Loading...
HomeMy WebLinkAboutStaff Report 2512-5749CITY OF PALO ALTO CITY COUNCIL Special Meeting Monday, June 15, 2026 Council Chambers & Hybrid 5:30 PM     Agenda Item     24.Adopt a Resolution Approving the 2026 Bicycle and Pedestrian Transportation Plan (BPTP); CEQA Status: Exempt Pursuant to Public Resources Code Section 21080.20. Public Comment, Staff Presentation 9 0 4 1 9 0 4 1 City Council Staff Report From: City Manager Report Type: ACTION ITEMS Lead Department: Transportation Meeting Date: June 15, 2026 Report #:2512-5749 TITLE Adopt a Resolution Approving the 2026 Bicycle and Pedestrian Transportation Plan (BPTP); CEQA Status: Exempt Pursuant to Public Resources Code Section 21080.20. RECOMMENDATION Adopt a Resolution Approving the Final 2026 Bicycle and Pedestrian Transportation Plan (BPTP) (Attachment A), including staff-recommended changes from the Pedestrian and Bicycle Advisory Committee (PABAC) (Attachment B). EXECUTIVE SUMMARY The 2026 Bicycle and Pedestrian Transportation Plan (BPTP) serves as the City’s comprehensive vision and action plan to create a comfortable, connected, and safe multimodal network for users of all ages and abilities. Following Council review of the Draft Plan on December 1, 20251, staff conducted final community outreach and considered final feedback from members of the public, Planning and Transportation Commission (PTC), PABAC, and City Council.2 The Final Plan (included in Attachment A) reflects this input to the Draft Plan, including Council’s request for a proactive approach to e-bikes, and tighter integration with ongoing and recent City initiatives (see Attachment C). The Final Plan advances a Low-Stress Network approach by prioritizing 25 bicycle projects, 24 intersection/pedestrian crossing projects, 3 special projects, and 3 studies, totaling about 19 miles of improvements including school commute routes, transit access routes, and pedestrian districts (see Attachment D and Attachment E). 1 Palo Alto City Council Meeting, December 1, 2025. Study Session: Bicycle and Pedestrian Transportation Plan (BPTP) Update: Draft Plan and Near-Term Projects. CEQA Status: Exempt Pursuant to Public Resources Code Section 21080.20. https://cityofpaloalto.primegov.com/Portal/Meeting?meetingTemplateId=16332. 2 Palo Alto Pedestrian and Bicycle Advisory Committee Meeting, May 7, 2026. Action Item: Staff Presents the Final 2026 Bicycle and Pedestrian Transportation Plan (BPTP) for Endorsement. https://www.paloalto.gov/files/assets/public/v/1/transportation/bicycling-walking/pabac/pabac- meetings-2026/2026-05-07_pabac-agenda-packet_final.pdf. 9 0 4 1 9 0 4 1 BACKGROUND 5 To modernize this vision, on May 17, 2021, the City Council supported a grant application for State Transportation Development Act Article 3 (TDA3) funds.6 Introduction, overview, context & baseline conditions on January 22, 2024;7 Vision, objectives, performance measures, and existing conditions on April 29, 2024;8 Project prioritization and recommendations on June 2, 2025;9 Draft Plan on December 1, 2025;10 and, Additional analysis efforts on March 9, 2026.11 5 Palo Alto City Council Meeting. September 12, 2012. Action Item 6: Public Hearing: Adoption of a Resolution Amending the Transportation Element of the Comprehensive Plan Incorporating the Bicycle and Pedestrian Transportation Plan and Approval of a Negative Declaration (continued from May 21, 2012). https://www.paloalto.gov/files/assets/public/v/1/agendas-minutes-reports/agendas-minutes/city-council- agendas-minutes/00-archive/2012/07-09-12-ccm-fixed.pdf . 6 Palo Alto City Council Meeting, May 17, 2021. Consent Item 6: Resolution 9955 Entitled, “Resolution of the Council of the City of Palo Alto Making Required Findings in Support of the City’s Grant Application for State Transportation Development Act Article 3 Funds to Update the City’s Bicycle and Pedestrian Transportation Plan. https://cityofpaloalto.primegov.com/Public/CompiledDocument?meetingTemplateId=3426&compileOutputType=1. 7 Palo Alto City Council Meeting, January 22, 2024. Informational Report: Bicycle and Pedestrian Transportation Plan (BPTP) Update: an active transportation plan--Introduction & Overview, Community Engagement, Context & Baseline Conditions, and Next Steps. https://cityofpaloalto.primegov.com/Public/CompiledDocument?meetingTemplateId=13335&compileOutputType=1. 8 Palo Alto City Council Meeting, April 29, 2024. Study Session: Bicycle and Pedestrian Transportation Plan (BPTP) Update: Review and discuss the vision statement, objectives, performance measures, and share and obtain feedback on the existing conditions technical analysis. https://cityofpaloalto.primegov.com/Public/CompiledDocument?meetingTemplateId=15058&compileOutputType=1. 9 Palo Alto City Council Meeting, June 2, 2025. Study Session: Bicycle and Pedestrian Transportation Plan (BPTP) Update: Draft Project Prioritization Framework and Prioritized Project Lists. https://cityofpaloalto.primegov.com/Public/CompiledDocument?meetingTemplateId=16124&compileOutputType=1. 10 Palo Alto City Council Meeting, December 1, 2025. Study Session: Bicycle and Pedestrian Transportation Plan (BPTP) Update: Draft Plan and Near-Term Projects. CEQA Status: Exempt Pursuant to Public Resources Code Section 21080.20. https://cityofpaloalto.primegov.com/Public/CompiledDocument?meetingTemplateId=16332&compileOutputType=1. 11 Palo Alto City Council Meeting. March 9, 2026. Consent Item 8. Approval of Contract Amendment No. 3 to Contract No. C23185922 with Kittelson & Associates, Inc. To Increase Compensation by $17,000 to $350,945 and to Extend the Term for an Additional Six Months Through December 31, 2026, for the City's Bicycle and Pedestrian Transportation Plan Update; CEQA status - exempt under Public Resource Code section 21080.20. https://cityofpaloalto.primegov.com/Public/CompiledDocument?meetingTemplateId=18681&compileOutputType=1. 9 0 4 1 9 0 4 1 ANALYSIS This report presents the Final 2026 Bicycle and Pedestrian Transportation Plan (Attachment A) for Council’s consideration and adoption. Based on prior input, the Final 2026 BPTP introduces a revised citywide bicycle network (Complete Vision and Low-Stress), introduces Pedestrian Districts, leverages existing planning foundations, and addresses changes in context and needs since 2012. Key Elements of the 2026 BPTP The 2026 BPTP includes the following key elements: Prioritizing a Low-Stress Bicycle Network: The plan shifts its foundational focus toward developing calm, neighborhood-based Bicycle Boulevards. This strategy prioritizes routes that community members already find comfortable and familiar, allowing the City to rapidly expand safe, continuous coverage with fewer tradeoffs involving vehicle traffic and parking. Targeted Near-Term Implementation Framework: Rather than trying to build the entire complete vision network at once, the plan isolates actionable, high-priority projects for the next 10 years. This near-term focus allocates resources toward 25 priority bicycle projects (representing roughly 19 miles of enhancements), 24 intersection and crossing improvements, three special projects, and three specific studies. Establishment of Dedicated Pedestrian Districts: To enhance walkability, the plan defines specific commercial and neighborhood "Pedestrian Districts"—such as the University Avenue, California Avenue, and San Antonio Road, and Mitchell Park/Cubberley corridors. It leverages a specialized Pedestrian Toolbox designed to explicitly improve sidewalk continuity, crossing visibility, signal adjustments, and neighborhood placemaking. Proactive E-Bike and Micromobility Integration: Reflecting recent community and City Council feedback, the plan features updated programmatic strategies to address the rapid adoption and unique speed/safety dynamics of e-bikes. This includes updating educational programs, assessing infrastructure compatibility, and ensuring micromobility safely integrates into the low-stress network. Inter-Agency Initiative Alignment: The plan ensures tight integration with other major city efforts, such as the Safe Streets for All (SS4A) Safety Action Plan, the San Antonio Road Area Plan, the South Palo Alto Bike/Ped Undercrossing at El Dorado Avenue, and the North Ventura Coordinated Area Plan. Changes Since December 2025 Following the City Council’s review on December 1, 2025, the Plan was updated to: Feature proactive regulation, engagement, and education strategies to manage the rapid growth of e-bikes and e-motos; 9 0 4 1 9 0 4 1 Ensure seamless alignment with major city initiatives like the San Antonio Road Area Plan, the North Ventura Coordinated Area Plan, and the Cubberley Master Plan; Include directives to audit the 2030 Comprehensive Plan policies that might otherwise restrict critical safety improvements. o Note, specific to 2030 Comprehensive Plan Policy T-4.1 (Keep Streets Open as a General Rule), PABAC recommended an amendment from a concern that the T- 4.1 policy could be interpreted to prevent implementation of modal filters on bike boulevards or school routes. In May 2026, City staff reexamined 2030 Comprehensive Plan Policy T-4.1 and found that a policy amendment is not necessary to implement modal filters since modal filters do not close streets as defined by the California Vehicle Code; and safely manage and reroute traffic under the clear authority of 2030 Comprehensive Plan Policies T-4.2 and T-4.3. Integrate several project-specific and programmatic modifications—such as prioritizing key travel segments on Middlefield Road, advancing additional safe routes to schools, and adding robust pedestrian-focused capital programs. See Attachment C for a table that details the City Council’s requested changes to the Draft Plan, and how City staff incorporated the requested change into the Final Plan. Next Steps Pending Council adoption, City staff will publish an Adopted Final Plan that incorporates minor edits based on PABAC’s May 7, 2026 meeting (Attachment B). Staff has also initiated work to advance the following initial priorities for BPTP Implementation: PABAC Reform (BPTP Policy IC-1.3): On June 4, 2026, PABAC provided initial input on the Committee’s role, structure and membership. Staff will engage further with PABAC and will return to Council in fall 2026 to obtain input and consider potential Bylaw amendments needed to increase the efficiency and effectiveness of the Committee. Electric Bicycle Strategy (IC-1.4, 1.5 & 1.6) and Bike Parking (CE-1.5): On June 1, 2026, Council expressed an interest in addressing issues associated with use of e-bikes on California Avenue, including locating bicycle parking at entrances to the community street.19 Staff is currently collaborating with Palo Alto Unified School District (PAUSD) staff and Palo Alto Council of PTAs (PTAC) representatives on a multi-pronged strategy to address an increase in e-bikes, illegal e-motos and collisions involving students. Educational material will be distributed to parents during summer and fall 2026, and staff will return 19 Palo Alto City Council Meeting, June 1, 2026. Action Item 16: Outdoor Activation Standards, Pre-Approved Parklet Plans and Public Space Design Concept for the Car-Free Portion of California Avenue; and FIRST READ: Adopt an Ordinance Amending the Sign Code to Streamline Permitting of Signs in Conjunction with a Parklet; CEQA Status - Exempt pursuant to CEQA Guidelines Section 15303. https://cityofpaloalto.primegov.com/Public/CompiledDocument?meetingTemplateId=18729&compileOutputType=1 9 0 4 1 9 0 4 1 to Council in fall 2026 to discuss a holistic strategy on this topic. Staff is also working on a grant application to accelerate installation of high-quality bike parking throughout the City, including gateway locations on California Avenue. Traffic Calming Policy Update (SI-1.7): Staff has secured Measure B Local Streets and Roads (LSR) funding to initiate work on potential improvements along Bryant Street (BLVD_2) as a follow up to an earlier traffic calming petition. This work will feed into a broader effort to update the City’s Traffic Calming Policy in order to increase the responsiveness and efficiency of traffic calming work in the City. Capital Projects: Staff is also seeking grant funding and will advance projects that were prioritized in the BPTP via the City's Capital Improvement Program (CIP) process, including the following capital projects that are already underway : o South Palo Alto Bikeways Demonstration Project (SB_18 & SB_23) to upgrade bicycle lanes on school routes, which is funded by federal Safe Streets for All (SS4A) and state Transportation Development Act Article 3 (TDA3) grant funds. o Planning for Midtown Bicycle and Pedestrian Undercrossing (Crossing_10), also known as South Palo Alto Connectivity Project in the vicinity of El Dorado, which is funded by a VTA Measure B Pedestrian and Bicycle Planning grant; o Design for Seale Avenue Bike/Pedestrian Undercrossing for Churchill Grade Esparation (Crossing_1), which is funded by Federal Railroad Administration (FRA) and Santa Clara Valley Transportation Authority (VTA) Measure B Grade Separation grants. o East Bayshore Road Bike Lanes (BL_10), which can be achieved in conjunction with scheduled repaving (SI-1.14). FISCAL/RESOURCE IMPACT There is no fiscal impact associated with the adoption of the 2026 BPTP. The 2026 BPTP will be used to help prioritize future capital projects through the City’s CIP planning efforts as well as grant-writing efforts to support these projects. Adoption of the 2026 BPTP will also make the City eligible to apply for certain grant funds including TDA3 funds. Work on the 2026 BPTP was undertaken with the support of a $334,852 TDA3 grant. STAKEHOLDER ENGAGEMENT The Final 2026 BPTP incorporated input obtained through an extensive, four-phase engagement process that combined digital engagement with in-person events to ensure broad representation. Engagement efforts are outlined in Section 1.7 of the Final Plan (Attachment A) and include: 9 0 4 1 9 0 4 1 Phases 1 & 2 Engagement on Visioning and Needs Analysis, included public workshops, walking tours, and cycling tours, the development of a project webpage, and survey. Feedback during this phase identified safety (particularly for students) as the top priority, as well as strong demand for a seamless, low-stress network that overcomes major barriers like highways and railroads while providing direct connections to schools and transit hubs. Phases 3 & 4 (Recommendations and Draft Plan) included a community workshop, two rounds of board, commission, and committee meetings (January-June 2025) as well as public comment and a unanimous recommendation by PTC on the Draft Plan (October- November 2025). Feedback during this phase called for a more robust prioritization framework integrating qualitative and quantitative measures and a pivot from "big streets" to "low-stress network" approach. During the final public comment period, feedback emphasized the desire for 20 mph speed limits on bike boulevards, proactive e-bike policies, and upgrades to Bryant Street corridor. Following Publication of the Final Plan, PABAC endorsed the Final Plan on May 7, 2026, with final requested changes as outlined in Attachment B.21 Staff considered this input and will incorporate most of the requested edits into the Adopted Final Plan, pending Council approval. ENVIRONMENTAL REVIEW California Senate Bill 922 (2022), codified as Public Resources Code section 21080.20, exempts active transportation plans, such as bicycle transportation plans like the 2026 BPTP, from environmental review under the California Environmental Quality Act (CEQA). ATTACHMENTS Attachment A: Resolution Approving the 2026 Bicycle and Pedestrian Transportation Plan (including the Plan itself) Attachment B: PABAC’s Requested Changes to the Final Plan and City Staff’s Response Attachment C: City Council Requested Changes Incorporated Into the Final Plan Attachment D: Recommended Near-term Improvement Projects Tables Attachment E: Recommended Near-term Improvement Projects Map APPROVED BY: Ria Hutabarat Lo, Chief Transportation Official 21 Palo Alto Pedestrian and Bicycle Advisory Committee Meeting, May 7, 2026. Action Item: Staff Presents the Final 2026 Bicycle and Pedestrian Transportation Plan (BPTP) for Endorsement. https://www.paloalto.gov/files/assets/public/v/1/transportation/bicycling-walking/pabac/pabac- meetings-2026/2026-05-07_pabac-agenda-packet_final.pdf. *NOT YET APPROVED* 1 160_20260601_ts24 Resolution No. _____ Resolution of the Council of the City of Palo Alto Approving the City’s 2026 Bicycle and Pedestrian Transportation Plan (BPTP) R E C I T A L S A. The City has an existing Bicycle and Pedestrian Transportation Plan from 2012 (“2012 BPTP”), which guides bicycle and pedestrian transportation planning. B. The City desires to update the 2012 BPTP and has engaged in an intensive scope of work since 2023 to create the 2026 Bicycle and Pedestrian Transportation Plan (“2026 BPTP” or “Plan”). This includes extensive community engagement in each of the three phases of the Plan’s development. C. As part of the City’s development of the 2026 BPTP, the City established the following vision statement: “We envision a city where sustainable, safe, efficient, equitable, and enjoyable transportation thrives. Together, we will create a comfortable and connected street and trail network that supports walking, biking, and rolling for people of all ages and abilities. We continue to be a leader in Safe Routes to School and invest more in active transportation infrastructure, education, and encouragement programs.” D. The 2026 BPTP serves as the City’s foundational blueprint for active transportation, guiding future planning for Capital Improvement Programs (CIPs), establishing clear frameworks to identify and prioritize high-impact infrastructure projects, and aligning local roadway designs with broader citywide safety and initiative goals. E. The 2026 BPTP advances a Low-Stress Network approach by prioritizing 25 bicycle projects, 24 intersection/pedestrian crossing projects, 3 special projects, and 3 studies, totaling about 19 miles of improvements including school commute routes, transit access routes, and pedestrian districts. F. The 2026 BPTP was reviewed and recommended for City Council approval by the City’s Planning and Transportation Commission on November 12, 2025; and by the Pedestrian and Bicycle Advisory Committee on May 7, 2026. G. The City has placed a public notice in a newspaper of circulation within Palo Alto giving notice of the public hearing as part of the City Council meeting on June 15, 2026 to receive public comment prior to the City Council’s consideration and decision to approve the 2026 BPTP. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF PALO ALTO RESOLVES AS FOLLOWS: SECTION 1. The City Council hereby approves the 2026 BPTP as attached in Exhibit A to this Resolution. *NOT YET APPROVED* 2 160_20260601_ts24 SECTION 2. The City Council finds that the 2026 BPTP is exempt from CEQA pursuant to Public Resources Code section 21080.20(a)(1)(A) because it is an “active transportation plan, a pedestrian plan, or a bicycle transportation plan for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.” SECTION 3. This resolution shall be effective upon adoption. INTRODUCED: PASSED:    AYES:  NOES:    ABSTENTIONS:    ABSENT:    ATTEST: __________________________ __________________________  City Clerk Mayor    APPROVED AS TO FORM: APPROVED:      __________________________ __________________________ Assistant City Attorney City Manager __________________________ Chief Transportation Official *NOT YET APPROVED* 3 160_20260601_ts24 Exhibit A 2026 Bicycle and Pedestrian Transportation Plan (see following pages) April 2026 Bicycle and Pedestrian Transportation Plan Final PENDING ADOPTION: This document is the final version being presented to the City Council, and is subject to formal approval. Exhibit A Table of Contents ACKNOWLEDGEMENTS LIST OF ACRONYMS 2.EXISTING FACILITIESAND CONDITIONS 2.1 Existing Pedestrian Facilities 43 2.2 Existing Bicycle Facilities 45 2.3 Safe Routes to School Program 56 2.4 Walking and Biking Activity 58 2.5 Barriers to Walking and Biking 62 2.6 Bicycle Level of Traffic Stress 66 2.7 Collision Analysis 69 2.8 Shared Micromobility, E-Bikes, E-Cycles, and E-Motos 75 0.EXECUTIVE SUMMARY 0.1 Purpose and Vision 11 0.2 Existing Bicycle Facilities 12 0.3 Community Engagement 15 0.4 Recommendations 16 0.5 Project Prioritization 22 1.INTRODUCTION 1.1 Purpose 26 1.2 Plan Organization 26 1.3 Benefits and Barriers to Walking and Biking 27 1.4 Vision, Objectives, and Performance Measures 28 1.5 Setting 31 1.6 Relationship to Other Documents 35 1.7 Public Outreach Summary 37 3.RECOMMENDATIONS 3.1 Bicycle Network Corridor Criteria 80 3.2 Recommended Bicycle Network and Facilities 81 3.3 Pedestrian District Guidelines and Toolbox 92 3.4 Policies and Programs 101 2 Exhibit A 4. IMPLEMENTATION AND FUNDING 4.1 Project Delivery Process 113 4.2 Project Prioritization 114 4.3 Cost Estimates 126 4.4 Funding Sources 126 5. CONCLUSION APPENDICES 3 Exhibit A LIST OF MAPS Figure 1: Existing Activity Generators 33 Figure 2: Walk and Bike Sheds for Major Transit Stops 34 Figure 3: Existing Bicycle Facilities Map 50 Figure 4: Existing Bicycle Parking Location 51 Figure 5: Demand for Walking and Biking Improvements 61 Figure 6: Linear Barriers 63 Figure 7: Transit Barrier Study Areas 65 Figure 8: Segment LTS Results 67 Figure 9: Intersection LTS Results 68 Figure 10: Total Number of Pedestrian Collisions by Year and Severity 71 Figure 11: Total Number of Bicycle Collisions by Year and Severity 71 Figure 12: Pedestrian Collisions by Severity (2018 – 2022) 72 Figure 13: Bicycle Collision by Severity (2018 – 2022) 73 Figure 14: Bicycle and Pedestrian High Injury Network 74 Figure 15: Recommended Bicycle Network 82 Figure 16: Complete Vision Bicycle Network 89 Figure 17: Low-Stress Bicycle Network 90 Figure 18: Pedestrian Districts and Pedestrian Priority Areas 94 Figure 19: Recommended Near-Term Projects 125 LIST OF TABLES Table 1: Performance Measures 29 Table 2: Potential Performance Measures 30 Table 3: Palo Alto Demographic Indicators 32 Table 4: Existing Bicycle Network in 2012 vs 2025 49 Table 5: Collision Data Summary (2018-2022) 71 Table 6: Primary Network Development Criteria 80 Table 7: Summary of Recommend Bicycle Projects 85 Table 8: Project List 85 Table 9: Prioritization Factors and Evaluation Criteria 114 Table 10: Near-Term Bicycle Projects 115 Table 11: Priority Intersection and Crossing Projects 120 Table 12: Other Priority Projects 124 4 Exhibit A The 2026 BPTP is grant funded by the Metropolitan Transportation Commission's (MTC) Transportation Development Act 3 program. APPENDICES Appendix A: List of Projects Appendix B: Pedestrian District Guidelines Appendix C: Policy and Program Recommendations LIST OF IMAGES Image 1: Palo Alto Demographic Indicators 31 Image 2: Four Phases of Engagement 37 Image 3: Virtual Visioning Workshop held on January 31, 2024 38 Image 4: Bike Palo Alto Event held on October 1, 2023 38 Image 5: Bicycle Network Development Workshop 39 Image 6: Community Walking Tour 39 Image 7: Types of Bicycle Facilities 45 Image 8: Updated Bicycle Facility Types 46 Image 9: Bicycle Facility Types 46 Image 10: Bicycle Parking Types - Short-Term 52 Image 11: Placement and Spacing Requirements 53 Image 12: Types of Wayfinding Signs 54 Image 13: Existing Signs in Palo Alto 55 Image 14: Relationship between LTS and Comfort 66 Image 15: Bicycle Facility Selection Approach 83 Image 16: Recommended Crossing and Intersection Improvements 93 Image 17: University Avenue Pedestrian District 95 Image 18: California Avenue Pedestrian District 96 Image 19: Midtown Pedestrian District 97 5 Exhibit A ACKNOWLEDGEMENTS The City of Palo Alto would like to express our gratitude to the residents, community leaders, community- based organizations, agencies, and other stakeholders who have helped shape the 2026 Bicycle and Pedestrian Transportation Plan. We appreciate your continued support and commitment to promoting Palo Alto as a healthy, safe, and vibrant community. 2026 City Council Vicki Veenker, Mayor Greer Stone, Vice Mayor Ed Lauing George Lu Julie Lythcott-Haims Keith Reckdahl Patrick Burt 2026 Planning & Transportation Commission Allen Akin, Chair Bryna Chang, Vice Chair Bart Hechtman Carolyn Templeton Forest Peterson Kevin Ji Todd James 2026 Parks and Recreation Commission Nellis Freeman, Chair Bing Wei, Vice Chair Vadim Axelrod Amanda Brown Roger Smith Shani Kleinhaus Yudy Deng City of Palo Alto Team Ria Hutabarat Lo, Chief Transportation Official Philip Kamhi, Chief Transportation Official, Former Sylvia Star-Lack, Transportation Planning Manager Ozzy Arce, Project Manager Charlie Coles, Senior Transportation Planner Katie Heuser, Senior Transportation Planner Rose Mesterhazy, SRTS Senior Planner Ana Lopez, Associate Transportation Planner City/School Transportation Safety Committee Lt. Ben Becchetti, PAPD Lt. Kara Apple, PAPD Lara Anthony, SRTS C/STSC PTAC Co-Chair Rachel Vazquex-Reina, SRTS C/STSC PTAC Co-Chair Leslie Crane, PAUSD Mike Jacobs, PAUSD Eric Holm, PAUSD Pedestrian and Bicycle Advisory Committee Bruce Arthur, Chair Nicole Rodia, Vice Chair Alan Wachtel Art Liberman Bill Zaumen Boris Foelsch Cedric de la Beaujardiere Eric Nordman Jane Rosten Kathy Durham Ken Joye Paul Goldstein Penny Ellson Robert Neff Steve Rock Palo Alto Rail Committee Consultant Kittelson & Associates Mobycon 6 Exhibit A This page is intentionally left blank. 7 Exhibit A 0. Executive Summary | 8 LIST OF ACRONYMS AAA All Ages and Abilities AB Assembly Bill BPTP Bicycle and Pedestrian Transportation Plan Caltrans California Department of Transportation CIP Capital Improvement Projects CSAP Comprehensive Safety Action Plan CSTSC City/School Transportation Safety Committee DIB Design Information Bulletin DP Director’s Policy E-Bike Electric Bike EPC Equity Priority Community FHWA Federal Highway Administration HIN High-Injury Network IIJA Infrastructure Investment and Jobs Act ITE Institute of Transportation Engineers KSI Killed or Seriously Injured LTS Level of Traffic Stress 8 Exhibit A 0. Executive Summary | 9 MPH Miles per Hour MTC Metropolitan Transportation Commission NACTO National Association of City Transportation Officials NRSS National Roadway Safety Strategy PABAC Pedestrian and Bicycle Advisory Committee PAPD Palo Alto Police Department PAUSD Palo Alto Unified School District PCF Primary Collision Factor PDO Property Damage Only PTA Parent-Teacher Association PTAC Palo Alto Council of PTAs PTC Planning and Transportation Commission SB Senate Bill SRTS Safe Routes to School SS4A Safe Streets For All US DOT United States Department of Transportation VMT Vehicle Miles Traveled VTA Santa Clara Valley Transportation Authority 9 Exhibit A 0. Executive Summary | 10 0. EXECUTIVE SUMMARY 10 Exhibit A 0. Executive Summary | 11 The City of Palo Alto (City) last updated its Bicycle and Pedestrian Transportation Plan (BPTP) in 2012. An update to BPTP is necessary to maintain funding eligibility, respond to evolving community needs, account for recent trends in cycling and technology, and align with current planning and design standards. The City undertook a comprehensive effort to update the BPTP by analyzing the existing walking and bicycling conditions, engaging the community, and incorporating the best practices in multimodal transportation planning. 0.1 Purpose and Vision The 2026 BPTP serves as a comprehensive action plan for the City to provide improved bicycle and pedestrian facilities for its residents, employees, and visitors. The purpose of the 2026 BPTP is to gather meaningful input from the community, evaluate progress since the 2012 plan, and update the City’s approach to policies, programs, and infrastructure that support walking and biking. To guide the 2026 BPTP, a vision statement and set of objectives were created based on strong community input gathered during the visioning workshop and early engagement activities. The resulting vision statement is We envision a city where sustainable, safe, efficient, equitable, and enjoyable transportation thrives. Together, we will create a comfortable and connected street and trail network that supports walking, biking, and rolling for people of all ages and abilities. We continue to be a leader in Safe Routes to School and invest more in active transportation infrastructure, education, and encouragement programs. All Ages and Abilities facilities are a national best practice for designing walking and biking facilities that strive to serve everyone safely, comfortably, and equitably. All Ages and Abilities design practices account for differences among potential users in physical abilities, age, height, cycling abilities, perceived personal safety, and comfort in riding with traffic. Exhibit A 0. Executive Summary | 12 0.2 Existing Bicycle Facilities The California Department of Transportation (Caltrans) defines four classes of bicycle facilities: Class I, II, III, and IV, as illustrated in Image EX 1. In addition to these statewide classifications, the City of Palo Alto uses further sub-classifications: Class IIa – standard bike lanes, Class IIb – buffered bike lanes, Class IIIa – bike routes, and Class IIIb – bike boulevards. Image EX 1: Types of Bicycle Facilities Source: Caltrans, Toward an Active California, State Bicycle and Pedestrian Plan, 2017. Exhibit A 0. Executive Summary | 13 Figure EX 1 illustrates the existing bikeway network in Palo Alto and surrounding jurisdictions. In 2012, the City had 59.3 miles of bikeways. Since then, approximately 14 miles have been added, bringing the total to 73.5 miles as of 2025. Notably, there were no Class II buffered or Class IV separated (or protected) bikeways in 2012; today, the City offers 3.3 miles of buffered bike lanes and 4.3 miles of separated bikeways. Table EX 1 includes comparison between 2012 bicycle network mileage with existing network in 2025. Table EX 1: Existing Bicycle Network in 2012 vs 2025 FACILITY1 TYPE 2012 2025 Class I Multi-Use Path 13.9 11.7 Class II Bike Lane 33.2 34.6 Class II Buffered Bike Lane 3.3 Class III Shared Lane 8.0 12.6 Class III Bicycle Boulevard 4.2 7.1 Class IV Separated Bikeway*4.3 TOTAL 59.3 73.5 1 A “facility” is a physical element of the transportation system that is designed to support safe, comfortable, and accessible travel by walking, biking, rolling, or using mobility devices. Source: 2012 BPTP Note: *Includes the Caltrans’ constructed El Camino Real Class IV separated bikeway. 2012 lane mile data is sourced from the 2012 BPTP; 2025 lane mileage is calculated using the 2025 roadway centerline file. The Class I length has not decreased between 2012 and 2025—differences are due only to the calculation method. Exhibit A 14 !f !f !f !f !f !f !f !f !f !f !f !f !f !f !s !s !s !s !s __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd King s l e y A v e Sea l e A v e Mor e n o A v e Park B l v d Arastra d e r o R d EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F Class I - Shared Use Path Class IIa - Bike Lane Class IIb - Buffered Bike Lane Class IIIa - Bike Route Class IIIb - Bike Boulevard Class IV - Separated Bikeway Trail !f Ped/Bike Bridge !s Ped/Bike Underpass City of Palo Alto Park/Open Space School/University Commercial Center Railroad Caltrain Station Library Community Center Data Sources: City of Palo Alto, MTC, Kittelson 0 1 2 Miles As of 9/1/2025 Figure EX 1: Existing Bicycle Facilities Map Exhibit A 0. Executive Summary | 15 0.3 Community Engagement The 2026 BPTP reflects input from a four-phase community engagement process combining online tools, in-person events, and meetings with the City Council, committees, commissions, and focus groups. The City promoted outreach through City channels, community partners, and local events. PHASE 1: VISIONING Gathered over 1,000 public comments through surveys, workshops, and events. Key themes included prioritizing student safety, closing network gaps, expanding separated bikeway, improving crossings of major barriers (Caltrain, US-101), and integrating micromobility. PHASE 2: NEEDS & CONCERNS The City and community partners led walking and biking tours and workshops where participants identified priority corridors (El Camino Real, Middlefield Road, Embarcadero Road, San Antonio Road, Alma Street), and identified the need for a continuous low-stress network and improved pedestrian environments on streets like University Avenue and California Avenue. Across all phases, safety (especially for students), network connectivity, high-quality separated facilities, and strong bicycle and pedestrian-focused design emerged as top community priorities, alongside support for education, policy, and funding strategies. PHASE 3: RECOMMENDED PROJECTS & PROGRAMS The City solicited feedback on draft projects through workshops, focus groups, and an interactive map (around 400 comments). Support was strong for safety improvements, pedestrian features, bike boulevards, quick-builds, and wayfinding, though projects on major arterials drew mixed reactions due to traffic and parking concerns. PHASE 4: PLAN ADOPTION Staff presented the draft 2026 BPTP to PABAC, PTC, and the City Council for review and adoption as a part of the final phase of engagement. Feedback focused on refining the project list and clarifying project descriptions. Exhibit A 0. Executive Summary | 16 0.4 Recommendations Network Development Approach The 2026 BPTP bikeway network builds on the 2012 Plan and incorporates recent regional and local planning efforts, including the MTC Regional Active Transportation Plan, VTA Bicycle Superhighway Plan, and Safe Routes to School maps. Primary Criteria: The first round of network development synthesized these plans to identify areas of agreement and highlight routes with less consensus. Secondary Criteria: Where multiple options existed, routes were refined by prioritizing directness to key community destinations, lower traffic stress, alignment with high-demand travel flows, and the ability to overcome major barriers. 0.4.1 RECOMMENDED NETWORK Figure EX 2 shows the updated bikeway network and bicycle friendly zones developed using the network corridor criteria explained in the previous section. It presents the complete vision of the bicycle network, including both the existing facilities and the low-stress network. Bicycle friendly zone are cohesive areas with concentrations of destinations, commercial activity, and pedestrian activity. These areas should see area- wide investment in bicycle-friendly amenities such as bicycle parking, signal timing, and traffic calming. A bicycle friendly zone is an area where cycling is convenient, comfortable, and direct on all of the streets within a designated area and is the preferred method of transportation. 0.4.2 LOW-STRESS BICYCLE NETWORK Figure EX 3 shows the Low-Stress Bicycle Network map. The Low-Stress Bicycle Network is the foundation for citywide bicycle connectivity, focused on delivering safe, comfortable, and familiar routes in the near term. It builds upon the City’s existing network of low-stress streets, primarily composed of shared-use paths and neighborhood-based Bicycle Boulevards, to rapidly expand access with minimal disruption and promote broad community support. 0.4.3 COMPLETE VISION NETWORK Figure EX 4 shows the Complete Vision Bicycle Network map. The Complete Vision Network represents the long-term vision for a fully connected, all-ages-and- abilities bikeway system. This map also includes existing bicycle facilities that are not being upgraded to illustrate the full network once fully implemented. The Complete Vision Network includes some lower-priority projects that may be reevaluated as the City grows. A total of 140 projects have been identified in the 2026 BPTP to achieve the Complete Vision Network. These consist of 94 bikeway projects, 35 crossing and intersection projects, 6 special projects, and 5 studies. Exhibit A 17 !f !f !f !f !f !f !f !f !f !f !f !f !f !f !s !s !s !s !s __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd King s l e y A v e Sea l e A v e Mor e n o A v e Park B l v d Arastra d e r o R d Deer Creek Rd Porte r D r Lagu n a A v e Hano v e r S t Cam b r i d g e A v e Montrose A v e Fab e r P l Cole r i d g e A v e Chu r c h i l l A v e Cha n n i n g A v e Bo y c e A v e Welch R d Vineyard Ln Arboretum Rd Palo R d Pasteur Rd Eve r e t t A v e Guin d a S t Chau c e r S t St Francis Dr Gar l a n d D r La Donna Ave Bar r o n A v e Georgia Ave Donald Dr Amaranta Ave Cesano Ct James Rd ElCaminoWay Portage Ave Ash StOliv e A v e Duncan Pl Nelson Dr Mackay Dr Am a r i l l o A v e Clark Way EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School FletcherMiddleSchool Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School JuanaBrionesElementary BarronParkElementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k Cast i l l e j a A v e Midd l e f i e l d R d Han s e n A v e Qu a r r y R d __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW PALO ALTO PORTOLA VALLEY LOS ALTOS HILLS F Recommended Bikeway Network Bicycle-Friendly Zones City of Palo Alto !f Ped/Bike Bridge !s Ped/Bike Underpass Park/Open Space School/University Commercial Center Community Center Library Caltrain Station Railroad Data Sources: City of Palo Alto, MTC, Kittelson, Mobycon 0 1 2 Miles To East Palo Alto To Menlo Park To Mountain View To Los Altos As of 9/1/2025 To Stanford Figure EX 2: Recommended Bicycle Network Exhibit A 18 !f !f !f !f !f !f !f !f !f !f !f !f !f !f !s !s !s !s !s __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd King s l e y A v e Sea l e A v e Mor e n o A v e Park B l v d Arastra d e r o R d Eve r e t t A v e Bo y c e A v e Welc h R d Chu r c h i l l A v e Porte r D r Oliv e A v e Cam b r i d g e A v e La Do n n a A v e EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F Recommended Existing Class I - Shared Use Path Class IIa - Bike Lane Class IIb - Buffered Bike Lane Class IIIa - Advisory Bike Lane Class IIIb - Bike Boulevard Class IV - Separated Bikeway Trail !f Existing Ped/Bike Bridge !s Existing Ped/Bike Underpass Recommended Bike Blvd Crossing Recommended Intersection Improvement Recommended Ped/Bike Bridge or Underpass Caltrain Station Data Sources: City of Palo Alto, MTC, Kittelson 0 1 2 Miles As of 9/1/2025 To East Palo Alto To Menlo Park To Mountain View To Los Altos Bicycle-Friendly Zone City of Palo Alto Recommended Figure EX 3: Low-Stress Bicycle Network Exhibit A 19 !f !f !f !f !f !f !f !f !f !f !f !f !f !f !s !s !s !s !s __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd King s l e y A v e Sea l e A v e Mor e n o A v e Park B l v d Arastra d e r o R d Eve r e t t A v e Bo y c e A v e Welc h R d Chu r c h i l l A v e Porte r D r Oliv e A v e Cam b r i d g e A v e La Do n n a A v e EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F Data Sources: City of Palo Alto, MTC, Kittelson 0 1 2 Miles As of 9/1/2025 To East Palo Alto To Menlo Park To Mountain View To Los Altos Recommended Existing Class I - Shared Use Path/Trail Class IIa - Bike Lane Class IIb - Buffered Bike Lane Class IIIa - Advisory Bike Lane Class IIIb - Bike Boulevard Class IV - Separated Bikeway In an approved Plan from a neighboring jurisdiction Caltrain Station !f Existing Ped/Bike Bridge !s Existing Ped/Bike Underpass Recommended Bike Blvd Crossing Improvements Recommended Intersection Improvements Recommended Ped/Bike Bridge or Underpass Trail Bicycle-Friendly Zone Recommended Figure EX 4: Complete Vision Bicycle Network Exhibit A 0. Executive Summary | 20 0.4.4 PEDESTRIAN DISTRICT GUIDELINES AND TOOLBOX The pedestrian district toolbox includes a range of selected treatments aimed at improving pedestrian safety and enhancing the pedestrian experience. The elements range from infrastructure improvements, such as raised crossings, traffic circles, or curb extensions that improve yielding rates, to aesthetic changes, such as trees, green storm infrastructure, benches, or public art, that can elevate the walking experience. Together, these elements will meet universal needs for safety and accessibility and create conditions making walking comfortable and an enjoyable experience for all. Priority pedestrian areas are key to creating a walkable, accessible, and enjoyable City. They offer areas where walking is prioritized to allow people of all ages and abilities to get around without competing with vehicles. Within these areas, slower vehicle movement is encouraged, and opportunities are provided for people to pause and enjoy their surroundings. Three pedestrian districts and three priority areas which are focus areas for pedestrian recommendations are included in the 2026 BPTP, as shown in Figure EX 5, include: Pedestrian Districts • University Avenue Pedestrian District • California Avenue Pedestrian District • Midtown Pedestrian District Pedestrian Priority Areas • El Camino Real Neighborhood Commercial Center • Embarcadero Neighborhood Commercial Center • San Antonio Road Area Exhibit A 21 University Avenue District California Avenue District El Camino Real Neighborhood Commercial Center Midtown District Embarcadero Neighborhood Commercial Center San Antonio Road Area __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd King s l e y A v e EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F Pedestrian Districts and Priority Areas City of Palo Alto Park/Open Space School/University Community Center Library Caltrain Station Railroad Data Sources: City of Palo Alto, MTC, Kittelson 0 1 2 Miles As of 9/1/2025 Figure EX 5: Pedestrian Districts and Pedestrian Priority Areas Exhibit A 0. Executive Summary | 22 0.5 Project Prioritization Project prioritization helps direct the City’s resources and develop a near-term implementation strategy. This 2026 BPTP prioritizes intersections and bikeway corridors, studies, and special projects, for implementation over the next ten years. The initial prioritization process scored each roadway segment in Palo Alto based on quantitative criteria to assess the level of alignment with the objectives of safety and connectivity. Projects that scored higher than 70 points were advanced to supplemental evaluation along with a subset of additional projects selected for further review. The supplemental evaluation considered project readiness, project cost, and project support to determine the top priority projects for near-term implementation. Table EX 2 presents the prioritization factors and evaluation criteria used in the prioritization process. Table EX 2: Prioritization Factors and Evaluation Criteria Note: *Only the projects that scored 70 or more points with a few exceptions in the Initial Evaluation advance to the Supplemental Evaluation. PRIORITIZATION FACTOR CRITERIA Initial Evaluation Safety High-Injury Corridors Recommended SRTS Suggested Walk & Roll Route Maps Connectivity Bicycle Level of Traffic Stress Access to Transit Supplemental Evaluation* Project Cost and Funding High, Medium, and LowProject Readiness Project Support Near-Term Implementation: A total of 25 bicycle projects (covering approximately 19 miles of the recommend network) and 24 intersection and crossing projects have been identified to initiate in the near-term (within 10 years). These projects are illustrated in Figure EX 6. Cost Estimation: The 2026 BPTP uses planning level rough-order-of-magnitude cost estimates to communicate relative investment needs rather than precise project budgets. Costs are categorized on a simple $ to $$$ scale, reflecting low, medium, and high anticipated costs based on comparable projects, facility type, and implementation complexity. The cost for bikeway, intersection, and crossing improvements varies widely and cannot be accurately estimated at this stage. Funding Strategy: Bicycle and pedestrian projects can be funded through a range of local, regional, state, and federal sources. To enhance its competitiveness for these funds, the City of Palo Alto should ensure its projects align with the core goals of the funding programs—typically centered on equity, safety, sustainability, and connectivity. Exhibit A 23 __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd King s l e y A v e Sea l e A v e Mor e n o A v e Park B l v d Arastra d e r o R d Eve r e t t A v e Bo y c e A v e Welc h R d Chu r c h i l l A v e Porte r D r Oliv e A v e Cam b r i d g e A v e La Do n n a A v e EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F Recommended Near-Term Improvements Class I - Shared Use Path Class IIa - Bike Lane Class IIb - Buffered Bike Lane Class IIIb - Bike Boulevard Class IV - Separated Bikeway Recommended Bike Blvd Crossing Recommended Intersection Improvement Recommended Ped/Bike Bridge or Underpass City of Palo Alto Railroad Caltrain Stop Data Sources: City of Palo Alto, MTC, Kittelson 0 1 2 Miles As of 9/1/2025 Figure EX 6: Recommended Near-Term Projects Exhibit A 1. Introduction | 24 1. INTRODUCTION 24 Exhibit A 1. Introduction | 25 Famous as the birthplace of Silicon Valley, the City of Palo Alto (City) is also a pioneer in active transportation, home to the nation’s first bicycle boulevard on Bryant Street. With its relatively flat geography, mild climate, abundant green spaces, and vibrant, historic downtown, the City offers an ideal setting for walking and bicycling. Strong connections to Stanford University and regional transit further enhance its appeal, helping Palo Alto achieve some of the highest walking and biking rates in the Bay Area and nation. Palo Alto’s is a Gold-rated Bicycle Friendly Community by the League as well. The City last updated its Bicycle and Pedestrian Transportation Plan (BPTP) in 2012. That plan established key planning, policy, and implementation strategies to enhance the safety and appeal of walking, biking, and rolling for both transportation and recreation. Since then, the share of residents driving alone to work has decreased significantly from 64.4% in 2012 to 51.65% in 2023. The Covid-19 pandemic also brought major shifts in travel behavior, including a sharp rise in telecommuting. By 2023, 27.9% of Palo Alto residents worked from home, nearly 2.5 times the rate in 2019 (9.7%).1 These changes, along with the growing use of emerging mobility options such as e-bikes and ridesharing, have prompted the City to initiate an update to the BPTP to better respond to current trends and future needs for walking and biking. Additionally, the City’s Sustainability and Climate Action Plan (S/CAP) (2022) set a goal of reducing greenhouse gas (GHG) emissions 80% below 1990 levels by 2030 (the “80 x 30” goal) and achieving carbon neutrality by 2030. The 2026 BPTP reflects community needs and desires, considers recent trends in cycling and bicycle technology, and addresses changes in bicycle and pedestrian planning and design. It builds upon extensive planning and design efforts already underway by the City, including the implementation of the 2012 BPTP, 2025 Safe Streets for All (SS4A) Safety Action Plan, and land use planning such as the 2023-2031 Housing Element Update, Downtown Housing Plan, and the San Antonio Road Area Plan. The 2026 BPTP was drafted in collaboration with the City and the community through multiple phases of engagement occurring over the course of BPTP development. 1 U.S. Census Bureau. 2012 and 2023 American Community Survey, Table S0801: Commuting Characteristics by Sex. Accessed June 28, 2025. A pedestrian is someone traveling on foot along sidewalks, crosswalks, or pathways. This also includes individuals using assistive devices such as canes, walkers, or wheelchairs. A bicyclist is a person riding a bicycle, which may include pedal- powered bicycles, electric bicycles (e-bikes) with pedal-assist or throttle features, and adaptive bicycles such as hand-cycles or tricycles. Shared micromobility refers to the use of small, low-speed vehicles like bicycles and scooters that are available for public rental on a short-term basis. Exhibit A 1. Introduction | 26 1.1 Purpose The 2026 BPTP serves as a comprehensive action plan for the City to provide improved bicycle and pedestrian facilities for its residents, employees, and visitors. The purpose of the 2026 BPTP is to gather meaningful input from the community, evaluate progress since the 2012 plan, and update the City’s approach to policies, programs, and infrastructure that support walking and biking. To achieve this purpose, the 2026 BPTP investigates safety data to propose impactful recommendations, explores the role of emerging transportation technologies such as electric-bicycles and micro-mobility devices, and establishes a long-term vision to make walking and biking easier, safer, and more accessible for everyone. This plan is also intended to support the City’s broader goals, including those in the 2030 Comprehensive Plan, the Sustainability and Climate Action Plan, and the City’s Safety Action Plan. 1.2 Plan Organization Who Can Use the Bike Lane? All bicycles are allowed on the bikeway network, including modified types such as unicycles, cargo bikes, bikes with trailers, and longtail bikes. All e-bikes, including those with pedal-assist speeds up to 28 mph are permittted on most bikeways, but are not allowed on unpaved trails (See Palo Alto Open Space and Park Rules and Regulations for more information). Palo Alto’s approach to e-bike regulation and policy continues to evolve as the City responds to rapid adoption, emerging safety concerns particularly with youth riders, and the need to balance innovation with the comfort and safety of all street and path users. Who Can Use the Sidewalk? Pedestrians can use sidewalk. In Palo Alto, riding on sidewalks in the California Avenue and Downtown Business Districts is prohibited (See Palo Alto MC 10.64.130 (c)). Chapter 1: Introduction This chapter summarizes the vision statement and objectives that guided the development of 2026 BPTP. It includes performance measures that will help track the City’s progress toward these goals, describes the relationship between other planning efforts and 2026 BPTP, and summarizes the public engagement efforts. Chapter 2: Existing Facilities This chapter documents the existing walking and bicycling infrastructure in Palo Alto. It analyzes the walking and bicycle activity, barriers and safety conditions. It includes information on the use of micromobility and e-bikes, and bicycle parking. Chapter 3: Recommendations This chapter includes the bicycle and pedestrian recommendations. It includes the process for developing bikeway network corridor criteria. For pedestrians, it includes recommendations related to the pedestrian district guidelines and toolbox. Lastly, it includes recommended policies and programs. Chapter 4: Implementation and Funding This chapter includes a prioritization framework classifying the recommended projects into near- and long-term categories. Additionally, it includes planning level rough order of magnitude generalized costs and identifies potential funding sources. Exhibit A 1. Introduction | 27 1.3 Benefits and Barriers to Walking and Biking Walking and biking offer significant public health, environmental, and economic benefits that align with the goals for sustainable transportation. The Caltrans’ Toward an Active California plan highlights how active transportation improves physical and mental health, reduces greenhouse gas emissions, and supports equitable access to mobility. Additionally, walking and biking reduce auto ownership costs, estimated at $8,500 annually per car and save $830 million in congestion, collision, and vehicle maintenance costs for the state of California.2 Furthermore, active transportation enhances community character, supports local businesses, and results in increased land values. However, key barriers remain. State and national reports emphasize challenges such as high-speed traffic, incomplete or disconnected pedestrian and bicycle networks, missing first- and last-mile connections, and a lack of secure bicycle parking. In Palo Alto, these issues are echoed by local feedback that calls for safer crossings, better lighting, and more low-stress, separated bicycle facilities. Equity also remains a concern, with a need to ensure access to high-quality infrastructure for all ages and abilities. 2 Caltrans. Toward and Active California. 2017. Retrieved from https://dot.ca.gov/programs/transportation-planning/division-of- transportation-planning/complete-streets/toward-an-active-california-state-bicycle-pedestrian-plan What does “All Ages and Abilities (AAA)” mean? To truly encourage walking and biking, facilities must be designed for everyone. All Ages and Abilities facilities are a national best practice for designing walking and biking facilities that strive to serve everyone safely, comfortably, and equitably. All Ages and Abilities design practices account for differences among potential users in physical abilities, age, height, cycling abilities, perceived personal safety, and comfort in riding with traffic. By prioritizing comfort, traffic separation, and equity, All Ages and Abilities design expands the reach of walking and bicycling, enhances mobility and independence, and makes active transportation a safe and appealing choice for all. Exhibit A 1. Introduction | 28 1.4 Vision, Objectives, and Performance Measures To guide the 2026 BPTP, the City gathered community input to help shape a vision statement, objectives, and performance measures to track progress toward these goals. This vision builds upon the 2030 Comprehensive Plan’s vision to create a safe, beautiful city and a sustainable transportation system. 1.4.1 VISION STATEMENT We envision a city where sustainable, safe, efficient, equitable, and enjoyable transportation thrives. Together, we will create a comfortable and connected street and trail network that supports walking, biking, and rolling for people of all ages and abilities. We continue to be a leader in Safe Routes to School and invest more in active transportation infrastructure, education, and encouragement programs. Exhibit A 1. Introduction | 29 1.4.2 OBJECTIVES The following objectives guide the recommendations in the 2026 BPTP. Safe and Inclusive: Prioritizing safety for all transportation network users regardless of age and ability and ensuring equitable access to pedestrian and bicycle infrastructure across the community while reducing fatal and severe injury collisions. Connected and Accessible: Featuring a convenient and interconnected network of sidewalks, bike lanes, and trails that provide efficient travel options and easy access to transit and important destinations, encouraging a shift away from driving and improving environmental health through lower vehicle miles traveled and greenhouse gas emissions. Community-Led and Cooperative: Fostering community engagement and participation in promoting active transportation, supported by education, programming, and infrastructure investments, in a way that cultivates learning for network users of all ages. Comfortable and Enjoyable: Enhancing the comfort and enjoyment of walking and cycling through amenities such as shade, greenery, and well-designed streetscapes. Integrated and Collaborative: Collaborating with neighboring cities to create a seamless, integrated, and efficient regional network of pedestrian and bicycle infrastructure. 1.4.3 PERFORMANCE MEASURES Table 1 lists performance measures that were established during the 2026 BPTP development process to track progress toward achieving the Plan vision and objectives and document the results of investments in biking, walking, and rolling in Palo Alto. Table 1: Performance Measures OBJECTIVE PERFORMANCE MEASURE REPORTING PERIOD Safe and Inclusive Annual pedestrian and bicycle collisions per 100,000 residents Annual Annual pedestrian and bicycle killed and severe injury (KSI) collisions per 100,000 residents Annual Connected and Accessible Walk/bike/roll to school and commute mode shares Annual (school mode share); Annual (commute mode share) Walking and biking volumes at key locations Annual Community-Led and Cooperative Number of walking and biking promotion events held per year at schools in the City Annual Number (and percent) of schools with at least one Transportation Safety Representative Annual Number of open street events held Annual Number of active pedestrian and/or bicycle advocacy group participants Annual Source: Kittelson & Associates, Inc. 2025 Exhibit A 1. Introduction | 30 Table 2 outlines potential performance measures that could be introduced as the 2026 BPTP is implemented and as walking, biking, and rolling network grows, prompting the need to expand how the 2026 BPTP is tracked. Biannually (every 2 years), the City of Palo Alto can consult with the Palo Alto Pedestrian and Bicycle Advisory Committee (PABAC) to determine if the annual performance measures exhibit trends (compared to baseline conditions and year-over-year) that illustrate a clear path forward for allocating resources. If it is determined that additional direction is needed to invest in the network to achieve 2026 BPTP vision and goals, then performance measures such as the following could potentially be established. Developing these measures will require further research and a formalized methodology including identifying reliable data sources that could be tracked periodically. Table 2: Potential Performance Measures OBJECTIVE PERFORMANCE MEASURE REPORTING PERIOD Safe and Inclusive Number of top pedestrian and bicycle KSI collision or high injury network locations improved or studied Annual Percentage of existing affordable housing projects within 1,000 feet of completed and connected all ages and abilities (AAA) cycling infrastructure (bikeways, trails) Annual Connected and Accessible Miles of bikeway facilities (per each bikeway type and total network)Annual Share of transportation budget spent on walk/bike/roll improvements Annual Comfortable and Enjoyable Percentage of cycling infrastructure mileage that are AAA routes or Level of Traffic Stress1 (LTS) 1/2 Annual Canopy coverage percentage of designated walking and bicycling routes.Annual Integrated and Collaborative Number of completed walking/bicycling projects that improve cross-jurisdictional gateways Every 3 years Percentage of transit stops and stations accessible on AAA cycling routes.Every 3 years Source: Kittelson & Associates, Inc. 2025 Notes: 1Level of traffic stress (LTS) is an approach that quantifies the amount of discomfort that people feel when they bicycle close to traffic. It is further described in section 2.5. Exhibit A 1. Introduction | 31 1.5 Setting Located between the open space preserves of the foothills and the tidal flats of San Francisco Bay, Palo Alto encompasses an area of approximately 26 square miles, nearly half of which is designated as parks, open space, and Baylands. With an established grid network of streets, vibrant business districts, a well-known park and trail system, and direct proximity to Stanford University, Palo Alto is an ideal place for walking and biking. Flat terrain, tree-lined streets, and a temperate climate also make Palo Alto a relatively easy place to bicycle. Palo Alto’s main transportation corridors are Interstate 280, Highway 101, Highway 84 (the Dumbarton Bridge), State Route 82 (El Camino Real), and Oregon Expressway/Page Mill Road. Within the City, commuter rail stations include the Palo Alto University Avenue stop (one of the most frequently used in the Caltrain system) and the California Avenue station. Bus service is primarily provided by the Santa Clara Valley Transportation Authority (VTA) and limited service is provided by SamTrans (San Mateo County Transit District), Dumbarton Express, and Stanford’s Marguerite Shuttle. Since 2012, the City of Palo Alto’s population has remained relatively consistent with around 66,000 residents, whereas the median household income has increased by 55 percent. Image 1 and Table 3 shows the key demographic indicators as obtained from 2023 U.S. Census ACS 1-Year estimates. Image 1: Palo Alto Demographic Indicators Source: U.S. Census Bureau, ACS 2023 1-Year Estimates. Exhibit A 1. Introduction | 32 Table 3: Palo Alto Demographic Indicators DEMOGRAPHIC INDICATOR ESTIMATE Total Population 65,881 Population Density 2,846 Population per square mile Sex ratio (males per 100 females)98.6 Average Household Size 2.35 High School Graduate or Higher 97.6% Median Household Income $184,068 Per Capita Income $97,307 Unemployment Rate 3.5% Mean Travel Time to Work 20.4 minutes Source: U.S. Census Bureau, ACS 2023 1-Year Estimates. 1.5.1 KEY DESTINATIONS There are several key destinations, community amenities, and resources within a walkable distance of half a mile and a bikeable distance of two miles of many Palo Alto residents. In this context, key destinations include both residential origins and non-residential destinations. Key destinations include medical and education centers, grocery stores, childcare centers, pharmacies, parks, libraries, and transit stops. Additionally, there are areas within the City where residential densities are higher than average; some of these areas are reflected in the Mixed Use and Other High Intensity Uses categories on Figure 1. Figure 1 identifies key destinations, or existing activity generators, that will benefit from improved bicycle and pedestrian connections. Figure 2 illustrates the 10-minute walk and bike sheds (area that is accessible within 10-minutes of walking or biking based on the existing street network without consideration of available existing facility) for major transit stops, which include Caltrain stations and bus stops served by rapid bus service. These walk and bike shed areas represent the majority of populated areas within the City. Bicycle and pedestrian infrastructure improvements on streets and sidewalks connecting to these stops are critical in providing safe and comfortable connections to transit. Exhibit A 33 __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k Stanford Medical Center Lucile Packard Children's Hospital VA Palo Alto Medical Care System Stanford Shopping Center Downtown Shopping Area Town & Country Village California Avenue Shopping Area Midtown Shopping Center Downtown Library Children's Library Rinconada Library Lucie Stern Community Center Mitchell Park Community Center Cubberley Community Center Jewish Community Center College Terrace Library Palo Alto Medical Foundation Santa Clara County Superior Court Palo Alto Transit Center Stanford Research Park East Bayshore San Antonio Road/ Bayshore Corridor Alma Village Edgewood Plaza Palo Alto Art Center Charleston Shopping Center Public Safety Building Ventura Community Center & Bicycle Safety Park !!TC __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F City of Palo Alto Commercial Neighborhood Commercial Mixed Use Employment District or Other High-Intensity Uses School Parks and Open Space Community Center Library Medical Center Shopping Center/Area Employment Center !!TC Transit Center Rapid Bus Stop Caltrain Station Railroad Data Sources: City of Palo Alto, MTC, Kittelson 0 1 2 Miles As of 9/1/2025 Figure 1: Existing Activity Generators Note: Icon is in a general area, not the exact location. Exhibit A 34 __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F 10-Minute Walk Area 10-Minute Bike Area Rapid Bus Stop Caltrain Station City of Palo Alto Park/Open Space School/University Commercial Center Community Center Library Railroad Data Sources: City of Palo Alto, MTC, Kittelson 0 1 2 Miles As of 9/1/2025 Figure 2: Walk and Bike Sheds for Major Transit Stops Exhibit A 1. Introduction | 35 1.6 Relationship to Other Documents The 2012 BPTP, along with a variety of local, regional, state and federal plans, legislation, and policy directives, provides guidance for the development and safe operation of bicycle and pedestrian facilities. The following section highlights relevant themes and findings from existing plans and policies. Across various plans, there is strong alignment on promoting sustainability, climate action, and increasing the rate of people walking and biking. Common vision and goals include: • Increasing biking and walking trips for all purposes • Constructing and maintaining safe and accessible streets for walking and biking and people of all ages and abilities • Developing a network of bikeways, pathways, and traffic-calmed streets that connect various business districts, residentials areas, open spaces and parks • Improving the aesthetics of walkways and bike paths to attract more walking and biking trips • Reducing the overall vehicle miles traveled (VMT) • Seeking to improve the quality of life, as well as environmental quality, economic health, and social equity The 2030 City of Palo Alto Comprehensive Plan introduces programs and policies such as collecting bicycle counts and conducting surveys to understand bicycle use (Program T1.16.1); encouraging participation in local walking and biking events (Program T1.16.4); providing facilities that encourage walking and biking (Policy T-1.19); and prioritizing investments for enhanced pedestrian access and bicycle use within Palo Alto (Program T1.19.2).3 Furthermore, the policies align with the Metropolitan Transportation Commission’s (MTC) Regional Active Transportation Plan4 and City’s Safe Routes to School (SRTS) Program. 3 City of Palo Alto. 2030 Comprehensive Plan. (2014) Accessed from https://www.paloalto.gov/Departments/Planning- Development-Services/Housing-Policies-Projects/2030- Comprehensive-Plan 4 Metropolitan Transportation Commission. Regional Active Transportation Plan. (2023) Accessed from https://mtc.ca.gov/ planning/transportation/bicycle-pedestrian-micromobility/ regional-active-transportation-plan The City’s Sustainability/Climate Action Plan (S/CAP) sets an ambitious goal to reduce community-wide GHG emissions 80% below 1990 levels by 2030, with transportation identified as a major focus area. The plan aims to cut transportation-related emissions at least 65% below 1990 levels by accelerating EV adoption, expanding public and private charging infrastructure, electrifying municipal fleets, and promoting e-bikes and other light electric vehicles. It also targets a 12% reduction in total vehicle miles traveled (VMT) by 2030 and seeks to increase active transportation and transit mode share for local work trips from 19% to 40% through bicycle and pedestrian plan implementation, transit expansion, transportation demand management (TDM), smart parking, and supportive land use policies. Overall, the transportation strategy emphasizes feasibility, equity, electrification, and reducing single-occupancy vehicle travel while aligning infrastructure and land use decisions with long-term climate resilience. The common themes from the review of documents surrounding the needs and challenges include: • Limited access to commercial areas • Insufficient bike parking • Safety concerns at crossings and high-traffic areas • Environmental risks • Funding uncertainty • Bicycle theft, and • Poor infrastructure maintenance Exhibit A 1. Introduction | 36 1.6.1 RELATIONSHIP TO CITY’S ONGOING EFFORTS At the time of the 2026 BPTP development, the City of Palo Alto was advancing several related planning efforts, including: • Safe Streets for All (SS4A) Safety Action Plan • 2023-2031 Housing Element • San Antonio Road Area Plan • Downtown Housing Plan • South Palo Alto Connectivity Project • Quarry Road Transit Connection at El Camino Park • Car-Free Streets: California Avenue and Ramona Street • El Camino Real Pavement, Rehabilitation, and Bikeways • Cubberley Community Center Project The BPTP team engaged with staff and consultants leading these initiatives to ensure coordination and consistency across planning efforts. Recommendations from projects that were further along in their development, such as the SS4A Safety Action Plan and the 2023–2031 Housing Element, were incorporated into the BPTP as appropriate. The Safety Action Plan prioritizes addressing risks for pedestrians on major downtown streets, pedestrians on arterials at night, youth bicyclists, broadside collisions between bicyclists and vehicles, and bicycle crossings on high- stress streets. The Housing Element highlights that improvements to walking and biking infrastructure can reduce household transportation costs and enhance residents’ quality of life. It also promotes strategies such as Pedestrian-Transit Oriented Development (PTOD) and mixed-use land development to foster more walkable and bikeable communities. Other efforts, including the San Antonio Road Area Plan and the South Palo Alto Connectivity Project, were still in progress at the time of 2026 BPTP development. The 2026 BPTP recognizes that the outcomes of these ongoing projects will continue to inform and influence the recommendations presented in this plan. The following active transportation projects are recommended as a part of the plans reviewed: • Across barrier connections across the City (Adobe Creek Highway 101 Overcrossing (completed), Caltrain/Alma Barrier Crossing at Matadero Creek (ongoing via the South Palo Alto Bike/Ped Connectivity Project) • Trails and Shared Use Pathway projects (including Embarcadero Road / Rinconada Park Sidepath and Adobe Creek Reach Trail (completed)) • Bicycle boulevard projects (including Castilleja- Park-Wilkie Bicycle Boulevard and Bryant Street Bicycle Boulevard Update) • Intersection spot improvements (including El Camino Real Intersection Through-Markings (completed) and Charleston Road at Middlefield Road Bicycle Through-Lanes (completed) • Infrastructure Programs (including Bicycle Parking Corral / Rack Installation Program (on-going) and Pedestrian Countdown Signals & Crossings Program (on-going)) • System rehabilitation and Maintenance (including Castilleja Street-Park Boulevard and Lytton Avenue (completed)) • Design, Feasibility, and Planning (including Middlefield Road “Complete Street” Plan Line Study and Embarcadero Road Plan Line Study (completed)) • Non-Infrastructure - Education Encouragement (including Citywide Traffic Counts and Data Collection and Bike Palo Alto! / Palo Alto Sunday Streets (on-going)) • Freeway interchange improvements (I-280/Page Mill Interim Improvements (completed)) • Planned Bicycle Bridge/Undercrossing (Stanford Avenue /Seale Avenue, San Francisquito Creek Trail (Bay Trail Crossing Complete), Adobe Creek Bridge (complete)) Exhibit A 1. Introduction | 37 1.7 Public Outreach Summary The development of the 2026 BPTP was guided by an extensive, four-phase community engagement process: 1) Visioning; 2) Needs & Concerns; 3) Recommended Projects and Programs; and 4) Plan Adoption. The community engagement effort included a combination of digital outreach and in-person events. The City promoted events on the City’s website, social media channels, “Transportation Connect” mailing list, tabling and community events, Uplift local newsletter, and at the Committee and Working Group meetings. Image 2: Four Phases of Engagement Exhibit A 1. Introduction | 38 Key Themes from Phase 1: • Safety is the top priority, particularly for students traveling to and from school. • Strong demand for separated bikeways or wider bike lanes and safer street crossings. • Need for a seamless network that crosses major barriers (e.g., highways, rail). • Direct connections to schools, transit hubs, and key community destinations. • Integration of e-bikes and other micromobility options. • Emphasis on high-quality design, including comfort, aesthetics, wayfinding, and shade. • Education, outreach, and ongoing community input are essential. PHASE 1: VISIONING The initial phase focused on establishing a shared vision through a variety of public engagement activities. A variety of methods were used to engage the public, including an interactive map, public survey (developed and distributed in partnership with the Safe Streets for All Action Plan team), a series of seven committee and working group meetings, an in-person pop-up event at Bike Palo Alto, and a virtual community visioning workshop. The interactive map received nearly 1,000 unique comments, with 54 percent citing safety concerns and 29 percent requesting new infrastructure. Many comments emphasized the need to close connectivity gaps in the bicycle network, improve safety, expand bike lanes for greater comfort, and provide infrastructure near schools. Key themes emerging from engagement with committee and staff working groups surfaced several key themes: 1) safety, especially for students; 2) demand for high-quality walking and biking infrastructure; 3) the need for across-barrier connections over obstacles like U.S. 101 and Caltrain; 4) interest in transformative technologies (e.g., e-bikes, sensors); and 5) alignment of transportation planning with future growth areas such as San Antonio Road. At the Bike Palo Alto event, residents echoed the importance of separated bikeway and identified El Camino Real as a major barrier. The visioning workshop led to the development of a vision statement and the objectives presented in Chapter 2. Image 3: Virtual Visioning Workshop held on January 31, 2024 Image 4: Bike Palo Alto Event held on October 1, 2023 Exhibit A 1. Introduction | 39 PHASE 2: NEEDS & CONCERNS The second phase of engagement included a series of committee and working group meetings and a week- long series of events and workshops that included a bicycle network development workshop, a community walking tour, and a community cycle tour. The Bikeway Network Development workshop guided participants to identify key destinations, connect destinations through a schematic “Star” network, and apply the schematic network to the street grid. The resulting networks highlighted the need for crossing across railway tracks and opportunities to improve facilities on major roads such as Middlefield Road, El Camino Real, and Embarcadero Road. The community walking tour, hosted in partnership with Avenidas (a senior activity center), explored University Avenue and the Palo Alto Caltrain Station area. Feedback from the tour contributed to the development of the Pedestrian Design Guidelines. The community bike tour, organized with the Silicon Valley Bicycle Coalition, involved 24 community members and covered a range of existing bicycle facility types over a seven-mile bike ride. Participants emphasized the need for a continuous low-stress network, stronger connectivity, and infrastructure that supports riders of all ages and abilities. Image 5: Bicycle Network Development Workshop Image 6: Community Walking Tour Key Themes from Phase 2: • Strengthen the existing network by addressing critical gaps. • Prioritize improvements along key corridors, including San Antonio Road, Alma Street, Embarcadero Road, Middlefield Road, and El Camino Real. • Enhance sidewalk continuity, wayfinding, and placemaking in pedestrian-oriented areas such as University Avenue and California Avenue. • Enhance the design of transitions between different bicycle facility types to ensure a continuous and intuitive riding experience. Exhibit A 1. Introduction | 40 PHASE 3: RECOMMENDED PROJECTS AND PROGRAMS This phase sought feedback on draft project and program concepts through focus group meetings (3), committee meetings (3), commission meetings (2), a public workshop, tabling and public events, online interactive map feedback and electronic feedback submissions. Discussions with focus groups, commission and committee members highlighted concerns about the cost and return on investment on bikeways on “Big Streets.” There appeared to be consensus on the need for micromobility supporting infrastructure, pedestrian-oriented streets, implementation of bike boulevards, Quick-Build projects, wayfinding, and, most importantly, safety enhancements. The City held a joint workshop for the 2026 BPTP and South Palo Alto Bike/Ped Connectivity5 project at the Mitchell Park Community Center. Key takeaways included strong support for expanding the pedestrian toolbox with features such as pedestrian beacons, pedestrian-only zones, raised crossings, wider sidewalks, permanent wayfinding, and improved bike parking. Feedback on separated bikeways was mixed. In addition to in-person events, the BPTP team prepared an online interactive map and feedback form. The map tool collected over 400 public comments, with 40 percent expressing support for improvements along corridors like Homer Avenue, Channing Avenue, Quarry Road, Charleston Road, and Oregon Expressway. Some (13%) raised concerns about specific treatments, while 24 percent opposed certain proposals, particularly where they could impact vehicle traffic—such as on San Antonio Road, Middlefield Road, and Embarcadero Road. Several commenters suggested leveraging creek corridors for non-motorized transportation. The feedback form received over 100 responses, which largely supported making Palo Alto more bike- and pedestrian-friendly but also raised concerns about the safety and practicality of certain recommend projects, particularly those involving busy arterial roads and parking removal. 5 City of Palo Alto. South Palo Alto Bike/Ped Connectivity Accessed from www.paloalto.gov/bikepedcrossings Key Themes from Phase 3: • Mixed reactions to “Big Streets” projects while they provide direct connections, many questioned their overall return on investment. • Strong call for a clearer prioritization framework that accounts for real-world constraints. • Desire for more pedestrian-focused recommendations. • Emphasis on improving overall network connectivity and cohesion. • Support for non-infrastructure strategies such as education, policy tools, funding mechanisms, and planning for emerging mobility modes. Exhibit A 1. Introduction | 41 PHASE 4: PLAN ADOPTION Staff presented the draft 2026 BPTP to PABAC, PTC, and the City Council for review and adoption as a part of the final phase of engagement. Feedback focused on refining the project list and clarifying project descriptions. Exhibit A 2. Existing Facilities and Conditions | 42 2. EXISTING FACILITIES AND CONDITIONS 42 Exhibit A 2. Existing Facilities and Conditions | 43 2.1 Existing Pedestrian Facilities Facilities1 that support people walking include sidewalks, shared-use paths, and trails, as well as crossing facilities such as curb ramps, high intensity activated crosswalk beacons, and marked and unmarked crosswalks. Amenities such as street furniture, pedestrian-scale lighting, pedestrian-oriented wayfinding, shade, benches, water fountains, and landscaping also serve to support and create an environment that is convenient and inviting for people walking. 1 A facility is a physical element of the transportation system that is designed to support safe, comfortable, and accessible travel by walking, biking, rolling, or using mobility devices. This chapter provides an overview of walking and biking in Palo Alto and presents relevant demographic data, existing walking and biking infrastructure, the High Injury Bicycle and Pedestrian Network, and the results of the bicycle level of traffic stress analysis. This inventory and analysis of existing conditions sets the stage for identifying pedestrian and bicycle needs and informs the prioritization process and network recommendations. A pedestrian is someone traveling on foot along sidewalks, crosswalks, or pathways. This also includes individuals using assistive devices such as canes, walkers, or wheelchairs. A bicyclist is a person riding a bicycle, which may include pedal-powered bicycles, electric bicycles (e-bikes) with pedal-assist or throttle features, and adaptive bicycles such as hand-cycles or tricycles. Shared micromobility refers to the use of small, low-speed vehicles like bicycles and scooters that are available for public rental on a short-term basis. Pedestrian crossing at El Camino Real. Source: City of Palo Alto Midblock crossing at City Hall Source: City of Palo Alto Exhibit A 2. Existing Facilities and Conditions | 44 Crossing at Quarry Road. Source: City of Palo Alto Pedestrians crossing El Camino Real. Source: City of Palo Alto Sidewalks are generally provided throughout Palo Alto on its arterial and residential streets, providing walking connectivity to destinations such as schools, parks, retail, and transit. However, there are some gaps in the sidewalk network, including around key walking destinations such as rail and bus rapid transit stops. For example, the presence of sidewalk gaps along Palo Alto Avenue and Alma Street (near Palo Alto Transit Station) and along San Antonio Road (near San Antonio Transit Station) affect the directness and convenience of walking to and from high quality transit service. In addition, some neighborhoods may lack complete sidewalk networks on their residential streets, such as those within proximity of San Antonio Transit Station as well as Barron Park. Marked crosswalks are provided at signalized and unsignalized intersections in the City. However, there are locations where consistent marked crosswalks are lacking. For example, at-grade arterials and expressways which bisect the City can have marked crosswalks that are limited and distant from one another. In addition, some signalized intersections do not provide marked crosswalks at all four legs, requiring pedestrians to undertake a three-stage crossing; for example, this condition occurs in proximity of Palo Alto Transit Station. Some signalized intersections also lack pedestrian crossing signals especially in key commercial areas like Downtown Palo Alto. The unsignalized intersections of side streets at arterial streets often lack marked crosswalks in any direction; for example, this condition is present near California Avenue Transit Station along streets such as Page Mill Road, California Avenue, and El Camino Real. Exhibit A 2. Existing Facilities and Conditions | 45 2.2 Existing Bicycle Facilities Facilities that support people bicycling include bike lanes, bike boulevards, separated bikeways, shared-use paths, and trails, as well as crossing facilities such as protected intersections and conflict zone markings. Amenities such as bicycle parking, bicycle-oriented wayfinding, and bicycle signals also serve to support and create an environment that is convenient and inviting for people bicycling. The City of Palo Alto has been a pioneer in developing bicycle facilities, having implemented the first Bicycle Boulevard in the United States on Bryant Street in the 1970s. The corridor is named in honor of Ellen Fletcher, a longtime councilwoman and former Palo Alto Vice-Mayor who helped transform the City into a nationally recognized bike-friendly community through her persistent advocacy. The California Department of Transportation (Caltrans) defines four classes of bicycle facilities: Class I, II, III, and IV, as illustrated in Image 7. In addition to these statewide classifications, the City of Palo Alto uses further sub- classifications: Class IIa – standard bike lanes, Class IIb – buffered bike lanes, Class IIIa – bike routes, and Class IIIb – bike boulevards. Image 7: Types of Bicycle Facilities Source: Caltrans, Toward an Active California, State Bicycle and Pedestrian Plan, 2017. Note: A pedestrian or bicycle facility is any infrastructure designed to support, enhance, and encourage bicycle use by improving the safety and convenience for pedestrians or bicyclists. A “facility” is a physical element of the transportation system that is designed to support safe, comfortable, and accessible travel by walking, biking, rolling, or using mobility devices. Exhibit A 2. Existing Facilities and Conditions | 46 The 2026 BPTP proposes the six bicycle facility types illustrated and described in Image 8 and Image 9. Image 8: Updated Bicycle Facility Types Image 9: Bicycle Facility Types TYPE OF FACILITY DESCRIPTION Class I Shared Use Path A shared use path is a physically separated path from vehicles that can be used by both pedestrians and bicyclists. They should be implemented adjacent to high volume collectors and arterial roads where speeds and volumes are high. They can also be implemented through parks and recreational areas. The City of Palo Alto has an extensive existing shared use pathway network that is used for both recreational and non-recreational use as they are low-stress routes that are attractive, comfortable, and for people of all ages and abilities. Considerations: Shared use paths must be designed with care at intersection crossings, to promote visibility and proper yielding behavior. At high user volumes, increased width or user-separated zones should be considered. Challenges: Limited right-of-way and gaps in the trail network that hinder connections to key destinations. Environmental considerations, such as potential impacts to habitat areas or heritage trees, also pose constraints. In addition, trail maintenance can be difficult when responsibilities are shared across multiple agencies. Class IIa Bicycle Lanes A bicycle lane is a dedicated lane for bicycles that is visually separated from the motor vehicle lane through pavement markings. As they are only visually separated, bike lanes should only be implemented on low-to-moderate collector roads where the speeds are less than or equal to 30 mph. Repurposing the public space for dedicated bicycle facility. Bike lanes should be at a minimum of 5 feet but preferably 6 feet when space allows. Considerations: Existing bike lanes that are 4 feet should be updated when possible. Challenges: Limited right-of-way, safe crossings at intersections and driveways, vehicle parking considerations, and conflicts with right- turning vehicles. 2.2.1 BICYCLE FACILITIES Exhibit A 2. Existing Facilities and Conditions | 47 TYPE OF FACILITY DESCRIPTION Class IIb Buffered Bicycle Lanes A buffered bicycle lane is similar to a painted bicycle lane, but it has an extra painted buffer to create more space between bicyclists and motorists. A buffered bike lane should be implemented on collector roads with low to moderate volumes, around 4,000-6,000 vehicles per day (vpd). Considerations: Parking lane or travel lane reconfiguration may be necessary to create space for buffered bike lanes. Challenges: Limited right-of-way, safe crossings at intersections and driveways, vehicle parking considerations, and conflicts with right- turning vehicles. Class IIIa Advisory Bike Lanes An Advisory Bike Lanes or Edge Lane Road is a treatment where people riding bicycles and motor vehicles share the road space. These should only be used on local streets or on collectors with low volumes and speeds. With low traffic volumes drivers can negotiate the reduced space, then the travel area can then be reduced to 1 lane for two-way travel, and advisory bike lanes can be painted on either side. Considerations: Advisory bike lanes are an experimental and emerging facility type. Outreach and education should be conducted before any installation to promote user awareness and project success. Challenges: They are suitable only for roadways with low traffic volumes and low vehicle speeds, and vehicle parking considerations. Exhibit A 2. Existing Facilities and Conditions | 48 TYPE OF FACILITY DESCRIPTION Class IIIb Bicycle Boulevards A bicycle boulevard is a low-stress shared roadway, where bicycles are prioritized and share the roadway with motor vehicle traffic. A bicycle boulevard should be implemented on a local street or a collector where speeds are low, and volumes are typically less than or equal to 2,000 vpd. A bicycle boulevard is recognizable based on the wayfinding, traffic calming treatments such as detached sidewalks and curb extensions. Gateway treatments should be implemented along major roadway entrances to indicate to drivers that they are entering a bicycle boulevard and to slow their speeds. Stop signs should be oriented to favor bicycle travel. Traffic filters should also be installed along the route to manage traffic access and keep motor vehicle volumes low. Design exceptions should be considered for situations such as SRTS Suggested Walk & Roll Route Maps. Considerations: For bicycle boulevards to provide a low-stress experience, traffic volumes and speeds must be intentionally managed and monitored over time. Challenges: They are suitable for roadways with low traffic volumes. Additionally, designing safe and efficient crossings at major streets presents a significant challenge. Note: Sharrows and other ground-stencils may be appropriate for bicycle boulevards as a way to identify them, and for wayfinding purposes. Class IV Separated Bikeway A separated bikeway, also referred to as a Protected Bike Lane, is a dedicated facility for bicycles that is physically separated from motor vehicle traffic. Separated bikeways should be implemented above 6,000 vpd, or when motor vehicles are travelling above 30 mph, and it is unsafe for them to mix and share the same space. Separated Bikeway travel area width should be 5 feet to 7 feet with an additional 2- to 3-foot or larger buffer depending on the available road space. Considerations: Care should be taken at intersections to improve the visibility and slow the speed of turning drivers. Maintenance of separated bikeway spaces is important to maintain their usability. Challenges: Limited right-of-way, safe crossings at intersections and driveways, vehicle parking considerations, and conflicts with right- turning vehicles. Source: Mobycon, 2025 Exhibit A 2. Existing Facilities and Conditions | 49 2.2.2 BICYCLE SUPPORT FACILITIES In December 2024, the BPTP team conducted a comprehensive inventory of bicycle parking facilities along University Avenue, Hamilton Avenue, and Lytton Avenue between Middlefield Road and the Palo Alto Downtown Caltrain Station. Figure 4 shows the distribution of bicycle parking locations within this area. The team identified a total of 142 locations, providing capacity for up to 679 bicycles in a variety of rack types, including inverted U – circular, inverted U - rectangle, series inverted U, elevated racks, wave racks, and lockers. High utilization was observed at many locations, particularly near University Avenue and the Caltrain Station. Most bike parking is conveniently located on or near sidewalks. However, some individuals were observed securing bicycles to sign poles or trees, likely for convenience, limited availability, or because the type of bike parking provided is difficult to use. Table 4: Existing Bicycle Network in 2012 vs 2025 FACILITY TYPE 2012 2025 Class I Multi-Use Path 13.9 11.7 Class II Bike Lane 33.2 34.6 Class II Buffered Bike Lane 3.3 Class III Shared Lane 8.0 12.6 Class III Bicycle Boulevard 4.2 7.1 Class IV Separated Bikeway*4.3 TOTAL 59.3 73.5 Source: 2012 BPTP Note: *Separated bikeways are also referred to as protected bike lanes. 2025 values include Caltrans’ Class IV separated bikeway on El Camino Real. 2012 lane mile data is sourced from the 2012 BPTP; 2025 lane mileage is calculated using the 2025 roadway centerline file. The Class I length has not decreased between 2012 and 2025—differences are due only to the calculation method. Figure 3 illustrates the existing bikeway network in Palo Alto and surrounding jurisdictions. In 2012, the City had 59.3 miles of bikeways. Since then, approximately 14 miles have been added, bringing the total to 73.5 miles as of 2025. Notably, there were no Class II buffered or Class IV separated bikeway in 2012; today, the City has 3.3 miles of buffered bike lanes and 4.3 miles of separated bikeways. Table 4 includes comparison between 2012 bicycle network mileage with existing network in 2025. Exhibit A 50 !f !f !f !f !f !f !f !f !f !f !f !f !f !f !s !s !s !s !s __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd King s l e y A v e Sea l e A v e Mor e n o A v e Park B l v d Arastra d e r o R d EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F Class I - Shared Use Path Class IIa - Bike Lane Class IIb - Buffered Bike Lane Class IIIa - Bike Route Class IIIb - Bike Boulevard Class IV - Separated Bikeway Trail !f Ped/Bike Bridge !s Ped/Bike Underpass City of Palo Alto Park/Open Space School/University Commercial Center Railroad Caltrain Station Library Community Center Data Sources: City of Palo Alto, MTC, Kittelson 0 1 2 Miles As of 9/1/2025 Figure 3: Existing Bicycle Facilities Map Exhibit A 51 ∙þ82 Midd l e f i e l d R d Ham i l t o n A v e Uni v e r s i t y A v e Lyt t o n A v e Add i s o n A v e Hom e r A v e For e s t A v e Eve r e t t A v e Cow p e r S t Wave r l e y S t Brya n t S t Eme r s o n S t Alma S t Webs t e r S t Palo Alto Caltrain __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F Elevated Inverted U Wave Locker Other Study Area City of Palo Alto Park/Open Space Commercial Center Library Caltrain Station Railroad Data Sources: City of Palo Alto, MTC, Kittelson 0 500 1,000 Feet As of 9/1/2025 Figure 4: Existing Bicycle Parking Location Exhibit A 2. Existing Facilities and Conditions | 52 Bicycle Parking Easy access to secure parking makes bicycling a more attractive option. People are more likely to ride if they know they’ll find a safe place to lock up their bike near their destination. Lack of parking often leads to uncertainty or inconvenience, discouraging trips by bike. Bicycle parking is generally categorized into short-term and long-term installations. These two kinds of parking serve different needs, and the starting point for most bike parking projects is recognizing whether the installation should serve short-term users, long-term users, or both. If users typically park for two hours or longer, they are likely to value security and shelter above the convenience and ease that should characterize short-term parking.1 Image 10 shows common short-term bicycle parking options that are currently available in the City. 1 Association of Pedestrian and Bicycle Professionals. Essentials of Bike Parking. 2015 Image 10: Bicycle Parking Types - Short-Term Source: Kittelson, 2025 Inverted U - Circular Elevated Inverted U - Rectangle Wave Locker Series Inverted U Exhibit A 2. Existing Facilities and Conditions | 53 Short-term parking shall be visible from and close to the entrance it serves—50’ or less is a good benchmark. When installing sidewalk racks, maintain the pedestrian through zone. Racks should be placed in line with existing sidewalk obstructions to maintain a clear line of travel for all sidewalk users. Image 11 shows guidance on placement and spacing requirements for bicycle racks. Additionally, the City could explore opportunities to install high security smart racks such as integrated electronic locking swingarms.1 Long-term parking is designed to meet the needs of employees, residents, public transit users, and others with a need to park for several hours and leave their bicycles unmonitored. Appropriate locations for long- term parking vary with context. Long-term parking facilities should anticipate the presence of a variety of bicycles and accessories, including—depending on context—recumbents, trailers, children’s bikes, long- tails, and others. To accommodate trailers and long bikes, a portion of the racks should be on the ground and should have an additional 36” of in-line clearance. The 2026 BPTP’s recommended policies and programs for bicycle parking are described in Section 3.4, Policies and Programs. 1 BART. High Security Bike Racks. Accessed from https://www. bart.gov/guide/bikes/parking Image 11: Placement and Spacing Requirements Source: APBP Essentials of Bike Parking. 2015 Exhibit A 2. Existing Facilities and Conditions | 54 Wayfinding Signs Wayfinding involves the use of signs, maps, and other visual cues to help people navigate through an area. Effective wayfinding systems improve accessibility and user experience. Image 12 illustrates the comprehensive bicycle wayfinding sign system family, incorporating both fundamental and enhanced wayfinding components. Image 13 shows the existing signs in Palo Alto that assist bicyclists in wayfinding. The 2026 BPTP includes a program to develop a non-motorized wayfinding plan connecting bicycle and pedestrian facilities with key local and regional destinations such as schools, trails, parks, and rail stations. Additionally, the wayfinding facilities will be implemented as part of the bicycle and pedestrian projects. The 2026 BPTP’s recommended policies and programs for wayfinding are described in Section 3.4, Policies and Programs. Image 12: Types of Wayfinding Signs Source: Alta Planning + Design, 2025 Exhibit A 2. Existing Facilities and Conditions | 55 Image 13: Existing Signs in Palo Alto Source: City of Palo Alto, Kittelson and Mobycon, 2025 Bicycle Boulevard Sample Signage Temporary Wayfinding Signs Sign regulating direction Bicycle Boulevard Sign at Bryant Street and Forest Avenue Sign at Caltrain Station Sign regulating parking and bike lanes Downtown Pedestrian Wayfinding Signs Bicycle Wayfinding Signage Wayfinding Sign assisting with confirmation and navigation Exhibit A 2. Existing Facilities and Conditions | 56 2.3 Safe Routes to School Program The Safe Routes to School (SRTS) Program represents a local community partnership between the City of Palo Alto, Palo Alto Unified School District (PAUSD), and Palo Alto Council of (PTA.) The partnership mission is to reduce risk to students en route to and from school and encourage families to choose healthy, active, sustainable alternatives to driving solo more often. Educating Student Bicyclists and Pedestrians Palo Alto’s history as a bicycle-friendly town is about more than its flat terrain and many bicycle facilities, it’s about shared community values. In 2025, SRTS partners recognized the thirty-year anniversary of the Palo Alto School District (PAUSD), Parent Teacher Association (PTA), and City of Palo Alto-supported Safe Routes to School (SRTS) education program. Educational efforts, in tandem with engineering and encouragement programming, are foundational to helping families enjoy safe, active, healthy, sustainable school commutes in Palo Alto. Beyond Education, Encouragement and Engineering, Engagement, Evaluation, and Equity considerations guide partnership outcomes and considerations. Key 30-year achievements include: 1. National Recognition - Compared with national walk/bike school commute percentages of 11 percent, more than 53 percent of Palo Alto students walk and bike to school. Since 2016, students have completed approximately 17 million walk/bike school commutes, reducing risk for families who walk and bike and improving access for families who must drive. 2. Lifelong Safety Skills - More than 23,000 students in the Palo Alto Unified School District have received 560 minutes, (nine hours) of in-school transportation safety education between grades K-6 compared with 45 minutes of third grade education in 1991. Palo Alto’s Bicycle Life Skills program, including Bicycle Rodeo events, have helped thousands of families gain confidence and learn important road-sharing safety skills. Palo Alto is one of the few communities to offer such robust safety education programming. In 2025, the City constructed the Bay Area’s first bicycle safety education traffic garden at Ventura Community Center to enhance offsite programming to even more students throughout Palo Alto and the surrounding community. 3. Car Trip Reductions - A 76-mile network of dedicated school commute bicycle lanes, boulevards and shared-use pathways, bicycle rack and facilities upgrades at all PAUSD campuses and the subsequent 2016 development of twenty Walk and Roll Suggested School Route to help families navigate this network has helped prevent the carbon emissions equivalent of more than 3,500 gasoline-powered cars annually, eliminating roughly 3,824,000 car trips from local roadways between 1994 and 2025. 4. Parent Involvement - During the past three decades, more than 450 parent volunteers have stepped up to serve as PTA-appointed Transportation Safety Representatives at each PAUSD school. Parents are essential to validating SRTS Partner projects and programming and setting community expectations. PTA Transportation Safety Events include the biannual Walk and Roll to School days and in-school, 3rd Grade Bicycle Life Skills lessons rodeos. Safe Routes to School Policies In the face of changing transportation habits, SRTS policies ensure families have a voice in shaping Palo Alto’s local transportation landscape. SRTS is directly referenced in four City Comprehensive Plan 2030 Programs and Policies. In 2021, the PAUSD Board of Education-approved a dedicated SRTS policy. SRTS is also cited in the 2022 Sustainability and Climate Action Plan (S/CAP). In 2025, unanimous support from the PAUSD Board of Education, City Council and Palo Alto Parent Council of PTAs (PTAC) led to the renewal of an updated SRTS Partnership Agreement, rededicating Palo Alto to the SRTS Partnership’s mission, goals and objectives. The 2026 BPTP builds off these efforts by prioritizing bicycle and pedestrian connectivity to schools, and by recognizing the foundational nature of this work within the Office of Transportation. Exhibit A 2. Existing Facilities and Conditions | 57 Moving Toward the Future of Safe Routes to School Between 2017 and 2022, a City School Transportation Safety Committee-approved Palo Alto a Five-Year Action Plan. Core objectives are paraphrased below: 1. Adopt and institutionalize key SRTS practices and policies 2. Provide SRTS education programs, materials and communications 3. Expand and enhance events and encouragement programs and materials 4. Gather data to assess and improve SRTS program outcomes 5. Engineer routes to school to develop a more safe and efficient network for families 6. Increase awareness & engagement between City Departments and the community 7. Commit to an equitable distribution of SRTS resources Five-Year Plan yearly strategic objectives yielded a mean completion rate of 72 percent, while Five-Year Work Plan ongoing objectives yielded a 100 percent completion rate. Several emergent trends, including a post-pandemic contraction of parent involvement, transit service reductions, restricted school access and the adoption of new transportation modes suggest that a second SRTS Five-Year Action Planning process may help support 2026 BPTP implementation, in addition to helping reverse net losses in post-pandemic active school commute mode share at the secondary level. For three decades, the SRTS Partnership has shaped Palo Alto’s identity as a leader in student bicycling and walking. Its achievements, millions of active commutes, improved infrastructure, and parent engagement, demonstrate the power of collaboration. While pandemic-related disruptions and emerging mobility trends present new challenges, the Partnership’s history of resilience and innovation provides a strong foundation for Palo Alto to continue supporting safe, healthy, and sustainable school commutes for the next generation. THE PALO ALTO BICYCLE SAFETY PARK In 2025, the City installed a Traffic Garden at the Ventura Community Center. The course, roughly the size of two basketball courts, is designed to serve as a hands-on classroom for young cyclists to learn road safety and cycling skills. Exhibit A 2. Existing Facilities and Conditions | 58 2.4 Walking and Biking Activity Existing walking and biking activity data was analyzed, including travel characteristics such as the purpose of the trip, trip duration, time of day, origin and destination, and traveler demographics. This information is used to identify improvements that would lead to the highest return on investment. The 2026 BPTP utilizes surveys, counts, and location-based data from Replica to understand the existing walking and biking activity. The Spring 2023 data from Replica was included as part of this analysis for bicycle and pedestrian trips originating within two miles of city limits. Replica (Big-Data provider) uses a comprehensive modeling technique that simulates the movements of residents, visitors, and commercial vehicles based on a synthetic population. This synthetic population is statistically representative of our community and constructed from a blend of mobile location data, consumer/resident data, built environment data, economic activity data, and, when available, bike and pedestrian counts. 2 Replica uses cell phone telemetry data to determine the relative popularity of points of interest. However, it’s important to note that this data isn’t utilized to determine the mode of transportation for a trip. This is because the GPS-derived speed of a device lacks the precision necessary to differentiate between modes such as bus trips and biking trips. Instead, the determination of a trip’s mode is based on factors such as the proximity between the origin and destination, the availability of roadways suitable for bicycles and pedestrians, as well as household and commute characteristics. These variables collectively influence the mode choice. Replica’s methodology allows us to explore mobility patterns with a granularity previously unattainable, offering detailed insights into how, when, and why different population segments navigate our City. Such detailed modeling can uncover latent needs and opportunities for infrastructure improvements that might not be evident from traditional data sources alone. As with other mobile device–based datasets, Replica data may not fully represent all population groups, with potential underrepresentation of seniors, children, lower-income households, and individuals less likely to carry smartphones or enable location tracking. This would result in undercounts in areas such as around schools. 2 For more information on Replica methodology, visit: https://documentation.replicahq.com/docs/seasonal-mobility-model- methodology-summary-places Exhibit A 2. Existing Facilities and Conditions | 59 Walking Activity Based on Replica data, the highest percentage of walking trips were associated with shopping (31%), work (9%), and restaurant (9%) related trips. With only 7% of the population, Hispanic and Latino travelers represent 20% of the total walking trips. With about 15% of the population, people aged 18-34 made almost 37% of the total walk trips. The peak time for pedestrian trips occurs between 3 and 5 p.m. Most walking trips (60%) are under 10 minutes with a mean of 11 minutes and median of 7 minutes. Most walking trips (56%) are under 0.5-mile, and 96% of trips are under two miles. Major destinations include Stanford University with other walking hubs in downtown, Barron Park, and Adobe Meadow/Meadow Park. Biking Activity Based on Replica data, the highest percentage of biking trips was associated with schools and colleges (17%), followed by shopping (11%) and work (8%) trips. With only 7% of the population, Hispanics and Latinos represent 20% of the total bike trips. With about 15% of the population, people aged 18-34 made almost 45% of the total bike trips. The highest percentage of trips in the morning occurs at 7 a.m., constituting around 11% of the overall bike trips. Over 59% of trips take place between 12 noon and 9 p.m., with the peak time observed at 3 p.m., representing 13% of the total bike trips. The average bike trip is 14.2 minutes, and the median travel time is 10 minutes. The average bike trip length is 2.5 miles, and 56% of trips are less than two miles in length, 23% are between 2 and 4 miles, and 20% are over two miles. Walking and Biking in Numbers To assess existing walking and biking activity at key locations, 12-hour bicycle and pedestrian counts were conducted from 7 a.m. to 7 p.m. at 32 locations citywide on both a weekday and a weekend in May 2024. The highest pedestrian activity was recorded along University Avenue on both days, followed by Embarcadero Road and California Avenue. Pedestrian volumes were relatively consistent across the morning, midday, and evening peak periods, with slightly higher activity observed during the morning peak. Bicycle activity was highest along Bryant Street, particularly near Churchill Avenue. On weekdays, bicycle volumes peaked in the morning, while weekend activity was more evenly distributed throughout the day. Note: A trip is a movement by a person between places. A trip begins when a person leaves a place and ends when a person stops to do a non-travel activity in a place. For example: If a person walks from home to a cafe, sits down to drink a coffee, and then walks to work, two trips have occurred. A person can use multiple modes within a single trip. For example: If a person walks to the bus stop and then takes the bus to work, this is a single trip with two trip segments. When a trip involves multiple modes, the trip is assigned a primary mode by using the following ranking: 1) Public transit, 2) Driving (private auto)/Auto passenger/Taxi/TNC, 3) Biking, 4) Walking. Exhibit A 2. Existing Facilities and Conditions | 60 2.4.2 POTENTIAL AND FUTURE ACTIVITY Approximately 49% of all vehicle trips are less than two miles (10-minute biking distance), presenting an opportunity for a potential transition to walking and biking. With a diverse land use mix and improved bicycle and pedestrian infrastructure, there is a possibility to encourage a mode shift towards active transportation. Furthermore, the City is exploring the option of shared micromobility options, and the rising popularity of e-bikes could further assist the City in achieving its climate action goals of reducing transportation-related Greenhouse Gas (GHG) emissions by 65% below 1990 levels. Figure 5 shows the latent demand score for walking and biking. The latent demand score is a measure of the relative amount of walking or biking activity that would be expected on each roadway segment based on proximity to key destinations and the quality of the existing pedestrian or bicycle facility. The highest demand for pedestrian and bicycle facilities is around the Downtown Caltrain Station and California Avenue Caltrain Station. This map was developed based on the key destinations and their relative usage. The other locations with the highest demand include areas near Mitchell Park and JLS Middle School stretching west of El Camino Real along Arastradero Road. Investing in bicycle infrastructure improvements along these roadways would be most beneficial in serving the major activity generators. Exhibit A 61 __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F Low Demand High Demand City of Palo Alto Park/Open Space School/University Commercial Center Community Center Library Caltrain Station Railroad Data Sources: City of Palo Alto, MTC, Kittelson 0 1 2 Miles As of 9/1/2025 Figure 5: Demand for Walking and Biking Improvements Exhibit A 2. Existing Facilities and Conditions | 62 2.5 Barriers to Walking and Biking Barriers to safely and comfortably walking and biking in Palo Alto can take many forms, such as: • Linear barriers, including freeways/highways, water bodies, and rail lines that lack comfortable crossings. • Gaps in pedestrian facilities, including sidewalks, curb ramps, crosswalk markings, and signals, or the street network itself (e.g., disconnected cul-de-sacs). Major barriers in Palo Alto were analyzed to determine where people may need to take detours and increase the length of their walking and biking trips. This assessment is summarized below. Linear barriers in Palo Alto consist of the following, as illustrated in Figure 6: • Freeways and highways – Major roadway barriers such as the Bayshore Freeway (US 101), (which provides limited crossing opportunities at the bicycle and pedestrian bridges at Adobe Creek and Embarcadero), spaced-out ramp locations, as well as expressways such as the Oregon Expressway which do not provide marked crossing opportunities at several side-street intersections. • Water bodies – Channels such as Adobe Creek or Matadero Canal cannot be crossed by an easily accessible street or pedestrian bridge. • Rail lines – Freight and passenger rail lines often provide few and distant crossing opportunities for all modes, significantly increasing the distance of walking trips. Freeways/highways, water bodies, and rail lines were analyzed to answer the following questions: How far does someone need to walk to cross a barrier at an available crossing location? Is there a lack of available crossings at a barrier that requires someone to travel a significant distance around that barrier? Exhibit A 63 !f !f !f !f !f !f !f !f !f !f !f !f !f !f !s !s !s !s !s __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F Rail Barrier Freeway/Highway Barrier Waterway Barrier High Traffic Roadway Barrier !f Ped/Bike Bridge !s Ped/Bike Underpass City of Palo Alto Park/Open Space School/University Commercial Center Community Center Library Railroad Caltrain Station Data Sources: City of Palo Alto, MTC, Kittelson 0 1 2 Miles As of 9/1/2025 Figure 6: Linear Barriers Exhibit A 2. Existing Facilities and Conditions | 64 Note that the linear barriers assessment specifically focuses on freeways/highways, water bodies, and rail lines, and does not assess major streets which can be stressful for walking and bicycling and serve as barriers. This assessment found that a number of linear barriers affect the convenience of walking and bicycling in Palo Alto: • A lack of consistently available crossing opportunities across Highway 101 results in noticeable detours for walking trips. The most significant gap in crossing opportunities occurs between the two walking and bicycling bridges over the highway, limiting access to the Adobe Creek Loop Trail. • People walking and bicycling may need to divert and increase their trip lengths to pass around Adobe Creek, especially to the south. This highest level of diversions occur in the area between the Los Altos-Palo Alto Bike Path and the Foothill Expressway, where the creek runs between the Alta Mesa Memorial Park to the west and residences to the east. • Crossing Matadero Canal may require detours that approximately double the walking or bicycling trip distance, which can be increased due to the presence of the rail line. • There are multiple areas along the rail line where substantial walking and bicycling diversions are required for crossing. These include the approximately 0.65-mile gap between the Churchill Avenue and California Avenue crossings and the approximately 1.3-mile gap between the California Avenue and Meadow Drive crossings in south Palo Alto. Barriers to transit access consisting of gaps in pedestrian facilities and street network connectivity were assessed in the areas surrounding the City’s rail stations and high-frequency bus stops, as shown in Figure 7. Gaps in safe and convenient walking access to high-quality transit vary throughout the City: • Near the Palo Alto Station, Palo Alto Transit Center, and El Camino Real/Embarcadero Road bus stops, barriers to transit access consist of channelized turn lanes, crossing locations with missing marked crosswalks, and sidewalk gaps, including longer segments where a sidewalk is only provided on one side of the street. • Near the California Avenue Station and El Camino Real/California Avenue bus stops, barriers to transit access include missing crosswalks, sidewalks (south side of the California Avenue Caltrain Station parking lot), and a channelized turn-turn lane at the intersection of El Camino Real and Page Mill Road. • Near the San Antonio Station and El Camino Real/Charleston Road bus stops, barriers to transit access primarily consists of a lack of sidewalks in residential neighborhoods and along a portion of San Antonio Road. Exhibit A 65 ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U ®¯U®¯U ®¯U®¯U ®¯U®¯U®¯U®¯U ®¯U ®¯U ®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U ®¯U ®¯U ®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U ®¯U®¯U®¯U ®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U ®¯U®¯U®¯U ®¯U®¯U®¯U ®¯U ®¯U®¯U ®¯U®¯U ®¯U®¯U ®¯U®¯U®¯U ®¯U®¯U ®¯U®¯U ®¯U®¯U ®¯U ®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U ®¯U ®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U ®¯U®¯U ®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U ®¯U®¯U ®¯U®¯U ®¯U®¯U®¯U®¯U ®¯U ®¯U ®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U ®¯U ®¯U ®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U ®¯U®¯U®¯U ®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U ®¯U®¯U®¯U ®¯U®¯U®¯U ®¯U ®¯U®¯U ®¯U®¯U ®¯U®¯U ®¯U®¯U®¯U ®¯U®¯U ®¯U®¯U ®¯U®¯U ®¯U ®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U ®¯U ®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U ®¯U®¯U ®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U ®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U®¯U __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F Caltrain Station ®¯U Rapid Bus Stop Rail Station Half-Mile Buffer Rapid Bus Stop Quarter-Mile Buffer Railroad City of Palo Alto Park/Open Space School/University Commercial Center Community Center Library Data Sources: City of Palo Alto, MTC, VTA, Kittelson 0 1 2 Miles As of 9/1/2025 Figure 7: Transit Barrier Study Areas Exhibit A 2. Existing Facilities and Conditions | 66 2.6 Bicycle Level of Traffic Stress Bicycle level of traffic stress (LTS) is a rating given to a road segment or crossing indicating the traffic stress it imposes on bicyclists. Levels of traffic stress range from 1 to 4 with LTS 1 indicating low stress facility and LTS 4 indicating a high stress facility, as shown in Image 14. Image 14: Relationship between LTS and Comfort The segment analysis considers roadway functional classification, vehicle volume, posted or prevailing vehicle speeds, number of vehicle lanes, the presence of on-street parking, and vehicle parking and bicycle lane widths. Figure 8 shows the LTS results from segment analysis. Streets with the highest stress levels or least comfortable conditions for bicyclists are typically those with narrow bike lanes (less than 5.5 feet), higher speeds (over 35 mph), multiple travel lanes, and adjacent on-street parking. Based on these criteria, the most stressful segments were identified along Alma Street between Embarcadero Road and San Antonio Road, Oregon Expressway between the US 101 ramps and El Camino Real, San Antonio Road between Casey Avenue (Mountain View) and Alma Street, and Foothill Expressway between Page Mill Road and the southern city limit. The crossing analysis considers the right-turn lane configuration and length, bike lane approach, vehicle turning speeds, and the presence of a median refuge. Among the 1,233 intersections, 139 are signalized and are assigned LTS 1 as traffic signals do not create a barrier and provide a protected way across. The remaining low stress intersections are typically located on residential streets characterized by low speeds and minimal vehicular activity. Notably, the corridors with the highest stress levels, including El Camino Real, Alma Street, San Antonio Road, and Oregon Expressway, are associated with the majority of high stress intersections. Figure 9 shows the LTS results from the crossing analysis. LTS 1 California Avenue in front Greene Middle School LTS 2 Hanover Street near Page Mill Road LTS 3 Meadow Drive near Wilkie Way LTS 4 San Antonio Road near Leghorn Streets Exhibit A 67 __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F LTS 1 (Most Comfortable) LTS 2 LTS 3 LTS 4 (Least Comfortable) City of Palo Alto Park/Open Space School/University Commercial Center Community Center Library Caltrain Stop Railroad Data Sources: City of Palo Alto, MTC, Kittelson 0 1 2 Miles Note: Split lines are only used for roadways with different conditions per direction (for example: bike lane in only one direction or parking only on one side), otherwise all roads are shown with only a centerline. As of 9/1/2025 Figure 8: Segment LTS Results Exhibit A 68 __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F LTS 1 (Most Comfortable) LTS 2 LTS 3 LTS 4 (Least Comfortable) City of Palo Alto Park/Open Space School/University Commercial Center Community Center Library Caltrain Station Railroad Data Sources: City of Palo Alto, MTC, Kittelson 0 1 2 Miles As of 9/1/2025 Figure 9: Intersection LTS Results Exhibit A 2. Existing Facilities and Conditions | 69 2.7 Collision Analysis Analyzing pedestrian- and bicyclist-involved collisions helps understand the location, severity, circumstances, and timing of collisions affecting people walking and biking. The BPTP team analyzed recent collision data to help determine the streets and types of improvements that should be prioritized to make it safer for people walking and biking. This assessment is summarized in the following section. Table 5 presents an overview of the five-year collision data. For the five years under review, a total of 104 pedestrian and 257 bicycle collisions were reported in the City of Palo Alto, with three collisions involving both pedestrians and bicyclists. Around 12%, or 12, of the pedestrian collisions resulted in a fatality (3 collisions) or severe injury (9 collisions). Around 5%, or 13, of the bicycle collisions resulted in a fatality (one collision) or severe injury (12 collisions). Figure 10 and Figure 11 shows these collisions organized by year and severity and Figure 12 and Figure 13 maps these by severity. Exhibit A 2. Existing Facilities and Conditions | 70 Key pedestrian and bicycle collisions trends include: • Severity: Collisions involving people walking or biking were more likely to result in an injury or a fatality compared to motor vehicle collisions. Approximately 12% of pedestrian collisions and 5% of bicycle collisions resulted in a fatality or severe injury. • Temporal Trends: The number of pedestrian and bicycle collisions has been decreasing over the most recent five-year period (2018-2022) likely reflecting the impact of the COVID-19 pandemic on traffic patterns. • Bicycle Collision Types: The most commonly-cited collision types for bicyclist-involved collisions were broadside collisions (61%) followed by sideswipe collisions (13%). For fatal and severe injury bicycle collisions specifically, the most common collision types were broadside collisions (54%), followed by head-on and hit object collisions (15% each). • Pedestrian Collision Factors: The most commonly- cited primary collision factors (PCFs) for pedestrian-involved collisions were pedestrian right of way (51%) followed by pedestrian violation and improper turning (13% each).3 For fatal and severe injury pedestrian collisions specifically, the most common PCFs were pedestrian violation at (42%), improper turning (25%), and pedestrian right of way at (17%). • Bicycle Collision Factors: The most commonly- cited PCFs for bicycle-involved collisions were improper turning (21%), automobile right of way (19%), and riding on the wrong side of the road (13%). For fatal and severe injury bicycle collisions specifically, the most common PCFs were improper turning and traffic signals and signs (23% each).4 3 Pedestrian Right-of-Way Violation – Occurs when a driver fails to yield to a pedestrian who has the legal right-of-way, such as at a marked or unmarked crosswalk (CVC §21950). Pedestrian Violation – Refers to instances where a pedestrian fails to follow traffic laws, such as crossing outside of a crosswalk (CVC §§21954, 21955). Improper Turning – Describes a collision caused by a motorist making a left or right turn that violates traffic regulations, such as turning from the wrong lane or failing to yield appropriately (CVC §§22100–22101). 4 Traffic Signals and Signs - describes a party disobeying a traffic control device, such as a traffic signal or roadside sign (CVC §§38280-38302). The BPTP team conducted an analysis of the collision data and the City’s roadway network to identify a set of bicycle and pedestrian high-injury streets, together called a High-Injury Network (HIN).5 For the 2026 BPTP, the Bicycle HIN is defined as the top 10 roadway segments with the highest concentration of bicycle collisions, weighted by severity. Similarly, the Pedestrian HIN is defined as the roadway segments with the highest concentration of pedestrian collisions. Note, the Palo Alto Safety Action Plan also identifies an HIN which accounts for collisions involving all travel modes, including collisions involving motor vehicles only. The bicycle and pedestrian HIN constitutes the worst-performing street segments based on both the frequency and the severity of collisions involving people walking and biking. The bicycle HIN and pedestrian HIN are shown in Figure 14. Bicycle HIN Includes • Wilton Ave between Park Blvd and El Camino Real • W Meadow Dr between Alma St and El Camino Way • Alma St between Meadow Dr and El Verano Ave • Gailen Ave between Bibbits Dr and Grove Ave • Quarry Rd between El Camino Real and Welch Rd • Hamilton Ave between Alma St and Guinda St • Melville Ave between Channing Ave and Embarcadero Rd • California Ave between Park Blvd and Hanover St • Charleston Rd between Alma St and San Antonio Rd • E Meadow Dr between Fabian Way and Alma St Pedestrian HIN Includes • High St between Lytton Ave and Channing Ave • Quarry Rd between El Camino Real and Vineyard Ln • El Dorado Ave between Alma St and Cowper St • South Ct between Oregon Expy and Matadero Creek • Hamilton Ave between Alma St and Guinda St • California Ave between Park Blvd and Hanover St • Waverly St between Lytton Ave and Churchill Ave • Charleston Rd between Alma St and San Antonio Rd • University Ave between Alma St & Woodland Ave • Loma Verde Ave between Alma St & Bayshore Rd 5 Palo Alto Safety Action Plan defines the high-injury network (HIN) as street segments with a high number of crashes, including KSI crashes and crashes involving vulnerable users (bicyclists, pedestrians, youth, and seniors) in the City. Exhibit A 2. Existing Facilities and Conditions | 71 Table 5: Collision Data Summary (2018-2022) PARTIES INVOLVED FATAL SEVERE INJURY MODERATE INJURY MINOR INJURY REPORTED TOTAL Pedestrian 3 (2.9%)9 (8.7%)49 (47.1%)43 (41.3%)104 Bicyclist 1 (0.4%)12 (4.7%)175 (68.1%)69 (26.8%)257 Source: Transportation Injury Mapping System (TIMS) data from January 1, 2018, through December 31, 2022 Figure 10: Total Number of Pedestrian Collisions by Year and Severity Figure 11: Total Number of Bicycle Collisions by Year and Severity Source: Transportation Injury Mapping System (TIMS) data from January 1, 2018, through December 31, 2022 Source: TIMS data from January 1, 2018, through December 31, 2022 Exhibit A 72 __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F Fatal and Severe Injury Other Injuries City of Palo Alto Park/Open Space School/University Commercial Center Community Center Library Caltrain Station Railroad Data Sources: City of Palo Alto, MTC, Kittelson, TIMS 2018-2022 0 1 2 Miles As of 9/1/2025 Figure 12: Pedestrian Collisions by Severity (2018 – 2022)Exhibit A 73 __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F Fatal and Severe Injury Other Injuries City of Palo Alto Park/Open Space School/University Commercial Center Community Center Library Caltrain Station Railroad Data Sources: City of Palo Alto, MTC, Kittelson, TIMS 2018-2022 0 1 2 Miles As of 9/1/2025 Figure 13: Bicycle Collision by Severity (2018 – 2022)Exhibit A 74 __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F Bicycle High Injury Network Pedestrian High Injury Network City of Palo Alto Park/Open Space School/University Commercial Center Community Center Library Caltrain Station Railroad Data Sources: City of Palo Alto, MTC, Kittelson, TIMS 2018-2022 0 1 2 Miles As of 9/1/2025 Figure 14: Bicycle and Pedestrian High Injury Network Exhibit A 2. Existing Facilities and Conditions | 75 2.8 Shared Micromobility, E-Bikes, E-Cycles, and E-Motos Electrification of the transport system has expanded in various ways with the development of electric bicycles (e-bikes) (which now out-sell electric cars in the USA) and e-scooters. The widespread use of internet-connected mobile phones has also allowed shared mobility to take off with bike, e-cycle, and e-scooter sharing systems being implemented in cities around the world. A summary of shared micromobility, e-bikes, and e-cycles is presented in this section. Electric Bicycles, E-Cycles, and E-Motos: CVC 312.5 defines e-bikes as “a bicycle equipped with fully operable pedals and an electric motor of less than 750 watts.” California Vehicle Code CVC 21(a) preempts cities from regulating e-bike traffic provisions unless the legislature specifically authorizes it.6 Use of the term ‘E-bikes’ specifically references California Vehicle Code § 1271-classified electric bicycles that do not exceed 20 mph (Class 1 and 2) and pedal assist-bicycles that do not exceed 28 mph (Class 3). In Palo Alto, transportation staff use the term ‘e-cycles’ to reference the broadest category of electrified one, two and three-wheeled vehicles, including bicycles, tricycles, scooters, one-wheels, mopeds, e-motos and off-highway vehicles, regardless of wattage or legal status. The classification and regulation of electric cycles, including e-bikes, is an emergent issue with ongoing policy considerations happening at the state and local level.7 For example, Senate Bill 1271 introduced new regulations for e-bikes in California, including Class 3 e-bikes are now required to be pedal assist-only with no throttle allowed, and all e-bikes must have functional pedals. E-motos are electric mopeds, electric motorcycles, and electric dirt bikes that are much more powerful and faster than electric bicycles. E-motos may have motors with thousands of watts of power that far exceed the 750 watts allowed for a legal e-bike. They are equipped with throttles and can go in excess of 30 mph, some achieving speeds of 65 mph. Unlike e-bikes, e-motos are considered “motor-driven cycles” and are subject to federal motor vehicle safety standards. 6 California Vehicle Code. Defining electric bicycle classes and standards. Accessed from https://codes.findlaw.com/ca/vehicle- code/veh-sect-312-5/ 7 Check the California Vehicle Code for current definitions and regulations related to e-bikes. E-bikes and e-cycles enable people to travel further by bicycle and can contribute to increased mode shifts and decongestion if they are replacing trips that would otherwise be made by personal automobile. Studies have shown that e-bike riders travel further and cycle more often with one study from 2020 finding that after purchasing an e-bike, riders increased their total bicycle usage from 1.3 miles to 5.7 miles per day and that their share of all trips made by bike increased from 17 percent to 49 percent. Exhibit A 2. Existing Facilities and Conditions | 76 The advantages of e-bikes likely outweigh the disadvantages, especially when they replace motor vehicle trips. However, there are some challenges that must be addressed. E-bikes can allow users to travel at relatively high speeds which may present a safety risk to e-bike users and other active transportation users (pedestrians, traditional cyclists) around them when there is a great speed differential. Additionally, while e-bikes are not drastically different than traditional bicycles, safely and effectively accommodating them in the transportation system may require wider facilities and additional separation to enable faster riders to overtake slower ones. Facility recommendations and design guidance developed for this 2026 BPTP consider potential increases in bike volumes and greater speed differential related to increases in e-bike usage. Furthermore, a number of manufacturers and retailers sell throttle-controlled, high-powered e-motos as e-bikes. For decades, the Safe Routes to School (SRTS) program has emphasized risk reduction as its primary goal and will continue promoting the use of conventional bicycles as the preferred onramp for helping students learn to share the road safely and responsibly. Policy recommendations developed for this BPTP consider effective regulation and education on E-bikes for all, and separate Electric Bicycle Engagement and Management Strategies to partner with local groups to ensure responsible use of personal electric mobility devices.8 8 Data from Marin County shows that youth aged 10-15 have five times the serious injury rate on electric devices and based on counts at local Marin County middle schools. Exhibit A 2. Existing Facilities and Conditions | 77 The City of Palo Alto adopted a one-year bicycle and electric scooter sharing pilot program in March 2018 (CMR #8546) and developed permit guidelines for vendors to operate within the City of Palo Alto. The City Council extended the pilot program in 2019 (Resolution #9822), in 2020 (Resolution #9882), and in 2021 (Resolution #9914). The pilot program implementation was initially delayed due to staff resources and delayed further as a result of the COVID-19 pandemic. The pilot program expired on September 30, 2022, and other shared micromobility partnerships have not been secured since the 37-bike system run by Motivate was discontinued. The City of Palo Alto began the Shared Micromobility Feasibility Study in December 2024 to determine a program structure that would best serve the City’s goals for mobility, environmental sustainability, and fiscal solvency. The recommendations from the Feasibility Study will inform the design of a new pilot program. Shared Micromobility: The United States Department of Transportation Federal Highway Administration (FHWA) defines micromobility as “any small, low- speed, human- or electric-powered transportation device, including bicycles, scooters, electric-assist bicycles, electric scooters (e-scooters), and other small, lightweight, wheeled conveyances”. Generally, micromobility vehicles (or devices) are expected to operate in the same road space as bicycles, using bike lanes and paths if available, otherwise sharing the roadway with motorists. While there is no California statewide law specifically permitting or prohibiting riding a bicycle on a sidewalk, the State DMV does not allow motorized scooters to be used on sidewalks and does not allow them to exceed 15 mph. In Palo Alto, riding these devices on sidewalks in the Cal Ave and Downtown Business Districts is prohibited.9 Under California Vehicle Code, e-scooter users under the age of 18 must wear a helmet and users must have a valid driver’s license. Over the past decade, a variety of shared micromobility systems have emerged with the most common being shared e-scooters and e-bike share systems. While e-bikes and e-scooters are the most common form of micromobility, other forms are emerging including e-cargo bikes, mopeds, and neighborhood electric vehicles (NEVs), although these forms of mobility are yet to become widespread. Advancements in technology have allowed many systems to now use a hybrid docked and dockless system based on geofencing. Municipalities and operators can now designate specific zones for parking shared micromobility vehicles, reducing the need for docking infrastructure while still allowing the municipality control over where vehicles can park. California’s New Daylighting Law (AB 413) makes it illegal to park within 20 feet of the approach of any marked or unmarked crosswalk, even if the approach does not have any red curbs painted. This provides an opportunity for the City to allow parking of bicycles and shared micromobility.10 9 City of Palo Alto. Bicyclist FAQs: Sharing the Road. Accessed from https://www.paloalto.gov/files/assets/public/v/1/transportation/ safe-routes-to-schools/sharing-the-road_-bicyclist-faqs-1.pdf 10 California Bicycle Coalition. Nine Uses for Daylighting Space. Accessed from https://www.calbike.org/nine-uses-for-daylighting- space/ Exhibit A 3. Recommendations | 78 3. RECOMMENDATIONS 78 Exhibit A 3. Recommendations | 79 The vision for the 2026 BPTP includes creating a safe, comfortable bicycle and pedestrian network that can be enjoyed by people of all ages and abilities. To build on the strengths of the existing bikeway network, the recommended bikeway network is structured around two tiers: The Low-Stress Bicycle Network and the Complete Vision Bicycle Network. Low-Stress Bicycle Network The Low-Stress Bicycle Network forms the foundation for citywide bicycle connectivity, expanding on existing low-stress routes between neighborhoods. Built primarily around Bicycle Boulevards, this network uses traffic-calmed local streets to provide safe, comfortable routes through residential areas. It also includes key connections to adjacent cities and destinations. Major streets with separated bikeways are included on the Low-Stress Bicycle Network only where the street network is disconnected and major roadways are the only way to/through a neighborhood. The City’s near- term investments will focus on the Low-Stress Network, closing gaps in the existing network and providing greater access to transit and schools within the next ten years. Complete Vision Bicycle Network The Complete Vision Bicycle Network represents the long-term vision for a fully connected, all-ages-and- abilities bikeway system. It expands the Low-Stress Network by adding separated bikeways on major streets, filling critical gaps and enabling direct connections to destinations. Implementation of this network involves more significant changes to street design, delivering transformative improvements in safety, access, and mobility. This network includes new railroad crossings and connections to those longer-term crossings. This chapter describes the network corridor criteria, project identification and prioritization process, and pedestrian districts and recommendations. Exhibit A 3. Recommendations | 80 3.1 Bicycle Network Corridor Criteria To guide bicycle network development, the following development approach and network corridor criteria were applied. The approach includes primary network development criteria which was further supplemented with secondary criteria for network refinement. 3.1.1 PRIMARY NETWORK DEVELOPMENT CRITERIA The network is built on the 2012 BPTP and refined with recent planning efforts in Palo Alto and the region including MTC Regional Active Transportation Plan; VTA Bicycle Superhighway Implementation Plan, and SRTS Suggested Walk & Roll Route Maps. The 2026 BPTP team synthesized recommendations from existing plans and projects to identify where there was agreement and where there was less planning consensus. The primary network development criteria are presented in Table 6. Table 6: Primary Network Development Criteria ATTRIBUTE SOURCE CRITERIA RATIONALE 2012 Plan Network Palo Alto 2012 Bicycle and Pedestrian Transportation Plan Route included in the 2012 plan network Foundation of the plan update. Existing Bicycle Facility 2024 Existing Bicycle Facilities map Route exists today as a formal bicycle facility Existing routes have value by virtue of their presence and current use. Palo Alto Bicycle Map Palo Alto Bicycle Map Route included in the City published user map. User map published by the City of Palo Alto, identifying bike friendly routes today. High Injury Network for Bicyclists 2024 High Injury Network for Bicyclists Route identified as a high injury network street in the 2024 BPTP Collision and Safety Analysis Route is a potential safety hazard today, may be enhanced to become an important or improved network link. 2016 Bike Boulevard Improvements Project City of Palo Alto Bike Boulevards Improvements Project Route included in Bike Boulevard Improvement Project Detailed planning of future bicycle boulevard implementation offers a more recent vetting of viable routes. Network Development Workshop 2024 Network Development Workshop Outcomes Route identified on the 2024 Network Development Workshops Network development workshops identified key destinations and potential direct routes between them. Regional Active Transportation Plans MTC Regional Active Transportation Plan; VTA Bicycle Superhighway Implementation Plan Route identified as a part of the regional AT network or Bicycle Superhighway Plan Regionally significant connection between communities. Safe Routes to School SRTS Suggested Walk & Roll Route Maps Route identified on SRTS Suggested Walk & Roll Route Maps Important connection to schools as a priority destination Source: Mobycon, 2025 Exhibit A 3. Recommendations | 81 3.1.2 SECONDARY CRITERIA FOR NETWORK REFINEMENT Where multiple route options exist, the 2026 BPTP team used secondary criteriawere used to support route selection and refinement. When selecting between alternative routes the following was considered: • More direct routes to activity generators, as identified in the Existing Activity Generators map (see Figure 1). • Traffic stress conditions as identified in the LTS Analysis to identify routes with more favorable existing conditions. • Direct alignment with high demand flows as identified in the Activity Analysis map of Bicycle Origins and Destinations. • Routes that overcome barriers identified in the Major Barriers Analysis. 3.2 Recommended Bicycle Network and Facilities 3.2.1 BICYCLE NETWORK Figure 15 shows the updated bikeway network and bicycle friendly zones developed using the network corridor criteria explained in the previous section. The map extends outside the City limits to illustrate the potential regional connections. It presents the complete vision of the bicycle network, including both the existing facilities and the low-stress network. Bicycle-Friendly Zones are cohesive areas with concentrations of destinations, commercial activity, and pedestrian activity. These areas should see area-wide investment in bicycle-friendly amenities such as signal timing and traffic calming. A bicycle friendly zone is an area where cycling is convenient, comfortable, and direct on all of the streets within a designated area and is the preferred method of transportation. The 2026 BPTP proposes three such zones: the commercial areas surrounding University Avenue and California Avenue, and the public-use area around Mitchell Park and Cubberley. All streets within these zones, particularly those identified on the bicycle network, should incorporate traffic-calming features to enable bicyclists and other micromobility users to safely and comfortably share the roadway. Wayfinding and zone-specific signage should also be provided to clearly indicate entry into a Bicycle-Friendly Zone. Exhibit A 82 !f !f !f !f !f !f !f !f !f !f !f !f !f !f !s !s !s !s !s __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd King s l e y A v e Sea l e A v e Mor e n o A v e Park B l v d Arastra d e r o R d Deer Creek Rd Porte r D r Lagu n a A v e Hano v e r S t Cam b r i d g e A v e Montrose A v e Fab e r P l Cole r i d g e A v e Chu r c h i l l A v e Cha n n i n g A v e Bo y c e A v e Welch R d Vineyard Ln Arboretum Rd Palo R d Pasteur Rd Eve r e t t A v e Guin d a S t Chau c e r S t St Francis Dr Gar l a n d D r La Donna Ave Bar r o n A v e Georgia Ave Donald Dr Amaranta Ave Cesano Ct James Rd ElCaminoWay Portage Ave Ash StOliv e A v e Duncan Pl Nelson Dr Mackay Dr Am a r i l l o A v e Clark Way EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School FletcherMiddleSchool Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School JuanaBrionesElementary BarronParkElementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k Cast i l l e j a A v e Midd l e f i e l d R d Han s e n A v e Qu a r r y R d __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW PALO ALTO PORTOLA VALLEY LOS ALTOS HILLS F Recommended Bikeway Network Bicycle-Friendly Zones City of Palo Alto !f Ped/Bike Bridge !s Ped/Bike Underpass Park/Open Space School/University Commercial Center Community Center Library Caltrain Station Railroad Data Sources: City of Palo Alto, MTC, Kittelson, Mobycon 0 1 2 Miles To East Palo Alto To Menlo Park To Mountain View To Los Altos As of 9/1/2025 To Stanford Figure 15: Recommended Bicycle Network Exhibit A 3. Recommendations | 83 3.2.2 BICYCLE FACILITIES SELECTION APPROACH The 2026 BPTP team took a simplified facility selection approach to the different types of bicycle facilities was chosen for the updated bikeway network presented in 4.2.1. The approach is informed by the Dutch CROW Design Manual for Bicycle Traffic1, the FHWA Bikeway Selection Guide2, and the NACTO All Ages & Abilities Bikeways guidance3. The bicycle facility selection approach (Image 15) first looked at road classification (local, collector, and arterial). Then traffic volumes followed by posted speeds were examined. Given the limited availability of traffic volumes, the network criteria relied on community input, and on-ground knowledge from the in-person working session in April 2024.4 The team applied this approach to each segment of the bikeway network and the facilities were selected based on the approach but also considered in the greater network and whether they met the 2026 BPTP vision and objectives. 1 CROW. “CROW Manual Updates Bike Lane Width Recommendations” CROW, 2023. 2 Federal Highway Administration. Pedestrian and Bicycle Safety Guide and Countermeasure Selection System: FHWA-SA-18-077. U.S. Department of Transportation, 2018. 3 National Association of City Transportation Officials (NACTO). “Choosing the Age and Ability of Bicycle Facility.” NACTO, n.d., 4 BPTP Team conducted a series of site visit in April 2024 to understand the roadway context. This is further described in the community engagement section. Image 15: Bicycle Facility Selection Approach Source: Mobycon, 2025 Exhibit A 3. Recommendations | 84 3.2.3 RECOMMENDED BICYCLE NETWORK Figure 16 shows the Complete Vision Bicycle Network map. The Complete Vision Network represents the long- term vision for a fully connected, all-ages-and-abilities bikeway system. This map also includes existing bicycle facilities that are not being upgraded to illustrate the full network once fully implemented. The Complete Vision Network includes some lower-priority projects that may be reevaluated as the City grows. In the near term, the focus will be on developing the low-stress bicycle network, as described in the following section. Low-Stress Bicycle Network Figure 17 shows the Low-Stress Bicycle Network map. The Low-Stress Bicycle Network is the foundation for citywide bicycle connectivity, focused on delivering safe, comfortable, and familiar routes in the near term. It builds upon the City’s existing network of low-stress streets, primarily composed of shared-use paths and neighborhood-based Bicycle Boulevards, to rapidly expand access with minimal disruption and promote broad community support. This approach prioritizes calm, residential routes that are already preferred by many community members, rather than rely on separated bikeway on busy arterial streets. Through public engagement, Bicycle Boulevards were identified as the most comfortable and familiar type of bikeway, offering a practical path forward with fewer trade- offs in terms of cost, complexity, and impacts to vehicle traffic or parking. The Low-Stress Network emphasizes continuity and citywide coverage. While most of the network is routed along local streets, Class IV separated bikeway are included in strategic locations—specifically on high-traffic gateway corridors where no safe, parallel alternative exists and where regional connectivity demands it. Additionally, short segments of separated bikeways may be used to close key gaps between Bicycle Boulevards, enhancing network cohesion. The goal is to create a citywide bikeway system that is connected, calmed, and protected, delivering meaningful benefits to people biking now while laying the groundwork for a more complete network in the future. By focusing on what works well today, the Low-Stress Network allows the city to move quickly and cost-effectively toward a safer, more accessible future for active transportation. As shown in Table 7, 2026 BPTP Complete Vision Network includes a total of 94 bicycle projects, representing 61 miles of upgraded and new bicycle facilities. In addition, the 2026 BPTP includes 35 crossing projects, 6 special projects, and 5 studies. The Low Stress Network includes a total of 54 of the 94 bicycle projects, representing 30 miles of upgraded and new bicycle facilities. A total of 25 bicycle projects, representing almost 19 miles of upgraded and new facilities, are prioritized on the Near-Term Project List, along with 24 crossing projects, 3 special projects, and 3 studies. Table 8 provides the list of projects that make up the Complete Vision Network. Appendix A: List of Projects includes project descriptions and maps by bicycle facility type. Exhibit A 3. Recommendations | 85 Table 7: Summary of Recommend Bicycle Projects PROJECT TYPE COMPLETE VISION NETWORK LOW-STRESS NETWORK NEAR-TERM PROJECTS Number of Recommend Projects Length (Miles) Number of Recommend Projects Length (Miles) Number of Recommend Projects Length (Miles) Shared Use Path (Class I)14 8.2 6 1.0 2 0.6 Bicycle Lane (Class IIa)12 4.1 9 3.4 2 0.4 Buffered Bicycle Lane (Class IIb)10 5.9 9 5.1 5 2.2 Advisory Bike Lane (Class IIIa)2 0.3 2 0.3 0 Bicycle Boulevard (Class IIIb)24 19.7 17 12.3 7 8.3 Separated Bikeway (Class IV)32 22.9 11 7.8 9 7.3 Total 94 61.1 54 29.9 25 18.8 PROJECT NUMBER PROJECT NAME ABL_1 Embarcadero Road Advisory Bike Lane at Harriet Mundy Marsh ABL_2 Geng Road Advisory Bike Lane BBL_1 Homer/Channing/Guinda Avenue Buffered Bike Lane BBL_2 Newell Road Buffered Bike Lane BBL_3a Hanover Street to Bol Park Path Buffered Bike Lane BBL_3b Hanover Street Buffered Bike Lane BBL_4 El Camino Way Buffered Bike Lane BBL_5 Embarcadero Road Buffered Bike Lane: East Bayshore to Baylands BBL_6 Loma Verde Avenue Buffered Bike Lane: Alma Street to Middlefield Road BBL_7 Cambridge Avenue Buffered Bike Lane BBL_8 California Avenue Buffered Bike Lane BBL_9 Amaranta - Coulombe Buffered Bike Lane BL_1 North California Avenue Bike Lane BL_2 Channing Avenue Bike Lane BL_3 Addison Avenue Bike Lane BL_4 Portage - Olive - Ash Bike Boulevard BL_5 Stanford Avenue Bike Lane connection to Hanover BL_6 California Avenue Bike Lane BL_7 Page Mill Road Bike Lane BL_8 Loma Verde Bike Lane BL_9 Colorado Ave Bike Lane BL_10 East Bayshore Road Bike Lane-from San Francisquito Creek to Embarcadero Road BL_11 West Bayshore Road Bike Lane Table 8: Project List In addition to bikeway projects in the table, we are recommending 35 crossing projects, 6 special projects, and 5 studies. Of these non- bikeway projects, 24 crossing projects, 3 studies, and 3 special projects are priority projects. Exhibit A 3. Recommendations | 86 PROJECT NUMBER PROJECT NAME BL_12 Arastradero Road BLVD_1 Clark Way Bike Boulevard BLVD_2 Bryant Street Bike Boulevard Downtown Access Project BLVD_3 Everett Avenue Bike Bike Boulevard BLVD_4 Guinda Street Bike Boulevard BLVD_5 Hamilton-Greer Avenue Bike Boulevard BLVD_6 Kingsley Avenue Bike Boulevard BLVD_7 Chaucer - Hamilton - Hale - Boyce Bike Boulevard BLVD_8 Greer Road Bike Boulevard BLVD_9 La Donna - Barron - Josina - Bike Boulevard BLVD_10 Saint Francis - Oregon Avenue Bike Boulevard BLVD_11 Faber Place Bike Boulevard BLVD_12 Amarillo Avenue Bike Boulevard BLVD_13 Garland Drive Bike Boulevard BLVD_14 Seale Avenue Bike Boulevard BLVD_15 Cowper Street Bike Boulevard BLVD_16 Colorado Avenue Bike Boulevard BLVD_17 Stanford Avenue Bike Boulevard BLVD_18 Bryant - Nelson - Carlson - Mackay Bike Boulevard BLVD_19 Laguna - Los Robles Avenues Bike Boulevard BLVD_20 Maybell - Donald - Georgia Bike Boulevard BLVD_21 Hanover Street Bike Boulevard BLVD_22 Park Boulevard Bike Boulevard BLVD_23 Margarita Avenue Bike Boulevard BLVD_24 Portage-Olive-Ash Bike Boulevard under NVCAP BLVD_CROSSING_1 Chaucer Street crossing of University Avenue BLVD_CROSSING_2 Carlson Street Crossing of E Charleston Rd BLVD_CROSSING_3 Wilkie Way Crossing of West Charleston Road BLVD_CROSSING_4 Cowper Street Crossing of East Meadow Drive BLVD_CROSSING_5 Seale Avenue Bike Boulevard Crossing of Middlefield Road BLVD_CROSSING_6 Faber Place Crossing at Embarcadero Road BLVD_CROSSING_7 Greer Road Crossing of Embarcadero Road BLVD_CROSSING_8 St Francis Drive crossing of Embarcadero Road BLVD_CROSSING_9 Cesano Ct Connection BLVD_CROSSING_10 Bryant St crossing of E Meadow Dr BLVD_CROSSING_11 Nelson Dr crossing of E Charleston Rd BLVD_CROSSING_12 Cowper Street Crossing of Embarcadero Road CROSSING_1 Seale Avenue Bike/Ped Undercrossing for the Churchill Avenue Grade Separation CROSSING_2 Everett Avenue Tunnel CROSSING_3 California Avenue Tunnel - Pedestrian/Bicycle Shared Use Enhancements Exhibit A 3. Recommendations | 87 PROJECT NUMBER PROJECT NAME CROSSING_4 New parallel tunnel for bicycles at California Avenue. Caltrain Station to Alma Street CROSSING_5 Palo Alto Transit Center/University Avenue Undercrossing CROSSING_6 Sutter Avenue crossing of Middlefield Road CROSSING_7 Embarcadero Crossing to Renzel Trail over East Bayshore Road CROSSING_8 Hanover Street entrance to Bol Park Bike Path enhancement CROSSING_9 Matadero Creek Highway 101 Seasonal Undercrossing CROSSING_10 Midtown Bicycle and Pedestrian Undercrossing CROSSING_11 Embarcadero Crossing Reconstruction INTERSECTION_1 Page Mill Road and Hanover Street Intersection Improvement INTERSECTION_2 West Meadow Drive and El Camino Way Intersection Improvement INTERSECTION_3 Quarry Road and El Camino Real Protected Intersection INTERSECTION_4 Greer Road and Oregon Expressway Intersection INTERSECTION_5 California Avenue and El Camino Real Protected Intersection INTERSECTION_6 Park to Serra Protected Intersection INTERSECTION_7 E Charleston Road and San Antonio Road Intersection INTERSECTION_8 E Charleston Road and Middlefield Road INTERSECTION_9 Maybell Avenue and El Camino Real INTERSECTION_10 Embarcadero Road and El Camino Real Protected Intersection INTERSECTION_11 Quarry Road and Arboretum Road Protected Intersection INTERSECTION_12 San Antonio Road and Middlefield Road SB_1 Deer Creek Road Separated Bikeway SB_2 Arboretum Road Separated Bikeway SB_3 Quarry Road Separated Bikeway SB_4 El Camino Real Separated Bikeway SB_5 Hillview Avenue Separated Bikeway SB_6a Alma Street Separated Bikeway to Menlo Park SB_6b Alma Street Separated Bikeway - North SB_7 Lytton Avenue Separated Bikeway: Alma Street to Guinda Street SB_8 Foothill Expressway Separated Bikeway SB_9 Hamilton Avenue Separated Bikeway: Middlefield Road to Bryant Street SB_10 University Avenue Separated Bikeway SB_11a Middlefield Road Separated Bikeway Connection to Menlo Park SB_11b Middlefield Road Separated Bikeway Connection to Garland Drive SB_11c Middlefield Road Separated Bikeway SB_11d Middlefield Road Separated Bikeway SB_12 Homer Avenue Separated Bikeway SB_13a Arastradero Road Separated Bikeway SB_13b Arastradero Road Separated Bikeway SB_14 Embarcadero Separated Bikeway: Middlefield Road to Newell Road SB_15 Embarcadero Road Separated Bikeway: Greer Road to E. Bayshore Road Exhibit A 3. Recommendations | 88 PROJECT NUMBER PROJECT NAME SB_16 Embarcadero Road Separated Bikeway: Full Corridor SB_17 East Bayshore Road Separated Bikeway: Embarcadero Road to Renzel Trail SB_18 East/West Meadow Drive Separated Bikeway SB_19 Alma Street Separated Bikeway - South SB_20a San Antonio Avenue Separated Bikeway SB_20b San Antonio Road Separated Bikeway SB_20c San Antonio Road Separated Bikeway into Mountain View SB_21a East Charleston Road Separated Bikeway: Industrial Avenue to Middlefield Road SB_21b East Charleston Road Separated Bikeway: Middlefield Road to Alma Street SB_22 West Charleston Road Separated Bikeway SB_23 Fabian Way Separated Bikeway SB_24 Churchill Ave Separated Bikeway SUP_1 Quarry Road Transit Extension Project SUP_2 Embarcadero Town & Country Shared Use Path SUP_4 Page Mill Road Shared Use Path SUP_5 Oregon Expressway Shared Use Path SUP_6 Matadero Canal Shared Use Path SUP_7 Barron Creek Shared Use Path SUP_8 San Antonio Road Shared Use Path SUP_9 Cubberley Community Center Shared Use Path SUP_10 Palo Alto Avenue Shared Use Path SUP_11 Hansen Way Shared Use Path SUP_12 Homer Tunnel to Caltrain Connection SUP_13 Embarcadero Road Shared Use Path: Alma to Emerson SUP_14 Bol Park Path - Chimalus Path Spur SUP_15 El Camino Park - El Palo Alto Park Connection SpecProj_1 Hamilton Ave Pedestrian Signal Heads SpecProj_2 Downtown Green Wave SpecProj_3 Ellen Fletcher Bike Blvd Project SpecProj_4 Stanford Avenue Pedestrian Crossing Improvements: multiple locations Study_1 Southern Palo Alto Bicycle and Pedestrian Railroad Crossing Study and Implementation Project Study_2 Embarcadero Road Corridor Study Study_3 Matadero Canal Shared Use Path Feasibility Study Study_4 Bryant Blvd & E Meadow Crossing Feasibility Study Study_5 Cal Ave Station Gap Closure project CS_1 California Avenue Community Street SS_1 University Avenue Slow Street Exhibit A 89 !f !f !f !f !f !f !f !f !f !f !f !f !f !f !s !s !s !s !s __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd King s l e y A v e Sea l e A v e Mor e n o A v e Park B l v d Arastra d e r o R d Eve r e t t A v e Bo y c e A v e Welc h R d Chu r c h i l l A v e Porte r D r Oliv e A v e Cam b r i d g e A v e La Do n n a A v e EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F Data Sources: City of Palo Alto, MTC, Kittelson 0 1 2 Miles As of 9/1/2025 To East Palo Alto To Menlo Park To Mountain View To Los Altos Recommended Existing Class I - Shared Use Path/Trail Class IIa - Bike Lane Class IIb - Buffered Bike Lane Class IIIa - Advisory Bike Lane Class IIIb - Bike Boulevard Class IV - Separated Bikeway In an approved Plan from a neighboring jurisdiction Caltrain Station !f Existing Ped/Bike Bridge !s Existing Ped/Bike Underpass Recommended Bike Blvd Crossing Improvements Recommended Intersection Improvements Recommended Ped/Bike Bridge or Underpass Trail Bicycle-Friendly Zone Recommended Figure 16: Complete Vision Bicycle Network Exhibit A 90 !f !f !f !f !f !f !f !f !f !f !f !f !f !f !s !s !s !s !s __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd King s l e y A v e Sea l e A v e Mor e n o A v e Park B l v d Arastra d e r o R d Eve r e t t A v e Bo y c e A v e Welc h R d Chu r c h i l l A v e Porte r D r Oliv e A v e Cam b r i d g e A v e La Do n n a A v e EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F Recommended Existing Class I - Shared Use Path Class IIa - Bike Lane Class IIb - Buffered Bike Lane Class IIIa - Advisory Bike Lane Class IIIb - Bike Boulevard Class IV - Separated Bikeway Trail !f Existing Ped/Bike Bridge !s Existing Ped/Bike Underpass Recommended Bike Blvd Crossing Recommended Intersection Improvement Recommended Ped/Bike Bridge or Underpass Caltrain Station Data Sources: City of Palo Alto, MTC, Kittelson 0 1 2 Miles As of 9/1/2025 To East Palo Alto To Menlo Park To Mountain View To Los Altos Bicycle-Friendly Zone City of Palo Alto Recommended Figure 17: Low-Stress Bicycle Network Exhibit A 3. Recommendations | 91 Exhibit A 3. Recommendations | 92 3.3 Pedestrian District Guidelines and Toolbox This section identifies priority pedestrian areas within Palo Alto and presents a toolbox of potential pedestrian- oriented treatments for use within these areas. These guidelines build upon existing foundational planning, bring in new ideas and innovations, and address changes and developments since the prior plan was adopted in 2012. 3.3.1 PEDESTRIAN DISTRICTS Priority pedestrian areas are key to creating a walkable, accessible, and enjoyable City. They offer areas where walking is prioritized to allow people of all ages and abilities to get around without competing with vehicles. Within these areas, slower vehicle movement is encouraged, and opportunities are provided for people to pause and enjoy their surroundings. Walking should be the preferred mode of choice for all trips within these areas with wider sidewalks that support high volumes of pedestrian activity through building a well-connected pedestrian network. Figure 18 maps three pedestrian districts and three priority areas which are focus areas for pedestrian recommendations. These areas were identified based on prior planning efforts, including the 2030 Comprehensive Plan, and the Palo Alto Economic Development Strategies Plan, as well as community input and on-the-ground knowledge from the in- person working session held in April 2024.5 These pedestrian districts and priority areas include: Pedestrian Districts: • University Avenue Pedestrian District • California Avenue Pedestrian District • Midtown Pedestrian District Pedestrian Priority Areas • El Camino Real Neighborhood Commercial Center • Embarcadero Neighborhood Commercial Center • San Antonio Road Area 5 The BPTP Team conducted a series of site visit in April 2024 to understand the roadway context. This is further described in the community engagement section. 3.3.2 PEDESTRIAN DISTRICT TOOLBOX The pedestrian district toolbox includes a range of selected treatments aimed at improving pedestrian safety and enhancing the pedestrian experience. The elements range from infrastructure improvements, such as raised crossings or curb extensions that improve yielding rates, to aesthetic changes, such as benches or public art, that can elevate the walking experience. Together, these elements will meet universal needs for safety and accessibility and create conditions where walking is comfortable and an enjoyable experience for all. The pedestrian toolbox consists of 27 treatments organized into seven categories: enhanced crossings, street reconfiguration, aesthetic and functional elements, activation and engagement, signal adjustments, major intersection treatments, and green infrastructure. Implementing pedestrian-oriented enhancements help in advancing the plan objectives of supporting a City that is Safe and Inclusive, Connected and Accessible, and Comfortable and Enjoyable. Image 16 lists pedestrian toolbox enhancements. Detailed information about these tools and their recommended application in the three pedestrian districts and two priority areas is available in Appendix B: Pedestrian District Guidelines. Exhibit A 3. Recommendations | 93 Image 16: Recommended Crossing and Intersection Improvements 19. In Street Treewells18. Bike parking corrals 1.Mid-block crossings Enhanced Crossings Street Design 2. Raised crossings 3. Raised intersections 4. Curb extensions 5. Wide sidewalks 10. Gateway Treatments 6. Shared streets 7. Reduced Curb Radii 8. Speed Hump Aesthetic and Functional Elements 9. Pedestrian lighting 12. Wayfinding11. Decorative pavers 13. Alleyway activation Activation and Engagement Flexible Street Use 14. Street furniture 15. Shade sails 16. Street art or murals 17. On Street Flex Zones 20. Rising Bollards Major Intersection Treatments 21. Pedestrian Signals 22. Signal Timing 23. Median island 24. Protected intersection Green Infrastructure 25. Bioswales 26. Rain Garden 27. Street Trees 28. Planting Strip Exhibit A 94 University Avenue District California Avenue District El Camino Real Neighborhood Commercial Center Midtown District Embarcadero Neighborhood Commercial Center San Antonio Road Area __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd King s l e y A v e EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F Pedestrian Districts and Priority Areas City of Palo Alto Park/Open Space School/University Community Center Library Caltrain Station Railroad Data Sources: City of Palo Alto, MTC, Kittelson 0 1 2 Miles As of 9/1/2025 Figure 18: Pedestrian Districts and Pedestrian Priority Areas Exhibit A 3. Recommendations | 95 Pedestrian District Recommendations University Avenue Pedestrian District Downtown Palo Alto’s historic main street and original civic/commercial core; today it functions as the City’s primary regional and commercial center and the “front door” many visitors remember. • Add midblock raised crossings (Hamilton Ave) and update existing midblock crossing (Forest Ave) to prioritize pedestrians. • Install bike/micromobility corrals at key destinations (Caltrain lot at Alma Street, Palo Alto Transit Center, Lytton Plaza) and anchor district wayfinding at University & Alma and the Homer Tunnel, coordinated with the MTC pilot.6 • Advance special projects: raised side-street crossings on University (Univ_A); permanent pedestrianized Ramona Street (Univ_B); alleyway activation (Univ_C); University & Alma interchange reconfiguration (Univ_D) (continuous/wider sidewalks, gateway, wayfinding); and improvements to the Transit Center/University undercrossing. 6 The MTC Regional Mapping & Wayfinding Project, https://mtc.ca.gov/operations/transit-regional-network-management/regional- mapping-wayfinding Note: Numbers refer to the pedestrian toolbox elements recommended at these locations. Additional information about Pedestrian Toolbox Elements and Special Projects is provided in Appendix M: Pedestrian District Guidelines. Image 17: University Avenue Pedestrian District Exhibit A 3. Recommendations | 96 California Avenue Pedestrian District A pedestrian activity center with compact blocks, back alleys, and active ground-floor commercial uses; recognized in City policy as a Multi-Neighborhood/Community-Serving center. • Use on-street flex zones for placemaking and add street treewells on Park Blvd, Ash St, and Birch St. • Provide wayfinding at El Camino Real/California Ave and the Caltrain station; add street art at key approaches. Note: Numbers refer to the pedestrian toolbox elements recommended at these locations. Additional information about Pedestrian Toolbox Elements and Special Projects is provided in Appendix M: Pedestrian District Guidelines. Image 18: California Avenue Pedestrian District Exhibit A 3. Recommendations | 97 Midtown Pedestrian District A mid-century neighborhood shopping area that has grown into a vital, neighborhood-serving hub; identified in recent plans as a neighborhood serving place for everyday needs. • Apply gateway treatments at Middlefield (Moreno Ave to the west; Matadero Canal to the east), plus bike corrals, street furniture, and wayfinding. • Advance special projects: a Midtown master street plan (Mid_1); a Middlefield Rd road diet (Mid_2) (raised intersections, continuous/wider sidewalks, pedestrian signals, flex zones, street furniture, treewells); a Sutter Ave mid-block crossing with ped signals (Mid_3); temporary parking-lot activation (Mid_4); and a central plaza parkway (Mid_5). Note: Numbers refer to the pedestrian toolbox elements recommended at these locations. Additional information about Pedestrian Toolbox Elements and Special Projects is provided in Appendix M: Pedestrian District Guidelines. Image 19: Midtown Pedestrian District Exhibit A 3. Recommendations | 98 Pedestrian Priority Area Recommendations El Camino Real Neighborhood Commercial Center A linear, citywide commercial corridor with a diverse mix of shops, restaurants, and services serving both residents and visitors. • Treat the corridor as a multimodal main street: add raised crossings on unsignalized side streets and provide street furniture to improve waiting areas. • Enhance Corridor walkability, bike lanes, and streetscape upgrades are underway as part of ongoing revitalization by Caltrans, in coordination with the City. Embarcadero Neighborhood Commercial Center (Edgewood Plaza) A neighborhood hub anchored by the Edgewood Plaza Shopping Center, known for its mid-century modern character and a mix of groceries, cafés, and local businesses—remaining a vibrant, accessible destination for nearby residents. • Provide bike parking corrals and wayfinding to local businesses and trail connections (notably the US-101/St. Francis Dr link), to support short local walking and biking trips. San Antonio Road Area A district to be guided by the same framework as other pedestrian districts—prioritizing walking, slower movement, and a connected sidewalk network—using the plan’s toolbox (e.g., raised crossings, wider sidewalks, bike corrals, gateway/wayfinding) as sites redevelop. • As sites redevelop, apply the plan’s pedestrian toolbox to create a walk-first environment: raised crossings/ raised intersections, curb extensions/reduced curb radii, continuous and wider sidewalks, bike corrals, and flexible curb zones. • Coordination with the City’s San Antonio Road Area Plan Exhibit A 3. Recommendations | 99 PEDESTRIAN DISTRICT DESIGN ELEMENTS To achieve the VMT-reduction and safety goals of Pedestrian Districts, future streetscape and development projects within these areas should incorporate the following urban design elements and principles: Fine-Grained Pedestrian Network: • Keep block lengths and crossing opportunities to 400’ or less, with paseos and high-visibility mid-block crossings where block lengths exceed 400’. Continuous, Generous Sidewalks: • Maintain wide, unobstructed pedestrian through-zones that comfortably accommodate side-by-side walking and meet or exceed PROWAG standards. Shortened Crossing Distances: • Utilize curb extensions (bulb-outs), pedestrian refuge islands, and tight curb radii of less than 15’ (if no bulb-out is provided) to reduce pedestrian exposure at intersections. Active Street Frontages: • Encourage visually engaging, ground-floor land uses with minimal building setbacks and human scaled elements (such as seating and public art) to create a welcoming and dynamic walking environment. Continuous Shade Canopy: • Prioritize street trees and landscaping that provide shade over the pedestrian right-of-way to improve thermal comfort. Minimal Curb Cuts: • Consolidate or eliminate driveway access points across sidewalks to reduce conflict points between vehicles and pedestrians. Pedestrian-Scale Lighting: • Install warm, dark-sky compliant, pedestrian-level lighting focused on the sidewalk and crosswalks to enhance visibility, safety, and comfort at night. Source: Kevin Lynch (1984), Jan Gehl (1996), and Ria Hutabarat Lo (2009) Exhibit A 3. Recommendations | 100 Exhibit A 3. Recommendations | 101 3.4 Policies and Programs As part of developing the Plan, the City identified policies, programs, and practices to improve conditions for walking and biking in Palo Alto. City staff from multiple departments participated in discussions to assess how the City is implementing existing policies, programs, and practices and ranked the highest priorities for inclusion in the Plan. This section presents the 2026 BPTP’s recommended programs and policies. It provides recommended strategies and actions to support walking and biking in Palo Alto as well as best practices that the City can undertake in developing programs to encourage active transportation. Some of the policies and programs will require additional resources such as staffing and budget to implement. The recommendations are organized under the 2026 BPTP’s five objectives, identified previously in section 1.4.2 Objectives: • Comfortable and Enjoyable • Community-Led and Cooperative • Safe and Inclusive • Connected and Accessible • Integrated and Collaborative Recommended strategies are summarized below and presented in more detail in Appendix C: Policy and Program Recommendations. Exhibit A 3. Recommendations | 102 Comfortable and Enjoyable: Enhancing the comfort and enjoyment of walking and cycling through amenities such as shade, greenery, and well- designed streetscapes. • CE-1.1 Active Transportation Design Policy and Standards: Develop or adopt design standards and specifications based on recent research and modern best practice for pedestrian, bicycle, and transit friendly street design. (2030 Comprehensive Plan Program T-1.19, Policy T-3.5.1) • CE-1.2 Implement Pedestrian District Guidelines and Toolbox: Implement recommendations and guidance included in the Pedestrian District Guidelines and Toolbox. • CE-1.3 Vertical Curb Standard: Revisit the City’s vertical curb standard to balance the removal of barriers to active transportation and maintaining separation for vulnerable modes. • CE-1.4 Older Adult Mobility Program: Support older adult mobility options, including a Trishaw* Pilot via Cycling Without Age, to provide access to statistically low-risk transit, possibly operated by trained student and/or older adult volunteers along low volume residential streets. (2030 Comprehensive Plan Program T-5.12) *Defined as a three-wheeled pedal-powered machine,often featuring electric-assist motors, with a pilot behind and a passenger seat up front. • CE-1.5 Bike Parking Inventory & Usage Monitoring Program: Conduct an inventory and monitor usage of bike parking at City properties and public rights- of-way (such as sidewalks) and continue to provide sufficient supply. Establish a program for members of the public and commercial properties to request site inspections and evaluation for installation of bicycle racks or parking corrals. Ensure the City’s bike parking program provides facilities that are publicly accessible and available for use by all members of the public. (2030 Comprehensive Plan Program T-5.12, Program T5.12.1, Program T5.12.2, Program T5.12.3) • CE-1.6 Bike Parking Requirements For New Development: Update the City’s minimum short- and long-term bike parking requirements for new development projects to reflect changes in parking demand. Update and maintain the City’s list of approved bike parking designs to accommodate a variety of bicycle types such as e-bikes and cargo bikes. (2030 Comprehensive Plan Program T-1.17) • CE-1.7 Bike Parking Design: The design of bike parking facilities shall be consistent with the Association of Pedestrian and Bicycle Professionals (APBP) Essentials of Bike Parking or Valley Transportation Authority (VTA) Bicycle Technical Guidelines Chapter 10. • CE-1.8 Walk & Bike Friendly Development: Consider prioritizing or requiring certification that encourages bicycle- and pedestrian-friendly developments, such as LEED-ND. Encourage developments that limit vehicle parking. • CE-1.9 Wayfinding Plan: Develop a non-motorized wayfinding plan connecting bicycle and pedestrian facilities with key local and regional destinations such as schools, trails, parks, and rail stations. Evaluate cut-throughs, short connections, ramp access, and ADA compliance. Continue to expand wayfinding facilities as the bicycle and pedestrian networks are implemented, and in coordination with Caltrans, develop a Wayfinding Signage Program specific to El Camino Real to help cyclists connect to the local bicycle network. • CE-1.10 Bike Racks on Buses: Work with Santa Clara Valley Transportation Authority (VTA) and coordinate with their Wheels on the Bus Pilot Program, to monitor the use of bike racks on buses and determine if demand is being accommodated. Exhibit A 3. Recommendations | 103 • CE-1.11 TDM Program: Promote and expand the Transportation Demand Management (TDM) program and continue to support implementation of TDM programs in an effort to increase the share of trips made by walking and biking and advance the City’s sustainability, climate action, vehicle miles traveled and carbon reduction goals. Pursue full participation of Palo Alto employers in the Transportation Management Association (TMA) and pursue expanding the TMA from Downtown to California Avenue and other areas of the city when appropriate. (2030 Comprehensive Plan Program T-1.1) • CE-1.12 Crossing Guards: Periodically evaluate school crossing guard locations and warrants to determine their appropriateness and evaluate opportunities for new locations. As part of the evaluations, consider factors such as the needs of younger bicyclists who may cross while walking, and incorporate collision and location data to assist in identifying opportunities for pilot locations that could increase the walk to school mode share. • CE-1.13 Development Review Updates: Evaluate development review and roadway design by metrics that focus on safety risk, user comfort, and access for all users including pedestrians and bicyclists (such as kinetic energy risk, level of traffic stress, and travel time by mode). Clearly communicate to help residents understand why proactive enhancements to support low-stress network buildout may be needed. (2030 Comprehensive Plan Program T-1.17) Exhibit A 3. Recommendations | 104 Community-Led and Cooperative: Fostering community engagement and participation in promoting active transportation, supported by education, programming, and infrastructure investments, in a way that cultivates learning for all network users of all ages . • CC-1.1 Bicycle Lending Library: Partner with the Palo Alto library and community partners with space, capacity, and expertise to create a bicycle lending library that enables residents to check out different types of bicycles, supplies, including trailers, and educational materials, including bike blenders, bike trivia wheels, safety vests for events, helmets and more; consult with agencies that have implemented similar programs such as the City of Oakland and San Mateo County Libraries. • CC-1.2 TDM Pilot Program for City Employees: Conduct a City of Palo Alto TDM pilot to improve facilities and encourage employee use of active transportation vehicles to reduce risk, given the high percentage of city vehicles that are used for <2 mile single occupant trips around town. Determine how best to pilot and incentivize trips to focus on both the right tool for the trip relative to the distance. Provide access to different types of bikes/trailers to support a wide range of users, access to an improved storage facility, conduct regular rides and safety trainings, ensure bicycles are regularly maintained and that there are risk management and anti-theft provisions to ensure safety and security. (2030 Comprehensive Plan Program T-1.1) • CC-1.3 Long-Term Education Program: Create a long-term education program to change the travel habits of residents, visitors, shoppers, and workers by informing them about transportation alternatives, incentives, and impacts. Work with the PAUSD and with other public and private interests, such as the Chamber of Commerce and Commuter Wallet partners, to develop and implement this program. • CC-1.4 Bike Education Program: Partner with groups to advertise and carry out bike safety and education classes in the city, including classes oriented towards children, older adults, and non- English speakers. Include driver education to encourage safer driving behavior, including in the presence of bicycles. • CC-1.5 Employee Education Program: Encourage and fund the participation of employees working on bicycle and pedestrian facilities in professional organizations and conferences in order stay up-to- date on the state of the practice and successes in other cities. Provide resources and support for employees to further their education, develop new skills, and keep up with changing patterns and transportation technologies. • CC-1.6 Interactive Map Tool: Update the City’s website to enhance its static bicycle facility and Safe Routes to School (SRTS) Suggested Walk & Roll Route Maps with interactive mapping applications. Work with PAUSD, PATMA, and other partners to share this resource. • CC-1.7 Community Rides Program: Partner with organizations to lead all ages and abilities bicycle rides throughout the calendar year, including rides that utilize recently-implemented projects. (2030 Comprehensive Plan Program T1.16.4) • CC-1.8 Valet Parking Program for Events: Collaborate with Community Services Department to partner with and budget for organizations to provide bike parking and/or bike valet services at City-sponsored or other large events. • CC-1.9 Street Closures - Open Streets: Prioritize street closures on areas located on the High Injury Network (identified in the Safety Action Plan), where high bicycle and pedestrian activity is expected, and where there is community support. (2030 Comprehensive Plan Program T1.16.2) • CC-1.10 Street Closures - School Streets Pilot: Implement a Street Closure - School Streets Pilot Program that can be used to gather data and outcomes that could then be applied to other schools. Community input will be used to identify locations for the pilot. School streets implement timed closures that prevent vehicles from entering the specified school zone. Restrictions are in place for approximately 15 to 90 minutes during drop- off and pick-up times and is enforced using signage and physical barrier(s). During this time, only pedestrians and cyclists can enter the School Street zone, aside from exempt vehicles (e.g. residents living in the zone). Exhibit A 3. Recommendations | 105 • CC-1.11 Active Transportation Incentives Program: Encourage PATMA to provide additional bicycle/ scooter incentives citywide. • CC-1.12 Safe Routes to School: Enhance and sustain the City/PAUSD/PTA/Youth community partnership to reduce risk to students en route to and from school, and encourage more families to choose healthy, active, sustainable alternatives to driving solo more often. Grow and strengthen community- wide support through the SRTS 6 E’s (Education, Encouragement, Engineering, Engagement, Evaluation, and Equity) model for safe, active, healthy, sustainable, school commutes. Aim to: • Adopt and institutionalize key SRTS practices and policies and gather best practices. • Provide, expand, and enhance school and community-based SRTS education programs and materials. • Promote and encourage use of the new traffic garden at the Ventura Community Center to enhance bike education. • Expand and enhance encouragement programs to communicate the value of SRTS. • Gather data to assess and improve outcomes. • Engineer routes to develop a more safe and efficient network. • Deepen awareness and engagement with City staff, Council, and community representatives to advance and institutionalize SRTS. • Commit an equitable distribution of resources to encourage broad community participation. • Maintain a Secondary School SRTS Coordinator to develop a youth SRTS program for grades 7-12 • CC-1.13 Safe Routes to School Action Plan Updates: Review the Safe Routes to School 5-Year Action Planning process or identify an alternative process to support the development of future program goals and objectives.7 • CC-1.14 Community Partnerships Program: Consider establishing or working with existing advocacy groups to reach out to local businesses or groups to help support and promote walking and bicycle-related projects and to maximize public- private funding opportunities such as development of bicycle or walking maps, path maintenance, and installation of bike parking facilities on private property. Explore a private bike parking subsidy program. • CC-1.15 Bike and Pedestrian Count Program: Establish regular citywide bicycle and pedestrian counts at key corridors, intersections, destinations, and require that intersection traffic counts collected for development projects’ transportation studies include bicyclist and pedestrian volumes. Utilize the counts collected in 2024 to establish a baseline for select locations. Enhance bicycle count efforts and collect more data to guide decisions by installing permanent automatic counters along key bikeways in representative locations. Using bike counters with displays along popular routes can encourage people to bike more often. (2030 Comprehensive Plan Program T1.16.1) • CC-1.17 Performance Reporting Program: Collect data and conduct analysis as part of periodic status reports detailing the City’s performance in relation to metrics recommended in this plan. • CC-1.18 Community Feedback Program: Expand survey efforts such as the Palo Alto Community Survey and the Performance Reports and National Citizen surveys to collect information related to walking and bicycling facility quality, Plan implementation, and programs. • CC-1.19 Encouraging Community Cycling: Continue City collaboration with local partners to support and explore community-led cycling events, such as Bike Palo Alto!, and participate in regional initiatives like Bike to Work Day (BTWD) to promote active transportation and increase rider confidence. (2030 Comprehensive Plan Program T1.16.4) 7 Palo Alto Safe Routes to School 2019 5-Year Action Plan: https:// www.paloalto.gov/files/assets/public/v/1/transportation/safe- routes-to-schools/five-year-work-plan_updated_dec-2020.pdf Exhibit A 3. Recommendations | 106 Safe and Inclusive: Prioritizing safety for all transportation network users regardless of age and ability, and ensuring equitable access to pedestrian and bicycle infrastructure across the community while reducing fatal and severe injury crashes . • SI-1.1 Institutionalize Safety: Via the 2025 Safety Action Plan, the City has committed to reducing traffic fatalities and serious injuries on the City’s roadways. Institutionalize safety into all aspects of policies, planning, program, design, implementation, and maintenance. • SI-1.2 Safe Routes to Work, Shopping, Downtown, Community Services, and Parks: Where Walk and Roll Map Suggested School Routes overlap with HIN, prioritize speed management and pedestrian/bicycle enhancements, especially at intersections: FHWA Guide for Improving Pedestrian Safety at Uncontrolled Crossing Locations, FHWA Improving Intersections for Pedestrians and Bicyclists, DIB 94, FHWA Safe System Approach for Speed Management. Establish non-HIN routes as primary access routes where possible and prioritize improvements on access routes with speeds over 25 mph: AB 43, countermeasure toolbox, DIB 94 • SI-1.3 Review Protocols for Updating Suggested Walk and Roll Maps: Develop protocols to review the city’s walk and roll suggested routes to school to proactively determine if traffic controls or other engineering modifications may be needed to improve student safety while walking, biking, and rolling to school. • SI-1.4 Speed Management Program: Implement a proactive speed management program following the FHWA Safe System Speed Management Framework to guide location specific interventions in all focus areas. Lower speed limits and design speeds on streets within the bike network and without separated bikeways to 25 mph or lower. • SI-1.5 Lower Speed Limits: Explore the mechanism to implement a potential policy of 20 mph or lower speed limits on all bike boulevards. • SI-1.6 Systemic Uncontrolled Crosswalk Placement/Enhancement Program: Develop a systemic uncontrolled crosswalk placement/ enhancement program for ped safety and accessibility: DIB 94, FHWA Safe System Roadway Design Hierarchy, FHWA Guide for Improving Pedestrian Safety at Uncontrolled Locations. Proactively design proposed crossings to provide bicyclists and pedestrians with context-appropriate facilities such as marked crossings, bike boxes, bike signal heads, bike detection, and leading bicycle intervals (LBIs)/leading pedestrian intervals (LPIs), audible and/or countdown signals, accessible push buttons, and curb ramps • SI-1.7 Update Traffic Calming Program: Systemically identify speed management needs and opportunities (such as speed humps and neighborhood traffic circle) and prioritize into a yearly implementation program based on kinetic energy risk, equity, proximity to schools, community input, and similar factors. Most funds should be programmed proactively, but some can be reserved for quick response discretionary purposes. Implement speed management strategies to moderate vehicle speeds to a contextually appropriate target speed: AB 43, countermeasure toolbox, FHWA Safe System Approach for Speed Management. It is recommended that that the Traffic Control Maintainer II position in Public Works (eliminated during the pandemic) be restored, so City staff can respond more quickly to add, maintain, or repair roadway safety infrastructure such as delineators, bollards, signage, guardrails, crash attenuators, faded striping and curb paints, and other features. When the City updates its Traffic Calming Policy, the City should consider incorporating the Good Streets approach within that effort. • SI-1.8 Update Public Works Standard Drawings and Specifications: Update Public Works Standard Drawings and Specifications to align with Safe System principles, including being consistent with NCHRP 1036 and Caltrans DIB 94. Exhibit A 3. Recommendations | 107 • SI-1.9 Revisit Street Closure Policy: Revisit Comprehensive Plan Policy T-4.1 (keeping all neighborhood streets open as a general rule) to consider the application of modal filters along bike boulevards. The analysis required for this work will be done as part of updating the traffic calming program, and will be coordinated with the City Planning & Development Services Department. • SI-1.10 Review Comprehensive Plan Policies: Review the City’s Comprehensive Plan policies and identify those that may conflict with installing certain bicycle and pedestrian infrastructure such as modal filters. Develop a work plan to revisit and potentially update the Comprehensive Plan policies. • SI-1.11 Near-Miss Reporting Program: Utilize SafeTREC Street Story mapping portal (https:// streetstory.berkeley.edu/city/palo-alto) to enable and encourage residents to provide information on near-misses and other safety information that would otherwise not be included in regularly- reported safety reports and statistics. • SI-1.12 The City’s Office of Transportation Traffic Engineering Team: Add or reallocate staff to administer quick build or traffic safety programs, including coordination, evaluation, planning, and engineering. • SI-1.13 Prioritize Maintenance of Bicycle and Pedestrian Facilities: Incorporate and prioritize bicycle and pedestrian facility maintenance needs into the City’s transportation maintance program standards and funding. (2030 Comprehensive Plan Program T1.16.2) • SI-1.14 Prioritize Bikeways in the Repaving Program: Prioritize repaving of new and existing bikeways as part of the repaving program. (2030 Comprehensive Plan Program T1.19.1) • SI-1.15 Bike Turnout Program: Seek to develop a project to identify and install appropriate bicycle turnouts for uphill reaches of two lane roads, such as Page Mill Road. • SI-1.16 Incorporate Pedestrian Improvements Into Repaving Program: Change approach to repaving program to include pedestrian improvements including new sidewalks, sidewalk widening, and curb extensions. This would require additional funding and a change in City processes for completing road and sidewalk repairs or installations. (2030 Comprehensive Plan Program T1.19.1, Program T1.19.2) Exhibit A 3. Recommendations | 108 Connected and Accessible: Featuring a convenient and interconnected network of sidewalks, bike lanes, and trails that provide efficient travel options and easy access to transit and important destinations, encouraging a shift away from driving and improving environmental health through lower vehicle miles traveled and reduced greenhouse gas emissions . • CA-1.1 Better Bikeways: Design and implement a high-comfort “All Ages and Abilities” network by utilizing modern best practices, such as NACTO guidelines. This includes providing appropriate facility widths, horizontal separation from vehicles, and low-stress intersection treatments. Priority will be given to safer crossings of major streets through strategies such as dedicated signals, daylighting, diverters or modal filters, pavement markings, and protected intersections to accommodate the city’s most vulnerable road users. (2030 Comprehensive Plan Program T1-19, Policy T-3.5.1) • CA-1.2 Bicycle and Pedestrian Capital Improvement Program: Establish dedicated funding for implementation of projects identified in the Bicycle and Pedestrian Transportation Plan Update and Pedestrian District Guidelines • CA-1.3 Station Access Program: Coordinate with Caltrain to deliver local station area access improvements that meet universal design principles such as curb ramps, tactile and audio crossing cues, improved sidewalks, slower traffic speeds, shorter crossing distances, and increased crossing time. Partner with Caltrain to encourage plans for low-stress active transportation facilities to Caltrain stations, and coordinate to ensure that grade separation projects adjacent to stations reflect multi-modal access needs. • CA-1.4 Signal Modification Program: Incorporate the crossing needs of bicyclists and pedestrians and encourage safe driver behavior when reviewing and adjusting signal timing at City traffic signals. Consider adding “Bicycle Detected” signal heads to recommended bike routes intersecting with arterials. • CA-1.5 Bicycle Detection Pilot Project: Implement innovative “blue light” (or other) bicycle detection indicators and signs at complex bicycle crossings. • CA-1.6 Update CIP Funding to Prioritize Bicycle and Pedestrian Access and Route: Allocate funding and prioritize implementation of BPTP projects as part of the City’s Capital Improvement Program (CIP). May include bike routes, streets on HIN, equity considerations: BPTP, HIN, East Palo Alto Walk and Roll Routes, Palo Alto Population Below Poverty, Palo Alto Transit Corridors. Ensure funding is allocated beyond signing/striping so intersections are also addressed through these projects: FHWA Guide for Improving Pedestrian Safety at Uncontrolled Crossing Locations, FHWA Improving Intersections for Pedestrians and Bicyclists. CIP Projects will align with Safe System Approach: FHWA Safe System Roadway Design Hierarchy, CIP Implementation Guidance. • CA-1.7 Identify Funding Opportunities: Continue to monitor federal, state, and regional funding opportunities to augment local funds to implement recommended walking, biking, and rolling improvements. • CA-1.8 Establish Dedicated Funding Source: Establish dedicated funding for citywide walking and bicycling facilities and supporting infrastructure such as bike parking in the City’s CIP. • CA-1.9 Quick-Build Program: Implement quick- build pilot/trial projects of the Plan’s walking and bicycling infrastructure recommendations. • CA-1.10 First/Last mile connection to Caltrain stations: Implement bikeways with connections to Caltrain stations to promote access. • CA-1.11 Existing Trail Access Improvements: Enhance on-street intersections along the existing trail network, key existing bridge/overpass approaches, and school route shared use paths, to improve ADA access, bikeway connectivity, and convenience for all users. Priority upgrades include: modifying or replacing substandard safety corrals with bollards and associated striping/signage; installing accessible curb ramps and regrading poor transitions; pedestrian-scaled lighting; installing high visibility crosswalks at key locations; and landscaping maintenance/ removal. • Exhibit A 3. Recommendations | 109 • CA-1.12 Evaluate Existing Crosswalks: Evaluate crosswalks on Arastradero Road near Arastradero Preserve and bring infrastructure to current standards, if needed. • CA-1.13 Safe Routes for Private Schools: Continue providing offerings for all community members, such as the Palo Alto Biccyle Safety Park and online resources, that can help private schools direct their resources to support their local Safe Routes to School engagement efforts. (2030 Comprehensive Plan Program T1.16.3) • CA-1.14 Sidewalk Gap Closure Program: Implement a program to fill sidewalk and other pedestrian facility gaps along key pedestrian routes, such as along school commute routes, transit access routes, across barriers, and around other key destinations. Exhibit A 3. Recommendations | 110 Integrated and Collaborative: Collaborating with neighboring cities to create a seamless, integrated, and efficient regional network of pedestrian and bicycle infrastructure. • IC-1.1 Update Municipal Code to Revise Walking, Biking, and Rolling Guidance: Review the City’s municipal code and ordinances to remove language that can discourage walking, biking, and rolling (such requirements to report secondhand bike purchases to the police department). Update code to align with State guidelines and create consistent language (e.g., for bike access on bridges, over and underpasses). • IC-1.2 Regional Network: Continue to consult with other agencies on bicycle and pedestrian improvement projects that abut or intersect jurisdictional boundaries to ensure consistency in facilities, in support of commute and recreational users, including Cities (East Palo Alto, Menlo Park, Los Altos, Los Altos Hills, and Mountain View), Counties (Santa Clara and San Mateo), Caltrans, and Caltrain. Partner with Stanford University, VTA, and adjacent jurisdictions to develop a connected network prioritizing access while minimizing distance between regional access points. • IC-1.3 PABAC Structure: Work with the Palo Alto Pedestrian and Bicycle Advisory Committee (PABAC) to evaluate existing role and structure, discuss membership and the potential to include members and/or liaisons from local non-profit organizations, advocacy groups, transportation management associations, City committees, and other groups, and propose changes that increase efficiency and effectiveness of the committee. • IC-1.4 Effective Regulation and Education on E-bikes: Advocate for comprehensive statewide regulations and safety initiatives, including mandatory safety courses, stricter age restrictions and helmet laws, public awareness campaigns, to ensure the responsible use of electric-bikes bicycles, electric scooters, and other electric mobility devices. • IC-1.5 Electric Bicycle Engagement Strategy: Partner with groups to advertise and carry out standardized, best practice informed, League Cycling Instructor (LCI)-led e-bike safety and education classes in the city. Pending policy changes at the state and local level, this may include prioritizing classes oriented towards children, youth older adults, and non-English speakers. • IC-1.6 Electric Bicycle Management Strategy: Work with PAUSD on strategies for electric bicycle management at school sites, including potential parking restrictions, to get ahead and develop regulations where possible for the City (and not preempted by the State). This is of particular importance given research indicating that the rate of e-bike crashes is nine times higher for youths than for people over 20 years old. The City’s Safe Routes to School program emphasizes risk reduction as it’s primary goal by encouraging and recommending parents purchase a conventional pedal bicycle for their students to develop better biking skills to become better cyclists as adults. For decades, Palo Alto’s Safe Routes to School program has emphasized risk reduction as its primary goal. In a community like Palo Alto, where more than forty percent of secondary students bicycle to school, promoting e-cycle use may have serious safety consequences other communities may not experience. Palo Alto’s local SRTS program will continue to strike a balance between education and promotion by providing cursory e-cycle safety information to PAUSD 5th and 6th grade students. • IC-1.7 Discouraging Driver Speeding: Work with Palo Alto Police Department and other partners when implementing and publicizing engineering, education, and enforcement efforts discouraging vehicle speeding near schools and high-injury locations in the city, particularly. Exhibit A 3. Recommendations | 111 • IC-1.8 Caltrans Coordination: Work with Caltrans to streamline permitting and integrate connected bikeways into Caltrans projects. Improve bikeway design approaching and crossing Caltrans facilities. • IC-1.9 Implementation Updates: Work with other jurisdictions and agencies to ensure that new or upgraded facilities are reflected in each agencies’ respective bikeway maps and applications. Exhibit A 4. Implementation and Funding | 112 4. IMPLEMENTATION AND FUNDING 112 Exhibit A 4. Implementation and Funding | 113 This chapter provides an overview of the project delivery process, project prioritization process, project cost estimates, and identifies funding sources to advance implementation. 4.1 Project Delivery Process This 2026 BPTP adopts a long-range vision for Palo Alto’s pedestrian and bicycle networks. With implementation of the Complete Vision Network recommendations, every resident in Palo Alto would have access to low-stress, comfortable bikeways that connect to major destinations throughout the City, along with connected sidewalks and frequent and appropriate crossing locations and designs. The recommendations included in 2026 BPTP could require further project-specific planning, data collection, analysis, public engagement, and engineering design before they can be implemented. Some portions of these networks will be implemented in the near-term (less than 10 years), while other recommendations are expected to be advanced beyond that timeframe. Implementation of the recommend network and programs may occur in phases over time and would be dependent on available resources. When considering when and how to implement these projects, the City incorporates design requirements, including maintaining access for people with disabilities, maintaining access for emergency responders, preserving access for utilities and maintenance, and meeting stormwater requirements, among other considerations. As projects advance to design, studies that consider the inclusion of bikeways or other right- of-way reallocations will be evaluated and potential trade-offs, such as repurposing of parking or travel lanes will be reviewed. The project development process generally consists of: • Project development, scoping, funding. As the first phase in the development of projects, the City conducts meetings with key stakeholders to define the scope of the project and identify funding opportunities. • Concept design. Concept design includes identification of a preferred alternative for approval by City Council. This stage typically includes collecting traffic, safety, parking, and operations data and analyzing the data to understand existing conditions, and potential concept design alternatives. Key studies would be conducted to understand the project benefits and impacts. Community engagement would be conducted as part of this effort to identify a preferred design. • Detailed engineering design. After designs are approved by City Council, detailed engineering will be conducted to answer remaining technical questions, develop accurate cost estimates, finalize the funding plan, and solicit construction bids. • Construction. Following award of the construction contract, the project will be built with notification to affected residents, property owners, and businesses. Certain long-term projects may be advanced through quick-build interim improvements, allowing the City to deliver early benefits while funding, design, and other challenges are being resolved. Quick-build strategies— such as paint-and-post treatments, curb extensions, or temporary traffic calming measures—can provide immediate safety and mobility enhancements at relatively low cost. In addition, quick-build implementation offers an opportunity to test design concepts, gather real-time performance data, and evaluate community feedback. This phased approach enables the City to strengthen community buy-in, refine project elements, and build momentum toward full implementation. Project Initiation & Scoping Concept Design Engineering Construction Exhibit A 4. Implementation and Funding | 114 4.2 Project Prioritization Prioritization Framework Project prioritization helps direct the City’s resources and develop a near-term list of improvements. This 2026 BPTP prioritizes intersections and bikeway corridors, studies, and special projects, for implementation over the next ten years. An initial prioritization was conducted to develop scores for each roadway segment in Palo Alto based on quantitative criteria to assess the level of alignment with the objectives of safety and connectivity. Projects that scored higher than 70 points were advanced to supplemental evaluation along with a subset of additional projects selected for further review. The supplemental evaluation considered project readiness, project cost, and project support to determine the top priority projects for near-term implementation. Table 9 presents recommend prioritization factors and evaluation criteria. The project prioritization included two stages of evaluation. The initial evaluation quantitively prioritizes projects based on the safety and connectivity factors. The second stage (supplemental evaluation) involved the consideration of three feasibility-oriented factors of project readiness, project cost and funding opportunities, and project support. (Only the projects that scored 70 or more points in the Initial Evaluation advance to the Supplemental Evaluation and those that are on the Low- Stress Network are considered for near-term implementation.) Table 9: Prioritization Factors and Evaluation Criteria PRIORITIZATION FACTOR CRITERIA Initial Evaluation Safety High-Injury Corridors Recommended SRTS Suggested Walk & Roll Route Maps Connectivity Bicycle Level of Traffic Stress Access to Transit Supplemental Evaluation* Project Cost and Funding High, Medium and LowProject Readiness Project Support Note: * Only the projects that scored 70 or more points in the Initial Evaluation advance to the Supplemental Evaluation. Additionally, the list of near term implementation projects was revised based on the feedback from the community and the City Council to prioritize the high-comfort, low-stress, tree-lined streets to encourage the interested but concerned users. Appendix A has the complete list of projects that includes the prioritization scores and the initial and supplemental evaluations. Near-Term Implementation The 2026 BPTP focuses staff resources to make incremental progress on the highest priority locations shown in Table 10 (not a ranked list), representing 25 priority bicycle projects for a total of 19 miles of enhancements on the network. Initially, projects scoring above 70 under the evaluation criteria were considered for near-term implementation; however, based on guidance from City staff, City Council, and community feedback, the list was refined. The remaining bicycle projects would be considered for long-term implementation. Figure 19 shows the near-term bikeway projects. Exhibit A 4. Implementation and Funding | 115 Table 10: Near-Term Bicycle Projects PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION SUP_1 Quarry Road Transit Connection Project Construct extension and upgrade existing trail from the intersection with El Camino Real to the Palo Alto Transit Center and Mitchell Lane as part of the Quarry Road Transit Connection Project. $$ High level of project readiness and strong community support, improves access to transit. SUP_14 Bol Park Path - Chimalus Path Spur Continue to work with the community to explore the feasibility of a Chimalus Path connection from the Bol Park Path to El Camino Real. $$$ High level of community interest, provides low-stress route to multiple destinations. SB_11a Middlefield Road Separated Bikeway Connection to Menlo Park Construct a new separated bikeway from Menlo Park to Everett Ave to allow for intercity connectivity. $$$ Addresses a high- stress street and high injury corridor and provides a key regional connection. SB_11c Middlefield Road Separated Bikeway Construct a new separated bikeway from California Avenue to Loma Verde Drive.$$$ Addresses a high stress street, high injury corridor and provides a key regional connection. SB_12 Homer Avenue Separated Bikeway Upgrade a painted bike lane to a buffered or separated bikeway on north side and Extend the separated bikeway on south side on Homer Avenue from Alma Street to Bryant Street. $$$ Closes key gap in the network and enhances access to Homer Tunnel. SB_18 East/West Meadow Drive Separated Bikeway Upgrade a painted bike lane to separated bikeway on West Meadow Drive from El Camino Way to Alma street and continue onto East Meadow Drive from Alma Street to Fabian Way. Consider raised crossings to slow traffic and create safer crossings for students. Coordinate with Study_4: E. Meadow & Bryant St. Crossing Feasibility Study. $$$ Addresses a high- stress street and high injury corridor and provides a key regional connection. SB_19 Alma Street Separated Bikeway - South Construct a new one-way separated bikeway on each side of the road Alma Street from East East Charleston Road to San Antionio Road to connect with Central Expresssway in Mountain View. Lane reconfiguration needed to create space for separated bikeway with quick-build or civil reconstruction to create raised cycle track in long term. $$$ Addresses a high- stress street and high injury corridor and provides a key regional connection and connection to San Antonio Caltrain Station. Opportunity to advance planning and design through the San Antonio Road Area Plan. Exhibit A 4. Implementation and Funding | 116 PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION SB_20a San Antonio Avenue Separated Bikeway Construct a new separated bikeway along San Antonio Avenue frontage street from Alma Street to Middlefield Road. $$$ Addresses a high stress street and high injury corridor and provides a key regional Connection. Opportunity to advance planning and design through the San Antonio Road Area Plan. SB_20b San Antonio Road Separated Bikeway Construct a new separated bikeway along San Antonio Road from Middlefield Road to East Bayshore Road. Request new developers to reconstruct street according to new design. Coordinate with the City’s San Antonio Area Planning efforts and with surrounding towns to create smooth transition between cities. $$$ Addresses a high stress street and high injury corridor and provides a key regional Connection. Opportunity to advance planning and design through the San Antonio Road Area Plan. SB_20c San Antonio Road Separated Bikeway into Mountain View Construct a new separated bikeway along San Antonio Road from Mountainview, along the overcrossing to Middlefield Road. $$$ Addresses a high stress street and high injury corridor and provides a key regional Connection. Opportunity to advance planning and design through the San Antonio Road Area Plan. SB_23 Fabian Way Separated Bikeway Coordinate with the existing South Palo Alto Bikeways Demonstration Project as part of the Palo Alto Safety Action Plan. Upgrade painted bike lane to buffered and/ or separated bikeway along Fabian Way from East Meadow Drive until Charleston Road to separate road users and create a more low-stress route for school commutes. Lane reconfiguration needed. $$$ Addresses a high- stress street and high injury corridor and provides a key regional connection. Opportunity to advance planning and design through the San Antonio Road Area Plan. BLVD_2 Bryant Street Bike Boulevard Downtown Access Project Install traffic diverters, speed bumps, traffic circles, or other similar interventions on Bryant Boulevard between Embarcadero Road and downtown. Include consideration of a turn restriction from Embarcadero Road going northbound onto Bryant Boulevard. $$ Upgrades priority corridor on the low stress network. Exhibit A 4. Implementation and Funding | 117 PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION BLVD_15 Cowper Street Bike Boulevard Upgrade a bike route to a bike boulevard on Cowper Street from Addison Avenue until East Meadow Drive. Install raised crossings at Hoover Park. Implement traffic calming elements and wayfinding along route and gateway treatments at intersections. Coordinate with BLVD_ CROSSING_12 at Cowper/Embarcadero. $$ Upgrades priority corridor on the low stress network. BLVD_16 Colorado Avenue Bike Boulevard Implement a new bike boulevard on Colorado Avenue from Bryant Street until Middlefield Road. Coordinate with Cowper Street Bike Boulevard project (BLVD_15). Implement traffic calming elements and wayfinding along route and gateway treatments at intersections. $$ Upgrades priority corridor on the low stress network. BLVD_18 Bryant - Nelson - Carlson - Mackay Bike Boulevard Upgrade a bike route to a bike boulevard on a circuitous route from on Bryant Street and connecting streets from East Meadow Drive along Nelson Drive and Mackay Road to San Antonio Road with an improved crossing at San Antonio Road/ Mackay Road-Nita Avenue. Implement traffic calming elements and wayfinding along route and gateway treatments at intersections. This project will be coordinated wtih the Cubberley Master Plan and San Antonio Road Area Plan. $$ Upgrades priority corridor on the low stress network. BLVD_20 Maybell - Donald - Georgia Bike Boulevard Upgrade a bike route and construct a new bike boulevard along Maybell Avenue from El Camino Real to Arastradero Road via Donald Drive and Georgia Ave. Implement traffic calming elements along route to slow down traffic and implement wayfinding signs along route indicating locations such as the Gunn High School Bike Path. Consider gateway treatments at the Arastradero Road entrances. Connect with the Arastradero Road Separated Bikeway project. $$ Upgrades priority corridor on the low stress network and implements a Safe Routes to School priority project. Exhibit A 4. Implementation and Funding | 118 PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION BLVD_22 Park Boulevard Bike Boulevard Create a bike boulevard on Park Boulevard (Castilleja) from Churchill Avenue to E Charleston Road and continuing onto Maclane Street, Wilkie Way and Miller Avenue to Mountain View, with a spur to El Camino Real via Monroe Drive and Cesano Street, and a connection to El Camino Way buffered bike lane via James Road. Maintain existing bike lanes on Park Boulevard between Castilleja/Peers Park and Page Mill Road, yet implement separated bikeways (Class IV) on the segment between Page Mill Road and Lambert Avenue, per the adopted 2024 North Ventura Coordinated Area Plan (NVCAP). Implement traffic calming elements along the route including speed humps or bumps and pinch points. Consider modal filter or other intersection treatment at the West Meadow Drive and West Charleston crossings. Coordinate with Wilkie Way Crossing with West Charleston Road Bike Boulevard Crossing Project (BLVD_ CROSSING_3). Incorporate landscaping and green infrastructure features such as tree wells and plantings in bulbouts. $$ Upgrades priority corridor on the low stress network. BLVD_24 Portage - Olive - Ash Bike Boulevard under NVCAP Proposed bike boulevards on Portage Avenue, Olive Avenue, and Ash Street per the adopted 2024 North Ventura Corridor Area Plan. $$ Adds new connection and coordinates with planned development. BBL_2 Newell Road Buffered Bike Lane Upgrade painted bike lane to a buffered bike lane on Newell Road from Embarcadero Road to Channing Avenue. Requires parking removal to create more comfortable conditions. Coordinate with the Embarcadero Road separated bikeway project to create a safe intersection crossing. $ Upgrades priority corridor on the low stress network. BBL_4 El Camino Way Buffered Bike Lane Upgrade El Camino Way to a buffered bike lane from Los Robles Avenue to Maybell Avenue. Parking removal needed. Intersection improvement and wayfinding at the intersection with West Meadow Drive to connect to the separated bikeway and Wilkie Way bike boulevard. Coordinate with major intersection improvement at El Camino Real and Maybell Avenue intersection and new bike boulevard. Alternatively, consider one-way traffic on El Camino Way to retain parking and accommodate buffered bike lanes. $ Upgrades a key route parallel to El Camino Real to provide a low stress connection. Exhibit A 4. Implementation and Funding | 119 PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION BBL_7 Cambridge Avenue Buffered Bike Lane Stripe a buffered bike lane on Cambridge Avenue and Yale Street from Park Boulevard to California Avenue, crossing El Camino Real. This is an alternate route for use when California Ave is occupied with community events. $ Provides low stress connection and alternate route for through traffic during community events. BBL_8 California Avenue Buffered Bike Lane Upgrade painted bike lane to a buffered bike lane on California Avenue from El Camino Real to Hanover Street. Parking reconfiguration needed to create space for buffered bike lanes. Coordinate with the El Camino Separated Bikeway project and the Hanover Street Buffered Bike Lane project to create smooth intersection crossings. $ Upgrades priority corridor and coordinates with adjacent projects to maximize benefits of investment. BBL_9 Amaranta - Coulombe Buffered Bike Lane Stripe a buffered bike lane on Amaranta Avenue and Coulombe Avenue from Los Robles Avenue to Arastradero Road. Consider design details appropriate for a more rural neighborhood context. Coordinate with Arastradero Road Separated Bikeway to create a safe intersection crossing and consider installing bike boxes and treatments to support bicyclists turning to/ from Arastradero Road. $ Upgrades priority corridor on the low stress network. BL_5 Stanford Avenue Bike Lane connection to Hanover Upgrade bike route and sharrows to painted bike lane on Stanford Avenue from Harvard Street to Dartmouth Street. Connect to existing bike lanes on Stanford Avenue and new Bike Boulevard on Hanover Street. Coordination needed with Stanford University and Escondido Elementary School. Consider a study of impacts of no left turns on to Escondido Road and Hanover Street. $ Upgrades priority corridor on the low stress network. BL_6 California Avenue Bike Lane Paint a bike lane on California Avenue from the Caltrain station to Birch Street. Coordinate with California Avenue Streetscape project. Consider reorientation of parking stalls to create more space for bicycling. $ Upgrades priority corridor on the low stress network and provides key connection to Caltrain Station. Source: Kittelson & Associates, 2025 Note: The planning level rough order of magnitude costs have been estimated and generalized costs, are presented as follows: $Less than $500,000 $$$500,001-$1,500,000 $$$More than $1,500,000 Exhibit A 4. Implementation and Funding | 120 In addition to the recommended bicycle network projects, the following 24 intersection and crossing projects should be considered for near-term implementation and are listed in Table 11. Table 12 lists additional priority projects, including special initiatives such as the Hamilton Avenue Pedestrian Signal Heads and the Ellen Fletcher Bicycle Boulevard Project, which are intended to encourage walking and cycling. It also includes three studies that will further evaluate feasibility and identify specific improvements through more detailed analysis. Of these, nine projects are on either the bicycle or pedestrian HIN. Figure 19 shows the near-term intersection and crossing projects. Table 11: Priority Intersection and Crossing Projects PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION CROSSING_1 Seale Avenue Bike/ Ped Undercrossing for the Churchill Avenue Grade Separation Initiate the design process to construct an undercrossing of Caltrain and Alma Street at Seale Avenue or similar as part of and in advance of the Churchill Grade Separation. $$$ Supports the Caltrain Grade Separation project. CROSSING_9 Matadero Creek Highway 101 Seasonal Undercrossing "Convert the existing Santa Clara Valley Water District (SCVWD) maintenance road along Matadero Creek under Highway 101 to a seasonal public trail with reconfiguration of the approaches and addition of lighting, railings and signage. Constructing the new undercrossing and other improvements will help implement the Matadero Creek Trail/ Midtown Connector project.1 $$$ Implements the Matadero Creek Trail/Midtown Connector, a community supported priority project. CROSSING_10 Midtown Bicycle and Pedestrian Undercrossing Construct a new bicycle and pedestrian undercrossing of Caltrain/Alma Street in the vicinity of El Dorado Avenue and enhance neighborhood approaches, per Council direction. This project implements the South Palo Alto Bike/Ped Connectivity Project and closes a 1.3 mile gap in the City's bicycle and pedestrian network by providing a new east-west connection under the Caltrain tracks between California Avenue and Meadow Drive. $$$ Close a 1.3 mile gap in the network and provide a new low-stress crossing under the Caltrain tracks. Provides connections to schools and other key destinations. 1 This project is on VTA’s Measure B Bike/Ped Candidate Project List, titled “Matadero Creek Trail and Undercrossing at US 101: https://www.vta.org/projects/funding/2016-measure-b#accordion-bicycle---pedestrian Exhibit A 4. Implementation and Funding | 121 PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION BLVD_ CROSSING_1 Chaucer Street crossing of University Avenue Configure the approaches of Chaucer street with bike boxes to prioritize people riding bicycles on this Bicycle Boulevard route. $$Addresses a high- stress crossing. BLVD_ CROSSING_2 Carlson Circle Crossing of E Charleston Rd Configure the approaches of Carlson Circle with bike boxes to prioritize people riding bicycles on this Bicycle Boulevard route. $$Addresses a high- stress crossing. BLVD_ CROSSING_3 Wilkie Way Crossing of West Charleston Road Coordinate with Wilkie Way Crossing with West Charleston Road Bike Boulevard Crossing Project (BLVD_CROSSING_3). $$Addresses a high- stress crossing. BLVD_ CROSSING_4 Cowper Street Crossing of East Meadow Drive Construct jogged connection from Mitchell Park Path to Cowper Street Integrate with East Meadow Street bikeway upgrades. $$Addresses a high- stress crossing. BLVD_ CROSSING_5 Seale Avenue Bike Boulevard Crossing of Middlefield Road Construct a low-stress crossing of Middlefield Road to encourage yielding to bicyclists on this Bicycle Boulevard route. Consider a full intersection median to filter out auto traffic on Seale Ave. $$Addresses a high- stress crossing. BLVD_ CROSSING_7 Greer Road Crossing of Embarcadero Road Configure the approaches of Greer Road with bike boxes to prioritize people riding bicycles on this Bicycle Boulevard route. $$Addresses a high- stress crossing. BLVD_ CROSSING_8 St. Francis Drive crossing of Embarcadero Road Configure the approaches of St. Francis Drive with bike boxes to prioritize people riding bicycles on this Bicycle Boulevard route. $$Addresses a high- stress crossing. BLVD_ CROSSING_10 Bryant St crossing of E Meadow Dr Enhance the crossing of East Meadow Dr with a median island, flashing beacon or hybrid beacon. $$Addresses a high- stress crossing. Exhibit A 4. Implementation and Funding | 122 PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION BLVD_ CROSSING_11 Nelson Dr crossing of E Charleston Rd Enhance the crossing of East Chareleson with a bike box and crossing markings for clear connection between the pathway and bike boulevard. $$Addresses a high- stress crossing. BLVD_ CROSSING_12 Cowper Street Crossing of Embarcadero Road Construct a low-stress crossing of Embarcadero Road at Cowper Street to allow bicycles to cross through. Drivers would be allowed to make right turns onto Cowper Street from Embarcadero but would not be able to turn left or cross through onto Cowper Street. Consider signalization. $$Addresses a high- stress crossing. INTERSECTION_1 Page Mill Road and Hanover Street Intersection Improvement Construct protected intersection design features to improve safety and comfort of this intersection. Consider implementing No Turn on Red restrictions. $$$Addresses a high- stress crossing. INTERSECTION_2 West Meadow Drive and El Camino Way Intersection Improvement Construct protected intersection design features to improve safety and comfort of this intersection. $$$Addresses a high- stress crossing. INTERSECTION_3 Quarry Road and El Camino Real Protected Intersection Construct a protected intersection at Quarry Road and El Camino Real as part of the Quarry Road Transit Connection project. $$$Addresses a high- stress crossing. INTERSECTION_5 California Avenue and El Camino Real Protected Intersection Construct protected intersection design features to improve safety and comfort of this intersection. Coordinate with regional transit agencies to install additional transit improvements. $$$Addresses a high- stress crossing. Exhibit A 4. Implementation and Funding | 123 PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION INTERSECTION_6 Park to Serra Protected Intersection Construct a protected intersection to support circulation between Park Avenue, Serra Avenue bike lanes, El Camino Real, the Serra Avenue pathway, and the Stanford Perimeter Trail. Project will require coordination with Stanford University and Caltrans. $$$Addresses a high- stress crossing. INTERSECTION_7 E Charleston Road and San Antonio Road Intersection Construct protected intersection design features to improve safety and comfort of this intersection in coordination with future bikeway upgrade projects. $$$Addresses a high- stress crossing. INTERSECTION_8 E Charleston Road and Middlefield Road Construct protected intersection design features to improve safety and comfort of this intersection in coordination with future bikeway upgrade projects. $$$Addresses a high- stress crossing. INTERSECTION_9 Maybell Avenue and El Camino Real Construct protected intersection design features to improve safety and comfort of this intersection in coordination with future bikeway upgrade projects. $$$Addresses a high- stress crossing. INTERSECTION_10 Embarcadero Road and El Camino Real Protected Intersection Construct protected intersection design features to improve safety and comfort of this intersection in coordination with future bikeway upgrade projects. $$$Addresses a high- stress crossing. INTERSECTION_11 Quarry Road and Arboretum Road Protected Intersection Construct protected intersection design features to improve safety and comfort of this intersection in coordination with future bikeway upgrade projects. $$$Addresses a high- stress crossing. INTERSECTION_12 San Antonio Road and Middlefield Road Construct protected intersection design features to improve safety and comfort of this intersection in coordination with future bikeway upgrade projects. $$$Addresses a high- stress crossing. Exhibit A 4. Implementation and Funding | 124 Table 12: Other Priority Projects PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION CS_1 California Avenue Community Street Community Street design on California Avenue from Birch Street to El Camino Real to align with the California Avenue Streetscape project. $ Implements community street design on a priority corridor. Study_2 Embarcadero Road Corridor Study Following the recommendations of the Palo Alto Safety Action Plan, conduct a corridor study to understand potential safety countermeasures for use on Embarcadero Road. This will determine the feasibility of the full corridor Embarcadero Road Separated Bikeway project. $ Addresses a high- stress street and high injury corridor and provides a key regional connection. Study_4 Bryant Blvd & E Meadow Crossing Feasibility Study Assess the feasibility of a traffic signal or other crossing treatment to facilitate crossings of the Bryant Street Bicycle Boulevard. This study would be coordinated with SB_18 and BLVD_ CROSSING_10. $ Addresses a high stress crossing of a primary bike route. Study_5 Cal Ave Station Gap Closure project Explore ways to connect Cal Avenue Station over Oregon Expwy to Page Mill Road, over the Page Mill Rd Bridge or via a new connection along the railroad. $$ Closes key gap in the network and enhances access to California Avenue Caltrain Station. SpecProj_1 Hamilton Ave Pedestrian Signal Heads Install pedestrian signal heads on Hamilton Ave in downtown.$$$ Implements pedestrian improvements in an area of high activity. SpecProj_3 Ellen Fletcher Bike Blvd Project Ellen Fletcher Bike Blvd. Project: Work with the Palo Alto Art Center and local volunteers to assign a historic designation to the Fletcher Bicycle Boulevard as the first in the US. Explore collaboration with Palo Alto History Museum. Provide an interactive art installation/digital signage at the El Carmelo/Bryant Bridge that identifies the number of daily cyclists and provides useful education and encouragement messages. Examples are in Fremont. Consider synching with apps like Strava for additional feedback. $ Celebrates the work and accomplishments of an important historic figure. SpecProj_4 Stanford Avenue Pedestrian Crossing Improvements: multiple locations Construct pedestrian crossing and traffic calming improvements along Stanford Avenue between El Camino Real and Bowdoin Street. Treatments may include curb extensions, raised crossings, median islands, leading pedestrian intervals, and other elements to support safer crossings. $$ Addresses high- stress crossings and improves access to key destinations. Exhibit A 125 __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San An to nio R d Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serr a B l v d Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd King s l e y A v e Sea l e A v e Mor e n o A v e Park B l v d Arastra d e r o R d Eve r e t t A v e Bo y c e A v e Welc h R d Chu r c h i l l A v e Porte r D r Oliv e A v e Cam b r i d g e A v e La Do n n a A v e EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F Recommended Near-Term Improvements Class I - Shared Use Path Class IIa - Bike Lane Class IIb - Buffered Bike Lane Class IIIb - Bike Boulevard Class IV - Separated Bikeway Recommended Bike Blvd Crossing Recommended Intersection Improvement Recommended Ped/Bike Bridge or Underpass City of Palo Alto Railroad Caltrain Stop Data Sources: City of Palo Alto, MTC, Kittelson 0 1 2 Miles As of 9/1/2025 Figure 19: Recommended Near-Term Projects Exhibit A 4. Implementation and Funding | 126 4.3 Cost Estimates Generalized cost estimates for bicycle facilities are presented using a simple **$ to $$$** scale to communicate relative order-of-magnitude costs rather than precise estimates. This approach reflects the early planning nature of these concepts and acknowledges that final costs can vary widely based on corridor conditions, right-of-way constraints, drainage, utilities, materials, and the extent of supporting infrastructure. Lower-cost ($) projects typically involve striping, signage, while mid-range ($$) projects may include traffic calming elements, and some signal and curb modifications. Higher-cost ($$$) projects generally require substantial capital investment, such as curb relocation, concrete barriers, drainage improvements, or full roadway and signal reconstruction. This cost framework is intended to support comparison and prioritization, with more detailed cost estimates developed as projects advance through design. 4.4 Funding Sources Bicycle and pedestrian projects can be funded through a range of local, regional, state, and federal sources. To enhance its competitiveness for these funds, the City of Palo Alto should ensure its projects align with the core goals of the funding programs—typically centered on equity, safety, sustainability, and connectivity. Besides dedicated funding sources, some bicycle and pedestrian projects can be implemented by integrating project elements into streets scheduled for repaving through the City’s five-year paving plan. Certain grants such as Transportation Fund for Clean Air (TFCA) require a project to reduce motor vehicle emissions or traffic congestion to be eligible for funding.1 All near-term implementation projects identified in the 2026 BPTP meet this criterion, as they were prioritized for their ability to improve access to transit and encourage mode shift. Similarly, the Active Transportation Program (ATP) requires applicants to show public health, safety, and greenhouse gas reduction benefits, as well as evidence of strong community engagement.2 The near-term projects satisfy these requirements, having received broad community support while advancing health, safety, and sustainability outcomes. Project readiness is another key factor; projects that have completed environmental clearance, secured right-of-way, and are close to being shovel-ready are often prioritized. In addition, strong support from key agency partners such as VTA, Caltrans, schools, nonprofit organizations, and neighboring jurisdictions can significantly strengthen a project’s application. 1 Bay Area Air District. TFCA Regional Fund. Accessed from https://www.baaqmd.gov/funding-and-incentives/funding- sources/regional-fund 2 California Transportation Commission. Active Transportation Program. Accessed from https://catc.ca.gov/programs/active- transportation-program Exhibit A 4. Implementation and Funding | 127 Exhibit A 5. Conclusion | 128 5. CONCLUSION 128 Exhibit A 5. Conclusion | 129 Safe and Inclusive Connected and Accessible Community- Led and Cooperative Comfortable and Enjoyable Integrated and Collaborative The Plan provides for both near-term and long-term investment in infrastructure, programs, and policies to support the Plan’s vision and objectives. Together, these components create a comprehensive approach that will guide, prioritize, and implement a network of quality bicycle and pedestrian facilities to improve mobility, connectivity, and public health throughout Palo Alto. The 2026 Bicycle and Pedestrian Transportation Plan promotes and encourages active and sustainable transportation in Palo Alto and establishes the City’s vision and comprehensive approach to improving conditions for walking, biking, and rolling. The vision is a universally accessible, safe, convenient, and integrated system that promotes walking and biking for people of all ages and abilities. The Plan’s performance measures allow for the ongoing tracking of progress towards implementation of the five objectives: Exhibit A Exhibit A PABAC’s Requested Changes to the Final 2026 BPTP and City Staff’s Response PABAC’s Requested Change City Staff Response 1. Policy & Programmatic Amendments a. Amend SI-1.9: Street Closure Policy: On page 107 and on Appendix C: Amend SI-1.9 description to include the following language: Clarify Comprehensive Plan Policy T-4.1 with PABAC’s recommended language: “Keep all neighborhood streets open as a general rule. Street closures may be considered when such closure will enhance safety or will increase use of active transportation modes.” Not recommended. PABAC recommended a formal amendment due to concerns that T-4.1 might inadvertently block modal filters on bike boulevards or school routes. Staff has reexamined T-4.1 and finds that an amendment is unnecessary. Modal filters do not close streets as defined by the California Vehicle Code; they safely manage and reroute traffic under the clear authority of Comp Plan Policies T-4.2 and T-4.3. b. Bicycle Friendly Street Design: In the Final Plan’s Policies and Programs section (3.4): Include a new policy that reads: In accordance with Comprehensive Plan Policy T-3.5 (When constructing or modifying roadways, plan for use of the roadway by all users), include a directive that the City should affirm that all City streets—not only designated bikeways—should be bike friendly streets to the extent possible. This includes exploring speed limits, traffic calming, restriping, and parking removal on non- bikeway streets to accommodate cyclists whose origins/destinations lie outside the designated network. Not recommended. The City’s Complete Streets Policy1 addresses this concern. c. Class IV and Class I Implementation Guidance: In the Final Plan’s Policies and Programs section (3.4): Include a new policy that reads: The City should implement Class IV separated bikeways and Class I multi-use paths adjacent to roadways with caution. Evaluation must prioritize mitigating potential turning conflicts at driveways/intersections (especially for e-bikes) and ensuring facilities do not introduce new hazards that cannot be reasonably mitigated. Not recommended. The City’s commitment to a Safe Systems Approach as well as best practices and use of context-sensitive designs will address this concern. d. Enhancement of Education (Program CC-1.4): Rewrite CC-1.4 (Bike Education Program) on page 104 and on Appendix C to read: The City should take further steps to develop and partner with groups to advertise and carry out bike safety and education classes in the city, Agreed. Staff will incorporate the requested change into the Adopted Final Plan. 1 City of Palo Alto, California. Complete Streets Policy (Resolution 9562). November 30, 2015. https://www.paloalto.gov/files/assets/public/v/1/transportation/misc-transportation/resolution-9562_complete-streets-policy.pdf PABAC’s Requested Change City Staff Response including classes oriented towards children, older adults, and non-English speakers. Include driver education to encourage safer driving behavior, including in the presence of bicycles. e. Removal of Program CE-1.10: On page 102 and on Appendix C, remove reference to "Bike Racks on Buses" as VTA’s Wheels On The Bus program is not currently being implemented. Agreed. Staff will incorporate the requested change into the Adopted Final Plan. 2. Project-Specific Modifications a. Project SB_19 (Alma Street Separated Bikeway South): Rewrite project description to read: Evaluate the feasibility of a two-way separated cycle track on Alma Street from San Antonio Road to E. Meadow Drive. And remove the project from the Plan’s Near- term project list Agreed. Staff will include the requested text in the project description as another option to consider, instead of replacing the existing text, for the Adopted Final Plan. Not recommended. Staff does not recommend removing the project from the near-term project list since it aligns with the San Antonio Road Area Plan recommendations and Council’s recent action to use TDA3 monies to expedite construction of the South Palo Alto Bikeways Demonstration project from E. Meadow Dr. to Fabian Way, which connects to this recommended project. b. Project SB_20c (San Antonio Road Separated Bikeway): Amend the project description and scope to focus instead on a joint planning effort with the City of Mountain View to develop a high-capacity facility serving the Caltrain Station, connecting through to the San Antonio Shopping Center via Pachetti Way and California Street Agreed. Staff will amend the project description as follows: Construct a new separated bikeway along San Antonio Road from Middlefield Road to Mountain View either along the Caltrain overcrossing or via other connections through to the San Antonio Shopping Center via Pacchetti Way and California Street. City Council Requested Changes Incorporated Into the Final Plan City Council’s Requested Change The Document Change 1. Proactively addressing the rapid growth of e-bikes/e-motos a. Include efforts to proactively address the rapid growth of e- bikes and e-motos in future facility design, programmatic, and educational efforts. The Final Plan incorporates several policies and programs related to e-bicycles and e-motoes, including: 1. CC-1.4: Bike Education Program 2. IE-1.4: Effective Regulation and Education on E- bikes 3. IC-1.5: Electric Bicycle Engagement Strategy 4. IC-1.6: Electric Bicycle Management 2. Ensure seamless alignment with other key City efforts a. Ensure the 2026 BPTP recommendations align with other recent and ongoing key City efforts. This includes enhanced alignment with the San Antonio Road Area Plan, the North Ventura Coordinated Area Plan (NVCAP), the Cubberley Master Plan, and the South Palo Alto Bike/Ped Connectivity Project. The Final Plan ensures alignment with other relevant or current City efforts, by: 1. Creating a Bicycle Friendly Zone around the neighborhood block of Cubberley Community Center and Mitchell Park & Community Center 2. Prioritizing active transportation projects along San Antonio Road (SB_20 series) and a portion of Alma Street (SB_19) near the San Antonio Caltrain Station 3. Prioritizing NVCAP recommendations for Ash St., Olive Ave., and Portage Ave. via project BLVD_24 4. Reflecting Council’s recent decision to advance El Dorado Avenue for the “Midtown Bicycle and Pedestrian Undercrossing.” (CROSSING_10) 3. Review Comprehensive Plan Policies that may limit future safety improvements a. Include a directive to evaluate 2030 Comprehensive Plan policies that could impede the implementation of critical safety projects, particularly on bicycle boulevards. The Final Plan includes the following Comprehensive Plan- related policies: 1. SI-1.9: Revisit Street Closure Policy (Comprehensive Plan Policy T-4.1)—Staff will remove SI-1.9 from the Adopted Final Plan since it is no longer needed per City staff review.1 2. SI-1.10: Review Comprehensive Plan Policies 3. CE-1.3: Vertical Curb Standard 4. Project-Specific Modifications a. Middlefield Road: Instead of corridor wide improvements, prioritize improvements along segments of Middlefield Avenue that provide access to key destinations, such as commercial centers and schools. Also, focus on segments that connect the The Final Plan prioritizes key segments only rather than corridor-wide improvements. Projects SB_11a and SB_11c on the near-term list prioritize a separated bikeway from Menlo Park to Everett Avenue for intercity connection and from California Avenue to Loma Verde Drive to make improvements around a school and shopping center. 1 In May 2026, City staff reexamined 2030 Comprehensive Plan Policy T-4.1 and found that a policy amendment is not necessary to implement modal filters since modal filters do not close streets as defined by the California Vehicle Code; and safely manage and reroute traffic under the clear authority of 2030 Comprehensive Plan Policies T-4.2 and T-4.3. City Council’s Requested Change The Document Change City’s activity centers to neighboring jurisdictions. b. Prioritize the Bol Park Path- Chimalus Drive Easement (SUP_14) to support the Midtown Bicycle and Pedestrian Undercrossing Project (CROSSING_10). The Bol Park Path-Chimalus Drive Easement Shared Use Path project (SUP_14) is on the Final Plan’s Near-term Project List. c. Enhance the connection for students and other cyclists heading to and at the Churchill/Alma railroad crossing. The Final Plan includes a new project on the list, SB_24: Churchill Avenue Separated Bikeway from Alma Street to Bryant Street, including incorporating a bike box and No Turn on Red When Children are Present restrictions at Churchill/Alma; and a traffic circle at Churchill/Bryant. d. Prioritize additional safe routes to schools. The Final Plan prioritizes additional projects along safe routes to school corridors: BLVD_20 (Maybell-Georgia- Donald Bike Boulevard), BBL_2 (Newell from Embarcadero Road to Channing Avenue), and BLVD_16 (Colorado Ave Bike Boulevard). e. Support for the Cowper Street Bike Boulevard project (BLVD_15), with a request to extend project boundaries past Embarcadero Road if the Plan also incorporates an intersection signalization project at Cowper/Embarcadero. The Final Plan extends the project boundaries for the Cowper Street Bike Boulevard (BLVD_15) to be from Addison Avenue to E. Meadow Drive, including a new Bike Blvd. intersection improvement project (BLVD_CROSSING_12) that considers signalization at Cowper/Embarcadero. Both projects are on the Final Plan’s Near-term Project List. 5. Programmatic-Specific Modifications a. Include exploring a private bike parking subsidy program and providing more driver education in the Programs & Policies section. The Final Plan includes CC-1.14: Community Partnerships Program that includes exploring a private bike parking subsidy program, and CC-1.4: Bike Education Program that calls out driver education to encourage safer driving behavior. b. More pedestrian-focused recommendations. The Final Plan has several policies and programs related to pedestrian improvements, including: 1. SI-1.13: Prioritize Maintenance of Bicycle and Pedestrian Facilities 2. SI-1.16: Incorporate Pedestrian Improvements Into Repaving Program 3. CA-1.2: Bicycle and Pedestrian Capital Improvement Program 4. CA-1.14: Sidewalk Gap Closure Program 5. CE-1.2: Implement Pedestrian District Guidelines and Toolbox 4. Implementation and Funding | 115 Table 10: Near-Term Bicycle Projects PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION SUP_1 Quarry Road Transit Connection Project Construct extension and upgrade existing trail from the intersection with El Camino Real to the Palo Alto Transit Center and Mitchell Lane as part of the Quarry Road Transit Connection Project. $$ High level of project readiness and strong community support, improves access to transit. SUP_14 Bol Park Path - Chimalus Path Spur Continue to work with the community to explore the feasibility of a Chimalus Path connection from the Bol Park Path to El Camino Real. $$$ High level of community interest, provides low-stress route to multiple destinations. SB_11a Middlefield Road Separated Bikeway Connection to Menlo Park Construct a new separated bikeway from Menlo Park to Everett Ave to allow for intercity connectivity. $$$ Addresses a high- stress street and high injury corridor and provides a key regional connection. SB_11c Middlefield Road Separated Bikeway Construct a new separated bikeway from California Avenue to Loma Verde Drive.$$$ Addresses a high stress street, high injury corridor and provides a key regional connection. SB_12 Homer Avenue Separated Bikeway Upgrade a painted bike lane to a buffered or separated bikeway on north side and Extend the separated bikeway on south side on Homer Avenue from Alma Street to Bryant Street. $$$ Closes key gap in the network and enhances access to Homer Tunnel. SB_18 East/West Meadow Drive Separated Bikeway Upgrade a painted bike lane to separated bikeway on West Meadow Drive from El Camino Way to Alma street and continue onto East Meadow Drive from Alma Street to Fabian Way. Consider raised crossings to slow traffic and create safer crossings for students. Coordinate with Study_4: E. Meadow & Bryant St. Crossing Feasibility Study. $$$ Addresses a high- stress street and high injury corridor and provides a key regional connection. SB_19 Alma Street Separated Bikeway - South Construct a new one-way separated bikeway on each side of the road Alma Street from East East Charleston Road to San Antionio Road to connect with Central Expresssway in Mountain View. Lane reconfiguration needed to create space for separated bikeway with quick-build or civil reconstruction to create raised cycle track in long term. $$$ Addresses a high- stress street and high injury corridor and provides a key regional connection and connection to San Antonio Caltrain Station. Opportunity to advance planning and design through the San Antonio Road Area Plan. 4. Implementation and Funding | 116 PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION SB_20a San Antonio Avenue Separated Bikeway Construct a new separated bikeway along San Antonio Avenue frontage street from Alma Street to Middlefield Road. $$$ Addresses a high stress street and high injury corridor and provides a key regional Connection. Opportunity to advance planning and design through the San Antonio Road Area Plan. SB_20b San Antonio Road Separated Bikeway Construct a new separated bikeway along San Antonio Road from Middlefield Road to East Bayshore Road. Request new developers to reconstruct street according to new design. Coordinate with the City’s San Antonio Area Planning efforts and with surrounding towns to create smooth transition between cities. $$$ Addresses a high stress street and high injury corridor and provides a key regional Connection. Opportunity to advance planning and design through the San Antonio Road Area Plan. SB_20c San Antonio Road Separated Bikeway into Mountain View Construct a new separated bikeway along San Antonio Road from Mountainview, along the overcrossing to Middlefield Road. $$$ Addresses a high stress street and high injury corridor and provides a key regional Connection. Opportunity to advance planning and design through the San Antonio Road Area Plan. SB_23 Fabian Way Separated Bikeway Coordinate with the existing South Palo Alto Bikeways Demonstration Project as part of the Palo Alto Safety Action Plan. Upgrade painted bike lane to buffered and/ or separated bikeway along Fabian Way from East Meadow Drive until Charleston Road to separate road users and create a more low-stress route for school commutes. Lane reconfiguration needed. $$$ Addresses a high- stress street and high injury corridor and provides a key regional connection. Opportunity to advance planning and design through the San Antonio Road Area Plan. BLVD_2 Bryant Street Bike Boulevard Downtown Access Project Install traffic diverters, speed bumps, traffic circles, or other similar interventions on Bryant Boulevard between Embarcadero Road and downtown. Include consideration of a turn restriction from Embarcadero Road going northbound onto Bryant Boulevard. $$ Upgrades priority corridor on the low stress network. 4. Implementation and Funding | 117 PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION BLVD_15 Cowper Street Bike Boulevard Upgrade a bike route to a bike boulevard on Cowper Street from Addison Avenue until East Meadow Drive. Install raised crossings at Hoover Park. Implement traffic calming elements and wayfinding along route and gateway treatments at intersections. Coordinate with BLVD_ CROSSING_12 at Cowper/Embarcadero. $$ Upgrades priority corridor on the low stress network. BLVD_16 Colorado Avenue Bike Boulevard Implement a new bike boulevard on Colorado Avenue from Bryant Street until Middlefield Road. Coordinate with Cowper Street Bike Boulevard project (BLVD_15). Implement traffic calming elements and wayfinding along route and gateway treatments at intersections. $$ Upgrades priority corridor on the low stress network. BLVD_18 Bryant - Nelson - Carlson - Mackay Bike Boulevard Upgrade a bike route to a bike boulevard on a circuitous route from on Bryant Street and connecting streets from East Meadow Drive along Nelson Drive and Mackay Road to San Antonio Road with an improved crossing at San Antonio Road/ Mackay Road-Nita Avenue. Implement traffic calming elements and wayfinding along route and gateway treatments at intersections. This project will be coordinated wtih the Cubberley Master Plan and San Antonio Road Area Plan. $$ Upgrades priority corridor on the low stress network. BLVD_20 Maybell - Donald - Georgia Bike Boulevard Upgrade a bike route and construct a new bike boulevard along Maybell Avenue from El Camino Real to Arastradero Road via Donald Drive and Georgia Ave. Implement traffic calming elements along route to slow down traffic and implement wayfinding signs along route indicating locations such as the Gunn High School Bike Path. Consider gateway treatments at the Arastradero Road entrances. Connect with the Arastradero Road Separated Bikeway project. $$ Upgrades priority corridor on the low stress network and implements a Safe Routes to School priority project. 4. Implementation and Funding | 118 PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION BLVD_22 Park Boulevard Bike Boulevard Create a bike boulevard on Park Boulevard (Castilleja) from Churchill Avenue to E Charleston Road and continuing onto Maclane Street, Wilkie Way and Miller Avenue to Mountain View, with a spur to El Camino Real via Monroe Drive and Cesano Street, and a connection to El Camino Way buffered bike lane via James Road. Maintain existing bike lanes on Park Boulevard between Castilleja/Peers Park and Page Mill Road, yet implement separated bikeways (Class IV) on the segment between Page Mill Road and Lambert Avenue, per the adopted 2024 North Ventura Coordinated Area Plan (NVCAP). Implement traffic calming elements along the route including speed humps or bumps and pinch points. Consider modal filter or other intersection treatment at the West Meadow Drive and West Charleston crossings. Coordinate with Wilkie Way Crossing with West Charleston Road Bike Boulevard Crossing Project (BLVD_ CROSSING_3). Incorporate landscaping and green infrastructure features such as tree wells and plantings in bulbouts. $$ Upgrades priority corridor on the low stress network. BLVD_24 Portage - Olive - Ash Bike Boulevard under NVCAP Proposed bike boulevards on Portage Avenue, Olive Avenue, and Ash Street per the adopted 2024 North Ventura Corridor Area Plan. $$ Adds new connection and coordinates with planned development. BBL_2 Newell Road Buffered Bike Lane Upgrade painted bike lane to a buffered bike lane on Newell Road from Embarcadero Road to Channing Avenue. Requires parking removal to create more comfortable conditions. Coordinate with the Embarcadero Road separated bikeway project to create a safe intersection crossing. $ Upgrades priority corridor on the low stress network. BBL_4 El Camino Way Buffered Bike Lane Upgrade El Camino Way to a buffered bike lane from Los Robles Avenue to Maybell Avenue. Parking removal needed. Intersection improvement and wayfinding at the intersection with West Meadow Drive to connect to the separated bikeway and Wilkie Way bike boulevard. Coordinate with major intersection improvement at El Camino Real and Maybell Avenue intersection and new bike boulevard. Alternatively, consider one-way traffic on El Camino Way to retain parking and accommodate buffered bike lanes. $ Upgrades a key route parallel to El Camino Real to provide a low stress connection. 4. Implementation and Funding | 119 PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION BBL_7 Cambridge Avenue Buffered Bike Lane Stripe a buffered bike lane on Cambridge Avenue and Yale Street from Park Boulevard to California Avenue, crossing El Camino Real. This is an alternate route for use when California Ave is occupied with community events. $ Provides low stress connection and alternate route for through traffic during community events. BBL_8 California Avenue Buffered Bike Lane Upgrade painted bike lane to a buffered bike lane on California Avenue from El Camino Real to Hanover Street. Parking reconfiguration needed to create space for buffered bike lanes. Coordinate with the El Camino Separated Bikeway project and the Hanover Street Buffered Bike Lane project to create smooth intersection crossings. $ Upgrades priority corridor and coordinates with adjacent projects to maximize benefits of investment. BBL_9 Amaranta - Coulombe Buffered Bike Lane Stripe a buffered bike lane on Amaranta Avenue and Coulombe Avenue from Los Robles Avenue to Arastradero Road. Consider design details appropriate for a more rural neighborhood context. Coordinate with Arastradero Road Separated Bikeway to create a safe intersection crossing and consider installing bike boxes and treatments to support bicyclists turning to/ from Arastradero Road. $ Upgrades priority corridor on the low stress network. BL_5 Stanford Avenue Bike Lane connection to Hanover Upgrade bike route and sharrows to painted bike lane on Stanford Avenue from Harvard Street to Dartmouth Street. Connect to existing bike lanes on Stanford Avenue and new Bike Boulevard on Hanover Street. Coordination needed with Stanford University and Escondido Elementary School. Consider a study of impacts of no left turns on to Escondido Road and Hanover Street. $ Upgrades priority corridor on the low stress network. BL_6 California Avenue Bike Lane Paint a bike lane on California Avenue from the Caltrain station to Birch Street. Coordinate with California Avenue Streetscape project. Consider reorientation of parking stalls to create more space for bicycling. $ Upgrades priority corridor on the low stress network and provides key connection to Caltrain Station. Source: Kittelson & Associates, 2025 Note: The planning level rough order of magnitude costs have been estimated and generalized costs, are presented as follows: $Less than $500,000 $$$500,001-$1,500,000 $$$More than $1,500,000 4. Implementation and Funding | 120 In addition to the recommended bicycle network projects, the following 24 intersection and crossing projects should be considered for near-term enhancements and are listed in Table 11. Table 12 lists additional priority projects, including special initiatives such as the Hamilton Avenue Pedestrian Signal Heads and the Ellen Fletcher Bicycle Boulevard Project, which are intended to encourage walking and cycling. It also includes three studies that will further evaluate feasibility and identify specific improvements through more detailed analysis. Of all these, nine projects are on either the bicycle or pedestrian HIN. Figure 19 shows the near-term bikeway, intersection and crossing projects. Table 11: Priority Intersection and Crossing Projects PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION CROSSING_1 Seale Avenue Bike/ Ped Undercrossing for the Churchill Avenue Grade Separation Initiate the design process to construct an undercrossing of Caltrain and Alma Street at Seale Avenue or similar as part of and in advance of the Churchill Grade Separation. $$$ Supports the Caltrain Grade Separation project. CROSSING_9 Matadero Creek Highway 101 Seasonal Undercrossing "Convert the existing Santa Clara Valley Water District (SCVWD) maintenance road along Matadero Creek under Highway 101 to a seasonal public trail with reconfiguration of the approaches and addition of lighting, railings and signage. Constructing the new undercrossing and other improvements will help implement the Matadero Creek Trail/ Midtown Connector project.1 $$$ Implements the Matadero Creek Trail/Midtown Connector, a community supported priority project. CROSSING_10 Midtown Bicycle and Pedestrian Undercrossing Construct a new bicycle and pedestrian undercrossing of Caltrain/Alma Street in the vicinity of El Dorado Avenue and enhance neighborhood approaches, per Council direction. This project implements the South Palo Alto Bike/Ped Connectivity Project and closes a 1.3 mile gap in the City's bicycle and pedestrian network by providing a new east-west connection under the Caltrain tracks between California Avenue and Meadow Drive. $$$ Close a 1.3 mile gap in the network and provide a new low-stress crossing under the Caltrain tracks. Provides connections to schools and other key destinations. 1 This project is on VTA’s Measure B Bike/Ped Candidate Project List, titled “Matadero Creek Trail and Undercrossing at US 101: https://www.vta.org/projects/funding/2016-measure-b#accordion-bicycle---pedestrian 4. Implementation and Funding | 121 PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION BLVD_ CROSSING_1 Chaucer Street crossing of University Avenue Configure the approaches of Chaucer street with bike boxes to prioritize people riding bicycles on this Bicycle Boulevard route. $$Addresses a high- stress crossing. BLVD_ CROSSING_2 Carlson Circle Crossing of E Charleston Rd Configure the approaches of Carlson Circle with bike boxes to prioritize people riding bicycles on this Bicycle Boulevard route. $$Addresses a high- stress crossing. BLVD_ CROSSING_3 Wilkie Way Crossing of West Charleston Road Coordinate with Wilkie Way Crossing with West Charleston Road Bike Boulevard Crossing Project (BLVD_CROSSING_3). $$Addresses a high- stress crossing. BLVD_ CROSSING_4 Cowper Street Crossing of East Meadow Drive Construct jogged connection from Mitchell Park Path to Cowper Street Integrate with East Meadow Street bikeway upgrades. $$Addresses a high- stress crossing. BLVD_ CROSSING_5 Seale Avenue Bike Boulevard Crossing of Middlefield Road Construct a low-stress crossing of Middlefield Road to encourage yielding to bicyclists on this Bicycle Boulevard route. Consider a full intersection median to filter out auto traffic on Seale Ave. $$Addresses a high- stress crossing. BLVD_ CROSSING_7 Greer Road Crossing of Embarcadero Road Configure the approaches of Greer Road with bike boxes to prioritize people riding bicycles on this Bicycle Boulevard route. $$Addresses a high- stress crossing. BLVD_ CROSSING_8 St. Francis Drive crossing of Embarcadero Road Configure the approaches of St. Francis Drive with bike boxes to prioritize people riding bicycles on this Bicycle Boulevard route. $$Addresses a high- stress crossing. BLVD_ CROSSING_10 Bryant St crossing of E Meadow Dr Enhance the crossing of East Meadow Dr with a median island, flashing beacon or hybrid beacon. $$Addresses a high- stress crossing. 4. Implementation and Funding | 122 PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION BLVD_ CROSSING_11 Nelson Dr crossing of E Charleston Rd Enhance the crossing of East Chareleson with a bike box and crossing markings for clear connection between the pathway and bike boulevard. $$Addresses a high- stress crossing. BLVD_ CROSSING_12 Cowper Street Crossing of Embarcadero Road Construct a low-stress crossing of Embarcadero Road at Cowper Street to allow bicycles to cross through. Drivers would be allowed to make right turns onto Cowper Street from Embarcadero but would not be able to turn left or cross through onto Cowper Street. Consider signalization. $$Addresses a high- stress crossing. INTERSECTION_1 Page Mill Road and Hanover Street Intersection Improvement Construct protected intersection design features to improve safety and comfort of this intersection. Consider implementing No Turn on Red restrictions. $$$Addresses a high- stress crossing. INTERSECTION_2 West Meadow Drive and El Camino Way Intersection Improvement Construct protected intersection design features to improve safety and comfort of this intersection. $$$Addresses a high- stress crossing. INTERSECTION_3 Quarry Road and El Camino Real Protected Intersection Construct a protected intersection at Quarry Road and El Camino Real as part of the Quarry Road Transit Connection project. $$$Addresses a high- stress crossing. INTERSECTION_5 California Avenue and El Camino Real Protected Intersection Construct protected intersection design features to improve safety and comfort of this intersection. Coordinate with regional transit agencies to install additional transit improvements. $$$Addresses a high- stress crossing. 4. Implementation and Funding | 123 PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION INTERSECTION_6 Park to Serra Protected Intersection Construct a protected intersection to support circulation between Park Avenue, Serra Avenue bike lanes, El Camino Real, the Serra Avenue pathway, and the Stanford Perimeter Trail. Project will require coordination with Stanford University and Caltrans. $$$Addresses a high- stress crossing. INTERSECTION_7 E Charleston Road and San Antonio Road Intersection Construct protected intersection design features to improve safety and comfort of this intersection in coordination with future bikeway upgrade projects. $$$Addresses a high- stress crossing. INTERSECTION_8 E Charleston Road and Middlefield Road Construct protected intersection design features to improve safety and comfort of this intersection in coordination with future bikeway upgrade projects. $$$Addresses a high- stress crossing. INTERSECTION_9 Maybell Avenue and El Camino Real Construct protected intersection design features to improve safety and comfort of this intersection in coordination with future bikeway upgrade projects. $$$Addresses a high- stress crossing. INTERSECTION_10 Embarcadero Road and El Camino Real Protected Intersection Construct protected intersection design features to improve safety and comfort of this intersection in coordination with future bikeway upgrade projects. $$$Addresses a high- stress crossing. INTERSECTION_11 Quarry Road and Arboretum Road Protected Intersection Construct protected intersection design features to improve safety and comfort of this intersection in coordination with future bikeway upgrade projects. $$$Addresses a high- stress crossing. INTERSECTION_12 San Antonio Road and Middlefield Road Construct protected intersection design features to improve safety and comfort of this intersection in coordination with future bikeway upgrade projects. $$$Addresses a high- stress crossing. 4. Implementation and Funding | 124 Table 12: Other Priority Projects PROJECT NUMBER PROJECT NAME DESCRIPTION GENERALIZED COST JUSTIFICATION CS_1 California Avenue Community Street Community Street design on California Avenue from Birch Street to El Camino Real to align with the California Avenue Streetscape project. $ Implements community street design on a priority corridor. Study_2 Embarcadero Road Corridor Study Following the recommendations of the Palo Alto Safety Action Plan, conduct a corridor study to understand potential safety countermeasures for use on Embarcadero Road. This will determine the feasibility of the full corridor Embarcadero Road Separated Bikeway project. $ Addresses a high- stress street and high injury corridor and provides a key regional connection. Study_4 Bryant Blvd & E Meadow Crossing Feasibility Study Assess the feasibility of a traffic signal or other crossing treatment to facilitate crossings of the Bryant Street Bicycle Boulevard. This study would be coordinated with SB_18 and BLVD_ CROSSING_10. $ Addresses a high stress crossing of a primary bike route. Study_5 Cal Ave Station Gap Closure project Explore ways to connect Cal Avenue Station over Oregon Expwy to Page Mill Road, over the Page Mill Rd Bridge or via a new connection along the railroad. $$ Closes key gap in the network and enhances access to California Avenue Caltrain Station. SpecProj_1 Hamilton Ave Pedestrian Signal Heads Install pedestrian signal heads on Hamilton Ave in downtown.$$$ Implements pedestrian improvements in an area of high activity. SpecProj_3 Ellen Fletcher Bike Blvd Project Ellen Fletcher Bike Blvd. Project: Work with the Palo Alto Art Center and local volunteers to assign a historic designation to the Fletcher Bicycle Boulevard as the first in the US. Explore collaboration with Palo Alto History Museum. Provide an interactive art installation/digital signage at the El Carmelo/Bryant Bridge that identifies the number of daily cyclists and provides useful education and encouragement messages. Examples are in Fremont. Consider synching with apps like Strava for additional feedback. $ Celebrates the work and accomplishments of an important historic figure. SpecProj_4 Stanford Avenue Pedestrian Crossing Improvements: multiple locations Construct pedestrian crossing and traffic calming improvements along Stanford Avenue between El Camino Real and Bowdoin Street. Treatments may include curb extensions, raised crossings, median islands, leading pedestrian intervals, and other elements to support safer crossings. $$ Addresses high- stress crossings and improves access to key destinations. 125 __`101 §¨¦280 ∙þ82 Midd l e f i e l d R d Alma S t Brya n t S t Ham i l t o n A v e Univ e r s i t y A v e Lyt t o n A v e Add i s o n A v e New e l l R d Channing Ave Sand H i l l R d Cow p e r S t Embarca d e r o R d Loui s R d Ore g o n E x p y Cali f o r n i a A v e Cal i f o r n i a A v e Pag e M i l l R d Color a d o A v e Lom a V e r d e A v e Mead o w D r El D o r a d o A v e Charl e s t o n R d Fa b i a n W y San Antonio Rd Bay s h o r e R d Gree r R d El Ca m i n o R e a l Los R o b l e s A v e Wilki e W y Ara s t r a d e r o R d Foot h i l l E x p y Han o v e r S t Hil l v i e w A v e Junipero Serra Blvd Sta n f o r d A v e Ross R d Mat a d e r o A v e May b e l l A v e Hom e r A v e Color a d o A v e El Ca m i n o R e a l Mille r A v e Centra l E x p y Middlefield Rd King s l e y A v e Sea l e A v e Mor e n o A v e Park B l v d Arastra d e r o R d Eve r e t t A v e Bo y c e A v e Welc h R d Chu r c h i l l A v e Porte r D r Oliv e A v e Cam b r i d g e A v e La Do n n a A v e EAST PALO ALTOMENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS Byxbee Park Mitchell Park Hoover Park Pearson-Arastradero Preserve Greer Park Eleanor Pardee Park Ramos Park Robles Park Bol Park Alta Mesa Memorial Park Rinconada Park Baylands Nature Preserve Palo Alto High School Gunn High School JLS Middle School Greene Middle School Fletcher Middle School Walter Hays Elementary Duveneck Elementary Ohlone Elementary El Carmelo Elementary Palo Verde Elementary Addison Elementary Hoover Elementary Greendell School Juana Briones Elementary Barron Park Elementary Lucille M. Nixon Elementary School Escondido Elementary School Palo Alto Caltrain California Ave Caltrain San Antonio Caltrain Menlo Park Caltrain Palo Alto Airport Mata d e r o C r e e k Barro n C r e e k Adobe C r e e k __`101 §¨¦280 ∙þ82 EAST PALO ALTO MENLO PARK STANFORD UNIVERSITY LOS ALTOS MOUNTAIN VIEW LOS ALTOS HILLS PALO ALTO PORTOLA VALLEY F Recommended Near-Term Improvements Class I - Shared Use Path Class IIa - Bike Lane Class IIb - Buffered Bike Lane Class IIIb - Bike Boulevard Class IV - Separated Bikeway Recommended Bike Blvd Crossing Recommended Intersection Improvement Recommended Ped/Bike Bridge or Underpass City of Palo Alto Railroad Caltrain Stop Data Sources: City of Palo Alto, MTC, Kittelson 0 1 2 Miles As of 9/1/2025 Figure 19: Recommended Near-Term Projects From:Beth Guislin To:Council, City Subject:2026 Bicycle and Pedestrian Transportation Plan Date:Monday, June 15, 2026 11:54:08 AM CAUTION: This email originated from outside of the organization. Be cautiousof opening attachments and clicking on links. i Please do not approve the 2026 Bicycle and Pedestrian Transportation Plan in its entirety. In a recent reconfiguration of Middlefield from University to the northern city border, city staff concluded Middlefield was not wide enough to include bike lanes. Beth Guislin Resident, Middlefield Rd This message needs your attention This is a personal email address. This is their first email to you. Mark Safe Report From:Alan Wachtel To:Council, City Subject:Bicycle and Pedestrian Transportation Plan Approval (Jun 15 meeting, Agenda Item 24) Date:Sunday, June 14, 2026 8:54:36 PM CAUTION: This email originated from outside of the organization. Be cautiousof opening attachments and clicking on links. i Members of the Council: I'm writing to you as a long-time member of the City's Pedestrian and Bicycle Advisory Committee (PABAC). The updated Bicycle and Pedestrian Transportation Plan (BPTP) that will be presented for your approval at this meeting reflects the enormous time and effort that have gone into it. It has many good points, and staff and consultants deserve a great deal of credit for their efforts, but there also areas where room remains for significant improvement. At its May 7 meeting, by a vote of 12-0, with one abstention, PABAC approved a series of policy and programmatic amendments and project-specific modifications to the BPTP. These changes have been set out in Attachment B to your agenda. Of eight proposals, city staff agrees with four and recommends against four. I urge you instead to adopt all eight of PABAC's carefully considered proposals and to direct staff accordingly to incorporate them into the final BPTP. Here, I'll draw your attention particularly to changes b and c. Change b, Bicycle Friendly Street Design The draft plan's proposals for bicycle infrastructure are limited almost exclusively to designated bikeways. But even the most optimistic scenario, in which the Complete Vision Network is fully built out at some distant future date, would provide bikeways on only about half of City streets. Yet cyclists will still have a significant need to travel on most of the remaining non-bikeway streets, because their origins and destinations cannot always lie on designated bikeways. As long ago as 1978, Caltrans's "Planning and Design Criteria for Bikeways in California" found that "Probably the most important effort that could be undertaken to enhance bicycle travel would be improved maintenance and upgrading of existing roads that are used regularly by bicyclists, regardless of whether or not bikeways are designated." PABAC therefore recommended that the plan include a directive for the City to affirm that all City streets--not only designated bikeways--should be bike friendly streets to the extent possible, in accordance with Comprehensive Plan Policy T-3.5, which already states, "When constructing or modifying roadways, plan for use of the roadway by all users." Staff maintains that the City's Complete Streets Policy addresses this concern, but the BPTP fails to even This message needs your attention This is a personal email address. Mark Safe Report on the subset of designated bikeways. This is a very significant omission. Furthermore, a policy of improving non-bikeway streets, as well as adding bikeways, could be carried out proactively, not only when constructing or modifying roadways. This approach would help to make the City more bicycle-friendly everywhere, in both the short and long term, efficiently and at relatively little cost. The Council should accept PABAC's recommendation. Change c, Class IV and Class I Implementation Guidance The plan's emphasis on Class IV separated bikeways and Class I multi-use paths should be replaced by a more balanced approach. While Class I and Class IV bikeways can be valuable facilities that many bicyclists perceive as safer and more comfortable, they can also present design issues that should be considered carefully before deciding to install them. In particular, these facilities can complicate turning conflicts at intersections and driveways, which are the most common cause of bike-car collisions. Such conflicts have already become more acute with the increasing popularity of higher-speed e-bikes. In addition, these bikeways are more expensive and use more right-of-way than other alternatives. Car-bike collisions between intersections, on the other hand, which separated facilities might arguably help to protect against, are already relatively infrequent (as the BPTP itself shows). PABAC has discussed these questions several times at great length, but neither the BPTP nor staff reports have chosen to reflect the complexity of this issue. PABAC, though, concluded for its part that "The City should implement Class IV separated bikeways and Class I multi- use paths adjacent to roadways with caution. Evaluation must prioritize mitigating potential turning conflicts at driveways/intersections (especially for e-bikes) and ensuring facilities do not introduce new hazards that cannot be reasonably mitigated." This is a careful and measured approach that continues to afford all options due consideration. Staff's response is that "The City’s commitment to a Safe Systems Approach as well as best practices and use of context-sensitive designs will address this concern." But the Safe Systems Approach and context-sensitive design, unfortunately, do not always accord these concerns sufficient attention. And even if you were to contend, for the sake of argument, that they do, that would at most render this recommendation superfluous, not contradictory. There is no downside, and there could be substantial benefit, for the Council to adopt PABAC's sensible recommendation. Respectfully, Alan Wachtel Palo Alto From:Amie Ashton To:Council, City Subject:Bike Plan - Cal Ave (or alternative) Bike Route Date:Saturday, June 13, 2026 11:44:49 AM CAUTION: This email originated from outside of the organization. Be cautiousof opening attachments and clicking on links. Mayor Veenker and Honorable City Council, I write in support of the 2026 Bicycle and Transportation Plan! I am so happy to see this at the finish line after years of work. Like many residents, I was excited to see staff's recommendation for improvements to Cal Avenue to make it exciting, interesting, and fun for all users of the space. We were disappointed to hear the much-reviewed "slow bike" concept, which best balanced the needs of our entire community, was eliminated from consideration at Council's June 1 meeting based on perceived dangers from a few bad e-moto-drivers (note: e-moto drivers represent a small percentage of total "bike" traffic on Cal Ave and injuries are not reflected in the city data provided over the last 2 years to PABAC). We ask you to reconsider your decision as there is no alternative safe route that can be easily/quickly implemented. Please reinstate staff's proposed California Avenue plan, consistent with the bike route in the Bicycle and Transportation Plan. The slow-bike lane pavement treatments, signage, separation, and connections proposed by staff are appropriate and create a safe experience for the community of Cal Ave users. Cal Ave connects directly to the train station, Alma bike/ped underpass, and the Park Bike Blvd; it is essential to keep it open for bikes and safe for peds. Further, many students use Cal Ave as a way to get to Green Middle School, Walter Hays Elementary, and Paly. Neighborhoods like Southgate and College Terrace are located far from their designated schools and Cal Ave is part of a safe routes strategy. If implementing staff's plan is not possible: Immediately plan infrastructure improvements to Cambridge (or other alternative route) before closing bicycle access to Cal Ave. Note however, this is not easily done. Alternative primary routes have already been exhaustively considered and disregarded due to disconnection, lack of access to destinations and shopping, and needed removal of parking. Additionally, Cambridge Ave has many driveways and entrances to parking lots, which are accident points. Sherman Ave and Grant Ave are not direct connections. Alos, relegating bikes to another street will decrease foot traffic from people on bikes who stop at Cal Ave businesses. We cannot move forward with prohibitions or half-solutions that put more road users in danger. Let’s make Cal Ave safe for everyone, consistent with staff's June 1 recommended improvements, or immediate study infrastructure improvements for an alternative route. This will be great for our community and consistent with our stated values that bikes are welcome in Palo Alto. Thank you for your service to all of us! Amie Ashton From:Robert Neff To:Council, City Subject:Endorse approval of new Bike-Ped Transportation Plan - Item 24 June 15. Date:Saturday, June 13, 2026 8:41:14 AM June 13, 2026, Dear Palo Alto City Council Members, I am writing to endorse approval of the 2026 Bicycle Pedestrian Transportation Plan (BPTP), item 24 on the June 15 agenda. The BPTP brings a needed update to network planning in Palo Alto, especially in quantifying the goal of a low-stress bicycle network. The final version of the plan incorporates strong suggestions made to the draft plan from Council, PTC, and PABAC to align near term projects with that overarching goal. (The idea of quantifying the level of discomfort, or “traffic-stress” in bicycle trips, and evaluating all components of a trip is actually new in bike network planning since the development of the earlier 2012 BPTP.) There are many proposed programs and projects in the plan. All are needed. – I look forward to protected bike lanes on Meadow, a new undercrossing near El Dorado, upgrading Cowper to a bike boulevard, including a signalized crossing at Embarcadero, and development of the Bryant/Meadow intersection for better safety at high traffic times. The addition of E-bike strategy is timely. The staff report mentions the PABAC (Pedestrian and Bicycle Advisory Committee) Reform activity coming to council in fall, 2026. As a member of PABAC, I participated in the input to staff from PABAC on June 4, but I want to emphasize that this reform will need City Council attention to determine the best way to guide Active Transportation (and perhaps all Transportation) programs and projects with city staff. I think our current structure with Council guiding staff, PTC reporting to Council, and PABAC reporting to staff is not optimal, but that is a discussion for another time. Please approve this plan on June 15. Thank you for your work for our city of Palo Alto. Robert Neff Emerson near Loma Verde Palo Alto Member of PABAC From:Paul B Goldstein To:Council, City Subject:Item 24, June 15 Meeting, 2026 Bicycle and Pedestrian Transportation Plan Date:Friday, June 12, 2026 9:52:15 PM CAUTION: This email originated from outside of the organization. Be cautious of opening attachments and clicking on links. Honorable members of the City Council, I urge you to approve the 2026 Bicycle and Pedestrian Transportation Plan. This is a good plan and represents a lot of hard work and public input. I would like to commend the staff of the Transportation Department, and in particular, Ozzy Arce, for their dedication and responsiveness to public comment. As a long-term resident of Palo Alto and long-time member of PABAC, I have seen this plan mature and improve throughout its development. I have one specific comment: Many of the near-term projects call for separated bicycle lanes. I urge you to proceed with caution. Although these projects seem attractive, the intended benefits can often be achieved using other, time-tested and much cheaper approaches. Separated bike lanes use a lot of right-of-way and present special safety problems at intersections and driveways. I look forward to this plan's approval and to seeing Palo Alto become an even better place to walk and bicycle. Respectfully, Paul Goldstein Emerson Street From:Art Liberman To:Council, City Subject:The BPTP lacks Wayfaring Signs on Bicycle Boulevards Date:Wednesday, June 10, 2026 7:51:53 PM CAUTION: This email originated from outside of the organization. Be cautiousof opening attachments and clicking on links. I am an avid cyclist and a member of PABAC. However, I write this note only for myself. The vote of PABAC to support the BPTP update was not unanimous. I abstained because the plan was missing an important element, ‘Wayfinding’ signs identifying Bicycle Boulevards. In the absence of a Wayfinding signage on Bicycle Boulevards, I could not in good conscience give my support to the 2026 BPTP Update. The 2026 BPTP plan is structured around low stress neighborhood streets and specifically around Bicycle Boulevards. The reason is to enhance the safety of cyclists and increase the number of cyclists. I strongly support this approach. However, the current 2026 BPTP update does not include a plan for creating and placing ‘Wayfinding’ signs along Bicycle Boulevards to identify them. The summary for a recommended plan for Wayfinding, CE-1.9 [on page 102 of the 2026 BPTP] does not mention placing Wayfinding signs on Bicycle Boulevards. The plan states the importance of Wayfinding signage multiple times. The following makes this very clear: “A bicycle boulevard is recognizable based on the Wayfinding traffic calming treatments such as detached sidewalks and curb extensions.” [ BPTP Plan, page: 48 ] Seeing “Wayfinding” signage is how a cyclist and motorists, would know whether a street where cyclists are riding is a bicycle boulevard. This is important for the safety of the cyclists. Many more cyclists and motorists would know if they are on a bicycle boulevard if they saw a Wayfinding sign with that information, rather than by accessing a 130-page pdf document. The need for Wayfinding sign has been mentioned numerous times by members of PABAC. Another member of PABAC said that "if Wayfinding signage is listed as a separate program in the BPTP, it will not get done or not get done properly." The new BPTP provides us with an opportunity to create Palo Alto Wayfinding signs and place them on bicycle boulevards NOW rather than “developing a Wayfinding signage program.” Wayfinding is mentioned each time Transportation officials asked the community for feedback at workshops and focus groups. The following is from the BPTP plan: 1.Under Phase 1: [BPTP, page 38] Visioning Community Engagement. The plan states under ' Key Themes from Phase 1': “Emphasis on high -quality design, including comfort, aesthetics, Wayfinding and shade.” 2.Under Phase 2: [BPTP, page 39] 'Needs and Concerns Community Engagement.' The plan states under Key Themes from Phase 2: “Enhance sidewalk continuity, Wayfinding and placemaking” 3.Under Phase 3: [BPTP, page 40] 'Recommended Projects & Programs.' The plan states, under Key Themes from Phase 3, that followed the workshop at the Mitchell Park Community Center: “Support was strong for safety improvements, pedestrian features, bike boulevards, quick-builds, and Wayfinding" I asked Ozzy Arce, the Office of Transportation official who has worked most closely with Kittelson consultants in creating the 2026 BPTP Update, about the Wayfinding signage. In response, he said that Wayfinding would be a separate program. This means that it would: a) need to be proposed and approved, b) be assigned its own engineering manpower, and c) would require more community outreach, more studies, more meetings, and more fundng. If you adopt the 2026 BPTP, please require Transportation to place Wayfinding signs on Bicycle Boulevards. I thank the Council members for their service to the citizens of Palo Alto. Arthur Liberman JUNE 15, 2026 www.paloalto.gov FINAL 2026 BICYCLE AND PEDESTRIAN TRANSPORTATION PLAN City Council Meeting Ozzy Arce, Senior Transportation Planner Meeting Purpose & Recommended Action Recommended Action: Adopt a Resolution Approving the Final 2026 Bicycle and Pedestrian Transportation Plan (Attachment A), including staff-recommended changes from the Pedestrian and Bicycle Advisory Committee (PABAC) (Attachment B). Purpose: Present the Final 2026 Bicycle and Pedestrian Transportation Plan (BPTP) for consideration and adoption. 2 Project Timeline Proposed Bicycle Network Pedestrian Districts Prioritization Framework Project List Visioning; Objectives Final PlanAdmin. Draft Plan Existing Conditions Analysis CSTSC + PABAC + PRC + PTC + RC + CC Public Review Draft Plan CSTSC + PABAC + PRC + PTC+CC CSTSC + PABAC + PRC + PTC + RC + CC PABAC + PTC + CC PABAC + City Council 20262023 Phase 1 Introduction & Visioning Phase 2 Existing Conditions, Needs & Concerns Phase 3 Recommendations Phase 4 Draft Plan Phase 5 Final Plan Adoption & Implementation 2024 2025 Workshop Online Mapping Survey Walk Audit Bike Ride Council, Commissions, Committee Responsive Final Plan: Incorporating Dec. 1 Council Feedback 4 How Staff Refined the Final Plan •Proactive E-bike & E-cycle Management: Added programmatic engagement, exploring concrete regulation, and youth education strategies to safely manage e-bike and e-cycle speeds. •Direct Alignment: Coordination with the Safety Action Plan, the San Antonio Road Area Plan, North Ventura Coordinated Area Plan, the Midtown Bike/Ped Undercrossing at El Dorado Avenue, and the Cubberley Master Plan. •Comprehensive Policy: Review of 2030 Comp Plan, noting that Comp Plan Policy T-4.1 (Keep Streets Open as a General Rule) fully supports safety tools like neighborhood modal filters. •Corridor Adjustments: Incorporates project-specific and programmatic modifications, such as advancing additional safe routes to school projects 1 Key Elements of the 2026 BPTP 5 •Low-stress Bicycle Network: Shifts its foundational focus toward developing calm, neighborhood-based Bicycle Boulevards. •Implementation Framework: Actionable, high-priority work focused: •25 Priority Bicycle Projects; about 19 miles of enhancements •24 Intersection & Crossing Upgrades •3 Special Projects and 3 Special Studies •Policies & Programs to improve walking and biking conditions •Pedestrians: Establishes dedicated high-activity pedestrian zones using a specialized Pedestrian Toolbox for improvements. •E-bikes; and Alignment:; Includes programmatic strategies to address the adoption of e-bikes and e-cycles; Ensures integration with other City projects. Next Steps 6 1.Publish an Adopted Final Plan document 2.Initial Priorities for 2026 BPTP Implementation: •Electric Bicycle & Electric Cycle Strategy •Traffic Calming Update •Advance Capital Projects •PABAC Reform Additional Discussion on Cal Ave. and E-Cycles 7 California Avenue •Incorporating Bike Access on Cal Ave.: Per Council direction on Dec. 1, 2025, the 2026 BPTP includes: -Bicycle access along Cal Ave with 8 mph speed limit; and -Future improvements along Cambridge Avenue as supplementary route when there is high-pedestrian activity on Cal Ave. •Addressing E-Moto Safety Concerns:On June 1, 2026, Council expressed concerns about use of e-bikes (and/or e-motos) along Cal Ave, and requested a bike-free design: -BPTP includes programs & policies for education, encouragement,enforcement & regulation -OOT and PD staff are collaborating with PAUSD on educational material on e-bikes & illegal e-motos focused on students, plus enforcement as resources allow, and potential restriction on campus Process and Implications of Cal Ave. Approach 8 Description Community Street (BPTP 12/1/2025)Bike-Free Design (Cal Ave 6/1/2026) Progress Complete Completed: •Ordinance to create Community St (3/24/2025) •Signage/striping design for ECR/Cal Ave •Encroachment permit applications (10/1/2024 &6/27/2025, received 2/5/2025 & 6/10/2026) •Interim design for slow bikes (6/1/2026) Progress Needed •Low-cost implementation by augmenting resurfacing, August 2026 • Walk Only during certain times •Reallocate staff and identify funds for CIPs for Cal Ave & Cambridge (mid-year or FY28) •Undertake bike-free design for Cal Ave & enhanced bike access on Cambridge inc. community engagement •Encroachment permit for Cambridge/ECR •Construction TBD (potentially 2032) •Remap school access routes Ultimate Condition •Textured thermoplastic to encourage slow bike movements •Enforcement recommended •Repave with smooth unmarked surface •Enforcement needed in interim & final •Students have higher traffic exposure Recommended Action Adopt a Resolution Approving the Final 2026 Bicycle and Pedestrian Transportation Plan (Attachment A), including staff-recommended changes from the Pedestrian and Bicycle Advisory Committee (Attachment B). 9 JUNE 15, 2026 www.paloalto.gov FINAL 2026 BICYCLE AND PEDESTRIAN TRANSPORTATION PLAN City Council Meeting Ozzy Arce, Senior Transportation Planner