Loading...
HomeMy WebLinkAbout2026-05-06 Finance Committee Agenda PacketFINANCE COMMITTEE Special Meeting Wednesday, May 06, 2026 Community Meeting Room & Hybrid 9:00 AM Page Numbers Added Budget Books are Available at: www.PaloAlto.gov/budget (C: Capital Budget Book, O: Operating Budget Book)   Finance Committee meetings will be held as “hybrid” meetings with the option to attend by teleconference/video conference or in person. Information on how the public may observe and participate in the meeting is located at the end of the agenda. The meeting will be broadcast on Cable TV Channel 26, live on YouTube https://www.youtube.com/c/cityofpaloalto, and streamed to Midpen Media Center https://midpenmedia.org. VIRTUAL PARTICIPATION CLICK HERE TO JOIN (https://cityofpaloalto.zoom.us/j/99227307235) Meeting ID: 992 2730 7235 Phone: 1(669)900-6833   PUBLIC COMMENTS General Public Comment for items not on the agenda will be accepted in person for up to three minutes or an amount of time determind by the Chair. General public comment will be heard for 30 minutes. Additional public comments, if any, will be heard at the end of the agenda. Public comments for agendized items will be accepted both in person and via Zoom for up to three minutes or an amount of time determined by the Chair. Requests to speak will be taken until 5 minutes after the staff’s presentation or as determind by the Chair. Written public comments can be submitted in advance to city.council@PaloAlto.gov and will be provided to the Council and available for inspection on the City’s website. Please clearly indicate which agenda item you are referencing in your subject line. Multiple individuals who wish to speak on the same item may designate a spokesperson. Spokespersons must be representing five or more verified individuals who are present either in person or via zoom. Spokespeople will be allowed up to 10 minutes, at the discretion of the presiding officer. Speaking time may be reduced if the presiding officer reduces the speaking time for individual speakers. PowerPoints, videos, or other media to be presented during public comment are accepted only by email to city.clerk@PaloAlto.gov at least 24 hours prior to the meeting. Once received, the Clerk will have them shared at public comment for the specified item. To uphold strong cybersecurity management practices, USB’s or other physical electronic storage devices are not accepted. Signs and symbolic materials less than 2 feet by 3 feet are permitted provided that: (1) sticks, posts, poles or similar/other types of handle objects are strictly prohibited; (2) the items do not create a facility, fire, or safety hazard; and (3) persons with such items remain seated when displaying them and must not raise the items above shoulder level, obstruct the view or passage of other attendees, or otherwise disturb the business of the meeting.  1 May 06, 2026 Materials submitted after distribution of the agenda packet are available for public inspection at www.paloalto.gov/agendas. CALL TO ORDER   PUBLIC COMMENT Members of the public may speak in-person ONLY to any item NOT on the agenda. 1-3 minutes depending on number of speakers. Public Comment is limited to 30 minutes. Additional public comments, if any, will be heard at the end of the agenda.   ACTION ITEMS   1.Summary of Day 1 (9:00 AM – 9:30 AM) 2.Planning and Transportation (9:30 AM – 11:00 AM) a) Planning and Development Services (O:337-352) i) Community Development Block Grant ii) Business Improvement District iii) Impact Fee Funds iv) Housing Funds b) Office of Transportation (O:323-335) i) Parking Funds 3.Public Safety (11:00 AM – 12:30 PM) a) Police (O:353-367) b) Fire (O:245-258) c) Office of Emergency Services (O:313-322) LUNCH BREAK (12:30 PM - 1:30 PM)   4.FY 2027 Proposed Municipal Fee Schedule (1:30 PM – 2:00 PM) Late Packet Report Added 5.Infrastructure and Environemnt: Capital Improvement Program (continued), Enterprise Fund Projects & Internal Service Fund Projects (2:00 PM – 3:30 PM) a) Information Technology i) Technology Fund (C:715-742) b) Public Works i) Airport Fund (Public Works) (C:393-415) ii) Stormwater Management Fund (Public Works) (C:555-586) iii) Wastewater Treatment Fund (Public Works) (C:627-666) iv) Vehicle Replacement and Maintenance Fund (C:743-771) c) Utilities  2 May 06, 2026 Materials submitted after distribution of the agenda packet are available for public inspection at www.paloalto.gov/agendas. i) Electric Fund (C:417-495) ii) Fiber Optics Fund (C:497-517) iii) Gas Fund (C:519-553) iv) Wastewater Collection Fund (C:587-625) v) Water Fund (C:667-711) 6. Closing Review (3:30 PM – 5:00 PM) FUTURE MEETINGS AND AGENDAS Members of the public may not speak to the item(s) ADJOURNMENT 3 May 06, 2026 Materials submitted after distribution of the agenda packet are available for public inspection at www.paloalto.gov/agendas. PUBLIC COMMENT INSTRUCTIONS Members of the Public may provide public comments to teleconference meetings via email, teleconference, or by phone. 1.Written public comments may be submitted by email to city.council@PaloAlto.gov. 2.For in person public comments please complete a speaker request card located on the table at the entrance to the Council Chambers and deliver it to the Clerk prior to discussion of the item. 3.Spoken public comments for agendized items using a computer or smart phone will be accepted through the teleconference meeting. To address the Council, click on the link below to access a Zoom-based meeting. Please read the following instructions carefully. ◦You may download the Zoom client or connect to the meeting in- browser. If using your browser, make sure you are using a current, up-to-date browser: Chrome 30 , Firefox 27 , Microsoft Edge 12 , Safari 7 . Certain functionality may be disabled in older browsers including Internet Explorer. Or download the Zoom application onto your smart phone from the Apple App Store or Google Play Store and enter in the Meeting ID below. ◦You may be asked to enter an email address and name. We request that you identify yourself by name as this will be visible online and will be used to notify you that it is your turn to speak. ◦When you wish to speak on an Agenda Item, click on “raise hand.” The Clerk will activate and unmute speakers in turn. Speakers will be notified shortly before they are called to speak. ◦When called, please limit your remarks to the time limit allotted. A timer will be shown on the computer to help keep track of your comments. 4.Spoken public comments for agendized items using a phone use the telephone number listed below. When you wish to speak on an agenda item hit *9 on your phone so we know that you wish to speak. You will be asked to provide your first and last name before addressing the Council. You will be advised how long you have to speak. When called please limit your remarks to the agenda item and time limit allotted. CLICK HERE TO JOIN Meeting ID: 992-2730-7235 Phone: 1-669-900-6833 Americans with Disability Act (ADA) It is the policy of the City of Palo Alto to offer its public programs, services and meetings in a manner that is readily accessible to all. Persons with disabilities who require materials in an appropriate alternative format or who require auxiliary aids to access City meetings, programs, or services may contact the City’s ADA Coordinator at (650) 329-2550 (voice) or by emailing ada@PaloAlto.gov. Requests for assistance or accommodations must be submitted at least 24 hours in advance of the meeting, program, or service.  4 May 06, 2026 Materials submitted after distribution of the agenda packet are available for public inspection at www.paloalto.gov/agendas. California Government Code §84308, commonly referred to as the "Levine Act," prohibits an elected official of a local government agency from participating in a proceeding involving a license, permit, or other entitlement for use if the official received a campaign contribution exceeding $500 from a party or participant, including their agents, to the proceeding within the last 12 months. A “license, permit, or other entitlement for use” includes most land use and planning approvals and the approval of contracts that are not subject to lowest responsible bid procedures and have a value over $50,000. A “party” is a person who files an application for, or is the subject of, a proceeding involving a license, permit, or other entitlement for use. A “participant” is a person who actively supports or opposes a particular decision in a proceeding involving a license, permit, or other entitlement for use, and has a financial interest in the decision. The Levine Act incorporates the definition of “financial interest” in the Political Reform Act, which encompasses interests in business entities, real property, sources of income, sources of gifts, and personal finances that may be affected by the Council’s actions. If you qualify as a “party” or “participant” to a proceeding, and you have made a campaign contribution to a Council Member exceeding $500 made within the last 12 months, you must disclose the campaign contribution before making your comments.  5 May 06, 2026 Materials submitted after distribution of the agenda packet are available for public inspection at www.paloalto.gov/agendas. Finance Committee Staff Report Report Type: ACTION ITEMS Lead Department: City Clerk Meeting Date: May 6, 2026 Report #:2604-6303 TITLE FY 2027 Proposed Municipal Fee Schedule This will be a late packet report published on April 30, 2026. Item 4 Item 4 Staff Report        Item 4: Staff Report Pg. 1  Packet Pg. 6 of 76  Item No. 4. Page 1 of 7 9 8 8 4 Finance Committee Staff Report From: City Manager Report Type: CONSENT CALENDAR Lead Department: Administrative Services Meeting Date: May 6, 2026 Report #:2604-6297 TITLE FY 2027 Proposed Municipal Fee Schedule RECOMMENDATION Staff recommends that the Finance Committee review amendments to the Municipal Free schedule for FY 2027 and make recommendations to Council for incorporation into the FY 2027 budget. EXECUTIVE SUMMARY This report presents the annual update to over 950 fees as part of the budget process and highlights proposed changes to the FY 2027 Municipal Fee Schedule. The proposed changes include 13 new fees, the deletion of 62 fees, and adjustments to existing fees. Most fees are adjusted annually by the General Rate Increase (GRI) of 4.59% or applicable cost indices to reflect changes in the cost of service. This year’s adjustments also include the implementation of a credit card processing fee to recover merchant service costs and the incorporation of select Utility fees1 and all Airport fees into the Citywide Municipal Fee Schedule. Upon Council approval, the recommended Municipal Fees included here will be incorporated into the FY 2027 Adopted Budget and take effect July 1, 2026. BACKGROUND The City charges fees for a variety of services, including parking permits, building inspection services, and facility rentals, to ensure that the cost of service is borne by the users receiving the benefit. As part of the annual budget process, departments review and propose updates to 1 Council previously approved these connection and capacity fees on October 20, 2025, and the accompanying staff report explained how these fees would be incorporated into the Municipal Fe Schedule starting in FY 2027; Agenda Item #1, #2505-4736: https://cityofpaloalto.primegov.com/viewer/preview?id=0&type=8&uid=f6825375- 8aac-44fd-bc66-1fde8593eeb3 Item 4 Item 4 Late Packet Report        Item 4: Staff Report Pg. 1  Packet Pg. 7 of 76  Item No. 4. Page 2 of 7 9 8 8 4 the Municipal Fee Schedule, which are presented for Finance Committee review and subsequently adopted by the City Council. 3 In addition, the City is implementing a credit card processing fee to align transaction costs with users who elect to pay by credit card, applied where costs are not otherwise recovered. 4 highlighted that, while fees can be established at full cost recovery based on cost of service analysis, the City Council retains discretion to subsidize certain fees based on policy objectives. In such cases, fees may be set below full cost to support policy objectives, improve accessibility, or incentivize desired outcomes. These policy-driven decisions are evaluated on a case-by-case basis and are reflected in the proposed fee adjustments. 3 Finance Committee recommended that Council approve the FY 2027 Airport Rates and Charges Schedule, accept the Palo Alto Airport Rates and Charges Study, and authorize annual fee adjustments based on the Airport Benchmark Index (ABI) on April 21, 2026; Agenda Item #3, #2602-5923 4 Finance Committee discussed Planning and Development Services fee structures and cost recovery considerations on April 7, 2026; Agenda Item #2, #2511-5562: https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=87767&dbid=0&repo=PaloAlto Item 4 Item 4 Late Packet Report        Item 4: Staff Report Pg. 2  Packet Pg. 8 of 76  Item No. 4. Page 3 of 7 9 8 8 4 Additionally, the Staff recommended Airport Fees updates that were reviewed and recommended by Finance Committee on April 21, 2026 will be incorporated into the Municipal Fee Schedule as a part of this update, repealing previously separate rate schedules. Table 1: Summary of Municipal Fee Cost Recovery Policy Item 4 Item 4 Late Packet Report        Item 4: Staff Report Pg. 3  Packet Pg. 9 of 76  Item No. 4. Page 4 of 7 9 8 8 4 ANALYSIS The development of the Municipal Fee Schedule for FY 2027 reflects some department service realignments as most fees across the City have been updated to maintain cost recovery levels. The General Rate Increase (GRI) for FY 2027 is 4.59% and reflects a combination of increases in salaries and benefits as well as inflationary factors. This rate is applied to most fees to maintain current cost recovery levels, consistent with City policy. Fees that were updated by a factor greater or less than 4.59% to achieve a different cost recovery level or based on staff recommendation are further detailed in Attachment A. As identified in Table 2 below, thirteen (13) new fees are recommended to be added to the FY 2027 Municipal Fee Schedule. For Airport and Utilities, this table includes only newly established fees; other fees are incorporated into the Municipal Fee Schedule as part of this update. Department Fee Title FY 2027 Proposed Fee Cost Recovery Level Administrative Services Credit Card Service Fee 2-3% of transaction; actual amount will be based on percentage charged to City High Community Services Leptospirosis Vaccine $45.00 per pet High Community Services FeLV Vaccine $45.00 per pet High Community Services Fluid Therapy - SQ $50.00 - 75.00 each High Community Services Medication $15.00 - $250.00 each High Community Services Sedation/Anesthesia $150.00 - $350.00 High Community Services Surgery, Preparation and Recovery $550.00 - $1,650.00 per hour High Utilities Unscheduled Gas Disconnection Service Call - After Hours $9,798 per mobilization High Utilities Unscheduled Gas Disconnection Service Call - Weekend $13,065 per mobilization High Airport Transient Aircraft Landing Fee (Non-Commercial) $3/1000lbs MTOW per landing High Item 4 Item 4 Late Packet Report        Item 4: Staff Report Pg. 4  Packet Pg. 10 of 76  Item No. 4. Page 5 of 7 9 8 8 4 Department Fee Title FY 2027 Proposed Fee Cost Recovery Level Airport Automobile Parking Citation Fee $57 per occurance High Airport Hangar Ground Lease Origination / Transfer Fee 2% of sale of assessed value per agreement High Airport Expired Certification of Insurance Fee $50 per month High Deleted Fees A total of 62 fees are proposed for deletion as part of this update. These fees are no longer applicable, have been consolidated, or are administered by external entities. Examples include the veterinary and massage establishment fees. A complete list of deleted fees and associated justifications is provided at the end of Attachment A. Changed Fees 241 fees are recommended to be adjusted by a factors other than the General Rate of Increase or applicable cost indices, including, but not limited to: (1)Attain a cost recovery level consistent with other fees; (2)Align with a market study; (3)Modify the fee structure to align with current service delivery; or (4)Hold the fee flat to avoid discouraging use of the service of activity Consistent with ongoing cost-of-service efforts, departments have continued to evaluate service costs and revenues and, where appropriate, adjust fees to better align with cost recovery targets; as a result, some fees in this section reflect increases. Each fee is listed by name along with the Adopted FY 2026 rate, the Proposed FY 2027 rate, and the fee change justification in Attachment A. Parking In-Lieu fees Palo Alto Municipal Code (PAMC) Chapter 16.57.030 requires that the Parking In-Lieu Fee be recalculated in the event the City Council approved the construction of a public parking structure. Per the Municipal Code, the fee shall be adjusted at the time the construction contract is awarded to include actual costs to date, plus the projected construction cost, and authorized contingency. A second recalculation must occur after the project is completed, based on actual design and construction costs incurred. The recalculated fee may be higher or lower than the initial fee. In December 2018, Council awarded a construction contract to Swinerton Builders (CMR 9688) for the California Avenue Area Parking Garage. The total project cost was calculated per PAMC 16.57.030 and includes design costs plus additional services, the construction bid with authorized Item 4 Item 4 Late Packet Report        Item 4: Staff Report Pg. 5  Packet Pg. 11 of 76  Item No. 4. Page 6 of 7 9 8 8 4 contingency, and all other staff and administrative costs incurred. This calculation was done and approved as part of the Fiscal Year 2020 budget development process (CMR 10225). The cost per parking space was calculated at $106,171 for the Fiscal Year 2020 Adopted Municipal Fee Schedule. FISCAL/RESOURCE IMPACT POLICY IMPLICATIONS STAKEHOLDER ENGAGEMENT Item 4 Item 4 Late Packet Report        Item 4: Staff Report Pg. 6  Packet Pg. 12 of 76  Item No. 4. Page 7 of 7 9 8 8 4 Staff has coordinated internally with budget and management staff in each department citywide to develop the recommendations in this report. Conversations with the City Council throughout May and June prior to the adoption of the FY 2027 Operating and Capital Budgets and Municipal Fee Schedule allow for public participation in this annual process. ENVIRONMENTAL REVIEW ATTACHMENTS APPROVED BY: Item 4 Item 4 Late Packet Report        Item 4: Staff Report Pg. 7  Packet Pg. 13 of 76  A achment A Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees Administrative Services  Fee Title   FY 2026 Adopted   FY 2027 Proposed Justification Business Registry Free $50.00 $54.00 each Now includes a $4 State of California pass through fee for ADA compliance Mailing (Certified) $4.85 each $5.30 each Determined by outside agency Returned Payment $25.00 each $25.00 each Determined by outside agency Fair Political Practices Commission Photocopies $0.10 each $0.10 each Determined by outside agency Domestic Partners Registration Fee $38.00 each $38.00 each Flat to promote accessibility and public participation Candidate Filing Fee $25.00 each $25.00 each Flat to promote accessibility and public participation JC Decaux Public Toilet Fee $0.50 each $0.50 each Fee set by vendor Online Processing of Traffic Citations $2.00 each $2.00 each Fee set by vendor Community Services  Fee Title   FY 2026 Adopted   FY 2027 Proposed Justification Adoptions ‐ Adoption Hold Fee $100.00 per pet $100.00 per pet Fee set by vendor Adoptions ‐ Cats (6 months and over)* $130.00 per cat | $130.00 per cat $130.00 per cat Fee set by vendor Adoptions ‐ Cats (Two adopted at once) $240.00 per cat | $240.00 per cat $195 per cat | $263 per cat Fee set by vendor Adoptions ‐ Cats (Under 6 Months) $175.00 per cat | $205.00 per cat $185.00 per cat | $217.00 per cat Fee set by vendor Adoptions ‐ Cockatiels, Parakeets, Chickens, Pigeons, & Doves $10.00 per pet $40.00 per pet Fee set by vendor Dogs (6 months and over)* $175.00 per dog | $205.00 per dog $175.00 per dog Fee set by vendor Dogs (Under 6 Months) $300.00 per dog | $350.00 per dog $350.00 per dog Fee set by vendor Boarding ‐ Cat $30.00 per day $30.00 per day Fee set by vendor Boarding ‐ Dog $30.00 per day $30.00 per day Fee set by vendor Boarding ‐ Rabbit $30.00 per day $30.00 per day Fee set by vendor Item 4 Attachment A - Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees        Item 4: Staff Report Pg. 8  Packet Pg. 14 of 76  A achment A Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees  Fee Title   FY 2026 Adopted   FY 2027 Proposed Justification Boarding ‐ Small Animal (Reptiles, Birds, etc.) $30.00 per day $30.00 per day Fee set by vendor Cremation ‐ A. Animal: 0lbs ‐ 3lbs $175.00 per pet | $50.00 per pet $200 per pet | $60.00 per pet Fee set by vendor Cremation ‐ B. Animal: 4lbs ‐ 20lbs $200.00 per pet | $50.00 per pet $240 per pet | $60.00 per pet Fee set by vendor Cremation ‐ C. Animal: 21lbs ‐ 49lbs $225.00 per pet | $50.00 per pet $270 per pet | $60.00 per pet Fee set by vendor Cremation ‐ D. Animal: 50lbs ‐ 79lbs $250.00 per pet | $50.00 per pet $300 per pet | $60.00 per pet Fee set by vendor Cremation ‐ E. Animal: 80lbs ‐ 99lbs $275.00 per pet | $50.00 per pet $330 per pet | $60.00 per pet Fee set by vendor Cremation ‐ F. Animal: 100lbs ‐ 150lbs $300.00 per pet | $50.00 per pet $360 per pet | $60.00 per pet Fee set by vendor Cremation Services ‐ Custom Engraved Plaque Fee $22.00 each $25.00 each Fee set by vendor Euthanasia ‐ A. Domestic Animals (up to 20lbs) $150.00 per pet $175.00 per pet Fee set by vendor Euthanasia ‐ B. Dogs (21lbs to 75lbs) $150.00 per pet $175.00 per pet Fee set by vendor Euthanasia ‐ C. Dogs (76lbs and over) $150.00 per pet $175.00 per pet Fee set by vendor Euthanasia ‐ D. Small Animals and Birds $45.00 per pet $45.00 per pet Fee set by vendor Other Animal Shelter Fees ‐ Classes, camps, corporate events $21.00 ‐ $1,075.00 per event $21.00 ‐ $1,075.00 per event Fee set by vendor Spay & Neuter Clinic Fees ‐ Cat ‐ Community Cat Package $125.00 per pet $175.00 per pet Fee set by vendor Spay & Neuter Clinic Fees ‐ Cat ‐ Neuter 150.00 per pet $175.00 per pet Fee set by vendor Spay & Neuter Clinic Fees ‐ Cat ‐ Spay $100.00 per pet $200.00 per pet Fee set by vendor Spay & Neuter Clinic Fees ‐ Dog ‐ A. Neuter (0lbs ‐ 50lbs)$220.00 per pet $270.00 per pet Fee set by vendor Spay & Neuter Clinic Fees ‐ Dog ‐ B. Neuter (51lbs and 99lbs)$250.00 per pet $300.00 per pet Fee set by vendor Spay & Neuter Clinic Fees ‐ Dog ‐ C. Neuter (100 lbs and over)$275.00 per pet $325.00 per pet Fee set by vendor Spay & Neuter Clinic Fees ‐ Dog ‐ D. Spay (0lbs ‐ 50lbs) $275.00 per pet $325.00 per pet Fee set by vendor Spay & Neuter Clinic Fees ‐ Dog ‐ E. Spay (51lbs and 99lbs)$330.00 per pet $380.00 per pet Fee set by vendor Spay & Neuter Clinic Fees ‐ Dog ‐ F. Spay (100 lbs and over)$400.00 per pet $450.00 per pet Fee set by vendor Item 4 Attachment A - Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees        Item 4: Staff Report Pg. 9  Packet Pg. 15 of 76  A achment A Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees  Fee Title   FY 2026 Adopted   FY 2027 Proposed Justification Spay & Neuter Clinic Fees ‐ General ‐ Clinic Board Fee $100.00 per pet $100.00 per pet Fee set by vendor Spay & Neuter Clinic Fees ‐ General ‐ Late Fee for Spay/Neuter Pickup $70.00 per pet $100.00 per pet Fee set by vendor Spay & Neuter Clinic Fees ‐ General ‐ No‐Show Fee (non‐ refundable) $70.00 per pet $100.00 per pet Fee set by vendor Spay & Neuter Clinic Fees ‐ General ‐ Rescue Group (Non‐Profit) ‐ Cat Neuter $75.00 per pet $125.00 per pet Fee set by vendor Spay & Neuter Clinic Fees ‐ General ‐ Rescue Group (Non‐Profit) ‐ Cat Spay $100.00 per pet $150.00 per pet Fee set by vendor Spay & Neuter Clinic Fees ‐ General ‐ Rescue Group (Non‐Profit) ‐ Dog Neuter (over 50 lbs) $175.00 per pet $225.00 per pet Fee set by vendor Spay & Neuter Clinic Fees ‐ General ‐ Rescue Group (Non‐Profit) ‐ Dog Neuter (under 50 lbs) $150.00 per pet $200.00 per pet Fee set by vendor Spay & Neuter Clinic Fees ‐ General ‐ Rescue Group (Non‐Profit) ‐ Dog Spay (over 50 lbs) $300.00 per pet $350.00 per pet Fee set by vendor Spay & Neuter Clinic Fees ‐ General ‐ Rescue Group (Non‐Profit) ‐ Dog Spay (under 50 lbs) $250.00 per pet $300.00 per pet Fee set by vendor Vaccinations ‐ Bordatella & Parainfluenza $20.00 per pet $25.00 per pet Fee set by vendor Vaccinations ‐ Cat Package $85.00 per pet $125.00 per pet Fee set by vendor Vaccinations ‐ DA2PP $20.00 per pet $25.00 per pet Fee set by vendor Vaccinations ‐ Dog Package $85.00 per pet $200.00 per pet Fee set by vendor Vaccinations ‐ FVRCP $20.00 per pet $25.00 per pet Fee set by vendor Vaccinations ‐ Kitten Package (under 3 months) $125.00 per pet $160.00 per pet Fee set by vendor Vaccinations ‐ Microchip $25.00 per pet $30.00 per pet Fee set by vendor Vaccinations ‐ Puppy Package (under 3 months) $125.00 per pet $250.00 per pet Fee set by vendor Vaccinations ‐ Rabies $20.00 per pet $25.00 per pet Fee set by vendor Vaccinations ‐ Rabies (Actual Clinic Cost) $6.00 per pet $6.00 per pet Fee set by vendor Vaccinations ‐ Trap Rental ‐ Deposit $75.00 each $100.00 each Fee set by vendor Veterinary Services ‐ Bandages $75.00 per pet $75.00 per pet Fee set by vendor Veterinary Services ‐ Brachycephalic Fee $100.00 per pet $150.00 per pet Fee set by vendor Item 4 Attachment A - Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees        Item 4: Staff Report Pg. 10  Packet Pg. 16 of 76  A achment A Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees  Fee Title   FY 2026 Adopted   FY 2027 Proposed Justification Veterinary Services ‐ Common Procedures ‐ Fluorescein Eye Stain $21.00 each $21.00 each Fee set by vendor Veterinary Services ‐ Common Procedures ‐ Medical Grooming $102.00 per hour $102.00 per hour Fee set by vendor Veterinary Services ‐ Cryptorchid Abdominal ‐ Fee $110.00 per pet $150.00 per pet Fee set by vendor Veterinary Services ‐ Cryptorchid Subcutaneous ‐ Fee $55.00 each $55.00 each Fee set by vendor Veterinary Services ‐ Ear Cleaning $33.00 each $38.00 each Fee set by vendor Veterinary Services ‐ Flea +/‐ Preventative (per dose) $30.00 ‐ $100.00 each $33.00 ‐ $110.00 each Fee set by vendor Veterinary Services ‐ Fluid Therapy ‐ IV Fluids $27.00 per hour $30.00 per hour Fee set by vendor Veterinary Services ‐ IV Catheter Placement $72.00 each $72.00 each Fee set by vendor Veterinary Services ‐ Lab work ‐ Fecal O & P $75.00 each $75.00 each Fee set by vendor Veterinary Services ‐ Lab work ‐ FeLV/FIV Test $52.00 each $70.00 each Fee set by vendor Veterinary Services ‐ Labwork ‐ Heartworm Test $48.00 each $60.00 each Fee set by vendor Veterinary Services ‐ Labwork ‐ Parvo Test $52.00 each $60.00 each Fee set by vendor Veterinary Services ‐ Labwork ‐ Reference Lab Labwork cost plus $30.00 service fee Labwork cost plus $30.00 service fee Fee set by vendor Veterinary Services ‐ Labwork ‐ Skin Scraping $33.00 each $33.00 each Fee set by vendor Veterinary Services ‐ Labwork ‐ USG $33.00 each $33.00 each Fee set by vendor Veterinary Services ‐ Local Anesthetic $43.00 each $43.00 each Fee set by vendor Veterinary Services ‐ Long‐Acting Topical Ear Medication $70.00 each $70.00 each Fee set by vendor Veterinary Services ‐ Nail Trim $0.00 with surgery $0.00 with surgery Fee set by vendor Veterinary Services ‐ Obesity Fee plus Spay Fee $55.00 per pet $55.00 per pet Fee set by vendor Veterinary Services ‐ Rabbit Hemorrhagic Disease Vaccine $33.00 each $33.00 each Fee set by vendor Veterinary Services ‐ Routine Deworming (roundworms & hookworms)$30.00 per dose $10.00 per dose Fee set by vendor Veterinary Services ‐ Tapeworm Treatment (Praziquantel) $20.00 per pet $25.00 per pet Fee set by vendor Item 4 Attachment A - Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees        Item 4: Staff Report Pg. 11  Packet Pg. 17 of 76  A achment A Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees  Fee Title   FY 2026 Adopted   FY 2027 Proposed Justification Veterinary Services ‐ Umbilical Hernia Repair $44.00 ‐ $95.00 per pet $50.00 ‐ $150.00 per pet Fee set by vendor Veterinary Services ‐ Veterinarian Exam $85.00 per hour $100.00 per hour Fee set by vendor Children's Theatre ‐ Children's Theatre ‐ Adults $14.00 ‐ $31.00 each $14.00 ‐ $31.00 each Adjustment within existing approved range Children's Theatre ‐ Children's Theatre ‐ Children $6.00 ‐ $31.00 each $6.00 ‐ $31.00 each Adjustment within existing approved range Children's Theatre ‐ Children's Theatre ‐ Per Show Production Per Participant Fee $66.00 ‐ $430.00 each | Fee plus up to 50% $66.00 ‐ $430.00 each | Fee plus up to 50%Adjustment within existing approved range Junior Museum & Zoo (JMZ) ‐ Ticketed Admission Fee $2.00 ‐ $26.00 per person $2.00 ‐ $26.00 per person Adjustment within existing approved range Golf ‐ Club & Cart Rental Fees ‐ Golf Cart ‐ 18 Holes $17.00 ‐ $41.00 per rental $20.00 ‐ $30.00 per rental Fee set by vendor Golf ‐ Club & Cart Rental Fees ‐ Golf Cart ‐ 9 Holes $11.00 ‐ $26.00 per rental $12.00 ‐ $18.00 per rental Fee set by vendor Golf ‐ Club & Cart Rental Fees ‐ Pull Cart ‐ 18 Holes $8.00 ‐ $15.00 per rental $8.00 ‐ $12.00 per rental Fee set by vendor Golf ‐ Club & Cart Rental Fees ‐ Pull Cart ‐ 9 Holes $5.00 ‐ $10.00 per rental $5.00 ‐ $9.00 per rental Fee set by vendor Golf ‐ Club & Cart Rental Fees ‐ Rental Clubs ‐ 18 Holes $50.00 ‐ $80.00 per rental $50.00 ‐ $85.00 per rental Fee set by vendor Golf ‐ Club & Cart Rental Fees ‐ Rental Clubs ‐ 9 Holes $25.00 ‐ $45.00 per rental $25.00 ‐ $50.00 per rental Fee set by vendor Golf ‐ Club & Cart Rental Fees ‐ Single Rider ‐ 18 Holes $20.00 ‐ $35.00 per rental $20.00 ‐ $30.00 per rental Fee set by vendor Golf ‐ Driving Range Fees ‐ A. Small Bucket $6.00 ‐ $10.00 per bucket $6.00 ‐ $10.00 per bucket Fee set by vendor Golf ‐ Club & Cart Rental Fees ‐ B. Medium Bucket $10.00 ‐ $17.00 per bucket $10.00 ‐ $17.00 per bucket Fee set by vendor Golf ‐ Club & Cart Rental Fees ‐ C. Large Bucket $14.00 ‐ $22.00 per bucket $14.00 ‐ $22.00 per bucket Fee set by vendor Golf ‐ Club & Cart Rental Fees ‐ D. Jumbo Bucket $17.00 ‐ $27.00 per bucket $18.00 ‐ $29.00 per bucket Fee set by vendor Golf ‐ Green Fees ‐ 9 Hole/Twilight Non Resident $268.00 ‐ $762.00 per team $282.00 ‐ $840.00 per team Fee set by vendor Golf ‐ Green Fees ‐ 9 Hole/Twilight Non Resident Note: Twilight rate will begin 4.5 hours before sunset. $40.00 ‐ $62.00 per player | $50.00 ‐ $75.00 per player $45.00 ‐ $66.00 per player | $55.00 ‐ $80.00 per player Fee set by vendor Golf ‐ Club & Cart Rental Fees ‐ 9 Hole/Twilight Resident or East Palo Alto Resident N t T ili ht t ill b i 4 5 h b f t $35.00 ‐ $56.00 per player | $45.00 ‐ $70.00 per player $40.00 ‐ $60.00 per player | $45.00 ‐ $74.00 per player Fee set by vendor Golf ‐ Club & Cart Rental Fees ‐ Bay Area Resident Note: Santa Clara County, San Mateo County, San Francisco C t Al d C t d C t C t C t $55.00 ‐ $120.00 per player | $65.00 ‐ $175.00 per player $70.00 ‐ $100.00 per player | $80.00 ‐ $110.00 per player Fee set by vendor Golf ‐ Club & Cart Rental Fees ‐ Baylands Cardholder $40.00 ‐ $100.00 per player | $55.00 ‐ $135.00 per player $45.00 ‐ $75.00 per player | $65.00 ‐ $95.00 per player Fee set by vendor Item 4 Attachment A - Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees        Item 4: Staff Report Pg. 12  Packet Pg. 18 of 76  A achment A Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees  Fee Title   FY 2026 Adopted   FY 2027 Proposed Justification Golf ‐ Club & Cart Rental Fees ‐ Juniors Note: Will be available to those 17 years old and younger ith lid ID $15.00 ‐ $32.00 per player | $25.00 ‐ $51.00 per player $15.00 ‐ $30.00 per player | $20.00 ‐ $35.00 per player Fee set by vendor Golf ‐ Club & Cart Rental Fees ‐ Membership Card $79.00 ‐ $175.00 per card $85.00 ‐ $190.00 per card Fee set by vendor Golf ‐ Club & Cart Rental Fees ‐ Non Resident $60.00 ‐ $130.00 per player | $70.00 ‐ $190.00 per player $85.00 ‐ $130.00 per player | $90.00 ‐ $140.00 per player Fee set by vendor Golf ‐ Club & Cart Rental Fees ‐ Palo Alto or East Palo Alto Resident $45.00 ‐ $110.00 per player | $55.00 ‐ $145.00 per player $55.00 ‐ $85.00 per player | $75.00 ‐ $105.00 per player Fee set by vendor Golf ‐ Club & Cart Rental Fees ‐ Replay Rate $25.00 ‐ $50.00 per player | $30.00 ‐ $70.00 per player $25.00 ‐ $70.00 per player | $35.00 ‐ $80.00 per player Fee set by vendor Golf ‐ Special Fees ‐ League Reservation Fee $282.00 ‐ $840.00 per team $600.00 ‐ $5,000 per team Fee set by vendor Golf ‐ Special Fees ‐ Tournaments $75.00 ‐ $205.00 per player | $85.00 ‐ $270.00 per player $80.00 ‐ $130.00 per player | $100.00 ‐ $170.00 per player Fee set by vendor Open Space Activities ‐ Registration ‐ Drop‐in Activities $1.00 ‐ $147.00 per person $1.00 ‐ $147.00 per person Adjustment within existing approved range Open Space Activities ‐ Registration ‐ Instructional Classes & Camps $3.00 ‐ $1,216.00 per person | Fee plus up to 50% $3.00 ‐ $1,216.00 per person | Fee plus up to 50% Adjustment within existing approved range Open Space Activities ‐ Registration ‐ Interpretive Programs Including Tours and Birthday Parties $3.00 ‐ $1,113.00 per person | $3.00 ‐ 1,194.00 per person $3.00 ‐ $1,113.00 per person | $3.00 ‐ 1,194.00 per person Adjustment within existing approved range Vehicle Entry Fees ‐ A. Vehicle Entry ‐ Daily Fee ‐ Vehicle Capacity 9 passengers or less $6.00 each $6.00 each Fee aligned with market rate Vehicle Entry Fees ‐ B. Vehicle Entry ‐ Daily Fee ‐ Vehicle Capacity 10‐24 passengers $30.00 each $30.00 each Fee aligned with market rate Vehicle Entry Fees ‐ C. Vehicle Entry ‐ Daily Fee ‐ Vehicle Capacity 25 or more passengers with a group permit $60.00 each $60.00 each Fee aligned with market rate Vehicle Entry Fees ‐ D. Vehicle Entry ‐ Annual Pass $0.00 ‐ $86.00 each $0.00 ‐ $86.00 each Department Recommendation Teen Center Membership ‐ Monthly $5.00 ‐ $10.00 per month $5.00 ‐ $10.00 per month Department Recommendation Teen Center Membership ‐ School Year $74.00 each $74.00 each Department Recommendation Registration ‐ Drop‐in Activities $2.00 ‐ $146.00 per person | Fees plus up to 50% $2.00 ‐ $146.00 per person | Fees plus up to 50%Department Recommendation Registration ‐ Instructional Classes & Camps $3.00 ‐ $1,909.00 per person | Fees plus up to 50% $3.00 ‐ $1,909.00 per person | Fees plus up to 50%Department Recommendation Rinconada Complex and PAUSD Pools ‐ A. Infant (2 and Under)$0.00 ‐ $4.00 per person | $0.00 ‐ $5.00 per person $0.00 ‐ $4.00 per person | $0.00 ‐ $5.00 per person Fee set by vendor Rinconada Complex and PAUSD Pools ‐ B. Youth (17 and Under)$4.00 ‐ $7.00 per person | $5.00 ‐ $10.00 per person $4.00 ‐ $7.00 per person | $5.00 ‐ $10.00 per person Fee set by vendor Rinconada Complex and PAUSD Pools ‐ C. Adult (18 and Over)$5.00 ‐ $9.00 per person | $6.00 ‐ $11.00 per person $5.00 ‐ $9.00 per person | $6.00 ‐ $11.00 per person Fee set by vendor Rinconada Complex and PAUSD Pools ‐ D. Lap Swimming $5.00 ‐ $9.00 per person | $5.00 ‐ $11.00 per person $5.00 ‐ $9.00 per person | $5.00 ‐ $11.00 per person Fee set by vendor Item 4 Attachment A - Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees        Item 4: Staff Report Pg. 13  Packet Pg. 19 of 76  A achment A Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees  Fee Title   FY 2026 Adopted   FY 2027 Proposed Justification Rinconada Complex and PAUSD Pools ‐ E. Senior and Senior Lap (60 and Over)$4.00 ‐ $6.00 per person $4.00 ‐ $6.00 per person Fee set by vendor Rinconada Complex and PAUSD Pools ‐ F. Membership (Swim Pass)$28.00 ‐ $75.00 per person $28.00 ‐ $75.00 per person Fee set by vendor Art Center ‐ Auditorium $204.00 per hour | $307.00 per hour $217.00 per hour | $337.00 per hour Sensitivity to declining rental demand Art Center ‐ Children's Clay Studio $54.00 per hour | $81.00 per hour $57.00 per hour | $89.00 per hour Sensitivity to declining rental demand Art Center ‐ Children's Outdoor Classroom $123.00 per hour | $186.00 per hour $131.00 per hour | $204.00 per hour Sensitivity to declining rental demand Art Center ‐ Historic Courtyard $123.00 per hour | $186.00 per hour $131.00 per hour | $204.00 per hour Sensitivity to declining rental demand Art Center ‐ Kitchen/Pre‐school $54.00 per hour | $81.00 per hour $57.00 per hour | $89.00 per hour Sensitivity to declining rental demand Art Center ‐ Lobby $123.00 per hour | $186.00 per hour $131.00 per hour | $204.00 per hour Sensitivity to declining rental demand Art Center ‐ Meeting Room $129.00 per hour | $194.00 per hour $137.00 per hour | $213.00 per hour Sensitivity to declining rental demand Art Center ‐ Project LOOK! Studio $54.00 per hour | $81.00 per hour $57.00 per hour | $89.00 per hour Sensitivity to declining rental demand Art Center ‐ Sculpture Garden $162.00 per hour | $244.00 per hour $173.00 per hour | $268.00 per hour Sensitivity to declining rental demand Art Center ‐ Studio A $54.00 per hour | $81.00 per hour $57.00 per hour | $89.00 per hour Sensitivity to declining rental demand Art Center ‐ Studio B $54.00 per hour | $81.00 per hour $57.00 per hour | $89.00 per hour Sensitivity to declining rental demand Athletic Fields ‐ Grass Fields $63.00 per hour | $114.00 per hour $67.00 per hour | $125.00 per hour Other, Department Recommendation Athletic Fields ‐ Synthetic Turf Field $85.00 per hour | $191.00 per hour $90.00 per hour | $210.00 per hour Other, Department Recommendation Athletic Fields ‐ Tennis Courts (USTA and Palo Alto Tennis Club Only) $8.00 per hour | $10.00 per hour $8.00 per hour | $11.00 per hour Other, Department Recommendation Children's Theatre ‐ Auditorium and Stage $189.00 ‐ $2,705.00 per hour | $286.00 ‐ $4,180.00 per hour $189.00 ‐ $2,705.00 per hour | $286.00 ‐ $4,180.00 per hour Adjustment within existing approved range Children's Theatre ‐ Castle Stage and Secret Garden $378.00 ‐ $3,382.00 per hour | $569.00 ‐ $5,225.00 per hour $378.00 ‐ $3,382.00 per hour | $569.00 ‐ $5,225.00 per hour Adjustment within existing approved range Children's Theatre ‐ Dance Studio $40.00 ‐ $1,455.00 per hour | $62.00 ‐ $2,245.00 per hour $40.00 ‐ $1,455.00 per hour | $62.00 ‐ $2,245.00 per hour Adjustment within existing approved range Children's Theatre ‐ Package Rental ‐ All Available Space and Garden $1,266.00 ‐ $6,764.00 per hour | $1,901.00 ‐ $10,451.00 per hour $1,266.00 ‐ $6,764.00 per hour | $1,901.00 ‐ $10,451.00 per hour Adjustment within existing approved range Cubberley Community Center ‐ Art Studio Short Term $107.00 per week | $119.00 per week $1.14 per sq ft per month $1.27 per sq ft per month Fee aligned with market rate Cubberley Community Center ‐ Theatre Rentals ‐ Additional Performance $450.00 each $450.00 each Fee aligned with market rate Item 4 Attachment A - Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees        Item 4: Staff Report Pg. 14  Packet Pg. 20 of 76  A achment A Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees  Fee Title   FY 2026 Adopted   FY 2027 Proposed Justification Foothills Nature Preserve ‐ Towle Camp (8 People) $42.00 per day $42.00 per day Fee aligned with market rate Foothills Nature Preserve ‐ Towle Camp Group (16 People) $58.00 per day $58.00 per day Fee aligned with market rate Bryant St ‐ Downstairs Large Space $212.00 per hour |$328.00 per hour $212.00 per hour |$328.00 per hour Other, Department Recommendation Bryant St ‐ Upstairs, Classroom 1 $188.00 per hour | $263.00 per hour $188.00 per hour | $263.00 per hour Other, Department Recommendation Bryant St ‐ Upstairs, Classroom 2 $143.00 per hour | $205.00 per hour $143.00 per hour | $205.00 per hour Other, Department Recommendation Rental ‐ Portable Digital Projector $107.00 per hour | $161.00 per hour $114.00 per hour | $177.00 per hour Other, Department Recommendation Rental ‐ Television $17.00 per use | $28.00 per use $17.00 per use | $28.00 per use Other, Department Recommendation Fire  Fee Title   FY 2026 Adopted   FY 2027 Proposed Justification Paramedic Internship Fee $1,000.00 each $1,000.00 each Flat fee for paramedic intership, paid by schools FireMed Business Tier 1 $20.00 per unit $20.00 per unit Not a fee for service, part of an insurance‐like program for ambulance transport. FireMed Business Tier 2 $100.00 per unit $100.00 per unit Not a fee for service, part of an insurance‐like program for ambulance transport. FireMed Business Tier 3 $200.00 per unit $200.00 per unit Not a fee for service, part of an insurance‐like program for ambulance transport. FireMed Business Tier 4 $500.00 per unit $500.00 per unit Not a fee for service, part of an insurance‐like program for ambulance transport. FireMed Business Tier 5 $1,000.00 per unit $1,000.00 per unit Not a fee for service, part of an insurance‐like program for ambulance transport. FireMed Residential $8.00 per household $8.00 per household Not a fee for service, part of an insurance‐like program for ambulance transport. Library  Fee Title   FY 2026 Adopted   FY 2027 Proposed Justification Fines & Penalties ‐ Billing Fee for Overdue Items $5.00 each $5.00 each Fee aligned with market rate Fines & Penalties ‐ Collection Agency Processing Fee $12.00 each $12.00 each Fee aligned with market rate Item 4 Attachment A - Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees        Item 4: Staff Report Pg. 15  Packet Pg. 21 of 76  A achment A Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees  Fee Title   FY 2026 Adopted   FY 2027 Proposed Justification Fines & Penalties ‐ Damaged and Lost Materials ‐ LINK+ $115.00 each $115.00 each Fee set by vendor Fines & Penalties ‐ Overdue Materials ‐ In House Laptops $0.30 each $0.30 each Fee aligned with market rate Fines & Penalties ‐ Replacement Library Card $1.00 each $1.00 each Fee aligned with market rate Rentals & Reservations ‐ Mitchell Park Library Community Room $66.00 per hour | $99.00 per hour $66.00 per hour | $99.00 per hour Fee aligned with market rate Rentals & Reservations ‐ Mitchell Park Library Community Room ‐ Full Day Rental $330.00 per hour | $494.00 per hour $330.00 per hour | $494.00 per hour Fee aligned with market rate Rentals & Reservations ‐ Photography/Filming ‐Space Rental Fee $100.00 ‐ $2,000.00 per session $100.00 ‐ $2,000.00 per session Fee aligned with market rate Rentals & Reservations ‐ Rinconada Library Community Room $96.00 per hour | $143.00 per hour $96.00 per hour | $143.00 per hour Fee aligned with market rate Rentals & Reservations ‐ Rinconada Library Community Room ‐ Full Day Rental $478.00 per day | $716.00 per day $478.00 per day | $716.00 per day Fee aligned with market rate Rentals & Reservations ‐ Room Cleaning & Damage Deposit $306.00 ‐ $3,060.00 per deposit $306.00 ‐ $3,060.00 per deposit Fee aligned with market rate Rentals & Reservations ‐ Room Cleaning Fee ‐ Add on $80.00 ‐ $500.00 per event $80.00 ‐ $500.00 per event Fee aligned with market rate Services ‐ Laser Prints ‐ Black & White $0.15 per page $0.15 per page Fee aligned with market rate Services ‐ Laser Prints ‐ Color $0.050 per page $0.050 per page Fee aligned with market rate Office of Transportation  Fee Title   FY 2026 Adopted   FY 2027 Proposed Justification Bicycle Training (or other training) $17.00 ‐ $80.00 per class $17.00 ‐ $80.00 per class Department Recommendation PA Link ‐ Discounted Fare $0.00 ‐ $4.00 per passenger trip $0.00 ‐ $4.00 per passenger trip Department Recommendation PA Link ‐ Monthly Pass $130.00 per month $130.00 per month Department Recommendation PA Link ‐ On‐Demand Transit ‐ (Palo Alto Link) $0.00 ‐ $4.00 per passenger trip $0.00 ‐ $4.00 per passenger trip Department Recommendation PA Link ‐ One‐Way Fare $0.00 ‐ $4.00 per passenger trip $0.00 ‐ $4.00 per passenger trip Department Recommendation PA Link ‐ Weekly Pass $40.00 per week $40.00 per week Department Recommendation All Downtown and SOFA ‐ Wait List Registration $12.00 per occurrence $12.00 per occurrence Department Recommendation Item 4 Attachment A - Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees        Item 4: Staff Report Pg. 16  Packet Pg. 22 of 76  A achment A Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees  Fee Title   FY 2026 Adopted   FY 2027 Proposed Justification All Downtown and SOFA Garages and Lots ‐ One Day Parking Permit $0 ‐ $25 per day $20.00 ‐ $25.00 per day Achieve Cost Recovery All Downtown and SOFA Lots and Garages Annual Parking Permit $990.00 per year $1,037.00 per year Achieve Cost Recovery All Downtown and SOFA Lots and Garages Reduced‐Price Annual Parking Permit $247.50 per year $260.75 per year Achieve Cost Recovery California Avenue Area All Garages and Lots ‐ Daily Parking Permit $0 ‐ $25 per day $20 ‐ $25 per day Achieve Cost Recovery California Avenue Area All Garages and Lots Annual Parking Permit $715.00 per year $750.00 per year Achieve Cost Recovery California Avenue Area All Garages and Lots Reduced‐Price Annual Parking Permit $178.75 per year $189.00 per year Achieve Cost Recovery "No Parking" Sign (on‐street) Note: Per space $29.00 per day $31.00 per day Achieve Cost Recovery Commercial/Construction ‐ Wide Load/Heavy Vehicle $17.00 per occurrence $28.00 per occurence Achieve Cost Recovery On‐Street Parking Permit (University Avenue & California Avenue) N t P $28.00 per day $30.00 per day Achieve Cost Recovery RPP Construction Parking Permit $128.50 per month $234.00 per month Achieve Cost Recovery College Terrace RPP ‐ Annual Resident Parking Permit $55.00 per year $62.00 per year Achieve Cost Recovery College Terrace RPP Daily Resident Parking Permit $5.50 per day $5.75 per day Achieve Cost Recovery Crescent Park NOP ‐ Annual Resident Parking Permit $55.00 per year $62.00 per year Achieve Cost Recovery Crescent Park NOP Daily Resident Parking Permit Note: Per night $5.50 each $5.75 each Achieve Cost Recovery Downtown RPP ‐ Annual Resident Parking Permit $55.00 per year $62.00 per year Achieve Cost Recovery Downtown RPP ‐ Daily Resident Parking Permit $5.50 per day $5.75 per day Achieve Cost Recovery Downtown RPP ‐ Reduced‐Price Employee Parking Permit Note: Per six months $144.00 each $153.00 per year Achieve Cost Recovery Downtown RPP Full Price Employee Parking Permit Note: Per six months $577.50 each $604.00 each Achieve Cost Recovery Evergreen Park ‐ Mayfield RPP Annual Resident Parking Permit $55.00 per year $62.00 per year Achieve Cost Recovery Evergreen Park ‐ Mayfield RPP Daily Resident Parking Permit $5.50 per day $5.75 per day Achieve Cost Recovery Evergreen Park ‐ Mayfield RPP Full Price Employee Parking Permit N t P i th $412.50 each $433.50 each Achieve Cost Recovery Evergreen Park ‐ Mayfield RPP Reduced‐Price Employee Parking Permit N t P i th $103.00 each $110.00 per year Achieve Cost Recovery Item 4 Attachment A - Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees        Item 4: Staff Report Pg. 17  Packet Pg. 23 of 76  A achment A Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees  Fee Title   FY 2026 Adopted   FY 2027 Proposed Justification Old Palo Alto RPP ‐ Annual Resident Parking Permit $55.00 per year $62.00 per year Achieve Cost Recovery Old Palo Alto RPP ‐ Daily Resident Parking Permit $5.50 each $5.75 each Achieve Cost Recovery Southgate RPP ‐ Annual Resident Parking Permit $55.00 per year $62.00 per year Achieve Cost Recovery Southgate RPP ‐ Daily Resident Parking Permit $5.50 per day $5.75 per year Achieve Cost Recovery Southgate RPP ‐ Full Price Employee Parking Permit Note: Per six months $412.50 each $433.50 each Achieve Cost Recovery Southgate RPP ‐ Reduced Price Employee Parking Permit Note: Per six months $103.00 each $110.00 per year Achieve Cost Recovery Planning and Development Services Fee Title  FY 2026 Adopted   FY 2027 Proposed Justification Rental Registry Program Registration Fee Exempt: $0.00 per unit Non‐Exempt: $35.00 per unit Exempt: $0.00 per unit Non‐Exempt: $40.00 per unit Achieve Cost Recovery Police Fee Title  FY 2026 Adopted   FY 2027 Proposed Justification Impoundment Fees ‐ Dog ‐ Licensed ‐ Second and Subsequent Offense*$75.00 per occurrence $185.00 per occurrence Policy Update for Efficiency Impoundment Fees ‐ Dog ‐ Unlicensed‐ Second and Subsequent Offense*$95.00 per occurrence $219.00 per occurrence Policy Update for Efficiency State Mandated Fees ‐ First Offense $35.00 per occurrence $35.00 per occurrence Determined by outside agency State Mandated Fees ‐ Second Offense $50.00 per occurrence $50.00 per occurrence Determined by outside agency State Mandated Fees ‐ Third and Subsequent Offenses $100.00 per occurrence $100.00 per occurrence Determined by outside agency OPM/DOD Background Check $5.00 per application $5.00 per application Determined by outside agency Impoundment Fees ‐ Vehicle Repossession Receipt $15.00 each $15.00 each Determined by outside agency Report Copy Fee $15.00 each $15.00 each Determined by outside agency A. Massage Establishment ‐ New $478.00 per year $900.00 per year Planned for Council consideration later this year for update and policy revision Item 4 Attachment A - Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees        Item 4: Staff Report Pg. 18  Packet Pg. 24 of 76  A achment A Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees  Fee Title   FY 2026 Adopted   FY 2027 Proposed Justification B. Massage Establishment ‐ Renewal $241.00 per year $800.00 per year Planned for Council consideration later this year for update and policy revision Massage Establishment ‐ Sole Proprietor (New) $318.00 per year $450.00 per year Planned for Council consideration later this year for update and policy revision Massage Establishment ‐ Sole Proprietor (Renewal) $235.00 per year $375.00 each Planned for Council consideration later this year for update and policy revision Public Works Fee Title  FY 2026 Adopted   FY 2027 Proposed Justification Street Cut Fees ‐ D. Pavement Condition: Very Good ‐ Excellent $28.00 per square foot $28.00 per square foot Based on actuals Street Cut Fees ‐ C. Pavement Condition: Good $20.00 per square foot $20.00 per square foot Based on actuals Street Cut Fees ‐ B. Pavement Condition: Fair/At‐Risk $17.00 per square foot $17.00 per square foot Based on actuals Street Cut Fees ‐ A. Pavement Condition: Poor $14.00 per square foot $14.00 per square foot Based on actuals Electric Vehicle Charger Connection $0.00 to $2.00 per connection $0.00 to $2.00 per connection Based on the individual charger according to charger type. Electric Vehicle Charger Connection Overstay $0.00 to $5.00 per hour $0.00 to $5.00 per hour Based on the individual charger according to charger type. Electric Vehicle Charging $0.25 per kilowatt hour $0.35 per kilowatt hour Achieve Cost Recovery Item 4 Attachment A - Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees        Item 4: Staff Report Pg. 19  Packet Pg. 25 of 76  A achment A Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees Deleted Fees Department  Type   Fee Justification Administrative Services Other Tobacco Retail Permit Administered and fee collected by Santa Clara County Community Services Department Adoptions Cats (5+ Years) Determined by Vendor Community Services Department Adoptions Dogs (5+ Years) Determined by Vendor Community Services Department Adoptions Exotic Animals Determined by Vendor Community Services Department Adoptions Rabbits Determined by Vendor Community Services Department Adoptions Rats, Hamsters, Guinea Pigs, & Mice Determined by Vendor Community Services Department Spay & Neuter Clinic Fees ‐ General Rabbit ‐ Neuter Determined by Vendor Community Services Department Spay & Neuter Clinic Fees ‐ General Rabbit ‐ Spay Determined by Vendor Community Services Department Vaccinations Kitten Package (over 3 months) Determined by Vendor Community Services Department Vaccinations Puppy Package (over 3 months) Determined by Vendor Community Services Department Vaccinations Routine Deworming (roundworms & hookworms) Determined by Vendor Community Services Department Veterinary Services Deciduous Tooth Extraction Determined by Vendor Community Services Department Veterinary Services Dewclaw Removal Determined by Vendor Community Services Department Veterinary Services Ear Mite Treatment Determined by Vendor Community Services Department Veterinary Services Fluid Therapy ‐ SQ (Dogs) Determined by Vendor Community Services Department Veterinary Services Fluid Therapy ‐ SQ (Cats) Determined by Vendor Community Services Department Veterinary Services Lab work ‐ In‐House Fungal Culture Determined by Vendor Community Services Department Veterinary Services Labwork ‐ PCV/TP Determined by Vendor Community Services Department Veterinary Services Labwork ‐ Pre‐surgical Determined by Vendor Community Services Department Veterinary Services Labwork ‐ Urine Dipstick Determined by Vendor Community Services Department Veterinary Services Leukemia/FIV Combo Testing Determined by Vendor Item 4 Attachment A - Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees        Item 4: Staff Report Pg. 20  Packet Pg. 26 of 76  A achment A Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees Department  Type   Fee Justification Community Services Department Veterinary Services Medication ‐ Oral Determined by Vendor Community Services Department Veterinary Services Medication ‐ Topical Determined by Vendor Community Services Department Veterinary Services Medication ‐ Injectable Determined by Vendor Community Services Department Veterinary Services Nail Trim Determined by Vendor Community Services Department Veterinary Services Sedation/Anesthesia ‐ IM Determined by Vendor Community Services Department Veterinary Services Sedation/Anesthesia ‐ IV Determined by Vendor Community Services Department Veterinary Services Sedation/Anesthesia ‐ Gas Determined by Vendor Community Services Department Veterinary Services Specialized Feeding Determined by Vendor Community Services Department Veterinary Services Leukemia/FIV Combo Testing Determined by Vendor Community Services Department Veterinary Services Medication ‐ Oral Determined by Vendor Community Services Department Veterinary Services Medication ‐ Topical Determined by Vendor Community Services Department Veterinary Services Nail Trim Determined by Vendor Community Services Department Veterinary Services Sedation/Anesthesia ‐ IM Determined by Vendor Community Services Department Veterinary Services Sedation/Anesthesia ‐ IV Determined by Vendor Community Services Department Veterinary Services Specialized Feeding Determined by Vendor Community Services Department Veterinary Services Surgery ‐ Minor Surgery, Preparation and Recovery Determined by Vendor Community Services Department Veterinary Services Surgery ‐ Major Surgery, Preparation and Recovery Determined by Vendor Community Services Department Rentals Downstairs Community Room ‐ Roth Service will be provided directly by the museum Community Services Department Rentals Downstairs Education Resource Room ‐ Roth Service will be provided directly by the museum Community Services Department Rentals Upstairs Meeting Room ‐ Roth Service will be provided directly by the museum Police Massage Estalishment Sale or Transfer of Interest Municipal Code Update: Report #:2512‐5609 Police Massage Estalishment Business Location Change Municipal Code Update: Report #:2512‐5609 Item 4 Attachment A - Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees        Item 4: Staff Report Pg. 21  Packet Pg. 27 of 76  A achment A Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees Department  Type   Fee Justification Police Massage Estalishment Non‐Certified (New) Municipal Code Update: Report #:2512‐5609 Police Massage Estalishment Non‐Certified (Renewal) Municipal Code Update: Report #:2512‐5609 Police Massage Estalishment Massage Practitioner ‐ Non‐Certified (New) Municipal Code Update: Report #:2512‐5609 Police Massage Estalishment Massage Practitioner ‐ Non‐Certified (Renewal) Municipal Code Update: Report #:2512‐5609 Police Massage Estalishment Massage Technician ‐ New Municipal Code Update: Report #:2512‐5609 Police Massage Estalishment Massage Technician ‐ Renewal Municipal Code Update: Report #:2512‐5609 Police Impoundment Fees ‐ Cat B. Second Offense Fee Replaced Police Impoundment Fees ‐ Cat C. Third and Subsequent Offenses Fee Replaced Police Impoundment Fees ‐ Dog ‐ Licensed C. Third Offense Fee Replaced Police Impoundment Fees ‐ Dog ‐ Licensed D. Fourth Offense Fee Replaced Police Impoundment Fees ‐ Dog ‐ Licensed E. Fifth to Tenth Offense Fee Replaced Police Impoundment Fees ‐ Dog ‐ Licensed F. Eleventh and Subsequent Offenses Fee Replaced Police Impoundment Fees ‐ Dog ‐ Licensed C. Third Offense Fee Replaced Police Impoundment Fees ‐ Dog ‐ Licensed D. Fourth Offense Fee Replaced Police Impoundment Fees ‐ Dog ‐ Licensed E. Fifth to Tenth Offense Fee Replaced Police Impoundment Fees ‐ Dog ‐ Licensed F. Eleventh and Subsequent Offenses Fee Replaced Police Pet Licenses B. 24 Months Unaltered Fee Replaced Police Pet Licenses C. 36 Months Unaltered Fee Replaced Library Library Services Expired Hold Fee No longer used Item 4 Attachment A - Municipal Fee Schedule Amendments for FY 2027 Changed and Deleted Fees        Item 4: Staff Report Pg. 22  Packet Pg. 28 of 76  CITY OF PALO ALTO UTILITIES Issued by the City Council Sheet No. S-5-0 Effective 071-01- 2026 ELECTRIC SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 Supersedes Sheet No. S-5-0 dated 0109-0101-202619 Charges in Utility Rate Schedule E-15 has been moved to City of Palo Alto Municipal Code Fee Schedule effective 7-1-2026. A. APPLICABILITY: This Rate Schedule applies to all connections, interconnections, expansions, and upgrades to the City's Electric Distribution System, except connections that serve street lighting or traffic signals . B. TERRITORY: This Rate Schedule applies anywhere the City of Palo Alto provides Electric Service. C. CHARGES: All Charges must be pre-paid by the Applicant prior to the scheduling of any construction or connections to the City's Electrical Distribution System. 1. ADVANCE ENGINEERING FEES The Applicant must pay all Advance Engineering Fees to start the engineering process which are non- refundable. The Advance Engineering Fees will be credited against the estimated job cost prior to the collection of construction fees. For Service connections applicable to fixed electric service connection fees, CPAU will not require Advance Engineering Fees. 2. UNDERGROUND SYSTEMS (A) Service Connection Charges: Service Connection Charges are required when the City connects any Customer to the City’s electrical Distribution System. A one-time waiver of this fee may be granted for Services connected during the construction of an underground utility district. (1) Residential or Small Commercial - Single service, single phase, 200 (or less) and 400 amp services that do not require customer Item 4 Attachment B - List of all Utility Fees Moved to Citywide Municipal Fee Schedule        Item 4: Staff Report Pg. 23  Packet Pg. 29 of 76  CITY OF PALO ALTO UTILITIES Issued by the City Council Sheet No. S-5-1 Effective 071-01- 2026 ELECTRIC SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 Supersedes Sheet No. S-5-1 dated 0109-0101-202619 (2) contribution for transformer upgrades or replacement. These fees apply to single-family dwellings, with or without an ADU, and small commercial businesses. (a) For a 250 volt maximum, 200 amp or less underground service ……. $3,940.00 (b) For a 250 volt maximum, 400 amp underground service ...................... $4,360.00 (c) For any connection requiring greater capacity or system upgrades, the fee shall be CPAU’s estimate of the installation cost. (B) On-site Distribution System Charges: Where the customer is financially responsible for CPAU installations of underground conductors (primary or secondary), switches or transformers in and on facilities provided by the developer within the boundaries of a sub-division or other development, an on-site distribution system fee shall be charged, based on CPAU’s estimate of all applicable installation costs. (C) Off-Site Distribution System Charges: Where the customer is financially responsible for CPAU installations of an Electric Distribution system, system extension, or system reinforcement outside the boundaries of a sub-division or other development to be served, an off-site distribution system fee shall apply, based on CPAU’s estimate of all applicable installation costs. 3. OVERHEAD SYSTEMS Connection Charges shall apply for all new single-phase Services or Service upgrades 400 amps or less. (A) Overhead Service Connection Replacement Charges: (1) Residential or Commercial – Single service, single phase, for 200 amps (or less) and 400 amps services that do not require customer contribution to transformer upgrades or replacement. Item 4 Attachment B - List of all Utility Fees Moved to Citywide Municipal Fee Schedule        Item 4: Staff Report Pg. 24  Packet Pg. 30 of 76  CITY OF PALO ALTO UTILITIES Issued by the City Council Sheet No. S-5-2 Effective 071-01- 2026 ELECTRIC SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 Supersedes Sheet No. S-5-2 dated 0109-0101-202619 These fees apply to single-family dwellings, with or without ADU, or small commercial businesses. (a) For a 250 volt maximum, 200 amp or less, 3 wire services, single phase overhead service of 80 feet in length maximum .............................$2,910.00 (b) For a 250 volt maximum, 400 amp, single phase overhead services, 80 feet in length maximum services ............................................................... $3,540.00 (c) For all other connections, the fee shall be CPAU’s estimate of the installation cost. (2) Charges for replacement or upgraded Overhead Services not described above, shall be based on CPAU’s estimate of applicable costs. 4. TEMPORARY SERVICE (A) Overhead Temporary Service Charges: (1) For a 250 volt, 200 amp or less, 3 wire service, within 50 feet if a suitable secondary system .....................................................................................$1,040.00 (2) Fees for a Temporary Service of greater length and capacity or voltage shall be based on CPAU’s estimate of all applicable installation and removal costs, or $1,040.00, whichever is greater. (B) Underground Temporary Service Charges: (1) For a 250 volt, 200 amp or less, 3-wire maximum service, within 100 feet of suitable secondary system and service box. Customer is responsible for all substructure. …………………………………………………………………………….$1,060.00 (2) If a suitable secondary system and/or service box is not available at the property, the Customer will be responsible for all cost necessary to extend or rearrange the system to allow for the temporary electric service. (3) Fees for a Temporary Service of greater length and capacity or Voltage shall be based on CPAU’s estimate of the installation and removal costs, or $1,060.00, whichever is greater. 5. GENERATOR INTERCONNECTION CPAU shall charge a fee for evaluation of Generator (Photo Voltaic (PV), Energy Storage System Item 4 Attachment B - List of all Utility Fees Moved to Citywide Municipal Fee Schedule        Item 4: Staff Report Pg. 25  Packet Pg. 31 of 76  CITY OF PALO ALTO UTILITIES Issued by the City Council Sheet No. S-5-3 Effective 071-01- 2026 ELECTRIC SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 Supersedes Sheet No. S-5-3 dated 0109-0101-202619 (ESS)) Interconnection Applications performed pursuant to Rule and Regulation 27. (A) Advance Engineering Fees: (1) Projects with a size less than or equal to 10kW in capacity… ....................................................................................................................... $520.00 (2) All Projects which are greater than 10 kW and less than 100 kW in capacity . ................................................................................................................... $1,140.00 (3) All Projects which are greater than or equal to 100 kW and less than 500 kW in capacity . ................................................................................................................... $7,560.00 (4) All Projects which are 500 kW or greater in capacity ............................... $14,500.00 (B) Supplemental and Detailed Studies: (1) Supplemental and Detailed Study fees for all Net Energy Metering Projects requiring additional study per Rule and Regulation 27 shall be based on CPAU’s estimate of applicable costs. (C) Interconnection Review Charges: (1) All projects less than or equal to 10 kW ........................................................ $520.00 (2) Interconnection fees for all Projects not covered under section 4(C)(1) will be based on CPAU’s estimate of applicable costs. 6. PALO ALTO CLEAN LOCAL ENERGY ACCESSIBLE NOW PROGRAM Meter maintenance and administrative service Charge for Generators participating in the Palo Alto Clean Local Energy Accessible Now (CLEAN) Program $207.00 D. CREDITS: Rebates or credits may be available to defray electric service connection chargers, if the service upgrade is a result of higher electrical loads caused by electric vehicle charging. For additional information visit: https://www.paloalto.gov/Departments/Utilities or call 650-329-2241 E. NOTES: 1. These Charges apply to all vacant land except where the Charges are recorded as previously paid. Item 4 Attachment B - List of all Utility Fees Moved to Citywide Municipal Fee Schedule        Item 4: Staff Report Pg. 26  Packet Pg. 32 of 76  CITY OF PALO ALTO UTILITIES Issued by the City Council Sheet No. S-5-4 Effective 071-01- 2026 ELECTRIC SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 Supersedes Sheet No. S-5-4 dated 0109-0101-202619 2. CPAU can generally provide service availability from 30 to 45 days after all Charges are paid except when long lead-time equipment or materials are required. Consult the City for estimated lead-times. 3. All fees and minimum charges are subject to DGS California Construction Cost Index (CCCI) adjustments, to be applied annually effective on July 1. 4. CPAU is not responsible for delays in Service connection caused by conditions beyond its control, including, but not limited to, delays in the arrival of equipment such as transformers, switches and cable. {End} Item 4 Attachment B - List of all Utility Fees Moved to Citywide Municipal Fee Schedule        Item 4: Staff Report Pg. 27  Packet Pg. 33 of 76  CITY OF PALO ALTO UTILITIES Issued by the City Council Sheet No. S-5-0 Effective 071-01- 2026 Supersedes Sheet No. S-5-0 dated 0109-0101-202619 WASTEWATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 Utility Rate Schedule S-5 has been repealed. Charges are now available in the City of Palo Alto Municipal Code Fee Schedule effective 7-1-2026. A. TERRITORY: This Rate Schedule applies anywhere the City of Palo Alto provides Wastewater Service. B. CHARGES: Customer must pay plan review and connection fees in full prior to scheduling any Utility construction work or inspections. CPAU will send invoices to the responsible party listed on the Service application. All Invoices are valid for 90 days from date of issuance. Once CPAU receives full payment, determines that all applicable Service requirements are met, and the Utilities Inspector determines that the project is ready for utility installation. CPAU Water, Gas, and Wastewater Utilities Operations (WGW Operations) staff will schedule the project for construction. Depending on material availability and scheduling constraints, Utility Services are generally installed between 60 and 90 days later. While CPAU staff makes best efforts to install Services as planned, construction delays may occur as a result of unforeseen conditions. Contact WGW Operations for scheduling lead- time. Regular CPAU work hours are 8 AM to 5 PM, Monday through Friday, excluding City holidays. Any work the City deems necessary to be performed during non-regular work hours shall be charged at the overtime rate per Utility Rate Schedule Rate C-1. Conditions in which work may need to be performed during non-regular work hours may include, but are not limited to, performing work on arterial streets, in business districts, in front of major commercial establishments, and near schools. 1. PLAN REVIEW: New single family residential building or remodel ......................................................... $635.00 New commercial building or remodeling permit valuation greater than $200,000 ...... $3,520.00 New subdivision residential unit ............................................................................... $232.00/unit System extension 8-inch HDPE Wastewater main ......................................................... $34.00/ft 2. DESIGN: Wastewater system design fee .............................................................................. Utility Estimate Item 4 Attachment B - List of all Utility Fees Moved to Citywide Municipal Fee Schedule        Item 4: Staff Report Pg. 28  Packet Pg. 34 of 76  CITY OF PALO ALTO UTILITIES Issued by the City Council Sheet No. S-5-1 Effective 071-01- 2026 Supersedes Sheet No. S-5-1 dated 0109-0101-202619 WASTEWATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 3. COLLECTION SYSTEM EXTENSIONS: City standard 8-inch main, Charge per linear foot ..................................................... $479.00/ft 4. CONNECTIONS: 4-inch connection, depth at 6 feet and below ............................................................. $15,615.00 6-inch connection, depth at 6 feet and below ............................................................. $17,478.00 4-inch lateral, depth between 6 feet and 10 feet ......................................................... $21,858.00 6-inch lateral, depth between 6 feet and 10 feet ......................................................... $22,938.00 Rehabilitation of existing 4” to 6” lateral by pipe bursting .......................................... $9,694.00 Connections of sewer laterals over 25 feet in length will be charged for the additional footage at a rate of $206/linear foot for 4-inch connections and $213/linear foot for 6-inch connections. Special arrangements must be made for connections larger than 6-inch. CPAU will estimate the cost which will serve as the basis for a Customer deposit. Upon receipt of this deposit CPAU will install the connection and the Customer will be responsible for the actual costs that exceed the deposit amount. 5. REPLACEMENT OR RELOCATION OF FACILITIES: Replacement of Lateral connections made necessary because of ordinary wear and deterioration will be made without Charge. Replacement due to inadequacy because of increased demand or load, relocation due to location will be charged as a new connection. Costs associated with CPAU-approved relocation of lateral, and other facilities are the responsibility of the Applicant. Payment of estimated costs is required before relocation work begins. 6. CAPACITY CHARGES: 4-inch connection with 5/8-inch Water Meter (WM) ................................................. $5,250.00 4-inch connection with 1-inch WM .......................................................................... $10,500.00 4- or 6-inch connection with 1-1/2-inch WM ........................................................... $31,668.00 6-inch connection with 2-inch WM .......................................................................... $52,500.00 6-inch and larger connection with 4-inch or larger WM ...................... By estimate at $210/FU* Item 4 Attachment B - List of all Utility Fees Moved to Citywide Municipal Fee Schedule        Item 4: Staff Report Pg. 29  Packet Pg. 35 of 76  CITY OF PALO ALTO UTILITIES Issued by the City Council Sheet No. S-5-2 Effective 071-01- 2026 Supersedes Sheet No. S-5-2 dated 0109-0101-202619 WASTEWATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 * FU = fixture unit (1 FU = 15 gallons per day). Capacity upgrades to an existing Lateral will be calculated as the difference between the new Lateral size and the existing Lateral size. 7. INSTALL AND CORE DRILL MANHOLE: (A) Depth, 6 feet or less ........................................................................................... $18,404.00 (B) Depth, greater than 6 feet .................................................................................. $24,812.00 (C) Core Drill and Connection Tap to Manhole (Shallow) ...................................... $5,488.00 (D) Core Drill and Connection Tap to Manhole (Deep) ........................................... $6,435.00 8. ABANDONMENT AND DEMOLITION: (A) Sewer Lateral..................................................................................................... $5,142.00 9. INSTALL SEWER CLEANOUT ................................................................................. $4,240.00 10. WORK PERFORMED BY OUTSIDE CONTRACTORS: Engineering and inspection service Charges per Utility Rate Schedule C-1 will apply to utility work performed by outside contractors, which may be done only with the prior written approval of the Utilities Department. (A) Engineering and inspection for new lateral ....................................................... $3,508.00 (B) Engineering and inspection for new main (per lineal foot) .................................... $55.00 (C) Engineering and inspection for new manhole ................................................... $4,385.00 (D) Engineering and inspection for lateral abandonment ........................................ $2,192.00 C. NON-STANDARD CONDITIONS 1. Any condition which, in the opinion of the Engineering Manager, Water-Gas-Wastewater, will result in a cost higher than the Charges set forth in Section B will be classified as non- standard. The Charge for a non-standard installation will be based on the Engineering Manager’s estimate of the total costs of all materials, labor, and other costs required to complete the installation. Item 4 Attachment B - List of all Utility Fees Moved to Citywide Municipal Fee Schedule        Item 4: Staff Report Pg. 30  Packet Pg. 36 of 76  CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No.G-5- 3 dated 0109-01-202619 Sheet No. G-5-3 Effective 071-01- 2026 WASTEWATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 2. In the event Wastewater Service to a Premise is requested and insufficient capacity exists to provide such Service, the Applicant shall bear the total cost for flow monitoring the existing main to determine remaining capacity, design of new sewer main and construction cost for enlarging the collection system to accommodate serving the Applicant. The Engineering Manager, Water-Gas-Wastewater may require the Applicant to make arrangements for the design and construction of said expansion in accordance with applicable CPAU Rules and Regulations, standards and specifications. Alternatively, CPAU may elect for City staff or contractors to design and install such facilities at the Applicant’s expense. 3. PUMPING PLANTS: If the development requires a pumping facility to drain into the City’s Wastewater collection system, the developer is responsible for the cost of construction of the pumping plant and the on- going plant operation and maintenance costs. D. SPECIAL NOTES: 1. All fees and minimum charges are subject to DGS California Construction Cost Index (CCCI) adjustments, to be applied annually effective on July 1. {End} Item 4 Attachment B - List of all Utility Fees Moved to Citywide Municipal Fee Schedule        Item 4: Staff Report Pg. 31  Packet Pg. 37 of 76  CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No.G-5- 4 dated 0109-01-202619 Sheet No. G-5-4 Effective 071-01- 2026 WATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 Utility Rate Schedule W-5 has been repealed. Charges are now available in the City of Palo Alto Municipal Code Fee Schedule effective 7-1-2026. A. TERRITORY: This Rate Schedule applies anywhere the City of Palo Alto provides Water Service. B. CHARGES: Customer must pay plan review and connection fees in full prior to scheduling any Utility construction work or inspections. The invoice will be sent to the responsible party listed on the Service application. All Invoices are valid for 90 days from date of issuance. Once CPAU receives full payment, determines that all applicable Service requirements are met, and the Utilities Inspector determines that the project is ready for utility installation, CPAU Water, Gas, and Wastewater Utilities Operations (WGW Operations) staff will schedule the project for construction. Depending on material availability and scheduling constraints, Utility Services will be installed between 60 and 90 days. While CPAU staff makes best efforts to install Services as planned, construction delays may occur as a result of unforeseen conditions. Contact WGW Operations for scheduling lead-time. Regular CPAU work hours are 8 AM to 5 PM, Monday through Friday, excluding City holidays. Any work the City deems necessary to be performed during non-regular work hours shall be charged at the overtime rate per Utility Rate Schedule Rate C-1. These conditions include but are not limited to performing work on arterial streets, in business districts, in front of major commercial establishments, and near schools. 1. PLAN REVIEW: New single family residence or residential remodel ......................................................... $635.00 New commercial building or remodeling permit valuation greater than $200,000 ......... $4,653.00 New subdivision residential unit ................................................................................ $526.00/unit System extension of 8-inch high-density polyethylene (HDPE) Water main .................. $19.00/ft 2. DESIGN: Water System Design ............................................................................................ Utility Estimate 3. DISTRIBUTION SYSTEM EXTENSION: City standard 8-inch main, Charge per linear foot ............................................................. $383.00 4. SERVICE CONNECTIONS: Item 4 Attachment B - List of all Utility Fees Moved to Citywide Municipal Fee Schedule        Item 4: Staff Report Pg. 32  Packet Pg. 38 of 76  CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No.G-5- 5 dated 0109-01-202619 Sheet No. G-5-5 Effective 071-01- 2026 WATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 Water Service: Domestic, Irrigation, and Fire Size Amount 1- inch copper connection ............................................................................................. $10,773.00 2- inch copper connection ............................................................................................. $11,965.00 2-inch connection .......................................................................................................... $12,236.00 4-inch connection .......................................................................................................... $15,030.00 6-inch connection .......................................................................................................... $17,920.00 8-inch connection .......................................................................................................... $19,482.00 10-inch connection ........................................................................................................ $21,826.00 Replacement of Service connection made necessary because of ordinary wear and deterioration will be made without Charge. Replacement due to inadequacy because of additional demand or load will be charged as a new Service connection. Additional Domestic or Irrigation Services For Service installations connecting to a pre-existing Service or installations of a new, larger Service. 2-inch connection ........................................................................................................... $5,626.00 4-inch connection ........................................................................................................... $7,956.00 Combination Domestic or Irrigation Water Service and Fire Service Combination Water Service connections require CPAU approval. If approved, connection Charges for both the fire Service and the domestic or irrigation Service connection will apply. Master Water Service Connections that serve domestic Water Service and fire protection through a detector Meter require CPAU approval. Applicable Charges for master Water Service connections will be based on CPAU’s estimate of the total costs, including materials, labor, metering, and all other costs required for the installation. 5. METERS: 5/8-inch x 3/4-inch Meter .............................................................................................. $1,193.00 1- inch Meter .................................................................................................................. $1,318.00 1 ½-inch Meter .............................................................................................................. $2,509.00 2- inch Meter .................................................................................................................. $2,726.00 Item 4 Attachment B - List of all Utility Fees Moved to Citywide Municipal Fee Schedule        Item 4: Staff Report Pg. 33  Packet Pg. 39 of 76  CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No.G-5- 6 dated 0109-01-202619 Sheet No. G-5-6 Effective 071-01- 2026 WATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 3- inch Meter .................................................................................................................. $4,478.00 4- inch Meter .................................................................................................................. $7,259.00 6-inch Meter .................................................................................................................. $9,805.00 Automatic Meter Reading - AMR Encoder Receiver Transmitter ................................... $216.00 6. CAPACITY CHARGES: Capacity Charges apply to new Utility Services and added demand on existing Services. Domestic: 5/8-inch x 3/4-inch Meter ................................................................................................ $3,750.00 1- inch Meter .................................................................................................................... $6,250.00 1 ½-inch Meter .............................................................................................................. $18,850.00 2- inch Meter .................................................................................................................. $31,250.00 4-inch Meter and larger ..................................................... By estimate at $125/fixture unit (FU)* *These charges vary and are based on the total number of fixture units (FU) estimated for the water supply demand. Water supply fixture units are estimated per California Uniform Plumbing Code. Fire Service Capacity Charges: 2-inch ................................................................................................................................ $750.00 4-inch ............................................................................................................................. $8,425.00 6-inch ............................................................................................................................ $18,250.00 8-inch ............................................................................................................................ $30,950.00 10-inch .......................................................................................................................... $48,110.00 If a Customer is upgrading the capacity of an existing Service, then the capacity Charge will be the difference between the new Service size and the existing Service size. 7. ADDITIONAL METERS: With new connection, up to 2-inch ............................................................................... $1,823.00 With existing connection, up to 2-inch ......................................................................... $2,463.00 2 Meter Manifold on 2” PE or 1” CU service ............................................................... $1,037.00 8. RELOCATION OF FACILITIES: The costs of CPAU-approved relocation of Services, hydrants, or other facilities will be the responsibility of the Applicant. Payment of estimated cost is required before relocation work begins. Item 4 Attachment B - List of all Utility Fees Moved to Citywide Municipal Fee Schedule        Item 4: Staff Report Pg. 34  Packet Pg. 40 of 76  CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No.G-5- 7 dated 0109-01-202619 Sheet No. G-5-7 Effective 071-01- 2026 WATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 9. FIRE HYDRANT: (A) Install new hydrant without lateral ......................................................................... $5,135.00 (B) Install new hydrant with lateral ............................................................................ $24,341.00 (C) Relocation behind curb (up to 5 feet) ................................................................... $13,518.00 Relocations more than 5 feet will require a new lateral and the existing lateral will be disconnected and abandoned at the main. 10. TAPPING THE WATER MAIN FOR CONTRACTOR-INSTALLED SERVICES: (A) Tap Water main for 2-inch Service ......................................................................... $2,435.00 (B) Tap Water main for 4-inch Service ......................................................................... $3,137.00 (C) Tap Water main for 6-inch Service ......................................................................... $5,170.00 (D) Tap Water main for 8-inch Service ......................................................................... $6,959.00 11. ABANDONMENT: (A) Small Service 2-inch and less ................................................................................ $6,593.00 (B) Large Service more than 2-inch ............................................................................ $8,991.00 12. WORK PERFORMED BY OUTSIDE CONTRACTORS: Engineering and inspection service Charges per Utility Rate Schedule C-1 will apply to utility work performed by outside contractors, which may be done only with the prior written approval of the Utilities Department. (A) Engineering and inspection for new 2-inch Service .............................................. $2,631.00 (B) Engineering and inspection for new 2-inch Service connected to larger Service . $1,754.00 (C) Engineering and inspection for new 4-inch to 8-inch Service .............................. $3,946.00 (D) Engineering and inspection for new hydrant and Service ..................................... $3,946.00 (E) Engineering and inspection for abandonment of 2-inch and smaller Service ....... $1,315.00 (F) Engineering and inspection for abandonment of 3-inch and larger Service .......... $1,754.00 (G) Engineering and inspection for new 8-inch main (per linear foot) ............................ $44.00 C. NON-STANDARD CONDITIONS: 1. Any condition which, in the opinion of the Engineering Manager, Water-Gas-Wastewater, will result in a cost higher than the Charges set forth in Section B will be classified as non-standard. The Charge for a non-standard installation will be based on the Engineering Manager’s estimate Item 4 Attachment B - List of all Utility Fees Moved to Citywide Municipal Fee Schedule        Item 4: Staff Report Pg. 35  Packet Pg. 41 of 76  CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No.G-5- 8 dated 0109-01-202619 Sheet No. G-5-8 Effective 071-01- 2026 WATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 of the total costs of all materials, labor, and other costs required to complete the installation. 2. If CPAU determines that insufficient capacity exists to provide Water Service to an Applicant, Applicant will be responsible for the CPAU’s costs to complete a hydraulic system capacity study to determine whether Distribution System upgrades will be required to serve the Applicant, as well the costs of completing the upgrades deemed necessary by CPAU. D. SPECIAL NOTES: 1. All fees and minimum charges are subject to DGS California Construction Cost Index (CCCI) adjustments, to be applied annually effective on July 1. {End} Item 4 Attachment B - List of all Utility Fees Moved to Citywide Municipal Fee Schedule        Item 4: Staff Report Pg. 36  Packet Pg. 42 of 76  CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No.G-5- 9 dated 0109-01-202619 Sheet No. G-5-9 Effective 071-01- 2026 GAS SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 Utility Rate Schedule G-5 has been repealed. Charges are now available in the City of Palo Alto Municipal Code Fee Schedule effective 7-1-2026. A. TERRITORY: This Rate Schedule applies everywhere the City of Palo Alto provides Gas Service. B. CHARGES: Customer must pay plan review and connection fees in full prior to scheduling any Utility construction work or inspections. CPAU will send invoices to the responsible party listed on the Service application. All invoices are valid for 90 days from date of issuance. Once CPAU receives full payment, determines that all applicable Service requirements are met, and the Utilities Inspector determines that the project is ready for utility installation, CPAU Water-Gas- Wastewater Utilities Operations (WGW Operations) staff will schedule the project for construction. Depending on material availability and scheduling constraints, Utility Services are generally installed 60 to 90 days later. While CPAU staff makes best efforts to install Services as planned, construction delays may occur as a result of unforeseen conditions. Contact WGW Operations for scheduling lead-time. Regular CPAU work hours are 8 AM to 5 PM, Monday through Friday, excluding City holidays. Any work the City deems necessary to be performed during non-regular work hours shall be charged at the overtime rate per Utility Rate Schedule Rate C-1. Conditions in which work may need to be performed during non-regular work hours may include, but are not limited to, performing work on arterial streets, in business districts, in front of major commercial establishments, and near schools. 1. COMMERCIAL PLAN REVIEW: New commercial building or remodeling permit valuation greater than $200,000 ....... $3,536.00 New subdivision residential unit ............................................................................... $520.00/unit System extension of 2-inch polyethylene (PE) Gas main ............................................... $20.00/ft 2. RESIDENTIAL PLAN REVIEW: New single-family residential (SFR) building or SFR remodeling permit valuation greater than $100,000 ........................................................................................................................ $1,270.00 3. DESIGN: Gas system design ................................................................................................ Utility Estimate Item 4 Attachment B - List of all Utility Fees Moved to Citywide Municipal Fee Schedule        Item 4: Staff Report Pg. 37  Packet Pg. 43 of 76  CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No.G-5- 10 dated 0109-01-202619 Sheet No. G-5-10 Effective 071-01- 2026 GAS SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 4. DISTRIBUTION SYSTEM EXTENSION: Charge per linear foot .................................................................................................... $350.00/ft 5. CONNECTION FOR SERVICE INSTALLED ON EXISTING MAIN: Service connection Charges include up to 40 feet of Service Line installation inside the property line. Service Lines will be installed along the shortest most practical route, as determined by the Utilities Department (perpendicular from the Gas main in the adjoining street, alley, lane road, or easement to the nearest suitable Meter location at the building or structure). Size 1- inch directionally bored connection ................................................................................$8,636.00 2- inch directionally bored connection .............................................................................. $13,439.00 Excess length Charge for directionally bored connection ................................................ $69.00 /ft* 1- or 2-inch trenched connection ........................................................................................$8,500.00 2- inch main installation in contractor-provided trench ......................................................... $245 /ft Connections above 2-inches ..................................................................................... Utility Estimate 1- or 2-inch excess flow valve (EFV) installation on PE service .................................... $6,713.00 *Excess Length Charge: An additional Charge ($69.00/foot) will apply to an extension greater than 40 feet from the property line closest to the street, to the Gas Meter location, measured along a line perpendicular to the street property line. Replacement of Service connections made necessary because of ordinary wear and deterioration will be made without Charge. However, if the need for replacement arises due to meeting an increase in load or relocation of a non- polyethylene (PE) pipe Service, the installation of the Service will be charged as a new Service. 6. METERS: 250 Cubic Foot Per Hour (CFH) House Meter ...................................................................$1,097.00 250 CFH Curb Meter ..........................................................................................................$2,601.00 400 CFH House Meter ........................................................................................................$1,457.00 400 CFH Curb Meter ..........................................................................................................$2,782.00 630 CFH House Meter ........................................................................................................$1,969.00 630 CFH Curb Meter ..........................................................................................................$2,796.00 800 CFH Diaphragm – Commercial House Meter .............................................................$2,782.00 1000 CFH Diaphragm - Commercial House Meter ...........................................................$3,217.00 1500 CFH Rotary-Commercial House Meter .....................................................................$3,202.00 2000 CFH Rotary-Commercial ..........................................................................................$4,165.00 3000 CFH Rotary-Commercial ..........................................................................................$4,278.00 Item 4 Attachment B - List of all Utility Fees Moved to Citywide Municipal Fee Schedule        Item 4: Staff Report Pg. 38  Packet Pg. 44 of 76  CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No.G-5- 11 dated 0109-01-202619 Sheet No. G-5-11 Effective 071-01- 2026 GAS SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 5000 CFH Rotary-Commercial ..........................................................................................$4,827.00 7000 CFH Rotary-Commercial ..........................................................................................$5,594.00 11000 CFH Rotary-Commercial ......................................................................................$15,898.00 16000 CFH Rotary-Commercial ......................................................................................$18,314.00 23000 CFH Rotary-Commercial ............................................................................... Utility Estimate Electronic Volume Corrector System ........................................................................ Utility Estimate Automatic Meter Reading (AMR) Encoder Receiver Transmitter – Diaphragm Meter .......$232.00 AMR Encoder Receiver Transmitter – Rotary Meter ...........................................................$324.00 Vent line for Gas Regulator ...................................................................................................$454.00 2- inch bollard (to protect Gas Meter) installation fee ...........................................................$525.00 4-inch bollard (to protect Gas Meter) installation fee ...........................................................$823.00 Other Meter sizes ...................................................................................................... Utility Estimate 7. ADDITIONAL METERS ON CONNECTION: These Charges apply to Meters up to 630 CFH. Charges for Meters above 630 CFH will be based on the Utilities Department’s estimate. Per Meter With new connection .............................................................................................................$648.00 On existing Metered connection .........................................................................................$1,585.00 8. SERVICE RELOCATION: Service riser relocation .......................................................................................................$2,791.00 Service riser relocations will only be performed on 1-inch and larger polyethylene (PE) pipe Service Lines that have been approved by Utilities Department. All Service Lines made of non-PE materials must be replaced from the main to the Meter at the Charges listed in Section B(6) of this Rate Schedule. Curb Meter- Riser relocation on existing 1-inch PE pipe ..................................................$1,337.00 Curb Meter- New Service from main to house ..................................................................$3,887.00 9. RELOCATION OF FACILITIES: Approved relocation of Service Lines and other facilities will be done at the cost of the Applicant. Payment of estimated costs is required before relocation work begins. 10. TAPPING THE GAS MAIN FOR CONTRACTOR-INSTALLED SERVICES: Item 4 Attachment B - List of all Utility Fees Moved to Citywide Municipal Fee Schedule        Item 4: Staff Report Pg. 39  Packet Pg. 45 of 76  CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No.G-5- 12 dated 0109-01-202619 Sheet No. G-5-12 Effective 071-01- 2026 GAS SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 Tap Gas main for 1- to 2-inch Service ...............................................................................$2,290.00 Tap Gas main for 4- to 6-inch Service ...............................................................................$2,864.00 11. ABANDONMENT OF GAS SERVICES: 1- inch to 2-inch Gas service abandonment ............................................................................. $6,092 12. WORK PERFORMED BY OUTSIDE CONTRACTORS: Engineering and inspection service Charges per Utility Rate Schedule C-1 will apply to utility work performed by outside contractors, which may be done only with the prior written approval of the Utilities Department. C. NON-STANDARD CONDITIONS: 1. Any condition which, in the opinion of the Engineering Manager, Water-Gas-Wastewater, will result in a cost higher than the Charges set forth in Section B will be classified as non-standard. The Charge for a non-standard installation will be based on the Engineering Manager's estimate of the total costs of all materials, labor, and other costs required to complete the installation. 2. In the event Gas Service to a Premise is requested and insufficient capacity exists to provide such Service, the Applicant shall bear the total cost for designing and enlarging the Distribution System to accommodate serving the Applicant. The Engineering Manager, Water-Gas-Wastewater, may require the Applicant to make arrangements for the design and construction of said expansion in accordance with applicable CPAU Rules and Regulations, standards and specifications. Alternatively, CPAU may elect for City staff or contractors to design and install such facilities at the Applicant's expense. Credit to the Applicant will be provided for any over sizing or extra facilities installed to meet Service demands above the specific capacity needs of the Applicant. D. SPECIAL NOTES: 1. All fees and minimum charges are subject to DGS California Construction Cost Index (CCCI) adjustments, to be applied annually effective on July 1. {End} Item 4 Attachment B - List of all Utility Fees Moved to Citywide Municipal Fee Schedule        Item 4: Staff Report Pg. 40  Packet Pg. 46 of 76  Fee Title FY 2026 Adopted Rates and Charges Recommendations Tail‐in Open Tie‐down, 0 to 3,500 pounds  $206 per month $214.50 per month Tail‐in Open Tie‐down, 3501 to 5,2001 pounds $239 per month 248.5 per month Tail‐in Open Tie‐down, 5,201 ‐ 10,200 pounds  $268.50 per month $279.50 per month Tail‐in Open Tie‐down, 10,200 ‐ 17,000 pounds 301.50 per month $313.50 per month Taxi‐in Open Tie‐down, 0 to 3,500 pounds  $257 per month $267.50 per month Taxi‐in Open Tie‐down, 3501 to 5,2001 pounds  $319.50 per month $332.50 per month Taxi‐in Open Tie‐down, 5,201 ‐ 10,200 pounds  $443.50 per month $461.50 per month Taxi‐in Open Tie‐down, 10,200 ‐ 17,000 pounds  $470.50 per month $489.50 per month Large Aircraft and helicopter designated tie‐downs  $470.50 per month $489.50 per month Transient Aircraft Landing Fee (Non‐Commercial) NEW FEE $3/1000lbs MTOW per landing  0‐3,500 pounds ‐  $25 per landing $9/1000lbs MTOW per landing  3501‐5200 pounds ‐ $27 per landing $9/1000lbs MTOW per landing  5201‐10,200 pounds ‐ $49 per landing $9/1000lbs MTOW per landing  10201‐17,000 pounds ‐ $97 per landing $9/1000lbs MTOW per landing  $5.50 for first 8 hours $14.50 per day   $14 for 8‐24 hours  $14.50 per day   $14 for every 24 hour period after $14.50 per day   $5.50 for 0‐8 hours $16.50 per day  $14 for 8‐24 hours  $16.50 per day  $14 for every 24 hour period after $16.50 per day  $14 for 0‐8 hours $31.00 per day  $30 for 8‐24 hours  $31.00 per day  $30 for every 24 hour period after $31.00 per day  $14 for 0‐8 hours Fee removed ‐ new fees are based soley on weight  $30 for 8‐24 hours  Fee removed ‐ new fees are based soley on weight  $30 for every 24 hour period after Fee removed ‐ new fees are based soley on weight  $14 for 0‐8 hours Fee removed ‐ new fees are based soley on weight  $30 for 8‐24 hours  Fee removed ‐ new fees are based soley on weight  $30 for every 24 hour period after Fee removed ‐ new fees are based soley on weight Transient Aircraft late Fee   $25 every 30 days for unpaid invoice $26 every 30 days for unpaid invoice Glider & Aircraft Trailer Parking   $190 per month $197.50 Automobile Daily Parking  $11 per day $21 per day Monthly Parking Permit ‐ Automobiles Only   $92 per month $104 per month Monthly Automobile Parking (Parking spots only rented in association  with a Tie‐down Account) $55.50 per month $57 per month Automobile Parking Citation Fee   NEW FEE $57 per occurance  Annual or Replacement Gate Card Access Fee   $31 per card $32 per card Mobile Truck Operations Permit Daily  $30 per day $31 per day Mobile Truck Operations Permit Monthly   $77.50 per month $156 per month Fire Extinguisher Replacement   $217 per fire extinguisher $227 per fire extinguisher  Fuel Flowage Fee  $0.21 per gallon $0.25 per gallon Commercial Non‐Aeronautical Operations Fee  10% Gross Reciepts for Rental Car Companies 10% Gross Receipts for all commercial non‐aeronautical operators Hangar Ground Lease Origination / Transfer Fee  NEW FEE 2% of sale of assessed value per agreement Expired Certification of Insurance Fee  NEW FEE $50 per month Transient Helicopter Open Tie‐down 5,201‐17000 pounds  PALO ALTO AIRPORT RATES AND CHARGES STUDY SUMMARY OF CHANGES Transient Aircraft Landing Fee (Commercial) Transient Aircraft Open Tie‐down 0‐3500 pounds  Transient Aircraft Open Tie‐down 3501‐5200 pounds  Transient Aircraft Open Tie‐down 5,201‐17000 pounds  Taxi‐through Transient Aircraft Open Tie‐down 5,201‐17000 pounds  Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 41  Packet Pg. 47 of 76  FINAL REPORT September 17, 2025 Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 42  Packet Pg. 48 of 76  2 Palo Alto Airport (PAO or Airport) is a towered, single runway airport owned and operated by the City of Palo Alto (City or Sponsor) for public use. The Airport is categorized as a General Aviation Regional role in the Federal Aviation Administration’s (FAA) National Plan of Integrated Airport System (NPIAS) with 331 based aircraft on 102 acres located within the city of Palo Alto, CA. The airfield consists of Runway 13/31, a 2,441’ x 70’ asphalt runway with an LNAV MDA non-precision instrument approach. In August 2014, the County of Santa Clara transferred the PAO back to the City. Since that time, staff has been bringing the Airport up to current Federal Aviation Administration (FAA) standards through several capital projects. In August 2019, the City consolidated a General Fund loan totaling $3.4M to support operating and capital expenses spanning FY 2011 to 2018. Additional revenue from airport operations is required to finance necessary capital projects and ensure the long-term financial health of the Airport. The Palo Alto Airport Master Plan is currently under development by C&S Engineers. The Master Plan depicts proposed facilities on the Airport Layout Plan (ALP). The Airport Capital Improvement Plan (ACIP) projects capital expenses and project phasing of facilities on the ALP. C&S updated the ACIP in 2024 prescribing $4.7M in capital projects between 2025 and 2030. Federal grants provide funding equal to approximately 90% of the eligible project costs in exchange for obligations to uphold FAA Grant Assurances. The Sponsor’s 10% match is typically offset by grants from the California Department of Transportation (Caltrans). However, state funding through Caltrans is limited and not all capital projects are eligible for federal and/or state funding. The PAO budget calls for an additional $5.8M in federally funded projects not on the current ACIP and $384k in capital projects not eligible for federal funding. In all, the Airport plans to fund $12.5M in capital projects requiring $1.4M of Sponsor contributions through 2030. City has engaged Ascension Group Partners (AGP) to conduct this Rates and Charges Study with the purpose of determining appropriate aeronautical fees sufficient to cover the Airport’s operating expenses and funding requirements for planned capital projects. A survey of market-based rates and charges was conducted for a peer set of airports along with a landing fee analysis, which uses a residual cost-recovery methodology to determine landing fees adequate to cover the Sponsor’s obligations without accumulating an excessive reserve. This report supplements the Rent Study Analysis conducted by AGP in August 2023 that evaluated market rates for aeronautical and non-aeronautical facilities for a similar peer set of airports. The following options are suggested to meet capital development funding needs at PAO: 1.Defer capital projects when capital reserve is insufficient to fund Sponsor contribution, 2.Adopt Minimum Standards and complete the Master Plan prior to conducting any Request for Proposal (RFP) for commercial aeronautical facility development, 3.Adjust Fee Schedule by 2.4% in line with the San Francisco-Oakland-Hayward CPI-U index for CY 2024. 4.Increase office and non-aeronautical ground rents by an additional 5.6% over CPI adjustment for FY26. 5.Increase the fuel flowage fee from $0.21 to $0.25, 6.Increase monthly vehicular parking rate from $90 to $100 and establish daily vehicular parking at 1/5th of the monthly rate and the Mobile Truck Operating Permit at five times the daily rate, 7.Establish a Hangar Ground Lease Origination / Transfer fee at 2% of sale or assessed value, 8.Apply a Commercial Non-Aeronautical Permit fee equal to 10% of gross receipts, 9.Modify the tie-down parking rate structure to differentiate landing fee and daily parking rates with the landing fee established at $3.00 / 1,000 lbs. maximum take off weight (MTOW), and 10.Benchmark future fee schedule increases to an Airport Benchmark Index (ABI) blending the City’s General Rate Increase (GRI) and the San Francisco-Oakland-Hayward CPI-U index at a 2:1 ratio. Palo Alto Airport is entering a sustained, capital intensive period of facility redevelopment without a substantial reserve to finance construction projects. The proposed Aeronautical Fee Schedule in Exhibit A would fund planned capital projects and end FY2026 with a positive reserve fund by making minimal changes to consolidate and standardize current aeronautical fees beyond the 2.4% annual CPI adjustment. Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 43  Packet Pg. 49 of 76  3 1.0 Airport Rates and Charges Grant Assurance 24, Airport Fees and Rents, requires the airport maintain a fee and rental structure for the facilities and services at the airport which will make the airport as self-sustaining as possible under the circumstances existing at the particular airport. Airport proprietors must employ a reasonable, consistent, and transparent (i.e., clear and fully justified) method of establishing rates and charges, and adjustments on a timely and predictable schedule. FAA will not ordinarily investigate the reasonableness of a general aviation airport’s fees absent evidence of a progressive accumulation of surplus aeronautical revenues. In establishing new fees, and generating revenues from all sources, airport owners and operators should not seek to create revenue surpluses that exceed the amounts to be used for airport purposes, including reasonable reserves and other funds to facilitate financing and to cover contingencies. FAA Grant Assurance 25 ensures all airport-generated revenue be used solely for the capital or operating costs of that airport (or other FAA‑approved airport-related purposes) and prohibits diverting those funds to non‑airport entities or uses, including through the use of inappropriate direct or indirect operating expenses. A hybrid compensatory-residual methodology is applied to determine the Airport’s rates and fees. Under this methodology, PAO charges market-based rates comparable to a peer set of airports (Peer Set) for the lease of airport property and airport-related services to aeronautical users while establishing any approved non-aeronautical use of the Airport at fair market value. The Airport’s landing fee is calibrated to balance operating and capital budgets after cross-crediting other airport revenues and any reserves. 2.0 Market-Based Rate Survey A market-based survey of rates and charges was conducted on a Peer Set of ten comparable airports. Seven criteria were used in the evaluation: NPIAS role, number of based aircraft, TFMSC C-II operations, Air Traffic Control Tower (ATCT), and Instrument Landing System (ILS) facilities, acres of land, and distance from PAO. Data was acquired from the FAA Form 5010-1 Airport Master Record database. The Traffic Flow Management System Count (TFMSC) operations for Airport Reference Code C-II aircraft or above was acquired from the FAA Aviation System Performance Metrics Web Data System. Figure 1. PAO Airport Peer Set. All airports in the Peer Set were scored on the seven criteria by indexing the value for each airport minus the value for PAO on a scale of 0 to 1 with the highest score given to airports identical to PAO and the lowest score given to airports most dissimilar to PAO. PAO received a score of 1 in each of the seven criteria for a total index score of 7.0. San Carlos (SQL) was the most similar airport with an index score of 6.96: NPIAS Role (1.00), based aircraft (0.98), TFMSC C-II Operations (1.00), ATCT (1.00), and ILS (1.00), acres (0.99), and distance (0.98). The ten most similar airports were included in this Peer Set (Figure 1). Code Name City State RNWY Length Acres NPIAS Role ILS ATCT Based Aircraft CII TFMSC Distance Index PAO PALO ALTO PALO ALTO CA 2443 102 Regional N Y 331 0 0 7.0000 SQL SAN CARLOS SAN CARLOS CA 2621 110 Regional N Y 323 0 8 6.9621 RHV REID-HILLVIEW SAN JOSE CA 3100 179 Regional N Y 330 0 18 6.9484 CCR BUCHANAN FLD CONCORD CA 5001 495 National N Y 340 1980 37 6.7201 HWD HAYWARD EXEC HAYWARD CA 5694 543 National N Y 446 1846 14 6.4857 FUL FULLERTON MUNI FULLERTON CA 3121 86 Regional N Y 312 0 340 6.2698 WHP WHITEMAN LOS ANGELES CA 4120 184 Regional N Y 223 1 303 6.1037 CMA CAMARILLO CAMARILLO CA 6013 650 National N Y 383 2920 281 6.0938 HHR HAWTHORNE MUNI HAWTHORNE CA 4884 80 National N Y 184 1849 324 5.8557 MER CASTLE ATWATER CA 11802 1360 Local N Y 71 118 85 5.8372 WVI WATSONVILLE MUNI WATSONVILLE CA 4502 330 Regional N N 282 13 40 5.7555 Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 44  Packet Pg. 50 of 76  4 Airports from the previous Rent Study Analysis conducted by AGP were also included in the peer set. These airports were selected by flagging regional general aviation service airports with a tower, non-Part 139 certificated, non- precision approaches, airports with +/- 300 based aircraft, +/- 2,000 feet difference from PAO’s longest runway, and within the state of California. The PAO Airport 2023 Peer Set (Figure 2) contained four airports included in the current peer set. Figure 2. PAO Airport 2023 Peer Set. 2.1 Ground Lease and Hangar Rent Rates Ground lease and hangar rent rates are difficult to compare because property leases are uniquely determined based on existing improvements, access to the airfield, negotiation between parties, appraisals, and/or comparative properties. Surveying ground lease and hangar rent rates is informative, but such rates are not universally comparable from airport to airport. Ground lease rates are typically influenced by terms specified in the lease, such as required scheduled improvements over the lease term or conditions such as improvement reversion requirements at the end of the term. The 2023 Rent Study Analysis (Exhibit C) provides a detailed review of market rental and ground lease rates at comparable airports. Ground lease rates are often bifurcated for unimproved sites with no utilities or taxiway access and improved sites that have utilities and taxiway access. However, the most common structure in the survey was a single aeronautical ground lease rate. Palo Alto’s Aeronautical Ground Lease rates are above the market average of $0.59 / sq. ft annually but still within the Peer Set range. Palo Alto’s airport owned T-hangar rental rates are priced below market average. Non-aeronautical rents are above average but the FAA requires these rates be assessed at fair market value. Compliance Guidance Letter 2018‑3 (CGL‑2018‑3) Appraisal Standards for the Sale and Disposal of Federally Obligated Airport Property augments FAA Order 5190.6B – Airport Compliance Manual, Chapter 17 and Appendix Z, by defining the appraisal process and documentation standards required to determine fair-market value for leases and sales of non‑aeronautical land and facilities. The study found that airport fees have not kept pace with operating and capital expenses. As a result, the Airport Enterprise Fund has begun to operate at a deficit and increased fees are necessary to achieve the Airport’s financial self-sufficiency. Without corrective action, the funding deficit will begin to limit the Airport’s ability to meet operational demands and fund critical infrastructure projects. The table below illustrates the City’s General Rate Increase (GRI) since FY 2019 and corresponding lease rate increases. The GRI methodology is used by the City of Palo Alto to keep fees in line with the cost of service, new or changes to service delivery, and changes in cost recovery levels. From FY 2019 to FY 2025, lease rates increased by approximately 24% while the GRI increased by 36% over the same period. Code Name State Runway Length Acres NPIAS Role ILS ATCT Based Aircraft CII TFMSC Distance Index PAO PALO ALTO CA 2443 102 Regional N Y 331 0 0 7 SQL SAN CARLOS CA 2621 110 Regional N Y 323 0 8 6.9621 FUL FULLERTON MUNI CA 3121 86 Regional N Y 312 0 340 6.2698 CMA CAMARILLO CA 6013 650 National N Y 383 2920 281 6.0938 WVI WATSONVILLE MUNI CA 4502 330 Regional N N 282 13 40 5.7555 TRK TRUCKEE-TAHOE CA 7001 2280 Regional N Y 114 1017 167 5.7369 LVK LIVERMORE MUNI CA 5253 644 Regional Y Y 400 1233 23 5.6816 SMO SANTA MONICA MUNI CA 3500 215 Local N Y 74 121 314 5.582 SAC SACRAMENTO EXEC CA 5503 540 Regional Y Y 172 319 80 5.3565 SBP SAN LUIS RGNL CA 6101 340 Non-Hub Y Y 327 11330 174 5.3502 Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 45  Packet Pg. 51 of 76  5 Table A. GRI vs Lease Rate Increases. GRI 100.00 Lease 100.00 FY19 2.6% 102.60 3% 103.00 FY20 7.5% 110.30 3% 106.09 FY21 2.6% 113.16 3% 109.27 FY22 2.0% 115.43 3% 112.55 FY23 4.6% 120.74 4% 117.05 FY24 7.5% 129.79 3% 120.56 FY25 5.2% 136.54 3% 124.18 FY26 6.8% 145.82 8% 134.12 AGP recommends a revised airport fee schedule based on an analysis of the Airport’s operating budget and CIP funding requirements. As part of this review, AGP also recommends an 8% increase in lease rates for new commercial aeronautical leases after July 1, 2025 to better align revenues with the increasing operating costs. With this proposed increase, lease rates between FY 2019 and FY 2026 will have increased 34%, or 3.75% per year. During the same period, the GRI increased 46%, or 4.85% per year. The updated lease rates for FY26 are critical to restore fiscal stability and ensuring that the Airport remains self- sustaining under FAA policy and grant assurance requirements. The decision to implement a moderate but necessary increase is consistent with the City’s obligation under FAA Grant Assurance 24 to maintain a fee and rental structure that will make the airport as self‑sustaining as possible under the circumstances existing at that particular airport. The use of the GRI is also consistent with FAA Order 5190.6B – Airport Compliance Manual guidance on escalation provisions in Section 9.5, Terms and Conditions Applied to Tenants Offering Aeronautical Services, subpart (e) that periodic adjustments be based on a recognized index to reflect inflation and other changing economic conditions. An Airport Blended Index (ABI) combining GRI/CPI rate increases would account for year-over-year salary and benefit increases calculated by the City in the GRI while the CPI covers all other cost increases. The ABI formula of 2/3 GRI + 1/3 CPI is justified based on 2/3 of the Airport fund expenses from salaries and benefits. 2.2 Fuel Flowage Fee Fuel flowage fees are a charge on fuel sales by Fixed Base Operators (FBOs) remitted to the Airport. Similar to ground lease rates, airports occasionally bifurcate fuel flowage fees for jet fuel and avgas. Several airports in the Peer Set exercise their exclusive right to provide sole fueling services at the airport, and therefore, do not have a published fuel flowage fee. Only three airports in the Peer Set include a retail fuel flowage fee in their fee schedule: Concord ($0.08 retail, or 4.5% of wholesale, $0.95 self-fuel), Fullerton ($0.15), Livermore ($0.11 - $0.15 depending on volume), San Carlos ($0.10), Camarillo ($0.06), Hayward (greater of $0.05 or 3%). Despite PAO having the highest published fuel flowage fee in the Peer Set, it is not uncommon for general aviation airports in the region to have retail fuel flowage fees between $0.20 - $0.25 per gallon. 2.3 Other Airport Fees and Charges Airports in the Peer Set were selected on characteristics similar to those found at PAO. However, many other circumstances influence the revenue-generating ability of the airport to cover capital and operating expenses toward the FAA’s stated goal of self-sufficiency described in Grant Assurance 24. These circumstances influence the opportunities available to PAO for additional revenue-generation. Thus, comparable market rates are informative in determining appropriate rates at PAO, but market rates may reflect other budget-balancing revenue sources that are not available to the Airport. Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 46  Packet Pg. 52 of 76  6 Fees found at Peer Set airports not charged by PAO include non-aeronautical permit fees and hangar ground lease origination / transfer fees. Non-aeronautical permit fees charged to rental car agencies or transportation network companies (TNCs) such as Uber, Lyft, and Turo are typically 10% - 12% of gross revenue or a fixed price per parking space. PAO has established a fee for car rentals equal to 10% of gross receipts, but not for TNC’s. Additionally, the existing Commercial Aeronautical Permit Fee of $134.50 annually be changed to a tiered structure that collects a fixed fee at lower thresholds while establishing a percentage of gross receipts fee for operators generating significant revenue. Ground lease origination / transfer fees are typically a fixed amount, ranging from $150 - $1,000, but can be 1% - 3% of the assessed or sale value like those collected at Camarillo. Similarly, some airports collect a percentage of revenue for subleasing of commercial aeronautical storage based on hangar square footage. PAO could add or change the following fees while remaining within the range of Peer Set market rates: Figure 3. Other Airport Fees. 2.4 Transient Landing Fees These fees allow the City to capture value created by their continued investment in airport infrastructure from based tenants. However, transient aircraft account for 27% of general aviation landed weight at PAO, yet transient landing fees only represent 0.08% of aeronautical revenue. Landing fees represent a mechanism immediately available to PAO for an increased source of sustainable, relatively inelastic revenue. Unlike hangar rent or fuel flowage fees, landing fees assess actual airport use that correlates with the operating and capital needs of the airfield. Commercial landing fees are assessed on aircraft weight. General aviation has traditionally been subsidized by commercial operators on the justification that heavier aircraft contribute more to the deterioration of runway pavement than lighter aircraft. However, load is less of a factor on runway deterioration when used primarily by aircraft within the pavement’s designed weight bearing capacity or in environments with heavy moisture, extreme temperatures, and frequent freeze-thaw cycles. While aircraft load can be a significant factor in runway deterioration, it isn’t the only factor or even the primary factor in many cases. Therefore, a flat rate may be applied for aircraft under a minimum weight threshold that represent a high share of operations but don’t significantly contribute to pavement deterioration. Based aircraft are typically exempt from landing fees as they pay into the airport system through ground, hangar, or tie-down rents and other fees. This has the secondary benefit of encouraging based aircraft registration, which may increase available state funding. •Current Fee:$10.50 / day •Typically $4-$30/day or $50-$150/monthVehicular Parking Fee: •Potential Fee:$1,500 annually / 1.75x monthly storage fee •Recent standard at GOO and WVI as well as SNS and O52 Derelict / Non-Operational Aircraft Storage Fee •Current Fee:$134.50 annually •Fixed fee of $150 -$1,400 min. annually; SQL: $500 monthly Commercial Aeronautical Permit Fee •Current Fee:10% of Gross Receipts for Rental Cars only •Ranges 10-12% , $100 per vehicle/month or fixed annual fee Commercial Non- Aeronautical Permit Fee •New Fee: 2% of greater sale or assessed value •Typically fixed fee of $150-$1,000; CMA: 2% of sale/assessed valueHangar Transfer Fee Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 47  Packet Pg. 53 of 76  7 3.0 Landing Fee Methodology A transient landing fee model provides a scalable, legally supported, and increasingly practical option thanks to third- party fee collection services. This model enables airports to align fees more closely with facility use and fund capital reserves without overburdening based tenants. PAO currently charges a fixed tier landing fee for commercial operators based on the aircraft Maximum Take Off Weight (MTOW) ranging from $24.50 to $93.00 per landing. General aviation aircraft are charged a tie-down parking fee for 0-8 hours tiered on aircraft weight. This charge acts as a landing fee equivalent to an average of $2.05 / 1,000 lbs. MTOW. Landing fees vary widely in the Peer Set with some based on a fixed tier like PAO but more commonly assessing a rate per 1,000 lbs. MTOW, or a hybrid of both. Truckee Tahoe (TRK) is one such airport that has established the maximum of the Peer Set range at $8 / 1,000 lbs. for all aircraft > 5,500 lbs. up to 22,000 lbs., $10 / 1,000 lbs. for aircraft 20,000 lbs. to 36,000 lbs., and $14 / 1,000 lbs. for aircraft 26,000 lbs. to 80,000 lbs, and $16 / 1,000 lbs. for aircraft over 80,000 lbs. MTOW. Others in the Peer Set charge landing fees ranging from $1.44 / 1,000 lbs. for aircraft over 12,500 lbs at Camarillo to $3.00 / 1,000 lbs for general aviation aircraft over 6,000 lbs. The transient aircraft landed weight at PAO for September 1, 2024 through April 14, 2025 of 22,956,000 pounds was calculated using data from 1200.aero to extrapolate the FY 2025 baseline of 37,075,000 pounds. Applying the tie- down parking fee (0-8 hours) to all transient landings, PAO would have collected approximately $74,892 in landing fees, representing 12% of tie-down revenue budgeted for FY 2025. As a cost recovery mechanism, landing fees can be determined by dividing expenditures, less all other airport revenues and any reserve funds, by the anticipated landed weight for the rate setting period. The ACIP provides estimated costs and timing for implementation over the 5-year planning period. Capital project expenditures assume FAA Airport Improvement Program (AIP) federal grants fund approximately 90%1 (Figure 4). The Sponsor participation of capital projects is approximately 10% of federally eligible projects and 100% of locally funded projects (Figure 5). Figure 4. Federal ACIP-eligible Projects. Figure 5. Locally Funded Projects. Operating expenses were forecasted by calculating the future value of the FY2025 projected expenses for the Airport operating fund at a 3% annual growth rate. FAA policy requires sponsors charge direct operating expenses only when costs can be specifically identified with airport functions and must allocate all other overhead through an FAA‑approved cost allocation plan prepared in accordance with OMB Uniform Guidance (2 CFR Part 200 Subpart E), ensuring indirect costs are GAAP‑consistent, reasonable, similarly billed to comparable sponsor units, limited to employee salaries and wages, and not billed directly as pass‑through expenses. The City should evaluate any internal policies for direct and indirect expenses allocated to the Airport for conformance with FAA Order 5190.6B – Airport Compliance Manual and FAA Order 5100.38D – AIP Handbook. 1 The FAA Reauthorization Act of 2024 provides a 95% match in federal funds through FY 2026. Year Airport Capital Improvement Projects (ACIP) - Federal FY 2025 - 2030 (Oct 1 - Sep 30) 2024 Est. Cost Future Value 2025 AWOS III (Construction)2,532,000$ 2,532,000$ 2026 Master Plan (Environmental)750,000$ 780,000$ 2027 Airfield Solar Array (Design)500,000$ 541,000$ 2028 Runway and Taxiway Reconstruction and Drainage Improvements (Environmental) 900,000$ 1,012,000$ 2026 Access Road Reconstruction (Design)300,000$ 312,000$ 2029 Airfield Electrical Improvement (Design)482,000$ 564,000$ 2031 Airfield Electrical Improvement (Construction)5,000,000$ 6,327,000$ Year Locally Funded Projects 2024 Est. Cost Future Value 2026 Airport Customer Parking Charging Stations (Design & Phase I)25,000$ 26,000$ 2026 Airport Temporary Office Buildings 359,000$ 373,000$ Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 48  Packet Pg. 54 of 76  8 The General Aviation Landing Fee is calculated in Exhibit B using the methodology as set forth in Table A. EXPENSE CATEGORY LINE ITEM Operations and Maintenance Expense A Operations and Maintenance Reserve Charge B Capital Improvement Plan Expenditures C Capital Improvement Plan Reserve Charge D AIRPORT TOTAL REQUIREMENT E = A + B + C + D Less Credits to Airport Total Requirement F AIRPORT NET REQUIREMENT G = E – F Total Landed Weight H General Aviation Landing Fee (per 1,000 lbs) I = G / H Line Item A. Operation and Maintenance Expenditures. This line item is the Airport’s costs for the operation, maintenance, and repair of the Airport including salaries and employee benefits, utility costs, ordinary maintenance, direct and indirect administrative and general expenses listed in the annual operating budget of the Airport Revenue Fund for the rate setting period. Line Item B. Operation and Maintenance Reserve. This line item is an amount equal to one fifth (1/5) of the annual budget for Operation and Maintenance Expenses for the rate setting period. Line Item C. Capital Improvement Plan Expenditures. This line item includes the sponsor’s participation of federal, state, and locally funded capital projects and other capital expenditures attributable to the airport cost center. Line Item D. Capital Improvement Plan Reserve Charge. This line item includes financing and contingencies that ensure airport self-sufficiency and a positive cashflow in future rate setting periods. The Capital Improvement Plan Reserve Charge is the Sponsor’s CIP Participation of Uncompleted Projects divided by the number of current and future rate setting periods in the CIP. The Sponsor’s CIP Participation of Uncompleted Projects means the total capital expense of uncompleted CIP projects less projected capital revenues from federal and state grant sources for future rate setting periods in the CIP. Line Item E. Airport Total Requirement. This line item is the sum of the following line items: Operation and Maintenance Expenditures, Operation and Maintenance Reserve Charge, Capital Improvement Plan Expenditures, and Capital Improvement Plan Reserve Charge. Line Item F. Credits to Airport Total Requirement. This line item identifies the credits to the Airport Total Requirement which include other airport revenues and the prior period ending balance of the Airport Revenue Fund, if any. The Airport Revenue Fund is a reserve fund to facilitate financing and cover contingencies. Any surplus revenue from the airport cost center will be transferred to the Airport Revenue Fund at the end of the fiscal year. Line Item G. Airport Net Requirement. This line item is the Airport Total Requirement less Credits to the Airport Total Requirement. Line Item H. Total Landed Weight is the sum of the Maximum Take Off Weight (MTOW) rounded up to the next highest 1,000 pound interval of each transient aircraft landing at the Airport with a MTOW of 8,000 pounds or more. For aircraft with a MTOW of less than 8,000 pounds, the landed weight is calculated as 1,000 pounds. Line Item I. General Aviation Landing Fee. Airport Net Requirement divided by Total Landed Weight. Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 49  Packet Pg. 55 of 76  9 4.0 Conclusion Palo Alto Airport is entering a sustained, capital intensive period of facility redevelopment without a substantial reserve to finance construction projects. Through 2030, the Airport is planning to fund $12.5M in capital projects requiring $1.4M in Sponsor contributions. The proposed Aeronautical Fee Schedule in Exhibit A would maintain a 10% average of Uncompleted Projects Funding in Reserve over the planning period. The reserve balance is forecast to remain above 0% during the planning period and end with 29% of the funding needed for Airport Electrical Improvement upgrades in 2031. This analysis assumes the City will defer non-critical capital projects if the reserve balance is insufficient to cover projected capital costs instead of pursuing debt financing. Once the Master Plan is complete, the Airport may choose to conduct a Request for Proposal (RFP) for private development of aeronautical facilities on airport-leased ground to realized additional revenues without funding capital development. The proposed T-hangar reconstruction, box hangar replacement, expanded commercial office development, and vertiport facilities could generate substantial revenue offsetting the need for higher aeronautical fees in the future. Airport-funded development requires up-front investment but provides a higher return over the lifespan of the project from facility rental revenues. Private development requires less upfront investment, dependent on existing site conditions, and the airport receives ground rent revenue. Reversionary ground leases for private developments are a common method for the airport to realize hangar rent revenues after the initial ground lease term has expired and the private developer has recovered their initial investment. Implementing a Hangar Ground Lease Origination / Transfer fee provides the Airport an opportunity to capture additional revenue on the initial sale and subsequent transfer of private hangars on airport leased ground. Similarly, collecting a Commercial Non-Aeronautical Recovery fee for off-airport operators enables the Airport to capture a percentage of gross receipts generated from activity at the airport. The waiver of landing fees for non-commercial transient aircraft operations is common among Peer Set airports. However, removing this waiver at PAO presents the opportunity to generate substantial and immediate revenue necessary to fulfill the City’s obligations for capital projects maintaining the airport in a safe and serviceable condition required by federal grant assurances. The following options are suggested to meet capital development funding needs at PAO: 1.Defer capital projects when capital reserve is insufficient to fund Sponsor contribution, 2.Adopt Minimum Standards and complete the Master Plan prior to conducting any Request for Proposal (RFP) for commercial aeronautical facility development, 3.Adjust Fee Schedule by 2.4% in line with the San Francisco-Oakland-Hayward CPI-U index for CY 2024. 4.Increase office and non-aeronautical ground rents by an additional 5.6% over CPI adjustment for FY26. 5.Increase the fuel flowage fee from $0.21 to $0.25, 6.Increase monthly vehicular parking rate from $90 to $100 and establish daily vehicular parking at 1/5th of the monthly rate and the Mobile Truck Operating Permit at five times the daily rate, 7.Establish a Hangar Ground Lease Origination / Transfer fee at 2% of sale or assessed value, 8.Apply a Commercial Non-Aeronautical Permit fee equal to 10% of gross receipts, 9.Modify the tie-down parking rate structure to differentiate landing fee and daily parking rates with the landing fee established at $3.00 / 1,000 lbs. maximum take off weight (MTOW), and 10.Benchmark future fee schedule increases to an Airport Benchmark Index (ABI) blending the City’s General Rate Increase (GRI) and the San Francisco-Oakland-Hayward CPI-U index at a 2:1 ratio. The proposed Aeronautical Fee Schedule in Exhibit A would fund planned capital projects and end FY2026 with a positive reserve fund by making minimal changes to consolidate and standardize current aeronautical fees beyond the 2.4% annual CPI adjustment. These include standardizing monthly rates at five times the daily rate and reclassifying the short-term tie down parking fee to a standardized landing fee per 1,000 lbs. based on the aircraft maximum take off weight. Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 50  Packet Pg. 56 of 76  EXHIBIT A – AERONAUTICAL FEE SCHEDULE (effective July 1, 2025) Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 51  Packet Pg. 57 of 76  *Aircraft not currently based in a hangar or tiedown at the Palo Alto Airport is considered a transient aircraft. On each July first of every year, all rates in Section A. “Based Aircraft”, Section B. “Non‐Based Aircraft” and Section C. “Other Charges” for the ensuing twelve (12) months shall be adjusted according to the Airport Benchmark Index calculated at 2/3rd the City of Palo Alto’s General Rate Increase (GRI) and 1/3rd the Consumer Price Index (CPI) for the San Francisco‐Oakland‐San Jose area of the United States Department of Labor, Bureau of Labor Statistics. In the case of an ABI decrease the rates will remain the same. All fees are rounded up to the nearest fifty cents ($.50) AIRCRAFT: All aircraft weights referenced in this document are defined by the aircraft manufacture and/or the Federal Aviation Administration (FAA) as the certified maximum gross take‐off weight (MTOW) rounded up to the nearest 1,000 lbs. Palo Alto Airport Schedule of Fees and Charges Fiscal Year 2026 (July 1, 2025 ‐ June 30, 2026) SECTION A. City‐Based Aircraft Tail‐in Open Tie‐Down, improved pavement (monthly) 0 to 3,500 pounds $ 206.00 3,501 to 5,200 pounds $ 239.00 5,201 to 10,200 pounds $ 268.50 10,201 to 17,000 pounds $ 301.50 Taxi‐in Open Tie‐Down, improved pavement (monthly) 0 to 3,500 pounds $ 257.00 3,501 to 5,200 pounds $ 319.50 5,201 to 10,200 pounds $ 443.50 10,201 to 17,000 pounds $ 470.50 Large aircraft and helicopter designated tie‐downs (monthly) $ 470.50 SECTION B. City Non‐Based Aircraft* Transient Aircraft, landing fee (non‐commercial) $ / 1,000 lbs. MTOW $ 3.00 Transient Aircraft, landing fee (commercial) $ / 1,000 lbs. MTOW $ 9.00 Transient Aircraft, tie‐down fees (daily for every 24 hour period, aircraft leaving within 4 hours of landing are exempt) 0‐3,500 pounds $ 14.00 3,501 to 5,200 pounds $ 16.00 5,201 to 17,000 pounds, taxi‐through, and helicopter $ 30.00 Transient Aircraft Late Fee Added to each invoice not paid within 30 days. $ 25.00 Transient Gliders will be charged for the number of tie‐downs they occupy. SECTION C. Other Charges Glider & Aircraft Trailer Parking Per Month $ 190.00 Automobile Daily Parking Permit $ 20.00 Monthly Parking Permit ‐ Automobiles Only $ 100.00 Monthly Automobile Apron Parking (Parking spots only rented in association with a Tie‐down account) $ 55.00 Automobile Parking Citation Fee Per Transaction (same as Transient Aircraft Convenience Fee) $ 50.00 Annual or Replacement Gate Access Card Fee Per Card $ 31.00 Mobile Truck Operations Permit Per Day $ 30.00 Per Month $ 150.00 Fire Extinguisher Replacement Per Fire Extinguisher $ 218.00 Commercial Operators/FBO Waste Oil Fee Per Quart $ 1.50 Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 52  Packet Pg. 58 of 76  SECTION D. Other Charges (not subject to annual ABI adjustment) Aircraft Storage Late Fee Per Month $ 45.00 Fixed Base Operator Late Fee Per Month 10% of amount due Hangar Sublease Fee Per Month per additional aircraft $ 25.00 Non‐Operational Aircraft Storage Fee Per Month 1.75x monthly storage fee Fuel Flowage Fee for Palo Alto Airport Per Gallon $ 0.25 Self‐Fueling Permit Flowage Fee: Individual aircraft owner/operator Annual Fee per aircraft $ 84.00 Aircraft owned or operated by a Flying Club Annual Fee per aircraft $ 731.00 Commercial Aeronautical Operations Fee Per Year $ 134.50 Commercial Non‐Aeronautical Fee (Rental Car and Transportation Network Company Operations) Operators who sublease to, or offer as a part of their services, car rental services, shall pay a monthly fee based on the gross receipts received from car rentals. 10% gross receipts Commercial Agreement Transmittal Fee Per Agreement $ 1,124.00 Hangar Ground Lease Origination / Transfer Fee Per Agreement 2% of sale or assessed value Payments made by credit card are subject to a 3% convenience fee. This fee does not apply to payments made by check, ACH or Cash. Per Month Expired Certificate of Insurance Fee $ 50.00 Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 53  Packet Pg. 59 of 76  EXHIBIT B – PRO FORMA FINANCIAL ANALYSIS Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 54  Packet Pg. 60 of 76  Actual Forecasted Fiscal Year (July 1 - June 30)2025 2026 2027 2028 2029 2030 2031 Operations Growth Rate 3.0% Operating Expense Escalation Rate 3.0% Capital Expense Escalation Rate 4.0% Activity Based Fees Fuel Flowage Fee $0.21 $0.21 $0.25 $0.25 $0.25 $0.25 $0.25 Transient Landing Fee ($/1k lbs)$3.00 $3.00 $3.00 $3.00 $3.00 Transient Landed Weight (000's)58,402 60,154 61,959 63,817 65,732 67,704 69,735 Fuel Sales (gallons)503,771 518,884 534,451 550,484 566,999 584,009 601,529 Rental Income Incraese 0% 0% 0% 0% 0% 0% 0% Operations and Maintenance Expense 3,458,112$ 3,399,722$ 3,493,509$ 3,590,109$ 3,689,607$ 3,792,090$ 3,897,648$ Operations and Maintenance Reserve Charge 691,622$ 679,944$ 698,702$ 718,022$ 737,921$ 758,418$ 779,530$ Capital Project Expenditures -$ 80,600$ 27,050$ 101,200$ 56,400$ -$ 1,086,700$ Capital Improvement Plan Reserve Charge -$ 211,892$ 248,860$ 285,775$ 362,233$ 543,350$ -$ Airport Total Requirement 4,149,734$ 4,372,158$ 4,468,120$ 4,695,106$ 4,846,162$ 5,093,858$ 5,763,878$ Less Credits to Airport Total Requirement (232,358)$ 1,156,088$ 1,035,690$ 1,074,407$ 1,122,491$ 1,180,223$ 1,247,892$ AIRPORT NET REQUIREMENT BEFORE LANDING FEES 4,382,092$ 3,216,070$ 3,432,431$ 3,620,698$ 3,723,671$ 3,913,635$ 4,515,986$ AIRPORT OPERATING FUND Airport Aeronautical Revenues Rental Income 970,089$ 1,104,620$ 1,137,759$ 1,171,891$ 1,207,048$ 1,243,260$ 1,280,557$ Hangar Fees 1,303,269$ 1,289,010$ 1,327,680$ 1,367,511$ 1,408,536$ 1,450,792$ 1,494,316$ Fuel Commission 115,709$ 79,210$ 81,586$ 84,034$ 86,555$ 89,152$ 91,826$ Tie Down Fees 715,336$ 636,500$ 655,595$ 675,263$ 695,521$ 716,386$ 737,878$ Parking 17,946$ 19,220$ 19,797$ 20,390$ 21,002$ 21,632$ 22,281$ Other Utilities 103,405$ 66,240$ 68,227$ 70,274$ 72,382$ 74,554$ 76,790$ Misc. Revenues (Transient Fees / Charter Flights)27,431$ 30,440$ 31,353$ 32,294$ 33,263$ 34,260$ 35,288$ Incremental Landing Fees -$ -$ 154,523$ 159,159$ 163,933$ 168,851$ 173,917$ Incremental Rental Income -$ -$ -$ -$ -$ -$ -$ Incremental Fuel Commission -$ -$ 52,026$ 53,587$ 55,195$ 56,851$ 58,556$ TOTAL AIRPORT AERONAUTCAL REVENUES 3,253,185$ 3,225,240$ 3,528,546$ 3,634,403$ 3,743,435$ 3,855,738$ 3,971,410$ Airport Aeronautical Expenses Salaries and Benefits (Operating & CIP)1,647,448$ 1,731,152$ 1,783,087$ 1,836,579$ 1,891,677$ 1,948,427$ 2,006,880$ Contract Services (ex-ACIP)374,333$ 270,900$ 279,027$ 287,398$ 296,020$ 304,900$ 314,047$ Supplies and Materials 52,842$ 76,472$ 78,766$ 81,129$ 83,563$ 86,070$ 88,652$ General Expenses 46,001$ 39,480$ 40,664$ 41,884$ 43,141$ 44,435$ 45,768$ Rents and Leases 670$ 6,630$ 6,829$ 7,034$ 7,245$ 7,462$ 7,686$ Direct and Indirect Charges 1,063,318$ 1,001,588$ 1,031,636$ 1,062,585$ 1,094,462$ 1,127,296$ 1,161,115$ Liability Insurance -$ -$ -$ -$ -$ -$ -$ TOTAL SALARY AND OPERATING EXPENDITURES 3,184,612$ 3,126,222$ 3,220,009$ 3,316,609$ 3,416,107$ 3,518,590$ 3,624,148$ Transfers Out State DOT Loan Repayment -$ -$ -$ -$ -$ -$ -$ General Benefits Fund -$ -$ -$ -$ -$ -$ -$ Loan Repayment- General Fund 272,000$ 272,000$ 272,000$ 272,000$ 272,000$ 272,000$ 272,000$ Transfer to Technology Fund 1,500$ 1,500$ 1,500$ 1,500$ 1,500$ 1,500$ 1,500$ Transfer to Vehicle Fund -$ -$ -$ -$ -$ -$ -$ TOTAL TRANSFERS OUT 273,500$ 273,500$ 273,500$ 273,500$ 273,500$ 273,500$ 273,500$ TOTAL AIRPORT AERONAUTICAL EXPENSES 3,458,112$ 3,399,722$ 3,493,509$ 3,590,109$ 3,689,607$ 3,792,090$ 3,897,648$ TOTAL AIRPORT OPERATING PROFIT (204,927)$ (174,482)$ 35,038$ 44,294$ 53,828$ 63,648$ 73,762$ Airport Capital Improvement Fund - Ending Balance 1,361,010$ 1,186,528$ 1,221,566$ 1,265,860$ 1,319,687$ 1,383,335$ 1,457,097$ Reserve for Encumberances 241,595$ 581,046$ 581,046$ 581,046$ 581,046$ 581,046$ 581,046$ Unrestricted Fund Balance 1,119,415$ 605,482$ 640,520$ 684,814$ 738,641$ 802,289$ 876,051$ Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 55  Packet Pg. 61 of 76  Airport Capital Improvement Fund 2025 2025 2026 2027 2028 2029 2030 Airport Capital Improvement Fund - Revenues Federal Grants (90% of Federal ACIP projects only)1,037,400$ 513,950$ 910,800$ 507,600$ -$ 5,694,300$ State Grants (0% of Federal ACIP and 0% of State Funded ACIP projects)-$ -$ -$ -$ -$ -$ TOTAL CAPITAL REVENUE 1,037,400$ 513,950$ 910,800$ 507,600$ -$ 5,694,300$ Airport Capital Improvement Fund - Expenses TOTAL CAPITAL EXPENSES (See ACIP Below)10,016,000$ 1,118,000$ 541,000$ 1,012,000$ 564,000$ -$ 6,781,000$ Sponsor Participation of Capital Projects 1,351,950$ 80,600$ 27,050$ 101,200$ 56,400$ -$ 1,086,700$ Sponsor Participation of Uncompleted Projects 1,351,950$ 1,271,350$ 1,244,300$ 1,143,100$ 1,086,700$ 1,086,700$ -$ Percentage of Uncompleted Projects Funding in Reserve 83% 48% 51% 60% 68% 74% Airport Capital Improvement Projects (ACIP) - Federal FY 2025 - 2030 (Oct 1 - Sep 30)Future Value 2025 Est. Cost 2026 2027 2028 2029 2030 2031 2025 AWOS III (Construction)2,532,000$ 2,532,000$ 2026 Master Plan (Environmental)780,000$ 750,000$ 780,000$ 2027 Airfield Solar Array (Design)541,000$ 500,000$ 541,000$ 2028 Runway and Taxiway Reconstruction and Drainage Improvements (Environmental) 1,012,000$ 900,000$ 1,012,000$ 2026 Access Road Reconstruction (Design)312,000$ 300,000$ 312,000$ 2029 Airfield Electrical Improvement (Design)564,000$ 482,000$ 564,000$ 2031 Airfield Electrical Improvement (Construction) - Phase I 6,327,000$ 5,000,000$ 6,327,000$ Locally Funded Projects 2026 Airport Customer Parking Charging Stations (Design & Phase I)26,000$ 25,000$ 26,000$ 2031 Airport Temporary Office Buildings 454,000$ 359,000$ 454,000$ Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 56  Packet Pg. 62 of 76  EXHIBIT C – 2023 RENT STUDY ANALYSIS Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 57  Packet Pg. 63 of 76  1 www.aeroplex.net Development Consulting Management Palo Alto Airport (PAO) Airport Rent Study Analysis Aeroplex Group Partners LLC June 1st, 2023 Palo Alto Airport (PAO) Rent Study Analysis Submitted By: 3333 E. Spring Street, Suite 204 Long Beach, CA 90806 Phone: (562) 981-2659 | Fax: (562) 426-8236 www.aeroplex.net Submitted to: Palo Alto Airport Palo Alto, California Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 58  Packet Pg. 64 of 76  2 www.aeroplex.net Development Consulting Management Palo Alto Airport (PAO) Airport Rent Study Analysis Aeroplex Group Partners LLC Mr. Andrew Swanson, C.A.E. Airport Manager 250 Hamilton Ave Palo Alto, CA 94301 RE: Airport Rates and Fees Analysis – Palo Alto (PAO) Dear Mr. Swanson The Aeroplex Group Partners LLC (AGP) is pleased to submit this report, a Rent Study Analysis for Palo Alto Airport (PAO). Our report provides recommendations based on an analysis of those rates used at comparable like airports, consistent with FAA Airport Compliance and Policy relative to rates and fees, and as well accepted airport industry standards and best practices. Palo Alto’s unique and diverse operations fleet mix provides opportunity for the airport sponsor to maximize revenue with respect to aircraft hangar and land rates with the goal to make the Airport as financially self-sustaining as possible. Evaluating the rates and fees structure for airport land on a regular basis will best assure Palo Alto can meet its federal obligations and support fund generation that will provide surplus funds for matching grant applications. AGP completed a survey of comparable rental rates from a list of similar airports provided to us by PAO. The 10 comparable airports offer similar physical and operational characteristics to Palo Alto. AGP has provided a recommendation on adjusting the current rates, which we believe aligns Palo Alto with the FAA’s obligation to maintain financial self- sustainability. The Aeroplex Group Partners LLC is pleased to submit this report to Palo Alto Airport. We appreciate the opportunity to conduct this work. We will remain available to answer any questions and provide additional assistance. Sincerely, Justin Castagna Justin Castagna, PMP, C.M. Partner Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 59  Packet Pg. 65 of 76  3 www.aeroplex.net Development Consulting Management Palo Alto Airport (PAO) Airport Rent Study Analysis Aeroplex Group Partners LLC Palo Alto Airport (PAO) Airport Rent Study Analysis I. BACKGROUND a. Current Practices II. ASSUMPTIONS III. FEDERAL POLICY RELATED TO AIRPORT RATES AND FEES a. Overview b. Self-sustainability c. Reasonable terms, without unjust discrimination IV. STUDY FINDINGS V. SUMMARY VI. RECOMMENDATIONS VII. CLOSING VIII. RESOURCES IX. APPENDIX X. REFERENCES Disclaimer: The information contained in this report is intended as a guide for the reader in better understanding the complexities, policies, industry standards and airport leasing policies, rules, and procedures that apply to airports. It is not intended to replace any necessary research and review of applicable law that may be required in a specific review of a particular case, nor is intended to give legal advice or take the place of an attorney who can advise with respect to a particular situation. While every care is exercised in the preparation of this report, AGP does not accept responsibility for an individual or entity’s reliance on its contents. Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 60  Packet Pg. 66 of 76  4 www.aeroplex.net Development Consulting Management Palo Alto Airport (PAO) Airport Rent Study Analysis Aeroplex Group Partners LLC BACKGROUND Aeroplex Group Partners LLC (AGP) is pleased to submit this Airport Rent Study to the Palo Alto Airport (PAO). This analysis includes a survey of the 10 comparable airports as noted above and the current market rents for aircraft hangars, tie-downs, office, restaurant and improved land rates at PAO. Consistent with FAA's Rates and Charges Policy for aeronautical rate setting, the most accurate and effective methodology for establishing market rents for aeronautical property is through the assessment of rental rates at similar and comparable airports, consistent with fair and reasonable rates and fees for aeronautical property at airports. These airports were selected by flagging regional general aviation service airports with a tower, non-Part 139 certificated, non-precision approaches, airports with +/- 300 based aircraft, +/- 2,000 feet difference from PAO’s longest runway, and within the state of California. The 10 airports selected had at least four of the six characteristics in common with PAO. Please note that market rents for off-airport, non-aeronautical properties were not utilized, as this approach is problematic due to the different types of land use. The adjustment between off-airport, non-aeronautical properties and on-airport, aeronautical properties would have to reflect the fact that these land uses do not exhibit the same rights or restrictions. It is very difficult to determine the adjustment applied to unencumbered off-airport, non-aeronautical rental rates to reflect the constraints imposed by the Federal Aviation Administration (FAA), the Airport, and/or others pertaining to the development and/or use of on-airport, aeronautical properties. TABLE 1 – COMPARABLE AIRPORTS Comparable Airports Airport Code Location San Carlos SQL San Carlos, CA Fullerton Municipal FUL Fullerton, CA Camarillo CMA Camarillo, CA Watsonville Municipal WVI Watsonville, CA Truckee Tahoe TRK Truckee, CA McClellan-Palomar CRQ Carlsbad, CA Santa Monica Municipal SMO Santa Monica, CA Livermore LVK Livermore, CA San Luis Obispo County SBP San Luis Obispo, CA Sacramento Executive SAC Sacramento, CA Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 61  Packet Pg. 67 of 76  5 www.aeroplex.net Development Consulting Management Palo Alto Airport (PAO) Airport Rent Study Analysis Aeroplex Group Partners LLC CURRENT PRACTICES AT PAO Current PAO Rates Hangar Type Rate T-Hangar $0.85 - $0.88/sf Box Hangar $0.85/sf Executive/Corporate Hangar $0.78 - $1.11/sf Tail-in Tie Down $196.00/mo Taxi-in Tie Down $244.50/mo Tie Down Rotorcraft $448.00/mo Office $2.28 – $2.64 Restaurant $2.39/sf Improved Land $0.74psf/yr ASSUMPTIONS It is noteworthy that the market rent opinions conveyed in this Rent Study Summary are based on the lessee having full (unrestricted) and continued access /from the Subject Property) to PAO’s airside and landside infrastructure. Additionally, it is important to note that the analysis was based on an evaluation of triple net lease rates (wherein the lessee pays maintenance, utilities, insurance, and taxes associated with the Subject Property). Market rents are driven by the amount a willing buyer (lessee) pays to a willing seller (lessor). To the extent that local economic and social factors affect rental rates at the national, regional, comparable, and competitive airports, these economic factors will be rejected in the rental rate conclusions. To derive the market rent opinions for the Subject Property, AGP has identified and analyzed (on a comparative basis) the rents being charged and paid for similar properties (by component) at a cross- section of airports that are considered most comparable to PAO. AGP recognizes that there are differences between PAO and the comparable airports where there is no identical comparison. Some of the comparable airports exhibit superior characteristics and some exhibit inferior characteristics. In an effort to identify airports that were considered most comparable to PAO, and to draw conclusions that reflect the conditions at PAO, the comparable airports were compared using a number of aeronautical activity and infrastructure indicators. Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 62  Packet Pg. 68 of 76  6 www.aeroplex.net Development Consulting Management Palo Alto Airport (PAO) Airport Rent Study Analysis Aeroplex Group Partners LLC FEDERAL POLICY RELATED TO GENERAL AVIATION AIRPORT RATES AND FEES FAA Airport Compliance Manual Order 5190.6B, chapter 18.2 requires all airports to adhere to policy regarding airport rates and charges. “The Rates and Charges Policy provides comprehensive guidance on the legal requirement that airport fees be fair, reasonable, and not unjustly discriminatory” (5190.6B, 18.2). Airport sponsors have the responsibility to establish a schedule of reasonable rental rates and charges for the use of facilities and services and to periodically revise those charges to be comparable with other airports having similar characteristics, facilities, and services. The FAA encourages airports to incorporate the following objectives into their fee structures: 1.Requirement to Be Financially Self-Sustaining – Sponsors must maintain a fee and rental structure, which based on the circumstances of that unique airport, makes the airport as financially self-sustaining as possible. 2.Fair and Reasonable Fees – Unless otherwise agreed by aeronautical users, the airport proprietor must allocate capital and operating costs among cost centers for those airfield facilities and services directly used by the aeronautical users. 3.Equitable Treatment of Tenants and Users at Airport – To ensure that the revenues generated by the tenants and users of the Airport will be consistent with the income potential of such tenants and users at the Airport. In addition, fee structures should be reviewed, and possibly revised, on a periodic basis with the goal of satisfying the reasonable expectation to maintain competitive fee structures for the tenants and users of the Airport on an ongoing basis. Ensuring that any airport tenants are subject to the same rates, fees, and charges as are uniformly applicable to other tenants offering similar services or utilizing similar facilities at the Airport will assist in alleviating the potential for claims of unjust discrimination. 4.Escalation Provision. FAA guidance provides that ground leases with terms of five (5) or more years should contain an escalation provision for periodic adjustments based on a recognized economic index. An annual escalation provision helps the sponsor comply with Grant Assurance 24, Fee and Rental Structure, which requires the sponsor to make the airport as self-sustaining as possible under existing circumstances for a specific airport. Thus, given the financial and competitive goal, it is reasonable that Airports apply such a standard for shorter lease terms less than five (5) years. The FAA policy provides that airport sponsors may use different mechanisms and methodologies to establish fees for different facilities, and for different aeronautical users, e.g., air carriers and fixed-base operators. The FAA will consider these differences if called upon to resolve a dispute over aeronautical fees or otherwise consider whether an airport sponsor complies with its obligation to provide access on fair and reasonable terms without unjust discrimination. The FAA typically will not investigate the reasonableness of an airport's fees absent evidence of a progressive accumulation of surplus aeronautical revenues. Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 63  Packet Pg. 69 of 76  7 www.aeroplex.net Development Consulting Management Palo Alto Airport (PAO) Airport Rent Study Analysis Aeroplex Group Partners LLC STUDY FINDINGS The tables below contain the specified airports’ metrics including Hangars, Tie-Downs, Office space, Restaurant and Improved Land. The three types of hangars studied are T-Hangar, Box Hangar, and Executive/Corporate Hangar. Due to the nature of varying hangar dimensions, an average was taken by dividing all monthly rates by hangar square footages. Similarly to hangars, three different tie-downs were evaluated. The three different types of tie downs are tail-in, taxi-in and rotorcraft. Sufficient information was gathered to compare rates for tail-in and taxi-in however not enough rates were compiled for rotorcraft simply because the majority of airports do not offer specific tie downs for rotorcraft. Similarly to hangars, tie-down rates also vary widely based on aircraft weight so rates listed in the tables below were calculated based on aircraft weighing under 12,500lbs. Office and Restaurant rates were taken directly from fee schedules provided on a monthly per square foot basis. Improved Land is the only rate that is calculated on a per square foot per year basis. The results of the study indicate that the average rental rate for T-Hangar is $1.15 psf/month and average rental rate for Box Hangars is $0.94 psf/month, both being slightly higher than the current rates at PAO. However the rate for Executive/Corporate Hangar is $1.02 psf/month, which is in line with the current range at PAO. The average monthly rate for a tail-in tie down is $141.16 and $162.25 for a taxi in tie down, respectively. Both rates are slightly lower than the current rates for tie downs at PAO. The average rates for Office, Restaurant and Improved Land are as follows: Office $1.99 psf/month, Restaurant $1.76 psf/month & Improved Land $0.59 psf/yr. These rates are significantly lower than current rates at PAO. Based on AGP’s research, there is sufficient data to derive reasonable conclusions of market rent for Palo Alto Airport. The selection of comparable market-based rental rates is based upon the information analyzed by the AGP team, with consideration to the sizes (SF), utility, and age of structures. It is important to note that for the three different types of hangar rates, we analyzed and compared on a rate per square foot basis. Since each airport has their own unique hangar sizes, AGP wanted to show comparable rates for the same structure, which is achieved by analyzing the specific rate per square foot on the space. T-Hangar Rates per SF PAO Rate $0.85 - $0.88 Minimum Rate $0.38 Maximum Rate $2.24 Average Rate $1.15 Box Hangar Rates per SF PAO Rate $0.85 Minimum Rate $0.29 Maximum Rate $2.56 Average Rate $0.94 Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 64  Packet Pg. 70 of 76  8 www.aeroplex.net Development Consulting Management Palo Alto Airport (PAO) Airport Rent Study Analysis Aeroplex Group Partners LLC Executive/Corporate Hangar Rates per SF PAO Rate $0.78 - $1.11 Minimum Rate $.37 Maximum Rate $2.56 Average Rate $1.02 Tail-in Tie down Rates per Month PAO Rate $196.00 Minimum Rate $71.14 Maximum Rate $300.00 Average Rate $141.16 Taxi-in Tie down Rate per Month PAO Rate $244.50 Minimum Rate $125.00 Maximum Rate $221.00 Mean Rate $162.25 Tie down Rotorcraft Rate per Month PAO Rate $448.00 Minimum Rate Maximum Rate Mean Rate $221.00* Office Rate per SF PAO Rate $2.28 - $2.64 Minimum Rate $0.50 Maximum Rate $4.87 Mean Rate $1.99 Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 65  Packet Pg. 71 of 76  9 www.aeroplex.net Development Consulting Management Palo Alto Airport (PAO) Airport Rent Study Analysis Aeroplex Group Partners LLC Restaurant Rate per SF PAO Rate $2.39 Minimum Rate $0.75 Maximum Rate $4.87 Mean Rate $1.76 Land Rates psf/yr PAO Rate $0.74 Minimum Rate $0.35 Maximum Rate $0.98 Mean Rate $0.59 SUMMARY Based on the results of all ten (10) surveyed airports, Palo Alto’s Airport’s range of various hangar rates are below the average rate of surveyed airports, with the exception of Executive/Corporate hangars. Tie down rates for both tail-in and taxi-in are higher than the average rate on the tables above. As stated previously, there is not enough data to derive an average rate for rotorcraft tie downs. Office, Restaurant and the annual Improved Land rates are higher than the average rate of surveyed airports. All these findings should be evaluated within PAO’s overall inventory of similar land and buildings, so to evaluate how these rates and fees, uniformly applied, can be used to support PAO’s budget and self- sustainability compliance goal, with revenues to provide for new investment. CLOSING Rates and fees for all general aviation users, regularly and consistently adjusted, will best support PAO in meeting its required grant assurance obligations to keep itself financially healthy and sustainable. As suggested by FAA policy, PAO should consult with aeronautical users and stakeholders well in advance, if practical, of introducing significant changes in charging systems and procedures or in the level of charges. PAO should also provide adequate information to explain to the aeronautical users the survey data justification for the change, the overall airport’s budget, and assess the need and reasonableness of any proposal to adjust PAO’s land rates. For consultations to be effective, PAO should give due regard to the views of aeronautical users and to the effect of any proposed changes in fees. Likewise, aeronautical users should also consider the financial needs of PAO itself so that it remains a viable enterprise. Understanding that consistent rate setting process will ensure that PAO remains self-sufficient, thereby best eliminating any risk in requiring support from the Airport Sponsor’s general fund. Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 66  Packet Pg. 72 of 76  10 www.aeroplex.net Development Consulting Management Palo Alto Airport (PAO) Airport Rent Study Analysis Aeroplex Group Partners LLC RESOURCES The ideas and concepts presented in this report are intended to be consistent with FAA Airport Compliance Policy and industry standards and recommendations, combining all of this information in an effort to assist Palo Alto Airport with best airport management practices available. These ideas and concepts are consistent with information from the Airport Cooperative Research Program (ACRP), which is funded by the FAA, whose information provides excellent resources and ideas. The ACRP carries out applied research on problems that are shared by airport operating agencies on a variety of airport subject areas. The primary participants in the ACRP are an independent governing board appointed by the Secretary of the U.S. Department of Transportation, with representation from airport operating agencies, other stakeholder, and relevant industry organizations. APPENDIX A. Definitions  Improved Land – Airport land having access (airside and landside) and utilities to the property boundary  Market Rent – The rent a property (land or improvement) will most likely command in the open market  Minimum – Minimum value present in the data range  Maximum – Maximum value present in the data range  Average – Arithmetic average of all data in the data range B. Limiting Conditions This report is subject to the following conditions and to other specific and limiting conditions as described by Aeroplex Group Partners (AGP) in this report. 1. AGP assumes no responsibility for matters legal in nature affecting the Subject Property, nor does AGP render any opinion as to the title of the Subject Property, which are assumed to be good and marketable. The Subject Property have been analyzed as though free and clear and held under responsible ownership and competent management. 2. Information, estimates, and opinions furnished to AGP and contained in this report were obtained from sources considered to be reliable and are believed to be true and correct. However. AGP assumes no responsibility for their accuracy. 3. Although parcel dimensions were taken from a source considered reliable, this should not be construed as n land survey. A licensed engineer or land surveyor should verily the exact land size. Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 67  Packet Pg. 73 of 76  11 www.aeroplex.net Development Consulting Management Palo Alto Airport (PAO) Airport Rent Study Analysis Aeroplex Group Partners LLC 4.Unless noted in this report the rental rate conclusions do not include contributory value of any personal property, furniture, fixtures, equipment, or on-going business value. 5.It is assumed that the utilization of the land is within the boundaries or property lines of the Subject Property and there is no encroachment or trespass unless noted in this report. 6.This report is prepared for the sole, exclusive use of the client. No third parties are authorized to rely on this report without the prior written consent of AGP and the client. 7.It is assumed that all applicable zoning and use regulations have been complied with unless non- conformity was stated, defined, and considered in this report. 8.It is assumed that all required licenses, certificates of occupancy, consents or other legislative or administrative authority from any local, state, or federal government or private entity or organization have been or can be obtained or renewed for any use on which the rental rate conclusions are based. 9.Full compliance with all applicable federal, state, and local environmental regulators and laws is assumed unless noncompliance is stated, defined, and considered in this report. 10.In this assignment, the existence of potentially hazardous material, gases, toxic waste, and mold, which may or may not be present on the Subject Property, nor does AGP have any knowledge of the existence of such materials on the Subject Property. To AGP’s knowledge, the presence of potentially hazardous waste, materials, or gases has not been detected, or if detected, it has been determined that the amount or level is considered to be safe according to standards established by the Environmental Protection Agency (EPA}. However, AGP is not qualified to detect such substances and does not make any guarantees or warranties that the Subject Property have been tested for the presence of potentially hazardous waste, gases, toxic waste, or mold and, if tested, that the tests were conducted pursuant to EPA-approved procedures. The existence of any potentially hazardous waste, gases, toxic waste, or mold may have an effect on the rental rate conclusions. 11.The American with Disabilities Act (ADA) became effective January 26, 1992. AGP has not made a specific compliance survey and analysis of the Subject Property to determine whether or not the Subject Property are in conformity with the various detailed analysis of the requirements of the ADA. It is possible that a compliance survey of the Subject Property together with a detailed analysis of the requirements of the ADA could reveal that the Subject Property are not in compliance with one or more of the requirements of the ADA. If so, this this fact could have a negative impact on the market rent conclusion. Since AGP has no direct evidence relating to this issue, possible noncompliance with the requirements of the ADA was not considered in the rental rate conclusions. 12.AGP assumes there are no hidden or unapparent conditions of the Subject Property or subsoil that would render the Subject Property more or less valuable. AGP assumes no responsibility for such conditions or for engineering that might be required to discover such facts. Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 68  Packet Pg. 74 of 76  12 www.aeroplex.net Development Consulting Management Palo Alto Airport (PAO) Airport Rent Study Analysis Aeroplex Group Partners LLC 13. No requirements shall be made of AGP to give testimony or appear in court by reason of this report unless arrangements have been made previously. If any courtroom or administrative testimony is required in connection with this report, additional fees and expenses shall be charged for those services. 14. Possession of this report, or copy hereof, does not carry with it the right of publication nor may it be used for any purpose whatsoever by any entity but the client without the prior written consent of AGP and the client. 15. Neither all nor any part of the contents of this report shall be disseminated to the public through advertising media or public means of communication without the prior written consent of AGP and the client. REFERENCES FAA Airport Compliance webpage: www.faa.gov/airports/airport_compliance/ FAA Order 5190.6B: Airport Compliance Requirements Policy Regarding Airport Rates and Fees (Federal Register Volume 78- Sept 2013) https://www.federalregister.gov/documents/2013/09/10/2013-21905/policy-regarding-airport- rates-and-charges Notice of Amendment to Policy Regarding Airport Rates and Charges: July 2008 Final Policy Regarding Airport Rates and Charges: June 1996 https://www.gpo.gov/fdsys/pkg/FR-1996-06-21/pdf/96-15687.pdf AIRPORT COOPERATIVE RESEARCH PROGRAM (ACRP) Report 23 - Guidebook for compliance with grant agreement obligations to provide reasonable Access to An AIP funded public use general aviation airport REPORT 16 -Guidebook for Managing Small Airports REPORT 36 -Airport/Airline Agreements- Practices and Characteristics REPORT 47 -Guidebook for Developing and Leasing Airport Property Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 69  Packet Pg. 75 of 76  13 www.aeroplex.net Development Consulting Management Palo Alto Airport (PAO) Airport Rent Study Analysis Aeroplex Group Partners LLC Exhibit A Airport Rent Study Analysis —Attached— Item 4 ​Attachment C - Palo Alto Airport Rates and Charges Study Summary of Fee Changes to be Incorporated into the Municipal Fee Schedule​        Item 4: Staff Report Pg. 70  Packet Pg. 76 of 76