Resolution No. 10284
Resolution of the Council of the City of Palo Alto Making Required Findings in Support of the
City’s Grant Application for FY2026/27 Transportation Development Act Article 3 Funds in the
Amount of $326,590 for the City’s South Palo Alto Bikeways Demonstration Project
R E C I T A L S
A.Article 3 of the Transportation Development Act (TDA), Public Utilities Code (PUC)
Section 99200 et seq., authorizes the submission of claims to a regional transportation
planning agency for the funding of projects exclusively for the benefit and/or use of
pedestrians and bicyclists; and
B.The Metropolitan Transportation Commission (MTC), as the regional transportation
planning agency for the San Francisco Bay region, has adopted MTC Resolution No.
4108, Revised, entitled “Transportation Development Act, Article 3, Pedestrian/Bicycle
Projects,” which delineates procedures and criteria for submission of requests for the
allocation of “TDA Article 3” funding; and
C.MTC Resolution No. 4108, Revised requires that requests for the allocation of TDA
Article 3 funding be submitted as part of a single, countywide coordinated claim from
each county in the San Francisco Bay region; and
D. The City of Palo Alto desires to submit a request to MTC for the allocation of TDA Article
3 funds to support the projects described in Attachment B to this resolution, which are
for the exclusive benefit and/or use of pedestrians and/or bicyclists.
NOW, THEREFORE, the Council of the City of Palo Alto RESOLVES as follows:
SECTION 1. The City of Palo Alto declares it is eligible to request an allocation of TDA
Article 3 funds pursuant to Section 99234 of the Public Utilities Code.
SECTION 2. There is no pending or threatened litigation that might adversely affect the
project or projects described in Attachment B to this resolution, or that might impair the ability
of the City of Palo Alto to carry out the project.
SECTION 3. The City of Palo Alto attests to the accuracy of and approves the statements
in Attachment A to this resolution.
//
//
Docusign Envelope ID: DDE14C0E-0162-4241-B006-DD04D8B56E38
155_20260414_ts24
SECTION 4. A certified copy of this resolution and its attachments, and any
accompanying supporting materials shall be forwarded to the congestion management agency,
countywide transportation planning agency, or county association of governments, as the case
may be, of Santa Clara County for submission to MTC as part of the countywide coordinated
TDA Article 3 claim.
INTRODUCED AND PASSED: MAY 4, 2026
AYES: BURT, LAUING, LU, LYTHCOTT-HAIMS, RECKDAHL, STONE, VEENKER
NOES:
ABSENT:
ABSTENTIONS:
ATTEST:
_______________________________ _________________________
City Clerk Mayor
APPROVED AS TO FORM: APPROVED:
________________________________ _________________________
Assistant City Attorney City Manager
Docusign Envelope ID: DDE14C0E-0162-4241-B006-DD04D8B56E38
155_20260414_ts24
ATTACHMENT A
Findings
1.That the City of Palo Alto is not legally impeded from submitting a request to the Metropolitan
Transportation Commission for the allocation of Transportation Development Act (TDA)
Article 3 funds, nor is the City of Palo Alto legally impeded from undertaking the project(s)
described in “Attachment B” of this resolution.
2.That the City of Palo Alto has committed adequate staffing resources to complete the
project(s) described in Attachment B.
3.A review of the project(s) described in Attachment B has resulted in the consideration of all
pertinent matters, including those related to environmental and right-of-way permits and
clearances, attendant to the successful completion of the project(s).
4.Issues attendant to securing environmental and right-of-way permits and clearances for the
projects described in Attachment B have been reviewed and will be concluded in a manner
and on a schedule that will not jeopardize the deadline for the use of the TDA funds being
requested.
5.That the project(s) described in Attachment B comply with the requirements of the California
Environmental Quality Act (CEQA, Public Resources Code Sections 21000 et seq.).
6.That as portrayed in the budgetary description(s) of the project(s) in Attachment B, the
sources of funding other than TDA are assured and adequate for completion of the project(s).
7.That the project(s) described in Attachment B are for capital construction and/or final design
and engineering or quick build project; and/or for the maintenance of a Class I bikeway which
is closed to motorized traffic and/or Class IV separated bikeway; and/or for the purposes of
restriping Class II bicycle lanes; and/or for the development or support of a bicycle safety
education program; and/or for the development of a comprehensive bicycle and/or
pedestrian facilities plan, and an allocation of TDA Article 3 funding for such a plan has not
been received by the City of Palo Alto within the prior five fiscal years.
8.That the project(s) described in Attachment B which are bicycle projects have been included
in a detailed bicycle circulation element included in an adopted general plan or included in
an adopted comprehensive bikeway plan (such as outlined in Section 2377 of the California
Bikeways Act, Streets and Highways Code section 2370 et seq.) or responds to an immediate
community need, such as a quick-build project.
9.That any project described in Attachment B as a bicycle project meets the mandatory
minimum safety design criteria published in the California Highway Design Manual or is in a
National Association of City and Transportation Officials (NACTO) guidance or similar best
practices document.
10.That the project(s) described in Attachment B will be completed in the allocated time (fiscal
year of allocation plus two additional fiscal years).
Docusign Envelope ID: DDE14C0E-0162-4241-B006-DD04D8B56E38
155_20260414_ts24
11.That the City of Palo Alto agrees to maintain, or provide for the maintenance of, the project(s)
and facilities described in Attachment B, for the benefit of and use by the public.
Docusign Envelope ID: DDE14C0E-0162-4241-B006-DD04D8B56E38
155_20260414_ts24
Attachment B
TDA Article 3 Project Application Form
1.Agency City of Palo Alto
Primary Contact
Mailing Address
Email Address Phone Number
Secondary Contact
the event primary is
not available)
Mailing address
different) N/A☒
8.Email Address Ria.Lo@PaloAlto.gov 9.Phone Number 650-329-2136
10.Send allocation
instructions to (if
different from above):
Project Title
Amount requested Fiscal Year of
Claim
FY26/27
14.Description of Overall Project:
Docusign Envelope ID: DDE14C0E-0162-4241-B006-DD04D8B56E38
155_20260414_ts24
15. Project Scope Proposed for Funding: (Project level environmental, preliminary
planning, and ROW are ineligible uses of TDA funds.)
16.Project Location: A map of the project location is attached or a link to a online
map of the project location is provided below:
Project Relation to Regional Policies (for information only)
17.Is the project in an Equity Priority Community?Yes☐
No☒
18.Is this project in a Priority Development Area or a Transit-Oriented Community? Yes☒
No☐
19.Project Budget and Schedule
Project Eligibility
A.Has the project been reviewed by the Bicycle and Pedestrian Advisory Committee? Yes
☒No☐
(If “YES,” identify the date and provide a copy or link to the agenda. If "NO,"
provide an explanation). PABAC reviewed on March 3, 2026. Minutes can be
found here. https://www.paloalto.gov/Departments/Transportation/Bicycling-
Walking/Pedestrian-and-Bicycle-Advisory-Committee-PABAC
B.Has the project been approved by the claimant's governing body?Yes☒
No☐
Council concept approval on August 9, 2021
Project Phase TDA 3 Other Funds Total Cost Estimated Completion
(month/year)
Bike/Ped Plan
ENV 13,000 13,000 February 2027
PA&ED 487,000 487,000 April 2027
PS&E 100,000 100,000 May 2027
ROW
CON 227,000 1,359,000 1,586,000 March 2028
Total Cost 327,000 1,859,000 2,186,000 December 2029
Docusign Envelope ID: DDE14C0E-0162-4241-B006-DD04D8B56E38
155_20260414_ts24
If "NO," provide expected date: _________________
C. Has this project previously received TDA Article 3 funding?Yes☐
No☒
(If "YES," provide an explanation on a separate page)
D.For "bikeways," does the project meet Caltrans minimum safety design criteria Yes☒
No☐
pursuant to Chapter 1000 of the California Highway Design Manual?
E.1. Is the project categorically exempt from CEQA, pursuant to CCR Section 15301(c), Yes
☒No☐
Existing Facility?
2.If “NO” above, is the project exempt from CEQA for another reason?Yes☐
No☐
Cite the basis for the exemption. __________________________
N/A☒
If the project is not exempt, please check “NO,” and provide environmental
documentation, as appropriate.
F.Estimated Completion Date of project (month and year): _12/31/29__________
G.Have provisions been made by the claimant to maintain the project or facility, or has
Yes☒ No☐
the claimant arranged for such maintenance by another agency? (If an agency other
than the Claimant is to maintain the facility, please identify below and provide the
agreement.
H.Is a Complete Streets Checklist required for this project ?Yes☒
No☐
If the amount requested is over $250,000 or if the total project phase or construction
phase is over $250,000, a Complete Streets checklist is likely required. Please attach
the Complete Streets checklist or record of review, as applicable. More information
and the form may be found here:
https://mtc.ca.gov/planning/transportation/complete-streets
Docusign Envelope ID: DDE14C0E-0162-4241-B006-DD04D8B56E38
Certificate Of Completion
Envelope Id: DDE14C0E-0162-4241-B006-DD04D8B56E38 Status: Completed
Subject: RESO 10284 - South Palo Alto Bikeways Demonstration Project Grant Application Findings
Source Envelope:
Document Pages: 7 Signatures: 4 Envelope Originator:
Certificate Pages: 2 Initials: 0 Christine Prior
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
250 Hamilton Ave
Palo Alto , CA 94301
Christine.Prior@PaloAlto.gov
IP Address: 170.85.155.14
Record Tracking
Status: Original
5/8/2026 2:40:27 PM
Holder: Christine Prior
Christine.Prior@PaloAlto.gov
Location: DocuSign
Security Appliance Status: Connected Pool: StateLocal
Signer Events Signature Timestamp
Tim Shimizu
Tim.Shimizu@paloalto.gov
Assist. City Attorney
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 170.85.155.45
Sent: 5/8/2026 2:42:58 PM
Viewed: 5/11/2026 3:51:20 PM
Signed: 5/11/2026 3:51:32 PM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Ed Shikada
Ed.Shikada@paloalto.gov
City Manager
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 170.85.54.118
Sent: 5/11/2026 3:51:33 PM
Viewed: 5/11/2026 5:27:06 PM
Signed: 5/11/2026 5:27:14 PM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Vicki Veenker
Vicki.Veenker@paloalto.gov
City of Palo Alto
Security Level: Email, Account Authentication
(None)Signature Adoption: Uploaded Signature Image
Using IP Address: 174.197.65.179
Sent: 5/11/2026 5:27:15 PM
Viewed: 5/20/2026 4:21:28 AM
Signed: 5/20/2026 4:21:58 AM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Mahealani Ah Yun
Mahealani.AhYun@paloalto.gov
City Clerk
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address: 170.85.155.33
Sent: 5/20/2026 4:21:59 AM
Viewed: 5/20/2026 6:43:42 PM
Signed: 5/20/2026 6:44:07 PM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 5/8/2026 2:42:58 PM
Certified Delivered Security Checked 5/20/2026 6:43:42 PM
Signing Complete Security Checked 5/20/2026 6:44:07 PM
Completed Security Checked 5/20/2026 6:44:07 PM
Payment Events Status Timestamps