HomeMy WebLinkAboutRESO 10286180321 cc 0260111
Resolution No. 10286
Resolution of the Council of the City of Palo Alto to Adopt a List of
Projects for Fiscal Year 2026-2027 Funded by SB 1: The Road Repair
and Accountability Act of 2017
R E C I T A L S
A. Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5,
Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April
2017 in order to address the significant multi-modal transportation funding shortfalls
statewide; and
B. SB 1 includes accountability and transparency provisions that will ensure the
residents of the City of Palo Alto (City) are aware of the projects proposed for funding in our
community and which projects have been completed each fiscal year; and
C. The City must adopt a list of all projects proposed to receive funding from the
Road Maintenance and Rehabilitation Account (RMRA), created by SB 1 by resolution, which
must include a description and the location of each proposed project, a proposed schedule for
the project’s completion, and the estimated useful life of the improvement; and
D. The City, will receive an estimated $1,930,258 in RMRA funding in Fiscal Year
2026-2027 from SB 1; and
E. This is the tenth year in which the City is receiving SB 1 funding which enables
the City to continue essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility
options for the traveling public that would not have otherwise been possible without SB 1; and
F. The City used a Pavement Management System to develop the SB 1 project list
to ensure revenues are being used on the most high-priority and cost-effective projects that
also meet the community’s priorities for transportation investment; and
G. The funding from SB 1 will help the City maintain and rehabilitate various streets
throughout the City this year and many similar projects into the future; and
H. The 2024 California Statewide Local Streets and Roads Needs Assessment found
that the City’s streets and roads are in “excellent” condition and this revenue will help us
maintain the overall quality of our road system and implement complete streets projects over
the next decade; and
I. The SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials and practices, will have significant
positive co-benefits statewide.
NOW, THEREFORE, the Council of the City of Palo Alto RESOLVES as follows:
SECTION 1. The foregoing recitals are true and correct.
Docusign Envelope ID: DB8FF5BA-B068-4CE4-A4B0-E43568E4C762
180321 cc 0260111
SECTION 2. The City of Palo Alto hereby adopts the following list of streets planned to
be funded in-part or solely with fiscal year 2026-2027 with Road Maintenance and
Rehabilitation Account revenues:
FY 2027 Street Resurfacing Project includes pavement repair, sidewalk, valley gutter, curb and
gutter replacement, upgraded curb ramps, and street paving. The following streets are included
in the FY2026 Street Resurfacing Project: Bibbits Drive (Louis Rd to Gailan Ave), Curtner Avenue
(El Camino Real to Park Blvd), Downing Lane (Forest Ave to Homer Ave), Embarcadero Road
(Middlefield Road to Fulton St), Faber Place (Embarcadero Rd to End), Fabian Way (West
Bayshore Rd to Charleston Rd), Fabian Street (Charleston Rd to San Antonio Rd), Fielding Drive
(Fielding Dr to End), La Mata Way (Matadero Rd to End), McKellar Lane (Kelly Wy to Lorabelle
Ct), Palo Alto Avenue (Byron St to Middlefield Rd), Park Avenue (Ash St to Park Blvd), Saint
Michael Drive (Saint Claire Dr to Saint Claire Dr), Saint Michael Court (Saint Michael Dr to End),
Stanford Avenue (City Limit to Amherst St), Walter Hays Drive (Stanley Wy to Walnut Dr),
Wintergreen Way (Ross Rd to End).
The estimated useful life is 30 years. Construction of FY2027 Street Resurfacing Project will start
in Fall 2026 and be completed in Summer 2027.
//
//
//
//
//
//
//
//
//
//
//
//
//
//
Docusign Envelope ID: DB8FF5BA-B068-4CE4-A4B0-E43568E4C762
180321 cc 0260111
SECTION 3. The Council finds that the adoption of this resolution does not meet the
definition of a project under Public Resources Code Section 21065, thus no environmental
assessment under the California Environmental Quality Act is required.
INTRODUCED AND PASSED: MAY 18, 2026
AYES: BURT, LAUING, LU, LYTHCOTT-HAIMS, RECKDAHL, STONE, VEENKER
NOES:
ABSENT:
ABSTENTIONS:
ATTEST:
_______________________________________________________
City Clerk Mayor
APPROVED AS TO FORM:APPROVED:
_______________________________________________________
Assistant City Attorney City Manager
_____________________________
Director of Public Works
_____________________________
Director of Administrative Services
Docusign Envelope ID: DB8FF5BA-B068-4CE4-A4B0-E43568E4C762
Certificate Of Completion
Envelope Id: DB8FF5BA-B068-4CE4-A4B0-E43568E4C762 Status: Completed
Subject: RESO 10286 - FY26-27 Project List Funded By SB 1: The Road Repair and Accountability Act of 2017
Source Envelope:
Document Pages: 3 Signatures: 6 Envelope Originator:
Certificate Pages: 2 Initials: 0 Christine Prior
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
250 Hamilton Ave
Palo Alto , CA 94301
Christine.Prior@PaloAlto.gov
IP Address: 170.85.155.26
Record Tracking
Status: Original
5/19/2026 1:24:59 PM
Holder: Christine Prior
Christine.Prior@PaloAlto.gov
Location: DocuSign
Security Appliance Status: Connected Pool: StateLocal
Signer Events Signature Timestamp
Mark Vanni
Mark.Vanni@paloalto.gov
Assistant City Attorney
COPA
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 73.231.59.147
Sent: 5/19/2026 1:40:22 PM
Viewed: 5/19/2026 1:55:12 PM
Signed: 5/19/2026 1:55:18 PM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Lauren Lai
Lauren.Lai@paloalto.gov
Director Administrative Services/CFO
COPA
Security Level: Email, Account Authentication
(None)
Signature Adoption: Drawn on Device
Using IP Address: 170.85.54.117
Sent: 5/19/2026 1:55:19 PM
Viewed: 5/19/2026 4:56:16 PM
Signed: 5/19/2026 4:56:22 PM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Brad Eggleston
Brad.Eggleston@paloalto.gov
Director of Public Works
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 170.85.54.112
Sent: 5/19/2026 4:56:23 PM
Viewed: 5/19/2026 4:58:07 PM
Signed: 5/19/2026 4:58:14 PM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Ed Shikada
Ed.Shikada@paloalto.gov
City Manager
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 170.85.54.89
Sent: 5/19/2026 4:58:15 PM
Viewed: 5/20/2026 11:43:47 AM
Signed: 5/20/2026 11:43:52 AM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Signer Events Signature Timestamp
Vicki Veenker
Vicki.Veenker@paloalto.gov
City of Palo Alto
Security Level: Email, Account Authentication
(None)Signature Adoption: Uploaded Signature Image
Using IP Address: 89.234.89.171
Signed using mobile
Sent: 5/20/2026 11:43:53 AM
Viewed: 5/27/2026 5:07:44 AM
Signed: 5/27/2026 5:08:48 AM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Mahealani Ah Yun
Mahealani.AhYun@paloalto.gov
City Clerk
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address: 165.225.242.89
Sent: 5/27/2026 5:08:49 AM
Viewed: 6/1/2026 8:24:20 AM
Signed: 6/1/2026 8:24:26 AM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 5/19/2026 1:40:22 PM
Certified Delivered Security Checked 6/1/2026 8:24:20 AM
Signing Complete Security Checked 6/1/2026 8:24:26 AM
Completed Security Checked 6/1/2026 8:24:26 AM
Payment Events Status Timestamps