM and a 120() baud modem.
4
__ ... l1li_"2 ',!Ii, ,-.......... ' .... , ...... , ~; .;."""",-'-"';" ... $ -c ..•
';.,".. ""-
~ ;~'L:)
">;i;"". ',_ ... :> ~;'S\.,.<
;q~f'~$4-! .
. -.,-.
. ,
"-
2.
..-.....
'-3
•
yanan. 811Mmg 5 • 3040 Hansen Way: The three buj]dings at thls address are served
by • central plaut wit. a peale. load ol 252 Ions.. This fun storage system is also DSing
Calmac tanks for ice storage. The tanks and cooling tower are in a pit below gradt;:_
The system is monitored with a Johnson control system (8540).. located in Building 4,
and coDects clat. on the folk>wing:
o
o
o
o
o
o
"
compressor status
pumps. status
cooling tower fan speed
chilled water supply :and return. te~perature
condensing water sUW!J and return temperature
chmed water flow rate;S
percent ke
SyntexlSyva.. Building 3: This Dew bullding's -central ptant, ins.taHed in August 1989t
also serves buildings 1 and 2. The new plane. peale. load is 1463 toos ol which 276
tons is sbift-ed by a partial ice stOfage system. Ibe ice storage tanks are
manufactured by Baltimoce Air Coil Co. No information on tbe monitored points is
avallable at this time.
4. Fcrd Aerospace -3875 Fabian Vlav: This system is the only Tram.pbase (eutectic
s.a1ts) instanation in Palo Alto~ The system was on~tlne in December" 1989 and has. a
peak load of 740 ions... Monitored points are shown in the attached schematic.. Their
monitoring computer requires 2: 1200 baud modern foc data retrieval
~ "
5. l..ock~_ed Mi-ssiles and Space -This company is presently examining the feaslbul!y of a E
5(X)..ton load shifttng TES system. The ins1aTIat1o[] is expected to be completed in ~
December, 1990. This site sr,ould be examined fDf potential <:onDectloD '0. O'..!T f
exis.ting monitoring system. f
s
;
j
~ ,
~ .,
! j
I
1_
2.
3.
5.
--
o o
Awe odix C \0 Emibit A
Emting Monitoring Sj'$tem Description
An sigrojficant components of the TES system are monitored for 10tal electric energy
consumption (t\Vh). This includes an space: c:onditkming sys.tem compressors :and
pumps in the buil<fmg. Cooling (in tons) delivered by the chiDed water distribution
Jcx>p is measured 'Vwitb temperature: sensors and a flow meter and is totalized on sne
by a Btu-meter.
t'Wh and ton data is recorded in 15 minute: intervals '9.ith a Sangarno Data Star
[ccorden..
•
Load pulse data from each :site is transfe ned to City Han via modem 10 the Sa ngamo
Central Station software and is CGnverted to ASCII text files on ao HP Vectra (PC
compatible~
ASCII text files are: k1aded into a custom menu....<J':riverI report generator "";:th graphic
capabilities.
Load data :is analyzed and used k> model performance: of a conventional cCXJTing
system to determine the load shifted and overaTI TES, sr-tern performance.
,
.~ .. "J
Exlubit B
CODtract Bodgot
City shal! pay Contracto.-within thirty (30) days of receipt of monthly invoices foe
services provided under t!lis Agreement, in o<cordance with tile foOowing budget:
Phase 1. Sit" F eas,bility
1. VlSits, me~tings, tL"lepbone, resear..:h
2. DerIVer Feasibility Report
3. DeEve! Nun-Feasibility Report
Phase 2. Design Specifications/Project Management
I. Develop Monitoring PlaOiDrawins,
2. Deliver InstaIla60n Specifications
3. Project Management
PIlase 3. Start-up!Documenta bon
1. Install New Sites. on Centra! StaGon
2. Update Op<'rations Manual
$1860. (I)
$1200. (2)
$300. (2)
$1440. (1)
5480.(2)
S2940. (1)
$750. (2)
5750. (2)
(1) These items are bi11ed eacb 30 days foc the actual110urs s-pent at S60/hr.,. not
10 exceed the stated amounL
(2.) These items ate de.1i¥'i:.rabks blTIab1e at a ~tated fi..-v.cJ cost wben de.1i'Jerec.
Maximum for a feasible site:
Maximom for a non-f~a.s.ibl~ site:
Cost for three 'Sites:
Cost rex five sites:
'> times 59420. 528,260.
5 times 59420. = $47,100.
$9420.
52[60.
Total payment under this contract snaTI DO{ exceed Forty~&"" ... en Thousand One
llundred DoDars ($47,100).
7
, . ~
,.-.
..
-.-' 7
Proposal
fu Expand
Thermal Energy Storage Mocitoring
City of Palo Alto Utlilties
April 18, 1990
Suhmitted by
Richard C. Rodgers, Jr.
Califorcia Micro Utility, Inc.
1195 Park Ave., Suite 202A
Emery"ll., CA 94608
(415) 658-1273
-. ,
o
Contents
A. Overview
\~<
)~;< B. Statement cC Work
c. Schedule
o. Deliverable.
E. Cost Proposal
F. Experience
o. Mere""""
U-P.""""""
I. Avallability
J. Statement uf Agreement to terms
..
. -' . . -'--------~ .. -------.;.., .. --~
A O\'ero..w
This propo .. l describes the tasks required to add up to five additional
thermal energy storage (TES) customer sites to the existing City DC Palo Alto TES
monitoring system.. It covers initiaJ site "islts to determine feasil:ility. foilowed by
the development of monitoring p12ns, equipment specifi.cations. and project
management of the installation. Fi.n.ally. it includes connecting the sites to the
eXlsting data system in the same manner as the two existing 5ite:5.
B. Statement of Work
The scope of the work eomprises three phases: site reaEibility? design
spcrulCations and project management,. and start-up documentation.
I. Site Feasibility
a. Site Survey
i Gather infonnation for each site by telephone and ID8.11.
ii. Verify preliminary data and coDed additxmal data with several
site visits.
iii. Determine if essential loads are measurable.
iv. Examine space constraints and location factors.
v. Determine ~('cess constraints including telephone lines and
security.
h. Site Evaluation
i. Write l'pporl descnoing reasons for any non-feasible sites.
ii. Write a preliminary plan, monitoring equipm<nt list and cost
estimate for hardware for feasible sltes.
.. '
\ ..
I 'f-.
! .~
f :":,~ ~
• r
i
,
1
:1
c_
i
. ,
o
Consultation
Discus. site feasibility and results of work to current point of
study_
Schedule
1_ Contrad; initiated 5110190
2_ Site Feasibility Phase completed 6flV90
3_ DesignlSpecification. Phase completed 7/10190
•• Installation begun 811190
5. Installation completed 8124J90
6. Start-up Documentation phase completed 917/00
0_ Deliverables
As descn"bed in Statement of Wo,k:
1_ Feasibility Repcrt
Narrative for non-f€asible sites
b_ NllIT2tive and p<eliminary cost estimate for feasible sites.
2. DesignlSpecifications fo< feasible sites
3. Install new sites on central station soft.ware.
•• Update operations manual.
',--".'
•
c,
';~,
"
~
-;-.-
,
~ :
~
-~ ,
j
;~ ,
,~
!
'i
f
p.
-~,
"'"
E. Cost Proposal
The foDowing costs ar'! given on a pel' site basis. They are then
~ombined to> give the total fal-Wee and five feasible sites.
Site Feasibility
1:. Visi~" meetings_ telepbon.e. researcn
2. Deliver Feasibility Report
3. Deli,,", Non·Feasibility Repart
Design Specificati"ns/Proje<:t Managem.,ot
1. DevelDI' Monitoring PlanIDrawings
2. Deliver InoWlaoan Specifi<:auoos
3. Project Management
Start-upIl)ocumentation
1. ms!.all New Sites on Central Station
2. Update Operations Manual
$1&30. (1)
$1200. (2) -.
$300.(2) j
$1440. (I)
$480. (2)
$2910. it)
$750. (2}
$7s.:J. (2)
.: .~.-:::. ,,-.~
.;::....ll,,--.:......--
(l) These items are billed eacl130 days lOr the actu.1 hours <pent at $GOIbr.,
not to> exceed the stated amount.
(2) These itelIL'l are deliverables billable at a stated fixed cost when delivered.
Maxim= for • feasible site: $11420.
$'2100. Maximum for a llOD·feasibfe site:
Cost for three sites:
Cost m in'. site.:
<I times $9~20. ~ $28,200.
5 times $9420. = $41,100.
1
1
I
-. -
o o
~'. Eq>erie""e
See attached resume.
G. References
Provided on requesL
H_ PeTSOllllel
Rkhard C. Rodgers. Jr. is the sote person ""orlcing on this contract.
Availability
7'be wOI'k can begin as soon as the contract is signed. There are no
scheduling conflicts.
J . Statement of Agreement to terms
I agree to the terms of the contract.
... tr.""' .... I!_I"I,.c-_ ..... IIIi,..' .. ,""'~""1 it-'5-' L __ ~~_,;
~ _ "l~,
•
.~:-1j..-
~ ":'3~ ~~'{
,--
•
\
'~. '
\
~ "
"
" -----~-----
o
TES MONITORING ~QUEST FOR PROPOSAL
Request ,,,, Proposal lor Desig. Senia. lur Expansion of
Ex!stiD~ Thermal Ener" Stonge Monitoring Sy.tem
Porpose
IJNU-'l'
The purpooe of this project is t(} connect up 10 five (5) additiooal remote
customer sites 10 an existing central statio[} TES monitori..'"1g 'System. The
purpose of this Request fa< Proposal is 10 solid, a proposal from California
M',cm Utility, Inc. (CMU) 10 pr",1de design. project management and start-op
services to bring the acJdioonal sites on-tine.
I. Monlt<>red Sites
The City ol Palo Aho UtJ.1ities presently bas m0niti.xing eq1Jipment at
two tbermal energy storage instarla 6ons. The project ""'as partiany
funded by a grant and was ccmpTe'~d Octo«r 1988. Existing
equIpment includes: Fouf-<:hannel recorders., Btu-rnekrs, temperature
sensors,. flow metef"S and .cllrrt:nt transformers.. A phone line is instaned
\0 tbe recorder·s modem 10 anow data. transfer 10 City Halt Existing
sites are described m Appe nOll< A
2. Additional Sites
J.
Four new thermal energy s!!.xage (rES) systems l1ave been instane.d and
one system is expected to be instaned 'v/ithin a year. The Ci-ty desires to
.connect monitoring equipmellt to these ,ys.tem.s. if feastbie and cost
justified. Each .ite and IES system type is described in Appendix B.
Existing Monit<>ring System
Field data recorders cotlect pulses and are con rJeC1ed. via modem, be the
central station at aty Han.. The central stations soft,".:are is loaded QO
an HP·Vectra, whiell is IBM PC compatiNe.
load pulse <lata is converted to ASL-'I kx.t files v..'hicb are used in a
C1Jst:orn menu driven program kJ produce tabular and graphlc data
repoets. &e Appendix C fa< further S}>tem des-."ription.
1
'.
'\
• •
",''}--
~~. ':,\!
'.--<~
. ,
•
. ,,'. -
•
,.;
•
;"'-.'
.,-.to
=c...;, .•.•. ,,"'-"-..;.. __ ~ ..... _ .••. ~ ... __ ""'~~"'''''''''''''''''' ___ ''''''''''_~_-"''''''+' "~r_..,;>;:.'':''':'ir'.:c>-_-:.,'~9t.~ ... ~: _______ ~.,:-:-
1.J2'\RFI'
o o
Consultant shall perfocm an work required to complete scope as defined herein..
Project scope is divided into three phases; site feasibility. design
specifications/project management and start-up/documentation.
I. Site FusibIlity
10 include but not Emited 10;
a. Site Survey
Consu!tant shan:
1. Verif)' the preliminary data about each site and coDect
additional relevant data. This may require several she
visits. Initial visit with the customer is to be 'SCheduted with
Utilities' staii.
i. Examine the custorner"'.s monitoring equIpment, if 3ny. and
evaluate the porentlal roc interface with our monitoring
system.
m. Determine if the esse[]tial equipment loads are measurable.
iv. Examine the space constraInts and equipmeut proximity to
the e 1ectrical pa oels.
v. Determine any access constraints. This indudes availability
of phone Ene ~ce~ a rid a oy sec urity restrictions..
b. Site Evaluation
Consultant shan:
i Prcwide: a bOef report describing reawns for any DOD
feasible sites..
i. Produce a prcllrninary monitoring equipment list and cost
estimate foe hardware requIrements foe feasible sites, as
,..'cll as prellminary cost estIm.ate for any central s.tatkm
programming required.
c, Consultation
Consuttanl shan:
i Discuss site feasibility ,.,;:th Crty representative,
i. Upon aPPfO"'dl, pcoceed to r:;ext pbase d scope.
2. Design SpecifICations/Project Management
ConsultaO! sltall:
a.
b.
Produce dra\loings and eqcipmeot specifICations sufficient for an
electrical contrd'l..1or 10 supply, assemble an.d in~tal1 the
components. The electrical contractor-s.haC be: contracted
separately with City.
Proo.id'e project management ser.ices during the instanation phase
0{ mooitorirlg equipment.
z
~, 0'-" .• -
~ -
.' ,
f
I -' .
• !
1
t
!
,
~--.
•
,
.. --.J
.'
I •
-
3. Start-uplDocumenlation
ConSl;."'.'lDt sball:
t. Program Central Station soCNiare \0 retrieve data from ne.;J{ s,ites.
and 10 produce re poc1s.
b. Produce scbematic diagram of metering equipment and insta11awn
foc each monitored sTte~
c. Update operations manual to include identificatioo parameters of
new sites and any other changes. This includes pll1se counts,
multipliers, e'c.
Prvjeded Schedu.le
I.
2.
3.
<-
5.
6.
Contract initiated
Site Feasibility phase completed -
DesignJSpecifications phase completed ~
Electrical .contraCkX contract initiated
Hardware instanation
Start-oplDocumentatioc phase completed -
As described in Scope:
1. Feasibility Report
June, 1990
July 30, 1990
Augu>! 30, 1990
September 15, 1990
October 15, 1990
NO""e mber 15, 1990
a. Narratr..'e foe nOil-feaslble sites. (see Scope: l,b,i)
,
b. Nanatr..'e and p!efimi:1ary cost estimate (0£ fc:asibie shes. (Scope: 1.b,ii)
•
(:.. Narrative and pi'ellminary cost estimate roc Ce[jtra~ Station programmIng
contingent upc>n cost es.tirnatlo[l.. (Scope: 1.bji.)
2. DesignJSpeciflCations foe an feasible and cost-jusli£ed sites. (see Scope: 2, a.)
3. Project Management (as described in Scope: 2,b.)
<-Central s,ation programming (Scope: 3, a.)
5_ Scbematk diagrams (Scope: 3, a.)
6. Upda'" operations manual (Scope: 3, c.)
3
;, .-, ,
"
'. .
--+-
f
0",'.
o o
f_~1 Submittals
Proposals shaD contain:
L
s.
6.
7.
Consuttant relevant experience
L Familiarity "'th Utllities metering. Thermal Energy Stordge (rES)HY AC
systems, Sangamo Central Station software.
b. Work experience 0[1 sirrular projects.
At least ] references.
A fist Q( personnel ",signed to the projecL
Proposed cost foe each of. the 3 phases of. projecL
a. Assume 2 scenarios:
-S feasible of 5 sites investigated,.
-3 feasible of 5 sites investigated.
b. Include • summary sbeet for p<oposed costs.
Commentary on availability for project and projected schedules.
Statement of ability 10 compl'J with cooditions 0( agreement bm (attached)..
Narrative describing proposed modification, if any, to scope or terms and
conditions.
4
f!i~ .••..... III!r:."' ........ -._ . .-... -_.",-, .....
-"'" ,
, ;.
-
n
-
I.
2.
I·
Appendix A
Existing Site Description
Channing House • 850 Webst«: The TES 'Y'tem is a fun storage 'Y'tem that uses
ice storage tanks manufactured by Ca!mac. The ¥tem has been operational since
May 1987. TES Monitoring began September 1988 and conec1S data on eight
channels:: 1) compressor kW. 2) glycol pumps kW, 3) cbined water pumps kW. 4)
condenser pumps kW, 5) coormg load IOns, 6) main building meter kW, 7) ambient
temperature and 8) tctal cooling lW.
\
Afza -950 Page Mill: The fuTI storage turbo ice-harvesting TES system bas been O!)
nne since January 1988. TES monitoring began September 1988 and conects data on:
1) compressor kW, 2) dulled waler pumps kW, 3) condenser pumps ,W, 4)
recirculating ""mp kW, 5) cooTIng load IOns, 6) room temperature, 1) ambient
temperature and 8) lOtal coonng k W.
AppenalX B
Addi:tiOnaI Sites
Varian. Building l -611 Hansen Volay: The C::!Jmac ice storage tanks instaned in
Oc!Ober 1988 provide fun storoge for Building I·, prak Imd of F,6O IOns. Varian bas
a Trane Energy Management System which monitors:
o .compressor status
o pumps status
o cooling tower fans status
0. TES vah-"e p;)sltions
o c.hilled water supply and return. temperature
Repol13 from this monitoring system show D umber of chiller starts and runtime hOUTh
per month. No Joad data (in IOns) is conected. Access f,o EMS requires
SMARTCOM and a 1200 baud modem.
5
c
•
~
t
I
; ,
i :
t
I
~
r
~
f
~
l
f • !
I
i ;
\
.. , .
i
•
.. . L •
\
.--.
o o
2. Varian. BuildinS So a .3040 Hansen Wav: The three bui1dings at this address are ser,red
by a central plant with • peak load of 252 1Ons. This fun storage system is also "SLng
Calmac tankS fo< ice storage. The tanks and cooling \OWer are in • pit below ~rade.
The system is monitored with • Johll5Oc coctrol system (8540), located in Building (,
and collects data on th.: fona";ng-.
o
o
o
" o
o
o
compressoc status
pumps status
cooling tower fan speed
chIDed v;ater supp1y and return temperature
condensing water suppl) and return temperature
chilled water flow rates
percent ice
3. SyntexlSyya, BuilaU)B }: Thts new buildLng's central plant, instaDed in August 1989,
also serves boildings 1 and 2. The new plant'. peak load is 1463 tons of which 27ti
K>o5 is shifted by a partial ice storage system. The ice stonge tmks are
manufactured by Baltimore Ak Co~ Co. No inf'X"matioo ac the monitored poln" is
available at this time.
(.
5.
ford Aerospace. 3815 Fabian Way: This syskm is. tbe only Transphasc (euteL1.ic
:salts) instanation in Palo Mo. The system was on-line "in December, 1989 and Ims a
peak: load at 740 tons.. ]...fonitoced points are shown in the atta<::bed schematic. Tbc:rr
monitoring compute£ requires a 1200 baud modern for data retrieval
Lockheed M"lSSiles and Space -This company is presently examIning the feasibility of a
500-ton load sbitting TES system. The instaUation is expected to be completed in
December" 1990. This site sbould be examIned for potential connection to our
exi>"ting monitoring syste rn.
,
.-..io. ' ... ----:....--~,,"
':""-~, .
"' .. ~
.-
-'
r '.
1.
•. '
AppenolX C
EJOsting Monitoring System Description
All significant components of the TES system are morutor<d roo-\01.11 e1eetric energy
consumption (kWb). This indu<ks an space conditioning SJ"em compressors and
pump< in the bu~omg. Cooling em IOns) delivered by tll<! chined water ol>tnbutioa
1009 :io; measured with tempenture sensors. aDd a. flo .... meter and :i5. totaftzed 00 5it~
by • 3!1J-meter.
2. tVlb and eon data is recorded in 15 min ute intervals '\Iro1..th So Sangamo Data Star
recorders.
3. Load pulse data from each sit~ is ttansferred to City Hall via modem to the Sangamo
Central Station software aad is converted to ASCIl lext flles on an HI' Veetr. (PC
compatible)
4-. ASC'U Lext files are loaded into a custom ml!uu-dmen report generator ",;,tb grarhic
capabilities.
50. 1...0'21.13 data is analyzed and used 1C model performance of a conventional cooling
system 10 determine the load shifted and overan T£S sy>tern penormance.
1