HomeMy WebLinkAboutStaff Report 2511-5431CITY OF PALO ALTO
CITY COUNCIL
Special Meeting
Monday, March 02, 2026
Council Chambers & Hybrid
5:30 PM
Agenda Item
3.Palo Alto Link Program & Transit Futures Review; CEQA status – not a project. Staff
Presentation
City Council
Staff Report
From: City Manager
Report Type: STUDY SESSION
Lead Department: Transportation
Meeting Date: March 2, 2026
Report #:2511-5431
TITLE
Palo Alto Link Program & Transit Futures Review; CEQA status – not a project.
RECOMMENDATION
Review service performance and transit funding options as Palo Alto Link services conclude
June 30, 2026.
EXECUTIVE SUMMARY
Palo Alto Link began as an 18-month pilot program funded by a Valley Transportation Authority
(VTA) Measure B Innovative Service grant on March 7, 2023. The service has provided on-
demand weekday micro-transit services throughout most of Palo Alto. The service currently
operates on weekdays from 7 a.m. to 7 p.m., with school exclusion zones. Additional grant and
partner funding, and City Council approvals, have extended the pilot term to June 30, 2026.
With committed grant funding winding down, City Council directed staff in June 2025 to review
options for (1) winding down the service; (2) continuing Palo Alto Link with less reliance upon
the City General Fund; (3) focusing the service to prioritize vulnerable riders; or (4) supplanting
the program with a shuttle or fixed routes services.
Staff reviewed current operating model and considered possible fare and service changes to
reduce costs and prioritize vulnerable populations, such as senior and disabled riders. Staff also
considered options to resume fixed route shuttle services or replace the Link with TNC or taxi
vouchers.
No options were found that completely eliminate costs to the City.
BACKGROUND
In 1998, City Council adopted the City’s Comprehensive Plan, which included Goal T-2: A
Convenient, Efficient Public Transit System that Provides a Viable Alternative to Driving.
Palo Alto Shuttle Program, 1999 – 2020
Based on this goal, the City began a Shuttle Program in December 1999 with two fare-free
services: 1) Crosstown shuttle between Crescent Park, Midtown and Charleston Road, which
was funded by the City and operated via a turnkey arrangement with MV Transportation1; and
2) Embarcadero shuttle between Palo Alto Transit Center and East Embarcadero Road, which
was initially managed by Caltrain with a partial subsidy from the City of Palo Alto that increased
as Caltrain funding diminished over time. These shuttle services operated Monday through
Friday, with a special school commute service on both routes on school days.
2 to advance local transit
options.
Table 1: Shuttle Alternatives Presented in the 2017 Palo Alto Transit Vision
Route Variant Service Hours and Headways
Annual
Service
Hours
Escalated
Annual Cost
($2026))3
1 SR 10281, June 24, 2019 https://www.cityofpaloalto.org/files/assets/public/v/1/agendas-
minutesreports/reports/city-manager-reports-cmrs/year-archive/2019/id-10282.pdf
2 See summary of Transit Vision alternatives in the table above; approved by City Council in March 2017:
https://www.cityofpaloalto.org/files/assets/public/v/1/transportation/misctransportation/
3 Since 2019, transit service costs have increased considerably as a result of inflation, supply chain issues, operate
shortages in the Bay Area and other factors.
Figure 1: Palo Alto Shuttle (Photo: City of Palo Alto)
Weekends: 8am–8pm @ 45-min
B2 Weekdays: 6am–10pm @ 30-min
Weekends: 8am–8pm @ 45-min 14,640 $1,330,000
A
Weekdays: 6:50am–7pm @ 20-min peak, no
midday, 40-min evenings
Weekends: No service
5,228 $475,000 Embarc-
adero
Route
B
Weekdays: 7am–9pm @ 15-min peak, 30-min
midday & evenings
Weekends: 8am–8pm @ 60-min
11,400 $1,036,000
A
Weekdays 7am–7pm @ 30-min daytime, 60-min
evenings
Weekends: No service
8,670 $788,000 South
Palo
Alto B
Weekdays: 7am–9pm @ 15-min peak, 30-min
midday, 60-min evening
Weekends: 8am–8pm @ 60-min
14,240 $1,294,000
Following the pandemic shutdown that abruptly reduced transit ridership and City financial
resources, Palo Alto Shuttle services were discontinued on July 1, 2020.
Palo Alto Link, 2023 – 2026
To fill the resulting gap in transit access, City staff submitted a successful application for
$2,000,000 in VTA Measure B Innovative Transit program funds for an On-Demand Transit
Service, with a $500,000 local match. The City subsequently selected Nomad Transit, LLC, (aka
Via) to operate “Palo Alto Link” with an initial $2,043,550 contract for an 18-month term
beginning on March 7, 2023. The City also executed a $744,000 cost sharing agreement with
Stanford University to recoup cost of trips originating or ending in Stanford Research Park (SRP).
Palo Alto Link employed hybrid and electric vehicles (EVs) to provide on-demand rides booked
via mobile app or phone with initial service hours from 8am to 6pm, Monday-Friday. The initial
fare for single rides was $3.50, with a discounted price of $1 for disabled, low-income, senior,
and youth riders. The cost of this service to the City is dependent upon allocated driver hours
and is not necessarily correlated with trips
provided.
On October 21, 2024, Council authorized
an amendment to extend services through
June 2025, with an additional $1,200,000
(bringing the total Via contract to
$3,801,000) and an additional $600,000
cost-sharing amount from Stanford
for trips to and from SRP. Based on Figure 2: Palo Alto Link (Photo: City of Palo Alto)
Council discussion, staff also sought out additional grant funding from the Air District’s
Transportation Fund for Clean Air (TFCA) program, which resulted in a grant award of $441,000.
7. Since June 2025, staff confirmed a
second TFCA award of $456,500, and received information that the service would not receive a
second Measure B Innovative Transit grant.
Table 2: Palo Alto Link Funding Milestones
Date Milestones Non-Fare Revenues (Grants &
Partnership Funding)
Cumulative
Service Cost
8
9
10
11
nd Transportation Fund for
Clean Air (TFCA) award
7 SR 2506-4761, June 16, 2025 https://cityofpaloalto.primegov.com/viewer/preview?id=8427&uid=b976b160-
b836-4718-8270-36f25c823c8d&type=2
8 SR 14959, December 12, 2022 https://cityofpaloalto.primegov.com/portal/item/?meetingItemId=20f80994-de00-
4d1a-aa0b-9e37365ba583
9 SR 2303-1128, April 10, 2023 https://cityofpaloalto.primegov.com/portal/item/?meetingItemId=5a61ff58-8c43-
48a2-ac4d-8b6814a65816
10 SR 2408-3387, October 21, 2024 https://cityofpaloalto.primegov.com/portal/item/?meetingItemId=2a1814e2-
47ed-4386-9b5a-26d412807895
11 Council motion on June 16, 2025 item https://cityofpaloalto.primegov.com/viewer/preview?id=16856&type=3
Palo Alto Link Performance
Today, Palo Alto Link services include on-demand transit service Monday-Friday for a 12-hour
service span 7am-7pm, with school exclusion zones and slightly increased fare prices ($4
standard and $2 discounted for seniors, disabled, low-income, and youth riders). Weekly and
monthly passes are also available.
The service operates within most of the City, except areas to the east and west that are
primarily characterized by large open spaces and conservation lands.
The service uses a nine (9) vehicle fleet to provide virtually positioned pick-up and drop-off
locations within an acceptable walking distance. Door-to-door service and a wheelchair
accessible vehicle is available for riders who may require extra assistance.
Between March 7, 2023, and September October 30, 2025, Palo Alto Link served 137,450 rides,
(3,011 to 6,072 per month), averaging 3.3 miles and 13.3 minutes long. Based on a survey by
Via in late 2024, 60% of riders identify as minorities, 57% earn less than $100,000 per year, and
53% are seniors, disabled, or economically challenged. A large proportion of monthly rides (40%
to 58%) included multiple bookings, where rider trips are shared with other riders.
Top destinations include the
Palo Alto Transit Center,
Stanford Research Park
destinations, Cubberly
Community Center, Midtown
shopping locations, Rinconada
Park area, Stanford Shopping
Center, the VA Hospital, and
Stanford Health locations,
though trips are also
distributed across the entire
service area, including many
residential locations.
Through the service’s
application or a booking agent,
riders receive a Seat
Unavailable message if there is
no available capacity for a new passenger booking a trip at that specific time or in that
particular service area. In the first 12 months of service, the monthly Seats Unavailable service
metric ranged from 3.8% to 9.1%. As committed funding has diminished over the last seven
months, staff have directed Via to scale down service costs. In response, Seats Unavailable
messages have ranged from 15.1% to 19.6% of all rides requested, as the vendor has had to
make less Vehicle Driver Hours available to the public. Typical wait times have also increased,
Figure 3: Palo Alto Link Mobile Application
from 12-15 minutes when the service began to 18-25 minutes since Fall 2024. Average pickup
walking distance has also been increased to pool rider trips more efficiently.
Figure 4: Palo Alto Link Popular Destinations
ANALYSIS
Table 3: Summary of Alternative Service and Funding Options
Strategy Type Description Ridership Impact Cost Impact
Table 3: Summary of Alternative Service and Funding Options
Strategy Type Description Ridership Impact Cost Impact
pilot with
higher fares
funding partners or allow
emerging options to progress
Continue Palo
Alto Link As Is
On-demand rides @ $4/trip ($2
discount) 18-25-minute wait,
15-20% unavailable, school
exclusion
Continue current 3,000-
6,000 trips / month
$1.2 million/year
($26/trip); continue
Stanford partnership
(up to $600k /year)
Increase fares ($10 general, $3
concessions)Decreases ridership Limited decrease in
total cost
Retain fare structure, but
reduce total driver hours Decreases ridership Limited decrease in
total cost
Restrict eligibility to disabled,
low-income, seniors, youth 50-80% decrease in trips
No decrease in total
cost unless fewer
driver hours
allocated
Prioritize & allow pre-booking
by disabled, low-income &
seniors; public only travel as
seats available
20-40% decrease in trips
No decrease in
total cost unless
fewer driver hours
allocated
Continue Palo
Alto Link with
Lower
Subsidy
Shift ridership to existing fixed
route bus routes where
available
Only ~6% of trips can be
completed via bus
network
No cost reduction
available
Embarcadero shuttle: 4+
vehicles @ 30-minute headway,
12 hour
Unknown potential
increase in ridership
$1.1 million; No fund
partnerships
currently available
Crosstown shuttle: 4+ vehicles
@ 30-minute headway, 12 hour
Unknown potential
increase in ridership
$0.8 million; Caltrain
no longer offers
funding partnership
Resume Fixed
Route Shuttle
Services
(~16 person
vehicle)South Palo Alto (Cal Ave to VA)
shuttle: 4+ vehicles @ 30-
minute headway, 12 hour
Unknown potential
increase in ridership
$0.8 million; No
funding partnerships
currently available
Subsidize TNC
or Taxi Service
Could be prioritized for
vulnerable users and desired
availability
Lack of control over rider
safety & availability of
wheelchair-accessible
vehicles
Releases Stanford
Research Park cost
share
Discontinue
Palo Alto Link
Concludes pilot program on
June 30, 2025
Users will pay more for
alternative TNC or taxi
services and users with
disabilities will need to
book 24 hours in advance
for paratransit
Saves City General
Fund from any
ongoing committed
funds
Continue Palo Alto Link as a Pilot Service
This strategy allows the City to buy time by extending the program offerings for an additional
year while other options emerge and staff continue to explore additional potential
partnerships. This option would involve re-programming committed FY 2026 General Fund
dollars to FY 2027 ($250,000), renewing the Stanford Research Park partnership through FY
2027, and utilizing awarded TFCA funds spread over the remainder of FY 2026 and across FY
2027. This approach could also be paired with service or ridership changes or reprioritizations
described.
Maintaining current service design would be the most cost-effective way to sustain transit
accessibility to the existing community of predominantly elderly and economically challenged
riders. While the total cost would not decrease, a continued focus on efficiency would continue
to minimize costs. Based on Via’s survey of similar services in Bay Area cities, Palo Alto Link
spends less per trip than other Bay Area on-demand micro-transit services.
Various options were considered as potential opportunities for reducing subsidies for Palo Alto
Link. The most promising options were increasing fares or reducing driver hours.
Increasing fares (with need-based discounts) may be expected to reduce general ridership,
which may reduce total savings. To test the impacts of fare increases on ridership, If Council
wishes to continue the Palo Alto Link service beyond June 2026, the City could potentially pilot
a fare increase for the remainder of FY 2025-26. Increased fares would generate additional
revenue and would likely not reduce the current funding gap of $250,000 (covered by awarded
TFCA funds in the current FY 2026), while also testing the effects of a fare increase on ridership.
Beyond June 2027, however, the funding gap would increase to $700,000 per year if the City is
unable to secure additional TFCA or other grants. This increase could be graduated by reduced
driver hours.
Other options that were explored as potential mechanisms to lower subsidies included
restricting access or prioritizing elderly and economically challenged riders. These options may
provide a higher quality of service for a limited rider base, but it would cause a spike in cost per
ride and may result in some wasted capacity in the form of empty deadhead trips that would
otherwise be occupied. The concept of redirecting ridership to bus routes was not considered
to be effective since existing bus route only serve a fraction of the current rider base and the
strategy would increase cost per trip.
Community members have expressed interest in fixed route shuttles as an alternative to Palo
Alto Link; however, this option is financially infeasible. As shown in Table 1, fixed route shuttle
services are more expensive than Palo Alto Link. Furthermore, prior shuttle funding
partnerships such as Caltrain and Stanford Health Care are no longer available, and a shift from
Palo Alto Link to a fixed route shuttle would likely result in the loss of the funding partnership
with Stanford since SRP trips are distributed throughout the City and not along shuttle routes.
Subsidize Transportation Network Companies (TNC) or Taxi Services
Discontinue Palo Alto Link (Default Option)
Funding Partnership Opportunities
Planning and Transportation Commission Review
In December 2025, the Planning and Transportation Commission reviewed information on Palo
Alto Link.17 Commissioners generally praised the value brought to Palo Alto Link users and
expressed a desire for better transit-like services in the City. PTC did not provide a specific
recommendation for continuing the service or supplanting it with any other option.
Palo Alto Link services are currently programmed to wind down at the end of the current fiscal
year, with the last date of service expected to be June 30, 2026.
The Palo Alto Link program currently operates at a fully burdened cost of approximately $26
per trip, with rider fares recovering less than 5% of total operating expenses.
Since early 2023, staff utilized funds from the Measure B Innovative Transit Program, Stanford
Research Park, and TFCA to fund approximately 95% of service costs through December 2025.
Measure B funds totaled $2,000,000 through June 2024. While external grants and the Stanford
Research Park (SRP) partnership successfully funded approximately 95% of service costs
through 2025, one-time resources such as VTA Measure B funding are now concluding.
The SRP contribution to funding has ranged from 33% to 50% of monthly costs since the
funding partnership began in March 2023, totaling approximately $1.2 million through
December 2025. Additional funds, including a second award valid through June 2027, from the
Bay Area Air Quality Management District's Transportation Fund for Clean Air (TFCA) have
decreased the impact on City dedicated funds, allowing an extension of the original pilot term
to June 30, 2026. Rider fares have currently contributed less than 5% of program costs.
If Council chooses to winddown service by June 30, 2026, the City will achieve a gross cost
saving of approximately $250,000 in Fiscal Year 2026-27 and approximately $700,000 in
subsequent years. However, the net fiscal benefit is reduced to approximately $125,000–
$275,000 after accounting for the loss of $425,000 to $575,000 in annual Stanford cost-sharing
revenue for services that connect to SRP.
This decision must be weighed against the City’s broader fiscal reality, including a $14.9 million
structural deficit. This program should align with the City's cost recovery objectives and
preserve General Fund stability. Any extension of general on-demand service would require a
significant subsidy level which the City Council should consider in context with other General
Fund supported services.
17 SR 2510-5293, November 12, 2025
https://cityofpaloalto.primegov.com/Portal/Meeting?meetingTemplateId=16610
STAKEHOLDER ENGAGEMENT
ENVIRONMENTAL REVIEW
ATTACHMENTS
APPROVED BY:
Palo Alto Link Program & Transit FuturesStudy Session
March 2, 2026 – City Council Meeting Item #3 www.paloalto.gov
2
Regional Transit Context
•Federal funding has long prioritized highways
•PA’s location at the edge of Santa Clara County
presents unique first / last-mile challenges
•Regional coordination needed
3
Shuttle Program Background
•1999-2014, 2016-2020
(Crosstown & Embarcadero
routes only)
•2014-2016 (EPA route added)
•2017 Draft Transit Plan
(Expansion plan / options,
including SPA, not shown)
4
Palo Alto Link Background
•Aug. 14, 2017 Council direction to explore flex transit model
•Nov. 8, 2022 Receipt of VTA Innovative Transit Service Grant
•Mar. 7, 2023 Service Start with Via (Nomad)
•Various service refinements made in response to Council
and public feedback
•Jun. 16 and 17, 2025, Council discussed service continuation
considering unknown grant funding awards
5
•On demand
•7am to 7pm M-F
•Point-to-point or door-to-
door (seniors / people with
disabilities)
•Serves most of Palo Alto
(exc.Baylands, Palo Alto Hills)
Palo Alto Link Service
6
Recent Policy Direction
•Jun. 16,2025 Council authorized funding extension of the
Palo Alto Link (PAL) On Demand Transit Services program for
up to 6 months (assuming all grant funds expended)
•Jun. 17, 2025 Council authorized contract renewal with
Nomad Transit through June 30, 2026 (considering potential
VTA Innovative Transit and Air District TFCA awards)
•Directed staff to consider and present termination
implications and alternate service options by end of 2025.
7
Recent Funding History
•Initial VTA Innovative Transit funding expired 6/30/2024
•Final round of TFCA funding will be expended by 6/30/2026
•General Fund share would need to substantially increase beyond
6/30/2026
7/1/2025-6/30/2026
Grants (TFCA)$456,500
Stanford Research Park (SRP)Up to $600,000
Fares $35,000 - $50,000
General Fund $0 - $250,000
Estimated Expenses $960,000
Strategy
No change
Palo Alto Link
with Lower
Subsidy
Resume Palo
Alto Shuttle
TNC subsidy
8
Service Options
Strategy Description Ridership Impact Cost & Funding
No change $4/trip, 18-25 minute wait, 15-20% unavailable No change $1.2M/year, ~$0.5M from SRP
Palo Alto Link
with Lower
Subsidy
Increase fares Decrease Limited reduction
Retain fares, reduce driver hours Decrease Limited reduction
Restrict to discounted fares 50-80% decrease Limited reduction
Prioritize discounted fares and pre-booking 20-40% decrease Limited reduction
Prioritize shifting riders to available transit 6% available No cost reduction
Resume Palo
Alto Shuttle
Embarcadero shuttle Unknown increase $1.1M, No funding partnership
Crosstown shuttle Unknown increase $0.8M, No funding partnership
South Palo Alto (Cal Ave to VA) shuttle Unknown increase $0.8M, No funding partnership
TNC subsidy 24/7 Service for Just Vulnerable Users Unknown Discontinues SRP partnership
9
Feedback on Palo Alto Link
PTC – November 2025
Values
•Meets many community member
needs (especially families with
special needs)
•Prioritize vulnerable users
•Capture lessons learned for
future services
Community Members / Users
•Service availability and accurate
time estimates are important
•App based service can be
difficult for seniors with
disabilities
•Increased span of coverage
desired (beyond City borders)
•Increased span of service desired
(weekend and evenings)
9
Fiscal Impact / Summary
•Current fiscal implications
o Per trip cost: $26
o 5% of operating costs covered by fares
o Key funding partnership (~$500,000 per year) with SRP
•Winding down by June 30, 2026
o Saves ~$250,000 in FY 2026-27
o Saves ~$700,000 per year in FY 2027-28 & beyond
o Results in loss of ~$425,000 to $575,000 in SRP
partnership
10
Discussion for Transit Future
•What feedback do you have on service performance and
transit funding options as Palo Alto Link concludes June 30,
2026?
Nate Baird
Transportation Planning Manager
Office of Transportation
nathan.baird@paloalto.gov
650-329-2340