Loading...
HomeMy WebLinkAboutStaff Report 2510-5343CITY OF PALO ALTO CITY COUNCIL Special Meeting Monday, April 06, 2026 Council Chambers & Hybrid 5:30 PM     Agenda Item     7.Approval of a Final Map for the Properties Located at 4335 and 4345 El Camino Real to Allow for a Condominium Subdivision to Create Eight Units on a 17,406-Square-Foot Parcel and to Create 21 Units on a 41,370-Square-Foot Parcel and the Naming of Three Private Streets Associated With the Development (25PLN-00160). CEQA Status: Exempt pursuant to CEQA Guidelines Section 15332 (In-fill Development). Zoning District: CS (Service Commercial). City Council Staff Report From: City Manager Report Type: CONSENT CALENDAR Lead Department: Planning and Development Services Meeting Date: April 6, 2026 Report #:2510-5343 TITLE Approval of a Final Map for the Properties Located at 4335 and 4345 El Camino Real to Allow for a Condominium Subdivision to Create Eight Units on a 17,406-Square-Foot Parcel and to Create 21 Units on a 41,370-Square-Foot Parcel and the Naming of Three Private Streets Associated With the Development (25PLN-00160). CEQA Status: Exempt pursuant to CEQA Guidelines Section 15332 (In-fill Development). Zoning District: CS (Service Commercial). RECOMMENDATION Staff recommend the City Council take the following actions: 1. Consider the project exempt from CEQA in accordance with CEQA Guidelines Section 15532 (in-fill) as documented in Attachment C; 2. Approve the final subdivision map, which follows the approved Vesting Tentative Map, for the previously approved residential project at 4345 El Camino Real, pursuant to Palo Alto Municipal Code (PAMC) Section 21.16 and the Subdivision Map Act; and 3. Approve the street names Fiesta Court, Maria Court, and Antonia Court as recommended by the Palo Alto Historical Association for the three new private streets as reflected in the Final Map. BACKGROUND On May 23, 2024, SummerHill Homes, on behalf of Cesano Inc. (the applicant), filed a Vesting Tentative Map application [24PLN-00153] to allow eight residential condominium units on the existing, 17,406-square-foot parcel located at 4335 El Camino Real, and 21 residential condominium units on the existing, 41,370-square-foot parcel located at 4345 El Camino Real, for a total of 29 condominium units. This was filed concurrently with a Streamlined Housing Development review application [23PLN-00152] for construction of a 29-unit residential townhome project. Four units of which would be provided at below market rate and made affordable to moderate income households (80-120% of Area Median Income). In accordance with the Vesting Tentative Map section of the PAMC (Section 21.13), the map application was deferred until all other entitlements were approved. The Director of Planning and Development Services approved the associated entitlement for the site improvements on February 19, 2025, following a public hearing with the Architectural Review Board (ARB) on September 19, 2024.1 Subsequently, Council approved the Vesting Tentative Map on March 17, 20252 following a recommendation of approval from the Planning and Transportation Commission (PTC) on February 26, 2025.3 Project Description On July 3, 2025, the applicant filed a Final Map application [25PLN-00160]. The Final Map application is the second of a two-phased process to subdivide the eight residential condominium units on the existing, 17,406-square-foot parcel located at 4335 El Camino Real, and 21 residential condominium units on the existing, 41,370-square-foot parcel located at 4345 El Camino Real, for a total of 29 condominium units, and create three associated private streets. A location map is included in Attachment A. The Final Map is the official, legal document that is recorded with the County that establishes the property lines, streets, and easements within the subdivision. The Final Map must be prepared under the direction of a registered civil engineer or a licensed land surveyor and be based on a survey. Approval of a Final Map is ministerial if the Final Map is in substantive compliance with the approved Vesting Tentative Map and the subdivider has satisfied the conditions of approval attached to the tentative map. While many cities delegate approval of the Final Map to the City Engineer, under PAMC Section 21.16.240, the City Council is responsible for the approval. To finalize the subdivision of the condominium units, the Applicant must also apply to the California Bureau of Real Estate. The condominium units would be accessed from three new private streets off of Cesano Court. ANALYSIS The Final Map is the document containing the statements, acknowledgements, and agreements from the property owner, surveyor, City officials and beneficiaries that the Final Map is in conformance with all applicable regulations and the approved Vesting Tentative Map. There are no policy implications related to the approval of the Final Map, since the map is consistent with the approved Vesting Tentative Map. 1 September 19, 2024 ARB Staff Report, item 2: https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=458&dbid=0&repo=PaloAlto 2 March 17, 2025 Council Staff Report, item 9: https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=5829&dbid=0&repo=PaloAlto 3 February 26, 2025 PTC Staff Report, item 2: https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=7629&dbid=0&repo=PaloAlto The proposed condominium subdivision also includes private streets for vehicular access to the units. In accordance with City’s Street Naming policy (Resolution 57397), the Palo Alto Historical Association selected proposed street names for the new private streets, for Council consideration and approval. The Palo Alto Historical Association’s proposed street names for the three streets are Fiesta Lane (or Fiesta Court), Maria Court, and Antonia Court. Fiesta Lane is a reference to the former Fiesta Lanes bowling alley, which was built in 1954 and located nearby at 4329 El Camino Real. However, Fiesta Court better fits the City’s naming policy for the hierarchy of street types, as this is a dead-end street, and is therefore staff’s recommendation. Maria and Antonia Court are references to Maria Antonia Garcia Robles. The land these streets are on were previously a part of the Rancho Rincon de San Francisquito, which was purchased by the Robles family in 1847. Maria and her husband Secundino Robles had 29 children and five of her daughters were also named Maria. FISCAL/RESOURCE IMPACT STAKEHOLDER ENGAGEMENT Daily Post on March 27, 2026, which is 12 days in advance of the meeting. Postcard mailing occurred on March 26, 2026, which is 13 days in advance of the meeting. 7 Resolution 5739: https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=55538&dbid=0&repo=PaloAlto ENVIRONMENTAL REVIEW ATTACHMENTS APPROVED BY: 43.5' 1 . 29. 122.7' 124.3' 58.4' 124.3' 90.0' 134.8' 8.9' 68.5' 2.5' 134.8' 66.2' 4.8' 135.0' 42.9' 100.5' 26.2' 45.5' 16.7' 55.0' 55.7' 4.8' 100.5' 60.5' 100.5' 42.3' 55.0' 16.7' 45.5' 25.7' 100.5'31.7' 103.0' 20.2' 28.3' 45.5' 16.7' 55.0' 61.0' 180.5' 1.0' 105.4' 103.0' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 103.5' 116.0' 150.0' 31.4' 70.0' 172.0' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 31.1' 104.9' 32.5' 123.9' 39.3' 103.3' 36.8' 61.9' 105.8' 45.3' 116.0' 278.4' 72.3' 20.0' 45.8' 161.5' 56.6' 172.5' 141.2' 101.6' 20.0' 103.5' 49.2' 205.8' 17.3'19.1'.3'.1'16.2' 172.5' .1'.0'11.4' 19.6' 17.4'4.6' 205.8' 122.7' 142.8' 53.8' 142.8' 105.2' 120.5' 1 120.5' 50.0' 20.0' 29.9' 165.3' 30.6' 161.8' 50.0' .' 37.0'118.4' 139.8'122.7' 15.3' 40.3' 135.0' 98.6' 5.4' 145.9' 37.0' 145.9' 86.3' 115.1' 118.4' 59.7' 101.9' 42.8'31.1' 131.0'32.0' 55.0' 16.7' 45.5' 38.3' 10.5' 101.9' 1 98.' 110. 70.7' 60.2' 20.0' 79.6' 60.2' 137. 145.5'37.0' 122.7' 137. 141.2' 234.5' 267.7' 402.3' 168.4' 314.4' 4380 43824339 4341 4343 440 4333 4335 4345 4329 124 120 118 116 116A 114 112 4337 4368 4 4378 4366 411 413 417 419 410 412 416 418 411 413 417 419 410 412 416 418 411 420 421 4372 4374 4376 4335 43334331 494 4350 4328 410 412 416 8 413 417 419 CESANO COURT EL CAMINO REAL EL CAMINO REAL MILLER COURT CESANO COURT RYAN LANE COLE COURT BRASSINGA COURT GENE COURT PC-3036 CS CS RM-20 This map is a product of the City of Palo Alto GIS This document is a graphic representation only of best available sources. Legend Project Site 0' 112' Attachment A: Location Map 4333/4335 El Camino Real and 4345 El Camino Real CITY OF PALO ALTO I NC O R P O R A TE D CALI FORNIA P a l o A l t o T h e C i t y o f APRI L 1 6 189 4 The City of Palo Alto assumes no responsibility for any errors ©1989 to 2016 City of Palo Alto chodgki, 2022-08-23 11:11:48 (\\cc-maps\Encompass\Admin\Personal\Planning.mdb) ACTION NO. 2025-02 RECORD OF THE COUNCIL OF THE CITY OF PALO ALTO LAND USE ACTION FOR 4335 and 4345 EL CAMINO REAL: VESTING TENTATIVE MAP, 24PLN-00153 At its meeting on March 17, 2025, the City Council of the City of Palo Alto (“City Council”) approved the Vesting Tentative Map for the development of a one-lot subdivision to create 8 residential condominium units, and a one-lot subdivision to create 21 residential condominium units making the following findings, determinations and declarations: SECTION 1. Background. A. On May 23, 2024, SummerHill Homes applied for a Vesting Tentative Map for the development of a one (1) parcel, 8-unit condominium subdivision project for 4335 El Camino Real and a one (1) parcel, 21-unit condominium subdivision project for 4345 El Camino Real (“The Project”). The project site is comprised of two existing lots. APN No. 148-09-010, approximately 17,406 square feet, contains a commercial retail building. APN No. 148-09-011, approximately 41,370 square feet, contains a motel. Uses abutting the site include a five-story apartment building located within the City of Mountain View to the south, a four-story hotel to the north, and a condominium building and several single-family homes to the east. Across El Camino Real is a three-story hotel and a gas station. A. Following staff review, the Planning and Transportation Commission reviewed the project and recommended approval on February 26, 2024, subject to conditions of approval. B. On March 17, 2025 the City Council held a duly noticed public hearing, at which evidence was considered and all persons were afforded an opportunity to be heard in accordance with the City Council’s policies and procedures. SECTION 2. Environmental Review. The City, as the lead agency for the Project, has determined that the project is exempt from the California Environmental Quality Act (CEQA) in accordance with CEQA Guideline section 15332, which provides an exemption for infill development projects. Documentation to support the exemption is available as part of the public record on file with the Planning and Development Services Division. SECTION 3. Vesting Tentative Map Findings. A legislative body of a city shall deny approval of a Parcel Map, if it makes any of the following findings (California Government Code Section 66474). The City Council cannot make these findings for the following reasons: Docusign Envelope ID: C8416892-F797-44E4-A9C0-2807746833D5 1. That the proposed map is not consistent with applicable general and specific plans as specified in Section 65451: The site is consistent with the Comprehensive Plan as described below. 2. That the design or improvement of the proposed subdivision is not consistent with applicable general and specific plans: There is no adopted specific plan for this project site. The proposed vesting tentative map and related improvements is consistent with the Comprehensive Plan in that it facilitates housing development on a site designated for multi-family use within the urban services area, consistent with Goal 2 of the Housing Element and Goal L1.2 of the Land Use Element. The project does not replace existing housing. The project includes four units that will be offered at a rate affordable to moderate income, three at 80%-100% AMI and one unit at 100%-120% AMI. The project improves the city’s jobs housing imbalance consistent with the Transportation Element’s goals and policies. 3. That the site is not physically suitable for the type of development: The Project site is suitable for multi-family residential development in that it’s identified as a Housing Inventory Site in the Housing Element. The existing parcel meets the minimum code requirements for the CS zone district with respect to lot area, width and depth. The parcel would not change with approval of this condominium subdivision. The proposed number of condominium units complies with the applicable densities set forth in the land use element and zoning code. 4. That the site is not physically suitable for the proposed density of development: The project would create a total of 29 multi-family residential units and varies from 20-22 dwelling units (DU) per acre across the two lots. This density is lower than the anticipated density for these sites in the Housing Element, therefore it is physically suitable. 5. That the design of the subdivision or the proposed improvements are likely to cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat: The project is located within the built environment that does not contain quality habitat for fish or other wildlife on the site or within the vicinity of the site. The nearest stream is a portion of Adobe Creek approximately 700 feet northwest from the project site. The adopted Palo Alto 2030 Comprehensive Plan includes Map N-1, which identified sensitive animal and plant species within the Palo Alto quadrangle, a large geographic area that includes the urban portions along the bay and within the foothills, based on information in the California natural Diversity Database (CNDDB). Based on this map, and the urban nature of the site, the subject property Docusign Envelope ID: C8416892-F797-44E4-A9C0-2807746833D5 does not contain any habitat for endangered, rare, or threatened species and has not historically supported any of these species. 6. That the design of the subdivision or type of improvements is likely to cause serious public health problems: The subdivision of this parcel and associated improvements would not have the potential to result in serious health problems. The proposed multi-family use would not include use or storage of hazardous materials and the use is located within the urban environment adjacent to other residential uses. The site is not located on a hazardous waste site pursuant to government code 65962.5. 7. That the design of the subdivision or the type of improvements will conflict with easements, acquired by the public at large, for access through or use of, property within the proposed subdivision. In this connection, the governing body may approve a map if it finds that alternate easements, for access or for use, will be provided, and that these will be substantially equivalent to ones previously acquired by the public. This subsection shall apply only to easements of record or to easements established by judgment of a court of competent jurisdiction and no authority is hereby granted to a legislative body to determine that the public at large has acquired easements for access through or use of property within the proposed subdivision. There are no public access easements over the property currently. Therefore, the design of the subdivision will not conflict with any public easements for access through, or use of, the property. New public utility easements will be provided to existing and proposed electrical utilities as part of this subdivision map as required in accordance with City of Palo Alto Utilities standards. New public access easements will be provided to provide access to the new units. SECTION 4. Vesting Tentative Map Approval Granted. Vesting Tentative Map Approval is filed and processed in accordance to PAMC Section 21.13.020 and granted by the City Council under PAMC Sections 21.12 and 21.20 and the California Government Code Section 66474, subject to the conditions of approval in Section 6 of this Record of Land Use Action. SECTION 5. Final Map. The Final Map submitted for review and approval by the City Council shall be in substantial conformance with the Vesting Tentative Map prepared by CBG titled “TM.1 - VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES” consisting of 12 pages, dated December 10, 2024 and submitted December 19, 2024, except as modified to incorporate the conditions of approval in Section 6. A copy of the Vesting Tentative Map is on file in the Department of Planning and Development Services, Current Planning Division. Prior to the expiration of the Vesting Tentative Map approval, the subdivider shall cause the subdivision or any part thereof to be surveyed, and a Final Map, as specified in Chapter 21.08, to be prepared in conformance with the Vesting Tentative Map as conditionally approved, and in compliance with the provisions of the Subdivision Map Act and PAMC Title 21 and submitted to the City Engineer (PAMC Section 21.16.010[a]). Docusign Envelope ID: C8416892-F797-44E4-A9C0-2807746833D5 SECTION 6. Conditions of Approval. Planning 1. PROJECT PLANS. The Vesting Tentative Map submitted for review and approval by the City Council shall be in substantial conformance with the Vesting Tentative Map titled “Vesting Tentative Map 739 Sutter Avenue For Condominium Purposes”, prepared by CBG and submitted December 19, 2024, except as modified to incorporate the conditions of this approval. 2. FINAL MAP COVER PAGE. At such time as the Final Map is filed, the cover page shall include the name and title of the Director of Planning and Development Services. 3. STANDARD CC&R REQUIREMENTS. Section 16.38 of Palo Alto’s Municipal Code provides that all condominium and other “community housing projects” shall submit Covenants, Conditions and Restrictions (CC&R’s) to the City Attorney for approval before issuance of the Final Map. The City Attorney has developed the following standard covenants which shall be included in all CC&R’s. a. PROPERTY SHALL COMPLY WITH CITY ZONING ORDINANCES. The property, including all common areas, private streets and, parks within the property, shall at all times comply with the City’s Zoning Code and shall not be used for any purpose other than as permitted in the City Zoning Code. b. MODIFICATIONS TO PROPERTY. Any alterations, modifications, or other improvements to the property shall comply with all applicable City Codes. c. MAINTENANACE AND LANDSCAPING OF COMMON AREAS. The Association is responsible for maintenance and landscaping of all parts of the community housing project which are held in common and such maintenance shall be performed to the standard of maintenance prevalent in the neighborhood. (See PAMC Section 16.38.030(a)). d. TERMINATION OF MANAGER OR MAINTENANCE CONTRACTS. The association may terminate the contract of any person or organization engaged by the developer to perform management or maintenance duties three months after the association assumes control of the community housing project or any time thereafter. (See PAMC Section 16.38.030(b).) e. PROTECTION OF STORM WATER FACILITIES. Neither the association, its residents, nor their agents, employees, representatives, invitees, licensees, customers, or contractors shall alter or modify any storm water facilities in any way including but not limited to placing, maintaining, constructing, or planting any improvements, landscaping or other items, including without Docusign Envelope ID: C8416892-F797-44E4-A9C0-2807746833D5 limitation decks, stairs, walls, irrigation systems, trees, or any vegetation on any storm water facilities. f. TRASH DISPOSAL AND RECYCLING AREAS SHALL COMPLY WITH CITY ORDINANCES. All trash disposal and recycling areas shall be kept in a clean and sanitary condition and shall comply with all applicable City Ordinances. g. PROHIBITION AGAINST AIR AND WATER POLLUTION. Neither the association, its residents, nor their agents, employees, representatives, invitees, licensees, customers, or contractors shall use the property in any way which emits pollution into the atmosphere in excess of environmental standards set forth by City, State, and Federal laws, ordinances, and regulations. Neither the association, its residents, nor their agents, employees, representatives, invitees, licensees, customers, or contractors shall discharge garbage, trash, waste, or any other substance or materials of any kind into any private or public sewer or waterway on the property in violation of any regulations of any private or public body having jurisdiction over such matters. h. AMENDMENTS TO ORGANIZATION DOCUMENTS REQUIRE CITY APPROVAL. Any amendments or modifications to the organizational documents shall be submitted to the city attorney for approval. No amendment or modification to the organizational documents shall be effective without prior written consent of the city attorney. i. CITY’S RIGHT TO ENFORCE COVENANTS AND RESTRICTIONS. The City is hereby granted the right, but in no event the duty, to enforce the covenants and restrictions set forth in this section of the organizational documents. The association shall recognize that it has the primary responsibility for enforcement of the organizational documents and unequivocally guarantees to institute and expeditiously prosecute any required legal action to obtain compliance with all provisions set forth in the organizational documents. j. NO WAIVER OF CITY’S RIGHTS. No failure of the City to enforce any of the covenants or restrictions contained in the organizational documents will in any event render them ineffective. k. CITY’S REMEDIES TO CURE A BREACH OR VIOLATION. Remedies available to the City to cure any breach or violation of the organizational documents shall be cumulative to any other provisions of law. The City’s failure to exercise any remedy provided for in the organizational documents shall not, under any circumstances, be construed as a waiver of the remedy. Docusign Envelope ID: C8416892-F797-44E4-A9C0-2807746833D5 l. SEVERABILITY. Invalidation of any one of the City’s required covenants or restrictions by judgment or court order shall in no way affect any other provisions which shall remain in full force and effect. 4. ADDITIONAL CC&R REQUIREMENT. The CC&Rs shall also include a provision that dictates the responsibilities of tenants for the trash pickup for the townhomes as shown in the approved plan set. 5. PRIVATE STREET NAMING. Prior to approval of the Final Map, the private streets shall receive Palo Alto Historical Association recommendation and Council approval, per PAMC 21.20.140. 6. DEVELOPMENT IMPACT FEES. The Property Owner or their designee shall pay all applicable development impact fees associated with the proposed development and subdivision prior to issuance of the building permit(s), as detailed in the Streamlined Housing Development Review Approval. 7. INDEMNITY. To the extent permitted by law, the Applicant shall indemnify and hold harmless the City, its City Council, its officers, employees and agents (the “indemnified parties”) from and against any claim, action, or proceeding brought by a third party against the indemnified parties and the applicant to attack, set aside or void, any permit or approval authorized hereby for the Project, including (without limitation) reimbursing the City for its actual attorneys’ fees and costs incurred in defense of the litigation. The City may, in its sole discretion, elect to defend any such action with attorneys of its own choice. Public Works Engineering 8. PUBLIC WORKS APPLICATIONS, FORMS, AND DOCUMENTS: Applicant shall be advised that most forms, applications, and informational documents related to Public Works Engineering conditions can be found at the following link: https://www.cityofpaloalto.org/Departments/Public-Works/Engineering- Services/Forms-and-Permits 9. SUBDIVISION IMPROVEMENT AGREEMENT: The applicant shall execute a Subdivision Improvement Agreement and provide improvement securities (Bonds) for all proposed public improvements. THE AGREEMENT SHALL BE EXECUTED PRIOR TO MAP RECORDATION OR ISSUANCE OF ANY PERMITS FOR CONSTRUCTION, ONSITE AND OFFSITE. ADVISORY -- The applicant shall provide a detailed itemized stamped and signed engineer's estimate for all off-site public improvements which will be reviewed to determine the security amount. 10. FINAL MAP: This project is subject to, and contingent upon the approval and recordation of a Final Map. The submittal, approval and recordation of the Map shall be in Docusign Envelope ID: C8416892-F797-44E4-A9C0-2807746833D5 accordance with the provisions of the California Subdivision Map Act and Palo Alto Municipal Code Title 21 Subdivision requirements. All existing and proposed property lines, easements, dedications shown on the map are subject to the City’s technical review and approval prior to issuance of any construction permits. 11. MAP THIRD-PARTY REVIEW: The City contracts with a third-party surveyor that will review and provide approval of the map’s technical correctness as the City Surveyor, as permitted by the Subdivision Map Act. The Public Works Department will forward a Scope & Fee Letter from the third-party surveyor and the applicant will be responsible for payment of the fee’s indicated therein, which is based on the complexity of the map. SECTION 7. Term of Approval. Vesting Tentative Map. All conditions of approval of the Vesting Tentative Map shall be fulfilled prior to approval of a Final Map (PAMC Section 21.16.010[c]). Unless a Final Map is filed, and all conditions of approval are fulfilled within a two-year period from the date of Vesting Tentative Map approval, the Vesting Tentative Map shall expire and all proceedings shall terminate. An extension of time may be granted by the city council after recommendation of the planning commission, upon the written application of the subdivider, prior to the expiration of the Vesting Tentative Map approval, or any previous extension granted. Such extension(s) shall be subject to the maximum limitations set forth in the Subdivision Map Act. // // // // // // // // // // // // Docusign Envelope ID: C8416892-F797-44E4-A9C0-2807746833D5 INTRODUCED AND PASSED: March 17, 2025 AYES: Burt, Lauing, Lu, Lythcott-Haims, Reckdahl, Stone, Veenker NOES: ABSENT: ABSTENTIONS: ATTEST: APPROVED: _________________________ ____________________________ City Clerk Mayor APPROVED AS TO FORM: APPROVED AS TO CONTENT: ___________________________ ___________________________ Assistant City Attorney City Manager ___________________________ Director of Planning and Development Services PLANS AND DRAWINGS REFERENCED: Those plans prepared by CBG titled “TM.1 - VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES” consisting of 12 pages, dated December 10, 2024 and submitted December 19, 2024. Docusign Envelope ID: C8416892-F797-44E4-A9C0-2807746833D5 If you need assistance reviewing the above documents, please contact the Project Planner or call the Planner-on-Duty at 650-617-3117 or email planner@cityofpaloalto.org Project Plans In order to reduce paper consumption, a limited number of hard copy project plans are provided to Council members for their review. The same plans are available to the public, at all hours of the day, via the following online resources. Directions to review Project plans and environmental documents online: 1. Go to: bit.ly/PApendingprojects 2. Scroll down to find “4345 El Camino” and click the address link 3. On this project-specific webpage you will find a link to the project plans and other important information Direct Link to Project Webpage: https://www.cityofpaloalto.org/Departments/Planning-Development-Services/Current- Planning/Projects/43334335-and-4345-El-Camino-Real