Loading...
HomeMy WebLinkAboutStaff Report 2511-5408CITY OF PALO ALTO CITY COUNCIL Monday, December 01, 2025 Council Chambers & Hybrid 5:30 PM     Agenda Item     10.Adoption of (Corrected) Resolution Amending Five Rate Schedules Setting Forth Utility Connection Fees and Other Charges: Utilities Rate Schedule E-15 (Electric Service Connections), W-5 (Water Service Connections), G-5 (Gas Service Connections), S-5 (Sewer Service Connections) and C-1 (Utility Miscellaneous Charges); CEQA Status: Not a Project Under CEQA Guidelines Sections 15378(b)(4) and (5) and Exempt Under Section 15273(a). Public Comment City Council Staff Report From: City Manager Report Type: CONSENT CALENDAR Lead Department: Utilities Meeting Date: December 1, 2025 Report #:2511-5408 TITLE Adoption of (Corrected) Resolution Amending Five Rate Schedules Setting Forth Utility Connection Fees and Other Charges: Utilities Rate Schedule E-15 (Electric Service Connections), W-5 (Water Service Connections), G-5 (Gas Service Connections), S-5 (Sewer Service Connections) and C-1 (Utility Miscellaneous Charges); CEQA Status: Not a Project Under CEQA Guidelines Sections 15378(b)(4) and (5) and Exempt Under Section 15273(a). RECOMMENDATION Staff recommends that Council adopt the attached Resolution (Attachment A) and related Rate Schedules (Attachments B - F) to correct a clerical error in a resolution adopted on October 20, 2025. BACKGROUND The City Council periodically adopts a resolution amending Utility Rate Schedules E-15, G-5, W- 5, S-5, And C-1 (Connection and Capacity Fees for the Electric, Water, Gas, and Wastewater Utilities, and Miscellaneous Utility Charges). At its meeting on October 20, 2025, following a noticed public hearing, the Council adopted its resolution amending these rate schedules effective January 1, 2026. For Rate Schedule C-1 (Utility Miscellaneous Charges), staff inadvertently uploaded a summary draft 2026 rate table, rather than the full text of the C-1 2026 rate schedule. Also, due to agenda revisions, Resolution 10253 misstated its adoption date; this has been corrected to reflect Council’s October 20, 2025 adoption of the Resolution. ANALYSIS To avoid the confusion that could be caused by this clerical error, Staff recommends adoption of the attached corrected resolution that includes the C-1 (Utility Miscellaneous Charges) rate schedule rather than the summary rate table, which also included draft rate calculations rather than final rates in some lines. Because the adopted rate schedules do not go into effect until January 1, 2026, there has been no negative impact on Customers from this clerical error. On October 20, 2025 (Staff Report #2505-4736), Council adopted Resolution 10253, which adopted 2026 rate schedules for certain connection charges and miscellaneous utility charges. Proposed 2026 Connection Fee Rate Schedules E-15, W-5, G-5 and S-5 were all properly uploaded to the system and matched what was intended for Council approval and described in the staff report. However, staff inadvertently uploaded a 2026 rate table summary of Rate Schedule C-1, an early draft of the rates and included some rates that were different from the amounts recommended in the staff report and the uploaded rate schedules. FISCAL/RESOURCE IMPACT STAKEHOLDER ENGAGEMENT . ENVIRONMENTAL REVIEW ATTACHMENTS APPROVED BY: NOT YET APPROVED Attachment A 1 027111225 Resolution No. _________ Resolution of the Council of the City of Palo Alto Amending Connection and Capacity Fees for the Electric, Water, Gas, and Wastewater Utilities, and Amending Miscellaneous Utility Charges (Utility Rate Schedules E-15, G-5, W-5, S-5, And C-1) R E C I T A L S A. Pursuant to Chapter 12.20.010 of the Palo Alto Municipal Code, the Council of the City of Palo Alto may by resolution adopt rules and regulations governing utility services, fees and charges. B. On October 20, 2025, at a noticed public hearing, the City Council heard and approved the proposed amendments to utility connection and capacity fees, and miscellaneous utility charges. C. Resolution 10253, the rate resolution adopted by the City Council on October 20, 2025, included a clerical error. D. The City Council desires to correct the clerical error. The Council of the City of Palo Alto does hereby RESOLVE as follows: SECTION 1. Pursuant to Section 12.20.010 of the Palo Alto Municipal Code, Utility Rate Schedule E-15 (Electric Service Connection Charges) is hereby amended to read as attached and incorporated. Utility Rate Schedule E-15, as amended, shall become effective January 1, 2026. SECTION 2. Pursuant to Section 12.20.010 of the Palo Alto Municipal Code, Utility Rate Schedule G-5 (Gas Service Connection Charges) is hereby amended to read as attached and incorporated. Utility Rate Schedule G-5, as amended, shall become effective January 1, 2026. SECTION 3. Pursuant to Section 12.20.010 of the Palo Alto Municipal Code, Utility Rate Schedule W-5 (Water Service Connection Charges) is hereby amended to read as attached and incorporated. Utility Rate Schedule W-5, as amended, shall become effective January 1, 2026. SECTION 4. Pursuant to Section 12.20.010 of the Palo Alto Municipal Code, Utility Rate Schedule S-5 (Wastewater Service Connection Charges) is hereby amended to read as attached and incorporated. Utility Rate Schedule S-5, as amended, shall become effective January 1, 2026. SECTION 5. Pursuant to Section 12.20.010 of the Palo Alto Municipal Code, Utility Rate Schedule C-1 (Utility Miscellaneous Charges) is hereby amended to read as attached and incorporated. Utility Rate Schedule C-1, as amended, shall become effective January 1, 2026. NOT YET APPROVED Attachment A 2 027111225 SECTION 6. The Council finds that the revenue derived from the adoption of this resolution shall be used only for the purpose set forth in Article VII, Section 2, of the Charter of the City of Palo Alto. SECTION 7. The Council finds that the fees and charges adopted by this resolution are charges imposed for a specific government service or product provided directly to the payor that are not provided to those not charged, and do not exceed the reasonable costs to the City of providing the service or product. SECTION 8. Council finds that the adoption of this resolution is statutorily exempt from the California Environmental Quality Act (CEQA), pursuant to California Code of Regulations Title 14, Chapter 3, Section 15273(a), because the fees and charges proposed are necessary to recover the cost of providing utility service and meet operating expenses. After reviewing the report and related attachments as presented, the Council incorporates these documents herein and finds that sufficient evidence has been presented setting forth with specificity the basis for this claim of CEQA exemption. Alternatively, correction of a clerical error in a rate schedule is not a project under CEQA Guidelines Sections 15378(b)(4) and (5), as government fiscal and administrative activities that will not result in physically significant changes in the environment. // // // // // // NOT YET APPROVED Attachment A 3 027111225 SECTION 9. The purpose of this Resolution is to correct a clerical error in Resolution 10253 adopted by the City Council on October 20, 2025. Instead of the complete text of Utility Rate Schedule C-1 (Utility Miscellaneous Charges), that resolution included a table summary of the utility miscellaneous charges, as well as the other utility connection fees, with some discrepancies from the final Rate Schedules. For administrative convenience, and avoidance of any confusion, the City Council has chosen to readopt the entire resolution, substituting the complete text of Utility Rate Schedule C-1 (Utility Miscellaneous Charges) included here in place of the summary rate table that was part of the resolution adopted on October 20, 2025. This resolution is intended to ratify, rather than repeal, those parts of the previously adopted resolution that are unchanged. INTRODUCED AND PASSED: AYES: NOES: ABSENT: ABSTENTIONS: ATTEST: Assistant City Attorney Director of Administrative Services NOT YET APPROVED Attachment A 4 027111225 Attachments: Utility Rate Schedule E-15 Utility Rate Schedule G-5 Utility Rate Schedule W-5 Utility Rate Schedule S-5 Utility Rate Schedule C-1 ELECTRIC SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE E-15 CITY OF PALO ALTO UTILITIES Issued by the City Council Effective 0101-01-260 Supersedes Sheet No. E-15-1 dated 01-01-209-01-19 Sheet No.E-15-1 8 4 7 9 A. APPLICABILITY: This Rate Schedule applies to all connections, interconnections, expansions, and upgrades to the City's Electric Distribution System, except connections that serve street lighting or traffic signals. This Rate Schedule applies anywhere the City of Palo Alto provides Electric Service. All Charges must be pre-paid by the Applicant prior to the scheduling of any construction or connections to the City's Electrical Distribution System. The Applicant must pay all Advance Engineering Fees to start the engineering process which are non-refundable. The Advance Engineering Fees will be credited against the estimated job cost prior to the collection of construction fees. For Service connections that do not require a job estimateapplicable to fixed electric service connection fees, CPAU will not require Advance Engineering Fees. (A)Service Connection Charges: Service Connection Charges are required when the City connects any Customer to the City’s electrical Distribution System. A one-time waiver of this fee may be granted for Services connected during the construction of an underground conversion utility district. (1) Residential or Small Commercial - Single Familyservice, single phase, 200 (or less) and 400 amp services that do not require customer contribution for transformer upgrades or replacement. These fees apply to a development in which Electric Metering will be on a single-family dwellings, with or without an ADU, and small commercial businesses basis.. ELECTRIC SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE E-15 CITY OF PALO ALTO UTILITIES Issued by the City Council Effective 0101-01-260 Supersedes Sheet No. E-15-2 dated 01-01-209-01-19 Sheet No.E-15-2 8 4 7 9 (a) For a 250 volt maximum, 200 amp or less underground service.. ………..$1,0403,940.00 (b) For a 250 volt maximum, 400 amp underground service …..……………… $4,360.00any connection requiring greater capacity the fee shall be CPAU’s estimate of the installation cost or $1040, whichever is greater. (c)For a 250 volt maximum, 200 amp max service from a rear easement..............................................................................................$2,330 (d)(c)For any rear easement connection requiring greater capacity or system upgrades, the fee shall be CPAU’s estimate of the installation cost or $2330, whichever is greater. (2) Commercial/Industrial These fees apply to commercial, industrial, and multi-family residential services. (a) For a 250 volt maximum, 200 amp or less service ...........................$1,420 (b) For any connection requiring greater capacity, the fee shall be CPAU’s estimate of the installation costs or $1420, whichever is greater. (B) On-site Distribution System Charges: Where the customer is financially responsible for CPAU installations or will installof the underground conductors (primary or secondary), switches or transformers in and on facilities provided by the developer within the boundaries of a sub-division or other development, an on-site distribution system fee shall be charged, based on CPAU’s estimate of all applicable installation costs. (C) Off-Site Distribution System Charges: Where the customer is financially responsible for CPAU installations or will installof an Electric Distribution system, system extension, or system reinforcement outside the boundaries of a sub-division or other development to be served, an off-site distribution system fee shall apply, based on CPAU’s estimate of all applicable installation costs. 3. OVERHEAD SYSTEMS Connection Charges shall apply for all new single-phase Services or Service upgrades exceeding 2400 amps or less. (A)Overhead Service Connection Replacement Charges: ELECTRIC SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE E-15 CITY OF PALO ALTO UTILITIES Issued by the City Council Effective 0101-01-260 Supersedes Sheet No. E-15-3 dated 01-01-209-01-19 Sheet No.E-15-3 8 4 7 9 (1) Residential or Commercial – Single Familyservice, single phase, for 200 amps (or less) and 400 amps services that do not require customer contribution to transformer upgrades or replacement. These fees apply to single-family dwellings, with or without ADU, or small commercial businesses. development in which Electric Metering will be on a single-family service basis. (a)For a 250 volt maximum, 200 amp or less, 3 and 4 wire services, single phase overhead service of (a)80 feet in length maximum service…………………………………………s $1,0402,910.00 (b)For a 250 volt maximum, 4200 amp or less, 3 and 4 wire single phase overhead services, (c)80 feet in length maximum services, mid-span connection …………………………………………………………….$2,3703,540.00 (b) (d)(c)For all other connections, the fee shall be CPAU’s estimate of the installation cost or $1040, whichever is greater. (a) For a 250 volt maximum, 200 amp or less, 3 and 4 wire services, 100 feet in length maximum service ..............................................$1,440 (b) For all others the fee shall be CPAU’s estimate of the installation cost or $1440, whichever is greater. (2) Charges for replacement or upgraded Overhead Services not described above, shall be based on CPAU’s estimate of applicable costs. 4. TEMPORARY SERVICE (A) Overhead Temporary Service Charges: (1) For a 250 volt, 200 amp or less, 3 wire service, within 50 feet if a suitable secondary system …………………………………………….. ………………………………………………………$1,1901,040.00 (2) Fees for a Temporary Service of greater length and capacity or voltage shall be based on CPAU’s estimate of all applicable installation and removal costs, or $1,040.001,190, whichever is greater. ELECTRIC SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE E-15 CITY OF PALO ALTO UTILITIES Issued by the City Council Effective 0101-01-260 Supersedes Sheet No. E-15-4 dated 01-01-209-01-19 Sheet No.E-15-4 8 4 7 9 (B) Underground Temporary Service Charges: (1) For a 250 volt, 200 amp or less, 3-wire maximum service, within 100 feet of suitable secondary system and service box. Customer is responsible for all substructure. …………………………………………………..................................................... .......................................$1,1901,060.00 (2) If a suitable secondary system and/or service box is not available at the property, the Customer will be responsible for all cost necessary to extend or rearrange the system to allow for the temporary electric service. (3) Fees for a Temporary Service of greater length and capacity or Voltage shall be based on CPAU’s estimate of the installation and removal costs, or $11901,060.00, whichever is greater. 5. GENERATOR INTERCONNECTION CPAU shall charge a fee for evaluation of Generator (Photo Voltaic (PV), Energy Storage System (ESS)) Interconnection Applications performed pursuant to Rule and Regulation 27. (A) Advance Engineering Fees: (1) Net Energy Metering p or pProjects with a size less than or equal to 10kW in capacity……………………………………………………………..……..$520.0 0 (1) Net Energy Metering projects or projects with a size less than or equal to 10 kW taking Service under the Net Energy Metering Successor Program................$0 (2) All Projects which are greater than 10 kW and less than 100 kW in capacity ...............................................................................................……...$8401,140.00 (3) All Projects which are greater than or equal to 100 kW and less than 500 kW in capacity ........................................................................................$5,5507,560.00 (4) All Projects which are 500 kW or greater in capacity .............$10,70014,500.00 (B) Supplemental and Detailed Studies: ELECTRIC SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE E-15 CITY OF PALO ALTO UTILITIES Issued by the City Council Effective 0101-01-260 Supersedes Sheet No. E-15-5 dated 01-01-209-01-19 Sheet No.E-15-5 8 4 7 9 Net Energy Metering projects or projects with a size less than or equal to 10 kW taking Service under the Net Energy Metering Successor Program)$0(1) Supplemental and Detailed Study fees for all Net Energy Metering Projects requiring additional study per Rule and Regulation 27 not covered under section 4(B)(1) shall be based on CPAU’s estimate of applicable costs. (C) Interconnection Review Charges: Net Energy Metering projects or projects taking Service under the Net Energy Metering Successor Program).........................................................................$0 (1) All projects less than or equal to 10 kW not under section 4(C)(1)…...$152520.00 (2) Interconnection fees for all Projects not covered under section 4(C)(1) or 4(C)(2) will be based on CPAU’s estimate of applicable costs. 6. PALO ALTO CLEAN LOCAL ENERGY ACCESSIBLE NOW PROGRAM Meter maintenance and administrative service Charge for Generators participating in the Palo Alto Clean Local Energy Accessible Now (CLEAN) Program.................$34.73207.00 DG. CREDITS: For single family or multi-family Service Connections only, if the installation of Electric Vehicle Supply Equipment will require a capacity upgrade of Electric Distribution System Equipment, a connection fee credit may be available under the City’s Low Carbon Fuel Standard (“LCFS”) Program. The credit shall be equal to the estimated cost of the upgrade of electric distribution system equipment, and may not exceed $3,000 per connection. When Service Connection is triggered by EVSE installation, the connection fee shall be the greater of a) the estimate of the installation costs minus the LCFS credit, or b) the minimum fee shown in section C.2(A)(1) (for single family Service Connections) or C.2(A)(2) (for multi-family Service Connections). The availability of the credit is subject to LCFS Program rules and funding availability. Rebates or credits may be available to defray electric service connection chargers, if the service upgrade is a result of higher electrical loads caused by electric vehicle charging. For additional information visit: https://www.paloalto.gov/Departments/Utilities or call 650-329-2241 ELECTRIC SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE E-15 CITY OF PALO ALTO UTILITIES Issued by the City Council Effective 0101-01-260 Supersedes Sheet No. E-15-6 dated 01-01-209-01-19 Sheet No.E-15-6 8 4 7 9 EH. NOTES: 1. These Charges apply to all vacant land except where the Charges are recorded as previously paid. 2. CPAU can generally provide service availability from 30 to 45 days after all Charges are paid except when long lead-time equipment or materials are required. Consult the City for estimated lead-times. 3.All fees and minimum charges are subject to DGS California Construction Cost Index (CCCI) adjustments, to be applied annually effective on July 1. 3.4. CPAU is not responsible for delays in Service connection caused by conditions beyond its control, including, but not limited to, delays in the arrival of equipment such as transformers, switches and cable. {End} GAS SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE G-5 Sheet No. G-5-1 Effective 09-01-201901-01-2026 Supersedes Sheet No.G-5-1 dated 05-01-201509-01-2019 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 0 A. TERRITORY: This Rate Schedule applies everywhere the City of Palo Alto provides Gas Service. B. CHARGES: Customer must pay plan review and connection fees in full prior to scheduling any Utility construction work or inspections. CPAU will mail send invoices to the responsible party listed on the Service application. All invoices are valid for 90 days from date of issuance. Once CPAU receives full payment, determines that all applicable Service requirements are met, and the Utilities Inspector determines that the project is ready for utility installation, CPAU Water, -Gas, and- Wastewater Utilities Operations (WGW Operations) staff will schedule the project for construction. Depending on material availability and scheduling constraints, Utility Services are generally installed 60 to 90 days later. While CPAU staff makes best efforts to install Services as planned, construction delays may occur as a result of unforeseen conditions. Contact WGW Operations for scheduling lead-time. Regular CPAU work hours are 8 AM to 5 PM, Monday through Friday, excluding legal City holidays. Any work the City deems necessary to be performed during non-regular work hours shall be charged at the overtime rate per Utility Rate Schedule Rate C-1. Conditions in which work may need to be performed during non-regular work hours may include, but are not limited to, performing work on arterial streets, in business districts, in front of major commercial establishments, and near schools. 1. COMMERCIAL PLAN REVIEW: New commercial building or remodeling permit valuation greater than $200,000 ...........................................................................................................................................$2,557.003 ,536.00 New subdivision residential unit .......................................................................................................................................$379.00520.0 0/unit System extension of 2-inch polyethylene (PE) Gas main .............................................................................................................................................$13.0020. 00/ft 2. RESIDENTIAL PLAN REVIEW: New single-family residential (SFR) building or SFR remodeling permit valuation greater than $100,000 GAS SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE G-5 Sheet No. G-5-2 Effective 09-01-201901-01-2026 Supersedes Sheet No.G-5-2 dated 05-01-201509-01-2019 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 0 ..............................................................................................................................................$924.001 ,270.00 3.DISTRIBUTION SYSTEM EXTENSIONDESIGN: Charge per linear footGas system design .........................................................................$205.00 /ftUtility Estimate 4. DISTRIBUTION SYSTEM EXTENSION: Charge per linear foot.......................................................................................................$350.00/ft 4.5.CONNECTION FOR SERVICE INSTALLED ON EXISTING MAIN: Service connection Charges include up to 40 feet of Service Line installation inside the property line. Service Lines will be installed along the shortest most practical route, as determined by the Utilities Department (perpendicular from the Gas main in the adjoining street, alley, lane road, or easement to the nearest suitable Meter location at the building or structure). Size 1-inch directionally bored connection ........................................................................................................................................$5,892.008 ,636.00 2-inch directionally bored connection ........................................................................................................................................$6,999.001 3,439.00 Excess length Charge for directionally bored connection ..........................................................................................................................................$52.0069.0 0 /ft* 1-or 2-inch trenched connection .......................................................................................................................................$7,126.008 ,500.00 2-inch main installation in contractor-provided trench.......................................................$68.00245 /ft Connections above 2-inches.....................................................................................Utility Estimate 1-or 2-inch excess flow valve (EFV) installation on PE service .....................................................................................................................................$2,740.006 ,713.00 *Excess Length Charge: An additional Charge ($52.0069.00 /foot) will apply to an extension GAS SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE G-5 Sheet No. G-5-3 Effective 09-01-201901-01-2026 Supersedes Sheet No.G-5-3 dated 05-01-201509-01-2019 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 0 greater than 40 feet from the property line closest to the street, to the Gas Meter location, measured along a line perpendicular to the street property line. Replacement of Service connections made necessary because of ordinary wear and deterioration will be made without Charge. However, if the need for replacement arises due to meeting an increase in load or relocation of a non- polyethylene (PE) pipe Service, the installation of the Service will be charged as a new Service. 5. METERS: 250 Cubic Foot Per Hour (CFH) House Meter ............................................................................................................................................$1,012.001 ,097.00 250 CFH Curb Meter ............................................................................................................................................$2,124.002 ,601.00 400 CFH House Meter ............................................................................................................................................$1,191.001 ,457.00 400 CFH Curb Meter ............................................................................................................................................$2,331.002 ,782.00 630 CFH House Meter ............................................................................................................................................$1,602.001 ,969.00 630 CFH Curb Meter ............................................................................................................................................$2,657.002 ,796.00 800 CFH Diaphragm – Commercial House Meter ............................................................................................................................................$1,772.002 ,782.00 1000 CFH Diaphragm - Commercial House Meter ............................................................................................................................................$2,213.003 ,217.00 1500 CFH Rotary-Commercial House Meter ............................................................................................................................................$2,894.003 ,202.00 2000 CFH Rotary-Commercial ............................................................................................................................................$3,924.004 ,165.00 GAS SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE G-5 Sheet No. G-5-3 Effective 09-01-201901-01-2026 Supersedes Sheet No.G-5-3 dated 05-01-201509-01-2019 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 0 GAS SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE G-5 Sheet No. G-5-4 Effective 09-01-201901-01-2026 Supersedes Sheet No.G-5-4 dated 05-01-201509-01-2019 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 0 3000 CFH Rotary-Commercial ...........................................................................................................................................$3,966.004 ,278.00 5000 CFH Rotary-Commercial ...........................................................................................................................................$4,469.004 ,827.00 7000 CFH Rotary-Commercial ...........................................................................................................................................$5,174.005 ,594.00 11000 CFH Rotary-Commercial .........................................................................................................................................$12,639.001 5,898.00 16000 CFH Rotary-Commercial .........................................................................................................................................$13,980.001 8,314.00 23000 CFH Rotary-Commercial .........................................................................................................................................$16,628.00 Utility Estimate Electronic Volume Corrector System................................................................................Utility Estimate$5,808.00 Automatic Meter Reading (AMR) Encoder Receiver Transmitter – Diaphragm Meter ..............................................................................................................................................$205.002 32.00 AMR Encoder Receiver Transmitter – Rotary Meter ..............................................................................................................................................$269.003 24.00 Vent line for Gas Regulator ..............................................................................................................................................$385.004 54.00 2-inch bollard (to protect Gas Meter) installation fee ...........................................................................................................................................$394.005 25.00 4-inch bollard (to protect Gas Meter) installation fee ..............................................................................................................................................$564.008 23.00 Other Meter sizes......................................................................................................Utility Estimate 6. ADDITIONAL METERS ON CONNECTION: These Charges apply to Meters up to 630 CFH.Charges for Meters above 630 CFH will be GAS SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE G-5 Sheet No. G-5-5 Effective 09-01-201901-01-2026 Supersedes Sheet No.G-5-5 dated 05-01-201509-01-2019 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 0 based on the Utilities Department’s estimate. Per Meter With new connection ..............................................................................................................................................$578.006 48.00 On existing Metered connection ...........................................................................................................................................$1,412.001 ,585.00 7. SERVICE RELOCATION: Service riser relocation ...........................................................................................................................................$1,920.002 ,791.00 Service riser relocations will only be performed on 1-inch and larger polyethylene (PE) pipe Service Lines that have been approved by Utilities Department. All Service Lines made of non- PE materials must be replaced from the main to the Meter at the Charges listed in Section B(64) of this Rate Schedule. Curb Meter- Riser relocation on existing 1-inch PE pipe ............................................................................................................................................$1,026.001 ,337.00 Curb Meter- New Service from main to house ............................................................................................................................................$2,946.003 ,887.00 8. RELOCATION OF FACILITIES: Approved relocation of Service Lines and other facilities will be done at the cost of the Applicant. Payment of estimated costs is required before relocation work begins. 9. TAPPING THE GAS MAIN FOR CONTRACTOR-INSTALLED SERVICES: Tap Gas main for 1- to 2-inch Service ...........................................................................................................................................$1,799.002 ,290.00 Tap Gas main for 4- to 6-inch Service GAS SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE G-5 Sheet No. G-5-6 Effective 09-01-201901-01-2026 Supersedes Sheet No.G-5-6 dated 05-01-201509-01-2019 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 0 ...........................................................................................................................................$2,505.002 ,864.00 1. ABANDONMENT OF GAS SERVICES: 1-inch to 2-inch Gas service abandonment ………………………………………………… $6,092 1.2.WORK PERFORMED BY OUTSIDE CONTRACTORS: Engineering and inspection service Charges per Utility Rate Schedule C-1 will apply to utility work performed by outside contractors, which may be done only with the prior written approval of the Utilities Department. C. NON-STANDARD CONDITIONS: 1. Any condition which, in the opinion of the Engineering Manager, Water-Gas-Wastewater, will result in a cost higher than the Charges set forth in Section B will be classified as non-standard. The Charge for a non-standard installation will be based on the Engineering Manager's estimate of the total costs of all materials, labor, and other costs required to complete the installation. 2. In the event Gas Service to a Premise is requested and insufficient capacity exists to provide such Service, the Applicant shall bear the total cost for designing and enlarging the Distribution System to accommodate serving the Applicant. The Engineering Manager, Water-Gas- Wastewater, may require the Applicant to make arrangements for the design and construction of said expansion in accordance with applicable CPAU Rules and Regulations, standards and specifications. Alternatively, CPAU may elect for City staff or contractors to design and install such facilities at the Applicant's expense. Credit to the Applicant will be provided for any over sizing or extra facilities installed to meet Service demands above the specific capacity needs of the Applicant. D. SPECIAL NOTES: 1. All fees and minimum charges are subject to DGS California Construction Cost Index (CCCI) adjustments, to be applied annually effective on July 1. {End} WATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE W-5 Sheet No. W-5-1 Effective 09-01-201901-01-2026 Supersedes Sheet No. W-5-1 dated 09-01-201905-01-2015 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 1 A. TERRITORY: This Rate Schedule applies anywhere the City of Palo Alto provides Water Service. B. CHARGES: Customer must pay plan review and connection fees in full prior to scheduling any Utility construction work or inspections. The invoice will be mailed sent to the responsible party listed on the Service application. All Invoices are valid for 90 days from date of issuance. Once CPAU receives full payment, determines that all applicable Service requirements are met, and the Utilities Inspector determines that the project is ready for utility installation, CPAU Water, Gas, and Wastewater Utilities Operations (WGW Operations) staff will schedule the project for construction. Depending on material availability and scheduling constraints, Utility Services will be installed between 60 and 90 days. While CPAU staff makes best efforts to install Services as planned, construction delays may occur as a result of unforeseen conditions. Contact WGW Operations for scheduling lead-time. Regular CPAU work hours are 8 AM to 5 PM, Monday through Friday, excluding legal City holidays. Any work the City deems necessary to be performed during non-regular work hours shall be charged at the overtime rate per Utility Rate Schedule Rate C-1. These conditions include but are not limited to performing work on arterial streets, in business districts, in front of major commercial establishments, and near schools. 1. PLAN REVIEW: New single family residence or residential remodel ………………………………………… $635.00 New commercial building or remodeling permit valuation greater than $200,000...........… $3,369.004,653.00 New subdivision residential unit ……………………………………………………...$378.00526.00/unit System extension of 8-inch high-density polyethylene (HDPE) Water main .............................................................................................................................................$13.0019. 00/ft 2. DESIGN: Water System Design ………………………………………………………………Utility Estimate 2.3.DISTRIBUTION SYSTEM EXTENSION: City standard 8-inch main, Charge per linear foot ..............................................................................................................................................$252.003 83.00 WATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE W-5 Sheet No. W-5-2 Effective 09-01-201901-01-2026 Supersedes Sheet No. W-5-2 dated 09-01-201905-01-2015 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 1 3. SERVICE CONNECTIONS: Water Service: Domestic, Irrigation, and Fire Size Amount 1-inch copper connection ………………………………………………………………$10,773.00 2-inch copper connection ………………………………………………………………$11,965.00 2-inch connection ............................................................................................................................................$7,671.001 2,236.00 4-inch connection ............................................................................................................................................$9,932.001 5,030.00 6-inch connection ..........................................................................................................................................$11,274.001 7,.920.00 8-inch connection ..........................................................................................................................................$13,170.001 9,482.00 10-inch connection ..........................................................................................................................................$14,669.002 1,826.00 Replacement of Service connection made necessary because of ordinary wear and deterioration will be made without Charge. Replacement due to inadequacy because of additional demand or load will be charged as a new Service connection. Additional Domestic or Irrigation Services For Service installations connecting to a pre-existing Service or installations of a new, larger Service. 2-inch connection ............................................................................................................................................$3,523.005 ,626.00 4-inch connection ............................................................................................................................................$4,663.007 ,956.00 WATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE W-5 Sheet No. W-5-3 Effective 09-01-201901-01-2026 Supersedes Sheet No. W-5-3 dated 09-01-201905-01-2015 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 1 Combination Domestic or Irrigation Water Service and Fire Service Combination Water Service connections require CPAU approval. If approved, connection Charges for both the fire Service and the domestic or irrigation Service connection will apply. Master Water Service Connections that serve domestic Water Service and fire protection through a detector Meter require CPAU approval. Applicable Charges for master Water Service connections will be based on CPAU’s estimate of the total costs, including materials, labor, metering, and all other costs required for the installation. 4. METERS: 5/8-inch x 3/4-inch Meter ...............................................................................................................................................$795.001 ,193.00 1-inch Meter ........................................................................................................................................$1,002.001 ,318.00 1 ½-inch Meter ............................................................................................................................................$1,593.002 ,509.00 2-inch Meter ........................................................................................................................................$1,945.002 ,726.00 3-inch Meter …………………………………………………………………………………$4,478.00 4-inch Meter ............................................................................................................................................$6,561.007 ,259.00 6-inch Meter ............................................................................................................................................$9,324.009 ,805.00 Automatic Meter Reading - AMR Encoder Receiver Transmitter ...............................................................................................................................................$108.002 16.00 WATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE W-5 Sheet No. W-5-3 Effective 09-01-201901-01-2026 Supersedes Sheet No. W-5-3 dated 09-01-201905-01-2015 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 1 WATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE W-5 Sheet No. W-5-4 Effective 09-01-201901-01-2026 Supersedes Sheet No. W-5-4 dated 09-01-201905-01-2015 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 1 5. CAPACITY CHARGES: Capacity Charges apply to new Utility Services and added demand on existing Services. Domestic: 5/8-inch x 3/4-inch Meter...................................................................................................$3,750.00 1-inch Meter.......................................................................................................................$6,250.00 1 ½-inch Meter.................................................................................................................$18,850.00 2-inch Meter.....................................................................................................................$31,250.00 4-inch Meter and larger........................................................By estimate at $125/fixture unit (FU)* *These charges vary and are based on the total number of fixture units (FU) estimated for the water supply demand. Water supply fixture units are estimated per California Uniform Plumbing Code. Fire Service Capacity Charges: 2-inch.....................................................................................................................................$750.00 4-inch..................................................................................................................................$8,425.00 6-inch................................................................................................................................$18,250.00 8-inch................................................................................................................................$30,950.00 10-inch..............................................................................................................................$48,110.00 If a Customer is upgrading the capacity of an existing Service, then the capacity Charge will be the difference between the new Service size and the existing Service size. 6. ADDITIONAL METERS: With new connection, up to 2-inch ...........................................................................................................................................$1,381.001 ,823.00 With existing connection, up to 2-inch …………………………………………………….2,463 2 Meter Manifold on 2” PE or 1” CU service ..............................................................................................................................................$868.001 ,037.00 7. RELOCATION OF FACILITIES: The costs of CPAU-approved relocation of Services, hydrants, or other facilities will be the responsibility of the Applicant. Payment of estimated cost is required before relocation work begins. WATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE W-5 Sheet No. W-5-4 Effective 09-01-201901-01-2026 Supersedes Sheet No. W-5-4 dated 09-01-201905-01-2015 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 1 WATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE W-5 Sheet No. W-5-5 Effective 09-01-201901-01-2026 Supersedes Sheet No. W-5-5 dated 09-01-201905-01-2015 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 1 8. FIRE HYDRANT: (A) Install new hydrant without lateral ...................................................................................................................................$3,542.005 ,135.00 (B) Install new hydrant with lateral .................................................................................................................................$15,285.002 4,341.00 (C) Relocation behind curb (up to 5 feet) ...................................................................................................................................$8,585.001 3,518.00 Relocations more than 5 feet will require a new lateral and the existing lateral will be disconnected and abandoned at the main. 9. TAPPING THE WATER MAIN FOR CONTRACTOR-INSTALLED SERVICES: (A) Tap Water main for 2-inch Service ...................................................................................................................................$1,929.002 ,435.00 (B) Tap Water main for 4-inch Service ...................................................................................................................................$2,539.003 ,137.00 (C) Tap Water main for 6-inch Service ...................................................................................................................................$3,852.005 ,170.00 (D) Tap Water main for 8-inch Service ...................................................................................................................................$5,244.006 ,959.00 10. ABANDONMENT: (A) Small Service 2-inch and less ...................................................................................................................................$3,341.006 ,593.00 (B) Large Service more than 2-inch ...................................................................................................................................$4,439.008 ,991.00 11. WORK PERFORMED BY OUTSIDE CONTRACTORS: Engineering and inspection service Charges per Utility Rate Schedule C-1 will apply to utility work performed by outside contractors, which may be done only with the prior written approval WATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE W-5 Sheet No. W-5-6 Effective 09-01-201901-01-2026 Supersedes Sheet No. W-5-6 dated 09-01-201905-01-2015 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 1 of the Utilities Department. (A) Engineering and inspection for new 2-inch Service ...................................................................................................................................$1,923.002 ,631.00 (B) Engineering and inspection for new 2-inch Service connected to larger Service ...................................................................................................................................$1,282.001 ,754.00 (C) Engineering and inspection for new 4-inch to 8-inch Service ...................................................................................................................................$2,885.003 ,946.00 (D) Engineering and inspection for new hydrant and Service ...................................................................................................................................$2,885.003 ,946.00 (E) Engineering and inspection for abandonment of 2-inch and smaller Service ......................................................................................................................................$962.001 ,315.00 (F) Engineering and inspection for abandonment of 3-inch and larger Service ...................................................................................................................................$1,282.001 ,754.00 (G) Engineering and inspection for new 8-inch main (per linear foot) ........................................................................................................................................$32.004 4.00 C.NON-STANDARD CONDITIONS: 1. Any condition which, in the opinion of the Engineering Manager, Water-Gas-Wastewater, will result in a cost higher than the Charges set forth in Section B will be classified as non-standard. The Charge for a non-standard installation will be based on the Engineering Manager’s estimate of the total costs of all materials, labor, and other costs required to complete the installation. 2. If CPAU determines that insufficient capacity exists to provide Water Service to an Applicant, Applicant will be responsible for the CPAU’s costs to complete a hydraulic system capacity study to determine whether Distribution System upgrades will be required to serve the Applicant, as well the costs of completing the upgrades deemed necessary by CPAU. D. SPECIAL NOTES: 1. All fees and minimum charges are subject to DGS California Construction Cost Index (CCCI) adjustments, to be applied annually effective on July 1. {End} WASTEWATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 Sheet No. S-5-1 Effective 09-01-2019 01-01-2026Supersedes Sheet No. S-5-1 dated 05-01-201509-01-2019 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 4 A. TERRITORY: This Rate Schedule applies anywhere the City of Palo Alto provides Wastewater Service. B. CHARGES: Customer must pay plan review and connection fees in full prior to scheduling any Utility construction work or inspections. CPAU will mail send invoices to the responsible party listed on the Service application. All Invoices are valid for 90 days from date of issuance. Once CPAU receives full payment, determines that all applicable Service requirements are met, and the Utilities Inspector determines that the project is ready for utility installation. CPAU Water, Gas, and Wastewater Utilities Operations (WGW Operations) staff will schedule the project for construction. Depending on material availability and scheduling constraints, Utility Services are generally installed between 60 and 90 days later. While CPAU staff makes best efforts to install Services as planned, construction delays may occur as a result of unforeseen conditions. Contact WGW Operations for scheduling lead- time. Regular CPAU work hours are 8 AM to 5 PM, Monday through Friday, excluding legal City holidays. Any work the City deems necessary to be performed during non-regular work hours shall be charged at the overtime rate per Utility Rate Schedule Rate C-1. Conditions in which work may need to be performed during non-regular work hours may include, but are not limited to, performing work on arterial streets, in business districts, in front of major commercial establishments, and near schools. 1. PLAN REVIEW: New single family residential building or remodel ………………………………………... $635.00 New commercial building or remodeling permit valuation greater than $200,000 .........................................................................................................................................$2,547.003 ,520.00 New subdivision residential unit ....................................................................................................................................$172.00232.0 0/unit System extension 8-inch HDPE Wastewater main ..........................................................................................................................................$24.0034. 00/ft 2. DESIGN: Wastewater system design fee …………………………………………………… Utility Estimate WASTEWATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 Sheet No. S-5-2 Effective 09-01-2019 01-01-2026Supersedes Sheet No. S-5-2 dated 05-01-201509-01-2019 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 4 2. COLLECTION SYSTEM EXTENSIONS: City standard 8-inch main, Charge per linear foot ........................................................................................................................................$248.00479 .00/ft 3. CONNECTIONS: 4-inch connection, depth at 6 feet and below .........................................................................................................................................$8,559.001 5,615.00 6-inch connection, depth at 6 feet and below .........................................................................................................................................$9,846.001 7,478.00 4-inch lateral, depth between 6 feet and 10 feet .......................................................................................................................................$11,456.002 1,858.00 6-inch lateral, depth between 6 feet and 10 feet ......................................................................................................................................$12,186.002 2,938.00 Rehabilitation of existing 4” to 6” lateral by pipe bursting ........................................................................................................................................$5,861.009 ,694.00 Connections of sewer laterals over 25 feet in length will be charged for the additional footage at a rate of $106206/linear foot for 4-inch connections and $110213/linear foot for 6-inch connections. Special arrangements must be made for connections larger than 6-inch. CPAU will estimate the cost which will serve as the basis for a Customer deposit. Upon receipt of this deposit CPAU will install the connection and the Customer will be responsible for the actual costs that exceed the deposit amount. 4. REPLACEMENT OR RELOCATION OF FACILITIES: Replacement of Lateral connections made necessary because of ordinary wear and deterioration will be made without Charge. Replacement due to inadequacy because of increased demand or load, relocation due to location will be charged as a new connection. WASTEWATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 Sheet No. S-5-3 Effective 09-01-2019 01-01-2026Supersedes Sheet No. S-5-3 dated 05-01-201509-01-2019 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 4 Costs associated with CPAU-approved relocation of lateral, and other facilities are the responsibility of the Applicant. Payment of estimated costs is required before relocation work begins. 5. CAPACITY CHARGES: 4-inch connection with 5/8-inch Water Meter (WM).....................................................$5,250.00 4-inch connection with 1-inch WM..............................................................................$10,500.00 4- or 6-inch connection with 1-1/2-inch WM...............................................................$31,668.00 6-inch connection with 2-inch WM..............................................................................$52,500.00 6-inch and larger connection with 4-inch or larger WM.........................By estimate at $210/FU* * FU = fixture unit (1 FU = 15 gallons per day). Capacity upgrades to an existing Lateral will be calculated as the difference between the new Lateral size and the existing Lateral size. 6. INSTALL AND CORE DRILL MANHOLE: (A) Depth, 6 feet or less ..............................................................................................................................$12,952.001 8,404.00 (B) Depth, greater than 6 feet ..............................................................................................................................$16,346.002 4,812.00 (C) Core Drill and Connection Tap to Manhole (Shallow) ……………………………... $5,488.00 (D) Core Drill and Connection Tap to Manhole (Deep) ………………………………… $6,435.00 7. ABANDONMENT AND DEMOLITION: (A) Sewer Lateral ................................................................................................................................$3,261.005 ,142.00 8. INSTALL SEWER CLEANOUT ........................................................................................................................................$2,523.004 ,240.00 WASTEWATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 Sheet No. S-5-4 Effective 09-01-2019 01-01-2026Supersedes Sheet No. S-5-4 dated 05-01-201509-01-2019 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 4 9. WORK PERFORMED BY OUTSIDE CONTRACTORS: Engineering and inspection service Charges per Utility Rate Schedule C-1 will apply to utility work performed by outside contractors, which may be done only with the prior written approval of the Utilities Department. (A) Engineering and inspection for new lateral ................................................................................................................................$2,564.003 ,508.00 (B) Engineering and inspection for new main (per lineal foot) .....................................................................................................................................$40.005 5.00 (C) Engineering and inspection for new manhole ................................................................................................................................$3,205.004 ,385.00 (D) Engineering and inspection for lateral abandonment ................................................................................................................................$1,603.002 ,192.00 C. NON-STANDARD CONDITIONS 1. Any condition which, in the opinion of the Engineering Manager, Water-Gas-Wastewater, will result in a cost higher than the Charges set forth in Section B will be classified as non- standard. The Charge for a non-standard installation will be based on the Engineering Manager’s estimate of the total costs of all materials, labor, and other costs required to complete the installation. 2. In the event Wastewater Service to a Premise is requested and insufficient capacity exists to provide such Service, the Applicant shall bear the total cost for flow monitoring the existing main to determine remaining capacity, design of new sewer main and construction cost for enlarging the collection system to accommodate serving the Applicant. The Engineering Manager, Water-Gas-Wastewater may require the Applicant to make arrangements for the design and construction of said expansion in accordance with applicable CPAU Rules and Regulations, standards and specifications. Alternatively, CPAU may elect for City staff or contractors to design and install such facilities at the Applicant’s expense. 3. PUMPING PLANTS: If the development requires a pumping facility to drain into the City’s Wastewater collection system, the developer is responsible for the cost of construction of the pumping plant and the on- going plant operation and maintenance costs. WASTEWATER SERVICE CONNECTION CHARGES UTILITY RATE SCHEDULE S-5 Sheet No. S-5-5 Effective 09-01-2019 01-01-2026Supersedes Sheet No. S-5-5 dated 05-01-201509-01-2019 CITY OF PALO ALTO UTILITIES Issued by the City Council 8 4 8 4 A. SPECIAL NOTES: 1. All fees and minimum charges are subject to DGS California Construction Cost Index (CCCI) adjustments, to be applied annually effective on July 1. {End} UTILITY MISCELLANEOUS CHARGES UTILITY RATE SCHEDULE C-1 CITY OF PALO ALTO UTILITIES Issued by the City Council Effective 04/03/2301/01/26 Supersedes Sheet No.C-1-1 dated 09/1/1904/03/23 Sheet No.C-1-1 Charges under this Rate Schedule may be either mailed to the responsible party in a form of invoice or added to the regular monthly Utilities bill of the Customer receiving the Service, and non-payment may result in termination of Service. Charges During Charges After Regular Hours1 Regular Hours A. SERVICE CALLS AND OTHER SERVICE WORK: 1.Setting Electric Meter2 No Charge $204.00263.00 2.Disconnection of Service for non-payment of Utilities Charges $152.00207.00 Not applicable 3.Restoration of Service following disconnection for non-payment of Utilities Charges $152.00 $207.00 $204.00 263.00 4.Restoration of Electric Service at power pole following disconnection for non-payment of Utilities Charges $390304.00 $526 408.00 B. LABOR, ENGINEERING AND INSPECTION RATES PER HOUR PER PERSON: Service provided during regular work hours 1.$152.00 $207.00 Not applicable 2.Service provided on overtime basis where the 1 Regular hours are 8am to 5pm, Monday through Friday, excluding legal holidays. 2 For Water Meters see Utility Rate Schedule W-5, for Gas Meters see Utility Rate Schedule G-5. UTILITY MISCELLANEOUS CHARGES UTILITY RATE SCHEDULE C-1 CITY OF PALO ALTO UTILITIES Issued by the City Council Effective 04/03/2301/01/26 Supersedes Sheet No.C-1-1 dated 09/1/1904/03/23 Sheet No.C-1-1 overtime is scheduled at the City's convenience. Not applicable $178.00243.00 1.Service provided on overtime basis where the overtime is scheduled at the Customer's convenience. Not applicable $$204.00279.00 C. EQUIPMENT CHARGES See Caltrans Equipment Rental Rates and Labor Surcharge at https://dot.ca.gove/programs/construction/equipment-rental-rates-and-labor- surcharges D. RETURNED PAYMENTS: See City of Palo Alto Municipal Fee Schedule. DE. LATE PAYMENTS: Two percent (2%) of unpaid balance of Utilities Charges EF. DEPOSITS: A.Customer deposit for Meter accuracy test $0-300.00 Not applicable GF. AMI OPT-OUT FEES: 1. Set Up Charge $100.00 Not applicable 2. Monthly $25.00 Not applicable H. CROSS-CONNECTION CONTROL NON-COMPLIANCE FEES Charge Per Unit Delinquency Backflow Prevention Assembly Non-Compliance Administrative & Processing Fee $57.00 UTILITY MISCELLANEOUS CHARGES UTILITY RATE SCHEDULE C-1 CITY OF PALO ALTO UTILITIES Issued by the City Council Effective 04/03/2301/01/26 Supersedes Sheet No.C-1-1 dated 09/1/1904/03/23 Sheet No.C-1-1 Test/certify 1/2”- 16" Reduced Pressure Principle Assemblies (RPPA); Double Check Valve Assemblies (DCVA); and Pressure Vacuum Breaker Assemblies (PVB) $310.00 Test/certify 2"- 16” Fire Service Reduced Pressure Principle Assemblies (RPDA); Fire Service Double Check Detector Assemblies (DCDA) $517.50 UTILITY MISCELLANEOUS CHARGES UTILITY RATE SCHEDULE C-1 CITY OF PALO ALTO UTILITIES Issued by the City Council Effective 04/03/2301/01/26 Supersedes Sheet No.C-1-1 dated 09/1/1904/03/23 Sheet No.C-1-1 UTILITY MISCELLANEOUS CHARGES UTILITY RATE SCHEDULE C-1 CITY OF PALO ALTO UTILITIES Issued by the City Council Effective 04/03/2301/01/26 Supersedes Sheet No.C-1-1 dated 09/1/1904/03/23 Sheet No.C-1-1 I. SPECIAL NOTES: 1.All fees and minimum charges are subject to California Construction Cost Index (CCCI) adjustments, to be applied annually on July 1. {End} From:Jo Ann Mandinach To:Council, City Subject:Gas Hikes, Pension spiking and useless consultants Date:Sunday, November 30, 2025 1:09:35 PM CAUTION: This email originated from outside of the organization. Be cautiousof opening attachments and clicking on links. ! Dear Mayor and Council Members, As we freeze this chilly holiday weekend WITHOUT turning on our heat due to our already outrageous bills, let me remind you that we ARE watching your votes on yet ANOTHER utility rate hike -- 22% this year alone -- and your vote on giving yet another raise to the already highly paid City Manager, retiring City Attorney and City clerk at a time when we already have unfunded pension liabilities in the HUNDREDS of MILLIONS of Dollars. Did you forget you're ALREADY charging us $22,000,000+++ extra in utility fees funneled into the General Fund so you can waste $27,000,000 p/a on consultants with little or no local knowledge and less oversight??? Did you forget about local layoffs and stock market crash and all the people losing their benefits? Do you think Social Security payments rose 22% this year to cover you these absurd never-ending rate hikes and out-of-control spending?? Did you forget that retirees are a growing portion of the PA population? (At least former city manager Frank Benest had the good grace to refuse his pension-spiking raise on his way out the door. Will Molly Stump do the same after she dragged out paying us our meager no-interest settlement in the Miriam Green lawsuit for a decade WHILE sub-contracting the appeal to a San Diego law firm? Or will greed again be the m/o for our current crop of "leaders"?) We'll be watching how you vote. Regards, This message could be suspicious The sender's email address couldn't be verified. Mark Safe Report Powered by Mimecast Jo Ann Mandinach