HomeMy WebLinkAboutStaff Report 2507-5009CITY OF PALO ALTO CITY COUNCIL Monday, October 06, 2025 Council Chambers & Hybrid 5:30 PM     Agenda Item     5.Approval of Construction Contract No. C25195264 with Precision Engineering, Inc. in the Amount Not-to-Exceed $6,842,121 and Authorization for the City Manager or Their Designee to Negotiate and Execute Change Orders for Related Additional but Unforeseen Work that May Develop During the Project Up to a Not-to-Exceed Amount of $684,212 for the Hamilton Avenue Capacity Upgrades Project (SD-25000), and Approval of a Budget Amendment in the Stormwater Management Fund; CEQA Status – Exempt under CEQA Guidelines Section 15301(c) City Council Staff Report From: City Manager Report Type: CONSENT CALENDAR Lead Department: Public Works Meeting Date: October 6, 2025 Report #:2507-5009 TITLE Approval of Construction Contract No. C25195264 with Precision Engineering, Inc. in the Amount Not-to-Exceed $6,842,121 and Authorization for the City Manager or Their Designee to Negotiate and Execute Change Orders for Related Additional but Unforeseen Work that May Develop During the Project Up to a Not-to-Exceed Amount of $684,212 for the Hamilton Avenue Capacity Upgrades Project (SD-25000), and Approval of a Budget Amendment in the Stormwater Management Fund; CEQA Status – Exempt under CEQA Guidelines Section 15301(c) RECOMMENDATION Staff recommends that the City Council: 1. Approve and authorize the City Manager or their designee to execute Construction Contract No. C25195264 with Precision Engineering, Inc. in the amount not-to-exceed $6,842,121 for the Hamilton Avenue Capacity Upgrades Project (SD-25000); 2. Authorize the City Manager or their designee to negotiate and execute one or more change orders to the contract with Precision Engineering, Inc. for related additional but unforeseen work that may develop during the project, the total value of which shall not exceed $684,212; and 3. Amend the Fiscal Year 2026 Budget Appropriation for the Stormwater Management Fund (requires a 2/3 vote) by: a. Increasing the expense appropriation for the Hamilton Avenue Capacity Upgrades project (SD-25000) by $625,000; and b. Decreasing the Stormwater Management Fund balance by $625,000. EXECUTIVE SUMMARY Hamilton Avenue from Center Drive to Rhodes Drive is prone to flooding due to an undersized storm drain system. The 2015 Storm Drain Master Plan identified upsizes to the storm system at Hamilton Avenue as a high priority project, and this project is included among the 13 high priority capital projects in the 2017 Stormwater Management ballot measure. The Hamilton Avenue Capacity Upgrades project will install larger storm pipes and manholes to convey the storm runoff from a 10-year storm event. Construction bids were solicited through OpenGov and four bids were received. The construction contract is being awarded to the lowest responsible bidder. A budget amendment in the Stormwater Management Fund is needed to fully fund the contract. BACKGROUND current capacity of the Hamilton Avenue storm drain line is 15-20 cfs, while the new system will have a capacity of 90 cfs. Following the New Year’s Eve 2022 San Francisquito Creek flooding event, staff reprioritized the project to be built sooner, in recognition of its ability to partially mitigate the impacts of any future Creek flooding that may occur before the Reach 2 flood control project is completed. The project includes installing 100 linear feet of 36-inch pipe on Center Drive starting at Hamilton Avenue going towards Dana Avenue. This segment is part of the Center Drive Capacity Upgrades project, another of the projects approved by voters that is currently scheduled for Fiscal Year 2027. The segment was advanced to coordinate with the Office of Transportation’s project to construct new concrete median islands and redesign the traffic circle at the Hamilton Avenue, Southwood Drive and Center Drive intersection. ANALYSIS 1 for the construction of the Hamilton Avenue Capacity Upgrades Project. 1 Precision Engineering, Inc. Hamilton Avenue Capacity Upgrades Project Contract No. C25195264 of curb and gutter, and sidewalk. Solicitation Process On July 25, 2025, an Invitation for Bids (IFB) for the Hamilton Avenue Capacity Upgrades Project was posted on OpenGov. A non-mandatory pre-bid meeting was held on August 4, 2025, within the 21-day bidding period. Nine bidders attended the pre-bid meeting to discuss the project. The invitation for bids was structured to select the lowest bidder using the base bid. Bids were received from four qualified contractors on August 15, 2025, as listed on the attached Bid Summary (Attachment B). Table 1: Summary of Invitation for Bids Project Bid Name / Number Hamilton Avenue Capacity Upgrades Project SD-25000, IFB No. 195264 Proposed Length of Project 10 Months (303 Calendar Days) Pre-Bid Meeting Yes Number of Company Attendees at Pre-Bid Meeting 9 Number of Bids Received 4 Base Bid Price Range $6,842,121 - $13,356,000 Public Link Solicitation https://procurement.opengov.com/portal/palo-alto- ca/projects/186570 FISCAL/RESOURCE IMPACT STAKEHOLDER ENGAGEMENT ENVIRONMENTAL REVIEW ATTACHMENTS APPROVED BY: 5 555 1400 14 LOOF R R 590 O AT 561 4 1408 1 200 573 IL 1 LI 6 NR1418BA 190 1425 587 HO The Cit y of Palo Alto170BAFR EE 593 HO RE W 150 FR 175 W 130 155 190 102 123 160 HA 140 LT 111 100 EAVDENGEWO E 645 475 D O VGEG WEWEOOD DRHA I V 510 LT PAVEN535UE 5 565 515 580 6 575 7 512 N 523 EO 8 I S 51 51 WO1161OD 545 531 AS 524 EHBR1551 754 10 OA 531A 517 0 RIV DAENA D 546 AV 555 539 52 507750525136 670 5 532 508508 1453 54 547 513A14576552229 509538519514 1453 663 5 1253528 5 18 520 15 525 1822PIT1458V E 534 MA NNA KING E 531 526 1832 32A771ESLA18 578 1 1842 705 DA 56 NA 579 AV 55 EN 572 UE 558 735 56582 555 PIT 564 725 550 NA 7 57 56 AL4571AN570NE 53583556CO780567UR77375557538 785 573 562 725 DA 557 541 54588 777 NA 542 AV 579 56EN8 56 553543 5431400781UE69054 723 1668 585 57 545 572 559 LO DE 5UIS682 ARC SA 73ADICO7210 OD 580 54APURRI 586 5VE169E809T 719 700 575 658600 743 70 170 825 717 7 5 581 14 724 614 850 1 57157A 684128 745 1748 N 67132UE 747 742 177 64 711 623 756 749 640 637 709 770 660 IVY784 E 657 798 675 Legend AssessmentParcelPaloAlto920901 Thismapisaproductof NGAssessmentParcelOutsidePaloAltoAVEN940 abc RoadCenterlineSmallText(TC) CurbFace(RF) PavementEdge(RF) 166 290 TUL vthai,2023-10-1111:31:58 HamiltonAvenueCapacityUpgradesProject(SD-25000) IFBPostDate:7/25/2025 IFB195264 IFBDueDate:8/15/2025 BASEBIDSUMMARY LOWESTBIDDER QTY UNIT Engineer'sEstimate PrecisionEngineering,Inc.RangerPipelines Cratus,Inc.AzulWorks,Inc.AVGBID#DESCRIPTION UNITPRICE BIDTOTAL UNITPRICE BIDTOTAL Δ UNITPRICE BIDTOTAL Δ 650,000.00 160% 2,400.00 -76% 145,000.00 45% UNITPRICE BIDTOTAL Δ UNITPRICE BIDTOTAL Δ UNITPRICE 1 MOBILIZATION 1 LS $250,000.00 $250,000.00 $500,000.00 $500,000.00 100% $650,000.00 $$30,000.00 $30,000.00 -88% $650,000.00 $650,000.00 160% $457,500.00 PUBLICNOTIFICATIONANDPOSTING $$$$$ LS $100,000.00 100,000.00 $150,000.00 150,000.00 50% $145,000.00 80,000.00 -20% $640,000.00 150,000.00 0% $540,000.00 640,000.00 540% $253,750.00 SHEETING,SHORINGANDBRACING 145,000.00 -3% $150,000.00 LS $10,000.00 10,000.00 $15,000.00 15,000.00 50% 50,000.00 0% 5,000.00 400% 127,800.00 -68% 5,550.00 -55% 16,000.00 -17% 962,400.00 -8% 395,600.00 -75% $35,000.00 35,000.00 250%$35,000.00 35,000.00 250% 50,000.00 0% 60,000.00 5900% 340,800.00 -15% 20,350.00 64% 19,200.00 0% $50,000.00 50,000.00 400%$33,750.00 UNFORSEENUTILITYALLOWANCE 32,000.00 3100% 621,960.00 56% 111,000.00 792% 105,600.00 450% 1,764,400.00 68% 2,373,600.00 52% 3,231,750.00 67% 65,880.00 0% 852 LF 399,375.00 264,120.00 -34% 336.25 150.00 670.00 550.00 3,000.00 1,092.50 10 INSTALL18-INCHHDPEPIPE 32 LF 600.00 500.00 680.00 600.00 11 INSTALL24-INCHHDPEPIPE 1,604 LF 655.00 $1,050,620.00 600.00 690.00 $1,106,760.00 5% 790.00 $1,562,620.00 0% 1,020.00 $2,126,700.00 10% 700.00 $1,122,800.00 7% 700.00 $1,384,600.00 -11% 1,400.00 $2,919,000.00 51% 12 INSTALL36-INCHHDPEPIPE 200.00 722.50 13 INSTALL48-INCHHDPEPIPE 1,200.00 $2,502,000.00 30%1,292.50 14 VIDEOINSPECTIONOFNEWSDPIPELINE 10.00 6,875.00 13,750.00 13,750.00 13,750.00 27,500.00 27,500.00 22,500.00 6,500.00 8,000.00 10,000.00 133.00 $65,880.00 96,250.00 41,250.00 233,750.00 13,750.00 2.00 20,000.00 15,000.00 15,000.00 7,500.00 $13,176.00 -80% 280,000.00 191% 45,000.00 9% 255,000.00 9% 7,500.00 -45% 4.00 6,000.00 $26,352.00 -60% 84,000.00 -13% 48,000.00 16% 340,000.00 45% 15,000.00 9% 5.00 10,000.00 12,000.00 15,000.00 15,000.00 $32,940.00 -50% 140,000.00 45% 36,000.00 -13% 255,000.00 9% 15,000.00 9% 480,000.00 336% 910,000.00 373% 20,000.00 -11% 10,000.00 54% 30,000.00 275% 60,000.00 500% 6,400.00 -62% 90,800.00 -62% 26,788.00 85% 18,550.00 41% 2,970.00 450% 20,000.00 -23% 10,000.00 100% 10,000.00 900% 7,000.00 -30% 6,000.00 100% 1,200.00 0% 12,000.00 168,000.00 75% 225,000.00 445% 1,292,000.00 453% 76,000.00 453% 12,000.00 16 INSTALLSTANDARDSDMH-CITYSTDDWGNO.312 3 EA 16,000.00 17 EA 1 EA 110,000.00 $100,000.00 400,000.00 264% $120,000.00 480,000.00 336% $120,000.00 304,000.00 176% $104,000.00 192,500.00 $50,000.00 532,000.00 176%$95,500.00 20,000.00 -11% 5,000.00 -23% 25,000.00 213% 60,000.00 500% 12,800.00 -25% 181,600.00 -25% 10,860.00 -25% 5,565.00 -58% 720.00 33% $10,000.00 10,000.00 -56% 5,000.00 -23% 20,000.00 150% 48,000.00 380% 12,160.00 -29% 172,520.00 -29% 10,860.00 -25% 9,275.00 -29% 1,170.00 117% 10,000.00 -62% 8,000.00 60% 5,000.00 400% 7,000.00 -30% 2,400.00 -20% 19,200.00 1500% 960.00 60% $20,000.00 23 INSTALL24-INCHFLAPGATE 24 INSTALL48-INCHCHECKMATEULTRAFLEXINLINECHECKVALVE 25 TYPEACURBANDGUTTER 128 LF 1,816 LF 724 SF 371 SF 18 SF 26 TYPEBCURBANDGUTTER 133.00 100.00 95.00 50.00 76.00 80.25 27 SIDEWALK 20.00 15.00 15.00 37.00 38.00 26.25 28 DRIVEWAY 35.35 15.00 25.00 50.00 72.00 40.50 29 DECORATIVEPAVEMENT 30.00 40.00 65.00 165.00 430.00 175.00 30 CURBRAMP 2 EA 13,000.00 26,000.00 5,000.00 10,000.00 -62%5,000.00 10,000.00 12,000.00 8,000.00 8,250.00 10,250.00 400.00 31 REFLECTIVERUBBERCURBS 32 STREETLIGHTRELOCATION EA 33 TRIMSTREETTREES 20 HRS 34 REMOVEANDREPLACESIGNPOSTWITHSIGNS 3 1,000.00 1,650.00 2,000.00 720.00 1,292.50 12 LF 280.00 36 FLEXIBLEDELINEATORS 50.00 100.00 250.00 3,000.00 400% 84,480.00 32% 140.00 142.50 37 3-INCHACOVER8-INCHPCCOVERLAY 256 TON 250.00 64,000.00 375.00 309.00 79,104.00 24%330.00 280.00 323.50 TOTALSSUMMARY LOWESTBIDDER Engineer'sEstimate PrecisionEngineering,Inc.RangerPipelines Cratus,Inc.AzulWorks,Inc. TotalBaseBid $$6,842,121.00 $$8,488,878.00 $ Total10%Contingency 674,589.72 684,212.10 843,115.10 1,335,600.00 14,691,600.007,420,486.91 7,526,333.10 9,274,266.10 9,337,765.80 OverEngineer'sEstimate:1%25%26%98% 1of1