HomeMy WebLinkAboutStaff Report 2511-5416, Staff Report 2510-5311CITY OF PALO ALTO
Climate Action and Sustainability Committee
Thursday, November 20, 2025
Agenda Item
1.Status Update on Sustainability and Climate Action Plan Mobility Goals and Key
Actions and Request for Feedback on Tentative 2026-2027 Work Plan Items. CEQA
Status - Not a project. Late Packet Report Added, Staff Presentation
Climate Action and Sustainability Committee
Staff Report
Report Type: ACTION ITEMS
Lead Department: Transportation
Meeting Date: November 20, 2025
Report #:2511-5416
TITLE
Status Update on Sustainability and Climate Action Plan Mobility Goals and Key Actions and
Request for Feedback on Tentative 2026-2027 Work Plan Items. CEQA Status - Not a project.
This report will be a late packet report published on November 13, 2025
8
3
8
8
Climate Action and Sustainability Committee
Staff Report
From: City Manager
Report Type: ACTION ITEMS
Lead Department: Public Works
Meeting Date: November 20, 2025
Report #:2510-5311
TITLE
Status Update on Sustainability and Climate Action Plan Mobility Goals and Key Actions and
Request for Feedback on Tentative 2026-2027 Work Plan Items. CEQA Status – Not a project.
RECOMMENDATION
This is a discussion item, and no action is requested. Staff is seeking feedback on the tentative
Mobility-related work items for the 2026-2027 Sustainability and Climate Action Plan (S/CAP)
Work Plan and the City’s current level of effort on Vehicle Miles Traveled (VMT) and mode shift
S/CAP Goals.
EXECUTIVE SUMMARY
This report provides an update on progress on the City’s S/CAP Mobility Goals and tentative
work items for the 2026-2027 S/CAP Work Plan. As of the 2023 community greenhouse gas
(GHG) inventory, the community had exceeded its 2030 VMT reduction goal but had not made
significant progress on its mode shift goal. Many of the gains in VMT reduction were driven by
remote work and vacancies during the pandemic, and there has been some erosion of those
gains. It remains to be seen whether there will be additional increases in VMT in the 2024 GHG
inventory or in future years, but regardless, the City has made significant progress.
Staff has tentatively identified various 2026-2027 S/CAP Work Plan work items to continue to
implement efforts to expand the bicycle and pedestrian transportation system, enhance transit
access, pilot micromobility programs, and improve safety. Although resource needs are
outlined, staff expects needs to be considered in the context of the FY 2027 budget process
which is expected to bring ongoing expense reductions.
BACKGROUND
8
3
8
8
The S/CAP adopted in June 20231 has a goal of 80% reductions in transportation emissions from
1990 levels by 2030. As of 2019, transportation represented about 60% of remaining
greenhouse gas emissions. Reducing single-occupancy vehicle travel not only has GHG
reduction benefits, but also improves community sustainability in other ways, as discussed in
the S/CAP Co-Benefits Analysis.2 These impacts are reflected in two key Mobility goals:
Reduce total vehicle miles traveled 12% by 2030, compared to a 2019 baseline
Increase mode share of biking, walking, and transit work trips from 19% to 40% by 2030
3 to achieve the City's
Mobility Goals listed above. The 2021 Impact Memo4 by a City consultant, AECOM, assessed
one possible pathway to achieve those reductions includes about 22,200 metric tons of carbon
dioxide equivalent (MT CO2-e) per year from reductions in vehicle miles traveled (VMT) through
telecommuting and mode shift.
Table 1: VMT and GHG Trends, 2019 to 2023
Methodology 2019 2023
VMT (miles)952 million 598 millionFehr and Peers (2019) +
Google EIE (2023)GHG (MT CO2-e)293,413 225,386
VMT (miles)739 million 598 millionBased on Google EIE only,
both years GHG (MT CO2-e)302,000 225,386
1 https://www.paloalto.gov/files/assets/public/v/1/sustainability/reports/2022-scap-report_final.pdf
2 https://www.paloalto.gov/files/assets/public/v/1/sustainability/reports/palo-alto-action-evaluation-memo-2021-
02-11.pdf
3 See page 53 of the S/CAP: https://www.paloalto.gov/files/assets/public/v/1/sustainability/reports/2022-scap-
report_final.pdf#page=53
4 https://www.paloalto.gov/files/assets/public/v/2/sustainability/reports/aecom-palo-alto-action-impact-
memo_final_rev-210607.pdf
8
3
8
8
ANALYSIS
2-e per year in 2023. Based on back of the
envelope estimates by staff (since it is not possible to disaggregate the source of the emissions
reductions using Google EIE data), vehicle electrification and improved fuel efficiency likely
contributed around 30% of that emissions reduction, which would mean close to 48,000 MT
CO2-e per year resulted from VMT reduction, exceeding the assumption in the 2021 impact
analysis.
2-e per year as the 2030
target for emissions reduction from VMT reduction, and the community had achieved a 48,000
MT CO2-e per year reduction as of 2023. Regional VMT models suggest that VMT continues to
increase post-pandemic, and therefore some of these gains may erode, but at minimum, the
community has made progress toward its 2030 VMT goal.
Table 2: OOT Work Plan Items Impacting VMT and Mode Shift
Long-term VMT Reduction / Mode Shift Short-term VMT Reduction / Mode Shift
Implementation of the Bike and Ped Plan
and Safety Action Plan, which will enhance
the attractiveness of transportation options
and provide a complete, connected low-
stress network
South Palo Alto Bike and Pedestrian
Connectivity project
Rail grade separations
Development and implementation of a
Transit Priority Policy
Development, implementation and
monitoring of a Travel Demand
Management (TDM) ordinance for
development
Safe Routes to School (SRTS) and other bicycle and
pedestrian safety programs
Near-term bike and pedestrian capital projects e.g.
Churchill Enhanced Bikeway
Completion of traffic speed surveys and increased
speed enforcement efforts
Traffic calming projects
Bike and pedestrian Municipal Code updates
Short-term reduction pilots or opportunities under study
Traffic calming policy change
Parking policy analysis
Micromobility Feasibility Study
Palo Alto Link
8
3
8
8
Because of the challenges of measuring the mode shift and VMT reduction results of individual
programs and investments, especially when multiple programs and investments work in concert
to contribute to VMT reduction, it is unclear how much mode shift these efforts will produce. In
some cases, it is possible to measure results, such as with the Palo Alto Transportation
Management Association (PATMA). PATMA has expanded its activities due to increased Council
funding. VMT reduction associated with PATMA’s work was estimated at 1,540,000 miles in 2024
while estimated GHG reduction was 603.4 tons.
Table 3: Tentative 2026-2027 S/CAP Work Plan Items
Work Item Description Resource Availability
Bicycle and Pedestrian Capital
Projects
Complete three bicycle / pedestrian
projects
Funded, proceed as staff time
available
Implement Micromobility
Feasibility Study
recommendations
Pursue a bike/e-bike/e-scooter share pilot
program or recommendations of the
Micromobility Feasibility Study
Fully staffed and funded (study)
Downtown Parking Pricing and
Management
Develop parking policy options for Council
consideration
Proceed as staff time is
available (advancement within
a year requires 0.5 FTE)
Traffic Signal Upgrades and
Timing Efforts
Upgrade traffic signals to optimize
multimodal performance
Proceed as staff time and
funding are available
Housing Element
Implementation / Land Use
Planning and Policy
Implement the goals, policies, and programs
in the City's 2023-2031 Housing Element of
the Comprehensive Plan to improve the
City's jobs-housing balance and to reduce
vehicle miles traveled (VMT)
Funded
Table 4: Potential Additional Work Items for Higher Level of Effort
Work Item Additional FTE Additional Non -Salary
Advance Downtown Parking Pricing and Management and
Traffic Signal Upgrades and Timing Efforts (see Table 3) by one
year
1 FTE Associate
Engineer
Accelerating infrastructure investment: Accelerate design and
delivery of planned improvements 2 FTE Engineer
Launching and operating a Micromobility Program 0.5 FTE Planner $200,000
8
3
8
8
Expanding transit service such as shuttles or Palo Alto Link $2,000,000 per year
Table 4 (continued): Potential Additional Work Items for Higher Level of Effort
Work Item Additional FTE Additional Non -Salary
Conduct a Land Use and Transportation Study: Identify and
utilize a data platform to project scenarios of housing growth
and mobility impacts to inform next CIPs and Comprehensive
Plan
0.5 FTE Planner $300,000
Establish Transportation Demand Management Ordinance
(TDM): Update TDM requirements 1 FTE Planner
Adult-Focused Bike, Walk, Transit Education &
Encouragement Programs: Create education &
encouragement programs for adult commuters and older
adults
0.3 FTE Planner $600,000 per year
FISCAL/RESOURCE IMPACT
The work items included in the 2026-2027 S/CAP Work Plan (Table 3) are funded in the FY 2026
budget, with some additional funding that would be proposed in the FY 2027 budget.
The tentative 2026-2027 S/CAP Work Plan (Table 3) includes items, such as Bicycle and Pedestrian
Capital Projects and Housing Element Implementation, which are funded in the FY 2026 budget
and will proceed as staff time is available.
Table 4 includes items that could be proposed in the FY 2027 budget if the City Council wished to
expand the level of effort on Mobility goals. However, staff are expecting a need to reduce
expenses in FY 2027 and beyond as noted in a recently released Finance Committee staff report.
Therefore, resource needs and funding availability is recommended to proceed in-line with the
FY 2027 citywide budget process and priority setting.
STAKEHOLDER ENGAGEMENT
For non-traffic signal items, typical stakeholder engagement includes outreach via social media
and mailers to local residents, and engagement via community meetings and advisory
committees.
ENVIRONMENTAL REVIEW
The Committee’s discussion of the status of current City efforts on the Mobility element of the
S/CAP is not a project as defined by CEQA because it does not involve any commitment to any
specific project which may result in a potentially significant physical impact on the environment.
CEQA Guidelines section 15378.
ATTACHMENTS
8
3
8
8
Attachment A: Tentative 2026-2027 S/CAP Work Plan Mobility Items
APPROVED BY:
Attachment A
9
7
8
9
Tentative 2026-2027 S/CAP Work Plan Mobility Items
Mobility
Achieve Benchmarks for Bicycle and Pedestrian Capital Improvement Projects
S/CAP Key Action(s): M1, M2, M3
Target Completion Date: Varying, by 2027
Resource Availability: Varying
Description: South Palo Alto Bikeways Demonstration Project: Upgrade crossings and bicycle
facilities on East Meadow Dr and Fabian Way to improve safety, especially for students
traveling to school. Pilot construction anticipated for summer 2027. Project is fully staffed and
funded.
Churchill Avenue Enhanced Bikeway Project: Improve walking and bicycling on Churchill
Avenue with a multi-use path, intersection improvements, and landscaping. Project work is
focused between the Caltrain tracks and El Camino Real. Construction is scheduled to finish
by fall 2026.
Quarry Road Extension at El Camino Park: Develop underused portion of El Camino Park to
provide a direct connection from El Camino Real to the Palo Alto Transit Center. Project is led
by Stanford. By fall 2027, project will complete the Caltrans process for the Encroachment
Permit and prepare plans, specifications, and estimate construction documents for the project
in both Caltrans and City right-of-way. In addition, the team will perform both a bike and
transit operations assessment and recommend operational scenarios to inform future bikes,
bus and shuttle operations in and around the Transit Center.
South Palo Alto Bike/Ped Connectivity: Identify locations and design concepts for additional
east-west bicycle and pedestrian crossings of the Caltrain railroad tracks in the southern part
of the City. Study will complete following Council adoption of a final report in fall 2026, and
next steps include securing grant funding for final design and construction.
Implement Micromobility Feasibility Study recommendations
S/CAP Key Action(s): M1, M2
Target Completion Date: 2027
Resource Availability: Fully staffed and partially
funded, need to evaluate based on
recommendation.
Description: Pursue a bike/e-bike/e-scooter share pilot program or other recommendation as advised
by the Micromobility Feasibility Study, to be finalized in early 2026.
Conduct a Land Use and Transportation Study
S/CAP Key Action(s): M6
Target Completion Date: Unknown
Resource Availability: Proceed as staff time is
available. Will need staff time and a cross-
departmental committee.
Attachment A
9
7
8
9
Description: Develop a data platform to project various scenarios of housing growth and
subsequent mobility impacts. This internal study would inform future discussions for the City’s
next comprehensive plan and area plans.
Downtown Parking Pricing and Management
S/CAP Key Action(s): M5, M10
Target Completion Date: 2028
Resource Availability: Proceed as staff time is
available for parking policy and operations.
Description: Explore parking policy and pricing options to manage parking supply and
availability. Work will include engagement of business community, residents and City
Council on options to be developed in conjunction with a new parking permit vendor.
Following Council consideration and selection of preferred options, staff will explore
next steps for implementation
Establish Transportation Demand Management Ordinance (TDM)
S/CAP Key Action(s): M4
Target Completion Date: Ongoing
Resource Availability: Currently unstaffed.
Description: Clarify existing TDM conditions of approval and monitoring procedures.
Formalize TDM requirements by ordinance and require new developments above a certain
size threshold to prepare and implement a TDM Plan to meet specific performance standards.
Require new development projects to pay a Transportation Impact Fee for all those peak-hour
motor vehicle trips that cannot be reduced via TDM measures. Evaluate possible alternatives
to expand voluntary TDM services (e.g. expanding the Transportation Management
Association).
Adult-Focused Bike, Walk, Transit Education/Encouragement Programs
S/CAP Key Action(s): M1, M4
Target Completion Date: 2027
Resource Availability: Proceed as staff time
and funding is available.
Description: Create education and encouragement programs for adult commuters and older
adult residents and visitors. Partner with local organizations with expertise in this area. City
could direct funding to Palo Alto TMA or others to do this work. Utilize HRC or create a
stakeholder committee to understand pain points in mode shift journey for adults.
Traffic Signal Operations and Multimodal Improvements
S/CAP Key Action(s): M8
Target Completion Date: On-going
Resource Availability: Mostly funded, long-
term funding needs being evaluated
Description: Maintain and modernize current traffic signals and central management
systems. Use technology to improve traffic operations and safety. Work with transit providers
on transit signal priority where feasible.
Projects that include operational improvements include the Quarry Road Intelligent
Transportation Systems and Operations Improvement (in-progress), Citywide Central
Attachment A
9
7
8
9
Management and ITS Updates (Ongoing), Citywide Arterial Operations Optimization (on-
going pending staff resources), and Automated Traffic Signal Performance Measure (ATSPM)
implementation (near-future). Each of these projects includes multimodal improvements and
optimization to improve operations and reduce emissions.
Housing Element Implementation / Land Use Planning and Policy
S/CAP Key Action(s): M7, M9
Target Completion Date: 2030
Resource Availability: Funding via grants and
annual City budget process
Description: Implement the goals, policies, and programs in the City's 2023-2031 Housing
Element of the Comprehensive Plan to improve the City's jobs-housing balance and to reduce
vehicle miles traveled (VMT). Implementation will continue creating a housing density and
land use mix that supports transit and non-SOV (Single Occupancy Vehicle) transportation
modes. Implementation includes efforts on land use and area plans, housing plans,
development standards, and affordable housing projects.
Update City’s Traffic Calming Policy and Process
S/CAP Key Action(s): M1, M2
Target Completion Date: End of 2027
Resource Availability: Proceed as staff time
available
Description: Update the City’s Traffic Calming Process to provide more clarity on traffic calming design
details and criteria for consideration in relation to engineering judgment
Status Update on Mobility Work Plan
Climate Action and
Sustainability Committee
November 20, 2025 www.paloalto.gov
2 2Acting Now for A Resilient Future paloalto.gov/ClimateAction
Objectives
•Provide a status update on Mobility goals and key actions
•Share planned and potential 2026-2027 S/CAP Work Plan Mobility
work items
•Seek Committee feedback on the work items
3 3Acting Now for A Resilient Future paloalto.gov/ClimateAction
Status: Mobility Goals and KPIs
•Goal 1: Reduce total vehicle miles traveled (VMT) 12% by
2030, compared to a 2019 baseline.
–Status: At least a 25% reduction 2019 through 2023
•Goal 2: Increase the mode share for active transportation
(walking, biking) and transit from 19% to 40% of local work
trips by 2030
–Status: Mode share remains at about 20%
4 4Acting Now for A Resilient Future paloalto.gov/ClimateAction
Challenges with VMT Measurement
•No access to detailed monitoring of every vehicle entering
and leaving Palo Alto and its origin, destination, and type
–2019: used Valley Transportation Authority (VTA) model
–Since then have relied on Google Environmental Insights Explorer
(EIE) data. 2019 Google EIE estimate lower than VTA model
•Google EIE has not yet published 2024 data, normally
would be published by now
–Has not communicated why, or timeline for release
–Staff exploring alternatives
•This limits our ability to understand how VMT is changing
from 2023 levels and impact on status of our KPIs
5 5Acting Now for A Resilient Future paloalto.gov/ClimateAction
Current OOT Work Items
Long-term VMT Reduction / Mode Shift Short-term VMT Reduction / Mode Shift
•Bike and Ped Plan and Safety Action
Plan implementation
•South Palo Alto Bike and Pedestrian
Connectivity project
•Rail grade separations
•Transit Priority Policy
•Travel Demand Management (TDM)
ordinance development,
implementation, and monitoring
•Safe Routes to School (SRTS) and other bicycle
and pedestrian safety programs
•Near-term bike and pedestrian capital projects
e.g. Churchill Enhanced Bikeway
•Completion of traffic speed surveys and increased
speed enforcement efforts
•Traffic calming projects
•Bike and pedestrian Municipal Code updates
•Pilots and opportunities under study
•Traffic calming policy change
•Parking policy analysis
•Micromobility Feasibility Study
•Palo Alto Link
6 6Acting Now for A Resilient Future paloalto.gov/ClimateAction
2026-2027 S/CAP Work Plan Items
Planned Items
Work Item Description
Bicycle and Pedestrian Capital
Projects Complete three bicycle/pedestrian projects
Implement Micromobility Feasibility
Study recommendations
Pursue a bike/e-bike/e-scooter share pilot program or
recommendations of the Micromobility Feasibility Study
Downtown Parking Pricing and
Management Develop parking policy options for Council consideration
Traffic Signal Upgrades and Timing
Efforts Upgrade traffic signals to optimize multimodal performance
Housing Element Implementation /
Land Use Planning and Policy
Implement the City's 2023-2031 Housing Element of the
Comprehensive Plan to improve the City's jobs-housing balance
7 7Acting Now for A Resilient Future paloalto.gov/ClimateAction
2026-2027 S/CAP Work Plan Items
Potential Additional Items
Work Item Additional FTE / Non-Salary
Advance Downtown Parking Pricing and Management and Traffic
Signal Upgrades and Timing by one year 1 FTE Associate Engineer
Accelerating infrastructure investment 2 FTE Engineer
Launching and operating a Micromobility Program 0.5 FTE Planner and $200,000
Expanding transit service (such as shuttles or Palo Alto Link)$2,000,000 per year
Conduct a Land Use and Transportation Study 0.5 FTE Planner and $300,000
Establish Transportation Demand Management Ordinance (TDM)1 FTE Planner
Adult-Focused Bike, Walk, Transit Education & Encouragement
Programs
0.3 FTE Planner and $600,000
per year